Upload
lethuy
View
224
Download
0
Embed Size (px)
Citation preview
The Enclosed Document Is Provided For Your Convenience.
Please Email ALL Questions:MailTo:[email protected]
Please Let Us Know If You Plan To Bid
City of TampaContract Administration Department
306 E. Jackson St. #280A4N Tampa, FL 33602
(813)274-8456
DEPARTMENT OF TRANSPORTATION
CONTRACT PLANS
NO.
SHEET
YEAR
FISCAL
3:30:47 PM Y:\13-05-1893 RFP 13 D 000027 4 Walk Bike Projs Design Willow Av\43271710000\roadway\KEYSRD01.DGNaepperson 3/9/2017
1 17
INDEX OF ROADWAY PLANS
BEE LINEEXPRESSWAY
FLO
RID
A S
TU
RNPIK
E
10
PENSACOLA FORT WALTON
BEACH
PANAMACITY
CHIPLEY
TALLAHASSEE
75
10
295
95
JACKSONVILLE
ST AUGUSTINE
GAINESVILLE
OCALA DAYTONA BEACH
DELAND4
NEW PORT RICHEY
TAMPA
754
LAKELAND
MELBOURNE -COCOA
ORLANDO
BARTOWST PETERSBURG
275
SARASOTA -
BRADENTON
75
95
FT PIERCE
FT MYERS
WEST PALM
BEACH
FT LAUDERDALE
MIAMI
75
75
NAPLES
KEY WEST
CITY
LAKE
N
CITY OF TAMPA
STA. 10+20.00
BEGIN PROJECT
STA. 81+57.00
END PROJECT
BIKE LANE/SIDEWALK PROJECT
15 - 20
14
8 - 13
7
6
5
3 - 4
2
1
SHEET NO.
UTILITY ADJUSTMENTS
SPECIAL DETAILS
ROADWAY PLAN
GENERAL NOTES
PROJECT LAYOUT
SUMMARY OF QUANTITIES
TYPICAL SECTION
SUMMARY OF PAY ITEMS
KEY SHEET
SHEET DESCRIPTION
SIGNALIZATION PLANS
SIGNING AND PAVEMENT MARKINGS
ROADWAY PLANS
FIN
AL P
LA
NS S
UB
MIT
TA
L -
03/10/17
CONTRACT PLANS COMPONETS
(FEDERAL FUNDS)
FINANCIAL PROJECT ID: 432717-1-58-01
CITY OF TAMPA PROJECT ID 1000260
WILLOW AVENUE FROM SWANN AVENUE TO MAIN STREET
CERTIFICATE OF AUTHORIZATION NO.: 30268
VENDOR NO.: 46-1885050
CONTRACT NO.: 13-05-1893
(813) 289-7771
TAMPA, FL 33607
2709 N. ROCKY POINT DR., SUITE 104
SAM SCHWARTZ ENGINEERING, D.P.C., PA
GREGORY S. TRIM, P.E. NO.: 52935
GEC PROJECT MANGER:
PROJECT MANAGER:
CITY OF TAMPA
ENGINEER OF RECORD:
ROADWAY PLANS
CHRIS MEARES, P.E.
NINA S. MABILLEAU, E.I.GOVERNING DESIGN STANDARDS:
GOVERNING STANDARD SPECIFICATIONS:
http://www.fdot.gov/roadway/DesignStandards/Standards.shtm
and applicable Design Standards Revisions (DSRs) at the following website:
Florida Department of Transportation, FY2016-17 Design Standards eBook (DSeB)
http://www.fdot.gov/programmanagement/Implemented/SpecBooks
at the following website:
and III Standard Specifications for Road and Bridge Construction
City of Tampa and Florida Department of Transportation, January 2017 Division II
LOCATION OF PROJECT
ITEM NO.
PAY
DESCRIPTION UNIT QUANTITY
SIGNING & PAVT. MARKING PAY ITEMS
ITEM NO.
PAY
DESCRIPTION UNIT QUANTITY
ROADWAY PAY ITEMS
PAY ITEM NOTES:
ITEM NO.
PAY
DESCRIPTION UNIT QUANTITY
UTILITY PAY ITEMS
101-1 MOBILIZATION LS 1
104-18 EA 3
110-1-1 CLEARING AND GRUBBING AC
400-0-11 CY
522-1 CONC. SIDEWALK, 4" THICK SY 979
522 2 CONC. SIDEWALK, 6" THICK SY 258
527-2 DETECTABLE WARNINGS SF 237
570-1-2 PERFORMANCE TURF, SOD SY
TN
9910W EA 2
3/13/2017aepperson Y:\13-05-1893 RFP 13 D 000027 4 Walk Bike Projs Design Willow Av\43271710000\roadway\CESSRD01.DGN1:02:54 PM
2 1000260
DATE DESCRIPTION
REVISIONS
DATE DESCRIPTIONNO.
SHEET
SUMMARY OF PAY ITEMS
CITY OF TAMPA
TRANSPORTATION DEPARTMENT
GREGORY S. TRIM, P.E.
2709 N. ROCKY POINT DR., SUITE 104
P.E. LICENSE NUMBER 52935
SAM SCHWARTZ ENGINEERING
TAMPA, FL 33607
CERTIFICATE OF AUTHORIZATION 30268
CITY PROJECT IDFINANICAL PROJECT ID
432717-1-58-01
700-1-11 SINGLE POST SIGN, F&I GROUND MOUNT, UP TO 12 SF AS
700-1-50 AS 4
700-1-60 AS 8
706-3
1
EA
711-11-123 LF 1111
711-11-124 LF 241
711-11-160 EA 12
711-11-170 THERMOPLASTIC, STANDARD, WHITE, ARROWS EA 10
711-11-141 GM
711-14-160 EA 37
711-14-170 EA 8
711-16-101 THERMOPLASTIC, STD - OTHER SURFACES, WHITE, SOLID, 6" GM 0.361
711-16-102 THERMOPLASTIC, STD - OTHER SURFACES, WHITE, SOLID, 8" GM 0.110
711-16-201 THERMOPLASTIC, STD - OTHER SURFACES, YELLOW, SOLID, 6" GM 0.579
711-16-133 GM 0.040
SY 3486327-70-6 MILLING EXIST. ASPH. PAVT., 1 1/2" AVG. DEPTH
0.17
337-7-81
CONCRETE CLASS NS, GRAVITY WALL
296
20
102-1 MAINTENANCE OF TRAFFIC LS 1
INLET PROTECTION SYSTEM
LF104-10-3 SEDIMENT BARRIER
SIGN PANEL, F&I OVERHEAD MOUNT, UP TO 12 SF EA
EA
2700-3-201
700-3-501 SIGN PANEL, RELOCATE, UP TO 12 SF
711-11-125 LF 202THERMOPLASTIC, STD., WHITE, SOLID, 24"
THERMOPLASTIC, STANDARD, WHITE, MESSAGES
0.081
711-14-125 LFTHERMOPLASTIC, PREFORMED, WHITE, SOLID, 24" 1121
THERMOPLASTIC, PREFORMED, WHITE, MESSAGES
THERMOPLASTIC, PREFORMED, WHITE, ARROWS
SF711-17 THERMOPLASTIC, REMOVE EXISTING PAVEMENT MARKINGS 536
EA 8
ITEM NO.
PAY
DESCRIPTION UNIT QUANTITY
630-2-11 LF
650-1-14 AS 3
650-1-70 AS 2
1
EA 1
EA
670-5-110 AS
630-2-12 LF
AS
AS
3660-2-101
660-2-106
670-5-600 ASTRAFFIC CONTROLLER - ASSEMBLY, REMOVE
SIGNALIZATION PAY ITEMS
CONDUIT, F&I, OPEN TRENCH, UNDERGROUND
CONDUIT, F&I, DIRECTIONAL BORE
TRAFFIC SIGNAL, F&I, ALUMINUM, 3-SECTION/1-WAY
TRAFFIC SIGNAL, RELOCATE
LOOP ASSEMBLY - F&I, TYPE A
LOOP ASSEMBLY - F&I, TYPE F
660-3-11
660-3-12
VEH. DETECTION SYSTEM, MICROWAVE, F&I, CABINET SYSTEM
VEH. DETECTION SYSTEM, MICROWAVE, F&I, ABOVE GROUND EQUIP. 1
TRAFFIC CONTROLLER - ASSEMBLY, F&I, NEMA 1
1
520-3 LF 58
872
LF 55520-1-10 CONCRETE CURB & GUTTER, TYPE F
646-1-60 EA 2
665-1-11
665-1-40
EA
EA
9
2
PEDESTRIAN DETECTOR, F&I, STANDARD
PEDESTRIAN DETECTOR, RELOCATE
670-5-500 TRAFFIC CONTROLLER - ASSEMBLY, RELOC. CONTROLLER W/CABINET AS 1
520-70 SYCONC. TRAF. SEP., SPECIAL - VARIABLE WIDTH 29.3
127
358
635-2-11 EAPULL BOX, F&I, 13x24 13
646-1-11 EA 9ALUMINUM SIGNALS POLE, PEDESTAL
ALUMINUM SIGNALS POLE, REMOVE
653-1-11 AS 8
653-1-40 AS 1
653-1-60 AS 2
PEDESTRIAN SIGNAL, F&I, LED COUNTDOWN, 1-WAY
PEDESTRIAN SIGNAL, RELOCATE
PEDESTRIAN SIGNAL, REMOVE
SY 7.3110-4 REMOVAL OF EXIST. CONC. PAVEMENT
700-1-12 AS 2SINGLE POST SIGN, F&I GROUND MOUNT, 12-20 SF
665-1-60 EA 4PEDESTRIAN DETECTOR, REMOVE
21
670-5-400 AS 1TRAFFIC CONTROLLER - ASSEMBLY, MODIFY
650-1-60 AS 1TRAFFIC SIGNAL, REMOVE
711-12-123 LFTHERMOPLASTIC, REFURBISHMENT, WHITE, SOLID, 12"
711-12-125 THERMOPLASTIC, REFURBISHMENT, WHITE, SOLID, 24" LF
166
103
THERMOPLASTIC, STD., WHITE, SOLID, 12"
THERMOPLASTIC, STD., WHITE, SOLID, 18"
ADJUST VALVE BOX TOP (HEIGHT)
ADJUST WATER METER BOX8100W
102-14 HR 32TRAFFIC CONTROL OFFICER
VALLEY GUTTER - CONCRETE
LF520-2-4 CONCRETE CURB, TYPE D 588
LF550-10-248 FENCING, TYPE B, 7.1'-8', RESET EXISTING 32
ASPHALTIC CONCRETE FRICTION COURSE, TRAFFIC B, FC-12.5, PG76-22
THERMOPLASTIC, STD. - OTHER SURFACES, WHITE, SKIP, 12" (3/9) LANE DROP
632-7-2 LF 632
639-2-1 LF
SIGNAL CABLE - REPAIR/REPLACE/OTHER, F&I
20ELECTRICAL SIGNAL CABLE, F&I
140
RETRO REFLECTIVE PAVEMENT MARKERS
SINGLE POST SIGN, RELOCATE
SINGLE POST SIGN, REMOVE
THERMOPLASTIC, STD., WHITE, 2'-4' DOT GUIDE, 6"120-71 LS
160-4 SY 258
SY 234
TYPE B STABILIZATION
285-706 OPTIONAL BASE, BASE GROUP 6
INCLUDES COST OF TRAFFIC CONTROLLER PAD. 5. 670-5-500:
SHALL INCLUDE THE COST OF ANY EXCAVATION NEEDED FOR DRIVEWAY CONSTRUCTION.4. 522-2:
INCLUDES COST TO REMOVE & RESET ROADWAY BRICKS.3. 520-3:
IN THE BID PRICE OF THE GRAVITY WALL. OF THE GRAVITY WALL. ALL COSTS FOR THE PROTECTION OF SLOPES SHALL BE INCLUDED THE CONTRACTOR SHALL PROTECT THE EXISTING ADJACENT SLOPES DURING CONSTRUCTION2. 400-0-11:
(SEE TYPICAL SECTION (2) FOR LOCATIONS) AND RELOCATING MAIL BOXES. INCLUDES THE COST OF REMOVING 68 SY OF EXISTING GRAVITY WALLS1. 110-1-1:
REGULAR EXCAVATION - (3R PROJECT ONLY) 1
439
653-1-12 PEDESTRIAN SIGNAL, F&I, LED COUNTDOWN, 2-WAY AS 1
3/9/2017aepperson Y:\13-05-1893 RFP 13 D 000027 4 Walk Bike Projs Design Willow Av\43271710000\roadway\TYPSRD01.DGN3:30:49 PM
3 1000260
DATE DESCRIPTION
REVISIONS
DATE DESCRIPTIONNO.
SHEET
TYPICAL SECTION (1)
CITY OF TAMPA
TRANSPORTATION DEPARTMENT
GREGORY S. TRIM, P.E.
2709 N. ROCKY POINT DR., SUITE 104
P.E. LICENSE NUMBER 52935
SAM SCHWARTZ ENGINEERING
TAMPA, FL 33607
CERTIFICATE OF AUTHORIZATION 30268
CITY PROJECT IDFINANICAL PROJECT ID
432717-1-58-01
5' 5'
EXISTINGMATCH
EXISTING
MATCH
LANEBIKE
LANEBIKE
11'
¡ SurveyExist. LA R/W LineExist. LA R/W Line
10' 10' 10' 11'
LA R/W (VARIES) LA R/W (VARIES)
4' 4'
LANEBIKE
LANEBIKE
11'
¡ Survey
11'
Exist. R/W Line Exist. R/W Line
R/W (VARIES) R/W (VARIES)
CONSTANT DEPTH MILLING AND RESURFACING
MILLING
RESURFACING
W. PLATT ST. TO CLEVELAND ST.
¡ SurveyExist. R/W Line
Exist. R/W Line
R/W (VARIES) R/W (VARIES)
ON-STREET
PARKING
ON-STREET
PARKING
GroundNatural
GroundNatural
¡ SurveyExist. R/W Line
Exist. R/W Line
R/W (VARIES) R/W (VARIES)
ON-STREET
PARKING
ON-STREET
PARKING
Exist. SW Exist. SW
GroundNatural
GroundNatural
Exist. SW Exist. SWGroundNatural
Exist. SW
GroundNatural
Exist. SW
GroundNatural
Exist. SW
GroundNatural
Exist. SW
TRAFFIC DATA
DESIGN SPEED = 30 MPH
DESIGN HOUR T = 3%
K = 9% D = 50% T = 2% (24 HOUR)
ESTIMATED DESIGN YEAR = 2036 AADT = 13,200
ESTIMATED OPENING YEAR = 2016 AADT = 10,730
CURRENT YEAR = 2015 AADT = 10,620
MILL EXISTING ASPHALT PAVEMENT (1.5" DEPTH)
STA. 26+37.30 TO STA. 31+15.53
W. PLATT ST. TO CLEVELAND ST.
TYPICAL SECTION
STA. 10+20.00 TO STA. 26+37.30
W. SWANN AVE. TO W. PLATT ST.
TYPICAL SECTION
STA. 31+15.53 TO STA. 36+60.00
CLEVELAND ST. TO W. JOHN F. KENNEDY BLVD.
