70
Plan Showing Survey of TUNDRA NORTH HARGRAVE 4-24-12-27 Well Site and Access Road Vertically Drilled From a Surface Location ln L.S.4 SEC.24 TWP.12 RGE.27 WPM R.M. of Wallace ACCESS ROUTE INFORMATION RGE.28 SCALE''50000 RGE.27 RGE.26 36 36 31 CL 256 1 skmk 83 31 ELK ORN 0 k HAR swo TH 8 ii 36 ph * k 286 s 83 6 0 *k 0 * ! LOCAL COORDINATES COORDINATE TABLE GEOGRAPHIC COORDINATES (GPS DERIVED) NAD 27 NAD 83 UTM COORDINATES (ZONE14) NAD 27 NAD 83 SURFACE 4-24 16500 N ofS T SEC 24 11000 EofW 7 164 89 N 1 S.W. COR. 11008 E I SEC.24 LAT. = 50'01'15.891" LONG = 101'03'21.042" LAT. = 50'01'15 880" LONG. = 101'03'19 373" 5 542 99952 N. 352 733 51 E. 5 542 779.43 N. 352 761 90 E. WELL CENTRE MOVEMENT LANDOWNER INFORMATION 165 00 N of S 165.00 N ofS GIVEN SEC.24 SURVEYED SEC. 24 11000 EofW 110.00 E of W LEGAL DESCRIPTION TITLE NO. S.W 1/4 SEC.24-12-27 WPM 2279844/2 LANDOWNER(S) PERRY JAMES PALAHICKY W/C SURVEYED ON REQUESTED COORDINATES AREA INFORMATION 1/4 HECTARES ACRES WELL SITE ACCESS ROAD TOTAL SW24 SW24 1.440 0.210 1.650 3. 56 0. 52 4.08 LICENCING INFORMATION The proposed well centre: Is at least 45m from any surveyed road Is at least 75m from any surface improvement Is at least 100m from water covered area Is at least 200m from any residence Is at least 5.0 km from a hghted airport Is at least 1.6 km from an unhghted airport YES NO 473.48 472. 86 ELEVATIONINFORMATION DATUM: CSRS PRECISE POINT POSITIONING WELL CENTRE = 472.94 473 12 472.26 I certify that the survey represented by this plan is correct and true to the best of my knowledge and was completed on the 28th day of August, 2014 OPERATOR INFORMATION ~W TVNDRA OIL & GAS PARTNERSHIP Nathan Holmes Witness REV DATE 0 2014 09 04 REVISION TABLE DESCRIPTION ISSUED BY CK'D NH TC gCALTKCH 1-204748-1063 1-3067767874 Cr S U R V E Y S (MB) wwwcaltechsurveys.corn TUNDRA AFE NO TUNDRA FILE NO 0 CALTECH FILE NO 414-4859 BROKER FILE NO 414-4859W01-RO DlNG DN NH CK TC PC JlN PAGE I OF 3 REVISION RGE.26 RGE.27 RGE.28 Little Scallion Creek Creek Scallion Scallion Creek Gopher Creek Creek TWP.11 TWP.12 Bosshill Creek 1 6 36 31 1 6 36 31 1 6 36 31 1 6 36 31 1 6 36 31 1 6 36 31 ELKHORN HARMSWORTH 473.48 472.94 473.12 WELL CENTRE = true to the best of my knowledge and was completed on the day of I certify that the survey represented by this plan is correct and The proposed well centre: NO YES Is at least 75m from any surface improvement Is at least 45m from any surveyed road Is at least 200m from any residence Is at least 5.0 km from a lighted airport Is at least 1.6 km from an unlighted airport Is at least 100m from water covered area LEGAL DESCRIPTION TITLE NO. LANDOWNER(S) S.W.1/4 SEC.24-12-27 WPM 2279844/2 PERRY JAMES PALAHICKY 1.440 0.210 1.650 SW24 SW24 3.56 0.52 4.08 ACCESS ROAD WELL SITE TOTAL 472.86 472.26 Witness Nathan Holmes DATUM: CSRS PRECISE POINT POSITIONING ELEVATION INFORMATION Plan Showing Survey of TUNDRA NORTH HARGRAVE 4-24-12-27 Well Site and Access Road Vertically Drilled From a Surface Location In L.S.4 SEC.24 TWP.12 RGE.27 WPM R.M. of Wallace SCALE: 1: ACCESS ROUTE INFORMATION 250000 LANDOWNER INFORMATION GIVEN SURVEYED W/C SURVEYED ON REQUESTED COORDINATES 165.00 110.00 N of S E of W SEC. 24 165.00 110.00 N of S E of W SEC. 24 WELL CENTRE MOVEMENT HECTARES ACRES AREA INFORMATION 1/4 JADE H. MCLEOD C O S S O O O N T I A I T H E F A V A L A B O T I N A M R U S D N S R O Y E E B M E M R Jade H. McLeod Manitoba Land Surveyor 1 83 83 256 256 4-24 LICENCING INFORMATION OPERATOR INFORMATION REVISION TABLE 0 28th PAGE: 1 OF 414-4859W01-R0.DWG REVISION PC: CK: DN: CALTECH FILE NO.: BROKER FILE NO.: TUNDRA FILE NO.: TUNDRA AFE NO.: 414-4859 NH TC JW 3 August, 2014. www.caltechsurveys.com VIRDEN 1-204-748-1053 REGINA 1-306-775-1814 U MB ( ) S R V E Y S 12.9km ± 1.5km ± N. E. N. E. LAT. = LONG. = { { SURFACE LONG. = LAT. = 4-24 165.00 110.00 164.89 110.08 N of S E of W N E SEC. 24 S.W. COR. 50°01'15.891" 101°03'21.042" 50°01'15.880" 101°03'19.373" 5 542 999.52 352 733.51 5 542 779.43 352 761.90 SEC. 24 LOCAL COORDINATES GEOGRAPHIC COORDINATES (GPS DERIVED) NAD 27 UTM COORDINATES (ZONE ) COORDINATE TABLE NAD 83 NAD 83 NAD 27 14 REV. DESCRIPTION BY CK'D DATE 0 2014.09.04 ISSUED NH TC

Plan Showing Survey of Plan TUNDRA NORTH …content.gov.mb.ca/iem/petroleum/documents/technical/...q.p~o'US 12O OO LOW AREA i (DRY) SEASONAL DRAINAGE / LOW ARE (DR PUBLIC FACILITY

Embed Size (px)

Citation preview

Plan Showing Survey of

TUNDRA NORTH HARGRAVE4-24-12-27Well Site and Access Road

Vertically Drilled From a Surface Location ln

L.S.4 SEC.24 TWP.12 RGE.27 WPMR.M. of Wallace

ACCESS ROUTE INFORMATION

RGE.28SCALE''50000

RGE.27 RGE.26

36 36 31

CL256

1 skmk

83

31 ELK ORN 0 k HAR swo TH8 ii 36

ph* k

286

s

83

60 *k

0 *!

LOCALCOORDINATES

COORDINATE TABLEGEOGRAPHIC COORDINATES (GPS DERIVED)

NAD 27NAD 83

UTM COORDINATES (ZONE14)NAD 27NAD 83

SURFACE 4-24

16500 N ofS T SEC 2411000 EofW 7

164 89 N 1 S.W. COR.11008 E I SEC.24

LAT. = 50'01'15.891"LONG = 101'03'21.042"

LAT. = 50'01'15 880"

LONG. = 101'03'19 373"5 542 99952 N.

352 733 51 E.5 542 779.43 N.

352 761 90 E.

WELL CENTRE MOVEMENT LANDOWNER INFORMATION

165 00 N of S 165.00 N ofSGIVEN SEC.24 SURVEYED SEC. 24

11000 EofW 110.00 E of W

LEGAL DESCRIPTION TITLE NO.

S.W 1/4 SEC.24-12-27 WPM 2279844/2

LANDOWNER(S)

PERRY JAMES PALAHICKY

W/C SURVEYED ONREQUESTED COORDINATES

AREA INFORMATION1/4 HECTARES ACRES

WELL SITE

ACCESS ROAD

TOTAL

SW24

SW24

1.440

0.210

1.650

3. 56

0. 52

4.08

LICENCING INFORMATION

The proposed well centre:

Is at least 45m from any surveyed roadIs at least 75m from any surface improvementIs at least 100m from water covered areaIs at least 200m from any residenceIs at least 5.0 km from a hghted airportIs at least 1.6 km from an unhghted airport

YES NO

473.48 472. 86

ELEVATIONINFORMATIONDATUM: CSRS PRECISE POINT POSITIONING

WELL CENTRE = 472.94

473 12 472.26

I certify that the survey represented by this plan is correct and

true to the best of my knowledge and was completed on the

28th day of August, 2014

OPERATOR INFORMATION

~W TVNDRAOIL & GAS PARTNERSHIP

Nathan Holmes Witness

REV DATE

0 2014 09 04

REVISION TABLEDESCRIPTION

ISSUED

BY CK'D

NH TC

gCALTKCH 1-204748-1063 1-3067767874Cr S U R V E Y S (MB) wwwcaltechsurveys.corn

TUNDRA AFE NOTUNDRA FILE NO

0CALTECH FILE NO 414-4859 BROKER FILE NO

414-4859W01-RO DlNG DN NH CK TC PC JlN PAGE I OF 3 REVISION

RGE.26RGE.27RGE.28

LittleScallionCreek

CreekScallion

Scallion Creek

GopherCreek

Creek

TWP

.11

TWP

.12

BosshillCreek

16

3631

16

3631

16

3631

16

3631

16

3631

16

3631ELKHORNHARMSWORTH

473.48

472.94

473.12

WELL CENTRE =

true to the best of my knowledge and was completed on theday of

I certify that the survey represented by this plan is correct and

The proposed well centre: NOYES

Is at least 75m from any surface improvementIs at least 45m from any surveyed road

Is at least 200m from any residenceIs at least 5.0 km from a lighted airportIs at least 1.6 km from an unlighted airport

Is at least 100m from water covered area

LEGAL DESCRIPTION TITLE NO. LANDOWNER(S)

S.W.1/4 SEC.24-12-27 WPM 2279844/2 PERRY JAMES PALAHICKY

1.4400.2101.650

SW24SW24 3.56

0.524.08

ACCESS ROADWELL SITE

TOTAL

472.86

472.26

WitnessNathan Holmes

DATUM: CSRS PRECISE POINT POSITIONINGELEVATION INFORMATION

Plan Showing Survey ofTUNDRA NORTH HARGRAVE 4-24-12-27

Well Site and Access RoadVertically Drilled From a Surface Location In

L.S.4 SEC.24 TWP.12 RGE.27 WPMR.M. of Wallace

SCALE: 1:ACCESS ROUTE INFORMATION

250000

LANDOWNER INFORMATION

GIVEN SURVEYED

W/C SURVEYED ONREQUESTED COORDINATES

165.00110.00

N of SE of W

SEC. 24165.00110.00

N of SE of W

SEC. 24

WELL CENTRE MOVEMENT

HECTARES ACRESAREA INFORMATION

1/4

JADE H.MCLEOD

C

O

SSO OO

N

TIAI

THE F

A

VALABOT

IN

AM

RUSDN

SR

OYEEBMEM R

Jade H. McLeod Manitoba Land Surveyor

1

83

83

256

256

4-24

LICENCING INFORMATION

OPERATOR INFORMATION

REVISION TABLE

0

28th

PAGE: 1 OF414-4859W01-R0.DWG REVISIONPC:CK:DN:CALTECH FILE NO.: BROKER FILE NO.:TUNDRA FILE NO.: TUNDRA AFE NO.:

414-4859NH TC JW 3

August, 2014.

www.caltechsurveys.com

VIRDEN1-204-748-1053

REGINA1-306-775-1814

U M B( )S R V E Y S

12.9

km ±

1.5km ±

N.E.

N.E.

LAT. =LONG. =

{{SURFACE

LONG. =LAT. =4-24

165.00110.00164.89110.08

N of SE of WNE

SEC. 24

S.W. COR.50°01'15.891"

101°03'21.042"50°01'15.880"

101°03'19.373"5 542 999.52

352 733.515 542 779.43

352 761.90SEC. 24

LOCAL COORDINATESGEOGRAPHIC COORDINATES (GPS DERIVED)

NAD 27UTM COORDINATES (ZONE )

COORDINATE TABLE

NAD 83NAD 83 NAD 2714

REV. DESCRIPTION BY CK'DDATE0 2014.09.04 ISSUED NH TC

Fd. 0.025Sq. I.B.

Mp.

C)

co

0 oCO

CIUJ

rn

c'oCO

FIELD LINE

123.01CULVERT 8

SIGHT LINES APPROACH REQD0.8km+ 1.0km+

807.65 (1/4 DIST) Fd. 0.025Sq. I.B.

SCALE 1:5000 METRES

150 100 50 0 100 200

LEGENDProposed well centre shown thus .

Proposed int casing, landing & target entry points shown thus

Proposed end horizontals & bottom holes shown thus

Proposed drilling locations ..Existing well locations shown thus .

Existing int casing, landing & target entry points shown thus............Existing end hz / bottom holes shown thus .

Abandoned wells shown thus.

Survey monuments found shown thus .

Survey monuments planted shown thus

Survey marks (Spikes) planted shown thus .

Survey marks (Hubs) planted shown thus .

Survey marks (Spikes) found shown thus ..Temporary points shown thus ..Portions referred to shown thus ..Workspace shown thus

Bearings shown are True North and are derived from GPS measurements.

Local coordinates shown are perpendicular to the referenced boundary.

Distances are in metres.

TUNDRA NORTH HARGRAVE4-24-12-27 (WPM)

+Qo

Qo

Qo

+040

k

BURIED FACILITIES INFORMATION

CALTECH FILE NO.: 414-4859 PAGE: 2 OF 3 REVISION

Prior to any construction on lease or access road,MTS Communications Inc.

and Manitoba Hydro must be contacted for location of any undergroundfacilities that may exist.

Underground facilities shown on this plan are those that could be found andlocated at time of survey. Other facilities may exist, of which we wereunaware or unable to locate.

All buried facilities must be located by the respective authority prior toconstruction.Manitoba Hydro: 1-888-624-9376MTS: 1-800-837-6448Flowlines: Individual Operator

R.M. Contact Info.:

R.M. of WallaceVirden, MB

Ph. (204) 748-1239

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

90°0

1'40

"

X X X X X X X X X X X X X X X X X X X X X X X X X X X X

XX

XX

XX

X X

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

SIGHT LINES0.8km± 1.0km±

807.65 (1/4 DIST)

804.

94 (1

/4 D

IST)

AS

SU

ME

D 1

80°0

1'40

"

30.175 ROAD ALLOWANCE

30.1

75 U

ND

EVE

LOPE

D R

OAD

ALL

OW

ANC

E

L.S. 5 L.S. 6L.S. 4 L.S. 3

2412-27 WPM

LOW GRADE GRAVEL ROAD(69N)

(157

W)

(DRY)AREAS

LOW

(DRY)AREALOW

(DRY)AREAS

LOW

BUSH

FIE

LD L

INE

&

DRAINAGESEASONAL

BUSHFIELD LINE

DRAINAGESEASONAL

OIL TARGET BDY.

DRAINAGESEASONAL

CULTIVATIONROLLING

20.00

90°

123.01

135.

17

SEE W/SDETAIL

Sq. I.B.Fd. 0.025

Sq. I.B.Fd. 0.025

Mp.

Sq. I.B.Fd. 0.025

Mp.

PAGE:CALTECH FILE NO.: REVISIONOF0

3414-4859TUNDRA NORTH HARGRAVE 4-24-12-27 (WPM) 2

Survey marks (Hubs) planted shown thus

Survey monuments found shown thus

Temporary points shown thus

Survey marks (Spikes) planted shown thus

Portions referred to shown thus

Existing end hz / bottom holes shown thusExisting int casing, landing & target entry points shown thus

Survey monuments planted shown thus

Proposed end horizontals & bottom holes shown thus

Survey marks (Spikes) found shown thus

Proposed int casing, landing & target entry points shown thusProposed well centre shown thus

Existing well locations shown thus

Abandoned wells shown thus

Proposed drilling locations

Local coordinates shown are perpendicular to the referenced boundary.Bearings shown are True North and are derived from GPS measurements.

LEGEND

Workspace shown thus

Distances are in metres.

Prior to any construction on lease or access road,MTS Communications Inc.and Manitoba Hydro must be contacted for location of any undergroundfacilities that may exist.

Underground facilities shown on this plan are those that could be found andlocated at time of survey. Other facilities may exist, of which we were

All buried facilities must be located by the respective authority prior to

BURIED FACILITIES INFORMATION

R.M. Contact Info.:

unaware or unable to locate.

construction.Manitoba Hydro: 1-888-624-9376MTS: 1-800-837-6448Flowlines: Individual Operator

R.M. of WallaceVirden, MBPh. (204) 748-1239

N

150 50100 0 100 200

METRESSCALE 1:5000

SURFACE165.00110.00

N/SE/W

CULVERT &APPROACH REQ'D

WELL SITE DETAILSCALE: 1: 2000

lgUJZ za MCI ~UJ

( )

LOW~~AREA(DRY)

q.p~o'US

12O OO

LOWAREA

i (DRY)

SEASONALDRAINAGE

/

LOWARE(DR

PUBLIC FACILITY& DWELLING SKETCHSCALE: 1: 50000

RGE.27 RGE.26

ONLY PUBLIC FACILITIES & DWELLINGS WITHIN 2km OF W/C ARE SHOWNOCCUPIED DWELLINGS SHOWN THUS: ~

UNOCCUPIED DWELLINGS SHOWN THUS:PUBLIC FACILITIESSHOWN THUS:

NEAREST OCCUPIED DWELLING IS 1.5km+ N.E. OF WELL CENTRENEAREST URBAN MUNICIPALITYIS ELKHORN 13.5km+ S.W. OF WELL CENTRE

PAGE: 3 OF 3 REVISIONTUNDRA NORTH HARGRAVE4-24-12-27 (WPM) C ALT EC H FILE NO J 414-4859

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

75m RA DIUS

45m RA DIUS

100m RA DIUS

TUNDRA4-24

(DRY)AREASLOW

60.0

0

60.00

120.00

120.

00

77.07

120.

00

90°

90° 90°

90°

DRAINAGESEASONAL

(DRY)AREALOW

(DRY)AREALOW

30.1

75 U

ND

EVE

LOPE

D R

OAD

ALL

OW

ANC

E

BUSH

FIE

LD L

INE

&

(DRY)AREALOW (DRY)

AREALOW20.00

90°

42.93

135.

17

NEAREST URBAN MUNICIPALITY IS ELKHORN 13.5km± S.W. OF WELL CENTRENEAREST OCCUPIED DWELLING IS 1.5km± N.E. OF WELL CENTRE

UNOCCUPIED DWELLINGS SHOWN THUS:

ONLY PUBLIC FACILITIES & DWELLINGS WITHIN 2km OF W/C ARE SHOWNOCCUPIED DWELLINGS SHOWN THUS:

PUBLIC FACILITIES SHOWN THUS:

16 15 14 13 18

9 10 11 12 7

28 27 26 25 30

21 22 23 24 19

RGE.27TW

P.1

2RGE.26

SCALE: 1:WELL SITE DETAIL

2000

SCALE: 1:PUBLIC FACILITY & DWELLING SKETCH

50000

PAGE:CALTECH FILE NO.: REVISIONOF0

3414-4859TUNDRA NORTH HARGRAVE 4-24-12-27 (WPM) 3

R=1.5km

N

TUNDRA OIL AND GAS PARTNERSHIP

PHOTO MOSAIC PLAN

TUNDRA NORTH HARGRAVE4-24-12-27

S.W.1/4 SEC.24 TWP.12 RGE.27 WPMSCALE: 1:10000

CALTECH 1-204-748-1053 1-306-775-1814

S U R Y E Y S (MB) wwwcaltechsurveys corn

DESCRIPTION

ISSUED

PHOTO DATE 2011

BY CICD

NH TC

800m RAD IUS

2412-27 WPM

1312-27 WPM

CALTECH FILE NO.: 414-4859 TUNDRA FILE NO.: PHOTO DATE: 2011

PROPOSEDTUNDRA

4-24

TUNDRA OIL AND GAS PARTNERSHIP

PHOTO MOSAIC PLAN

SCALE: 1:10000

IN THE

SHOWING

TUNDRA NORTH HARGRAVE 4-24-12-27S.W.1/4 SEC.24 TWP.12 RGE.27 WPM

N

www.caltechsurveys.com

VIRDEN1-204-748-1053

REGINA1-306-775-1814

U M B( )S R V E Y S

REV. DESCRIPTION BY CK'DDATE0 2014.09.04 ISSUED NH TC

Innovation, Energy end Mines

APPLICATIONFOR WELL LICENCEIn comphance with Ihe Oil and Gas Act and the Drilhng and Production Regulation, application is hereby made for a well

licence for.

Well Name Tundra North Har ave 04-24-12-27 WP

Well Location 04 24(LSD) (Quadrant) (Section)

Name of Well Owner Tundra Oil Ec Gas Partnershi

12 27(Township) (Rauge)

hfanitoba Corporation No

Address of Well Owner 1700 One Lombard Place W MB R3B OX3

Telephone 204 -934-5850

Surface Location 04(LSD)

Ground Elevation 472 94

Fax 204 -934-5820

24 12 27(Quadraat) (Seciiou) (Tonus hip) (Rmge)

metres above sea level

Surface Co-ordinates

165.00m N of S of Sec 24

110.00m E of Wof Sec 24

Directional or Horizontal WellBottomHoie Co-ordinates

165.00m N of S of Sec 24

110.00m Eof Wof Sec 24

Surface Owner Pe Palahic S4409

Occupant Trevor Soder

Royalty Owner(s) See Attached

Freehohl Oil and Gas Rights Leased By

Crown Reservation or Lease No.

Prairie Land T. Jordan(Naue of Otl md Gas Lease Agent aad Corporation)

Type of Well OIL

Projected Total Depth 743.0m in Devonian

Casing SizeOj). mm

1. 244.50

177.80

Weightim

48.07

29.76

Grade

H-40

J-55

From

Surface

Surface

To

135.00

707.50

EstimatedCemented Interval

Surface

257.00

Drilhng Contractor Trinidad Drillin Ltd.

Expected Spud Date 12-Se -2015

Responsible Agent of Company at Well Eric B'ornsson

Rig No. 10

06-Jul-2015(Date) DD.'htbtbl YYYY (Siguature of applicaat)

For assistance in completing this form contact Paulette Seymour at (204) 945-6575 or Dan Smzyshyn at (204) 945-8102.

For Department Use Only

Well Licence No.: 10414 UWIt 100.04-24-012-27W1.00

Well ClasssTscation J)EVELOPMENT (CONFIDENTIAL)Please see attached conditions.

Date of Issue evtewed by:

Lic. No. 10414 Tundra North Hargrave 04-24-12-27 (WPM)

A licence to drill a well known as Tundra North Hargrave 04-24-12-27 (WPM) is hereby

granted to Tundra Oil A Gas Partnership.

The Licensee shall comply with all the provisions of the Oil and Gas Act, the Drilling and

Production Regulation and the following terms and conditions:

1. The Petroleum Branch will forward a copy of the surface lease for the above location to the

Surface Rights Board to satisfy the requirements of Section 15 of the Surface Rights Act.

2. The lease is to be constructed in a manner that it does not impede the flow of seasonal

drainage.

3. Tundra must ensure that the core box is labeled with the licence ¹, bottomhole location and

intervals for that particular box. (In Large Bold Letters).

Lic. No. 10414 Tundra North Hargrave 04-24-12-27 (WPM)

A licence to drill a well known as Tundra North Hargrave 04-24-12-27 (WPM) is hereby

granted to Tundra Oil & Gas Partnership.

