IT Infrastructure -2009-09 Folie 1ITI / E.Wörle
PLANSEE Group IT-Infrastructure
IT Infrastructure -2009-09 Folie 2ITI / E.Wörle
ServicesAnforderungen an die ITData CenterBusiness Impact Analyse
IT Infrastructure -2009-09 Folie 3ITI / E.Wörle
IT Infrastructure Services
Application Services Network and Hardware Services
- High Performance Computing Center- 24 / 7 Service
- Prod. and Backup Computing Center
- synchronous Datamirroring- SAP Applications
- email Services
- File Services - Standby Crew / Remote Support
- WAN/LAN Networking, Firewalls, Servers
- Concepts- Realizing- Security- Maintenance und Operating- Monitoring- Trouble Shooting
- SAP Basics Consulting- System Architecture and Installation
- Upgrades and Support Packages- Monitoring und Optimizing
- Support Management
- Hardware and Software- Hard- and Software Consulting- Purchasing
- Maintenance Hard- and Software
- 2nd Level Support
IT Infrastructure -2009-09 Folie 4ITI / E.Wörle
Locations Worldwide
PLANSEE HPM
PMG
CERATIZIT
GTP
IT Infrastructure -2009-09 Folie 5ITI / E.Wörle
Anforderungen an die IT
• der Service Levels• der Verfügbarkeit• der Antwortzeiten• der Verwaltbarkeit• des Desaster Recovery
„Do more for less“
Verbessern:
Senken:• der Software Lizenzkosten• der Wartungskosten• des IT-Budgets ….
IT Infrastructure -2009-09 Folie 6ITI / E.Wörle
Total Cost of Ownership verringern
• Anzahl der Geräte reduzierenLastet die installierte Basis besser aus
• Anzahl der Modelle verringernSupport- und Servicekosten sinken
• Anzahl der Serviceprovider verringernKomplexität nimmt ab
• Installierte Basis professionell managenSichert Einsparungen über die ZeitVerbessert und sichert die ServicequalitätVerbessert kontinuierlich den Prozess
• Definition von Standards (Modelle, Services)Sichert die Servicequalität
• Weltweite Zielrichtung mit regionalen und lokalen AspektenAufbau HUBS in den Zeitregionen (z.B.: Asia Hub)Vermindert die Komplexität von Services und LieferantenRealisiert erhebliche Vorteile innerhalb der Regionen
IT Infrastructure -2009-09 Folie 7ITI / E.Wörle
Historie Desaster Recovery bei PLANSEE
• 70-er JahreLochkartenzeit – Batchverarbeitung - Lochkartenablage in Lagerraum
• 80-er JahreStart Online Services – Datensicherung – Bandablage in Tresorraum
• 90-er Jahre bis 1996Ausweitung Online Services auf EuropaZusätzliche Auslagerung Sicherungsbänder in Tresor in entferntem GebäudeWiederanlaufplan auf Papier (Notsystem)
• 1997 - 2003Einführung SAP R/3 - Ausweitung Online Services auf USAMobiles Vorsorgerechenzentrum (LKW) bei 72 Stunden Wiederanlaufzeit
• 2004 - heuteInternationalisierung weltweitRedundantes Rechenzentrum
IT Infrastructure -2009-09 Folie 8ITI / E.Wörle
Data Center Connections
IT Infrastructure -2009-09 Folie 9ITI / E.Wörle
SAP System Landscape 09/2009 – Virtual Processors
Productive Computing Center
208/48 GB RAM16/16 Proc. Power 5+64 bit dynamic LPAR11 LPAR Partitions
IBM
p590
Backup Computing Center
IBM
p590
208/48 GB RAM16/16 Proc. Power 5+64 bit dynamic LPAR8 LPAR Partitions
SAP ECC 6.0 TEST PSQ
SPTN01 - 16 GB12 virtual Proc.
SAP ECC 6.0 Learning PSX
SPTN65 - 24 GB12 virtual Proc.
SAP ECC 6.0 internal Test PST
SPTN05 - 4 GB4 virtual Proc.
Netweaver 7.0 Dev. + Test BWE
SPTN11 - 12 GB4 virtual Proc.
Netweaver 7.0 Dev. + Test WAE
SPTN19 - 10 GB4 virtual Proc.
Netweaver 7.0 Dev. + Test PIE
SPTN03 - 8 GB4 virtual Proc.
Netweaver 7.0 Dev. + Test AET
SPTN51 - 6 GB4 virtual Proc.
Netweaver 7.0Dev. + Test MIE
SPTN55 - 6 GB4 virtual Proc.
Netweaver 7.0Dev. + Test TSE
SPTN61 - 8 GB4 virtual Proc.
SAP ECC 6.0 Development PSE
SPTN15 - 10 GB4 virtual Proc.
Netweaver 7.0Dev. + Test IME
SPTN67 - 8 GB4 virtual Proc.