TYPICAL SECTION
INTERSTATE 275 TO W. MAIN ST. - STA. 75+63.00 TO STA. 81+57.00
W. ARCH ST. TO W. LA SALLE ST. - STA. 71+07.00 TO STA. 74+00.00
W. CYPRESS ST. TO W. NASSAU ST. - STA. 63+35.16 TO STA. 68+72.00
W. JOHN F. KENNEDY BLVD. TO W. CASS ST. STA. 36+60.00 TO STA. 55+50.00
TYPICAL SECTION
15' 15'
20' 20'
INTERMITTENT INTERMITTENT
FRICTION COURSE (TRAFFIC B, FC-12.5, PG76-22) (1.5")
Ground
Natural
¡ Survey
GroundNatural
Exist. SW
Exist. R/W LineExist. R/W Line
PROP.
6' SW
ON-STREET
PARKING
ON-STREET
PARKING
3/9/2017aepperson Y:\13-05-1893 RFP 13 D 000027 4 Walk Bike Projs Design Willow Av\43271710000\roadway\TYPSRD01.DGN3:30:50 PM
4 1000260
DATE DESCRIPTION
REVISIONS
DATE DESCRIPTIONNO.
SHEET
TYPICAL SECTION (2)
CITY OF TAMPA
TRANSPORTATION DEPARTMENT
GREGORY S. TRIM, P.E.
2709 N. ROCKY POINT DR., SUITE 104
P.E. LICENSE NUMBER 52935
SAM SCHWARTZ ENGINEERING
TAMPA, FL 33607
CERTIFICATE OF AUTHORIZATION 30268
CITY PROJECT IDFINANICAL PROJECT ID
432717-1-58-01
¡ SurveyExist. R/W Line
Exist. R/W Line
PROP.
6' SW
ON-STREET
PARKING
ON-STREET
PARKING
Exist. SW
GroundNatural
¡ SurveyExist. R/W Line
Exist. R/W Line
PROP.
ON-STREET
PARKING
ON-STREET
PARKING
Exist. SW
GroundNatural
6' SW
INDEX NO. 304PROP. SW CURB
SEDIMENT BARRIER
SEDIMENT BARRIER
30' R/W 30' R/W
20' 20'
CLEARING & GRUBBING
SOD3.5'
CLEARING & GRUBBING
SOD3.5'
30' R/W 30' R/W
20' 20'
STA. 74+00.88 TO STA. 75+62.32
W. LA SALLE ST. TO I-275 OVERPASS
TYPICAL SECTION
CLEARING & GRUBBING
SOD3.5'
STA. 70+13 TO STA. 70+93 REMOVE EXIST. GRAVITY WALL
30' R/W 30' R/W
20' 20'
STA. 68+72.96 TO STA. 71+06.22
W. NASSAU ST. TO W. ARCH ST.
TYPICAL SECTION
STA. 55+50.00 TO STA. 63+35.16
W. CASS ST. TO W. CYPRESS ST.
TYPICAL SECTION
Exist. Granite Curb
STA. 62+94 TO STA. 63+01STA. 61+37 TO STA. 61+75STA. 61+04 TO STA. 61+10REMOVE EXIST. GRAVITY WALL
(AS SHOWN ON PLANS) INDEX NO. 6011OR GRAVITY WALL(B.C.) INDEX NO. 304 PROP. SW BACK OF CURB
CONCRETE SIDEWALK, 4"
Exist. Granite Curb
CONCRETE SIDWALK, 4"
(MAX)2%
(MAX)
2%
SEDIMENT BARRIER
(MAX)
2%
3/9/2017aepperson Y:\13-05-1893 RFP 13 D 000027 4 Walk Bike Projs Design Willow Av\43271710000\roadway\SUMQRD01.DGN3:30:50 PM
5 1000260
DATE DESCRIPTION
REVISIONS
DATE DESCRIPTIONNO.
SHEET
SUMMARY OF QUANTITIES
CITY OF TAMPA
TRANSPORTATION DEPARTMENT
GREGORY S. TRIM, P.E.
2709 N. ROCKY POINT DR., SUITE 104
P.E. LICENSE NUMBER 52935
SAM SCHWARTZ ENGINEERING
TAMPA, FL 33607
CERTIFICATE OF AUTHORIZATION 30268
CITY PROJECT IDFINANICAL PROJECT ID
432717-1-58-01
SUMMARY OF CURB RAMPS
NO.
CURB RAMPOFFSET
CR-E 36.40' LT.
CR-F 23.59' LT.
CR-F 24.04' RT.
CR-G 22.48' RT.
CR-F 23.50' LT.
CR-G 28.97' RT.
24.42' LT.
23.29' RT.
23.77' RT.
24.25' LT.
24.09' LT.
26.03' LT.
CR-L
CR-G
CR-G
CR-G
CR-G
STATION TO STATION OFFSET
RT.
LT.
LT.
LT.
TOTAL
SUMMARY OF PROP. 6' CONC. SW
STATION TO STATION
56+51.11 TO 57+01.23
57+37.85 TO 58+22.20
58+22.20 TO 58+45.25
OFFSETSTATION TO STATION
31.41' RT. (BK. OF SW)
SUMMARY OF EXIST. 6' SW CONC. TO BE REPLACED
DEPTH
CONC.
58+45.25 TO 58+93.39
59+77.05 TO 60+38.94
60+57.01 TO 61+17.19
61+16.24 TO 61+30.13
61+29.19 TO 61+86.07
61+71.78 TO 61+90.54
68+83.54 TO 69+86.07
69+84.88 TO 69+95.42
57+01.23 TO 57+37.85
60+38.94 TO 60+57.95
61+89.60 TO 63+11.50
74+14.70 TO 75+62.32
6" CONC. DRWY.
6" CONC. DRWY.
6" CONC. DRWY.
6" CONC. DRWY.
6" CONC. DRWY.
6" CONC. DRWY.
6" CONC. DRWY.
6" CONC. DRWY.
4" CONC. SW
4" CONC. SW
4" CONC. SW
4" CONC. SW
4" CONC. SW
4" CONC. SW
4" CONC. SW
4" CONC. SW
4" CONC. SW
4" CONC. SW
OFFSET LOCATION
37.77' BK. OF PROP. SW LT.
25.41'/31.05' BK. OF PROP. SW RT.
SW AT BK. OF EXIST. CURB RT.
SW AT BK. OF EXIST. CURB RT.
SW AT BK. OF EXIST. CURB RT.
SW AT BK. OF EXIST. CURB RT.
SW AT BK. OF EXIST. CURB RT.
SW AT BK. OF EXIST. CURB RT.
SW AT BK. OF EXIST. CURB RT.
SW AT BK. OF EXIST. CURB RT.
SW AT BK. OF EXIST. CURB RT.
SW AT BK. OF EXIST. CURB RT.
SW AT BK. OF EXIST. CURB RT.
SW AT BK. OF EXIST. CURB RT.
SW AT BK. OF EXIST. CURB LT.
SW AT BK. OF EXIST. CURB LT.
SW AT BK. OF EXIST. CURB LT.
SW AT BK. OF EXIST. CURB LT.
69+94.24 TO 70+95.12
SUMMARY OF REPLACEMENT SOD
49+65.49 - 49+84.50
51+86.33 CR-F RT.
21.15' RT.
29.38' RT.CR-H (MOD)
CR-H (MOD)
(CROSS STREET)
STATION
AREA (SY)
STA. 55+26.20 (CASS ST.)
STA. 56+34.85 (CASS ST.)
STA. 55+06.99 (CASS ST.)
STA. 59+10.26 (LEMON ST.)
STA. 59+62.38 (LEMON ST.)
STA. 62+93.52 (CYPRESS ST.)
STA. 68+74.54 (NASSAU ST.)
STA. 71+04.29 (ARCH ST.)
STA. 74+01.68 (LA SALLE ST.)
6.9
8.2
8.1
6.0
8.2
16.1
11.3
7.3
5.8
15.9
TOTAL 261.6
48+55.87 TO 49+82.87 (FIG ST. - GRAY ST.)
49+68.46 TO 49+74.46 (GRAY ST. - SOUTH)
50+24.22 TO 50+71.78 (GRAY ST. - NORTH)
52+88.72 TO 53+87.10 (CARMEN ST. - NORTH)
53+60.00 TO 53+67.14 (CARMENT ST. - NORTH)
84.7
4.0
31.7
65.6
4.8
190.80
AREA (SY.)
4" 6"
6.7
32.3
59.6
44.4
38.5
29.6
27.5
19.8
33.5
57.7
31.6
43.3
39.7
30.8
57.4
68.8
66.3
97.3
TOTAL 526.4 258.4
AREA (SY)
6.2
5.7
438.8TOTAL
48+52.87 - 49+85.87
50+16.30 - 50+74.78
SW (BK.) LT.
52+15.92 CR-G RT.
CR-F LT.
CR-G RT.
61+30.77 - 61+78.02
60+58.60 - 61+15.59
61+91.36 - 62+93.52
SW (BK.) RT.
52+80.80 - 53+87.10
57+44.01 - 58+21.85 SW (BK.) RT.
58+46.03 - 59+10.26
59+62.38 - 60+38.29 CR-G, SW (BK.) RT.
SW (BK.) RT.
SW (BK.), CR-K (MOD) RT.
68+74.54 - 69+84.88 CR-G, SW (BK.) LT.
69+95.35 - 71+04.29 SW (BK.), CR-G LT.
74+01.68 - 75+62.32 CR-H (MOD), SW (BK.) LT.
44.3
12.4
38.2
70.1
24.5
22.0
25.3
15.2
13.5
33.4
35.4
43.8
48.8
CR-E, SW (FRONT & BK.) LT.
CR-F, SW (FRONT & BK.) LT.
CURB RAMP OR EXIST. 6' SW TO BE REPLACED. * SOD QUANTITIES ESTIMATED AT A 3' OFFSET AROUND PERIMETER OF
STA. 49+84.50 (GRAY ST.)*
STA. 50+16.30 (GRAY ST.)*
STA. 51+86.33 (CARMEN ST.)*
STA. 52+15.92 (CARMEN ST.)*
STA. 52+80.80 (CARMEN ST.)*
IN THIS SET OF PLANS. MEASURED AND SET. NO SURVEY IS AVAILABLE AND NO DRAWINGS ARE PROVIDED EXIST. SIDEWALK REMOVAL AT FIG ST., GRAY ST., AND CARMEN ST. WERE FIELD
48+56.37 TO 48+66.37*
53+04.84 TO 53+52.84*
ARE PROVIDED IN THIS SET OF PLANS.* PROP. SW LOCATIONS FIELD MEASURED AND SET. NO SURVEY IS AVAILABLE AND NO DRAWINGS
CR-L STA. 55+64.04 (CASS ST.) 22.52' LT. 47.3
12.0
CR-C
CR-C STA. 63+09.90 (CYPRESS ST.) 40.28' RT. 8.6
18.5
CR-C STA. 63+58.39 (CYPRESS ST.) 40.37' RT. 17.8
4"
AREA (SY)
STA. 55+05.44 (CASS ST.) 20.28' RT.CR-A (MOD) 20.8
20.8
10
* BAHIA SOD SHALL BE USED TO REPAIR AREAS DISTURBED BY CONSTRUCTION.
ACCEPTANCE.* SOD TO BE TRUCK WATERED FOR ESTABLISHMENT PERIOD OF 90-DAYS AFTER
28.00' LT. 12.0CR-L STA. 81+50.00 (MAIN ST.)
AND REPLACED WITH TYPE D CONCRETE CURB. EXISTING GRANITE CURB AT PROPOSED RAMP CONSTRUCTION TO BE REMOVED NO SURVEY IS AVAILABLE AND NO DRAWINGS ARE PROVIDED IN THIS SET OF PLANS.* CURB RAMPS AT GRAY ST. AND CARMEN ST. WERE FIELD MEASURED AND SET.
SUMMARY OF EROSION AND SEDIMENT CONTROL DEVICES
LOCATION
SIDEBARRIER
SEDIMENT
REMARKSREFERENCE
FIELD BOOK
STA. TO STA.LF
P F
56+31.18 TO 56+99.53 RT. 71
57+17.14 TO 57+25.86 RT. 8
57+38.71 TO 58+20.30 RT. 82
58+48.37 TO 59+11.37 RT. 63
59+61.37 TO 60+36.18 RT. 75
60+60.16 TO 61+14.02 RT. 54
61+32.30 TO 61+76.37 RT. 44
61+92.92 TO 63+01.45 RT. 126 (INCL. SIDESTREET)
68+87.05 TO 69+82.44 LT. 106 (INCL. SIDESTREET)
69+96.36 TO 70+91.45 LT. 103 (INCL. SIDESTREET)
74+15.47 TO 75+10.43 LT. 101 (INCL. SIDESTREET)
75+24.43 TO 75+63.28 LT. 39
TOTAL: 872
SUMMARY OF PERMANENT BARRIER WALL
NO.
PAY ITEMPAY ITEM DESCRIPTION
LOCATIONSIDE UNIT
QUANTITY TOTAL
NOTES
DESIGN
REMARKS
CONSTRUCTION
STA. TO STA. P F P F
400-011 CONCRETE CLASS NS, GRAVITY WALL 62+70.73 TO 63+00.52 RT CY 4.3 4 1.75' AVERAGE HEIGHT
62+21.78 TO 62+70.73 RT CY 5.5 1.5' AVERAGE HEIGHT
61+97.86 TO 62+21.78 RT CY 2.5 1.25' AVERAGE HEIGHT
61+37.25 TO 61+71.78 RT CY 3.8 1.5' AVERAGE HEIGHT
60+89.49 TO 61+09.61 RT CY 2.0 1.25' AVERAGE HEIGHT
60+65.37 TO 60+89.49 RT CY 1.9 1.0' AVERAGE HEIGHT
TOTAL 20.0
10 20
PI S
TA.
25
+19.1
2
30
PI S
TA.
31
+37.3
3
40 50
PI S
TA.
54
+70.0
6
60
PI S
TA.
63
+35.1
6
PI S
TA.
68
+44.8
4
70
PI S
TA.
76
+71.7
7
80
3/9/2017aepperson Y:\13-05-1893 RFP 13 D 000027 4 Walk Bike Projs Design Willow Av\43271710000\roadway\PLAYRD01.DGN3:30:51 PM
6 1000260
DATE DESCRIPTION
REVISIONS
DATE DESCRIPTIONNO.
SHEET
PROJECT LAYOUT
CITY OF TAMPA
TRANSPORTATION DEPARTMENT
GREGORY S. TRIM, P.E.
2709 N. ROCKY POINT DR., SUITE 104
P.E. LICENSE NUMBER 52935
SAM SCHWARTZ ENGINEERING
TAMPA, FL 33607
CERTIFICATE OF AUTHORIZATION 30268
CITY PROJECT IDFINANICAL PROJECT ID
432717-1-58-01
N
N. WILLOW AVENUE
W.
SW
AN
N
AV
E.
W.
DE LE
ON S
T.
W.
HO
RA
TIO S
T.
W.
PL
AT
T S
T.
CLE
VE
LA
ND S
T.
W. J
OH
N F.
KE
NN
ED
Y B
LV
D.
W.
FU
LLE
R S
T.
W.
NO
RT
H
A S
T.
W.
NO
RT
H
A S
T.
W.
NO
RT
H B S
T.
W.
FIG S
T.
W.
FIG S
T.
W.
GR
AY S
T.
W.
CA
RM
EN S
T.
W.
CA
RM
EN S
T.
W.
CA
SS S
T.
W.
CA
SS S
T.
W.
LE
MO
N S
T.
W.
CYP
RE
SS S
T.
W.
GR
AC
E S
T.
W.
NA
SS
AU S
T.
W.
AR
CH S
T.
W.
LA S
ALLE S
T.
W.
GR
EE
N S
T.
W.
MAIN S
T.
