23
© Siemens AG 2014 All rights reserved. siemens.com/energy/fossil-power-generation Plant Optimization through Integrated Design Update on H Class technology from Siemens PowerGen India & Central Asia, New Delhi, May 2014 Himanshu Garg VP, New Plants & Services Sales South Asia

Plant Optimization through Integrated Design - Siemenstablet.energy.siemens.com/hq/pool/hq/energy-topics/pdfs/en... · Plant Optimization through Integrated Design ... Overhead crane

Embed Size (px)

Citation preview

© Siemens AG 2014 All rights reserved. siemens.com/energy/fossil-power-generation

Plant Optimization through Integrated Design Update on H Class technology from Siemens

PowerGen India & Central Asia, New Delhi, May 2014

Himanshu GargVP, New Plants & Services SalesSouth Asia

Sfar/ Garg @ Power-Gen India & Central Asia 2014New Delhi, May 5-7, 2014 © Siemens AG 2014 All rights reserved.Page 2

Siemens Energy Solutions CCPP’s –Leading questions…

Wirkungsgrad

OnDemand

Netz-Stabilisierung

1. How to cope with the increasing energy demand, increase profitability and save the environment?

2. How can different load profiles be compensated by rapid availability of

CCPP’s?

3. How can CCPP’s provide grid support

and stable operation in case of grid incidents?

Sfar/ Garg @ Power-Gen India & Central Asia 2014New Delhi, May 5-7, 2014 © Siemens AG 2014 All rights reserved.Page 3

What I would like to talk about today…

• Siemens Energy Solutions product portfolio

• Our plant design philosophy to meet major market drivers

• Dangjin 3 – Asia’s most efficient plant

• Service Concept

• Operational experience

• Conclusions

Sfar/ Garg @ Power-Gen India & Central Asia 2014New Delhi, May 5-7, 2014 © Siemens AG 2014 All rights reserved.Page 4

50 H

z SGT5-8000H

SGT5-4000FSGT5-2000E

295 MW

172 MW

375 MW

SGT6-8000H

112 MWSGT6-5000F

SGT6-2000E

274 MW232 MW

60 H

z

Indu

stria

l Gas

Tur

bine

sLa

rge-

scal

eG

as T

urbi

nes

Pow

er G

ener

atio

n

Oil

& G

as P

ower

Gen

erat

ion

Mec

hani

cal D

rive

50/6

0 H

z

47/50 MW

31 MW25 MW

8 MW7 MW

SGT-800

5 MW

36 MW

19 MW13 MW

SGT-800

SGT-750SGT-700SGT-600SGT-500SGT-400

SGT-300SGT-200

SGT-100

Output in MW @ ISO conditions

Siemens Gas Turbines for 50Hz and 60Hz markets

Sfar/ Garg @ Power-Gen India & Central Asia 2014New Delhi, May 5-7, 2014 © Siemens AG 2014 All rights reserved.Page 5

SCC5-4000F

SCC6-5000F

We deliver tailor-made power plants based on proven standards

E-ClassRobust & Durable

F-ClassFlexible & Reliable

H-ClassPioneering & Proven

50 Hz

60 Hz

SSC5-2000E

SCC6-8000H

SCC5-8000H

SSC6-2000E

Pre-engineered power plant solutions available as Simple (SSC) or Combined Cycle (SCC)

Sfar/ Garg @ Power-Gen India & Central Asia 2014New Delhi, May 5-7, 2014 © Siemens AG 2014 All rights reserved.Page 6