SAP ECC 6.0 Production PSP
SPTN33 - 95 GB24 virtual Proc.
Netweaver 7.0 Production BWP
SPTN81 - 26 GB12 virtual Proc.
Netweaver 7.0Production WAP
SPTN21 - 13 GB4 virtual Proc.
Netweaver 7.0 Production PIP
SPTN13 - 10 GB4 virtual Proc.
Netwaever 7.0Production AEP
SPTN53 - 6 GB4 virtual Proc.
Netweaver 7.0 Production MIP
SPTN57 - 6 GB4 virtual Proc.
Netweaver 7.0 Production TSP
SPTN63 - 8 GB4 virtual Proc.
Netweaver 7.0 Production SMP
SPTN39 - 6 GB4 virtual Proc.
IT Infrastructure -2009-09 Folie 10ITI / E.Wörle
Data Center Storage09/2009
Tape Library 3494 14 x Jaguar 3 -3592
DS 8100 Server 64 GB Cache20 Terabyte
Backup Data Center Productive Data Center
Storage Area Network
DS 8100 Server 64 GB Cache 23 Terabyte
TSM Server SAP Systems
TSM Server Non SAP Systems
N-Series Filer 20TB Metro Cluster
N-Series Filer 20 TB Metro Cluster
PSP BWP SMP PIP PSQ PSE WAE BWE PIE PST TSM WAP TSE AET TSP AEP IME MIE BWP MIP
PSP SMPWAP TSPPIP MIPAEP PSXPSTTSM
IT Infrastructure -2009-09 Folie 11ITI / E.Wörle
High availability conceptfor VMware and dedicated servers
Benefits:
• High availability
• High performance
• Full hardware redundancy
• Fast disaster recovery
• High scalability and flexibility
IT Infrastructure -2009-09 Folie 12ITI / E.Wörle
High availability conceptfor VMware and dedicated servers
Facts / Current situation (2009):
IBM N-Series Storage (NetApp):
• 2 IBM N-Series (NetApp) Storage
• Approx. 15TB net (SAN / NAS) storage with synchronous
mirroring, snapshot technology and RAID redundancies
• 4Gb net (SAN) for VMware or dedicated servers, remaining for NAS
• Storage savings upto 70% by Deduplication (!)
IBM BladeCenter and BladeServers:
• Upto 28 IBM BladeServers with 2 IBM BladeCenter
• 10 IBM BladeServers running VMware ESX Server (Cluster)
• Several dedicated BladeServers with redundant Cold Standby Servers
VMware ESX Infrastructure:
• 10 clustered VMware ESX Servers
320GB RAM – 200GHz CPU ressources with 20 Intel QuadCore CPUs á 4x 2.5GHz
• Over 110 virtual machines
IT Infrastructure -2009-09 Folie 13ITI / E.Wörle
> 4 TB
> 1,5 TB
0,25 – 1,5 TB
< 0,25 TB
Space in Terabyte
On both SitesyesyesXLarge Site or
central Hub>500
NetApp Metro Cluster /
SnapMirror
Asynch Cluster if not
removal of tape necessary
to other fire area
noNo/yesLarge Site orregional Hub
100 - 500NetApp
Single/DualController
Removal of tape necessary
to other fire area
nonoMedium Site25 - 150IBM File Server
not necessarydata stored inregional HUB
nonoSmall Site 1 - 40CISCO WAAS
BackupArchive Solution
RedundancyType of Installation
Number of UserStorage Solution
Standard Storage Solutions
IT Infrastructure -2009-09 Folie 14ITI / E.Wörle
Standard Connection Solutions
YesoptionalYesoptionalNo< 30 minutes6 -8 weeksYes>50VPN Secure-
Platform Cluster
YesYesoptionaloptionalNo< 5 minutes2 – 3 monthsYes>50MPLS
YesoptionalYesoptionalNo< 30 minutes6 -8 weeksYes16 – 50VPN-1 Edge
Cluster
YesNoYesNoNo< 72 hours4 – 6 weeksNo2 - 16VPN-1 Edge
NoNoYesYesYes> 72 hours1 weekNo1Secure Client
printMPLSxDSLISDNanalogMax.