W.
SW
AN
N
AV
E.
W.
PL
AT
T S
T.
1 2
3 4 5 6
STA. 76+71.77 AND W. MAIN ST.
W. CYPRESS ST. AND W. NASSAU ST.
CLEVELAND ST. AND W. CASS ST.
W. SWANN AVE. AND W. PLATT ST.
NO SURVEY BETWEEN
N 0°44'59" E N 00°34'05" E
¡ Survey
N 00°50'07" E N 00°48'41" E N 00°54'16" E
W.
GR
AC
E S
T.
N 00°48'44" E N 00°52'51" E
W.
GR
EE
N S
T.
W.
LE
MO
N S
T.
W.
CYP
RE
SS S
T.
STA. 81+57.00
END PROJECT
STA. 10+20.00
BEGIN PROJECT
IN
TE
RS
TA
TE 275
OV
ER
PA
SS
STA. 26+37.30
RESURFACING
BEG. MILLING AND
STA. 31+15.53
RESURFACING
END MILLING ANDE. 503586.11
N. 1311907.36
ELEV. 17.15
35.4' RT.
STA. 26+94.70,
NAIL & DISK
BENCHMARK 1
E. 503585.73
N. 1312374.43
ELEV. 15.15
30.3' RT.
STA. 31+61.89,
NAIL & DISK
BENCHMARK 2
E. 503564.07
N. 1314782.31
ELEV. 17.33
26.5' LT.
STA. 55+69.21,
NAIL & DISK
BENCHMARK 3
E. 503621.33
N. 1315170.30
ELEV. 15.33
25.3' RT.
STA. 59+57.95,
NAIL & DISK
BENCHMARK 4
E. 503579.55
N. 1315579.86
ELEV. 14.32
22.4' LT.
STA. 63+66.86,
NAIL & DISK
BENCHMARK 5
E. 503631.12
N. 1316044.75
ELEV. 15.86
21.9' RT.
STA. 68+32.51,
NAIL & DISK
BENCHMARK 6
E. 503639.65
N. 1316628.88
ELEV. 17.76
22.1' RT.
STA. 74+16.67,
NAIL & DISK
BENCHMARK 7
PROJECT NOTES
3/9/2017aepperson Y:\13-05-1893 RFP 13 D 000027 4 Walk Bike Projs Design Willow Av\43271710000\roadway\GNNTRD01.DGN3:30:51 PM
7 1000260
DATE DESCRIPTION
REVISIONS
DATE DESCRIPTIONNO.
SHEET
GENERAL NOTES
CITY OF TAMPA
TRANSPORTATION DEPARTMENT
GREGORY S. TRIM, P.E.
2709 N. ROCKY POINT DR., SUITE 104
P.E. LICENSE NUMBER 52935
SAM SCHWARTZ ENGINEERING
TAMPA, FL 33607
CERTIFICATE OF AUTHORIZATION 30268
CITY PROJECT IDFINANICAL PROJECT ID
432717-1-58-01
TEMPORARY TRAFFIC CONTROL PLAN GENERAL NOTES
CONSTRUCTION NOTES
TEMPORARY TRAFFIC CONTROL PLAN PHASE NOTES
TREE EQUIVALENCY TABLE TREE EQUIVALENCY TABLE
CURB SHALL BE CONSIDERED INCIDENTAL TO THE COST FOR CONCRETE CURB CONSTRUCTION.
TAMPA, FL 33605 (CONTACT PETE BRETT 813-274-8054). THE COSTS FOR SALVAGING, STORING, AND DELIVERING THE GRANITE
DELIVERED TO THE CITY OF TAMPA TRANSPORTATION & STORMWATER SERVICES DEPARTMENT AT 3802 EAST 26TH AVENUE,
12. EXISTING GRANITE CURB AND BRICK TO BE REMOVED DURING CONSTRUCTION SHALL BE SALVAGED, SECURELY STORED, AND
WITH COT P&R TECHNICAL MAINTENANCE PLAN.
WATER SHALL BE PREFORMED EACH WEEK OF 90-DAY MAINTENANCE PERIOD. WATER APPLICATION RATES IN ACCORDANCE
11. ALL PLANTS, TREES, GROUND COVERS AND SOD SHALL BE MAINTAINED FOR 90-DAYS AFTER ACCEPTANCE. FREQUENCY OF
INCLUDED IN STANDARD CLEARING AND GRUBBING.
REMOVAL OF ANY TREE OR ORNAMENTAL/DECORATIVE SHRUB WITH A TRUNK DIAMETER EXCEEDING 4 INCHES. COST TO BE
TO CHAPTER 13: TREE AND LANDSCAPE CODE, TECHNICAL MANUAL. CONTRACTOR SHALL CONSULT THE ENGINEER PRIOR TO
INDEX 546, AND APPLICABLE ADA REQUIREMENTS. BARRICADES ARE REQUIRED FOR TREES TO REMAIN AND SHALL CONFORM
10. TREES WITHIN THE LIMITS OF THIS PROJECT THAT ARE TO REMAIN SHALL BE TRIMMED TO CONFORM TO SECTION 110,
AN APPROVED SYSTEMIC FUNGICIDE AND ROOT INDUCING HORMONE E.G. IBA.
9. FOLLOWING CONSTRUCTION OF CURB, THE QUALIFIED ARBORIST SHALL DRENCH THE PERIMETER OF THE ROOTBALL(S) WITH
NINE INCHES.
CURB AND CONTINUING PARALLEL TO PLANTER TO A DEPTH NOT TO EXCEED THE PROFILE OF THE CURB OR APPROXIMATELY
8. ROOTS SHALL BE CUT EVEN AND SMOOTH WITH SOIL AND ROOTBALL INTACT BEGINNING ONE INCH OFFSET FROM BACK OF
"EQUIVALENT PIECE OF MACHINERY" PRIOR TO CONDUCTING ROOT PRUNING.
EQUIVALENT PIECE OF MACHINERY. CONTRACTOR TO OBTAIN APPROVAL FROM CITY OF TAMPA PROJECT MANAGER FOR
7. ROOT PRUNING SHALL BE DONE BY A LICENSED CERTIFIED, QUALIFIED ARBORIST USING A DASCO ROOT PURNER OR THE
TO VERIFY SITE CONDITIONS AND SCOPE OF WORK PRIOR TO SUBMITTING BID.
6. ROOT PRUNING MAY BE NECESSARY WHERE THERE ARE EXISTING TREES ACCORDING TO PLAN AND NOTES. CONTRACTOR
TECHNICAL MANUAL.
EXISTING PALM TREES. REFER TO CITY OF TAMPA LAND DEVELOPMENT CODE, CHAPTER 13, TREE AND LANDSCAPE CODE
EXISTING PROTECTED GRAND TREE SPECIES, WITHIN 10-FEET OF EXISTING PROTECTED TREE SPECIES OR 6' WITHIN
5. ROOT PRUNING TO 8" DEPTH SHALL BE REQUIRED WHEN SUBSURFACE CONSTRUCTION IS PROPOSED WITHIN 20-FEET OF
WITH THE CITY OF TAMPA TREE ORDINANCE.
FIVE INCHES OR MORE IN DIAMETER OR THE TRIMMING OR ROOT PRUNING OF GRAND TREES. TREE REMOVAL SHALL COMPLY
REMOVAL PERMIT, ISSUED BY THE CITY NATURAL RESOURCES DEPARTMENT, IS REQUIRED FOR THE REMOVAL OF ALL TREES
URBAN PLANNER, MARY DANIELEWICZ-BRYSON, AT [email protected] OR AT 813-274-3100. A TREE
4. ALL TREES PROPOSED TO BE TRIMMED, ROOT PRUNED, OR REMOVED, SHALL BE COORDINATED WITH THE CITY OF TAMPA
3. EXISTING DRAINAGE STRUCTURES WITHIN CONSTRUCTION LIMITS SHALL REMAIN UNLESS OTHERWISE NOTED.
HV-02 0170 (EL 12.831) AND HV-02 0167 (EL 11.689).
2. ELEVATIONS ARE IN FEET AND BASED ON NAVD 88 DATUM. REFERENCE BENCHMARKS ARE CITY OF TAMPA BENCHMARKS
WEST ZONE NAD 83/90 AND CONTROLLED BY NATIONAL GEODETIC SURVEY STATIONS Q-18, GANDY AND FLGPS 59 AZ MK.
1. BEARINGS SHOWN HEREON AS (M) ARE BASED ON THE FLORIDA STATE PLAN COORDINATE SYSTEM, TRANSVERSE MERCATOR,
IRRIGATION SYSTEMS, SIGNS OR LANDSCAPING TO BE REMOVED WITHIN THE PROJECT LIMITS.
8. THE CONTRACTOR TO CONTACT THE PROPERTY OWNER 96 HOURS PRIOR TO CLEARING & GRUBBING EXISTING
ASPHALT PAD CONSTRUCTION INCLUDED IN THE PROPOSED COST OF CURB, CURB & GUTTER, OR VALLEY GUTTER.
EXTEND A MINIMUM OF 4" BEHIND THE BACK OF CURB, CURB & GUTTER OR VALLEY GUTTER. COST FOR THE
CURB & GUTTER OR VALLEY GUTTER. THE ASPHALT CURB PAD SHALL HAVE A MINIMUM THICKNESS OF 4" AND
EXISTING ROAD OR DRIVEWAY AN ASPHALT CURB PAD SHALL BE CONSTRUCTED UNDER THE PROPOSED CURB,
7. FOR LOCATIONS WHERE NEW CURB, CURB & GUTTER OR VALLEY GUTTER WILL BE CONSTRUCTED ADJACENT TO AN
6. SIDEWALK CURB RAMPS SHALL CONFORM TO THE SPECIAL DETAILS PROVIDED AND INDEX NO. 304.
UTILITY COMPANIES IN THE AREA BEFORE BEGINNING CONSTRUCTION.
DETERMINE THE EXACT LOCATIONS OF THE UTILITIES PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL NOTIFY ALL
5. THE LOCATION OF EXISTING UTILITIES ARE APPROXIMATE AS SHOWN AND IT'S THE CONTRACTOR'S RESPONSIBILITY TO
WATERING OR OTHER METHODS AS REQUIRED.
4. THE CONTRACTOR SHALL CONTROL ALL FUGITIVE DUST GENERATED BY CONSTRUCTION ACTIVITIES ON THE PROJECT BY
OR REPLACE THEM AS NEEDED.
3. THE CONTRACTOR SHALL CHECK ALL EROSION AND SILTATION CONTROL DEVICES AFTER EACH RAINFALL AND REPAIR
QUALITY.
SEDIMENT BARRIERS OR OTHER APPROPRIATE MEASURES TO PREVENT ADVERSE IMPACTS TO EXISTING SURFACE WATER
TO INLETS, SURFACE DRAINS, LAKES AND WETLANDS. THE CONTRACTOR SHALL USE INLET PROTECTION SYSTEMS AND
2. THE CONTRACTOR SHALL USE APPROPRIATE MEASURES TO PREVENT EROSION AND TRANSPORT OF SEDIMENT MATERIAL
SHALL BE INCLUDED WITH THE COST OF THE GRAVITY WALL.
1. TEMPORARY SHORING MAY BE REQUIRED TO CONSTRUCT SOME SEGMENTS OF GRAVITY WALL. ALL ASSOCIATED COSTS
(inches) on Site for Credit
5" to 7"
8" to 12"
13" to 19"
20" to 29"
30" or More
All Palms
Total:
1
0
1
2
4
10
1
0
0
0
0
0
1
1
Diameter Number Removed Multiplier Debit
(inches) on Site for Debit
5" to 7"
8" to 12"
13" to 19"
20" to 29"
30" or More
All Palms
Total:
4
0
1
2
4
1
0
0
0
4
4
8
Diameter Number Retained Multiplier Credit
Inch per Inch
1
TOTAL DEBIT VALUE OF TREES REMOVED SHALL BE PLACED IN THE TREE TRUST FUND.
VICINITY 24 HOURS IN ADVANCE OF PERFORMING ANY LANE CLOSURES OR DETOURS.
13. THE CONTRACTOR TO NOTIFY ALL LOCAL ENFORCEMENT, EMERGENCY/RESCUE AGENCIES LOCATED IN THE PROJECT
a. W. PLATT STREET
TRAFFIC CONTROL OFFICER.
INTERSECTIONS LISTED BELOW WHEN SIGNALS ARE NOT IN USE, AND SHALL BE PAID FOR UNDER PAY ITEM 102-14,
12. A UNIFORMED TRAFFIC CONTROL OFFICER SHALL BE UTILIZED FOR TRAFFIC CONTROL THOURGH THE SIGNALIZED
11. THE CITY ENGINEER MUST APPROVE NIGHT WORK AND LANE CLOSURES AT LEAST 48 HOURS IN ADVANCE.
10. DAYTIME WORK ONLY, NO LANE CLOSURES 6-9:30AM AND 3:30-6:30PM.
9. THE CONTRACTOR SHALL NOTIFY THE ENGINEER A MINIMUM OF 7 DAYS IN ADVANCE OF ANY LANE CLOSURES.
COST SHALL BE INCLUDED IN 102-1.
8. THE CONTRACTOR SHALL ENSURE CONTINUOUS OPERATION OF THE EXISTING HIGHWAY LIGHTING SYSTEM.
BEYOND USE, AS DETERMINED BY THE ENGINEER, SHALL BE REPLACED AT THE CONTRACTOR'S EXPENSE.
7. THE CONTRACTOR SHALL EXERCISE CAUTION WHEN RELOCATING SIGNS FOR TCP PURPOSES. ANY SIGNS DAMAGED
CONSTRUCTING THE NEXT LIFT OF ASPHALT.
IN THE DIRECTION OF TRAVEL AT A RATE OF 1:50 OR FLATTER. THIS WEDGE SHALL BE REMOVED PRIOR TO
TRAVEL ON AN OPEN TRAVEL LANE, A WEDGE OF ASPHALT SHALL BE CONSTRUCTED TO PROVIDE A VERTICAL TAPER
6. WHEN A PAVING OPERATION RESULTS IN A PAVEMENT GRADE DIFFERENCE 3/4" OR MORE IN THE DIRECTION OF
5. THE EXISTING SPEED LIMIT SHALL BE MAINTAINED AT ALL TIMES.
AS APPROVED BY THE ENGINEER.
WITH TYPE 1 OR 2 BARRICADES, VERTICAL PANELS, TEMPORARY DRUMS OR TEMPORARY LOW PROFILE BARRIER
4. ALL LANE TAPERS AND MAINTAINED LANE LINES ADJACENT TO CONSTRUCTION AREAS SHALL BE DELINEATED
3. TRAVEL LANES SHALL BE NO LESS THAN 10' IN WIDTH THROUGHOUT ALL PHASES OF CONSTRUCTION.
BE RELOCATED, REMOVED, OR COVERED FOR EACH TRAFFIC PATTERN PHASE, AS APPROVED BY THE ENGINEER.
2. ALL EXISTING WARNING, GUIDE, AND REGULATORY SIGNS SHALL BE MAINTAINED AT ALL TIMES. SIGNS SHALL
BE ON THE PROJECT SITE AT ALL TIMES WHILE WORK IS BEING CONDUCTED.
CERTIFICATION FROM THE FLORIDA DEPARTMENT OF TRANSPORTATION. THE CERTIFIED SUPERVISOR SHALL
ON THE PROJECT HAVE A WORK ZONE TRAFFIC CONTROL SAFETY CERTIFICATION OR TRAFFIC SUPERVISOR
1. THE CITY REQUIRES THAT THE SUPERVISOR OR FOREMEN CONTROLLING THE WORK FOR THE CONTRACTOR
3. OVERHEAD WORK SHALL BE IN ACCORDANCE WITH INDEX 600.
THE INTERSECTIONS.