862 MW

1140 MW

Gas fired power plantsPower output ranges in standard configurations

All values: ISO base rating

410 MW

690 MW

820 MW

171 MW

342 MWS

impl

e cy

lce

Com

bine

d

cycl

e

112 MW

232 MW232MW

345 MW

570 MW

253 MW

341 MW

295 MW

512 MW

SCC5-8000H 2x1

SCC5-4000F 2x1

SCC5-8000H 1S

SCC5-4000F 1S

SCC5-2000E 1x1

SSC5-2000E

SSC5-4000F

SCC5-2000E 2x1

SCC6-8000H 2x1

SCC6-5000F 2x1

SCC6-8000H 1S

SCC6-2000E 1x1

SSC6-2000E

SSC6-5000F

SCC6-2000E 2x1

50 Hz

SCC6-5000F 1x1

60 Hz

172 MW

Sfar/ Garg @ Power-Gen India & Central Asia 2014New Delhi, May 5-7, 2014 © Siemens AG 2014 All rights reserved.Page 7

SCC5-8000H 1S

SCC-8000H seriesPerformance and configuration overview

SCC-8000H 2x1

SCC5/6-8000H 2x1

50 Hz 60 Hz

SGT-PAC 8000H 375 MW 274 MW40 % 40 %

SCC-8000H 1S 570 MW 410 MWSCC-8000H 1x1 > 60 % > 60 %

SCC-8000H 2x1 1.145 MW 824 MW> 60 % > 60 %

SCC-8000H 3x1 - - 1.236 MW- - > 60 %

SCC6-8000H 3x1

Sfar/ Garg @ Power-Gen India & Central Asia 2014New Delhi, May 5-7, 2014 © Siemens AG 2014 All rights reserved.Page 8

Highest efficiency

SCC-8000H – supporting the Customer requirements…

Wirkungsgrad

OnDemand

Netz-Stabilisierung

Sfar/ Garg @ Power-Gen India & Central Asia 2014New Delhi, May 5-7, 2014 © Siemens AG 2014 All rights reserved.Page 9

Power plant solutions as an outcome of an integrated approach

Thermal stress optimization

Load Ramp

Start-up readiness

Opt

imiz

atio

n C

riter

ia

Integrated Plant

Design

GT limits

ST limits

HRSG limits

Water chemistry

Controlsystem

Piping limits

Electrical limits

GT

ST

HRSG

Condenser

Auxiliaries

Control

system

BOP

Start-up

procedure

Environment

Market B

oundaries

Flexibility

Profitability

Integrated Plant design

FACY enables the world’s fastest start-up times without additional life time consumption

Sfar/ Garg @ Power-Gen India & Central Asia 2014New Delhi, May 5-7, 2014 © Siemens AG 2014 All rights reserved.Page 10

Dangjin 3 (former Bugok 3) – South KoreaSCC6-8000H 1S

Sfar/ Garg @ Power-Gen India & Central Asia 2014New Delhi, May 5-7, 2014 © Siemens AG 2014 All rights reserved.Page 11

SCC6-8000H 1S – Dangjin 3 Proven H-class using advanced cycle technology

Sfar/ Garg @ Power-Gen India & Central Asia 2014New Delhi, May 5-7, 2014 © Siemens AG 2014 All rights reserved.Page 12

HRSG design

• Live steam temp.: 600 °C• Reheat temp: 600 °C

11-Nov-2010

Ulrich Hartmann (Irsching #4, Germany)600°C steam parameter @ SH and RH section

Dangjin 3 (South Korea)585°C steam parameter with T91 material @ SH

and RH section

• Live steam temp.: 585 °C

• Reheat temp: 585 °C

• Live steam temp.: 600 °C

• Reheat temp: 600 °C

Siemens is the only company with a 600 ºC HRSG in operation. HRSG solution for 600 ºC according ASME design available

Sfar/ Garg @ Power-Gen India & Central Asia 2014New Delhi, May 5-7, 2014 © Siemens AG 2014 All rights reserved.Page 13

Dangjin 3 – A globally optimized and integrated design based on a compact low level arrangement

Benson® HRSG w/ Boiler House

Seal oil

IP/LP drums

HP separator

Steam Turbine

Main Transformer

PCC’s GasTurbineGenerator

Overhead crane

Lube oil skid

Air intakeGenerator Circuit

Breaker

Vacuum pumpid

Stack

Sfar/ Garg @ Power-Gen India & Central Asia 2014New Delhi, May 5-7, 2014 © Siemens AG 2014 All rights reserved.Page 14