The Licensee shall comply with all the provisions of the Oil and Gas Act, the Drilling and

Production Regulation and the following terms and conditions:

1. The Petroleum Branch will forward a copy of the surface lease for the above location to the

Surface Rights Board to satisfy the requirements of Section 15 of the Surface Rights Act.

2. The lease is to be constructed in a manner that it does not impede the flow of seasonal

drainage.

3. Tundra must ensure that the core box is labeled with the licence #, bottomhole location and

intervals for that particular box. (In Large Bold Letters).

Lie. No. 10414 Tundra North Hargrave 04-24-12-27 (WPM)

MANIT BA BMI I NRE IREMENT F RNEWWELL

The following notiTications and information must be provided to the appropriate district office.

OPERATIONS IN TOWNSHIPS 1 TO 6Dept. of Innovation, Energy and MinesPetroleum BranchBox 22023 Railway AvenueWaskadaMB ROM2EOPhone: 2044I73-2472 (24 hour service)Fax: 204-673-2767

OPERATIONS NORTH OF TOWNSHIP 6Dept. of Innovation, Energy and MinesPetroleum BranchBox 1359227 King Street WestVlrden MB ROM 2CO204-7484260 (24 hour service)204-748-2208

DRILLING, COMPLETION AND INITIALPRODUCTION SUBMSSION REGUIREMENTS

COMPANY REPRESENTATIVE ATWELLSITE IS RESPONSIBLE FOR ITEMS 1 TO 9.

1. 24 hours advance noses of Intent to spud a well.

FOR OEPr, u% ONLY

RECEIVED

2, 2 hours advance notice of intent to run and cement surface casing or production casing.

3. 2 hours advance notice of intent to pull pipe after running a DST.

4. 2 hours advance notice of a dry hole abandonment. Verbal approval to abandon must be obtained

horn the district oNce.

5, Weekly status reports on all acdvitles up to rig release. R rts tobe called in each MONDAY

6. Acomplete copy of the drilling tours.

7. Two (2) copies of field prints of all logs.

8. Tagged Image Ales of all open hole logs and cased hole logs and LAS (Log ASCII) Flies) for any

log that may be represented in LAS format (submlsed on 1.44 floppy disk, CD or DVD format) as

per Informational Nodce 054I5.

Two (2) copies of any directional sunreys run (submitted in digital format as per Informational

10. Aone (1) litre sample of drilling fluids. Squeezing of a pit is not to proceed without the consent of

the district office.

11. Any drill cutting samples and cores are to be shipped to: Rock Preparation Lab, 10 Midland

Street, Winnipeg MB, R3E 2Y6.

12. Two (2) copies of all reporls of drill stem tests, oore analyses or of any other test. (E.g, fluid

analyses, pressure surveys, etc.)

13. Two (2) copies of any Geological Repon,

14. Chronological report of all completion operations incluMng full details.

15. Two (2) copies of all completion logs.

16. Two (2) copies of the Initial Produchon Report (lorms ssached).

Lic. No. 10414 Tundra North Hargrave 04-24-12-27 (WPM)

TUNDRA NORTH HARGRAVE04-24-12-27 WPMVERTICALSTRAT WELL

License ¹: 10414

UWI: 100.04-24-012-27W1.00

Tundra Oil 4 Gas Partnership1000, 715-5've S.K

Calgary, AlbertaT2P 2%6

Well Data ReportAugust 4, 2015

Compiled by: Chris Frank, B.Sc.Troy Cockerill, B.Sc.

5405492 MB LTD.612 —12

" STREETBranson, Manitoba, Canada

(204) 851-2937

Troy Cockerill

TUNDRA NORTH HARGRAVE 04-24-12-27 WPM

VERTICAL STRAT WELL

License #: 10414

UWI: 100.04-24-012-27W1.00

Tundra Oil & Gas Partnership

1000, 715-5th Ave S.W.

Calgary, Alberta

T2P 2X6

Well Data Report

August 4, 2015

Compiled by: Chris Frank, B.Sc.

Troy Cockerill, B.Sc.

5405492 MB LTD.

612 – 12TH

STREET

Branson, Manitoba, Canada

(204) 851-2937

____________________

Troy Cockerill

Tundra North Hargrave 04-24-12-27 WPM1

Contents

Well Data Summary

Geological Markers

Mud Record

Bit Record

Daily Operations Summary

Surveys

Coring ¹I & 2 Report

Core Descriptions

Logging Report

Geological Summary

Strip Log (s)

2

3

4

4

5

5

6

7

9

10

in back pocket

5405492 MANITOBALTD.612-12'treet, Brandon, Manitoba, Canada R7A 4M9

(204) 851-2937

Tundra North Hargrave 04-24-12-27 WPM

1

5405492 MANITOBA LTD.

612-12th Street, Brandon, Manitoba, Canada R7A 4M9

(204) 851-2937

Contents

Well Data Summary 2

Geological Markers 3

Mud Record 4

Bit Record 4

Daily Operations Summary 5

Surveys 5

Coring #1 & 2 Report 6

Core Descriptions 7

Logging Report 9

Geological Summary 10

Strip Log (s) in back pocket

Tundra North Hargrave 04-24-12-27 WPM2

WELL DATASUMMARY

WELL NAME:LEGALLOCATION:FIELD / REGION:PROVINCE:OPERATOR:PARTICIPANTS:DRILLING LICENSE:SECURITY STATUS:

Tundra North Hargrave 04-24-12-27 WPM04-24-012-27 WPMHargraveManitobaTundra Oil and Gas PartnershipN/A10414

Development (Confidential)

CO-ORDINATES: SURFACE: 165.00m N of S, 110.00m E of W, Section 24BOTTOM: 165.00m N of S, 110.00m E of W, Section 24

ELEVATIONS: GROUND: 472.94mK.B.: 477.04m

DATES:SPUD DATE:DRILL OUT:SAMPLE POINT:CORE POINT:TOTALDEPTH:

11:00 hrs, August 1, 201500:25 hrs, August 2, 201505:15 hrs, August 2, 201509:25 hrs, August 2, 201511:24 hrs, August 3, 2015

TOTALDEPTH:

OBJECTIVE:

745.0m TVD

Regolith Porosity

SAMPLE INTERVAL: 5 m samples washed and vialed from 400m to TD.

SAMPLE QUALITY: Fair.

CASING: Surface: 11 jts 244.5mm, 48.07kg/m, H-40, STkC; landed @138.0m.

DRILL CONTRACTOR: Trinidad 10

TOOLPUSH: Vern FalloonWELL ENGINEER: Tom UnderwoodWELL GEOLOGIST: Troy Cockerill / Chris FrankSERVICE CO'S: DRILLING MUD: Moose Mountain Mud

DIRECTIONAL: N/ACEMENTING: TricanHOLE SURVEYS: N/ALOGGING: WeatherfordCORING: Blackie's Coring Services

WELL STATUS: Strat hole prepared for vertical well completion.

5405492 MANITOBALTD.612-12'treet, Brandon, Manitoba, Canada R7A 4M9

(204) 851-2937

Tundra North Hargrave 04-24-12-27 WPM

2

5405492 MANITOBA LTD.

612-12th Street, Brandon, Manitoba, Canada R7A 4M9

(204) 851-2937

WELL DATA SUMMARY

WELL NAME: Tundra North Hargrave 04-24-12-27 WPM

LEGAL LOCATION: 04-24-012-27 WPM

FIELD / REGION: Hargrave

PROVINCE: Manitoba

OPERATOR: Tundra Oil and Gas Partnership

PARTICIPANTS: N/A

DRILLING LICENSE: 10414

SECURITY STATUS: Development (Confidential)

CO-ORDINATES: SURFACE: 165.00m N of S, 110.00m E of W, Section 24

BOTTOM: 165.00m N of S, 110.00m E of W, Section 24

ELEVATIONS: GROUND: 472.94m

K.B.: 477.04m

DATES:

SPUD DATE: 11:00 hrs, August 1, 2015

DRILL OUT: 00:25 hrs, August 2, 2015

SAMPLE POINT: 05:15 hrs, August 2, 2015

CORE POINT: 09:25 hrs, August 2, 2015

TOTAL DEPTH: 11:24 hrs, August 3, 2015

TOTAL DEPTH: 745.0m TVD

OBJECTIVE: Regolith Porosity

SAMPLE INTERVAL: 5 m samples washed and vialed from 400m to TD.

SAMPLE QUALITY: Fair.

CASING: Surface: 11 jts 244.5mm, 48.07kg/m, H-40, ST&C; landed @

138.0m.

DRILL CONTRACTOR: Trinidad 10

TOOLPUSH: Vern Falloon

WELL ENGINEER: Tom Underwood

WELL GEOLOGIST: Troy Cockerill / Chris Frank

SERVICE CO’S: DRILLING MUD: Moose Mountain Mud

DIRECTIONAL: N/A

CEMENTING: Trican

HOLE SURVEYS: N/A

LOGGING: Weatherford

CORING: Blackie’s Coring Services

WELL STATUS: Strat hole prepared for vertical well completion.

Tundra North Hargrave 04-24-12-27 WPM3

GEOLOGICALMARKERSKB = 477.04m

FORMATIONTOPS PROGNOSIS SAMPLE* LOGS

Sub sea

DethmTrue Vertical

DethmSub sea

Deth mTrue Vertical

Deth mSub sea

Dethm

Base Fish Scales

Mannville Sand

Jurassic

MelitaRed Jacket

Core Point ¹ILodgepoleRegolith Porosity

Upper Virden

Upper BakkenMiddle Bakken

Birdbear

DuperowTD

131

70

27

-12.5

-30.5

-79.5

-85.5

-101.5

-170.0

-171.0

-195.5

-230.5

-266

346.0

407.0

451.0

491.0

506.0

553.0

556.4

561.0

577.5

650.4

651.2

675.5

710.4

745.0

131.0

70.0

26.0-14.0

-29.0

-76.0

-79.4

-84.0

-100.5

-173.4

-174.2

-198.5

-233.4

-268.0

349.7

406.5

451.0

491.8

505.0

557.2

560.0

576.0

651.0

651.8

676.5

711.2

745.3

127.3

70.5

26.0-14.8

-28.0

-80.2

-83.0

-99.0

-174.0

-174.8

-199.5

-234.2

-268.3

*Tops based on ROP, mud gas, and samples +/- core.

5405492 MANITOBALTD.612-12'treet, Brandon, Manitoba, Canada R7A 4M9

(204) 851-2937

Tundra North Hargrave 04-24-12-27 WPM

3

5405492 MANITOBA LTD.

612-12th Street, Brandon, Manitoba, Canada R7A 4M9

(204) 851-2937

GEOLOGICAL MARKERS KB = 477.04m

FORMATION TOPS PROGNOSIS SAMPLE* LOGS

Subsea True Vertical Subsea True Vertical Subsea

Depth (m) Depth (m) Depth (m) Depth (m) Depth (m)

Base Fish Scales 131 346.0 131.0 349.7 127.3

Mannville Sand 70 407.0 70.0 406.5 70.5

Jurassic 27 451.0 26.0 451.0 26.0

Melita -12.5 491.0 -14.0 491.8 -14.8

Red Jacket -30.5 506.0 -29.0 505.0 -28.0

Core Point #1 - 553.0 -76.0 --- ---

Lodgepole -79.5 556.4 -79.4 557.2 -80.2

Regolith Porosity -85.5 561.0 -84.0 560.0 -83.0

Upper Virden -101.5 577.5 -100.5 576.0 -99.0

Upper Bakken -170.0 650.4 -173.4 651.0 -174.0

Middle Bakken -171.0 651.2 -174.2 651.8 -174.8

Birdbear -195.5 675.5 -198.5 676.5 -199.5

Duperow -230.5 710.4 -233.4 711.2 -234.2

TD -266 745.0 -268.0 745.3 -268.3

*Tops based on ROP, mud gas, and samples +/- core.

Tundra North Hargrave 04-24-12-27 WPM4

MUD RECORD

Mud TypeMud CompanyMudman

Polymer.Moose Mountain MudRyan Miller

Pump Liner Size ¹1 152.0 mm Stroke Length 229 mm

Volume per Pump Stroke ¹1 0.0112 m (100.0% efficiency) (Gardner-Denver PZ-9)

Pump Output

Mud Gas:

¹1 1.40 m /min @ 125 Stk/min (100% efficiency)

Mud gas logged from surface to TD of well with a Pason total gas detection system.

BIT RECORD

5405492 MANITOBALTD.612-12'treet, Brandon, Manitoba, Canada R7A 4M9

(204) 851-2937

Tundra North Hargrave 04-24-12-27 WPM

4

5405492 MANITOBA LTD.

612-12th Street, Brandon, Manitoba, Canada R7A 4M9

(204) 851-2937

MUD RECORD

Mud Type Polymer.

Mud Company Moose Mountain Mud

Mudman Ryan Miller

Pump Liner Size #1 152.0 mm Stroke Length 229 mm

Volume per Pump Stroke #1 0.0112 m3 (100.0% efficiency) (Gardner-Denver PZ-9)

Pump Output #1 1.40 m3/min @ 125 Stk/min (100% efficiency)

Mud Gas: Mud gas logged from surface to TD of well with a Pason total gas detection system.

BIT RECORD

Date Depth Density Viscosity Fluid Filter pH Pressure Chlorides

(m) (Kg/m3) (sec/l) Loss (cm3) Cake (mm) (kPa) (ppm)

August 3 724 1155 156 6.3 1.1 10.5 5771 1380

Bit Size (mm) Type Jets Out Meters Hours RPM Force (daN)

1 349 Western 4x12.50 138 138 2.0 165 10.0

2 222 Security FX54 5x11.1 553 415 4.5 150 3.0

3 199 Blackies 6x9.5 563 10 1.5 90 2.0

3RR 199 Blackies 6x9.5 572 9 1.5 75 2.6

2RR 222 Security FX54 5x11.1 745 192 --- 140 6.0

Tundra North Hargrave 04-24-12-27 WPM5

DAILYOPERATIONS SUMMARY

I ~g

~

I I I I

August 1

August 2

August 3

138

572

Move Rig, Rig up, spud well @ 11:00hrs, drill ahead on surface hole to 138m,condition mud and circulate, POOH, rig to and run casing, condition mud and

circulate, rig to and cement 244.5mm casing, WOC, nipple up, pressure test, RIH.Drill out surface casing @ 00:30hrs, Drill ahead on vertical hole. Core Point ¹1 @553.0m 09:25hrs, POOH. P/U core barrels, RIH to core, Core¹1: 553-563m (8.6mrcvd), POOH due to jamming, Retrieve core, M/U core barrels, RIH for Core ¹2,Core ¹2: 563-572m (8.6m rcvd), POOH, retrieve core.

M/U BHA, RIH to ream rat hole, drill ahead on vertical hole to TD @ 745.0m11:24hrs, circulate and condition mud, wiper, POOH for loggers, Rig to and

Wireline logs, run production casing.

SURVEYS

5405492 MANITOBALTD.612-12'treet, Brandon, Manitoba, Canada R7A 4M9

(204) 851-2937

Tundra North Hargrave 04-24-12-27 WPM

5

5405492 MANITOBA LTD.

612-12th Street, Brandon, Manitoba, Canada R7A 4M9

(204) 851-2937

DAILY OPERATIONS SUMMARY

DATE DEPTH

(m)

(00:00 hrs)

OPERATIONS SUMMARY

August 1 0 Move Rig, Rig up, spud well @ 11:00hrs, drill ahead on surface hole to 138m,

condition mud and circulate, POOH, rig to and run casing, condition mud and

circulate, rig to and cement 244.5mm casing, WOC, nipple up, pressure test, RIH.

August 2 138 Drill out surface casing @ 00:30hrs, Drill ahead on vertical hole. Core Point #1 @

553.0m 09:25hrs, POOH. P/U core barrels, RIH to core, Core#1: 553-563m (8.6m

rcvd), POOH due to jamming, Retrieve core, M/U core barrels, RIH for Core #2,

Core #2: 563-572m (8.6m rcvd), POOH, retrieve core.

August 3 572 M/U BHA, RIH to ream rat hole, drill ahead on vertical hole to TD @ 745.0m

11:24hrs, circulate and condition mud, wiper, POOH for loggers, Rig to and

Wireline logs, run production casing.

SURVEYS

SURFACE HOLE MAIN HOLE

Depth (m) Deviation (o) Depth (m) Deviation (

o)

25.00 0.65 201.00 1.40

65.00 0.35 306.00 0.40

103.00 0.28 398.00 0.50

488.00 0.19

593.00 0.80

Tundra North Hargrave 04-24-12-27 WPM6

CORING REPORT

Coring Company:Corehand:Core Bit Type:Core Bit Size:

Main Hole Size:

Core Barrel Length:Core Barrel Size:

Blackie's Coring Services

ErniePDC199x89 mm222 mm20.19m176mm

CoRE ¹1

IntervalFormationMetres CoredMetres RecoveredTime CoringWOBRPMSPMPressure

ViscosityDensityFluid Loss

pHPump (m3/min)Date

553.0 —563.0m TVDRegolith Porosity/ Upper Lodgepole10.0

8.61.5 hrs

2.0

85

70

399047

1100

8.0

9.01.50

August 2, 2015

CoRE ¹2

IntervalFormationMetres CoredMetres RecoveredTime CoringWOBRPMSPMPressure

ViscosityDensityFluid Loss

pHPump (m3/min)Date

563.0 —572.0m TVDRegolith Porosity/ Upper Lodgepole9.0

8.62.0 hrs

2.5

80

76

550045

1110

8.5

10.0

1.50

August 2, 2015

5405492 MANITOBALTD.612-12'treet, Brandon, Manitoba, Canada R7A 4M9

(204) 851-2937

Tundra North Hargrave 04-24-12-27 WPM

6

5405492 MANITOBA LTD.

612-12th Street, Brandon, Manitoba, Canada R7A 4M9

(204) 851-2937

CORING REPORT

Coring Company: Blackie’s Coring Services

Corehand: Ernie

Core Bit Type: PDC

Core Bit Size: 199x89 mm

Main Hole Size: 222 mm

Core Barrel Length: 20.19m

Core Barrel Size: 176mm

CORE #1

Interval 553.0 – 563.0m TVD

Formation Regolith Porosity/ Upper Lodgepole

Metres Cored 10.0

Metres Recovered 8.6

Time Coring 1.5 hrs

WOB 2.0

RPM 85

SPM 70

Pressure 3990

Viscosity 47

Density 1100

Fluid Loss 8.0

pH 9.0

Pump (m3/min) 1.50

Date August 2, 2015

CORE #2

Interval 563.0 – 572.0m TVD

Formation Regolith Porosity/ Upper Lodgepole

Metres Cored 9.0

Metres Recovered 8.6

Time Coring 2.0 hrs

WOB 2.5

RPM 80

SPM 76

Pressure 5500

Viscosity 45

Density 1110

Fluid Loss 8.5

pH 10.0

Pump (m3/min) 1.50

Date August 2, 2015

Tundra North Hargrave 04-24-12-27 WPM7

CORE DESCRIPTIONS

Top of Core ¹1: 553.0m MD / -76.0m SS

Bottom of Core ¹1: 563.0m MD/ -86.0m SS

Core ¹1: 86% total recovery (8.6m recvd/ 10.0m cut)

Top of Core ¹2: 563.0m MD/ -86.0m SS

Bottom of Core ¹2: 572.0m MD/ -95.0m SS

Core ¹2: 95.6% total recovery (8.6m recvd/ 9.0m cut)

553-555.9m (2.9m):Fossiliferous SHALE: black/ dark gray, abundant shell fragments along hz lams, calcareous, minor beds off white to

slightly greyish LIMESTONE; NVPNS.NON RESERVOIR.

555.9-556.4m (0.5m):Calc SHALE: medium to dark gray, gen massive, brks easily hz planes, no vis fossil fragments; NVPNS.NON RESERVOIR.

Miss. Lodgpole Unconf.: 556.4m MD/-79.4m SS

556.4-559.3m (2.9m):LIMESTONE/ DOLOMITE: off white/ light gray in part, sharp erosional contact at top of interval marked withBreccia clasts and medium green SHALE, gen massive/ minor prly bedd, MST; pr to fair patchy ppv, NS.NON RESERVOIR.

559.3-561.0m (1.7m):LIMESTONE: gysh brown/ medium gray, waxy/ earthy, blocky, gen massive, anhydritic; NVPNS.NON RESERVOIR.

Regolith Porosity: 561.0m MD/-84.0m SS

561-561.6m (0.6m):Regolith Porosity/ Target Zone: brown to medium gray/ minor light green SHALE, brecc, cm size angular clasts/

reworked, anhydritic/ DOLc, 1st occur of oil at 561m, medium to dark brown bleeding oil; fair to gd scattered ppv/slightly karstic porosity, 60 to 70% bright yellow fluorescence dcr with dpth, instant blooming white cut/ faint sour

petrf odor, best potential reservoir at the top 20cm of interval.FAIRRESERVOIR.

561.6-563m (1.4m):NO CORE/ NOT RECOVERED.

563-563.9m (0.9m):Regolith Porosity/ DOLOMITE: medium to dark gray/ slightly brnsh/ 10 to 20% medium to dark brown bleedingoil, prly bedd, slightly brecc, anhydritic/ siliceous in part, common cm size angular Chert fragments; pr to fair/scattered gd ppv/ fracture and slightly karstic porosity, 15 to 25% light yellow fluorescence/ instant blooming whitecut/ faint sour petrf odor.FAIRRESERVOIR.

5405492 MANITOBALTD.612-12'treet, Brandon, Manitoba, Canada R7A 4M9

(204) 851-2937

Tundra North Hargrave 04-24-12-27 WPM

7

5405492 MANITOBA LTD.

612-12th Street, Brandon, Manitoba, Canada R7A 4M9

(204) 851-2937

CORE DESCRIPTIONS Top of Core #1: 553.0m MD / -76.0m SS

Bottom of Core #1: 563.0m MD/ -86.0m SS

Core #1: 86% total recovery (8.6m recvd/ 10.0m cut)

Top of Core #2: 563.0m MD/ -86.0m SS

Bottom of Core #2: 572.0m MD/ -95.0m SS

Core #2: 95.6% total recovery (8.6m recvd/ 9.0m cut)

553-555.9m (2.9m):

Fossiliferous SHALE: black/ dark gray, abundant shell fragments along hz lams, calcareous, minor beds off white to

slightly greyish LIMESTONE; NVPNS.

NON RESERVOIR.

555.9-556.4m (0.5m):

Calc SHALE: medium to dark gray, gen massive, brks easily hz planes, no vis fossil fragments; NVPNS.

NON RESERVOIR.

Miss. Lodgpole Unconf.: 556.4m MD/ -79.4m SS

556.4-559.3m (2.9m):

LIMESTONE/ DOLOMITE: off white/ light gray in part, sharp erosional contact at top of interval marked with

Breccia clasts and medium green SHALE, gen massive/ minor prly bedd, MST; pr to fair patchy ppv, NS.

NON RESERVOIR.

559.3-561.0m (1.7m):

LIMESTONE: gysh brown/ medium gray, waxy/ earthy, blocky, gen massive, anhydritic; NVPNS.

NON RESERVOIR.

Regolith Porosity: 561.0m MD/ -84.0m SS

561-561.6m (0.6m):

Regolith Porosity/ Target Zone: brown to medium gray/ minor light green SHALE, brecc, cm size angular clasts/

reworked, anhydritic/ DOLc, 1st occur of oil at 561m, medium to dark brown bleeding oil; fair to gd scattered ppv/

slightly karstic porosity, 60 to 70% bright yellow fluorescence dcr with dpth, instant blooming white cut/ faint sour

petrf odor, best potential reservoir at the top 20cm of interval.

FAIR RESERVOIR.

561.6-563m (1.4m):

NO CORE/ NOT RECOVERED.