2. CONSTRUCT SIGNAL MODIFICATIONS AND LOOP DETECTOR CONSTRUCTION WHILE MAINTAINING TRAFFIC THROUGH
1. INSTALL TEMPORARY TRAFFIC CONTROL DEVICES PER INDEX 615.
PHASE 3: INCLUDES THE SIGNAL MODIFICATIONS AT W. PLATT STREET.
TEMPORARY TRAFFIC CONTROL DEVICES.
5. UPON COMPLETION OF ALL OTHER CONSTRUCTION, INSTALL FINAL PAVEMENT MARKINGS AND SIGNS AND REMOVE
DIRECTION).
4. MILL AND RESURFACE INSIDE LANES WHILE MAINTAINING TRAFFIC IN OUTSIDE TRAVEL LANES (ONE LANE EACH
IN EACH DIRECTION) PER INDEX 613 & 615.
3. REVISE TEMPORARY TRAFFIC CONTROL DEVICES AND SHIFT TRAFFIC TO THE OUTSIDE TRAVEL LANES (ONE LANE
DIRECTION).
2. MILL AND RESURFACE OUTSIDE LANES WHILE MAINTAINING TRAFFIC IN INSIDE TRAVEL LANES (ONE LANE EACH
IN EACH DIRECTION) PER INDEX 613.
1. INSTALL TEMPORARY TRAFFIC CONTROL DEVICES AND SHIFT TRAFFIC TO THE INSIDE TRAVEL LANES (ONE LANE
PHASE 2: INCLUDES THE ROADWAY MILLING & RESURFACING AND INSTALLATION OF SIGNING AND PAVEMENT MARKINGS.
CURB RAMP CONSTRUCTION.
4. SIDEWALKS SHALL BE RE-OPENED TO PEDESTRIANS IMMEDIATELY UPON THE COMPLETION OF SIDEWALK AND
CONCRETE SIDEWALK, AND SIDEWALK CURB RAMPS UTILIZING INDICES 601 THRU 605.
3. RECONSTRUCT WILLOW AVE AND LEMON STREET INTERSECTION AND CONSTRUCT GRAVITY WALL, CONCRETE DRIVEWAY,
LANDSCAPING AND CAP AND PLUG CONFLICTING IRRIGATION. ROOT PRUNE EXISTING TREES AS REQUIRED.
2. REMOVE EXISTING TREES IDENTIFIED IN THE PLANS FOR REMOVAL. CLEAR AND GRUB ALL CONFLICTING
1. MAINTAIN PEDESTRIAN ACCESS PER INDEX 660.
AND RECONSTRUCTION OF WILLOW AVE AND LEMON STREET.
PHASE 1: INCLUDES THE CONSTRUCTION OF CONCRETE SIDEWALK AND CONCRETE CURB RAMPS ALONG WILLOW AVENUE
S
ST
M
IRV
RM
IRV
CO
Alice Kelly's Subdivision
PLAN OF WEST SIDE PARK
Strain Pole
Strain PoleTrafficStrain Pole
(60'
Platted R/
W)
WV
FH
WM
Conc.
Walk
CSP
CSPTSV
Conc.
Walk
Conc.
TSV
TSVCSP
CSP
Conc. Walk
0.5'
Conc.
Curb
Conc. Walk
Elec.
Cabinet
GI Top= 16.55
=17.63
CI TOP
2'
Conc.
C
& G
= 18.06
CI Top
2'
Conc.
C
&
G
Asph. Traf.
Traf.TAMPA HILLSBOROUGH COUNTY
EXPRESSWAY AUTHORITY
Lot 1, Block 3
24 25 26 27 28
25
+19.1
2PI S
TA.
W.
PL
AT
T S
TR
EE
T
S. WILLOW AVENUE
Exist. LA R/W
Exist. LA R/W
Exist. LA R/W
N 00°34'05" E
¡ Survey
N 1" = 40'
BM 1
39.75' LT.+36.47
62.12' RT.+38.61
Exist. Dr. Pipe
W. SWANN AVE. TO W. PLATT ST.
NO SURVEY PROVIDED BETWEEN
NOTE:
STA. 26+37.30
RESURFACING
BEG. MILLING &
Exist.
R/
W
Exist.
LA R/
W
Exist.
R/
W
Exist.
LA R/
W
PO
T S
TA.
10
+00.0
0
10 11
22
+40.0
0
3/9/2017aepperson Y:\13-05-1893 RFP 13 D 000027 4 Walk Bike Projs Design Willow Av\43271710000\roadway\planrd01.dgn3:30:53 PM
8 1000260
DATE DESCRIPTION
REVISIONS
DATE DESCRIPTIONNO.
SHEET
ROADWAY PLAN (1)
N. WILLOW AVENUE
CITY OF TAMPA
TRANSPORTATION DEPARTMENT
GREGORY S. TRIM, P.E.
2709 N. ROCKY POINT DR., SUITE 104
P.E. LICENSE NUMBER 52935
SAM SCHWARTZ ENGINEERING
TAMPA, FL 33607
CERTIFICATE OF AUTHORIZATION 30268
CITY PROJECT IDFINANICAL PROJECT ID
432717-1-58-01
MA
TC
H LIN
E
AT S
TA.
28
+00.0
0
10 40
Feet
0
STA. 10+20.00
BEGIN PROJECT
W.
SW
AN
N
AV
E.
LIMITSRESURFACINGMILLING AND
LEGEND
S
M
Strain Pole
WM
(60'
PL
AT
TE
D R/
W)
TA
MP
A HILLS
BO
RO
UG
H C
OU
NT
Y
EX
PR
ES
SW
AY A
UT
HO
RIT
Y
Conc. Walk
Conc. Walk
12"P
TSV
Elec.Cabinet
CSP
12"PConc. Columns(Typ.)
Conc. Columns(Typ.)
0.5' Conc.Curb
12"P
2' Conc. C & G
2' Conc. C & G
TA
MP
A HILLS
BO
RO
UG
H C
OU
NT
Y
EX
PR
ES
SW
AY A
UT
HO
RIT
Y
EOP
EOP
CI Top= 13.94
CI Top= 14.34
Traf.
28 29 30 31 PI S
TA.
31
+37.3
3
32 33
CLE
VE
LA
ND S
TR
EE
TC
LE
VE
LA
ND S
TR
EE
T
S. WILLOW AVENUE
Exist. LA R/W
N 00°34'05" E
Exist. LA R/W
¡ Survey
N 1" = 40'
BM 2
18" rcp 12
'x 5'
18" rcp
77.16' LT.+08.97
INLET PROTECTION
INLET PROTECTION
STA. 31+15.53
RESURFACING
END MILLING AND
41.66' RT.+19.07
CLEVELAND ST. AND W. CASS ST.
NO SURVEY PROVIDED BETWEEN
NOTE:
Exist.
R/
W
Exist.
R/
W
Exist.
R/
W
28
+00.0
0
3/9/2017aepperson Y:\13-05-1893 RFP 13 D 000027 4 Walk Bike Projs Design Willow Av\43271710000\roadway\planrd02.dgn3:30:53 PM
9 1000260
DATE DESCRIPTION
REVISIONS
DATE DESCRIPTIONNO.
SHEET
ROADWAY PLAN (2)
N. WILLOW AVENUE
CITY OF TAMPA
TRANSPORTATION DEPARTMENT
GREGORY S. TRIM, P.E.
2709 N. ROCKY POINT DR., SUITE 104
P.E. LICENSE NUMBER 52935
SAM SCHWARTZ ENGINEERING
TAMPA, FL 33607
CERTIFICATE OF AUTHORIZATION 30268
CITY PROJECT IDFINANICAL PROJECT ID
432717-1-58-01
MA
TC
H LIN
E
AT S
TA.
28
+00.0
0
10 40
Feet
0
LEGEND
LIMITSRESURFACINGMILLING AND
MM
MM
M
Extension of Collins Addition
M
Revised Plat of Woodlawn Park
WM
WMWM
WMWM
Conc.
Walk
Conc.
Walk
Vault Vault
Lot 1, Block 30Lot 2, Block 30Lot 3, Block 30Lot 4, Block 30
Lot 5, Block 30
¢
WV
WV
6'CLF
1-Story
Masonry
FH
Conc.
1-Story Masonry
WM
TSV
4" Crepe MyrtleConc.
Conc.
Walk
Brick RoadBrick Rd.
10"P
PedestrianWalk Post
PedestrianWalk Post
GV
WV
WV
Strain Pole
Light Pole
TSV Conc.
Lot 24, Block 5 Lot 23, Block 5
Lot 1, Block 21
Conc.
10"O
12"O
6"O8"U
12"Palms
Elec.Cabinet
0.5'
Conc.Curb
0.5'
Conc.
Curb
Bric
k
Bric
k
24"
Asph.
Asph.
Asph.
Asph.
Traf.
Asph.
Face of Bld
g.
Asph.
Asph.
Masonry
Wall
Conc. Dr.
Collins AdditionExtension of
¢ ¢
Dr.
Block 5
Lot 22,
54 55 56 57 58 59
N. WILLOW AVENUE
W.
CA
SS S
TR
EE
T
W.
CA
SS S
TR
EE
T
N 00°48'41" EN 00°50'07" E
Exist. R/W
N
1" = 40'
CR-G
70'
R
(BK. OF SW)26.02' RT.+69.05
(BK. OF SW)29.61' RT.+15.64
(B.C.)34.12' RT.+16.15
SEE SHEET 14 FOR RAMP DETAILS
(B.C.)38.44' RT.+26.91
(BK. OF SW)29.57' RT.+27.36
M-3MOD
M-3
ST
A.
57
+08.9
013.5'
DR
WY.
ST
A.
57
+32.1
79.5'
DR
WY.
ST
A.
58
+33.9
721.5'
DR
WY.
20.28' RT.+05.44
29.38' RT.+26.20
20.58' RT.+23.31
(B.C.)26.54' RT.+77.55
(B.C.)27.55' RT.+80.55
(B.C.)34.12' RT.+01.68
(B.C.)26.58' RT.+89.15
¡ Survey
CLEVELAND ST. AND W. CASS ST.
NO SURVEY PROVIDED BETWEEN
NOTE:
CR-AMOD
CR-HMOD
CR-L
CR-L
(TYP.)WARNING SURFACEPROP. DETECTABLE
28.50' LT.+08.70
BM 3
20.46' LT.
+76.05
CONNECTIONPROP. SW
23.29' RT.+10.26
Exist. R/W
20.18' RT.
+00.00
49.27' LT.
+59.85
18.18' LT.
+90.57
28.97' RT.+34.85
CR-G
22.72' RT.+89.16
42.21' RT.+89.76
29.17' RT.+85.60
23.96' RT.+85.74
102' R
2' R (TYP.)(SPECIAL)CONST. TRAFF. SEP.
(B.C.)27.57' RT.+86.15
(B.C.)30.40' RT.+01.67
DRIVEWAY DETAIL TABLE
STATION SIDE SLOPE (%)LENGTH AREA (SY)
P
F
P
F
P
F
STA. 57+08.90
STA. 57+32.17
STA. 58+33.97
RT.
RT.
RT.
4.5'
8.9'
30.4
29.1
44.4
16.85
16.81
16.54
17.51
18.18
(ELEV.)
BK. OF SW
(ELEV.)
END OF DRWY.
14.7%
15.5%
16.00
16.06
15.50
LINE
EX. FLOW
16.17
16.23
15.67
LIP (2")
DRWY
16.67
16.73
16.46
SIDEWALK
DRWY/
OF NEW SIDEWALKROOT PRUNE EDGE
TREE SURVEY LEGEND
- PALM
- DECIDUOUS (OAK, UNKNOWN)
OF NEW SW/DRWYROOT PRUNE EDGE
NA NA NA
PI S
TA.
54
+70.0
6
21.70' LT.+03.28
CURBTYPE DCONST.
CURBTYPE DCONST.
REMOVE TREE
C & GTYPE FCONST.
CURBTYPE DCONST.
29.14' RT.+99.37
24.00' RT.+01.79
(BK. OF SW)28.42' RT.+51.11
AND GATEFENCE TYPE BRESET EXIST.LOWER AND
CURB (TYP.)4" CONC. W/PROP. 6' SW,
MAILBOXRELOCATE
MAILBOXRELOCATE
(SEE DETAIL SHEET 14)* 5' DRWY SLOPE=15.8%
CONST. TYPE D CURB
20.61' RT.+17.29
(B.O.S.)26.50' RT.+93.39
(B.C.)30.10' RT.+21.85
WALLMATCH EXIST.(B.C.)30.10' RT.+45.30
END B.C26.55' RT.+59.95
GRAVITY WALLOF NEW SIDEWALKROOT PRUNE EDGE
(SILT FENCE)(TYP.)SEDIMENT BARRIER
- 93.50 SF)(IPM REAL ESTATE
AGREEMENTRIGHT OF ENTRY
(B.C.)30.28' RT.+37.43
(B.C.)38.38' RT.+37.48
(FISHER - 128.25 SF)AGREEMENTRIGHT OF ENTRY
SAW CUT
(TYP.)SAW CUT
OF NEW SIDEWALKROOT PRUNE EDGE
OF NEW SIDEWALKROOT PRUNE EDGE
PROP. VALLEY GUTTER
TYPICAL SECTION(SEE SECTION 11)RDWY REGRADING LIMITS
Exist.
R/
W
Exist.
R/
W
Exist.
R/
W
Exist.
R/
W
Exist.
R/
W
Exist.
R/
W
Exist.
R/
W
Exist.
R/
W
Exist.
R/
W
Exist.
R/
W
PI +69.1
0
PI +94.0
3
PI +01.2
3
PI +15.6
4
EL.
16.8
6
PI +27.3
6
EL.
16.8
3
PI +36.9
3
EL.
16.8
0PI +45.1
6
EL.
16.7
6
PI +83.1
9
EL.
16.6
1
PI +97.4
7
EL.
16.5
2
PI +14.7
9
EL.
16.2
3
PI +44.7
5
PI +75.4
3
EL.
16.1
9
PI +93.3
9
EL.
16.2
3PI +99.3
7
EL.
15.7
9
PI +05.3
9
EL.
15.4
0
EL.
17.5
0 B.C.
EL.
16.7
5E
L.
17.5
0 B.C.
EL.
16.8
9E
L.
17.5
0 B.C.
EL.
16.8
5E
L.
17.5
0 B.C.
16.8
6 B.C.
EL.
17.3
5 B.C.
EL.
17.4
0 B.C.
16.2
2 S
W
EL.
17.5
0 B.C.
EL.
17.2
5 B.C.
EL.
17.2
0 B.C.
EL.
17.2
0 B.C.
EL.
17.0
0 B.C.
EL.
16.5
0 B.C.
EL.
17.3
0 B.C.
EL.
16.1
0 B.C.
EL.
16.4
0 B.C.
EL.
15.7
0 B.C.
GRADE (RT.)PROP. SW
GRADE (RT.)PROP. B.C.
Grade (RT.)Exist. R/W
Exist.
EO
P 16.3
9
Exist.
EO
P 15.6
3
Grd. Line¡ Survey
EL.
16.2
7PI +41.7
1
PI +59.3
9
PI +51.1
1
EL.
16.9
3
EL.
17.5
0 B.C.
EL.