Danjing 3 – Environmental, Health and Safety (EHS) performance sets a benchmark…

50

2932

45

67

59

27

1117

0,070,09

0,130,17

0,20

0,140,15

0,52

0

10

20

30

40

50

60

70

2004 2005 2006 2007 2008 2009 2010 2011 20120,0

0,1

0,2

0,3

0,4

0,5

0,6

Mio Man-hours LTAFR

-87%0,20

LTAFRMio man-hours

… confirming overall Siemens Energy Solutions project execution excellence

LTA = Lost Time Accident LTAFR =LTAs x 100.000Man-hours worked

Dangjin 3 (2013) Man hours: 1,470 Mio LTAFR: 0,07

LTAFR Development Status as of November 2012

Sfar/ Garg @ Power-Gen India & Central Asia 2014New Delhi, May 5-7, 2014 © Siemens AG 2014 All rights reserved.Page 15

We are your most trusted partner offering cutting edge integrated solutions at highest quality

We want to become the leading power producing company in Asia. And we want to continue our partnership with Siemens“ „

Beyond 60 % efficiency: Dangjin – the most efficient fossil power plant in Asia

Using top quality components and software, Siemens engineered an outstanding power plant solution

Wan-Kyoung Lee President and CEO GS EPS Co. LtdSeoul Korea

“ „

Sou

rce:

ww

w.g

seps

.com

Sfar/ Garg @ Power-Gen India & Central Asia 2014New Delhi, May 5-7, 2014 © Siemens AG 2014 All rights reserved.Page 16

All rotating blades, including compressor, are replaceable without a rotor lift.

8000H Maintainability

The SGTX-8000H core engine was designed for easy and fast maintenance

Row 1 Turbine Blades/Vanes/Ring Segments & Row 4 Blades can be replaced with or without cover lift.

Vane 1 Removal Turbine Blade 4 Removal

Sfar/ Garg @ Power-Gen India & Central Asia 2014New Delhi, May 5-7, 2014 © Siemens AG 2014 All rights reserved.Page 17

Roll out/in capability of the turbine vane carrier enables exchange of stationary turbine hardware without rotor lift.

Roll out/in capability also allows for optional assembled spare vane carrier exchange concept which further reduces outage durations

The SGTX-8000H core engine was designed for easy and fast maintenance

8000H Maintainability

Sfar/ Garg @ Power-Gen India & Central Asia 2014New Delhi, May 5-7, 2014 © Siemens AG 2014 All rights reserved.Page 18

8000H Maintainability

The Major Inspection concept allows access to all necessary components!

Sfar/ Garg @ Power-Gen India & Central Asia 2014New Delhi, May 5-7, 2014 © Siemens AG 2014 All rights reserved.Page 19

SGT-8000HReferences

Gyeongggi‐do, S. KoreaAnsan

Under Contract – COD 2014

2

Samsun, TurkeySamsun Cengiz

Under Contract – COD 2015

1

Balikesir, TurkeyBandirma II

Under Contract – COD 2016

1

x Number of GTs

28 GTs under contract; 9 units in commercial operation

Penang, MalaysiaPrai

Under Contract – COD 2016

2

Luzon, PhilipinesSan Gabriel

Under Contract – COD 2016

1

Incheon, South KoreaPOSCO Power 2

Under Contract – COD 2014/15

3

Daegu, South KoreaDaegu City

Under Contract – COD 2014

1

Dangjin‐gun, South KoreaDangjin III

Operating – COD 2013

1

Andong, South KoreaAndong (KOSPO)

