26
Polson Water Supply Presentation to Polson City Council September 9, 2009

Polson Water Supply Presentation to Polson City Council

Embed Size (px)

DESCRIPTION

Polson Water Supply Presentation to Polson City Council. September 9, 2009. PRESENTERS. Roger Noble, Sr. Hydrogeologist Applied Water Consulting, LLC Tony Porrazzo, Superintendent Polson Water and Sewer Department. WATER SUPPLY SOURCES. Surface Water – Hell Roaring Creek - PowerPoint PPT Presentation

Citation preview

Page 1: Polson Water Supply  Presentation to Polson City Council

Polson Water Supply Presentation to

Polson City Council

September 9, 2009

Page 2: Polson Water Supply  Presentation to Polson City Council

PRESENTERSPRESENTERS

Roger Noble, Sr. HydrogeologistRoger Noble, Sr. Hydrogeologist Applied Water Consulting, LLCApplied Water Consulting, LLC

Tony Porrazzo, SuperintendentTony Porrazzo, Superintendent Polson Water and Sewer Polson Water and Sewer

DepartmentDepartment

Page 3: Polson Water Supply  Presentation to Polson City Council

WATER SUPPLY WATER SUPPLY SOURCESSOURCES

Surface Water – Hell Roaring CreekSurface Water – Hell Roaring Creek

Alluvial AquiferAlluvial Aquifer Groundwater Groundwater Deltaic Deltaic

AquiferAquifer

Bedrock AquiferBedrock Aquifer

Page 4: Polson Water Supply  Presentation to Polson City Council

HISTORY OF VIOLATIONSHISTORY OF VIOLATIONSHELL ROARING CREEKHELL ROARING CREEK

May 16, 1995May 16, 1995 June 16, 1995June 16, 1995 June 20, 1995June 20, 1995 July 28, 1996July 28, 1996 July 31, 1997July 31, 1997 October 22, 1997October 22, 1997

Page 5: Polson Water Supply  Presentation to Polson City Council

Violation of TCR and/or Fecal Violation of TCR and/or Fecal ColiformColiform

EPA Surface Water Treatment RuleEPA Surface Water Treatment Rule

HKM Feasibility Study HKM Feasibility Study

Whitefish uses Haskill CreeksWhitefish uses Haskill Creeks

Upgrade costs ~ $7,000,000Upgrade costs ~ $7,000,000

Page 6: Polson Water Supply  Presentation to Polson City Council

HELL ROARING HELL ROARING WATER RIGHTSWATER RIGHTS

Flow RateFlow Rate VolumeVolume Priority DatePriority Date

900 gpm900 gpm 1,460 ac-ft1,460 ac-ft January January 3, 19223, 1922

1,125 gpm1,125 gpm 1,825 ac-ft1,825 ac-ft September 4, 1947September 4, 1947

(225 gpm)(225 gpm) (365 ac-ft) (365 ac-ft)

Page 7: Polson Water Supply  Presentation to Polson City Council
Page 8: Polson Water Supply  Presentation to Polson City Council
Page 9: Polson Water Supply  Presentation to Polson City Council
Page 10: Polson Water Supply  Presentation to Polson City Council

DepthDepth Production DateProduction DateWell No.Well No. (feet)(feet) Zone (feet)Zone (feet)

ConstructedConstructed 1 1 525 525 251-292 251-292 19691969 22 166 166 150-160 150-160 19601960 33 177 177 152-174 152-174 19761976 44 150 150 128-140 128-140 20002000 55 135 135 113-125 113-125 2000 2000 66 385 385 258-385 258-385 19991999 77 350 350 239-350 239-350 20012001 8*8* 428 428 398-418 398-418 19701970 9*9* 530 530 512-524 512-524 19661966

*Northwest Holdings*Northwest Holdings

Page 11: Polson Water Supply  Presentation to Polson City Council
Page 12: Polson Water Supply  Presentation to Polson City Council
Page 13: Polson Water Supply  Presentation to Polson City Council

WellWell Permitted Permitted Current Current Volume Volume No.No. CapacityCapacity Pumping RatePumping Rate (ac-(ac-

ft)ft) 1 1 450 450 0 0 77 77 22 450 450 400 400 726 726 33 650 650 500 500 246 246 44 500 500 200 200 712 712 55 500 500 100 100 66 500 500 425 425 1,2691,269 77 500 500 425 425 88 250 250 0 0 424 424 99 250 250 0 0