16.1
9 B.C. 1
5.2
7 F
L./
RA
MP
B.C. (RT.)PROP. TOP
PROP. TOP B.C. (RT.)
VERIZON BFO
PROP. TOP B.C. (RT.)
EL.
16.2
3 B.C.
FL.
15.4
6
FL.
15.2
8
PI +00.1
6B
EG.
GU
TT
ER
PI +07.0
7
GUTTER (RT.)PROP. VALLEY
Grd. Line (RT.)Exist. EOP/Flow
EO
P/F
LO
W E
L.
16.0
0D
RW
Y S
TA.
57
+08.9
0
EO
P/F
LO
W E
L.
16.0
657
+32.1
7D
RW
Y S
TA.
EO
P/F
LO
W E
L.
15.5
0D
RW
Y S
TA.
58
+33.9
7
PI +23.1
6
EL.
16.5
0
EL.
16.5
0
PI +44.7
0
EL.
18.4
0 B.C.
PI +19.0
0
EL.
18.4
0 B.C.
PI +23.5
0
PI +49.0
0
EL.
17.4
0 B.C.
3/9/2017aepperson Y:\13-05-1893 RFP 13 D 000027 4 Walk Bike Projs Design Willow Av\43271710000\roadway\planrd03.dgn3:30:55 PM
10 1000260
DATE DESCRIPTION
REVISIONS
DATE DESCRIPTIONNO.
SHEET
ROADWAY PLAN (3)
N. WILLOW AVENUE
CITY OF TAMPA
TRANSPORTATION DEPARTMENT
GREGORY S. TRIM, P.E.
2709 N. ROCKY POINT DR., SUITE 104
P.E. LICENSE NUMBER 52935
SAM SCHWARTZ ENGINEERING
TAMPA, FL 33607
CERTIFICATE OF AUTHORIZATION 30268
CITY PROJECT IDFINANICAL PROJECT ID
432717-1-58-01
1" = 2' VERT.
SCALE: 1" = 40' HORIZ.
12
16
2020
16
12
54 55 56 57 58 59
MA
TC
H LIN
E
AT S
TA.
59
+20.0
0
W.
CA
SS S
TR
EE
T
60"
pip
e
M
Extension of Collins Addition
M
S 89°1
6'2
1"
E'
WMVault
Conc.Walk
Elec.Cabinet
TSV
Conc.
Walk
Masonry
Wall
Vault
Conc.
Conc.Walk
Conc. Walk
Masonry WallVault
4'
CLF
10"P
10"P
Masonry
Wall
(Poor Conditio
n)
24"O
(Poor Condition)
Brick Rd.
(50'
Platted R/
W)
Lot 1, Block 31Lot 2, Block 31Lot 3, Block 31
Lot 4, Block 31Lot 5, Block 31
Lot 2, Block 1
10"P10"P
Brick
Brick
Asph.
Asph.
Conc.
Dr.
Dr.
Asph.
= 14.10
CI Top
Sec.
14 - T
wp.
29 S. - Rng 18 E.
Sec.
23 - T
wp.
29 S. - Rng 18 E.
¢ ¢ ¢ ¢
¢ ¢
60 61 62 63 64
N. WILLOW AVENUE
W.
LE
MO
N S
TR
EE
T
W.
CYP
RE
SS S
TR
EE
T
Exist. R/W
Exist. R/W
N
1" = 40'
CR-G
N 00°48'41" E
SEE SHEET 14FOR RAMP DETAIL
M-3 M-3M-3
ST
A.
60
+48.4
317'
DR
WY.
ST
A.
61
+23.1
712'
DR
WY.
ST
A.
61
+84.7
010'
DR
WY.
(B.C.)37.77' RT.+57.51
INLET PROTECTION
OF NEW SIDEWALKROOT PRUNE EDGE
W. CYPRESS ST. AND W. NASSAU ST.
NO SURVEY PROVIDED BETWEEN
NOTE:
CR-C
40.28' RT.+09.90
RETAINING WALLMATCH EXIST.
GRAVITY WALLREM. EXIST.
INDEX NO. 6011PROP. GRAVITY WALL
GRAVITY WALLREM. EXIST.
STATION SIDE SLOPE (%)LENGTH
DRIVEWAY DETAIL TABLE
AREA (SY)
P
F
P
F
P
F
RT.
RT.
RT.
STA. 60+48.43
STA. 61+23.17
STA. 61+84.74
15.81
15.42
15.59
17.15
16.50
7.9'
7.7' 19.6
27.6
39.8
TREES (2)REM. PALM
(TYP.)WARNING SURFACEPROP. DETECTABLE
(B.C.)37.78' RT.+39.39
NO. 300GUTTER INDEXPROP. VALLEY
BM 4REM. PALM TREE
CR-C
BM 5
20.29' RT.
+73.00
CR-C
MATCH EXIST.28.38' RT.+64.37
40.37' RT.+58.39
(B.C.)30.65' RT.+39.39
(B.C.)30.64' RT.+57.51
20.90' RT.+88.03
15.06
14.67
14.18
LINE
EX. FLOW
15.23
14.84
14.35
LIP (2")
DRWY
15.73
15.34
15.51
SIDEWALK
DRWY/
(ELEV.)
BK. OF SW
(ELEV.)
END OF DRWY.
16.9%
14.0%
TREE SURVEY LEGEND
- PALM
- DECIDUOUS (OAK, UNKNOWN)
CONNECTIONPROP. SW
CONNECTIONPROP. SW
NA NA NA
23.77' RT.+62.38
CURBTYPE DCONST.
CURBTYPE DCONST.
CURBTYPE DCONST.
MAIL BOXRELOCATE
MATCH EXIST.53.86' RT.+64.41
CURBTYPE DCONST.
PI S
TA.
63
+35.1
6
(SEE DETAIL SHEET 14)* 5' DRWY SLOPE = 23%
AT R/WTO EXIST. WALLGRAVITY WALLCONNECT PROP.
(SW)29.86' RT.+30.13
(DRWY)37.55' RT.+29.19
(DRWY)37.55' RT.+17.19
(SW)29.87' RT.+16.24
(WALL/B.O.S.)26.75' RT.+36.68
(B.O.S.)29.94' RT.+78.92
(B.O.S.)29.95' RT.+90.54
(B.O.S./WALL)26.82' RT.+96.82
(B.O.S./WALL)26.75' RT.+96.45
(B.O.S./WALL)27.24' RT.+99.45
(B.O.S.)26.83' RT.+77.05
TYPICAL SECTION)(SEE THIS SHEETREPL. EXIST. BRICK/PVMTCONST. VALLEY GUTTER ®RADE RDWY BASE.REM. EXIST. BRICK/PVMTRDWY. REGRADING LIMITS
(HARVEY - 131.75 SF)AGREEMENTRIGHT OF ENTRY
(HARVEY - 184.50 SF)AGREEMENT
RIGHT OF ENTRY
CUTSAW
(B.C./WALL)26.65' RT.+64.37
¡ Survey
(B.C.)26.42' RT.+28.44
GRAVITY WALLCURB (TYP.) OR4" CONC. W/PROP. 6' SW
(WALL/B.O.S.)27.21' RT.+09.66
B.C.)(WALL/B.O.S./26.87' RT.+71.78
(3.8'x2.8'x1.33')CONTROLLER PADPROP. LOCATION
WORK AREA& RAMP, CLEAR & GRUBPROP. 6' SIDEWALK
(SILT FENCE)(TYP.)SEDIMENT BARRIER
Exist.
R/
W
Exist.
R/
W
Exist.
R/
W
PI +77.0
5
EL.
15.9
4
PI +88.3
2
EL.
15.9
0
PI +24.6
8
EL.
15.9
0
PI +28.4
4
EL.
15.9
0PI +39.8
9
EL.
15.8
3
PI +57.0
1
EL.
15.7
8
PI +64.3
7
EL.
15.7
7
PI +75.4
8
EL.
15.7
6
PI +89.4
9
EL.
15.5
0
PI +09.6
6
EL.
15.4
8
(-) 0.101%
PI +17.1
9
EL.
15.4
7
PI +29.1
9
EL.
15.4
0
PI +36.6
8
EL.
15.3
1
PI +52.4
0
EL.
15.1
1
PI +71.7
8
EL.
14.8
8
PI +77.6
5
PI +89.5
9
EL.
14.9
1
PI +96.8
2
EL.
14.9
0 PI +14.4
2
PI +41.3
7
EL.
14.5
6
PI +90.5
3
EL.
13.7
6
PI +96.5
3
EL.
14.2
6
EL.
15.2
2 S
WE
L.
15.7
2 B.C.
EL.
16.4
0 B.C.
EL.
16.5
0 B.C.
EL.
16.5
0 B.C.
EL.
16.5
0 B.C.
EL.
16.5
0 B.C.
EL.
16.6
0 B.C.
EL.
16.3
3
WA
LL
EL.
16.7
5
WA
LL
EL.
15.6
5 B.C.
EL.
15.7
0 B.C.
PI +52.4
0
EL.
15.7
5
WA
LL
EL.
16.1
0
WA
LL
14.3
5 B
AC
K
OF S
W
16.1
8 T
OP
OF
WA
LL
Grd. Line¡ Survey
Exist.
EO
P 15.6
3
Exist.
EO
P 13.9
8
PI +80.3
5
EL.
15.7
5PI +82.3
5
EL.
15.7
0
EL.
15.7
5
PI +77.4
8
EL.
16.5
0 B.C.
EL.
16.3
3
WA
LL
EL.
15.9
0
WA
LL
PI +17.0
5
EL.
15.3
2
WA
LL
PI +19.4
0
EL.
15.3
2
WA
LL
PI +21.7
8
EL.
15.9
0
WA
LL
EL.
15.9
0
WA
LL
Grade (RT.)Exist. R/W
EL.
16.7
5
WA
LL
WALL (RT.)PROP. TOP OF
VERIZON BFO
FL.
15.0
8
PI +68.0
7
EL.
15.2
0
PI +73.0
1E
ND
GU
TT
ER
B.C. (RT.)PROP. TOP
EL.
16.7
5
WA
LL
PI +64.3
4
EL.
14.4
5E
L.
15.7
5
WA
LL
EL.
14.4
4
PI +85.5
3
EL.
13.8
4E
L.
15.7
5
WA
LL
EL.
14.4
2
PI +79.5
3
PI +70.7
3
EL.
15.7
5
WA
LL
Grd. Line (RT.)Exist. EOP/FLOW
EO
P/F
LO
W E
L.
15.0
6D
RW
Y S
TA.
60
+48.4
3
EO
P/F
LO
W E
L.
14.6
7D
RW
Y S
TA. 61
+23.1
7
EO
P/F
LO
W E
L.
14.1
8D
RW
Y S
TA.
61
+84.7
0
@ 0.30%GUTTER (RT.)PROP. VALLEY
EL.
16.6
5
WA
LL
EL.
16.8
0
WA
LL
EL.
16.5
0
WA
LL
PI +64.8
6
EL.
16.3
0
WA
LL
EL.
15.8
0 B.C./
WA
LL
EL.
15.7
5
WA
LL
EL.
16.6
5 B.C./
WA
LL
EL.
16.2
5 B
C/
WA
LL
PI +91.6
6
PI +79.8
6
EL.
14.9
5
53
+60.0
0
59
+20.0
0
3/9/2017aepperson Y:\13-05-1893 RFP 13 D 000027 4 Walk Bike Projs Design Willow Av\43271710000\roadway\planrd04.dgn3:30:55 PM
11 1000260
DATE DESCRIPTION
REVISIONS
DATE DESCRIPTIONNO.
SHEET
ROADWAY PLAN (4)
N. WILLOW AVENUE
CITY OF TAMPA
TRANSPORTATION DEPARTMENT
GREGORY S. TRIM, P.E.
2709 N. ROCKY POINT DR., SUITE 104
P.E. LICENSE NUMBER 52935
SAM SCHWARTZ ENGINEERING
TAMPA, FL 33607
CERTIFICATE OF AUTHORIZATION 30268
CITY PROJECT IDFINANICAL PROJECT ID
432717-1-58-01
12
16
20
12
16
20
1" = 2' VERT.
SCALE: 1" = 40' HORIZ.
60 61 62 63 64
MA
TC
H LIN
E
AT S
TA.
59
+20.0
0
CONC. REMOVAL
LEGEND
¡
3'
(MIN.)
4'
VARIES VARIES
2%
2% TO 3.5% 2% TO 5%
STA. 59+00.00 TO STA. 59+73.00
WILLOW AVE. AT LEMON ST.
VALLEY GUTTER TYPICAL SECTION
TYPE B STABILIZATION
13.5'18.83'
BASE GROUP 6)BASE (OPTIONALON 8" CRUSHED CONC.RELAY EXIST. BRICK RESET BRICK
WILLOW AVE
PROP. PVMT
LEMON ST.
GROUP 6)BASE (OPTIONAL BASEW/8" CRUSHED CONC.THICKNESS (2" MIN.)MATCH EXIST. ASPHALTSAW CUT AND
VALLEY GUTTER
Map of Phillip Collins
Map of Munro's and Lewis'
M
Conc. Steps
MUP
(60'
Platted R/
W)
(60'
Platted R/
W)
Brick Road
WV
Conc.
Walk
WV
Brick
Conc. Walk
0.5' Conc.Curb
WV
FHMasonry Wall4
' C
LF
Lot 24, Block 4
Lot 1, Block 5
Lot 24, Block 5
14'
Platted
Alley
(Unim
proved)
Lot 13, Block 3Lot 12, Block 6
MUP
Conc.Walk
WMMB 12"P 10"P
Conc.
4'CLF
Asph.
Asph.
2nd Addition to W. Tampa
Addition to W. Tampa
67 68 69 70 71 72
W.
NA
SS
AU S
TR
EE
T
W.
AR
CH S
TR
EE
T
N. WILLOW AVENUE
N 00°48'44" E
Exist. R/W Exist. R/W
¡ SurveyN
1" = 40'
BM 6
CR-G
CR-G
M-3
ST
A.
69
+89.4
414'
DR
WY.
24.25' LT.+74.54
(B.C.)26.38' LT.+77.89
(B.C.)29.96' LT.+84.88
REM. PALM TREE
(B.C.)26.45' LT.+02.39
(B.C.)29.96' LT.+95.42
Exist. R/W
GRAVITY WALLREM. EXIST.
(TYP.)WARNING SURFACEPROP. DETECTABLE
W. CYPRESS ST. AND W. NASSAU ST.
NO SURVEY PROVIDED BETWEEN
NOTE:
DRIVEWAY DETAIL TABLE
STATION SIDE SLOPE (%)LENGTH AREA (SY)
P
F
16.58 17.25
(ELEV.)
BK. OF SW
(ELEV.)
END OF DRWY.
15.83
LINE
EX. FLOW
16.00
LIP (2")
DRWY
16.50
SIDEWALK
DRWY/
STA. 69+89.44 LT. 7.9' 8.5% 39.8
TREE SURVEY LEGEND
- PALM
- DECIDUOUS (OAK, UNKNOWN)
CURB (TYP.)4" CONC. W/PROP. 6' SW
RELOCATE MAILBOX
(SILT FENCE)(TYP.)SEDIMENT BARRIER
CONC. WALKREPL. DISTURBED OF NEW SIDEWALK
ROOT PRUNE EDGE
PI S
TA.
68
+44.8
4
CURBTYPE DCONST.
24.09' LT.+04.29
CURBTYPE DCONST.
(B.C.)28.05' LT.+83.54
(B.C.)28.04' LT.+89.27
(B.C.)26.53' LT.+90.76
(B.C.)26.55' LT.+95.12
Exist.