563-563.9m (0.9m):

Regolith Porosity/ DOLOMITE: medium to dark gray/ slightly brnsh/ 10 to 20% medium to dark brown bleeding

oil, prly bedd, slightly brecc, anhydritic/ siliceous in part, common cm size angular Chert fragments; pr to fair/

scattered gd ppv/ fracture and slightly karstic porosity, 15 to 25% light yellow fluorescence/ instant blooming white

cut/ faint sour petrf odor.

FAIR RESERVOIR.

Tundra North Hargrave 04-24-12-27 WPM8

CORE DESCRIPTIONS

563.9-566.2m (2.3m):DOLOMITE/ LIMESTONE: light to medium gray/ occasional off white, MICXL to VFXL/occasional ALTMST,slightly limy increase with dpth, minor spotty medium brown bleeding oil, anhydritic, occasional white Chert nods,

gen massive/ moderately bedd; pr to fair patchy gd ppv and intercrystalline porosity, spotty faint to light yellowfluorescence/ instant strmg cut.POOR RESERVOIR.

566.2-572m (5.8m):LIMESTONE: off white/ slightly gray in part, MST/ MICXL, anhydritic/ slightly dolomitic dcr with dpth,occasional white large Chert nods, prly bedd becoming massive; pr to fair patchy gd ppv and intercrystalline/microfrac porosity, rare spotty light yellow fluorescence with faint cut/ last occur of oil at 566.5m.VERY POOR to NON RESERVOIR.

BOTTOM OF CORE ¹2: 572.0m MD/ -95.0m SS

5405492 MANITOBALTD.612-12'treet, Brandon, Manitoba, Canada R7A 4M9

(204) 851-2937

Tundra North Hargrave 04-24-12-27 WPM

8

5405492 MANITOBA LTD.

612-12th Street, Brandon, Manitoba, Canada R7A 4M9

(204) 851-2937

CORE DESCRIPTIONS

563.9-566.2m (2.3m):

DOLOMITE/ LIMESTONE: light to medium gray/ occasional off white, MICXL to VFXL/ occasional ALT MST,

slightly limy increase with dpth, minor spotty medium brown bleeding oil, anhydritic, occasional white Chert nods,

gen massive/ moderately bedd; pr to fair patchy gd ppv and intercrystalline porosity, spotty faint to light yellow

fluorescence/ instant strmg cut.

POOR RESERVOIR.

566.2-572m (5.8m):

LIMESTONE: off white/ slightly gray in part, MST/ MICXL, anhydritic/ slightly dolomitic dcr with dpth,

occasional white large Chert nods, prly bedd becoming massive; pr to fair patchy gd ppv and intercrystalline/

microfrac porosity, rare spotty light yellow fluorescence with faint cut/ last occur of oil at 566.5m.

VERY POOR to NON RESERVOIR.

BOTTOM OF CORE #2: 572.0m MD/ -95.0m SS

Tundra North Hargrave 04-24-12-27 WPM9

LOGGING REPORT

COMPANY:DISTRICT:ENGINEER:UNIT:HOLE SIZE:

WeatherfordEstevan

K. Canning13380

222 mm

DEPTH CHECKS:

K.B. ELEVATION:SURFACE CSG:TOTALDEPTH:

DRILLER477.04

138.0745.0

LOGGER477.04

138.0745.3

DIGITALLOGS: Posted FIELD PRINTS: 2 FINALPRINTS: N/A

MUD TYPE: Gel Chem

Density:Viscosity:Mud pH:Fluid Loss:

Rm:Rmf:Rmc:Rm@BHTBHT @ T.D.:Circulation Ended:Start Logging (btm):Operating Time:

1110.0 kg/m120.0sec/1

10.0

7.0 ml/30min0.88 ohmm @ 20.0 'C0.76 ohmm @ 20.0'C0.90 ohmm @ 20.0'C0.64 ohmm @ 35'C35'C @ 745.3m18:00 hrs, August 3, 201523:00 hrs, August 3, 2015

8.0 hrs

REMARKS: Dipole Sonic —GR, Spectral Pe Density-CN, STI, Spectral GR, High resolution Neutron Density

logged in combination.

5405492 MANITOBALTD.612-12'treet, Brandon, Manitoba, Canada R7A 4M9

(204) 851-2937

Tundra North Hargrave 04-24-12-27 WPM

9

5405492 MANITOBA LTD.

612-12th Street, Brandon, Manitoba, Canada R7A 4M9

(204) 851-2937

LOGGING REPORT

COMPANY: Weatherford

DISTRICT: Estevan

ENGINEER: K. Canning

UNIT: 13380

HOLE SIZE: 222 mm

DEPTH CHECKS:

DRILLER LOGGER

K.B. ELEVATION: 477.04 477.04

SURFACE CSG: 138.0 138.0

TOTAL DEPTH: 745.0 745.3

DIGITAL LOGS: Posted FIELD PRINTS: 2 FINAL PRINTS: N/A

MUD TYPE: Gel Chem

Density: 1110.0 kg/m3

Viscosity: 120.0sec/l

Mud pH: 10.0

Fluid Loss: 7.0 ml/30min

Rm: 0.88 ohmm @ 20.0 oC

Rmf: 0.76 ohmm @ 20.0oC

Rmc: 0.90 ohmm @ 20.0oC

Rm @ BHT 0.64 ohmm @ 35oC

BHT @ T.D.: 35oC @ 745.3m

Circulation Ended: 18:00 hrs, August 3, 2015

Start Logging (btm): 23:00 hrs, August 3, 2015

Operating Time: 8.0 hrs

REMARKS: Dipole Sonic – GR, Spectral Pe Density-CN, STI, Spectral GR, High resolution Neutron Density

logged in combination.

Tundra North Hargrave 04-24-12-27 WPM10

GEOLOGICALSUMMARY

The purpose of drilling this exploration well was to quantify and qualify reservoir potential in the UpperLodgepole Dolomitic Breccia Formation in the Hargrave, Manitoba area; specifically oil / watersaturations, effective porosity and permeability of zone of interest. The primary analytical methods used

included core lab analysis and standard wireline logging (Spectral Gamma Ray, Spectral Pe Density-CN,STI, etc.). Mud gas was monitored by a Pason gas detector from surface to TD. Drill cuttings were takenat 5m intervals from 400m to TD (745.0m). The quality of the cuttings was fair throughout the well.Two cores were cut over the Regolith Porosity / Upper Lodgepole Dolomitic Breccia. The cores were drilledfrom 553.0 —572.0m (19.0m cut / 17.2m recovered, combined).

Typically the top of the Mississippian Lodgepole is underlain by the targeted regolith porosity in this

area. The cored interval started in the Red Jacket Shale and was terminated in the Lodgepole Limestone.The interval did show the presence of hydrocarbons within the Lodgepole Dolomitic Breccia (regolith);considered to have Fair reservoir potential. The best oil shows were noted from 561.0-561.6m TVD and

from 563.0-563.9m (see sample descriptions for further details). The dolomite breccia was noted to have

a fair to good pin point and slightly karstic porosity, bright yellow fluorescence and an instant bloomingwhite cut. The Lodgepole LS had rare spotty light yellow fluorescenced and was considered VERY POORto NON RESERVOIR. The well was terminated in the Duperow formation, -34.6m below the top of the

Birdbear / Duperow contact.

The vertical well was completed for oil production.

5405492 MANITOBALTD.612-12'treet, Brandon, Manitoba, Canada R7A 4M9

(204) 851-2937

Tundra North Hargrave 04-24-12-27 WPM

10

5405492 MANITOBA LTD.

612-12th Street, Brandon, Manitoba, Canada R7A 4M9

(204) 851-2937

GEOLOGICAL SUMMARY

The purpose of drilling this exploration well was to quantify and qualify reservoir potential in the Upper

Lodgepole Dolomitic Breccia Formation in the Hargrave, Manitoba area; specifically oil / water

saturations, effective porosity and permeability of zone of interest. The primary analytical methods used

included core lab analysis and standard wireline logging (Spectral Gamma Ray, Spectral Pe Density-CN,

STI, etc.). Mud gas was monitored by a Pason gas detector from surface to TD. Drill cuttings were taken

at 5m intervals from 400m to TD (745.0m). The quality of the cuttings was fair throughout the well.

Two cores were cut over the Regolith Porosity / Upper Lodgepole Dolomitic Breccia. The cores were drilled

from 553.0 – 572.0m (19.0m cut / 17.2m recovered, combined).

Typically the top of the Mississippian Lodgepole is underlain by the targeted regolith porosity in this

area. The cored interval started in the Red Jacket Shale and was terminated in the Lodgepole Limestone.

The interval did show the presence of hydrocarbons within the Lodgepole Dolomitic Breccia (regolith);

considered to have Fair reservoir potential. The best oil shows were noted from 561.0-561.6m TVD and

from 563.0-563.9m (see sample descriptions for further details). The dolomite breccia was noted to have

a fair to good pin point and slightly karstic porosity, bright yellow fluorescence and an instant blooming

white cut. The Lodgepole LS had rare spotty light yellow fluorescenced and was considered VERY POOR

to NON RESERVOIR. The well was terminated in the Duperow formation, ~34.6m below the top of the

Birdbear / Duperow contact.

The vertical well was completed for oil production.

T:tGeologyipubliciNorm HopkinsQUORTH MANAREASiNorth HargraveiWellDataiSection 2434-24-12-27wliProgi4-24-12-27WI PRELIM Geological Prognosis 2015

06 09.docx

TUNDRAOIL 6'FAS LIMITED

Preliminar Geolo ical Pro nosis

Well Name: Tundra North Hargrave 4-24-12-27WIM

Location:

Target: Regolith

GR: 472.94 m KB: 477.04 m (est)

TD: 743.04m (MD), 743.04m (TVD)Formation: Duperow

Geological Tops:Prognosis Actual

Formation mSS m TVD mMD mSS m TVD mMD

Base Fish Scale

Mannville Sand

Jurassic

Melita

Red Jacket

Mississippian/LDGP

Regolith Porosity

Upper Virden

Bakken

Middle Bakken

Birdbear

Duperow

TD

131.00

70.00

27.00

-12.50

-30. 50

-79. 50

-85. 50

-101.50

-170.00

-171.00

-195.50

-230.50

-266.00

346. 04

407. 04

450. 04

489. 54

507. 54

556. 54

562. 54

578. 54

647. 04

648. 04

672. 54

707. 54

743. 04

First generated Hepkms 2015 01 09

6/23/2015, sk00 PM 1/2

T:\Geology\Public\Norm Hopkins\NORTH MAN AREAS\North Hargrave\Well Data\Section 24\4-24-12-27w1\Prog\4-24-12-27W1 PRELIM Geological Prognosis 2015 06 09.docx

First generated Hopkins 2015 01 09 6/23/2015, 4:00 PM 1/2

Preliminary Geological Prognosis Well Name: Tundra North Hargrave 4-24-12-27W1M Location: Feature N-S (local) E-W (local) Reference Elevation Surface 165.00 N of S 110.00 E of W Sec. 24 472.94m Bottom 165.00 N of S 110.00 E of W Sec. 24 743.04

Target: Regolith GR: 472.94 m KB: 477.04 m (est)

TD : 743.04m (MD), 743.04m (TVD) Formation: Duperow Geological Tops:

Prognosis Actual

Formation mSS mTVD mMD mSS mTVD mMD

Base Fish Scale 131.00 346.04

Mannville Sand 70.00 407.04

Jurassic 27.00 450.04

Melita -12.50 489.54

Red Jacket -30.50 507.54

Mississippian/LDGP -79.50 556.54

Regolith Porosity -85.50 562.54

Upper Virden -101.50 578.54

Bakken -170.00 647.04

Middle Bakken -171.00 648.04

Birdbear -195.50 672.54

Duperow -230.50 707.54

TD -266.00 743.04

T:tGeology)Public)Norm Hopkins)NORTH MANAREAS)North Hargrave)WellData)Section 2414-24-12-27w1)Prog)4-24-12-27WI PRELIM Geological Prognosis 201506 09.docxTesting: none

Coring: 9m core over the Regolith

Logging: See attached program.

Samples: As per government requirements, Tundra: 400m (TVD)to TD (5 m intervals)

Reports: 3 copies of wellsite geology report and striplog, two disks.

Contacts:

Office PhoneHome PhoneCellularCellularOffice Fax

Geologist:Norm Hopkins403-767-1238403-282-0453403-999-0458403-681-4531403-261-1042

Engineer:Lindsey Snyder403-910-1665

403-650-1973

Date: 2015-06-09

First generated Hopkins 2015 01 096/23/2015, 4:00 PM 2/2

T:\Geology\Public\Norm Hopkins\NORTH MAN AREAS\North Hargrave\Well Data\Section 24\4-24-12-27w1\Prog\4-24-12-27W1 PRELIM Geological Prognosis 2015 06 09.docx

First generated Hopkins 2015 01 09 6/23/2015, 4:00 PM 2/2

Testing: none Coring: 9m core over the Regolith Logging: See attached program. Samples: As per government requirements, Tundra: 400m (TVD) to TD (5 m intervals) Reports: 3 copies of wellsite geology report and striplog, two disks. Contacts: Geologist:

Norm Hopkins Engineer: Lindsey Snyder

Office Phone 403-767-1238 403-910-1665 Home Phone 403-282-0453 Cellular 403-999-0458 403-650-1973 Cellular Office Fax

403-681-4531 403-261-1042

Date: 2015-06-09

f¹0tTCRIDRA

W 0th & GAS PARTNERSHIP

License ¹. XXXKX

Verbca Depth.74304 m ND

Est. Dri I Time. 4 Days

AFE¹r'02015IDX

North Hargrave 04 240t227 WPM

KB (est)r 477.04 m

RigKBtoGLL410m

GL (surveyed)r 47294 m

Drilling Rig. Trinidad XX

I~Ill I I

DrilincIDMana er: Eric Biomsson

Office: 204.748.3095 Ce: 204851 2397

Geo orlisti Norm Hopkins

Office:403.767.1238 Cell 403.9994N58

I» III III ~(

m AMSL m TVD

C~as>n 6 Cement

Vendors Fontana's 8 Trican

~Dr>lin Fluid

Vendor: Moose Mountain Mud

Other Information

Surface Casing

BFSC

MANNVLLE

JURASS C

MELITA

REDJACKET

LODGEPOLE

REGOLITH

UPPER VRDEN

BAKKEN U

BAKKENM

BIRDBEAR

DUPEROW

342.0>

135.0

CEMENT TOP 257.0

150 M ABOVE THE MANNVILLE

131 0 346 0

70 0 407 0

27 0 450 0

.12.5 489 5

.30.5 5075

.79.5 5565

85.5 562.5

101 5 578 5

170 0 647 0

171 0 648 0

195 5 672 5

230 5 707 5

266.0 743.0

~Surface Casin . 2445 mm 48 07 kg/m, H4 STSC(Surface to TD)

Centra izers. On upper most jomt and bottom mostjoint

(~I( (

151t(13 7 m31 TSCt 3'/I

CaC 2 (0 905m3/T,100'/I

excess)

TSC 1700@

17Mlkglm3

Adjusttonnage accordingly based on previous cement returns to surface.

Geolo ical Sam les 8 Well Evaluation Pr ram.

Tundra. 400 mND. TD (5 m interva s).

P Branch. As per icense requirements.

Cores.'1.18m core (Regolith Porosity), as per geo prognosis

Logs: Aspergeoogica prognosis.

DST'sr Check with area geologist afteroggmg

Once Logs are posted, immediatey

notify Virden DNtce and

decision wit be made to order casing, cement, or DST.

Prlucti~ Casin4I: 1778mm. JS5,29.76kglm. STI C

Scratchers. 10 Scratchers,5 per jomt over perforationinterva.

Centra izers. P aced around the casing coupling on everyjomt from TD

to Red Jacket top then every 3rdiomt to panned cement top.

t~uli t I t»(:

Prefush. 20m3mhibited water,20m3 Dpi flush

Scavenger. 09t(20m3) (2408m3/T)

TAC.405'/ICaCI2(B 1250kglm3

Fil:(257mto493m): 54t(59m3) (1098m3/T.BO'/oexcessl

TAC.405'/ICaCI2(B 1550kglm3

Tailr(493to743mMD): 47t(47m3) (1004m3/T.35'Aexcessl

TAC.405'/ICaCI2(B 1600kglm3

Note. In the case of an Exp oratory Verical adjust cement volumes to

35'/I over Caliper (either Abandonment or Production Cement)

Surface Hole.

Mud Type. Ge Chemical

Spud inmth I sack causic and fresh water

Maintain ow vise un ass ho e condifions dictate

otherwise.

~yo Hole Section.

F oc water dri from surface casmg shoe to either

Manviatop

or midway through Watrous.

Use cone tank, maintain ca crom IB 600.800

mglL with Envirofloc. Momtor shee returns and

pump pressure treat mud rigs with detergent.

I(

Mud Type. EnerPAC Regu ar

MW: 1050 kglm FV: 40.45slL

PV 8.16mPa.YP: 4 IOPa

10 secge

3 6 Pa. 10 mm ge: 6.

12 Pa

FL 8.

10cm'H:

9.

9 5. Ca:<

400 mglL

(~i(it II

MW: 1100 kglm3 FV 50 55slL

FL 8.10cm3 pH:95 10

~ll II It I»m

MW: 1100 kglm3 FV IOOuslL

FL 8.10cm3 pH:95 10

S~urve .

349 mm 517 Button Surface Bil

Maintainhole Inc< Ideg, Surveyevery30m

Production Ho e.

222mm Security PDC from surface shoe to TD

Hod'PreSpud'meetwith Geoogy,l Too Pushoutining

responsibi ries and requirements

BHA

Ensure strmg stabilizer for 222mm hue is run one drill colar above the

bit Contact Security to have stabilizer brought to ocafion.

Survey 75 m beow shoe, thenin 150mmterva s to TD. (Survey@

Mannville Top, not during)

Reduce rotary speed when the Watrous and Lodgepoe formaions are

encountered. Advise dn erato reduce rotary speed through rough

drilling sections as well

SSiecial Notes

Refer to TOGP Procedure for Exploratory Vertical and Strat Wells Casing,

Cement and Verical Well Abandonment

9herrequesutmsampletnteivat and descnpttonsforthe

uppert5mofthe

Birdbear formation

N24/2015 "DIAGRAMNOT TO SCALE" North Hargrave 04 24012 27 WPM Stick Diagram

Drilling Rig Supervisor:

License #: XXXXX KB (est): 477.04 m Drilling Manager: Eric BjornssonVertical Depth: 743.04 m TVD Rig KB to GL: 4.10 m Office: 204-748-3095 Cell: 204-851-2397Est. Drill Time: 4 Days GL (surveyed): 472.94 m Geologist: Norm Hopkins

AFE#: 02015XXXDX Drilling Rig: Trinidad XX Office: 403-767-1238 Cell: 403-999-0458

Drilling Fluid Other Informationm AMSL m TVD Vendor: Moose Mountain Mud

Surface Casing : 244.5 mm, 48.07 kg/m, H-40 ST&C (Surface to TD) Surface Hole: Surveys: Centralizers: On upper most joint and bottom most joint. Mud Type: Gel Chemical 349 mm 517 Button Surface Bit

Surface Casing Cement: Spud in with 1 sack caustic and fresh water. Maintain hole Inc < 1 deg, Survey every 30 m

Surface Casing 342.0 > 135.0 TSC 1700 @ 1700 kg/m3Top Hole Section: Production Hole:

CEMENT TOP 257.0 222mm Security PDC from surface shoe to TD.150 M ABOVE THE MANNVILLE

BFSC 131.0 346.0

MANNVILLE 70.0 407.0Mud up to Core Point: BHA

JURASSIC 27.0 450.0 Mud Type: EnerPAC RegularMW: 1050 kg/m3 FV: 40 - 45 s/L

MELITA -12.5 489.5 PV: 8 - 16 mPa, YP: 4 - 10 Pa

10 sec gel: 3 - 6 Pa, 10 min gel: 6 - 12 PaRED JACKET -30.5 507.5 FL: 8 - 10 cm3 pH: 9 - 9.5, Ca: < 400 mg/L

LODGEPOLE -79.5 556.5Scratchers: 10 Scratchers, 5 per joint over perforation interval.

REGOLITH -85.5 562.5

UPPER VIRDEN -101.5 578.5

BAKKEN U -170.0 647.0 Production Casing Cement: Preflush: 2.0 m3 inhibited water, 2.0 m3 Opti-flush Coring Mud Properties

BAKKENM -171.0 648.0 Scavenger: 0.9 t (2.0 m3) (2.408 m3/T) MW: 1100 kg/m3 FV: 50 - 55 s/L

T.A.C. + 0.5% CaCl2 @ 1250 kg/m3 FL: 8 - 10 cm3 pH: 9.5 - 10Fill: (257 m to 493 m): 5.4 t (5.9 m3) (1.098 m3/T, 80% excess) Logging Mud Properties T.A.C. + 0.5% CaCl2 @ 1550 kg/m3 MW: 1100 kg/m3 FV: 100+ s/L Special Notes

BIRDBEAR -195.5 672.5 Tail: (493 to 743 mMD): 4.7 t (4.7 m3) (1.004 m3/T, 35% excess) FL: 8 - 10 cm3 pH: 9.5 - 10 T.A.C. + 0.5% CaCl2 @ 1600 kg/m3

DUPEROW -230.5 707.5

TD -266.0 743.0

Logs : As per geological prognosis.DST's: Check with area geologist after logging.

Formations / Hole Size

Hold "Pre-Spud" meet with Geology, & Tool Push outlining responsibilities and requirements.

Use cone tank, maintain calcium @ 600-800 mg/L with Envirofloc. Monitor shale returns and pump pressure, treat mud rigs with detergent.

Casing & CementVendors: Fontana's & Trican

Floc water drill from surface casing shoe to either Manville top or midway through Watrous.

Geological Prognosis

Adjust tonnage accordingly, based on previous cement returns to surface.

15.1 t (13.7 m3) TSC + 3% CaCl2 (0.905m3/T, 100% excess) Maintain low visc unless hole conditions dictate otherwise.

North Hargrave 04-24-012-27 WPM

Reduce rotary speed when the Watrous and Lodgepole formations are encountered. Advise drillers to reduce rotary speed through rough

drilling sections as well.

Survey 75 m below shoe, then in 150 m intervals to TD. (Survey @ Mannville Top, not during)

Centralizers: Placed around the casing coupling on every joint from TD to Red Jacket top, then every 3rd joint to planned cement top.

Once Logs are posted, immediately notify Virden Off ice and decision will be made to order casing, cement, or D ST.

Note - Circulate hole clean prior to penetrating the Blairemore. Lost circulation is possible in

the Lodgepole, mix sawdust through the upper part of the lodgepole while drilling.

Wiper trip or backream through the Lodgepole as tight hole conditions dictate.

Production Casing: 177.8mm, J-55, 29.76 kg/m, ST&C

Ensure string stabilizer for 222mm hole is run one drill collar above the bit. Contact Security to have stabilizer brought to location.

Refer to TOGP Procedure for Exploratory Vertical and Strat Wells Casing, Cement and Vertical Well Abandonment.

Note: In the case of an Exploratory Vertical adjust cement volumes to 35% over Caliper. (either Abandonment or Production Cement)

Geological Samples & Well Evaluation Program:Tundra: 400 mTVD - TD (5 m intervals).P-Branch: As per license requirements.

Cores: 1 - 18 m core (Regolith Porosity), as per geo prognosis.

Other requests: 1m sample interval and descriptions for the upper 15 m of the Birdbear formation.