Operating – COD 2013

2

PA, USAPatriot

Under Contract – COD 2016

2

PA, USALiberty

Under Contract – COD 2015

2

FL, USACape Canaveral

Operating – COD 2013

3

FL, USARiviera Beach

Operating – COD 2014

3

FL, USAPort Everglades

Under Contract – COD 2014

3

Vohburg, GermanyUlrich Hartmann

Operating – COD 2011

1

Düsseldorf, GermanyLausward

Under Contract – COD 2015 

1

Sfar/ Garg @ Power-Gen India & Central Asia 2014New Delhi, May 5-7, 2014 © Siemens AG 2014 All rights reserved.Page 20

SGT-8000HOperational Status

status Feb 2014

The SGT-8000H has achieved more than 1300 starts & 66.000 EOH

SGT5-8000H SGT6-8000H

GT Validation Operation

starts

EBH

EOH

GT Validation Operation

85

1525

4365

480

9100

16700

137 (115 gas, 22 oil)

302 (236 gas, 65 oil)

3822

600

30000

41000

Sfar/ Garg @ Power-Gen India & Central Asia 2014New Delhi, May 5-7, 2014 © Siemens AG 2014 All rights reserved.Page 21

SCC-8000H will accumulate > 250.000 EOH until 2015

Proven Technology in Commercial Operation

Combined Cycle

Comissioning, Testing and Commercial Operation

Ulrich Hartmann

End of 50 Hz GT Test & Validation Phase and

Extension to Combined

CycleLaunch –

Concept Phase

1st Fire –Beginning of

Validation Phase

2000

October

2007

December

2009

August

2011

January

2013

JanuaryWorld Record 25,000 EOHs

Extensive Operational Experience

2015

January

Pioneering technology is proven.

PAC Inauguration

250,000 EOHs

Sfar/ Garg @ Power-Gen India & Central Asia 2014New Delhi, May 5-7, 2014 © Siemens AG 2014 All rights reserved.Page 22

Siemens Energy Solutions is your most trusted partner offering cutting edge integrated solutions at highest quality

1. SCC-8000H power plant series is based on proven technology and is the result of a fully integrated approach.

2. World class performance & operational flexibility as well as highest plant reliability / availability.

3. Asia’s first H-class and most efficient power plant Dangjin 3 achieved commercial operation ahead of schedule

4. Dangjin 3 impressively demonstrates Siemens Energy Solutions project execution excellence and highest quality standards

5. Consequently the customer will continue the trustful partnership with Siemens

Sfar/ Garg @ Power-Gen India & Central Asia 2014New Delhi, May 5-7, 2014 © Siemens AG 2014 All rights reserved.Page 23

Disclaimer

This document contains forward-looking statements and information – that is, statements related to future, not past, events. These statements may be identified either orally or in writing by words as “expects”, “anticipates”, “intends”, “plans”, “believes”, “seeks”, “estimates”, “will” or words of similar meaning. Such statements are based on our current expectations and certain assumptions, and are, therefore, subject to certain risks and uncertainties. A variety of factors, many of which are beyond Siemens’ control, affect its operations, performance, business strategy and results and could cause the actual results, performance or achievements of Siemens worldwide to be materially different from any future results, performance or achievements that may be expressed or implied by such forward-looking statements. For us, particular uncertainties arise, among others, from changes in general economic and business conditions, changes in currency exchange rates and interest rates, introduction of competing products or technologies by other companies, lack of acceptance of new products or services by customers targeted by Siemens worldwide, changes in business strategy and various other factors. More detailed information about certain of these factors is contained in Siemens’ filings with the SEC, which are available on the Siemens website, www.siemens.com and on the SEC’s website, www.sec.gov. Should one or more of these risks or uncertainties materialize, or should underlying assumptions prove incorrect, actual results may vary materially from those described in the relevant forward-looking statement as anticipated, believed, estimated, expected, intended, planned or projected. Siemens does not intend or assume any obligation to update or revise these forward-looking statements in light of developments which differ from those anticipated.

Trademarks mentioned in this document are the property of Siemens AG, it's affiliates or their respective owners.