R/
W
Exist.
R/
W
Exist.
R/
W
Exist.
R/
W
Exist.
R/
WE
xist.
R/
W
Exist.
R/
W
Exist.
R/
W
PI +83.5
4
EL.
16.0
0
PI +22.3
3
EL.
16.2
5
PI +62.2
4
EL.
16.0
8
PI +85.1
0
PI +95.1
9
PI +02.2
7
EL.
16.4
4
PI +16.2
4
EL.
16.4
9
PI +46.6
3
EL.
16.6
9
PI +86.7
3
EL.
16.7
4
EL.
17.0
0 B.C.
EL.
17.0
0 B.C.
EL.
17.0
0 B.C.
EL.
16.5
7 S
W.
EL.
17.0
0 B.C.
EL.
17.2
4 B.C.
EL.
17.4
4 B.C.
EL.
17.0
0 B.C.
EL.
16.7
6 S
W
& B.C.
SW GRADE (LT.)PROP. BACK OF
Grd. Line (LT.)Exist. EOP
B.C. (LT.)PROP. TOP
PI +78.0
1E
L.
16.1
0E
L.
17.0
0 B.C.
EL.
16.5
9 S
W
EL.
15.5
8 S
W
& B.C.
EL.
16.5
7 B.C.
EL.
16.7
9 B.C.
PI +69.1
1
EL.
16.7
2E
L.
17.1
5 B.C.
GRADE (LT.)Exist. R/W
B.C. (LT.)PROP. TOP
EO
P E
L.
15.8
3D
RW
Y S
TA.
69
+89.4
4
Grd. Line¡ Survey
PI +27.1
2
EL.
16.7
5 B.C.
PI +25.1
2
PI +19.8
4
EL.
17.0
0 B.C.
PI +21.8
4
EL.
16.7
5 B.C.
53
+60.0
0
59
+20.0
0
53
+60.0
0
59
+20.0
0
3/9/2017aepperson Y:\13-05-1893 RFP 13 D 000027 4 Walk Bike Projs Design Willow Av\43271710000\roadway\planrd05.dgn3:30:56 PM
12 1000260
DATE DESCRIPTION
REVISIONS
DATE DESCRIPTIONNO.
SHEET
ROADWAY PLAN (5)
N. WILLOW AVENUE
CITY OF TAMPA
TRANSPORTATION DEPARTMENT
GREGORY S. TRIM, P.E.
2709 N. ROCKY POINT DR., SUITE 104
P.E. LICENSE NUMBER 52935
SAM SCHWARTZ ENGINEERING
TAMPA, FL 33607
CERTIFICATE OF AUTHORIZATION 30268
CITY PROJECT IDFINANICAL PROJECT ID
432717-1-58-01
12
16
20
12
16
20
1" = 2' VERT.
SCALE: 1" = 40' HORIZ.
67 68 69 70 71 72
MA
TC
H LIN
E
AT S
TA.
72
+00.0
0
S
EB
Map of Phillip Collins
(S.R.
93)
Map of Phillip Collins
GM
14'
Platted
Alley
(Unim
proved)
(60'
Platted R/
W)
(60' Platted R/W)
Lot 24, Block 1
Lot 1, Block 1
FDOT
CPVault
05.' Conc. Curb
Brick Rd.
MUP
WV
10"P
MUP
GV
WV
10"P
10"P
Conc.
Walk
Brick
Brick Rd.
14'
Platted
Alley
Lot 12, Block 3
Exception Exception
Asph.
EO
P
Asph.
EO
P
2nd Addition to W. Tampa2nd Addition to W. Tampa
Interstate - 275
Overpass
(S.R.
93)
Interstate - 275
Overpass
Lot 13, Block 3
Lot 24, Block 4
72 73 74 75 76
N 00°48'44" E
Exist. R/W
Exist. R/WExist. R/W
Exist. R/W
¡ Survey
N. WILLOW AVENUE
N
1" = 40'
BM 7
4" CONC.PROP. 6' SW
ST
A.
75
+17.4
3Unim
proved
Alley
ST
RE
ET
W.
LA S
ALLE
Exist. LA R/W
SEE SHEET 14FOR RAMP DETAIL
CR-HMOD
(BK. OF SW)26.15' LT.+16.60
26.22' LT.+58.64
24.71' LT.+60.13
26.19' LT.+65.64
24.70' LT.+64.13
(TYP.)WARNING SURFACEPROP. DETECTABLE
26.03' LT.+01.68
MATCH EXIST.(BK. OF SW)26.00' LT.STA. 75+62.32
STA. 75+62.32 AND W. MAIN ST.
NO SURVEY PROVIDED BETWEEN
NOTE:
(SILT FENCE)(TYP.)SEDIMENT BARRIER
(BK. OF SW)28.05' LT.+14.70
CURBTYPE DCONST.
PI S
TA.
76
+71.7
7
Exist.
R/
W
Exist.
R/
W
Exist.
R/
W
Exist.
R/
W
Exist. R/
W
Exist.
R/
W
Exist.
R/
WE
xist.
R/
W
PI +05.6
0
EL.
17.3
1
PI +14.7
1
EL.
17.7
6
PI +29.0
0
EL.
17.8
6
EL.
17.9
1
PI +17.5
0
EL.
17.9
4
PI +47.2
7
EL.
17.9
8
PI +03.6
0
EL.
17.1
5
PI +73.9
6
Grd. Line¡ Survey
Grd. Line (LT.)Exist. EOP
EL.
17.9
0 S
WGRADE (LT.)Exist. R/W
EO
P E
L.
18.0
9Unim
proved
Alley
EL.
17.0
9 S
W
PI +10.1
9
EL.
17.6
8 SW GRADE (LT.)PROP. BACK OF
81 PO
T S
TA.
81
+76.2
2
3/9/2017aepperson Y:\13-05-1893 RFP 13 D 000027 4 Walk Bike Projs Design Willow Av\43271710000\roadway\planrd06.dgn3:30:57 PM
13 1000260
DATE DESCRIPTION
REVISIONS
DATE DESCRIPTIONNO.
SHEET
ROADWAY PLAN (6)
N. WILLOW AVENUE
CITY OF TAMPA
TRANSPORTATION DEPARTMENT
GREGORY S. TRIM, P.E.
2709 N. ROCKY POINT DR., SUITE 104
P.E. LICENSE NUMBER 52935
SAM SCHWARTZ ENGINEERING
TAMPA, FL 33607
CERTIFICATE OF AUTHORIZATION 30268
CITY PROJECT IDFINANICAL PROJECT ID
432717-1-58-01
12
16
20
12
16
20
1" = 2' VERT.
SCALE: 1" = 40' HORIZ.
72 73 74 75 76 77
MA
TC
H LIN
E
AT S
TA.
72
+00.0
0
OUTSIDE EDGE OF CURB
ARE TYPICALLY 0.12' ABOVE
BACK OF SW ELEVATIONS
NOTE:
W.
MAIN S
TR
EE
T
STA. 81+57.00
END PROJECT
S
55
M
WV
FH
WM
Elec.Cabinet
Bric
k
Asph.
Conc.
16.73
17.16
17.31
17.06
16.49
17.15
63
Elec.Cabinet
TSV
= 14.10CI Top
Conc.
Walk
Masonry
Wall
13.25
14.10
13.97
13.20
14.29
14.24
14.24
13.62
13.97
Asph.
Brick
GM
Exist.
R/
W
Conc.
Walk
WV
WV
MUP
17.34
17.69 1
8.06
18.12
18.08
18.06
17.07
17.00
17.53
17.81
74
17.94
N N N
DRIVEWAY DETAIL - WILLOW AVENUE
WILLOW AVENUE
N
SL
OP
E
VA
RIE
S
DIS
TA
NC
E
AN
D
4'
SW
AT 2
%
¡ Survey
Exist. R/W
M-3
6" CONC.PROP. 4' SW
6" CONC.PROP. DRWY.
13.62
14.24
(TOP OF CURB)EL. 17.90EL. 17.60 SW30.33' LT.STA. 74+07.87
(TOP OF CURB)EL. 17.56EL. 17.31 SW27.97' LT.STA. 74+05.56
EL. 17.15 SWSTA. 74+03.47
POLE TO REMAIN
BK. OF SW CURB
MATCH EXIST.48.70' RT.STA. 63+11.50
CR-C
¡ Survey
FL./RAMPEL. 13.7020.90' RT.STA. 62+85.53
FL./RAMPEL. 13.5542.75' RT.STA. 63+10.72
CR-AMOD
CR-HMOD
55
WV
Conc.
Walk
Brick Rd.
Pedestrian
Walk Post
WV
WV
Strain Pole
Light Pole
TSVConc.
Conc.
Asph.
Traf.
CR-LCR-L
N
FL./RAMPEL. 16.6023.70' LT.STA. 55+07.05
FL./RAMPEL. 16.6120.18' LT.STA. 55+00.07
(TOP OF CURB)EL. 17.1820.21' LT.STA. 55+86.55
EL. 16.52 EOP18.18' LT.STA. 55+90.57
EL. 16.47 FL.19.68' LT.STA. 55+90.55
(BK. OF RAMP)EL. 16.8027.70' LT.STA. 55+68.56
(TOP OF CURB)EL. 17.55EL. 16.99 SW29.58' RT.STA. 55+05.43
(TOP OF CURB)EL. 17.57EL. 16.99 SW29.58' RT.STA. 55+03.43
¡ Survey
EL. 17.2725.73' RT.STA. 55+13.26
(TOP OF CURB)17.30EL. 16.96 SW35.17' RT.STA. 55+18.80
(TOP OF CURB)EL. 17.33EL. 17.18 SW31.34' RT.STA. 55+15.30
EL. 17.07 SW26.60' RT.STA. 55+17.85
EL. 17.10 SW28.01' RT.STA. 55+17.51
EL. 16.79 SW27.21' RT.STA. 55+21.09
EL. 16.50 FL.27.22' RT.STA. 55+24.61
EL. 16.88 SW33.31' RT.STA. 55+22.31
EL. 16.48 FL.EL. 17.07 SW36.90' RT.STA. 55+29.39
EL. 17.6730.07' RT.STA. 54+95.43
EL. 17.35 SW30.01' RT.STA. 55+12.43
POLE TO REMAIN
CR-C
FL./RAMPEL. 13.6220.90' RT.STA. 62+90.53
FL./RAMPEL. 13.6637.63' RT.STA. 63+10.06
CR-HMOD
EL. 17.29 (TOP OF CURB)37.50' LT.STA. 55+62.04
EL. 17.27 (TOP OF CURB)45.30' LT.STA. 55+61.91
EL. 16.90 FL.STA. 55+61.35, 49.30' LT.
EL. 17.29 SW37.55' LT.STA. 55+68.04
EL. 17.34 SW28.26' LT.STA. 55+86.52
POLE TO REMAIN
EL. 16.95 EOP49.27' LT.STA. 55+59.85
EL. 16.87 FL.40.56' LT.STA. 55+61.49
EL. 16.97 EOP40.54' LT.STA. 55+59.99
EL. 16.84 FL.31.83' LT.STA. 55+61.62
EL. 16.97 EOP31.81' LT.STA. 55+60.12
(TOP OF CURB)EL. 17.30EL. 16.90 SW31.94' LT.STA. 55+68.12
EL. 16.70 FL.23.57' LT.STA. 55+65.10
¡ Survey(TOP OF CURB)EL. 17.30EL. 16.69 SW27.74' LT.STA. 55+78.52
EL. 16.60 EOP18.53' LT.STA. 55+73.30
EL. 16.56 FL.20.03' LT.STA. 55+73.34
EL. 16.82 EOP22.52' LT.STA. 55+64.04
(TOP OF CURB)EL. 17.30EL. 16.7 SW27.72' LT.STA. 55+73.52
FL./RAMPEL. 16.8132.06' LT.STA. 55+09.20
EL. 16.85 FL.25.66' LT.STA. 55+04.83
EL. 16.86 FL.23.59' LT.STA. 55+00.38
EL. 17.33 SW22.51' LT.STA. 54+94.18
EL. 17.43 SW28.09' LT.STA. 54+94.18
(BK. OF CURB)EL. 17.50EL. 16.94 SW27.74' LT.STA. 55+00.28
(TOP OF CURB)EL. 17.50EL. 16.93 SW28.41' LT.STA. 55+01.73
EL. 17.33 SW39.83' RT.STA. 55+20.54 EL. 17.21 SW
38.53' RT.STA. 55+24.33
(TOP OF WALL)EL. 15.70EL. 14.44 SW26.32' RT.STA. 62+70.73
EL. 13.64 SW43.30' RT.STA. 63+06.49
EL. 13.74 SW38.35' RT.STA. 63+05.82
(TOP OF WALL)EL. 15.75EL. 13.76 SW27.81' RT.STA. 62+90.53
EL. 18.04 SW35.82' LT.STA. 74+10.10
EL. 17.86 SW32.69' LT.STA. 74+10.14
EL. 17.06 FL.STA. 74+01.09
EL. 17.02 FL.23.92' LT.STA. 74+02.92
EL. 18.04 SW35.82' LT.STA. 14.73
EL. 17.96 SW32.68' LT.STA. 74+14.72
EL. 17.76 SW28.05' LT.STA. 74+14.71
(TOP OF WALL)EL. 15.75EL. 13.84 SW27.82' RT.STA. 62+85.53
(TOP OF WALL)EL. 15.75 EL. 14.42 SW27.82' RT.STA. 62+79.53
(3.8'x2.8'x1.33')CONTROLLER PAD
(TOP OF CURB)EL. 17.50EL. 17.53 SW37.97' LT.STA. 55+01.47
(TOP OF CURB)EL.17.50EL. 17.08 SW31.98' LT.STA. 55+02.16
REMOVEDPOST TO BE
5'
DR
WY.
AT 10
% *
58+33.97 & 61+84.74GREATER THAN 10% AT STATIONS* - NOTE, 5' DRIVEWAY SLOPE
4" CONC.PROP. 6' SW
TYPE D CURBCURB & REPLACE WITHREMOVE EXIST. GRANITE
N. WILLOW AVENUE
EL. 16.47 FL.19.78 RT.STA. 55+05.44
CURBTYPE DCONST.
R/WExist.
W. CASS STREET - SE CORNER
N. WILLOW AVENUE
CURBTYPE DCONST.
(TOP OF WALL)EL. 15.75 EL. 14.44 SW27.82' RT.STA. 62+75.73
CURBCONST. TYPE D
POLE TO REMAIN
CONNECTION)(PROP/EXIST WALL28.86' RTSTA. 63+00.52 (TOP OF WALL)
EL. 16.10EL. 14.26 SW27.81' RT.STA. 62+96.53
3' R
R/WExist.
W. CYPRESS STREET - SE CORNER
EL. 17.66 SW20.12' LT.STA. 74+14.69
N. WILLOW AVENUE
W. LA SALLE STREET - NW CORNER
Exist. R/W
EL. 17.56 SW20.88' LT.STA. 74+08.09
EL. 17.63 SW24.06' LT.STA. 74+10.23
CONST. TYPE D CURB
(TYP.)SAW CUT
R/WExist.
EL. 17.3938.04' LT.STA. 55+06.76
EL. 17.00 SW32.03' LT.STA. 55+06.34
FL./RAMPEL. 16.9032.06' LT.STA. 55+09.24
CONST. TYPE D CURB
N. WILLOW AVENUE
W. CASS STREET - NW & SW CORNER
3/9/2017aepperson Y:\13-05-1893 RFP 13 D 000027 4 Walk Bike Projs Design Willow Av\43271710000\roadway\SPDTRD01.DGN3:30:57 PM
14 1000260
DATE DESCRIPTION
REVISIONS
DATE DESCRIPTIONNO.