TotalTotal 4,0504,050 2,050 2,050 3,454 3,454

Pumping 24/7/365 = 2,141 gpmPumping 24/7/365 = 2,141 gpm

Page 14: Polson Water Supply  Presentation to Polson City Council
Page 15: Polson Water Supply  Presentation to Polson City Council

Drawdown Well 2 2006

0.0

2.0

4.0

6.0

8.0

10.0

12.0

14.0

16.0

18.0

20.0

1/1/2006 3/1/2006 5/1/2006 7/1/2006 9/1/2006 11/1/2006

Date

Wa

ter

Ab

ov

e T

ran

sd

uc

er

(fe

et)

On

Off

Page 16: Polson Water Supply  Presentation to Polson City Council

Drawdown Well 3 2006

20.0

22.0

24.0

26.0

28.0

30.0

32.0

34.0

36.0

38.0

40.0

1/1/

2006

2/1/

2006

3/1/

2006

4/1/

2006

5/1/

2006

6/1/

2006

7/1/

2006

8/1/

2006

9/1/

2006

10/1

/200

6

11/1

/200

6

12/1

/200

6

Date

Wat

er A

bo

ve T

ran

sdu

cer

(fee

t)OnOff

Page 17: Polson Water Supply  Presentation to Polson City Council
Page 18: Polson Water Supply  Presentation to Polson City Council

Figure 4 - Predicted Affect of Pumping at 400 gom

110.00

115.00

120.00

125.00

130.00

135.00

140.00

0.0 30.0 60.0 90.0

Elapsed Time (minutes)

Wat

er L

evel

BT

OC

(fe

et)

30 gpm60 gpm

SWL = 119.58 btoc

82 gpm

Upper most perfortations at 128.5 feet btoc = maximum potential drawdown

Predicted drawdown at pumping rate of 400 gpm =131.3 feet

Page 19: Polson Water Supply  Presentation to Polson City Council

IRON AND MANGANESE IRON AND MANGANESE LEVELSLEVELS

Well No.Well No. IronIron ManganeseManganese

66 1.271.27 ND ND

77 1.181.18 ND ND

88 0.130.13 0.39 0.39

99 NDND 0.42 0.42

MCLMCL 0.30 mg/L 0.05 0.30 mg/L 0.05 mg/Lmg/L

Page 20: Polson Water Supply  Presentation to Polson City Council
Page 21: Polson Water Supply  Presentation to Polson City Council

Well No.Well No. Water QualityWater Quality

2, 3, 4, & 52, 3, 4, & 5 Excellent; no Fe or Excellent; no Fe or MnMn

6 and 76 and 7 High Iron; treatableHigh Iron; treatable

1, 8, and 91, 8, and 9 High Manganese; High Manganese;

Very expensive to treatVery expensive to treat

Page 22: Polson Water Supply  Presentation to Polson City Council
Page 23: Polson Water Supply  Presentation to Polson City Council

0

50

100

150

200

250

300

350

Gal

lon

s (X

1,0

00,0

00)

Total Gallons Pumped

Total Gallons Billed

2004 2005 2006 2007 2008

Page 24: Polson Water Supply  Presentation to Polson City Council

0

50

100

150

200

250

300

350

Gal

lon

s (X

1,0

00,0

00)

Total Gallons Pumped

Total Gallons Billed

2004 2005 2006 2007 2008

Page 25: Polson Water Supply  Presentation to Polson City Council

0

5

10

15

20

25

30

35

40

45

50

Ga

llo

ns

(X

1,0

00

,00

0)

Total Gallons Pumped

Total Gallons Billed

Aug 2004 Dec Aug 2005 Dec Aug 2006 Dec Aug 2007 Dec Aug 2008 Dec

Page 26: Polson Water Supply  Presentation to Polson City Council

RECOMENDATIONSRECOMENDATIONS

Provide sufficient water supply Provide sufficient water supply to accommodate future to accommodate future growthgrowth

1.1. Drill additional test wells to the Drill additional test wells to the north and west of PWS-3north and west of PWS-3

2.2. Drill test wells along the south shoreDrill test wells along the south shore

3.3. Replace high manganese wellsReplace high manganese wells