Surface Hole:349 mm

Production Hole:222 mm

6/24/2015 **DIAGRAM NOT TO SCALE** North Hargrave 04-24-012-27 WPM Stick Diagram

RTNitR IIIP

ra Oil & Gas Limited Partnership

eoff Puckett

Completion Field Report

Well Name

undra North Hargrave 04-24-012-27 (WPM)

Unique Well Identifier

100.04-24-012-27W1.00

Surface Location

04-24-012-27 (WPM)

Licence Number

10414

AFE Number

02015366DD

Province:

Region: Manitoba

Fietd:

Start Date: 19-Aug-2015 End Date: 05-Dec-2015

Serv.Rig Start Date: 19-Aug-2015 Serg.Rtg End Date: 05-Dec-2015

Field Supervisor

Dan Rudneski

Vwsan 026 wellman 9-rrasowce Energy solulmns Inc roost 2450220 www msowoeenergysolusons corn January 20 2016 oagetorr

~TUNIIRAOil. Fy GA5 PARTNIIRslllp Daily Completion Report

Operator: Tundra Oil 8 Gas Limited Psruwmhlp Rspora Tor Gsoa puclwlt Consulant Oan RudnssklTsl2:Tsn: i204) 551-1052

UWI: 100.04-24-012-27W1.00 WELL: Tundra North Hargrave 04-24-012-27 (WPM) DATE: 19-Aug-201524 Hr Summary: RU, RIH/w TBG, TAGGED PBTD int 745.9mKB, PULLED JNT SECURED WEL END: 05-Dec-2015Formation: Lodgepole Surf Loc 04-244I12-27 tWPM) Lienee: 10414 Day¹: 1

Objective: Run Production Serv Rig Start 1thaug-2015 Serv Rig End: 064)ec-2016

Operations at 8:00: swab down to 600m, POOH/w to sgck, log 5 perf wellDally Cost: $ 13,143 Previous Cwnulative Cost

AFE ¹: 0201536600 AFE Estimate: $ 140,400.00

$ 0 Cum Cost: $ 13,143

Data Perf Formation Top Base

20.Aug-t5 epole 562.50 565.00

SITP: 0 kPs SICP: 0 kPa SCV: open kPa H2S 0emarks:

ag gad PBTD @ 745.9mKB

trna Fro Time To

13;00 13:30

13;30 14:00

1500I

14;00

15:00 15:30

Hours

0.5

0.5

0.5

Code

MOVE

WLHD

RIG

BOPS

Did pre trip krspecoons on al equipment. Move rig and equipment to above location from 3-23

Spotted rig and equipment, Held safety meering and made out work permit

Instalhd 21 MPa well head and surface casksg venL

Rigged up service rig and equipment to company standards got over hole and locked down

Fundion tested and installed BOFss. Rt/ 73.0mm Ibg equipment tloor and tongs

15;30 16:30 TRpTBG Tallied,ddoed,picked up and ran in hole with 177.8mm casing scraper on 73.0mm lbg

Ta ged PBTD @ 745.0mKB, Pulled 1 jomt and landed tbg instaled swab tree

16:30 17'.00 0.5 SDFN Secured wel SDFN

Total: 4

Equipment on Location:

ReservoirFluidsSummary

Gas:Reset

Oil or Condensate:Gums

Water.

Time Swabbed/Flowed:

Daily:

Dally:

Hpnp/d

Daiy: r/P

Daily: 0.00 hrs

Cum:

Cum:

Cum:

Cum:

10'm'

m'm'ubing volume;

Csg. ann vol:

Open hole vol:

Total:

m''

m'oad

Flukls

Hours

R tOIL

WATER

OTHER

Service Rig Hours Daily 4.00 hrs Cumulahve 4.00 hrs

Personnel on Location Rig: 5 Sewlce: 2

Rec m'umRec m'um

0 m'o Roc 0m''o

Rec

m'ompany:

hrs I Cumulative DownTime: hrs

1 Total Personnel: 8

m'um 0 m'o Rec 0

m'eather.

Sunny

Manager. Craig Lane

,Temp: +20 'CILease: Good/rough

Iprogrammed By: Geolf Puckett

Roads; Good/dusty

Vmstrrr //22 Wellman 0 - Resource Enwpy oaaabrm lsc /402/2454220 www nwomcssswgysolvasns som January 20 2016 Rscs r orr

4¹tb TLIN»ibt%J Ou. Fd GAs PARTNEREIIIP Daily Completion Report

0 rater: Tundra ON & Gas LlmNed Psrinershl Re To: Geoff Puckett ConsuNanc Dan RudneskiT912:Tell: (204) 551-IOS2

UWj: 100.04-24-012-27W1.00 WELL: Tundra North Hargrave 04-24-012-27 (WPM) DATE: 20-Aug-201524 Hr Summary: swab down to 500m, POOH/w tbg to stick, log & perf well, RjH/w tbg 5m b p END: 05-Dec-2015Formafion: Lodgepole Surf Loc: 04-24012-27 lWPM) Licence: 10414 Day¹: 2

Daily Cost: $ 18,040 Previous Cumulative Cost:

Objective: Run Production

Operations at 6:00: SWAB AND EVALUATEWELL

Serv Rig Start: 19-Aug-2015 Serv Rig End: 054)ec-2015

AFE fk 02015366DD AFE Estimate: $ 140,400.00

$ 13,143 Cum Cost: $ 31,182

Ground: 472.94 m KB To TH: 3.43 m Open Hole: mKB Date Perf Formation Top Base

KB to Grd: 4.10 m

TD (MDj: 745.00 m

PBTD: 586.30 m

BOP Drill:

Liner: 0 mm

BOP Press Test:

Tubing: 73 mm

Casing: 177.8 mm

Bot at: 576.56 m 20-Aug-15

Set at:

Top ab

Function Test:

Lodgepole 562.50 565.00

SITP: 0 kPa SICP: 0 kPa SCV; open kPa H2S 0 '/o

emarks:

OT LANDED e 576.56mKB, PSN LANDED @566.88mKB, BOT IS LANDED 168.44m ABOVE PBTD @745.00mKB, BOT IS LANDED 11.56mELOW PERFS @562 5-565mKB

ime Frorrl Time To

07;30 08:00

08:00 09'/00

09:00 09:15

Houm Code

0.5 SAFE

I CIRC0.25 PTST

Comments

Service and start rig and equipment, Held pre job safety meeting and discussed afi hazards

Issued permits to afi contratsors on location, Applied scavenger to produced H20

Rigged up and reverse circulated well over to produced water Pumped 18m3 @ 600Umin

Pressure test BOP's and TIW too 1 &14Mpa, RO circ equipment

09;15 j 10:30

10;30 12:00

12;00 14:00

1.25 SWAB Rigged in swab equipment, swabbed fluid level down to 510 m, Recovered 9.60m3 to tank

2 LOGS Rigged in wireline truck, held safety meet ran in hole and performed GR-CCL log from

PBTD 744,8 to Surf CSG shoe, Lay out logging tools, Held pre shoot meeting

1.5 TRPTBG jPufied and stood 77 joints of 73.0mm,9.67kg/m,J-55,EUE tubing in derrick, RU weatherford

14:00 15:00 I PERF

Made up 101.6mm, 2.5m REHSC gun,17 spm, 25g, SDP, 60 phasing and ran in hole, fluid 49 520m

Did CCL log from TD because afi collars the same length, No marker joint, Confirmed afi ¹¹5Perforated interval 562.50m - 565.00mKB. POOH/w gun confirmed afi shots fired

15:00 15:30

15:30 j 16:15

Pull back to 200m and re tagged fluid 62 475mKB, POOH/w gun confirmed afi shots fired

RO weatherford & RU 73.0mm Ibg handling equipment0.5 PERF

0.75 ITRPTBG RIH/w 73.0mm tbg as follows:

1- 73.0rnm EPOXY COATED BC

1- 73.0mm 4'ERF PUP

1 - 73.0mm TAILJOINTS1- 73.0mm A.P.I PSN

.13m

1.24m

9.55m

.33m

59- 73.0mm JOINTS OF TBG 564.58m

Total: 9

Equipment on Location:

KB Diff 1.97m

ReservoirFluidsSummary

Gas;Reset

Oil or Condensate:Gums

Water.

Daily: I Iyms/d Cum:

Daily: m'um:Cum:Daily; m'

m'

ms

Csg. ann vok

Open hole voh

0 10'm'ubing volume:

m'''oad

Fluids

Time Swabbed/Flawed;

Reset Q OIL

WATER

OTHER

Daily: 0.00 hrs Cum: Total:

Rec m'um 0 ms

Rec m'um 0m'ec

20 m'um 20 ms

0m'o

Rec 0m'o

Rec 0m'o

Rec 0

m'oursService Rig Hours

Personnel on Location

Weather. Sunny

DownTime:Daily 9.00 hrs Cumulative 13.00 hrs

Company: 1Rig: 5 Service: 2

Temp: +20 'C ILeasia Good/rough

Cumulative DownTime: hrs

Total Personnel: 8

Roads; Good/dusty

Manager. Craig Lane jProgrammed By: Geoff Puckett

Verskw 2222 vyel/msn 9 - Resource Energy 90/ui/cns inc. (402/ 245 0220 www rssouiceeneigysc/urisns corn Jenueiy 20 2015 Page 1 or 2

~T1INI)RA%J OIL CJ GASPr1ar'1741!RSIID'aily Completion Report

Consunsnr Oan Rudnaskl

Tal2.Tel1: 1204) 881-1082

UWI: 100.04-24-012-27W1.00 WELL: Tundra North Hargrave 04-24-012- Day ¹: 2 DATE: 20-Aug-2015Tlime Fmrrl Time To Hours Code

BOT LANDEDI 576.56mKB, PSN LANDED @ 566.88mKB

BOT IS LANDED 168.44m ABOVE PBTD @745.00mKB

BOT IS LANDED 11.56m BELOW PERFS I 562.5 - 565mKB

16;15 16:30 0.25 Secured well SDFN

rsrsrrm 1172 Wellman 6 -Remurce Energy Soludons inc. (403) 246 0220 www resourceensrrrsoluuons corn Januarrr 202016 Paga2of2

daft TL/Nl)iht%J Oil. & Ons PARTNIIRsI IIV Daily Completion Report

0 rater: Tundra OS 8 Gss Umltsd Partnsmhl Reporu To; Geoe Puckelt Consukanz Oan RudneskiTel2:Ten: 1204) 051-1002

UWI: 100.04-24-012-27W1.00 WELL: Tundra North Hargrave 04-24412-27 fWts

24 Hr Summary: IFLISurf, pulled 10swahs and flowed 4.1m3lhr, rec 3.89m3 H20,Formation: Lodgepole Surf Loc: 04-24412-27 tWPM):Ucence: 10414

ug-2015

ec-2015Day¹: 3

Objective: Run Production

Operations at 6:00: Circ well over rungacker/w2/108le slick JolnL swab onDaily Cost: $7,395 Pnwious Cumulathe Cost: $31,1$ 2 Cum Cost:

Datej

Perf Formation Top

$ 38,678

Base

Serv Rig StarL'9dtug-2015 Serv Rig End: 054)ec-2015

'AFE1802015366DD AFEEstimate: $ 140,400.00

20-Aug-t5 Lodgepole 552.50 565.00

marks

intake @ 576.56mKB. PSN @ 566.8&mKB/Pulled 10 swabs, started Rowing back 4m3 95% dl Recovered 35.35m3 totalW «389m3 & 31.45m3 dl/ H20 cut last hour= 5%, IFL O surf / 01% bs/last Salkrty readlng @72000ppm / Csg shut in pressure =250 kPA,

me From Time To Hours Code07.'30

07:50

08:00

08:30

09:15

17:15

07:50 0.33 SAFE

08:00 0.17 SHUT

08:30 0.5 SWAB

09:15 0.75 WAIT

17:15 8 SWAB

17:30 0.25 SDFN

Start and service rig and equipment, held 0101ob safeiy meeting, discussed hazards

Went over Eergency Response Plan, issued Safe Work Permit

Recorded shut in pressures, 50kPA on the tubing and 250kPA on the casing,

Rigged in swab equipment, changed sandline Rags, blew out lines

Waited on air Irailer to amve on location, Pulled 8000ppm sour HZS sample

First swab of the day had a fluid level @ surface

Swabbed and evaluated well. pulled 10 swabs, well started Rowing an avg of 4m3/hr

Recovered 35.35m3 total, SW =3.89m3 & 31.45m3 oil / H20 cut last hour= 85%

Secured wall, SDFNcc«cccccc«cccc SWAB DETAILS»»»»»»»»»INITIALFLUID LEVEL-RNAL FLUID LEVEL-INIT5ALCASING PRESSURE-

RNALCASING PRESSURE-

SWAB RATE IN THE lAST HOUR-WATER CUT IN THE LAST HOUR-SAND CUT IN THE lAST HOUR-SALINITY IN THE LAST HOUR-LASTH2S READING-

surf

Flowing

250k PA250k PA4.3m3/HOUR

0.1% / TRACE72000PPM

1.4%

Total: 10

Equipment on Location: FALCON ¹7 RIG AND EQUIPMENT, 400BBL TANK,PRESSURE VESSEI„FLARE,TBG TRAILER

ReservoirFluklsSummary

LoadFluids

Gas:Reset

Oil or Condensate:Gums

Water.

Time Swabbed/Flowed:

Reset Q OIL

WATER

Dalir. 1lpm*/d Gum: 01lpm'aily.

31.45 nP

Daily. 3.89 np

Daily. 880 hm

Cum: 31.45 np

Cum: 3.89 nP

Cum: $ .5 hm

Recm'ec

m'sed

m'um 0m'sedm'um 20

m'ubingvolume:

Csg. ann vok

Open hole vok

Total:

0 m'um

Cum 20

m''r0m'o

Rec 0m'o

Rec 0

m'ours

OTHER

Service Rig Hours

Personnel on Location

Used m'um 0 rrp

Daily 10.00 hrs CumuaRve 23.00 hrs

Rig: 5 Servke: 3

Rec rrP

Down Tine:

Company: 1

Gum 0 m'o Rec 0m'rs

Cumulative DownTime; hrs

Total Personnel: 9

Weather. Sunny

Manager. Craig Lane

Temp: I+20 'CI Lease: Good/rough

I Programmed By: GeoN Puckeu

Roads: Good/dusty

Versed //22 Wsanan 0 - Rvuwrce Ensrpy Scadkws /nc. (402/ 2104/220 www.nw urceenwwso/vdons.cow January 20 2016 Pare 1 0/1

dN5'UNI/Lt%!J Oil. Fd GAS PARTNlsRSllll'aily Completion Report

Operator. Tundra Ou 8 Gss Umited Partnership RepoNng To: Geoff Puckett Consultant: Dan RudnesklTel2:Tel1: (204) 551-1052

UWI: 100.04-24-012-27W1.00 WELL: Tundra North Hargrave 04-24-012-27 lWPM) DATE: 22-Aug-201524 Hr summary: Circ well over to produced H20, END: 05-Dec-2015Formation: Lodgepole Surf Loci'04-24412-27 (WPM) Llcanca: 10414 Day e 4

Oblactlvru Run Production Sarv Rig Start: 19%ug.2016 Serv Rig End: 054300-2016

Operations at 8:00: trp tbg to stick run packer, swab back on and plug well AFE th 02016368DD AFE Estimate: $ 140,400.00

D08y Cost: $ 8,387 Previous Cumulative Cost: $ 38,678 Cum Cost: $46,985

Date Perf Formation Top Base

20.Aug-15 Lodgepole 562.50 565.00

amerks:

roke circ/w 2m3, Pumped 25m3 @ 400IJmln O 1 SmPA, returned 12m3 up tbg, Lost 10m3 totalHUT DOWN DUE TO LIGHTNING AND HEAVYRAIN

ime Fro

07:30

07:50

06.00

09:00

Time To07:50

08;00

09:00

10;30

Hours

0.33

0.17

1.5

Code

SAFE

SHUT

CIRC

WAIT

Comments

Service and start eig and equipment Held pre lob safety meeting and discussed ag hazards

Took wellhead pressures: Tbg on slight vac, Csg was 260kPA

RU to reverse circulate well over to produced inhibited lodgepole H20

Broke circ/w 2m3, Pumped 25m3@400L/min 1.5mPA, returned 12m3 up tbg, Lost 10m3 total

Ag og returned very stinky 1,4% sour, Shut well in and waited on lightnin to pass over

Called office and decided to shut down for day!

Total: 3

Equipment on Location: FALCON87 RIG AND EQUIPMENT, 400BBL TANK, PRESSURE VESSEL, FLARE, TBG TRAILER

ReservoirFluklsSummary

Gas:Reset

Oil or Condensate;Gums

Water.

Time Swabbed/Flowed:

1IPms/d

m'a6y:

RP

Daily: 0.00 hm

Cum: 0

10'm'um:

Cum:

3.89m'.5

hm

Cum; 31.45

m'ubing volume;

Csg. ann vok

Open hole vok

Total:

m'''

m'oad

Fluids

Hours

ROIL

WATER

OTHER

Service Rig Hours

Personnel on Location

Daily 3.00 hrs Cumulative 26.00 hrs DownTime; hrs Cumulative DownTime:

Rig: 5 Service Company: 1 Total Personnel; 8

Rec 12 m'um 12 m'o Rec -12m'ec

0 m'um 20 m' Rec 25m'ecm'um 0 m'oRec 0

m'eather.

storming

Manager. Craig Lane

Temp: +20 'C ILease: wet

programmed By; Geoff Puckett

Roads: wet

verzun /JTJ wellman 0-Resomceanmgysoludnns inc. /402/245 0220 www resculceenergymlnllcnc corn January 20 2015 Pagerol1

tfigjfi TUNI/R,iM Oil. (IG,is PARTHIIRsiiip Daily Completion Report

0 rater: Tundra Oil & Gml Linllted Parlnemhl

UW(: 100.04-24-012-24 Hr Summary: POOHFormation: Lodgepole

Objective: Run Producti

Operations at 6:00/ .Ret

Re rtl To: Geoff Puckett Consultant Dan RvdnesktTei2:Tell: (204) 651-1052

Daily Cost: 519 363 Previous Cumulative Cost:

Ground: 472.94 m KB To TH: 3.43 m

KB to Grd: 4,10 m Tubing: 73 mm

Open Hole:

Bot ak

546,965 Cum Cost:

mKB Date

554.28 m 20-Aug-15

Perf Formation

Lodgepole

566,328

Top Base

562.50 555.00

TD (MDj: 745.00 m Casing: 177.5 mm Set at: 745 m

PBTD: 586.30 m Liner. 0 mm Top at:

BOP Drill: BOP Press Test: Function Test:

SITP: vac kPa SICP: 0 kPa SCV: open kPa H2S 1.4

erne rks:

ryton mech set DBL GRP Retrievable PKR 177.fimm x 73.0mm, C/W TX slick joint, otls 73.0mm x 47.63mm Profile Packer Bottom set @54 28mKB, TOP @550 96mKB, COE @552 62mKB, 73 gmm on/off stem I w 1.87" tx profile, Got out 2 78m2 H20 & 2 11m3Emulsion well started

recordersWork strln lett in hole to II lu &

ime From Time To Hours Code

07:30 08:00I

0 5 SAFE

08:00 06:10I

0 17 SHUT

08;10 09:00 0.83 TRPTBG

09:00 10:00 I TRPTBG

10:00 10:30 0.5 TRPTBG

CommentsService and start rig and equipmenl, held pre job safety meeting and discussed afi hazards

Issued permits to ag personeg on location

Took welhead pressums: Tbg on slight vac, Csg was tstm, Pulled gas test, no H2S readings

RU 73.0mm tbg equipment, POOHku tbg to stick 60jnts lotal and layed out BHA

Pkked up hylon mech set DBL GRP Relrievable PKR 177 8mm x 73 Omm

25,3Kg/m - 38.7Kg/m 152.4mm OD: 6.00", TX slick joint, olis 73.0mm x 47.63mm Profile

TL on/off Tool, 7k, 139.7mm x 73.0mm

RIH/w tbg to land packer COE 10m above I le rfs @562 50mKB-565 00mKB

Installed dog nut made measurment, split and Set packer I/4 turn and down, Did usht ufi

Came off 177.8mm PKR. Re land dognut and stripped off BOP's. Pulbd and re spfit dognut

10:30

11:00

11:15

12:00

13:30

11:00

11:15

12;00

13;30

15:00

0.5 BOPS

0.25 PTST

0.75 SWAB

1.5 WIRE

1.5 RIG

Latched back onto acker and did sh/pufi, Landed packer in 4dAN tension, Installed bonnet

Packer Bottom set @ 554.28mKB, TOP @ 550.96mKB, COE @ 552.62mKB

Pressum lasted CSG to 3.5mPA (HELD GOOD), Bled pressum back to tank instfied master valve

Swabbed and evaluated well, pulled 5 swabs. well started fkwring an avg of 2.3m3/hr

Got out 2.78m2 H20 & 2.11m3Emulsion well started Rowing back again with 4.9m3 swabbed back

RU quality wireline RIH/w 38mm tool string, 45mm x line 47.63m xx plug, Tagged nipple

552mKB set plug and POOH/w wireline, Closed master, Bled olf lube

Secured wefi, RO rig and equipment and cleaned up hcalion

Pulhd ag equipment onto matting

Total: 7.5

EquiPment on Location: FALCON 87 RIG AND EQUIPMENT, 400BBL TANK,PRESSURE VESSEL, FLARE, TBG TRAILER

ReservoirFluklsSummary

Gas:Reset

Oil or Condensate;Gums

Water:

Time Swabbed/Flowed:

11Fm'Id

Dafiy: 2.11m'afiy:

2.78m'aRy:

0.75 hm

Cum:

Cum: 33SSm'um:

6.67m'um:

92 hm

Csg. ann vol:

Open hole vol:

Total:

0 1lpnP Tubing volume:

m''

mr

LoadFlukls

Hours

R tOIL

WATER

OTHER

Service Rig Hours

Personnel on Location

Used rrp Cum 0 m* Rec m'um 12 mr ToRec -12m'sed

m'sed

m'aily

7.50 hrs Cumtdative 33.50 hm DownTkne:

Company. 1Rig: 5 Senrice: 3

Cumulative DownTime; hrs

Total Personnel: 9

Gum 45 m* Rec m'um 20 m'oRec 25m'um

0 m* Rec m'um 0 m'oRec 0

m'eather.

Windy

Manager. Craig Lane

Temp: 20 'C ILease: wet

I Frog/warned By: Geoff Puckett

Roads: wet

Vesta /222 wesmen 0- Rvmvice Enercy Sc/vdons /nc. /403/ 245 0220 www msovmemerpymkdknsmm Jstue/7202016 Fitge I of 1

dNh TL/Nnlbt%J OIL Fd G&5PARTNIIRSI IIV Daily Completion Report

Operator: Tundra Ou & Gss Limned Psrtnemhlp Reportl To: Geoff Puckett Consultant: Gord GardinerTsl? (403l 3504997Tait: (204l 861-3212

UWI: 100.04-24-012-27W1.00 WELL: Tundra North Hargrave 04-24-012-27 iWP$ $ ) DATE: 05-Sep-201524 Hr summary: Sotted rig,reined out .equipment stuck END: 05-Dec-2015Formation: Lodgepole Surf Loc: 04.24.012-27 iWPM) Licence: 10414 Day¹: 6

Obiectlve Run Production

Operations at 6:00: Shut down till Tuesday

Serv Rig Start: 10+ug-2016 Sarv Rig End: 0643ec.2016

AFE ¹: 02016388DD AFE Estimate: $ 140,400.00

Dally Cost: $ 6,303 Previous Cumulative Cost: $ 88,328 Cum CosL $72,721

Data Perf Formation Top Base

20-Aug.t5 Lodgepole 562.50 565,00

emarks:

ried to move service rig and equlpmenl to 3-23-12-27 but got rained out,trucks stuck. Pulled them out and shut dawn till tuesday.

ime Fro

07.'30

Time To08:00

Houm Code

0.5 SAFEComments

Held safety meeting andiob procedure with all persomnel made out safew work permit and forms.

FLOTT I Rigged in testers

I RIG lAttempted to move service rig from 4-24 to 3-23-12-27. Tank buck got stiuck.

Couldn't move picker truck. Ordered out tractor to pull equipment out.

08: 00 10:00 Shut down till Tuesday.