SHEET
SPECIAL DETAILS
CITY OF TAMPA
TRANSPORTATION DEPARTMENT
GREGORY S. TRIM, P.E.
2709 N. ROCKY POINT DR., SUITE 104
P.E. LICENSE NUMBER 52935
SAM SCHWARTZ ENGINEERING
TAMPA, FL 33607
CERTIFICATE OF AUTHORIZATION 30268
CITY PROJECT IDFINANICAL PROJECT ID
432717-1-58-01
EL. 17.34 SW28.27' LT.STA. 55+90.52
R/WExist.
(TYP.)SAW CUT
C>YPE FCONST.
S
ST
24 25 26 27 28
25
+19.1
2PI S
TA.
M
IRV
RM
IRV
CO
Alice Kelly's Subdivision
PLAN OF WEST SIDE PARK
Strain Pole
Strain PoleTrafficStrain Pole
(60'
Platted R/
W)
WV
FH
WM
Conc.
Walk
CSP
CSPTSV
Conc.
Walk
Conc.
TSV
TSVCSP
CSP
Conc. Walk
0.5'
Conc.
Curb
Conc. Walk
Elec.
Cabinet
GI Top= 16.55
=17.63
CI TOP
2'
Conc.
C
& G
= 18.06
CI Top
2'
Conc.
C
&
G
Asph. Traf.
Traf.TAMPA HILLSBOROUGH COUNTY
EXPRESSWAY AUTHORITY
Lot 1, Block 3
W.
PL
AT
T S
TR
EE
T
S. WILLOW AVENUE
Exist. LA R/W
Exist. LA R/W
Exist. LA R/W
N 00°34'05" E
¡ Survey
N 1" = 40'
BM 1
People's Gas6" Plastic GM
People's Gas2" Plastic GM P
eople's
Gas
6"
Pla
stic
GM
Veriz
on
BT - 4'-
6"
Deep/To Re
main
10 40
Feet
0
STA. 26+37.30
RESURFACING
BEG. MILLING AND
W. SWANN AVE. TO W. PLATT ST.
NO SURVEY PROVIDED BETWEEN
NOTE:
Exist.
R/
W
Exist.
LA R/
W
Exist.
R/
W
Exist.
LA R/
W
PO
T S
TA.
10
+00.0
0
10 11
3/9/2017aepperson Y:\13-05-1893 RFP 13 D 000027 4 Walk Bike Projs Design Willow Av\43271710000\roadway\utadrd01.dgn3:30:58 PM
15 1000260
DATE DESCRIPTION
REVISIONS
DATE DESCRIPTIONNO.
SHEET
UTILITY ADJUSTMENTS (1)
N. WILLOW AVENUE
CITY OF TAMPA
TRANSPORTATION DEPARTMENT
GREGORY S. TRIM, P.E.
2709 N. ROCKY POINT DR., SUITE 104
P.E. LICENSE NUMBER 52935
SAM SCHWARTZ ENGINEERING
TAMPA, FL 33607
CERTIFICATE OF AUTHORIZATION 30268
CITY PROJECT IDFINANICAL PROJECT ID
432717-1-58-01
MA
TC
H LIN
E
AT S
TA.
28
+00.0
0
3. UTILITY/AGENCY OWNERS: COMPANY CONTACT TELEPHONE NUMBERS RESPONSE AS OF 01/14/15
2. EXISTING UTILITIES ARE TO REMAIN IN PLACE UNLESS OTHERWISE NOTED.
LIMITED INVESTIGATION TECHNIQUES AND SHOULD BE CONSIDERED APPROXIMATE ONLY.
1. THE LOCATION(S) OF THE UTILITIES SHOWN IN THE PLANS ARE BASED ON
UTILITY NOTES
W.
SW
AN
N
AV
E.
STA. 10+20.00
BEGIN PROJECT
813-684-6100 x 34097
877-366-8344 ext 2
813-978-2158
813-627-8343
813-275-3762
813-275-3743
813-301-4047
813-274-8633
813-274-8066
813-274-8095
813-274-8676
813-274-8121
813-275-3037
NOT INVOLVED
NOT INVOLVED
INVOLVED
INVOLVED
INVOLVED
INVOLVED (NORTH A ST. TO NORTH B ST.)
INVOLVED
INVOLVED
INVOLVED
INVOLVED
INVOLVED
Bright House Networks
Level 3 Communications LLC
Verizon Florida, Inc.
TECO
TECO-Peoples Gas-Tampa
XO Communications
City of Tampa Transportation Dept.
City of Tampa Sewer Department
City of Tampa Water Department
Tampa Electric Company
Mr. Don Pullen
Mr. Micheal Nunez
Mr. Daniel Collings
Mr. David Wynns
Mr. Ted Felegy
Mr. Luis Castellano
Mr. Jeff Sbrocco
Mr. Mike Honeycutt
Mr. Vik Bhide
Mr. Jack Ferras
Ferraro Jacobs
Mr. Rory Jones
Mr. Jason Cooper
S
28 29 30 31 PI S
TA.
31
+37.3
3
32 33
M
Strain Pole
WM
(60'
PL
AT
TE
D R/
W)
TA
MP
A HILLS
BO
RO
UG
H C
OU
NT
Y
EX
PR
ES
SW
AY A
UT
HO
RIT
Y
Conc. Walk
Conc. Walk
12"P
TSV
Elec.Cabinet
CSP
12"PConc. Columns(Typ.)
Conc. Columns(Typ.)
0.5' Conc.Curb
12"P
2' Conc. C & G
2' Conc. C & G
TA
MP
A HILLS
BO
RO
UG
H C
OU
NT
Y
EX
PR
ES
SW
AY A
UT
HO
RIT
Y
EOP
EOP
CI Top= 13.94
CI Top= 14.34
Traf.
CLE
VE
LA
ND S
TR
EE
T
S. WILLOW AVENUE
Exist. LA R/W
N 00°34'05" E
Exist. LA R/W
¡ Survey
N 1" = 40'
People's
Gas
6"
Pla
stic
GM
People's Gas6" Plastic GM
Veriz
on
BT - 4'
Deep/To Re
main
Veriz
on
BT - 2'-
6"
Deep/To Re
main
VerizonOH Tel./To Remain
CLE
VE
LA
ND S
TR
EE
T
Veriz
on
OH Tel./To Re
main
10 40
Feet
0
STA. 31+15.53
RESURFACING
END MILLING AND
BM 2
CLEVELAND ST. AND W. CASS ST.
NO SURVEY PROVIDED BETWEEN
NOTE:
Exist.
R/
W
Exist.
R/
W
Exist.
R/
W
28
+00.0
0
3/9/2017aepperson Y:\13-05-1893 RFP 13 D 000027 4 Walk Bike Projs Design Willow Av\43271710000\roadway\utadrd02.dgn3:30:59 PM
16 1000260
DATE DESCRIPTION
REVISIONS
DATE DESCRIPTIONNO.
SHEET
UTILITY ADJUSTMENTS (2)
N. WILLOW AVENUE
CITY OF TAMPA
TRANSPORTATION DEPARTMENT
GREGORY S. TRIM, P.E.
2709 N. ROCKY POINT DR., SUITE 104
P.E. LICENSE NUMBER 52935
SAM SCHWARTZ ENGINEERING
TAMPA, FL 33607
CERTIFICATE OF AUTHORIZATION 30268
CITY PROJECT IDFINANICAL PROJECT ID
432717-1-58-01
MA
TC
H LIN
E
AT S
TA.
28
+00.0
0
54 55 56 57 58 59
MM
MM
M
Extension of Collins Addition
M
Revised Plat of Woodlawn Park
WM
WMWM
WMWM
Conc.
Walk
Conc.
Walk
Vault Vault
Lot 1, Block 30Lot 2, Block 30Lot 3, Block 30Lot 4, Block 30
Lot 5, Block 30
¢
WV
WV
6'CLF
1-Story
Masonry
FH
Conc.
1-Story Masonry
WM
TSV
4" Crepe MyrtleConc.
Conc.
Walk
Brick RoadBrick Rd.
10"P
PedestrianWalk Post
PedestrianWalk Post
GV
WV
WV
Strain Pole
Light Pole
TSV Conc.
Lot 24, Block 5 Lot 23, Block 5
Lot 1, Block 21
Conc.
10"O
12"O
6"O8"U
12"Palms
Elec.Cabinet
0.5'
Conc.Curb
0.5'
Conc.
Curb
Bric
k
Bric
k
24"
Asph.
Asph.
Asph.
Asph.
Traf.
Asph.
Face of Bld
g.
Asph.
Asph.
Masonry
Wall
Conc. Dr.
Collins AdditionExtension of
¢ ¢
Dr.
Block 5
Lot 22,
N. WILLOW AVENUE
W.
CA
SS S
TR
EE
T
W.
CA
SS S
TR
EE
T
N 00°48'41" EN 00°50'07" E
Exist. R/W
¡ Survey
N 1" = 40'
BM 3
People's Gas4" CI GM
People's
Gas
4"
CI
GM
VerizonOH Tel./To Remain
Veriz
on
OH Tel./To Re
main
Veriz
on
3'-
10"
Deep/To Re
main
1-1.2
5"
Poly
pip
e
w/F
OC
BY CONTRACTOR
CITY
OF T
AMPA/
WATE
R METE
R BOX/
ADJU
ST
BY C
ON
TR
AC
TO
RCIT
Y
OF T
AM
PA/
ADJ
US
TW
AT
ER
ME
TE
R B
OX/
VE
RIZ
ON/B
Y
OT
HE
RS
2'x
3'
VA
ULT/
ADJ
US
T
BY C
ON
TR
AC
TO
RCIT
Y
OF T
AM
PA/
ADJ
US
TW
AT
ER
ME
TE
R B
OX/
BY C
ON
TR
AC
TO
RCIT
Y
OF T
AM
PA/
ADJ
US
TW
AT
ER
ME
TE
R B
OX/
Exist. R/W
VE
RIZ
ON/B
Y
OT
HE
RS
2'x
3'
VA
ULT/
ADJ
US
T
BY C
ON
TR
AC
TO
RCIT
Y
OF T
AM
PA/
ADJ
US
TW
AT
ER
ME
TE
R B
OX/
CLEVELAND ST. AND W. CASS ST.
NO SURVEY PROVIDED BETWEEN
NOTE:
Exist.
R/
W
Exist.
R/
W
Exist.
R/
W
Exist.
R/
W
Exist.
R/
W
Exist.
R/
W
Exist.
R/
W
Exist.
R/
W
Exist.
R/
W
Exist.
R/
W
PI +69.1
0
PI +94.0
3
PI +01.2
3
PI +15.6
4
EL.
16.8
6
PI +27.3
6
EL.
16.8
3
PI +36.9
3
EL.
16.8
0PI +45.1
6
EL.
16.7
6
PI +83.1
9
EL.
16.6
1
PI +97.4
7
EL.
16.5
2
PI +14.7
9
EL.
16.2
3
PI +44.7
5
PI +75.4
3
EL.
16.1
9
PI +93.3
9
EL.
16.2
3PI +99.3
7
EL.
15.7
9
PI +05.3
9
EL.
15.4
0
EL.
17.5
0 B.C.
EL.
16.7
5E
L.
17.5
0 B.C.
EL.
16.8
9E
L.
17.5
0 B.C.
EL.
16.8
5E
L.
17.5
0 B.C.
16.8
6 B.C.
EL.
17.3
5 B.C.
EL.
17.4
0 B.C.
16.2
2 S
W
EL.
17.5
0 B.C.
EL.
17.2
5 B.C.
EL.
17.2
0 B.C.
EL.
17.2
0 B.C.
EL.
17.0
0 B.C.
EL.
16.5
0 B.C.
EL.
17.3
0 B.C.
EL.
16.1
0 B.C.
EL.
16.4
0 B.C.
EL.
15.7
0 B.C.
GRADE (RT.)PROP. SW
GRADE (RT.)PROP. B.C.
Grade (RT.)Exist. R/W
Exist.
EO
P 16.3
9
Exist.
EO
P 15.6
3
Grd. Line¡ Survey
EL.
16.2
7PI +41.7
1
PI +59.3
9
PI +51.1
1
EL.
16.9
3
EL.
17.5
0 B.C.
EL.
16.1
9 B.C. 1
5.2
7 F
L./
RA
MP
B.C. (RT.)PROP. TOP
PROP. TOP B.C. (RT.)
VERIZON BFO
PROP. TOP B.C. (RT.)
EL.
16.2
3 B.C.
FL.
15.4
6
FL.
15.2
8
PI +00.1
6B
EG.
GU
TT
ER
PI +07.0
7
GUTTER (RT.)PROP. VALLEY
Grd. Line (RT.)Exist. EOP/Flow
EO
P/F
LO
W E
L.
16.0
0D
RW
Y S
TA.
57
+08.9
0
EO
P/F
LO
W E
L.
16.0
657
+32.1
7D
RW
Y S
TA.
EO
P/F
LO
W E
L.
15.5
0D
RW
Y S
TA.
58
+33.9
7
PI +23.1
6
EL.
16.5
0
EL.
16.5
0
PI +44.7
0
EL.
18.4
0 B.C.
PI +19.0
0
EL.
18.4
0 B.C.
PI +23.5
0
PI +49.0
0
EL.
17.4
0 B.C.
53
+60.0
0
59
+20.0
0
3/9/2017aepperson Y:\13-05-1893 RFP 13 D 000027 4 Walk Bike Projs Design Willow Av\43271710000\roadway\utadrd03.dgn3:31:00 PM
17 1000260
DATE DESCRIPTION
REVISIONS
DATE DESCRIPTIONNO.
SHEET
UTILITY ADJUSTMENTS (3)
N. WILLOW AVENUE
CITY OF TAMPA
TRANSPORTATION DEPARTMENT
GREGORY S. TRIM, P.E.
2709 N. ROCKY POINT DR., SUITE 104
P.E. LICENSE NUMBER 52935
SAM SCHWARTZ ENGINEERING
TAMPA, FL 33607
CERTIFICATE OF AUTHORIZATION 30268
CITY PROJECT IDFINANICAL PROJECT ID
432717-1-58-01
1" = 2' VERT.
SCALE: 1" = 40' HORIZ.
12
16
2020
16
12
54 55 56 57 58 59
MA
TC
H LIN
E
AT S
TA.
59
+20.0
0
Exist.
EO
P 16.5
4
OUTSIDE EDGE OF CURB
ARE TYPICALLY 0.12' ABOVE
BACK OF SW ELEVATIONS
NOTE:
60 61 62 63 64
M
Extension of Collins Addition
M
S 89°1
6'2
1"
E'
WMVault
Conc.Walk
Elec.Cabinet
TSV
Conc.
Walk
Masonry
Wall
Vault
Conc.
Conc.Walk
Conc. Walk
Masonry WallVault
4'
CLF
10"P
10"P
Masonry
Wall
(Poor Conditio
n)
24"O
(Poor Condition)
Brick Rd.
(50'
Platted R/
W)
Lot 1, Block 31Lot 2, Block 31Lot 3, Block 31
Lot 4, Block 31Lot 5, Block 31
Lot 2, Block 1
10"P10"P
Brick
Brick
Asph.
Asph.
Conc.
Dr.
Dr.
Asph.
= 14.10
CI Top
Sec.
