4
October 2002 Committed to Excellence Point-to-Point Enhanced Wiring Schematics hComponent info: hPicture hLocation hTheory hAnimation hDiscrete circuits fully linked with all other circuits 9 of 20

Point-to-Point Enhanced Wiring Schematics · October 2002 Committed to Excellence Benefits of MRLN • Improve Readiness • Reduce logistics footprint/burden • Reduce operation

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Point-to-Point Enhanced Wiring Schematics · October 2002 Committed to Excellence Benefits of MRLN • Improve Readiness • Reduce logistics footprint/burden • Reduce operation

October 2002Committed to Excellence

Point-to-Point Enhanced Wiring Schematics

hComponent info:

hPicture

hLocation

hTheory

hAnimation

hDiscrete circuits fully linked with all other circuits

9 of 20

Page 2: Point-to-Point Enhanced Wiring Schematics · October 2002 Committed to Excellence Benefits of MRLN • Improve Readiness • Reduce logistics footprint/burden • Reduce operation

October 2002Committed to Excellence

Forward Support Battalion

What is Maintainer’s Remote Logistics Network (MRLN)?

BTN

MaintenanceCentral

Merge TACOM IETMs with MTS:*Track vehicle location *Diagnose remotely.* Real-time transmission of sensor

readings.*Low bandwidth and secure* Assist in mission planning

National MaintenanceManagement

GCSS-A Logistics Data Network

10 of 20

Builds on TACOM’s Electronic Maintenance System-authored

Interactive Electronic Technical Manuals (IETMs)

Page 3: Point-to-Point Enhanced Wiring Schematics · October 2002 Committed to Excellence Benefits of MRLN • Improve Readiness • Reduce logistics footprint/burden • Reduce operation

October 2002Committed to Excellence

On-Vehicle System

Electronic Control Modules (ECMs)

Electronic Maintenance System (EMS) IETM

interprets and evaluates readings

Electronic Analog or Digital System (EAS/EDS)

captures signals

Movement Tracking System (MTS)

transmits information

ENGINE

CTIS

OTHER

ABS

TRANS

11 of 20

Page 4: Point-to-Point Enhanced Wiring Schematics · October 2002 Committed to Excellence Benefits of MRLN • Improve Readiness • Reduce logistics footprint/burden • Reduce operation

October 2002Committed to Excellence

Benefits of MRLN

• Improve Readiness• Reduce logistics footprint/burden• Reduce operation & support costs• Real-time awareness of vehicle/fleet health and

location

• Immediate intervention via remote troubleshooting and diagnostics

• Collection of all maintenance actions for trend analysis and development of prognostics

• Efficient use of tailored maintenance packages• Enhanced deployment

LogisticsEnabler for ArmyTransformation

12 of 20