Total: 2.5

Equipment on L ': FALCON ¹7 RIG ANDEQUIPMENT, 400BBL TANK,PRESSURE VESSEI„FLARE, TBG TRAILERneutron

ReservoirFluklsSummary

Gas:Reset

Oil or Condensate:Gums

Water.

0 1Ãnp

Daily:m'aily:

m'um: 33.86m'um:

6.67

m'aily.

1 tpm»20 Cum: Tubing volume:

Csg. ann vok

Open hole vok

m'ime

Swabbed/Flowed: Daily: 0.00 hm Cum: 9.3 hrs Total: 0

m'oad

Fluids

0 OIL

WATER

OTHER

m»m'um 12 m'o Rec -12m'um

20 m'o Rec 25m'um

0 m'o Rec 0

m'oursService Rig Hours

Personnel on Location

Weather. Rain

Dally 3.00 hrs Cumulatim 36.50 hrs

Rig: 5 Senrice: 4

Temp: 18H4 'C ILease: wet

IDownTine: hrs

I Company: 1

Cumulative DownTime; hrs

Total Personnel: 10

Roads: wet

Manager. Craig LaneI Programmed By: Geolf Puckett

Vd»atm 2/22 we//men 0- Resource Enerpy sorurons /nc /403/ 2464/220 wwwm»omcssnerpy»olvrmn»corn Janvery 20 20/6 Pape 1 0/2

~TUernL1OIL C~ Gas PRRl>tiasilfi'aily Completion Report

Consultant: Gord Gardlnar

Tel2 (403) 3604001Tal1: I204I 361-3212

UWI; 100.04-24-012-27W1.00 WELL: Tundra NorthHargrave04-24-012- 'ay¹: 6 DATE: 05-Sep-2015ime From Time To Hours Code Comments

I 5:00

verssw 2272 wellman e - Resource Eneroy sorurons inc f403l 240o220 www rawrurceenereysolutisns corn January 20 2016 Paaasof2

rfslk TIINUP t%J Oii. & G.ts PAI4TNFRSllll Daily Completion Report

OPerator. Tundra OS 5 Gas Limited Partnership Repomn Tor Geoe Puckslt Concllsallc Geol GsldlhefTel2'. /403i 350-4997Ten: (204) 551-3212

LjWj: 100.04-24-012-27W1.00 WELL: Tundra North Hargrave 04-24-012-27 (WPM) DATE: 00$ ep-201524 Hr summary: Rig up,rig in slickline truck, pull plug and recorders, kill well, trip packer END: 05-Dec-2015

Day fk 7Ucance: 10414Surf Loc: 04-24412-27 twpujFormation: Lodgepole

Objective: Run Production

Operations at 6:00: Tumed well over to operator

Smv Rig Start 194tug-2015 Sere Rig End: 054iec-2015

AFE ¹: 02015366DD AFE Estimate: 5140 400.00

Daily Cost: 627,859 Prevbus Cumulegve Cost 572,721 Cum Cost: 6100,680

Date Perf Formation Top Base

20-Aug-15 Lodgepole 562,50 565.00

emarks

Igged up,service rig, rigged In wlreline, pulled tubing plug, pated recorders, rsn tubing plug, Rekmsed an/oN connector end pulled up .Sm. ReverseIrculated well over to inhibited fresh water. Latched on/offend putsd tubkrg in tenskm. Installed wellhead snd secured. Rig ouL

ime From Time To07.'30 08'.00

08'.00 09'.00

09:00 I 11:30

11:30 13:00

13;00 13:30

13:30I

14:30

14:30 15:00

0,5 SAFE

I I RIG

2.5 WIRE

1.5 TRPTBG

CIRC0.5 TRPTBG

RIG

0.5 MOVE

Hours Code Comments

Held safely meegn and job procedure with at personnel. Made out safe work permit and safety

meefing fonna..

Rigged up senrice rig snd testers. To Tundra regulations.

Moved in slkktine buck and rigged up to pull tubing plug from packer. Ran in hole and

retrkwed recordem from packer st 552mKB.

Rsn in hole and latched onto Olis 47 S3mm plug @ 551 mKB,pulled out of hole.

Ran in ovemhot and latched onto recorders at 552mKB. And poled out of hole.

Made up 000 47.63mm tubing plug and ran in and sst in X profse of packer at 552.62mKB.

Pressure tested pl to 3500 Kpa fopr 10 min. Bled off pmsssme and rigged out wireline.

Rigged off velhead,krstalhd pup joint and valve, Released on lolf and picked up I/2 meter.

Reverse circulated well over to inhibited fresh water 14m3 .

Latched onto on/olf connerdor and pulled tubing into 4000 daN tension.

Rigged up wellhead and master vahre.

Secumd well. Riggerd out at equipment .

Empeed rig tank and P-tank.

Moved at equipment to 3-23-1 2-27

Total: 7.5

Equipment on Location: FALCON ¹7 RIG ANDEQUIPMENT, 400BBL TANK,PRESSURE VESSEL, FLARE, TBG TRAILER

ReservoirFluidsSummary

GaeReset

Q Oil or Condensate:Gums

Water.

Time Swabbed/Flowed;

010*m'aily.

m'aily.

m'aily:

0.00 hm

~Gum: 33.56m'curn:

6.67 m'

Cum: 9.3 hrs

Daily: 10'm'Id Cum: Tubing volume:

Csg. ann vok

Open hole vok

Total:

m''

m'oad

Fluids

R IOIL

Q WATER

OTHER

Rec

Rec

Rec

m'um0 m'Rec 0

m'um

12 m'o Rec -12m'um

20 m'o Rec 25

m'oursService Rig Hours

Personnel on Location

Weather. ovsmast

Daily 7.60 hrs Cumulafive 44.00 hrs

Rig: 5 Sen/ice: 6

Temp: 18/7 'C Lease: wet spots

DownTime:

Company; 1

hrs Cumulative DownTime: hrs

Total Personnel: 12

Roads: good

Manager. Craig Lane Progranmed By: Geoff Puckett

version II22 are/sean 0 - Resowce Eeersy sessbrm Iec. /403/ 2450220 www ~verve/bes cern Jeev cry 20 20/ 5 Pere I 0/2

~TtrRIIL(Ott. & Gas PARTTQ(iREIIIP Daily Completion Report

UWI: 100.04-24-012-27W1.00fime Froni Time To Hours Code

Tat? (403) 3304332Consultant: Gord Gardinar Tel1: (204) 331-3212

WELL: Tundra North Hargrave 04-24-012- Day ¹: 7 +DATE: 08-Set)-2015Comments

15'too

trsrsam 3222 Wellman u - Resource Energy Sotufons inc. (403) 2450220 wwrr nwoumeenmgysululluns curn January 20 20ld Page 2 of 2

4508 TUNDibt%J Oil. & GAS i ARTNERSIIIP Daily Completion Report

rstorr Tundra 08 & Gss Limited Partnership Ra purlin Tor Gmrif Puckalt Consunsns Dau RudneskiTsl2.Tsn: (204) 051-1062

24 Hr summary: Move in and RU, Red hawk rig 6, Did rig inspection END: 05-Dec-201 5

Day¹: 8Licence: 10414Formation: Lodgepole

Objective: Run Production

Surf Loc: 04-24012-27 tWPMj

Serv Iag Start 1 94kug-2015 Serv Rig End: 0543ec-2015

UWI: 100.04-24-012-27W1.00 WELL: Tundra North Hargrave 04-24-012-27 (WPM) DATE: 02-Dec-2015

Operations at 6:00: Begin final com letlon AFE fk 02015366DD AFE Estimate: $ 140 400.00

Daily Cost: $ 5,738 Previous Cumulative Cost $100,580 Cum Cost: $ 106,318

Date Perf Formation Top Base

20-Aug-15 Ladgepole 562.50 565.00

emarks:

U RIG AND EQUIPMENT, DID RIG INSPECTION ON ALLEQUIPMENT. SDFN

ime From Time To

09:00 12:00

12:00 14:00

Hours Code

3 MOVE

SAFE

2 RIG

Moved rig and equipment to above loca90n from oxbow, sask, Spotted equipment on location

Held pre job safely meeting and discussed a8 poten0al hazards, Went through tkkets &

papewwuk on rig. A8 persone8 safety orientated on comply works

RU rig and equipment to company standards, Got over hole and locked down

IDId full rig inspecton on a8 equipment

SDFN

Total: 5

Equipment on Location: Red Hawk ¹6, RIG AND EQUIPMENT, PRESSURE VESSEI„FLARE,TBG TRAILER

ReservoirFluidsSummary

Gas:Reset

Oil or Condensate:Gums

Water.

Daily:m'aily:

m'aily:

1IFm'/d Cum: 0 10mr

Cum: 33.56m'um:

6.67

m'ubing volume:

Csg. ann vok

Open hole vokm''ime

Swabbed/Flowed: Daily: 0.00 hm Cum: 9.3 hrs Total: 0

m'oad

Flukls

P O8.

Cu WATER

OTHER

m'r Cum 12 m'o Rec -12m'um

20 m' Rec 25m'um

0 m'Rec 0

m'oursService Rig Hours

Personnel on Location

Weather. overcast

Rig: 2 Service

Temp: +2 'CILease: Dry

Company: 1

Daily 5.00 hrs Cumulative 49.00 hm DownTime: hrs Cumulative DawnTime:

Total Personnel; 4

Roads; good

Manager: Craig LaneI Programmed By: Geoff Puckett

Vurstm 3372 wellman 0 - /tusaurca Energy Solar/uns inc. (403/ 2450220 www rmaumuunergyxau/ious uom January 20 20m page I or l

JM2 TUNI>RAOIL fri GAS PARTNFRSI I IP Daily Completion Report

0 tori Tundra Dll & Gas Umltad Parinaishl R run To: Gaoff Puckatt Consultant Dan RudnasklTai2Tait: 204 051-1002

UWI: 100.04-24-012-27W1.00 WELL'undra North Hargrave 04-24-012-27 (WPM) DATE: 03-Dec-201524 Hr summahw Pull plug, RIH/w drlgable abandonment plug, dump cement for new PBTD END: 05-Dec-2015

Day 1k 9Surf Loc: 04-24612-27 jwPMl Licence: 10414Formation: Lodge pole

Objective: Run Production Serv Rig Start 19Aug-2015 Serv Rig End: 054>ec-2015

Daily Cost: $24,132 Previous Cumulabve Cost

Operations at 6:00: Logco, RIH/w1772imm lug, Dum bal cement AFE tt 0201 5366DD AFE Estimate: $ 140 400.00

$106.318 Cum Cost: $ 130,450

Ground: 472.94 m KB To TH: 3.43 m Open Hole: mKB Date Perf Formation Top Base

KB to Grd: 4.10 m Tubing: 73 mm

TD (MDj: 745.00 m Casing; 177.8 mm

Bot at 55448 m 20-Aug-15 Lodgepole

Set at 745 m

552.50 555.00

PBTD: 586.30 m Liner. 0 mm Top atBOP Drill: BOP Press Test: yes Fundion Test yes

SITP: 0 kPa SICP: 0 kPa SCV: open kPa HzS .2

erne rks:

U slkkline unit, POOH with slickline plug, Well equa9zed and on syght vac. POOH/w tryton 177.8mm TX-8 packer, RIH/w 177.8mm CSG scraper toD, Circ well over to inhibited FW, POOH/w scraper, RIH/w 177.8mm Dr9mble BP, Dumped 140LIr cement ontop of plug, Plug wouldn't shift sleeve

ime From

07:30

Time To Hours Code05:00

I05 SAFE Senrice and start rig and equipment, held pre job safety meeting and discussed all hazards

Ilssued permits to ag personeg on locarion

05:00 05:15 0.25 SHUT Took we9head pressures: Tbg on slight vac, Cag was tstm, Poled gas test, no H2S readings

08;15

09:00

09;30

10:00

10:30

11:30

12:30

12:30

13;15

09:00 0.75 SLICK

09:30 0.5 SLICK

10:00 0.5 WLHD

10:30 0.5 BOPS

11:30 I CIRC

12:30 I TRPTBG

13;30 I TRPTBG

13:15 0.75 CIRC

14:15 I I TRPTBG

Total: 11

RU quality wirelne RIWw 38mm tool shing, RIHhv 45mm GS CANequalizing rod, Set @ 552.00mKB

Jared down to equalize plug, TBG on slight vac. Jared plug free, Pushed to on/oif profile

Tagged nipple @ 555mKB, Jared mandrel free and POOH/w slickline and plug

RO qualky wkeline truck. Spot fonlanas lbg trailer with 40jnts to circ on bottom, R+R press

boih sides on slight vac, undressed wellhead, Instalhd pup, pulled up and split dognut

Dawn on 8>g put 2dAN compression, Unset packer, m landed dognut

Fundlon tested and kistalhd BOPs, Pressure test high/low to 14mPA

RU lo reverse drc well over to produced Ink 5>ited H20. Broke circ with 1.2m 3, Pumped 20m3 @l600Umtn returned 11.6m3 to tank, Total fluid loss of 8.4m3, RO circ equipment

IRU 73.0mm Ibg equipment goer and tongs, POOHhv Tryton mech set DBL GRP Retrievable PKR

lf77. 6mm x 73.0mm, C/W TX stck joint, Layed out on ground

Picked up1 77.8mm CSG scraper and RIWw 57 jnts fiom stick, Tallied, drifted, picked up and ran

in hoh with another 20jnls 73.0mm tbg off hailer TTInLc total in hole

IRU to revmse arc well over to Fresh inhibited H20, Broke circ with 3m3, Pumped 18m3 tgl600Umin mtumed 12.2m3 to tank, Total fluid loss of 4.8m3, RO circ equipment

POOH/w tbg, Layed out 16jnts and, Stood 61 jnts lo sgck, Layed out CSG scrapercccccc«cc<«c<cccc«<cconrd on page two»»»»»»»»»»»>

Equipment on Location: Rsd Hawk 86, RIG AND EQUIPMENT. PRESSURE VESSEL, FLARE. TBG TRAILER

ReservoirFluklsSummary

Gas:Reset

Oil or Condensate:Gums

Water:

Daily: 1 tpmahl

Daily: RP

Dai0F IIP

0 tipm*

Cum: u.56m'um:

6.67

m'ubing volume:

Csg. enn vot

Open hole votm''ime

Swabbed/Flowed: Dagy: 0.00 hm Cum: 92 hm Total: 0

m'oad

Fluids

Reset Q OIL

WATER

OTHER

m* Cum 12 ma o Rec -12 m*

Rec 23.8 m* Cum 43.8 ma o Rec 41.2m'ec

m* Cum 0 m' Rec 0

m'oursService Rig Hours

Personnel on Location

Weather: overcast

Rig: 5 Service

Temp: +5 'CILease: Dry

COII>puny: 1

Daily 11.00hrs Cumulative 60.00 hrs DownTime: hm Cumulative DcwnTime: hrs

Total Personnel: 8

Roads; good

Manager. Craig Lane jpmgrmnmed By: Geon Puckea

Varsraa//22 wellman 9- Ramvim Enarpy So/aaaaa lna. /402I 24&0220wwwmsoarcaanarpym/0/2>as<am January 20 20ia Pape I a/2

/¹0t TIR nLt~OH.E» GASPARTari RSitiP Daily Completion Report

Tel2corwuNanc Oen Ruaneskl Tell: l204) 651 1062

UWI: 100.04-24-012-27W1.00 WELL: Tundra North Hargrave 04-24412- Daj/¹: 9 DATE: 03-Dec-2015rime From Time To Hours Code Comments

14;15 15:30 1.25 MTLNR Picked up 177.8mm tryton drigabte bridge plug, RIHhv 6 jnts of 73.0mm tbg

Mixed up 2 -1 pa89 of water to 1 bag cement, Mhed 6 water to 3 bags in barrel, Used drilled

mixed up well so no clumps of cement, Ulled barrel to tbg opened valve cement came out 1-1/2

hose good, Total cement dumped was 10 bags cement to 20 pails of fresh H20

15:30

16:00

16:00

17;00

0.5 RPTBG

PTST

RIH to set plug with 61jnts 88 588.00mKB, Picked corer 89 586.00mKB, collar on depth

Installed 68, set plug on depth, Filled tbg with 1.5m3, Presswed up to 14mPA let sit Smins

Bud down paged on plug lo see if sleeve shiged, Plug wasn't set

Pressured up to 18500kPA, still didn't set, teed down tried to spud tbg to get packer to shift

Tried 3x to get plug to set up had no luck, Called 0$ ce, Tokl to POOH with packer17.'00 17:30 0.5 RPTBG POOHhv wet string to stick. Had vac out to suck up cement, Orilted first 6 jnts, RIH/w 20 jnt

kill string, Secured well SOFN

versen l/77 wellman 9-Resource Euurpy solusoos rnc /402/~www muoumuuuureyxo/u//oox corn Junuuiy 20 20i6 Page 2 of 2

fdqv Tt/Ni>ibtOU. & GAS PAL'TNIIRSIlll'aily Completion Report

rstor: Tundra 00 5 eas Limned Pannsrshl Rs /tin To: esse Puckstl Consultant csn RudnssklTel2:Tsn: 204 551-1052

UWI: 100.04-24-012-27W1.00 WELL: Tundra North Hargrave 04-24-012-27 (WPjjgj DATE: 04-Dec-201524 Hr summary: Set BP II 589.00mKB, Dump bail cement, Run kill string END: 05-Dec-2015Formation: Lodgepole

Objective: Run Production

Ucence: 10414 Dayn 10Surf Loc: 04-24-012-27 (WPMj

Serv Rig Stark 19+ug-2015 Serv Rig End: 0543ec-2015

Operations at 6:00: RIH/w tbg to tag new PBTD, RINw Production string AFE fk 02015366DD AFE Estimate: $ 140,400.00

Daily Cost: $9,969 Previous Cumukdkre Cost: $130,450 Cum Cost:

Perf FormationDate

20-Aug-lS Lodgepole

$ 140,419

Topj

Base

562.50 565.00

emarks;

IH/w 177 8mm 10K Titan drillable bridge plug, Set COE O 589 oomKB, Phg top O 588 80mKB. Dump bailer 4 liner meters of class "G" cement

ime From

13;00

tn3oI

15'.00

15:45

16;45

17:45

18:15

Time To Hours

13:30 0.5

15:00 1.5

15:45 0.75

16:45

17:45

18:15 0.5

18:30 0.25

Code

SAFE

WAITSAFEWIRE

WIRE

RIG

SDFN

Sewice and start rig and equipment, held pre job safety meeting and discussed all hazards

Issued permits to ao personeo on location

Wait on Logco to anive on location, Spotted hgco, Signed in,

RU logging truck. Held safety meeting and discussed ao hazards Issued SWP's

Made up 177.8mm WR plug, RIH did correlation pass from 600- 552, on depth with collars,

Picked collar I 585.09mKB adjusted 0.2m, Back to 600md, Pulnd tool on depth for COE

589.00mKB, Pulnd up 5m back down tagged plug on depth, POOH/w wireline layed out setting

sleeve, RU to RIH/w dump bailer, Mixed 4 liner meters of cement, 6- 20kg bags

Dumped cement into bailer, RIH tagged plug top with bailer on depth @ 588 oomKB,

Pulled up 10m and re tagged plug. Tag was high and so0, POOH/w chamber bailer

RO Logco equipment, RIH with 10 stands of TBG, 20-73.0mm tbg total

Secured wet SDFN

Total: 5.5

Equipment on Location: Red Hawk 06, RIG ANDEQUIPMENT, PRESSURE VESSEL, FLARE. TBG TRAILER

ReservoirFluklsSummary

Q Gas:Reset

Oil or CondensatnGums

Water:

Time Swabbed/Flowed:

0 ttpnp

Daily: mr

Cum: u.ss np

Cum: S.87m'aily:

0.00 hrs I Cum: 9.3 hrs

Daily: 1 ipm*/d Cum: Tubing volume:

Csg, ann vok

Open hole vok

Total:

mr

m'

m'oad

Fluids

Hours

Reset Q OIL

WATER

OTHER

Service Rig Hours

Personnel on Location

Weather. overcast

Daily 5.50 hrs Cumulaove 65.50 hrs

Rig: 5 Service: 2

Twnp: +4 'CiLease: Dqr

Company. 1 Total Personnel: 8

Roads: good

m'um 12 m' Rec -12m''um

43.8 m' Rec 41.2 m*

m'um 0 m'oRec 0m'ownTlme:hrs Cumulative DownTime: hrs

Manager. Craig Lane jProgrammed By; Geon Puckett

nsstw 2222 n'essxw 5 - nsuxxce Enwor nsv sons /nc /402/ 245 022o euw resowosessrgysosuzwsuxs A/suey 20 zola page 1 M 1

/E5t TUNI)lb(%J Oil. & 6&5PARTNERSIIIP Daily Completion Report

Operator: Tundra On d Gss Limned Psrlnsmhip Reporting To: Gsoff Puckstt Consuusnt Osn RudnssklTsl2:Tsl1: i204) 551-1052

UW(; 100.04-24-012-27W1.00 WELL: Tundra North Hargrave 04-24-012-27 (WPM) JDATEI 05-Dec-201524 Hr Summav Circ, Round trip anchor, RlH/w BHP & rods, TWOTP END: 05-Dec-2015Formation: Lodgepoie

Objective: Run Production

Surf Loc: 04-24-012-27 (WPM) Licence: 10414 Dayik 11

Serv Rig Start 19+09-2015 Serv Rig End: 05-Dec-2015

Daily Cost; $ 37,625 Previous Cumulative Cost

Operations at 6:00: TWOTP, Move to next location JAFEf8 02015366DD JAPE Estimate: $ 140,400.00

$140,419 Cum Cost: $ 178,044

Date Perf Formation Top Base

20-Aug-15 Lodgepole 562.50 565.00

emerks:

OT LANDEDI 571.39mKB, TOP OF PSN LANDED @ 560.12mKB, BOT IS LANDED 14r) 1 m abave Cement top @ 586.30mKBnchor C/W tbg swivel & 50000¹ shear, BOTTOM OF TBG ANCHOR LANDEDei 550.52mKB, BHP ¹ TSMV- 31 515, (25-200 RWAC 24X3)

ed cement t 586.13 mKB NEWP BTD 586 30mKB - 1 3m BELOW PERSIme From Time To Hours Code

0&30 I08.00 0.5 SAFE Service and start rig and equipment, held pre iob safety meeting and discussed all hazards

Issued permits to ag pemoneg on locarion, Did walk around inspection

0&000&15

08:15

09:00

025 ISHUT

0.75 CIRC

Took wellhead Pressum. 50kPA - TBG, 80kPA - CSG, Oil @ surface

RU to circulate well with BOT landed @ 190mKB. Brake reverse circ instanly, Pumped sm3

450Um. Returned 4m3 to tank mostly os in returns, Bhd well down to zero

09 00

OP. 30

09; 30

1koo

0. 5 TRPTBG

1.5 CIRC

RU 73.0mm tbg handling equipment, RIH/W 41 jnts, picked 6'upTagged cement top @ 586.13mKB, (NEW PBTD ii 586.30mKB) - (21.3m BELOW PERS)

Layed out pup and pused grg 1m above slips, RU to drculate

Wait on mam water fmm bagery, Filled hole with 2m3, Pumped 16m3 total @ 500tjmin

Returned Sm3 to rig tank mostly oil. Shut in well R+R well pmssures, CSG and TBG on slight vac

RO circ equipment, Drained pump & lines. RO testers

11:00

1845

1215

11:45

12:15

12'45

0.75 TRPTBG

0.6ITRPTBG

0.5 BOPS

RU 730mm tbg handling equipment, POOH with 2 )nts too trailer & rest of TBG to stick = 59)nts

Surface tested and hstalled 177.8mm LHS tbg anchor C/W tbg swivel & 50000¹ shear, 10 pins

RIH with 57 -73 omm tbg fram derrick, landed dognut on depth for BOT 583 36mKB,

RO 73.0mm tbg equipment floor and tongs, Stripped off BOP's and Installed pup

Total: 10

<c<c<ccccc«cc<cDAV CONT'D ON PAGE ¹2»»»»»»»»»

Equipment on Location: Red Hawk ¹6, RIG ANDEQUIPMENT, PRESSURE VESSEL, FLARE, TBG TRAILER, AIR TRAILER

ReservoirFluidsSummary

Gas:Reset

Oil or CondensateCams

Water.