14 - T
wp.
29 S. - Rng 18 E.
Sec.
23 - T
wp.
29 S. - Rng 18 E.
¢ ¢ ¢ ¢
¢ ¢
N. WILLOW AVENUE
W.
LE
MO
N S
TR
EE
T
W.
CYP
RE
SS S
TR
EE
TN 00°48'41" E
Exist. R/W
Exist. R/W
¡ Survey
N 1" = 40'
BM 4
BM 5
People's Gas4" CI GM
People's
Gas
4"
CI
GM
People's Gas4" CI GM
Veriz
on
11"x
17"
Vault/To Re
main
Veriz
on
3'-
10"
Deep/To Re
main
1-1.2
5"
Poly
pip
e
w/F
OC
Veriz
on
11"x
17"
Vault/To Re
main
BY C
ON
TR
AC
TO
RCIT
Y
OF T
AM
PA/
ADJ
US
TW
AT
ER
ME
TE
R B
OX/
BY C
ON
TR
AC
TO
RCIT
Y
OF T
AM
PA/
ADJ
US
TW
AT
ER
ME
TE
R B
OX/
VE
RIZ
ON/B
Y
OT
HE
RS
11"x
17"
VA
ULT/
ADJ
US
T
W. CYPRESS ST. AND W. NASSAU ST.
NO SURVEY PROVIDED BETWEEN
NOTE:
BY C
ON
TR
AC
TO
RCIT
Y
OF T
AM
PA/
CA
BIN
ET/R
EL
OC
AT
ESIG
NA
L C
ON
TR
OLLE
R
60"
pip
e60"
pip
e
Exist.
R/
W
Exist.
R/
W
Exist.
R/
W
PI +77.0
5
EL.
15.9
4
PI +88.3
2
EL.
15.9
0
PI +24.6
8
EL.
15.9
0
PI +28.4
4
EL.
15.9
0PI +39.8
9
EL.
15.8
3
PI +57.0
1
EL.
15.7
8
PI +64.3
7
EL.
15.7
7
PI +75.4
8
EL.
15.7
6
PI +89.4
9
EL.
15.5
0
PI +09.6
6
EL.
15.4
8
(-) 0.101%
PI +17.1
9
EL.
15.4
7
PI +29.1
9
EL.
15.4
0
PI +36.6
8
EL.
15.3
1
PI +52.4
0
EL.
15.1
1
PI +71.7
8
EL.
14.8
8
PI +77.6
5
PI +89.5
9
EL.
14.9
1
PI +96.8
2
EL.
14.9
0 PI +14.4
2
PI +41.3
7
EL.
14.5
6
PI +90.5
3
EL.
13.7
6
PI +96.5
3
EL.
14.2
6
EL.
15.2
2 S
WE
L.
15.7
2 B.C.
EL.
16.4
0 B.C.
EL.
16.5
0 B.C.
EL.
16.5
0 B.C.
EL.
16.5
0 B.C.
EL.
16.5
0 B.C.
EL.
16.6
0 B.C.
EL.
16.3
3
WA
LL
EL.
16.7
5
WA
LL
EL.
15.6
5 B.C.
EL.
15.7
0 B.C.
PI +52.4
0
EL.
15.7
5
WA
LL
EL.
16.1
0
WA
LL
14.3
5 B
AC
K
OF S
W
16.1
8 T
OP
OF
WA
LL
Grd. Line¡ Survey
Exist.
EO
P 15.6
3
Exist.
EO
P 13.9
8
PI +80.3
5
EL.
15.7
5PI +82.3
5
EL.
15.7
0
EL.
15.7
5
PI +77.4
8
EL.
16.5
0 B.C.
EL.
16.3
3
WA
LL
EL.
15.9
0
WA
LL
PI +17.0
5
EL.
15.3
2
WA
LL
PI +19.4
0
EL.
15.3
2
WA
LL
PI +21.7
8
EL.
15.9
0
WA
LL
EL.
15.9
0
WA
LL
Grade (RT.)Exist. R/W
EL.
16.7
5
WA
LL
WALL (RT.)PROP. TOP OF
VERIZON BFO
FL.
15.0
8
PI +68.0
7
EL.
15.2
0
PI +73.0
1E
ND
GU
TT
ER
B.C. (RT.)PROP. TOP
EL.
16.7
5
WA
LL
PI +64.3
4
EL.
14.4
5E
L.
15.7
5
WA
LL
EL.
14.4
4
PI +85.5
3
EL.
13.8
4E
L.
15.7
5
WA
LL
EL.
14.4
2
PI +79.5
3
PI +70.7
3
EL.
15.7
5
WA
LL
Grd. Line (RT.)Exist. EOP/FLOW
EO
P/F
LO
W E
L.
15.0
6D
RW
Y S
TA.
60
+48.4
3
EO
P/F
LO
W E
L.
14.6
7D
RW
Y S
TA. 61
+23.1
7
EO
P/F
LO
W E
L.
14.1
8D
RW
Y S
TA.
61
+84.7
0
@ 0.30%GUTTER (RT.)PROP. VALLEY
EL.
16.6
5
WA
LL
EL.
16.8
0
WA
LL
EL.
16.5
0
WA
LL
PI +64.8
6
EL.
16.3
0
WA
LL
EL.
15.8
0 B.C./
WA
LL
EL.
15.7
5
WA
LL
EL.
16.6
5 B.C./
WA
LL
EL.
16.2
5 B
C/
WA
LL
PI +91.6
6
PI +79.8
6
EL.
14.9
5
53
+60.0
0
59
+20.0
0
3/9/2017aepperson Y:\13-05-1893 RFP 13 D 000027 4 Walk Bike Projs Design Willow Av\43271710000\roadway\utadrd04.dgn3:31:01 PM
18 1000260
DATE DESCRIPTION
REVISIONS
DATE DESCRIPTIONNO.
SHEET
UTILITY ADJUSTMENTS (4)
N. WILLOW AVENUE
CITY OF TAMPA
TRANSPORTATION DEPARTMENT
GREGORY S. TRIM, P.E.
2709 N. ROCKY POINT DR., SUITE 104
P.E. LICENSE NUMBER 52935
SAM SCHWARTZ ENGINEERING
TAMPA, FL 33607
CERTIFICATE OF AUTHORIZATION 30268
CITY PROJECT IDFINANICAL PROJECT ID
432717-1-58-01
12
16
20
12
16
20
OUTSIDE EDGE OF CURB
ARE TYICALLY 0.12' ABOVE
BACK OF SW ELEVATIONS
NOTE:
1" = 2' VERT.
SCALE: 1" = 40' HORIZ.
60 61 62 63 64
MA
TC
H LIN
E
AT S
TA.
59
+20.0
0E
xist. ¡ S
urvey 15.8
5
Exist. ¡ S
urvey 13.9
8
67 68 69 70 71 72
Map of Phillip Collins
Map of Munro's and Lewis'
M
Conc. Steps
MUP
(60'
Platted R/
W)
(60'
Platted R/
W)
Brick Road
WV
Conc.
Walk
WV
Brick
Conc. Walk
0.5' Conc.Curb
WV
FHMasonry Wall4
' C
LF
Lot 24, Block 4
Lot 1, Block 5
Lot 24, Block 5
14'
Platted
Alley
(Unim
proved)
Lot 13, Block 3Lot 12, Block 6
MUP
Conc.Walk
WMMB 12"P 10"P
Conc.
4'CLF
Asph.
Asph.
2nd Addition to W. Tampa
Addition to W. Tampa
W.
NA
SS
AU S
TR
EE
T
W.
AR
CH S
TR
EE
T
N. WILLOW AVENUE
N 00°48'44" E
Exist. R/W
Exist. R/W Exist. R/W
¡ Survey
Exist. R/W
N 1" = 40'
BM 6
VerizonOH Tel./To Remain
Cit
y of Ta
mpa
8"
DIP
WM City of Tampa
6" DIP WM
City of Tampa12" CAS WM
CIT
Y
OF T
AM
PA/B
Y C
ON
TR
AC
TO
RW
AT
ER
ME
TE
R B
OX/
ADJ
US
T
W. CYPRESS ST. AND W. NASSAU ST.
NO SURVEY PROVIDED BETWEEN
NOTE:
CIT
Y
OF T
AM
PA/B
Y C
ON
TR
AC
TO
RB
URIE
D/
ADJ
US
TW
AT
ER
VA
LV
E B
OX
Exist.
R/
W
Exist.
R/
W
Exist.
R/
W
Exist.
R/
W
Exist.
R/
WE
xist.
R/
W
Exist.
R/
W
Exist.
R/
W
PI +83.5
4
EL.
16.0
0
PI +22.3
3
EL.
16.2
5
PI +62.2
4
EL.
16.0
8
PI +85.1
0
PI +95.1
9
PI +02.2
7
EL.
16.4
4
PI +16.2
4
EL.
16.4
9
PI +46.6
3
EL.
16.6
9
PI +86.7
3
EL.
16.7
4
EL.
17.0
0 B.C.
EL.
17.0
0 B.C.
EL.
17.0
0 B.C.
EL.
16.5
7 S
W.
EL.
17.0
0 B.C.
EL.
17.2
4 B.C.
EL.
17.4
4 B.C.
EL.
17.0
0 B.C.
EL.
16.7
6 S
W
& B.C.
SW GRADE (LT.)PROP. BACK OF
Grd. Line (LT.)Exist. EOP
B.C. (LT.)PROP. TOP
PI +78.0
1E
L.
16.1
0E
L.
17.0
0 B.C.
EL.
16.5
9 S
W
EL.
15.5
8 S
W
& B.C.
EL.
16.5
7 B.C.
EL.
16.7
9 B.C.
PI +69.1
1
EL.
16.7
2E
L.
17.1
5 B.C.
GRADE (LT.)Exist. R/W
B.C. (LT.)PROP. TOP
EO
P E
L.
15.8
3D
RW
Y S
TA.
69
+89.4
4
Grd. Line¡ Survey
PI +27.1
2
EL.
16.7
5 B.C.
PI +25.1
2
PI +19.8
4
EL.
17.0
0 B.C.
PI +21.8
4
EL.
16.7
5 B.C.
53
+60.0
0
59
+20.0
0
53
+60.0
0
59
+20.0
0
3/9/2017aepperson Y:\13-05-1893 RFP 13 D 000027 4 Walk Bike Projs Design Willow Av\43271710000\roadway\utadrd05.dgn3:31:01 PM
19 1000260
DATE DESCRIPTION
REVISIONS
DATE DESCRIPTIONNO.
SHEET
UTILITY ADJUSTMENTS (5)
N. WILLOW AVENUE
CITY OF TAMPA
TRANSPORTATION DEPARTMENT
GREGORY S. TRIM, P.E.
2709 N. ROCKY POINT DR., SUITE 104
P.E. LICENSE NUMBER 52935
SAM SCHWARTZ ENGINEERING
TAMPA, FL 33607
CERTIFICATE OF AUTHORIZATION 30268
CITY PROJECT IDFINANICAL PROJECT ID
432717-1-58-01
12
16
20
12
16
20
OUTSIDE EDGE OF CURB
ARE TYICALLY 0.12' ABOVE
BACK OF SW ELEVATIONS
NOTE:
1" = 2' VERT.
SCALE: 1" = 40' HORIZ.
67 68 69 70 71 72
MA
TC
H LIN
E
AT S
TA.
72
+00.0
0
Exist. ¡ S
urvey 15.8
4
Exist.
EO
P 15.5
6
Exist.
EO
P 16.5
0E
xist. ¡ S
urvey 17.0
6
S
72 73 74 75 76
EB
Map of Phillip Collins
(S.R.
93)
Map of Phillip Collins
GM
14'
Platted
Alley
(Unim
proved)
(60'
Platted R/
W)
(60' Platted R/W)
Lot 24, Block 1
Lot 1, Block 1
FDOT
CPVault
05.' Conc. Curb
Brick Rd.
MUP
WV
10"P
MUP
GV
WV
10"P
10"P
Conc.
Walk
Brick
Brick Rd.
14'
Platted
Alley
Lot 12, Block 3
Exception Exception
Asph.
EO
P
Asph.
EO
P
2nd Addition to W. Tampa2nd Addition to W. Tampa
Interstate - 275
Overpass
(S.R.
93)
Interstate - 275
Overpass
Lot 13, Block 3
Lot 24, Block 4
W.
LA S
ALLE S
TR
EE
T
N 00°48'44" E
Exist. R/W
Exist. R/W
Exist. R/W Exist. LA R/W
Exist. R/W
Exist. R/W
¡ Survey
N. WILLOW AVENUE
BM 7
People's Gas6" Plastic GM
People's
Gas
2"
Pla
stic
GM
City of Tampa6" UCI WM
Cit
y of Ta
mpa
8"
DIP
WM
Cit
y of Ta
mpa
8"
DIP
WM
Cit
y of Ta
mpa
8"
DIP
WM
CIT
Y
OF T
AM
PA/B
Y C
ON
TR
AC
TO
RW
AT
ER
VA
LV
E B
OX/
ADJ
US
T
STA. 75+62.32 AND W. MAIN ST.
NO SURVEY PROVIDED BETWEEN
NOTE:
Exist.
R/
W
Exist.
R/
W
Exist.
R/
W
Exist.
R/
W
Exist. R/
W
Exist.
R/
W
Exist.
R/
WE
xist.
R/
W
81 PO
T S
TA.
81
+76.2
2
PI +05.6
0
EL.
17.3
1
PI +14.7
1
EL.
17.7
6
PI +29.0
0
EL.
17.8
6
EL.
17.9
1
PI +17.5
0
EL.
17.9
4
PI +47.2
7
EL.
17.9
8
PI +03.6
0
EL.
17.1
5
PI +73.9
6
Grd. Line¡ Survey
Grd. Line (LT.)Exist. EOP
EL.
17.9
0 S
WGRADE (LT.)Exist. R/W
EO
P E
L.
18.0
9Unim
proved
Alley
EL.
17.0
9 S
W
PI +10.1
9
EL.
17.6
8 SW GRADE (LT.)PROP. BACK OF
59
+20.0
059
+20.0
059
+20.0
0
3/9/2017aepperson Y:\13-05-1893 RFP 13 D 000027 4 Walk Bike Projs Design Willow Av\43271710000\roadway\utadrd06.dgn3:31:02 PM
20 1000260
DATE DESCRIPTION
REVISIONS
DATE DESCRIPTIONNO.
SHEET
UTILITY ADJUSTMENTS (6)
N. WILLOW AVENUE
CITY OF TAMPA
TRANSPORTATION DEPARTMENT
GREGORY S. TRIM, P.E.
2709 N. ROCKY POINT DR., SUITE 104
P.E. LICENSE NUMBER 52935
SAM SCHWARTZ ENGINEERING
TAMPA, FL 33607
CERTIFICATE OF AUTHORIZATION 30268
CITY PROJECT IDFINANICAL PROJECT ID
432717-1-58-01
12
16
20
12
16
20
OUTSIDE EDGE OF CURB
ARE TYICALLY 0.12' ABOVE
BACK OF SW ELEVATIONS
NOTE:
1" = 2' VERT.
SCALE: 1" = 40' HORIZ.
53
+60.0
0
72 73 74 75 76 77
MA
TC
H LIN
E
AT S
TA.
72
+00.0
0
Exist.
EO
P 16.5
0E
xist. ¡ S
urvey 17.0
6
Exist. ¡ S
urvey 18.0
0E
xist.
EO
P 17.5
3
STA. 81+57.00
END PROJECT
W.
MAIN S
TR
EE
T