down timeavailabilityredundancyUser
Different kind of SAP Connections
IT Infrastructure -2009-09 Folie 15ITI / E.Wörle
Infrastruktur Data Center produktiv
• Standort – 2.Stock = hochwassersicher• Brandfrühesterkennung• Brandmeldeanlage• Automatische Brandlöschanlage • betriebliche Werksfeuerwehr• Redundante Klimatisierung• USV-Anlage• Redundante Netzversorgung • Notstromaggregat (Synergieeffekt)• Zutrittskontrolle • Redundante WAN, LAN, SAN Anbindung
IT Infrastructure -2009-09 Folie 16ITI / E.Wörle
Geschäftsprozesse und Informationstechnologie
Produktion
SAP PP
SAP Core
Vertrieb
MicrosoftExchange
Speichersysteme
PLANSEE SE IT
Business
Leistungs-
anforderung
Leis
tung
s-
erbr
ingu
ng
Leis
tung
s-
erbr
ingu
ng
Leistungs-
anforderung
IT-Services
Anwendungen
Geschäfts-prozesse
Infrastruktur / Komponenten
IT Infrastructure -2009-09 Folie 17ITI / E.Wörle
- Die Business Impact Analyse (BIA) dient dazu, ein Verständnis über die für das Kerngeschäft des jeweiligen Standorts wichtigsten Geschäftsprozesse und die dazu notwendigen IT-Ressourcen/Anwendungen zu erhalten
- Identifikation spezifischer „nicht finanzieller (qualitativer)“, ev. „finanzieller (quantitativer)“ und „operationeller Auswirkungen“, die der Ausfall oder Unterbrechungen eines Geschäftsprozesses über einen definierten Zeitrahmen nach sich zieht.
- Das Ergebnis ist eine klar definierte, dokumentierte Matrix der kritischen Geschäftsprozesse einschließlich deren Abhängigkeiten zur Informationstechnologie
Business Impact Analyse
Die BIA stellt somit die Verbindung von Geschäft un d IT im zu integrierenden Standort her.����
IT Infrastructure -2009-09 Folie 18ITI / E.Wörle
- VorgangsweiseIn Form von Workshops und Interviews gemeinsam mit den für den
Geschäftsprozess Verantwortlichen Selbsteinschätzung der für den Geschäftsprozess VerantwortlichenQualitätssicherung und Freigabe durch den jeweiligen Produkt- /
Serviceverantwortlichen- Voraussetzung
definierte „Verfügbarkeitsklassen“Awareness bei den Ansprechpartnern und ausreichende Information
- HilfsmittelProzessübersichtBIA Excel Matrix
Business Impact Analyse Vorgangsweise & Hilfsmittel
IT Infrastructure -2009-09 Folie 19ITI / E.Wörle
Allgemeine Informationen (I)
Unternehmensbereich- Plansee- Ceratizit- PMG- GPT
Wertschöpfungsbereich- Wertekette Porter
Prozesse / Anwendungen- die Standortprozesse (oder
die Anwendungen)
IT Services- die dazu notwendigen IT-
Services / Anwendungen
Kurzbeschreibung
IT Infrastructure -2009-09 Folie 20ITI / E.Wörle
Priorität
Wiederanlaufklassen - PrioritätPriorität 4:
- maximale Ausfallzeit von 12 Stunden- höchst geschäftskritisch
Priorität 3:- maximale Ausfallzeit von 24 Stunden- spürbar geschäftsschädigend
Priorität 2:- maximale Ausfallzeit von 72 Stunden- leicht geschäftsschädigend
Priorität 1:- maximale Ausfallzeit größer 72 Stunden- nicht geschäftsschädigend
Priorität 0:- nicht in Verwendung
geforderte Abweichungwenn die geforderte Zeit nicht in das vorgegebene Schema passt
12h
IT Infrastructure -2009-09 Folie 21ITI / E.Wörle
Bewertungskriterien
- Interner Schaden- Mehraufwendungen in der Administration - Lästige, vorübergehende Beeinträchtigung der
Arbeitsverhältnisse
- Imageschaden (Aussenwirkung);- keine Auskunftsfähigkeit dem Kunden gegenüber- sehr langsame Beantwortung von Anfragen, - WebShop nicht erreichbar- Öffentlichkeitswirksam – ev. Meldung in den Medien
- externer Schaden- Kunden sind direkt betroffen und bemerken die
Auswirkungen unmittelbar- Verlust von Aufträgen- Strafzahlungen / Pönalen
IT Infrastructure -2009-09 Folie 22ITI / E.Wörle
Arbeitsplätze
- innerhalb der Wiederanlaufklasse notwendige Arbeitsplätze
- Gesamtanzahl der Arbeitsplätze
- benötigte zusätzliche Infrastruktur- spezielle Drucker- Handscanner- etc.
IT Infrastructure -2009-09 Folie 23ITI / E.Wörle
Auswirkungen
Direkte Auswirkungen- kein Druck von Lieferscheinen- kein interner Transport von
Rohmaterialien- kein Status einer Bestellung- keine Rechnungslegung
Folgewirkungen- keine Auslieferung wegen fehlender
Begleitpapiere- keine Produktion wegen mangelnder
Rohmaterialien
Ersatzlösungen (wenn möglich – aber OHNE IT Unterstützung)
- Bestellungen auf Papier erfassen
IT Infrastructure -2009-09 Folie 24ITI / E.Wörle
Kontakt
Engelbert WoerleManager IT Infrastructure
PLANSEE SE - 6600 Reutte, AustriaTel. + 43 5672 600-2849 - Fax + 43 5672 [email protected] - www.plansee-group.com