Dagy: 1(Pms/dIGum: 0

10'm'aily:

m' Cum: 33.56 m*

Daily: m' Cum: 6.67

m'ubing volume:

Csg, ann vot

Open hole votm'ime

Swabbed/Rowed: Dagy: 0.00 hrs I cum: 9.3 hrs Total: 0

m'oad

Flukls

Hours

ROIL

WATER

OTHER

Service Rig Hours

Personnel on Location

Weather. overcast

Daily 10.00 hm CumWalive 75.50 hrs

Rig: 5 Service:

Temp: +5 'C Lease: Dry

Company: 1 Total Personnel: 8

Roads: good

Rec m'um 12 ms o Rec -12m'ec

12 m'um 55.8 m' Rec 55.2m'ecm'um 0 m' Rec 0m'ownTime:hrs Cumulative DownTime; hrs

Manager. Craig Lane Programmed By: Geoff Puckett

Versus l f72 tetslmm 0 - RssasrrmEnser sokx/uns /nc /402) 2<$ 0220 www msosmssnsrgrsobussscom Jsnvsry 20 2015 Psus 1 o/2

i¹gt TUIvl)RA%J Oil. eu GASPARTNliRSllll'aily Completion Report

Consuganl. Dsn Rudneskl

Tel2Ten .'(204) 951.1092

UW(: 100.04-24-012-27W1.00 WELL: Tundra North Hargrave 04-24-012- Day ¹: 11 DATE: 05-Dec-2015iTime From Time To Hours Code

RIH w/prod string as desc: (Tbg desc in downhole progie)

I - 73.0mm epoxy Coated BC 0.13m (BOT Tbg @ 571.39mKB)

I - 73.0mm x 1.24m Perf Pup

I - 73.0mm Tail Jnt's

I - 73.0mm API PSN

I - 73.0mm J-55 EUE Tlxi

I - 73.0mm Tbg swivel

1.25m

034m ([email protected])

9.60m

0.34m (Botlom 48 550.52mkB)

I - 177.8x73mm LHS anchor S=50 K 0.93m

57-73.0mm J-55EUETbg 545 32m

I - Stretch for 700MaN Tension 0.15m

I - 73.0mm DBB ctw nipple 0.35m

KB- TH 3.43m

Tbg landed in 7000daN Tension, (0.15m) with KB-THF of 3.43m

BOT @ 571.39KB, PSN is @ 560.12mKB, anchor is @ 550 52mKB.

12;45 14:30 1.75 LHD Broke apart welhead and tumed I/2 turn so valves gned up with gowiine

Set Tryton 177.8mm x 73.0mm LHS/anchor in 7000daN tension

Relanded split bushing dognut. dressed wellhead

Rushed tbg with 5.0m3 produced Mhibited hdgepole H20

Pick-up 8 surf test used BHP ¹TSMV-31 515 (25-200 RWAC 24 X 3) S SSC2" x 20 Dura G Baneg - Metal Spray Plunger c/w 10 cup -1 aaniwn balls,

tungsten seats, 2.5" x 3 cup hold down, 1.5" HPT Pull Rod. Fishneck 2", 232" max stroke

14:30

15:45

16:00

16:30

15:45 1.25 RPROD

16:00 0.25 PUMP

16:30 0.5 LHD

17:30 I RIG

Rig to RIH w/BHP 6 rods off traiksras desc.

I - BHP ¹ TSMV-31515. (25-200 RWAC 24X3) - MAXSTROKE 232"

10- 38.1mm SINKER BARS

44 - 19.1mm plain rods Reconditioned 11/10

18- 19 lmm Std. 2 5" 6/rod Grd 'D78" (01/15)

I - 19 Imm x 1.24m SCRAPE RED PONY (11/I 4)I - 9 72m x 31.8mm (30') 4140 S/M Polish rod ( just off lap wffsgck up

Scatted BHP, spaced out, Hole was full

Skoke lasted to 3.5mpA, took aprox 5 strokes, (held 5min's - good test)

Installed hmses head and landed pogsh rod in bridle of jack

ROSR - secum well

Notilied olfice job is complete

SEE DOWNHOLE PROFILE OR PUMP AND ROD REPORT FOR DETAILED LANDINGDEPTHS

Vnrsrtm 1/TJ Wellman 9- Resource Energy So/et/nns tnc /402/ ar50220 www msmsceenergysotutions corn January 20 20/9 Page 2 ol 2

~TUitht)I21tOIL C~G 18 PJLRTNI-:RSIln'luid Transfer Report

Operator: Tundra 00 & Oas Limited parlnemhlp Repmdng Tor esca puctmtt ConsussnL Oan Rudnesul

Tern

Tel1: (204) 061-1062

UWI: 100.04-24-012-27W1.00 WELL Tundra North Hargrave 04-24-012-27 (WPM DATE: 20-Aug-2015,PROJECT: C pi ii I

INCOMING FROM:

ZONE: Lodgepole

Opening Inventorlr.

Page 1 of 1

DATE FROM TRUCKERTYPE TICKET¹ OIL (m') WATER (m')

20-Aug-2015

21-Aug-2015

22-Aug-2015

6-29-10-26

8-19-11-26

8-19-11-26

Slverltne 49776

Stlverline 50461

Silverline 50462

LPW 9776/10254

LPW

LPW 7610I7611

20

10

22

23-Aug-2015

03-Dec-201 5

03-Dec-2015

05-Dec-201 5

05-Dec-201 5

8-19-11-26

12-24-10-29

Silverline Yard

6-29-10-26

12-24-10-29

Silverline 50463I

LPW

TSL ISW

Silva rline IFW

Silverline ¹54146I

SW

TSLI

SW

7612

130901

47636

1141 7

113076

10

20

20

10

20

05-Dec-2015 12-24-10-29 TSL SW 113078

OUTGOING Tor

Receipts Total: .00

0 nin Invento nks + Remi Total: .00

137.00

137.00

DATE

20-Aug-2015

TO

6-29-10-26

TRUCKER

Silverline 49776

FLUIDTYPE

SW 4145/4146 20

TICKET¹ OIL (m') WATER (m')

20-Aug-2015

21-Aug-2015

22-Aug-2015

03-Dec-2015

04-Dec-2015

05-Dec-2015

05-Dec-2015

05-Dec-2015

6-29-10-26

6-29-10-26

6-29-10-26

New Alla

7-18 Kiwi

7-18 tgwt

7-18 Kiwi

7-18 Kiwi

Silverline 49776

Silverline 50461

Silvedine 50463

Slgverline

TSL

TSL

TSL

TSL

SW

SW

SW

Cement

SW

SW

SW

4147

7613

43674

113074

113078

113077

113079

20

30 18

0.5

15

14

12

"Negative total mCecta new wa'Ibore fluid.

COMMENTS:

Outgoing Total:

Closing Inventory (tanks):

Closing Inventory + Outgoing Total;

Fluid to Recover:

wellman 0- Resource Energy salubbns inc. Ihgsl 24$ 0220 www rasrmrcrumayysolurionscom January 20 2016 page 1 of 1

JP6( TUNI7RA~Oil. & GAs PARTNi(Rsiiip

Consukant: Dan Rudneskl

UWI: 100.04-244( 2-27W1.00

Downhole Profile

Operator: Tundra Oil 8 Gas Limned PReporting Ta: Geoff Puckett

Tell: lzosj 851-1062 Tel2:

IDATE: 19.Aug-2010

WELL: Tundra North Hargrave 04-24-012-27 (WPM) AFE ¹: 02016366DDELBE/ATIONS lmi

KB: 477.04

Ground: 472.94

CASING / TUBINGSurface Casing

Intermediate Casing

Size (mm) Weight(kg/m)

48.06

Grade Depth(mKB)

138.00HM

TD: 745.00

KB to GL: 4.10

KB to CBF: 3.85

KB to THF: 3.43

PBTD: 586.30

Producaon Casing

Production Liner

Tie Back Casing

Tubing

Open Hole

177.80

73.00

29.76

9.67

J.55

J.55

746.00

571.39

TUBING Type/Class:

TUBING String Description:

Make: Zone:

Tubing Number 1 Tally

Lodaeoole

Lan)Lth0 13

1.25

9.550. 34

9801.27

545.32

0.120.15

0.23

T mKB571,26570 01

580 46580.12550 52

549 25

3.93

3 81

343

Weight orTension on

String

Packer

Tubing deN 'Str or Slackofl 4+ daN Correc8on+/- .00 m

daN Total Siring Weight 8401 daN String Length 567.96 m

Hanger daN Landed String WL daN Adjusted Length 567.ea m

From TH- KB to TH 3.43 m Wireline+/- .00 m Depth from KB 571.39 mKB

Diredlons to Site:

ve~~/084 Wellman 9- Resource Enenly Saluaans inc. /403/ 245 0220 www resourceenergysa/ul/ans cern January 20 2016 Pages of2

~TUNIIRA~Oil. & GASPARTNIIRSIIII'onsursnt

Dan Rudneski

Downhole ProfileOperator: Tundra Og 6 Gns UmltReporting To: Gcnff Puckctt

Tel1: I204) 851-1 062 Tel2:

UWI: 100.04-24-012-27W1.00

WELL: Tundra North Hargrave 04-24012-27 iWPM)

DATE: 19-Aug-2015

AFE tk 02015366DD

Qty Rod String Details1 BHP-25.200RWAC243 TSNV31515 Re Imd

22mm In hnndan n

Size mmxm

222mm x a2m

Grade

78

Len ~th m

3210

18

38.1mm GRADE "C" SINKER BARS m mn19.1mm lain rods Recondrdoned11l1019mm sx25" 6 r acr rods ondafnmm ref f119.1mm x 1.24m cern

39.tmm x T.szm19.1mm x 7.62m19.1mm x 7.62m18.1mm x f~

787878

7620335 28

137 16

1241 31 smm X 30'PRAY METALPOUSH ROD Tla COUP

KB -TH313hnm x 9.1 4140 7 00

Total Rod String Length (m) 561.13

Surface Casing Bowl:MAKE: weatherfordBottom Connection:

Top Connectiorr.

TYPE: R53 SERIAL No.:244 mm x Kpa 21000x Ring gasket size:

279.4 mm x Kpa 210Nx Ring gasket size:WeldedR-53

Tubing Spool:MAKE: weatherfordBoNom Connection:

Top Connection:

TYPE: Flange SERIAL No.: 14042600-205-2014279.4 mm x Kpa 21000x Ring gasket size: R-53

177.0 mm x Kpa 210Nx Ring gasket size: RX5

Left casing valve: Make: Redco Type; ball Serial No.:Size: 50.8 mm x Kpa 21000 x Ring gasket size: Threads Trim:

Right casing valve: Make: Redco Type ball Senal No

Size; 50.6 mm x Kpa 21000 x Ring gasket size: Threads Trim:

Lower master valve: Make:

Size: mm xKpa

UPPer master valve: 85ake

Size: mm xKpa

Type:x Ring gasket size:

Type:x Ring gasket size:

Serial No.:

Tllm;

Serial No.:

Trim:

Wing valve:

Size:

Make:

mm xKpaType:

x Ring gasket size:

Serial No.:

Trim:

ycrzfcn 7 084 Wellman 9- Resource Energy Sdurcnz inc. Iuozf 245 0220 www rescurceeneqlyuoludcns corn January 20 2016 Page 2 of 2

dpas TUNDRA~On. Ei Gas PiglydlI'RSI III Pump and Rod Report

Operator: Tundra 00 5 Gss Limited Partnamblp Repordna Tor Geelf Puckelt onsuaant. Oan Rudneski

Tel2:

Ten: (204) 651-1062

UWI: 100.04-24-012-27W1.00 WELL: Tundra North Hargrave 04-244)12-27 (WPM) DATE: 05-Dec-2015

SURFACE LOC: 04-24-012-27 (WPM)

PRODUCTION TUBING PULLED

KB -THF.'.43 AFE No: 02015366DD Day ¹: 11

PRODUCTION TUBING RUN

JTS

/

DESCRIPTION LENGTH TOP OF(m) (mKB)

DESCRIPTION

73.0mm Epoxy coated BC

3.0mm x 1.24m Perf pup3.0mm, 6.99kg/m, J-55 TBG

3.0mm A.P.I PSN

3.0mm, 6.99kglm, J-55 TBG

17

17

177.8mm x 73.0mm Tbg Anchor clw swivel 5

LENGTH TOP OF(m) (mKB)

.13 571.26

1.25 570.01

9.55 560.46

560.12

9.60 550.52

1.27 649.25

73.0mm, 6.99kglm, J-55 TBG57 545.32 3.93

3.0mm TBG nipple .12 3.81

7dAN stretch .15 3.66

DognutlTublng Hanger'KB - TH

.23

3.43

3.43

LANDEDATmKB LANDED ATmKB 571.39

JTS SIZEmm

SUCKER RODS RUN

DESCRIPTION LENGTH TOP OF(m) (mKB)

1 BHP - 25-200 RWAC 24-3, TSMV 315 .50

11 x .32m 22mm plain handling pony .32

10x 7.62m

44 x 7.62m

18x 7.62m

38.1 mm GRADE "C" SINKER BARS

19.1 mm plain rods Recondltloned 1

19mm 6x2.5" 6 per scr rods recondl

76.20

335.28

137.16

1 x 1.24m 19.1mm x 1.24m scrapered pony 1.24

1 9.1 31.8mm X 30'PRAY METALPOLIS

KB -TH7.00

3.43

POLISHED ROD IN BOTTOM STROKE ( POLISHED ROD IN BOTTOM STROKE 2.10

MAKE: DURA

PUMP RUN

SIZE:

NUMBER:

25 X 200 RWAC 24 X 3"

CEFV 31515

FLOW TEE

PUMPING WELLHEAD EQUIPMENT

ROD BOP STUFFING BOX

BIZE:

IRemarks:

HERCULES

3.0 x 73.0 x 50.8 x 25.4mm

RATIGAN

3.0mm with 31.8mm blocks

HERCULES

73.0mm with 31.8mm packing

yurstm 030 wellman 0 - Resource Enurpy Suenfans lnc. (403) 2450220 wwwrmuurceeneffyscfuffsns curn January 20 2016 page 1 of 1

CORE ANALYSIS REPORTFOR

TUNDRA OIL & GAS PARTNERSHIP

TUNDRA NORTH HARGRAVE4-24-12-27LSD 00/04-24-012-27 W1M

NORTH HARGRAVE, MANITOBA

Lic. ¹ 10414

THESE ANALYSES, OPINIONS OR INTERPRETATIONS ARE BASED ON OBSERVATIONS AND MATERIALSSUPPLIED BY THE CLIENT TO WHOM; AND FOR WHOSE EXCLUSIVE AND CONFIDENTIAI

USE; THIS REPORT IS MADE. THE INTERPRETATIONS OR OPINIONS EXPRESSED REPRESENT THE BEST JUDGEMENT OF CORE LABORATORIES (ALL ERRORS AND OMISSIONS EXCEPTED); BUT

CORE LABORATORIES AND ITS OFFICERS AND EMPLOYEES, ASSUME NO RESPONSIBILITY AND MAKENO WARRANTY OR REPRESENTATIONS, AS TO THE PRODUCTIVITY, PROPER OPERATIONS,

OR PROFITABLENESS OF ANY OIL, GAS OR MINERAL WELL OR FORMATION IN CONNECTION WITH WHICH SUCH REPORT IS USED OR RELIED UPON. CORE LABORATORIES IS COMMITTED TO

CUSTOMER SATISFACTIONAND WELCOMES YOUR FEEDBACK. YOU CANE-MAILTHE GENERAL MANAGERWITH YOUR COMMENTS ATFSCAJVADA.FEEDBACK COBELAB.COM.

THESE ANALYSES, OPINIONS OR INTERPRETATIONS ARE BASED ON OBSERVATIONS AND MATERIALS SUPPLIED BY THE CLIENT TO WHOM; AND FOR WHOSE EXCLUSIVE AND CONFIDENTIALUSE; THIS REPORT IS MADE. THE INTERPRETATIONS OR OPINIONS EXPRESSED REPRESENT THE BEST JUDGEMENT OF CORE LABORATORIES (ALL ERRORS AND OMISSIONS EXCEPTED); BUT

CORE LABORATORIES AND ITS OFFICERS AND EMPLOYEES, ASSUME NO RESPONSIBILITY AND MAKE NO WARRANTY OR REPRESENTATIONS, AS TO THE PRODUCTIVITY, PROPER OPERATIONS,

OR PROFITABLENESS OF ANY OIL, GAS OR MINERAL WELL OR FORMATION IN CONNECTION WITH WHICH SUCH REPORT IS USED OR RELIED UPON. CORE LABORATORIES IS COMMITTED TO

CUSTOMER SATISFACTION AND WELCOMES YOUR FEEDBACK. YOU CAN E-MAIL THE GENERAL MANAGER WITH YOUR COMMENTS AT [email protected] .

Lic. # 10414

CORE ANALYSIS REPORT FOR

NORTH HARGRAVE , MANITOBA

TUNDRA OIL & GAS PARTNERSHIP

TUNDRA NORTH HARGRAVE 4-24-12-27LSD 00/04-24-012-27 W1M

RESERVOIR OPTINIZATION

September 29, 2015

Iaetrolleurtrt gastric=ea IDitriaionCore Laboratones Canada, Ltd2510 — 12 Street N.ECalgary, Alberta, Canada T2E 7P7Tel: (403) 250-4000Fax: (403) 250-5120www,corelab.corn

Tundra Oil R Gas Partnership1000, 715 —5've SWCalgary, Alberta T2P 2X6

Attention: Norman Hopkins

Subj ect: TUNDRA NORTH HARGRAVE 4-24-12-27 W1MOur File Number: 52131 —15-0052

Diamond coring equipment and water base mud were used to core the subject well. Thecore was boxed at the wellsite and transported to our Calgary laboratory.

Prior to analysis, spectral gamma ray activity and bulk density index were measured.

Prior to analysis, the core material was photographed and one set of white light 216 mmX 280 mm, photographs and one compact disk were forwarded to your office.

1. Conventional, Plug Type Analysis

Five samples (38.1 mm diameter) were cleaned in a vapour phase extractor usingtoluene and dried. in a. friction air oven Analysis includes porosity by &oyle's 1 awtechnique using helium as the gaseous medium, residual fluid determination by retorton adjacent material, and horizontal permeability to air

2. Full Diameter Analysis

Fifteen samples were cleaned in a vapour phase extractor using toluene and dried ina friction air oven. Porosity was determined by the Boyle's Law technique usinghelium as the gaseous medium. Permeability to air was measured in both horizontal(Kmax, K90) and vertical (Kv) directions. The summation o f fluid saturationtechnique (retort) was used to determine residual fluid saturation on full diametersample end pieces.

3. Pressure Decay Profile Permeability

The Pressure Decay Profile Permeameter measures slip —corrected (Klinkenberg) andconventional gas permeabilities; both of which are free from inertial flow resistanceeffects.

ISO 9001 2000FS 51856

Tundra Oil A. Chas PartnershipNorman Hopkins

September 29, 2015

The instrument is an unsteady state device that measures the rate of pressure decayof gas through a probe tip sealed onto the core surface using an Q-ring.

The Profile Permeameter utilizes four gas reservoirs of different calibrated volumes;large volumes for high permeability intervals and small volumes for lowpermeability intervals. This allows for permeability measurements to be takenquickly over a wide range of permeabilities (0.001 mD to 20 Darcies).

During operation a reservoir tank of the appropriate volume is filled with gas at aknown pressure. After the probe tip is sealed against the core surface the probevalve is opened and the tank pressure is recorded as a function of the time. Thehigher the permeability, the larger the tank selected and the faster the pressure willdecay. The slope of the pressure-decay curve at any time yields an instantaneousflow rate function. and. permeability'an be calculated.

The utilization of different volume reservoirs and a laser guided probe allows a largenumber of permeability measurements to be taken rapidly and provides a continuousdetailed description of core permeability.

Interchangeable probe assemblies accommodate permeability measurements ondifferent rock types. The probe is equipped with a laser light to allow accuratepositioning on the core surface.

Recording o f permeability measurements along with their accompanying x-ycoordinates facilitates plotting the data on a depth log comparable in format to coresample permeability plots or downhole logs.

The data for the subj ect well was measured on clean, slabbed core withmeasurements taken at 2.5 cm spacing.

The results of these analyses are reported in both tabular and graphical form.

Samples outside the 95 lo confidence interval (three standard deviations) on thePermeability X Porosity crossplot have been identified and have been checked and re-analyzed to ensure data integrity.

As a guide to evaluation and correlation with other data, statistics with tabulated cut-offranges and plots are also presented herein.

The core material was slabbed in accordance with government regulations and one set ofwhite light, 216 mm X 280 mm, photographs and one compact disk were forwarded toyour office under a. separate cover.

Tundra Oil M Chas PartnershipNorman Hopkins

September 29, 2015

Thank you for the opportunity to be of service.

&ours truly,

CORE LABORATORIES CANADA, LTD.

Derrick J. DavisSupervisor, Routine Rock Properties

DD/soenclosures

Field: NORTH HARGRAVE

Province: MANITOBA

License : 10414

TUNDRA OIL & GAS PARTNERSHIPTUNDRA NORTH HARGRAVE4-24-12-27

LSD 00/04-24-012-27 W1M

Formation: LODGEPOLE

Coring Equip: DIAMOND

Coring Fluid: WATER BASE MUD

File No.: 52131-15-0052

Date: 2015-08-03

Analysts: DJB

Core Dia: 100 mm

CORE ANALYSIS FINAL RESULTS

SAMPLENUMBER

DEPTHm

INTVL SAMPLE

REP LENGTH

SPOT PERMEABILITY CAPACITY(MAXIMUM) (90 DEG) (VERTICAL) (MAXIMUM)

Kair Kair Kair Kairm mD mD mD mD-m

POROSITY CAPACITY BULK GRAIN

fraction k /m3 k /m3

(HELIUM) (HELIUM) DENSITY DENSITY

SATURATION(PORE VOLUME)OIL WATERfrac frac

COMMENTS

NA 553.00- 556.25 3.25

CORE NO.1 553.00 - 563.00 m (CORE RECEIVED 8.17 m) (8 BOXES)

JURASSIC

LODGEPOLEsh

NA

FD

FD

FD

NA

NA

NA

FD

NA

LC

556.25- 556.63

556.63- 556.79

556.79- 556.92

3 556.92- 557.09

557.09- 559.00

559.00- 559.52

559.52- 560.70

560.70- 560.91

560. 91- 561. 1 7

561.17- 563.00

0.38

0.16 0.09

0.13 0.07

0.17 0.10

1.91

0.52

1.18

0.21 0.13

0.26

1.83

706. 594.

32.3 29.4

23.7 19.8

170. 126.

938. 148.260

3.39 5.168

3.61 3.081

5.04 28.900

0.072

0.103

0.102

0.148

0.012

0.013

0.017

0.031

2630

2540

2530

2380

sh

2830 0.000 0.691 dol i sv

2830 0.000 0.477 dol i ppv sv calc

2820 0.000 0.530 dol i ppv sv calc

dol

dol sshy

sh

2790 0.112 0.463 dol i ppv sv mv calc vfrac

dol ru

Lost core

CORE NO.2 563.00 - 572.00 m (CORE RECEIVED 8.22 m) (8 BOXES)

SPA

SP

5 563.00- 563.50 0.50

6 563.50- 563.64 0.14

563.30 0.012

563.55 1420.

