PLANNING TECHNICAL ACTIVITIES

Planning Technical Activities

Embed Size (px)

DESCRIPTION

Engineering Management

Citation preview

Page 1: Planning Technical Activities

PLANNINGTECHNICALACTIVITIES

Page 2: Planning Technical Activities

THE NATURE OF PLANNING- There are many instances when managers are overwhelmed by various activities which at times becloud his judgement. This must be expected since anybody who is confronted by several situations happening simultaneously will loose sight of the more important concerns. To minimize mistakes in decision-making, planning is undertaken.

Page 3: Planning Technical Activities

A plan, which is the output of planning, provides a methodical way of achieving desired results. In the implementation of activities, the plan serves as a useful guide. Without the plan, some minor tasks may be afforded major attention which may, later on, hinder the accomplishment of objectives.

Page 4: Planning Technical Activities

PLANNING DEFINED

•According to Nickels and others, it refers to “the management function that involves anticipating future trends and determining the best strategies and tactics to achieve organizational objectives.”

Page 5: Planning Technical Activities

• According to Aldag and Stearns, on the other hand, define planning as “the selection and sequential ordering of tasks required to achieve an organizational goal.

• According to Cole and Hamilton, planning is “deciding what will be done, who will do it, where, when and how it will be done, and the standards to which it will be done.

Page 6: Planning Technical Activities

PLANNING AT VARIOUS MANAGEMENT LEVELS

Since engineer managers could be occupying positions in any of the various management levels, it will be useful for them to know some aspects of planning undertaken at the different management levels.

Planning activities undertaken at various levels are as follows:

Page 7: Planning Technical Activities

1.TOP MANAGEMENT LEVEL- strategic planning

2.MIDDLE MANAGEMENT LEVEL-intermediate planning

3.LOWER MANAGEMENT LEVEL- operational planning

Page 8: Planning Technical Activities

TYPES OF PLANNING•STRATEGIC PLANNING

It refers to the process of determining the major goals of the organization and the policies and strategies for obtaining and using resources to achieve goals. The top management of any firm is involved in this type of planning.

The output here is the strategic plan which spells out “the decision about long-range goals and the course of action to achieve these goals.

Page 9: Planning Technical Activities

• INTERMEDIATE PLANNINGIt refers to “the process of

determining the contributions that sub units can make with allocated resources. This type of planning is undertaken by middle management.

Under intermediate planning, the goals of sub unit are determined and a plan is prepared to provide a guide to the realization of the goals. The intermediate plan is designed to support the strategic plan.

Page 10: Planning Technical Activities

• OPERATIONAL PLANNINGIt refers to “the process of

determining how specific tasks can best be accomplished on time with available resources. This type of planning is a responsibility of lower management. It must be performed in support of the strategic plan and the intermediate plan.

Page 11: Planning Technical Activities
Page 12: Planning Technical Activities

THE PLANNING PROCESS

1. Setting organizational, divisional or unit goals.

2. Developing strategies or tactics to reach those goals

3. Determining resources4. Setting standards

Page 13: Planning Technical Activities

SETTING ORGANIZATIONAL, DIVISIONAL or UNIT GOALS

The first task of the engineer manager is to provide a direction to his firm. The setting of goals provide an answer to the said concern. If everybody is aware of the goals, there is a big chance that everybody will contribute his share in the realization of such goals.

Goals may be defined as the “precise statement of results thought, quantified in time and magnitude, where possible.”

Page 14: Planning Technical Activities

DEVELOPING STRATEGIES OR TACTICS TO REACH GOALS

After determining the goals, the next task is to devise some means to realize them. The ways to realize the goals are called strategies and these will be the concern of top management. The middle and lower management will adapt their own tactics to implement their plans.

Page 15: Planning Technical Activities

• STRATEGY – may be defined as “a course of action aimed at ensuring that the organization will achieve its objectives.”

• TACTIC – is a short-term action taken by management to adjust to negative internal or external influences. They are formulated and implemented in support of the firm’s strategies. The decision about short-term goals and the courses of action are indicated in the tactical plan.

Page 16: Planning Technical Activities

DETERMINING RESOURCES NEEDED

When particular sets of strategies or tactics have been devised, the engineer manager will, then, determine the human and non-human resources required by such strategies or tactics. Even if the resource requirements are currently available. They must be specified.