0.006

198.800

0.032

0.077

0.016

0.011

2490 2570 0.135 0.514 cht

2440 2640 0.160 0.310 dol i sdy cht

Page 1 of 2

File No. : 52131-15-0052

Field : NORTH HARGRAVE Formation : LODGEPOLE Date : 2015-08-03

Province : MANITOBA Coring Equip : DIAMOND Analysts : DJB

License : 10414 Coring Fluid : WATER BASE MUD Core Dia : 100 mm

INTVL

REP

m

SAMPLE

LENGTH

m

SPOT

DEPTH

m

(MAXIMUM)

Kair mD

PERMEABILITY (90 DEG)

Kair mD

(VERTICAL)

Kair mD

CAPACITY (MAXIMUM)

Kair mD-m

POROSITY

(HELIUM)

fraction

CAPACITY

(HELIUM)

ø-m

BULK

DENSITY

kg/m3

GRAIN

DENSITY

kg/m3

COMMENTS

NA 553.00- 556.25 3.25 sh

NA 556.25- 556.63 0.38 sh

FD 1 556.63- 556.79 0.16 0.09 32.3 29.4 3.39 5.168 0.072 0.012 2630 2830 0.000 0.691 dol i svFD 2 556.79- 556.92 0.13 0.07 23.7 19.8 3.61 3.081 0.103 0.013 2540 2830 0.000 0.477 dol i ppv sv calc

FD 3 556.92- 557.09 0.17 0.10 170. 126. 5.04 28.900 0.102 0.017 2530 2820 0.000 0.530 dol i ppv sv calc

NA 557.09- 559.00 1.91 dol

NA 559.00- 559.52 0.52 dol sshy

NA 559.52- 560.70 1.18 sh

FD 4 560.70- 560.91 0.21 0.13 706. 594. 938. 148.260 0.148 0.031 2380 2790 0.112 0.463 dol i ppv sv mv calc vfracNA 560.91- 561.17 0.26 dol ru

LC 561.17- 563.00 1.83 Lost core

SPA 5 563.00- 563.50 0.50 563.30 0.012 0.006 0.032 0.016 2490 2570 0.135 0.514 chtSP 6 563.50- 563.64 0.14 563.55 1420. 198.800 0.077 0.011 2440 2640 0.160 0.310 dol i sdy cht

SATURATION (PORE VOLUME) OIL WATER frac frac

CORE NO.1 553.00 - 563.00 m (CORE RECEIVED 8.17 m) (8 BOXES)

JURASSIC

LODGEPOLE

CORE NO.2 563.00 - 572.00 m (CORE RECEIVED 8.22 m) (8 BOXES)

TUNDRA OIL & GAS PARTNERSHIPTUNDRA NORTH HARGRAVE 4-24-12-27

LSD 00/04-24-012-27 W1M

C O R E A N A L Y S I S F I N A L R E S U L T S

SAMPLE NUMBER

DEPTH m

Page 1 of 2

Field: NORTH HARGRAVE

Province: MANITOBA

License : 10414

TUNDRA OIL & GAS PARTNERSHIPTUNDRA NORTH HARGRAVE4-24-12-27

LSD 00/04-24-012-27 W1M

Formation: LODGEPOLE

Coring Equip: DIAMOND

Coring Fluid: WATER BASE MUD

File No.: 52131-15-0052

Date: 2015-08-03

Analysts: DJB

Core Dia: 100 mm

CORE ANALYSIS FINAL RESULTS

SAMPLENUMBER

DEPTHm

INTVL SAMPLE

REP LENGTH

SPOT PERMEABILITY CAPACITY(MAXIMUM) (90 DEG) (VERTICAL) (MAXIMUM)

Kair Kair Kair Kairm mD mD mD mD-m

POROSITY CAPACITY BULK GRAIN

fraction k /m3 k /m3

(HELIUM) (HELIUM) DENSITY DENSITY

SATURATION(PORE VOLUME)OIL WATERfrac frac

COMMENTS

FD

SP

7 563.64- 564.04 0.40 0.13

8 564.04- 564.14 0.10

414. 264.

564.10 3080.

29.8 165.600

308.000

0.131

0.324

0.052

0.032

2400

1800

2760 0.000 0.119 dol i ppv sv calc

2670 0.134 0.655 ss vf f m dol

NA

FD

FD

FD

NA

FD

FD

NA

10

12

13

564.14- 564.48

564.48- 564.70

564.70- 564.94

564.94- 565.06

565.06- 565.86

565.86- 566.12

566.12- 566.34

566.34- 566.58

0.34

0.22 0.13

0.24 0.12

0.12 0.11

0.80

0.26 0.13

0.22 0.13

0.24

202. 155.

29.0 17.8

4.63 52.520

5.98 6.380

427. 386. 84.2 93.940

272. 208. 128. 65.280

375. 365. 230. 45.000

0.233

0.284

0.208

0.205

0.109

0.051

0.068

0.025

0.053

0.024

2170

2020

2230

2240

2390

2830 0.120

2830 0.071

2810 0.000

dol

0.652 dol i ppv sv calc

0.559 dol i ppv sv calc

0.671 dol i ppv sv calc

dol

2810 0.052 0.726 dol i ppv sv mv Iv calc

2690 0.000 0.673 Is i ppv sv mv Iv sty

dol

SP

FD

SP

NA

FD

NA

FD

FD

FD

NA

LC

14

15

16

17

18

19

20

566.58- 566.71

566.71- 566.86

566.86- 566.98

566.98- 567.24

567.24- 567.67

567.67- 568.47

568.47- 568.77

568.77- 569.05

569.05- 569.30

569.30- 571.22

571.22- 572.00

0.13

0.15 0.11

0.12

0.26

0.43 0.13

0.80

0.30 0.10

0.28 0.13

0.25 0.11

1.92

0.78

566.62 77.3

2.74 2.67

63.2 19.3

1.50

3. 53

0.20

1.40

3.40

0.17

566.90 96.9

10.049

1.32 0.411

11.628

2.58 27.176

0.44 0.450

0.34 0.988

0.08 0.050

0.169

0.081

0.108

0.082

0.095

0.091

0.057

0.022

0.012

0.013

0.035

0.029

0.025

0.014

2330

2490

2520

2440

2540

2510

2620

2810 0.109 0.521 dol i ppv calc

2710 0.000 0.815 Is i

2820 0.107 0.413 dol i ppv sv mv 1am

dol

2660 0.000 0.577 Is i ppv sv

dol

2800 0.000 0.708 Is i dol sty

2760 0.000 0.723 Is i ppv sv mv

2780 0.000 0.626 Is i dol

dol

Lost core

Page 2 of 2

File No. : 52131-15-0052

Field : NORTH HARGRAVE Formation : LODGEPOLE Date : 2015-08-03

Province : MANITOBA Coring Equip : DIAMOND Analysts : DJB

License : 10414 Coring Fluid : WATER BASE MUD Core Dia : 100 mm

INTVL

REP

m

SAMPLE

LENGTH

m

SPOT

DEPTH

m

(MAXIMUM)

Kair mD

PERMEABILITY (90 DEG)

Kair mD

(VERTICAL)

Kair mD

CAPACITY (MAXIMUM)

Kair mD-m

POROSITY

(HELIUM)

fraction

CAPACITY

(HELIUM)

ø-m

BULK

DENSITY

kg/m3

GRAIN

DENSITY

kg/m3

COMMENTS

SATURATION (PORE VOLUME) OIL WATER frac frac

TUNDRA OIL & GAS PARTNERSHIPTUNDRA NORTH HARGRAVE 4-24-12-27

LSD 00/04-24-012-27 W1M

C O R E A N A L Y S I S F I N A L R E S U L T S

SAMPLE NUMBER

DEPTH m

FD 7 563.64- 564.04 0.40 0.13 414. 264. 29.8 165.600 0.131 0.052 2400 2760 0.000 0.119 dol i ppv sv calcSP 8 564.04- 564.14 0.10 564.10 3080. 308.000 0.324 0.032 1800 2670 0.134 0.655 ss vf f m dol

NA 564.14- 564.48 0.34 dol

FD 9 564.48- 564.70 0.22 0.13 427. 386. 84.2 93.940 0.233 0.051 2170 2830 0.120 0.652 dol i ppv sv calc

FD 10 564.70- 564.94 0.24 0.12 272. 208. 128. 65.280 0.284 0.068 2020 2830 0.071 0.559 dol i ppv sv calc

FD 11 564.94- 565.06 0.12 0.11 375. 365. 230. 45.000 0.208 0.025 2230 2810 0.000 0.671 dol i ppv sv calc

NA 565.06- 565.86 0.80 dolFD 12 565.86- 566.12 0.26 0.13 202. 155. 4.63 52.520 0.205 0.053 2240 2810 0.052 0.726 dol i ppv sv mv lv calc

FD 13 566.12- 566.34 0.22 0.13 29.0 17.8 5.98 6.380 0.109 0.024 2390 2690 0.000 0.673 ls i ppv sv mv lv sty

NA 566.34- 566.58 0.24 dol

SP 14 566.58- 566.71 0.13 566.62 77.3 10.049 0.169 0.022 2330 2810 0.109 0.521 dol i ppv calc

FD 15 566.71- 566.86 0.15 0.11 2.74 2.67 1.32 0.411 0.081 0.012 2490 2710 0.000 0.815 ls i

SP 16 566.86- 566.98 0.12 566.90 96.9 11.628 0.108 0.013 2520 2820 0.107 0.413 dol i ppv sv mv lam

NA 566.98- 567.24 0.26 dol

FD 17 567.24- 567.67 0.43 0.13 63.2 19.3 2.58 27.176 0.082 0.035 2440 2660 0.000 0.577 ls i ppv sv

NA 567.67- 568.47 0.80 dol

FD 18 568.47- 568.77 0.30 0.10 1.50 1.40 0.44 0.450 0.095 0.029 2540 2800 0.000 0.708 ls i dol sty

FD 19 568.77- 569.05 0.28 0.13 3.53 3.40 0.34 0.988 0.091 0.025 2510 2760 0.000 0.723 ls i ppv sv mv

FD 20 569.05- 569.30 0.25 0.11 0.20 0.17 0.08 0.050 0.057 0.014 2620 2780 0.000 0.626 ls i dol

NA 569.30- 571.22 1.92 dol

LC 571.22- 572.00 0.78 Lost core

Page 2 of 2

CODE KEY - DESCRIPTIONS

ACAanhyargASTbitbkccalccarbcblcglchtcoalcoqdolffcFD

foesfreefriglaucgrnl

gyphei

hfrac

IFD

incl1am

Removed for advanced core analysisAnhydriteArgillaceousAppears similar toBitumenBreakCoarseCalcite (calcareous)CarbonaceousCobbleConglomerateChertCoal/coal inclusionCoquinaDolomiteFineFilter cake on suface of core sampleFull diameter analysis including threedirectional permeabilities, porosity anddensitiesFossil (fossiliferous)Fracture (undifferentiated)FriableGlauconite (glauconitic)GranuleGypsumHalite (sa It)Ho rizo nta I fractureIntercrystallineInner Full Diameter (Full diameter sampleis drilled from the bulk portion of thecore in the vertical direction forpermeability and porosity measurements)InclusionsLaminae (laminated)

Is

Iv

mmimvNANROB

oolpblPFDppvPRPSAPSPpyrpyrbitI'u

SAsdySEMsh

shySld

sltstsltySP

SPA

= Limestone= Large vug= Medium= Mud invaded= Medium vug= Not analyzed by request= Not received= Overburden sample (permeability and

porosity measured at net overburdenstress)

= Oolitic= Pebble= Preliminary Full Diameter sample= Pinpoint vug= Preserved for future studies= Particle size analysis= Preliminary Small Plug sample= Pyrite (pyritic)= Pyrobitumen= Rubble= Sieve analysis= Sandy= Scanning electron microscope analysis= Shale= Moderately shaly (20% -40%)= Siderite= Siltstone= Silty= Small plug (sample drilled from core in

maximum horizontal direction and parallel tobedding plane where possible) permeabilityporosity, and grain density are measured

= (Prefix A) Horizontal matrix permeabilitymeasured by pressure decay profilepermeametry through a probe tip dueto sample quality

SPH

SPPSPTss

ssdyashystysulfsvTEC

TSunconsVC

vfvfracVISVOB

vshyVSP

vugwsXRD

10240

= Humidity analysis of small plug sample at 60

degrees Celsius and 50% relative humidty= Small plug from preserved section of the core= Small Plug used for tracer analysis= Sandstone= Slightly sandy (<20%)= Slightly shaly («20%)= Stylolite (ic)= Sulphur= Small vug= Thermal Extraction Chromatography to

determine oil richness= Thin section= Unconsolidated= Very coarse= Very fine= Vertical fracture= Viscosity of oil measured= Vertical overburden sample (vertical

permeability measured at net overburdenstress)

= Very shaly (>40%)= Vertical small plug drilled from whole

core to measure vertical permeability(and occasionally porosity)

= Vuggy(vuggular)= Water sand= X-ray diffraction= Data unavailable due to poor sample quality= Permeability»10 Darcies, (maximum

routine permeability measurement)

CODE KEY - DESCRIPTIONS

ACA = Removed for advanced core analysis Is = Limestone SPH = Humidity analysis of small plug sample at 60anhy = Anhydrite lv = Large vug degrees Celsius and 50 % relative humidtyarg = Argillaceous m = Medium SPP = Small plug from preserved section of the coreAST = Appears similar to mi = Mud invaded SPT = Small Plug used for tracer analysisbit = Bitumen mv = Medium vug ss = Sandstonebk = Break NA = Not analyzed by request ssdy = Slightly sandy (<20%)c = Coarse NR = Not received sshy = Slightly shaly (<20%)calc = Calcite (calcareous) OB = Overburden sample (permeability and sty = Stylolite (ic)carb = Carbonaceous porosity measured at net overburden sulf = Sulphurcbl = Cobble stress) sv = Small vugcgl = Conglomerate ool = Oolitic TEC = Thermal Extraction Chromatography tocht = Chert pbl = Pebble determine oil richnesscoal = Coal/coal inclusion PFD = Preliminary Full Diameter sample TS = Thin sectioncoq = Coquina ppv = Pinpoint vug uncons = Unconsolidateddol = Dolomite PR = Preserved for future studies vc = Very coarsef = Fine PSA = Particle size analysis vf = Very finefc = Filter cake on suface of core sample PSP = Preliminary Small Plug sample vfrac = Vertical fractureFD = Full diameter analysis including three pyr = Pyrite (pyritic) VIS = Viscosity of oil measured

directional permeabilities, porosity and pyrbit = Pyrobitumen VOB = Vertical overburden sample (verticaldensities ru = Rubble permeability measured at net overburden

foss = Fossil (fossiliferous) SA = Sieve analysis stress)frac = Fracture (undifferentiated) sdy = Sandy vshy = Very shaly (>40%)fri = Friable SEM = Scanning electron microscope analysis VSP = Vertical small plug drilled from wholeglauc = Glauconite (glauconitic) sh = Shale core to measure vertical permeabilitygrnl = Granule shy = Moderately shaly (20% - 40%) (and occasionally porosity)gyp = Gypsum sid = Siderite vug = Vuggy (vuggular)hal = Halite (salt) sltst = Siltstone ws = Water sandhfrac = Horizontal fracture slty = Silty XRD = X-ray diffractioni = lntercrystalline SP = Small plug (sample drilled from core in * = Data unavailable due to poor sample qualityIFD = Inner Full Diameter (Full diameter sample maximum horizontal direction and parallel to 10240 = Permeability >10 Darcies, (maximum

is drilled from the bulk portion of the bedding plane where possible) permeability routine permeability measurement)core in the vertical direction for porosity, and grain density are measuredpermeability and porosity measurements) SPA = (Prefix A) Horizontal matrix permeability

incl = Inclusions measured by pressure decay profilelam = Laminae (laminated) permeametry through a probe tip due

to sample quality

CORE LABORATORIES

Company:TUNDRA OIL & GAS PARTNERSHIPWell: TUNDRA NORTH HARGRAVE4-24-12-27

Field:NORTH HARGRAVEFormation:LODGE POLE

File No:52131-15-0052Date:2015-08-03

TABLE 2

SUMMARY OF FINAL CORE DATA

~ g ~ ~ ~ g g L L L ~

DATATYPE:

orosity--------------P (HELIUM)

Permeability----------- (MAXIMUM)Kair

CUTOFFS:

ZONE:

Identification---------- LODGEPOLE

Top Depth------------556 25 m

Bottom Depth----------572.00 m

Number of Samples------20

ZONE:

Number of Samples---- 20

Thickness Represented-- 4.53 m

POROSITY:

Storage Capacity------ 0.557 8 -m

Arithmetic Average----- 0.123 frac

Minimum------------0.032 frac

Maximum----------- 0.324 frac

Median-------------0.106 frac

Standard Deviation-----+0.078 frac

PERMEABILITY:

Flow Capacity-------Arithmetic Average---Geometric Average---Harmonic Average----

inimum-----------M'

aximum----------M

edian------------M

Standard Dev. (Geom)-

1171.69 mD-m

258.65 mD

21.35 mD

0.10 mD

0.01 mD

3080.00 mD

87.10 mD

K"10'-" "'D

Porosity(Minimum)------- 0.0000 frac

Porosity(Maximum)------ 1.0000 frac

Permeability(Minimum)---- 0.0000 mD

Permeability(Maximum)---- 100000 mD

Water Saturation(Maximum)- 1.000 frac

Oil Saturation(Minimum)--- 0.000 frac

Grain Density(Minimum)---2000. kg/m3

Grain Density(Maximum)--- 3000. kg/m3

Lithology Excludes------- NONE

GRAIN DENSITY:

Arithmetic Average----- 2745. kg/m3

Minimum------------2570. kg/m3

Maximum----------- 2830. kg/m3

Median-------------2795. kg/m3

Standard Deviation-----+77. kg/m3

HETEROGENEITY(Permeability):

Dykstra-Parsons Var.— 0.295

Lorenz Coefficient---- 0.723

Oil- 0.053 frac

Water------------ 0.565 frac

AVERAGESATURATION(Pore Volume):

Company :TUNDRA OIL & GAS PARTNERSHIP Field :NORTH HARGRAVE File No :52131-15-0052Well :TUNDRA NORTH HARGRAVE 4-24-12-27 Formation :LODGEPOLE Date :2015-08-03

ZONE: ZONE:Identification------------------- LODGEPOLE Number of Samples-------- 20Top Depth-------------------------556.25 m Thickness Represented--- 4.53 m Flow Capacity------------- 1171.69 mD-mBottom Depth-------------------- 572.00 m Arithmetic Average------ 258.65 mDNumber of Samples------------20 Geometric Average------ 21.35 mD

Harmonic Average-------- 0.10 mDDATA TYPE: Storage Capacity------------ 0.557 ø -m Minimum--------------------- 0.01 mD

Porosity---------------------------- (HELIUM) Arithmetic Average----------0.123 frac Maximum-------------------- 3080.00 mDPermeability---------------------- (MAXIMUM) Kair Minimum-----------------------0.032 frac Median------------------------ 87.10 mD

Maximum---------------------- 0.324 frac Standard Dev. (Geom)-- K*10±1.351 mDCUTOFFS: Median------------------------- 0.106 frac

Standard Deviation----------±0.078 fracPorosity(Minimum)--------------0.0000 fracPorosity(Maximum)-------------1.0000 fracPermeability(Minimum)--------0.0000 mD Dykstra-Parsons Var.-- 0.295Permeability(Maximum)-------100000 mD Lorenz Coefficient-------- 0.723Water Saturation(Maximum)-1.000 frac Arithmetic Average----------2745. kg/m3Oil Saturation(Minimum)------ 0.000 frac Minimum-----------------------2570. kg/m3Grain Density(Minimum)------ 2000. kg/m3 Maximum---------------------- 2830. kg/m3Grain Density(Maximum)----- 3000. kg/m3 Median------------------------- 2795. kg/m3 Oil----------------------------- 0.053 fracLithology Excludes--------------NONE Standard Deviation----------±77. kg/m3 Water------------------------ 0.565 frac

C O R E L A B O R A T O R I E S

ZONE AND CUTOFF DATA CHARACTERISTICS REMAINING AFTER CUTOFFS

PERMEABILITY:

S U M M A R Y O F F I N A L C O R E D A T A

TABLE 2

AVERAGE SATURATION(Pore Volume):

GRAIN DENSITY:

POROSITY:

HETEROGENEITY(Permeability):

100000

Permeability vs Porosity

1 OOOO

1 000

Cll

CllCll

gCll

ClCll

IV

100

10

0.1

0.01

0.0010.000 0.040 0.080 0.120 0.160 0.200 0.240 0.280 0.320 0.360 0.400

Helium Porosity: fraction

0.001

0.01

0.1

1

10

100

1000

10000

100000

0.000 0.040 0.080 0.120 0.160 0.200 0.240 0.280 0.320 0.360 0.400

Hor

izon

tal P

erm

eabi

lity

(Max

): m

D

Helium Porosity: fraction

Permeability vs Porosity

Log(Y) = 17.2919* X ‐0.7017Correlation Coef. = 0.657    

TUNDRA OIL & GAS PARTNERSHIPTUNDRA NORTH HARGRAVE 4‐24‐12‐27

NORTH HARGRAVE 

LODGEPOLE (556.25 ‐ 572.00 m)Core Laboratories Canada Ltd.

‐ LEGEND ‐F I N A L  D A T A 

CORE SPECTRAL GAMMA

TUNDRA NORTH HARGRAVE 4-24-12-27 W1MJURASSIC / LODGEPOLE (553.00 - 572.00 m )

10 cm - 24.0 mCore Laboratories Canada Ltd.

TUNDRA OIL & GAS PARTNERSHIP

CORE GAMMA

1:240MD in M

DEPTH THORIUM URANIUM

Total Gamma0 API 150

Uranium Free Gamma0 API 150

Uranium0 PPM 40

Thorium0 PPM 40

Potassium0 FRAC 0.08

545

550

555

560

565

570

575

CORE GAMMA

1:240MD in M

DEPTH THORIUM URANIUM

Total Gamma0 API 150

Uranium Free Gamma0 API 150 Uranium

0 PPM 40

Thorium0 PPM 40

Potassium0 FRAC 0.08

BULK DENSITY INDEX

TUNDRA NORTH HARGRAVE 4-24-12-27 W1MJURASSIC / LODGEPOLE (553.00 - 572.00 m )

10 cm - 24.0 mCore Laboratories Canada Ltd.

TUNDRA OIL & GAS PARTNERSHIP

GAMMA RAY (API)

1:240MD in M

DEPTH BULK DENSITY INDEX

Total Gamma0 API 150

Uranium Free Gamma0 API 150

Low Bulk Density Index High2.0 GM/CC 3.0

545

550

555

560

565

570

575

GAMMA RAY (API)

1:240MD in M

DEPTH BULK DENSITY INDEX

Total Gamma0 API 150

Uranium Free Gamma0 API 150

Low Bulk Density Index High2.0 GM/CC 3.0

CORRELATION COREGRAPH

TUNDRA NORTH HARGRAVE 4-24-12-27 W1MJURASSIC / LODGEPOLE ( 556.25 - 572.00 m)

10 cm - 24.0 mCore Laboratories Canada Ltd.

TUNDRA OIL & GAS PARTNERSHIP

LithologyLimestone Dolomite Sandstone

Conglomerate

Shale

Glauconite

Anhydrite

CoalSiltstoneShaley Sandstone

GAMMA RAY (API)

1:240MD in M

DEPTH POROSITY / GRAIN DENSITY

Total Gamma0 API 150

Uranium Free Gamma0 API 150

Helium Porosity

0.4 FRACTION 0.0

Core Grain Density

2000 KG/M3 3000

545

550

555

560

565

570

575

GAMMA RAY (API)

1:240MD in M

DEPTH POROSITY / GRAIN DENSITY

Total Gamma0 API 150

Uranium Free Gamma0 API 150

Helium Porosity

0.4 FRACTION 0.0

Core Grain Density

2000 KG/M3 3000

CORRELATION COREGRAPH

TUNDRA NORTH HARGRAVE 4-24-12-27 W1MJURASSIC / LODGEPOLE ( 556.25 - 572.00 m)

10 cm - 24.0 mCore Laboratories Canada Ltd.