Page 17: Planning Technical Activities

The quality and quantity of resources needed must be correctly determined. Too much resources in terms of either quality or quantity will be wasteful. Too little will mean loss of opportunities for maximizing income.

Page 18: Planning Technical Activities

SETTING STANDARDSThe standards for measuring

performance may be set at planning stage. When actual performance does not match with the planned performance, corrections may be made or reinforcements are given.

STANDARD – may be defined as “a quantitative or qualitative measuring device designed to help monitor the performances of people, capital goods or processes.

Page 19: Planning Technical Activities

TYPES OF PLANS

1. Functional Area Plans

2. Plans With Time Horizon

3. Plans According to Frequency of Use

Page 20: Planning Technical Activities

FUNCTIONAL AREA PLANS

Plans may be prepared accdg. to the needs of the different functional areas. Among the types of functional area plans are the ff:

1. MARKETING PLAN – this is the written document or blueprint for implementing and controlling an organization’s marketing activities related to a particular marketing strategy.

Page 21: Planning Technical Activities

2.PRODUCTION PLAN – this is a written document that states the quantity of output a company must produce in broad terms and by product family.

3.FINANCIAL PLAN – it is a document that summarizes the current financial situation of the firm, analyzes financial needs, and recommends a direction for financial activities.

4.HUMAN RESOURCE MANAGEMENT PLAN – is a document that indicates the human resource needs of a company detailed in terms of quantity and quality and based on the requirements of the company’s strategic plan.

Page 22: Planning Technical Activities

PLANS WITH TIME HORIZON

Plans with time horizon consist of the following:

1.SHORT-RANGE PLANS – are plans intended to cover a period of less than one year. First-line supervisors are mostly concerned with these plans.

2. LONG-RANGE PLANS – are plans covering a time span of more than one year. These are mostly undertaken by middle and top management.

Page 23: Planning Technical Activities

PLANS ACCORDING TO FREQUENCY OF USE

According to frequency reuse, plans may be classified as:

1. Standing Plans

2. Single-use plans

Page 24: Planning Technical Activities

STANDING PLANS – are plans that are used again and again, and they focus on managerial situations that recur repeatedly.

Standing plans may be further classified as:1.POLICIES- are broad guidelines to aid managers at every level in making decisions about recurring situations or functions.2.PROCEDURES – are plans that describe the exact series of actions to be taken in a given situation.3.RULES – are statements that either require or forbid a certain action.

Page 25: Planning Technical Activities

SINGLE-USE PLANS – these plans are specifically developed to implement courses of action that are relatively unique and are unlikely to be repeated.

Single-use plans may be further classified as:

1. Budgets

2. Programs

3. Projects

Page 26: Planning Technical Activities

• BUDGET – is “a plan which sets forth the projected expenditure for a certain activity and explains where the required funds will come from”, according to Weston and Brigham.

• PROGRAM – is a single-use plan designed to coordinate a large set of activities.

• PROJECT – is a single-use plan that is usually more limited in scope than a program and is sometimes prepared to support a program.

Page 27: Planning Technical Activities
Page 28: Planning Technical Activities

PARTS OF A STRATEGIC PLANThe strategic plan must contain the following:

1. Company of corporate mission2. Objectives or goals3. Strategies

Company of corporate mission refers to the “strategic statement that identifies why an organization exists, its philosophy of management, and its purpose as distinguished from other similar organizations in terms of products, services and markets.”

Page 29: Planning Technical Activities

MAKING PLANNING EFFECTIVE

Planning is done so that some desired results may be achieved. At times, however, failure in planning occurs.

Planning may be made successful if the following are observed:

1. Recognize planning barriers

2. Use of aids to planning

Page 30: Planning Technical Activities

According to Plunkett and Attner, the planning barriers are as follows:

1. Manager’s inability to plan2. Improper planning process3. Lack of commitment to the planning

process4. Improper information5. Focusing on the present at the expense

of the future.6. Too much reliance on the planning

department.7. Concentrating on only the controllable

variables.

Page 31: Planning Technical Activities

Among the aids to planning that may be used are:

1. Gather as much information as possible

2. Develop multiple sources of information

3. Involve others in the planning process.