TUNDRA OIL & GAS PARTNERSHIP

GAMMA RAY (API)

1:240MD in M

DEPTH PERMEABILITY POROSITYFLUID

SATURATION

Total Gamma0 API 150

Uranium Free Gamma0 API 150

Horizontal Kmax

0.001 MD 10,000

Horizontal K90

0.001 MD 10,000

Vertical Kv

0.001 MD 10,000

Helium Porosity

0 FRACTION 0.4

Core Grain Density

2000 KG/M3 3000Water Saturation

1 FRAC 0

Oil Saturation

0 FRAC 1

545

550

555

560

565

570

575

GAMMA RAY (API)

1:240MD in M

DEPTH PERMEABILITY POROSITYFLUID

SATURATION

Total Gamma0 API 150

Uranium Free Gamma0 API 150

Horizontal Kmax

0.001 MD 10,000

Horizontal K90

0.001 MD 10,000

Vertical Kv

0.001 MD 10,000

Helium Porosity

0 FRACTION 0.4

Core Grain Density

2000 KG/M3 3000

Water Saturation

1 FRAC 0

Oil Saturation

0 FRAC 1

PROFILE PERMEAMETRY

TUNDRA NORTH HARGRAVE 4-24-12-27 W1MJURASSIC / LOGEPOLE ( 553.00 - 572.00 m )

10 cm - 24.0 mCore Laboratories Canada Ltd.

TUNDRA OIL & GAS PARTNERSHIP

GAMMA RAY (API)

1:240MD in M

DEPTH PERMEABILITYPOROSITY

GRAIN DENSITYFLUID

SATURATION

Total Gamma0 API 150

Uranium Free Gamma0 API 150

Profile Permeability Kair0.001 MD 10,000

Permeability Kmax

0.001 MD 10,000

Helium Porosity

0.4 FRACTION 0.0

Core Grain Density

2500 KG/M3 3500

Water Saturation

1 FRAC 0

Oil Saturation

0 FRAC 1

545

550

555

560

565

570

575

GAMMA RAY (API)

1:240MD in M

DEPTH PERMEABILITYPOROSITY

GRAIN DENSITYFLUID

SATURATION

Total Gamma0 API 150

Uranium Free Gamma0 API 150

Profile Permeability Kair0.001 MD 10,000

Permeability Kmax

0.001 MD 10,000

Helium Porosity

0.4 FRACTION 0.0

Core Grain Density

2500 KG/M3 3500

Water Saturation

1 FRAC 0

Oil Saturation

0 FRAC 1

PROFILE PERMEAMETER INDEXTUNDRA NORTH HARGRAVE 4-24-12-27

00/04-24-01 2-27 W1 M

Point Depth (m) K Air (mD) K Liquid (mD) Comment

1

23456789

10111213141516171819202122232425262728293031323334353637383940

554.6632554.6973554. 7249554. 7586554.851 1

554. 902554. 9475554. 9901555. 0286555. 0663555. 1 689555. 1 921555.2338555.7571555. 8032555. 8398555. 8802555. 9095555. 9388555. 9751556. 0054556. 0357556. 0661556. 1 053556. 1 307556. 1 702556.2646556.2995556. 3307556. 3665556.409

556.4447556.4906556. 5229556. 5535556. 5984556.6653556.681 8556. 6944556. 7288

0.03870.1560.441

0.290. 09630.01 780. 07750.051 3

0.1990. 06570. 02820. 03930. 02340.01 560.01 230.01 730.01 050.01 130.01 050.01 85

0.01 1

0.01450.01 120.01 580. 02470.01 390.01 93

0.0140.01 330. 02750.01 560.01 640.01 820.01 720. 0267

0.187103

31.82.223. 51

0.01 240.0749

0.2610.159

0. 04090. 00424

0. 03090.01 80.101

0. 02490.00803

0.01 270.006230.003530.002520.004080.002010.00222

0. 0020.004470.0021 20.0031 80.0021 80.003590.006710.002980.004750.00302

0. 00280.007760.003530.003770.004390.004050.00747

0. 093594. 327.8

1.62.67

FD 1

FD 1

FD 1

FD 1

Page 1 of 10

Point Depth (m) K Air (mD) K Liquid (mD) Comment

1 554.6632 0.0387 0.0124

2 554.6973 0.156 0.0749

3 554.7249 0.441 0.261

4 554.7586 0.29 0.159

5 554.8511 0.0963 0.0409

6 554.902 0.0178 0.00424

7 554.9475 0.0775 0.0309

8 554.9901 0.0513 0.018

9 555.0286 0.199 0.101

10 555.0663 0.0657 0.0249

11 555.1689 0.0282 0.00803

12 555.1921 0.0393 0.0127

13 555.2338 0.0234 0.00623

14 555.7571 0.0156 0.00353

15 555.8032 0.0123 0.00252

16 555.8398 0.0173 0.00408

17 555.8802 0.0105 0.00201

18 555.9095 0.0113 0.00222

19 555.9388 0.0105 0.002

20 555.9751 0.0185 0.00447

21 556.0054 0.011 0.00212

22 556.0357 0.0145 0.00318

23 556.0661 0.0112 0.00218

24 556.1053 0.0158 0.00359

25 556.1307 0.0247 0.00671

26 556.1702 0.0139 0.00298

27 556.2646 0.0193 0.00475

28 556.2995 0.014 0.00302

29 556.3307 0.0133 0.0028

30 556.3665 0.0275 0.00776

31 556.409 0.0156 0.00353

32 556.4447 0.0164 0.00377

33 556.4906 0.0182 0.00439

34 556.5229 0.0172 0.00405

35 556.5535 0.0267 0.00747

36 556.5984 0.187 0.0935

37 556.6653 103 94.3 FD 1

38 556.6818 31.8 27.8 FD 1

39 556.6944 2.22 1.6 FD 1

40 556.7288 3.51 2.67 FD 1

TUNDRA NORTH HARGRAVE 4-24-12-27

00/04-24-012-27 W1M

PROFILE PERMEAMETER INDEX

Page 1 of 10

PROFILE PERMEAMETER INDEXTUNDRA NORTH HARGRAVE 4-24-12-27

OO/04-24-01 2-27 W1 M

Point Depth (m) K Air (mD) K Liquid (mD) Comment

41424344454647484950515253545556575859606162636465666T68697071727374757677787980

556. 761 4556. 8051556. 8271556. 8394556. 8504556. 8793556. 91 1 4556. 9302

556. 955556. 9865557. 0064557. 0273557.0381557. 0562557.0781557.1 195557. 1 547557.207

557.2391557. 2804

557.31 9557. 3634557.4026557.4414557. 5034557. 5469557. 5937557.646

557.6891557. 736

557. 7846557. 8359557. 8977557. 9526557. 9973558. 0591558. 0987558. 1 305558. 1 825

558.21 2

0. 02330.4290. 586

0.0831104

31.40. 0829

0.680.19120486

0.1281 16128

0. 07950.02210. 0295

1 8.80. 04780. 02650. 03650.01 64

0. 0290.01 92

0.21 T0. 02490. 0324

0.020.0201

0.020. 025

0. 02640. 02250. 02080. 05050.02210. 024T

0.020. 06850. 0328

0. 00620.2510. 363

0. 033895.427.4

0. 03370.428

0.0951111463

0. 058T1061 18

0. 0320.005750.00855

1 5.90.01 640. 00'740.01 14

0.003730.008410.00475

0.1 130.006810.009770.005030.005040.005010. 006840.007380.005910.00529

0.01 760.005750.006T2

0. 0050. 0264

0.00988

FD 2FD 2FD 2FD 2

FD 3FD 3FD 3FD 3FD 3

Page 2 of 10

Point Depth (m) K Air (mD) K Liquid (mD) Comment

TUNDRA NORTH HARGRAVE 4-24-12-27

00/04-24-012-27 W1M

PROFILE PERMEAMETER INDEX

41 556.7614 0.0233 0.0062

42 556.8051 0.429 0.251

43 556.8271 0.586 0.363 FD 2

44 556.8394 0.0831 0.0338 FD 2

45 556.8504 104 95.4 FD 2

46 556.8793 31.4 27.4 FD 2

47 556.9114 0.0829 0.0337

48 556.9302 0.68 0.428

49 556.955 0.19 0.0951

50 556.9865 120 111 FD 3

51 557.0064 486 463 FD 3

52 557.0273 0.128 0.0587 FD 3

53 557.0381 116 106 FD 3

54 557.0562 128 118 FD 3

55 557.0781 0.0795 0.032

56 557.1195 0.0221 0.00575

57 557.1547 0.0295 0.00855

58 557.207 18.8 15.9

59 557.2391 0.0478 0.0164

60 557.2804 0.0265 0.0074

61 557.319 0.0365 0.0114

62 557.3634 0.0164 0.00373

63 557.4026 0.029 0.00841

64 557.4414 0.0192 0.00475

65 557.5034 0.217 0.113

66 557.5469 0.0249 0.00681

67 557.5937 0.0324 0.00977

68 557.646 0.02 0.00503

69 557.6891 0.0201 0.00504

70 557.736 0.02 0.00501

71 557.7846 0.025 0.00684

72 557.8359 0.0264 0.00738

73 557.8977 0.0225 0.00591

74 557.9526 0.0208 0.00529

75 557.9973 0.0505 0.0176

76 558.0591 0.0221 0.00575

77 558.0987 0.0247 0.00672

78 558.1305 0.02 0.005

79 558.1825 0.0685 0.0264

80 558.212 0.0328 0.00988

Page 2 of 10

PROFILE PERMEAMETER INDEXTUNDRA NORTH HARGRAVE 4-24-12-27

OO/04-24-01 2-27 W1 M

Point Depth (m) K Air (mD) K Liquid (mD) Comment

81828384858687888990919293949596979899

1001011021031041051061071081091 101111 121 131141 151 161171 181 19120

558.2283558. 2644558. 3022558. 371 7558.3996558.4237558.451 2558.4987558. 548 1

558. 5959558.6556558.6956558.71 95558. 7467558. 7699558. 8051558. 8292558. 8794558. 9531559.041 8559. 0951559. 1 638559. 3046559. 3549559.4205559.4776559.51 17559. 5449559. 5786560.2763560. 3367

560.51 2560. 545

560. 5947560.6943560. 7539

560. 798560. 8202560. 8379560. 8532

0.071 50.01 5

0.01 870. 024

0.03010.051 50.08410. 0796

0.1530.136

0. 03480. 02960. 03780. 06920. 03320.03310. 03460.021 80. 03580. 04750. 05950.03750. 0272

0.0310. 02430. 05790. 03990.03070. 02630.01 960. 02530.02210. 02350.02010. 0226

1 29082.9462124593

0. 02780.003350.004550.006450.00881

0.01 820. 03440.03210. 07330. 06350.01 07

0.008610.01 2

0. 02670.01 01

0.010.01 06

0.005640.01 120.01 63

0. 0220.01 19

0.007680.0091 90.00655

0.02120.01 29

0. 009040.007320.004850.006960.005740.006260. 005040.00594

1 25075.6440115568

FD 4FD 4FD 4FD 4

Page 3 of 10

Point Depth (m) K Air (mD) K Liquid (mD) Comment

TUNDRA NORTH HARGRAVE 4-24-12-27

00/04-24-012-27 W1M

PROFILE PERMEAMETER INDEX

81 558.2283 0.0715 0.0278

82 558.2644 0.015 0.00335

83 558.3022 0.0187 0.00455

84 558.3717 0.024 0.00645

85 558.3996 0.0301 0.00881

86 558.4237 0.0515 0.0182

87 558.4512 0.0841 0.0344

88 558.4987 0.0796 0.0321

89 558.5481 0.153 0.0733

90 558.5959 0.136 0.0635

91 558.6556 0.0348 0.0107

92 558.6956 0.0296 0.00861

93 558.7195 0.0378 0.012

94 558.7467 0.0692 0.0267

95 558.7699 0.0332 0.0101

96 558.8051 0.0331 0.01

97 558.8292 0.0346 0.0106

98 558.8794 0.0218 0.00564

99 558.9531 0.0358 0.0112

100 559.0418 0.0475 0.0163

101 559.0951 0.0595 0.022

102 559.1638 0.0375 0.0119

103 559.3046 0.0272 0.00768

104 559.3549 0.031 0.00919

105 559.4205 0.0243 0.00655

106 559.4776 0.0579 0.0212

107 559.5117 0.0399 0.0129

108 559.5449 0.0307 0.00904

109 559.5786 0.0263 0.00732

110 560.2763 0.0196 0.00485

111 560.3367 0.0253 0.00696

112 560.512 0.0221 0.00574

113 560.545 0.0235 0.00626

114 560.5947 0.0201 0.00504

115 560.6943 0.0226 0.00594

116 560.7539 1290 1250

117 560.798 82.9 75.6 FD 4

118 560.8202 462 440 FD 4

119 560.8379 124 115 FD 4

120 560.8532 593 568 FD 4

Page 3 of 10

PROFILE PERMEAMETER INDEXTUNDRA NORTH HARGRAVE 4-24-12-27

OO/04-24-01 2-27 W1 M

Point Depth (m) K Air (mD) K Liquid (mD) Comment

121122123124125126127128129130131132133134135136137138139140141142143144145146147148149150151152153154155156157158159160

560.871 1

560. 8837561 .0829561.1 143561 . 1 469563. 0239563. 0581563.2058563. 2324563.2551563.2727

563.291563.31 1

563. 3442563.41 9

563.4433563.4655563.4846563.51 25563. 5462563. 5785563.6469563.6636563.6905563. 7394563. 7834563.81 18563. 8439563. 8759563.891 9563. 921 4563. 9578

563. 976563. 9948

564. 02564. 0405564. 0506564. 0658564. 0788564. 1 082

2221200

0. 03470.01 530.01 85

0. 3377.92196

29. 1

35433.7

0. 04660. 04930. 08060. 0488

1 7.21 6.2

0.01 777.823882819. 7846.7124

0.51 8161142

22.41.336.9842.6

0. 04877.845.243.696.9167213909

2580

2081160

0.01 070.003420.00449

0.1896.31183

25.3335

29.50.01 590.01 710. 03250.01 69

1 4.51 3.6

0.004216.223682657.9141.6115

0.314150131

19.10.91 5

5.537.7

0.01 6270.640.238.688.6155200875

251 0

FD 4FD 4

SP 5SP 5

SP 6SP 6

FD 7FD 7FD 7FD 7FD 7

SP 8SP 8

Page 4 of 10

Point Depth (m) K Air (mD) K Liquid (mD) Comment

TUNDRA NORTH HARGRAVE 4-24-12-27

00/04-24-012-27 W1M

PROFILE PERMEAMETER INDEX

121 560.8711 222 208 FD 4

122 560.8837 1200 1160 FD 4

123 561.0829 0.0347 0.0107

124 561.1143 0.0153 0.00342

125 561.1469 0.0185 0.00449

126 563.0239 0.337 0.189

127 563.0581 7.92 6.31

128 563.2058 196 183

129 563.2324 29.1 25.3

130 563.2551 354 335

131 563.2727 33.7 29.5

132 563.291 0.0466 0.0159 SP 5

133 563.311 0.0493 0.0171 SP 5

134 563.3442 0.0806 0.0325

135 563.419 0.0488 0.0169

136 563.4433 17.2 14.5

137 563.4655 16.2 13.6

138 563.4846 0.0177 0.00421

139 563.5125 7.82 6.22

140 563.5462 388 368 SP 6

141 563.5785 281 265 SP 6

142 563.6469 9.78 7.91

143 563.6636 46.7 41.6

144 563.6905 124 115

145 563.7394 0.518 0.314

146 563.7834 161 150 FD 7

147 563.8118 142 131 FD 7

148 563.8439 22.4 19.1 FD 7

149 563.8759 1.33 0.915 FD 7

150 563.8919 6.98 5.5 FD 7

151 563.9214 42.6 37.7

152 563.9578 0.048 0.0162

153 563.976 77.8 70.6

154 563.9948 45.2 40.2

155 564.02 43.6 38.6

156 564.0405 96.9 88.6

157 564.0506 167 155

158 564.0658 213 200

159 564.0788 909 875 SP 8

160 564.1082 2580 2510 SP 8

Page 4 of 10

PROFILE PERMEAMETER INDEXTUNDRA NORTH HARGRAVE 4-24-12-27

OO/04-24-01 2-27 W1 M

Point Depth (m) K Air (mD) K Liquid (mD) Comment

161162163164165166167168169170171172173174175176177178179180181182183184185186187188189190191192193194195196197198199200

564. 1 21564.1515564. 1 827564. 1 969564.2252564.2522564.2776564. 3086564. 3441564. 3749

564.41 8564.4543564.4763564.4988564. 5239564. 5476

564. 573564. 5879564.6014564. 6254564.651 6564.6789564.71 89564. 7474564. 761 2564. 7758564. 7954564.81 51564. 8408564. 8648564. 8887

564.91 2564. 9632

564.981564. 9953565.01 18565. 0295565. 0459

565. 079565. 1 063

22301790886

0.1040. 0798

0.2930.142

0.790. 5960.1870.01 90. 0230.111

1 7.33793994599.24104453420469

0. 086839725726871.12548.8415317425

45029030930249

3321 .870.37

21 701 740852

0.04510.0321

0.160. 0667

0. 5090.37

0.09310.004660.00609

0. 04921 4.63593784377.4695.3431399446

0. 035837624225264. 52397.07141162

21.5429273291285

43.83141.33

0.21 1

SP 8

FD 9FD 9FD 9FD 9FD 9FD 9

FD 10FD 10FD 10FD 10FD 10FD 10

FD 11FD 11FD 11FD 11FD 11FD 11

Page 5 of 10

Point Depth (m) K Air (mD) K Liquid (mD) Comment

TUNDRA NORTH HARGRAVE 4-24-12-27

00/04-24-012-27 W1M

PROFILE PERMEAMETER INDEX

161 564.121 2230 2170 SP 8

162 564.1515 1790 1740

163 564.1827 886 852

164 564.1969 0.104 0.0451

165 564.2252 0.0798 0.0321

166 564.2522 0.293 0.16

167 564.2776 0.142 0.0667

168 564.3086 0.79 0.509

169 564.3441 0.596 0.37

170 564.3749 0.187 0.0931

171 564.418 0.019 0.00466

172 564.4543 0.023 0.00609

173 564.4763 0.111 0.0492

174 564.4988 17.3 14.6

175 564.5239 379 359

176 564.5476 399 378

177 564.573 459 437 FD 9

178 564.5879 9.24 7.46 FD 9

179 564.6014 104 95.3 FD 9

180 564.6254 453 431 FD 9

181 564.6516 420 399 FD 9

182 564.6789 469 446 FD 9

183 564.7189 0.0868 0.0358

184 564.7474 397 376 FD 10

185 564.7612 257 242 FD 10

186 564.7758 268 252 FD 10

187 564.7954 71.1 64.5 FD 10

188 564.8151 254 239 FD 10

189 564.8408 8.84 7.07 FD 10

190 564.8648 153 141

191 564.8887 174 162

192 564.912 25 21.5

193 564.9632 450 429 FD 11

194 564.981 290 273 FD 11

195 564.9953 309 291 FD 11

196 565.0118 302 285 FD 11

197 565.0295 49 43.8 FD 11

198 565.0459 332 314 FD 11

199 565.079 1.87 1.33

200 565.1063 0.37 0.211

Page 5 of 10

PROFILE PERMEAMETER INDEXTUNDRA NORTH HARGRAVE 4-24-12-27

OO/04-24-01 2-27 W1 M

Point Depth (m) K Air (mD) K Liquid (mD) Comment

201202203204205206207208209210211212213214215216217218219220221222223224225226227228229230231232233234235236237238239240

565. 1 263565. 1 662565. 1 989565.2206565.2526565.275

565. 321 4565. 3521565. 3827565.41 26565.4368565.4635565.501 6565. 5402565. 5634565.61 39565.6469565.6657565.6866565.71 63565. 7368565. 7585565. 7906565. 8338565. 8492565. 8784565. 9028565. 9287565. 9463565. 9565

565.971565. 9885566.001 9

566. 025566. 048

566.1 1 18566. 1 444566. 1 733566. 1 955

566.21 6

2.351 .43

0.71 1

5. 5866.8143

60.4127

80.61 7.843.547.553.730.833.273. 1

94. 8151302712

1 54093.5

9669. 1

0.12434721915839435538.8

4586.5

0. 5571 9.20.76

0.1078.685.6440.4

1.710. 9940.4514.3360.2132

54. 3117

73.215.138.542.248. 1

26.829. 1

66. 1

86.6140286682

1 49085.487.762.4

0. 056432920514737333734. 2

4078.7

0. 3421 6.3

0.4870. 0468

6.934.3835. 7

FD 12FD 12FD 12FD 12FD 12FD 12FD 12

FD 13FD 13FD 13

Page 6 of 10

Point Depth (m) K Air (mD) K Liquid (mD) Comment

TUNDRA NORTH HARGRAVE 4-24-12-27

00/04-24-012-27 W1M

PROFILE PERMEAMETER INDEX

201 565.1263 2.35 1.71

202 565.1662 1.43 0.994

203 565.1989 0.711 0.451

204 565.2206 5.58 4.33

205 565.2526 66.8 60.2

206 565.275 143 132

207 565.3214 60.4 54.3

208 565.3521 127 117

209 565.3827 80.6 73.2

210 565.4126 17.8 15.1

211 565.4368 43.5 38.5

212 565.4635 47.5 42.2

213 565.5016 53.7 48.1

214 565.5402 30.8 26.8

215 565.5634 33.2 29.1

216 565.6139 73.1 66.1

217 565.6469 94.8 86.6

218 565.6657 151 140

219 565.6866 302 286

220 565.7163 712 682

221 565.7368 1540 1490

222 565.7585 93.5 85.4

223 565.7906 96 87.7

224 565.8338 69.1 62.4

225 565.8492 0.124 0.0564

226 565.8784 347 329

227 565.9028 219 205

228 565.9287 158 147 FD 12

229 565.9463 394 373 FD 12

230 565.9565 355 337 FD 12

231 565.971 38.8 34.2 FD 12

232 565.9885 45 40 FD 12

233 566.0019 86.5 78.7 FD 12

234 566.025 0.557 0.342 FD 12

235 566.048 19.2 16.3

236 566.1118 0.76 0.487

237 566.1444 0.107 0.0468

238 566.1733 8.68 6.93 FD 13

239 566.1955 5.64 4.38 FD 13

240 566.216 40.4 35.7 FD 13

Page 6 of 10

PROFILE PERMEAMETER INDEXTUNDRA NORTH HARGRAVE 4-24-12-27

OO/04-24-01 2-27 W1 M

Point Depth (m) K Air (mD) K Liquid (mD) Comment

241242243244245246247248249250251252253254255256257258259260261262263264265266267268269270271272273274275276277278279280

566.2409566.2568566.2701566.2905566.31 22566. 3498566. 3767566.41 78566.4582566.4973566. 5384566.561 7566. 5731566.61 47566.6296566.6487566.6687566. 7224566. 7527566. 7847566.81 02566. 8326566. 8646566. 8834566. 9059566. 9543566. 9796567. 0031567. 0235567.0401567.061 8567. 1 062567. 1 371567.2005567.2292567.2459567. 2664567. 3036567. 3367567. 3691

4.391 1.8

110. 0236

0.1 7144.92.42

0. 09470.245

0. 04241 6.3252

47.60.1 13

0.3341.124.976.72.952.151 .22

0.468125

0. 95950.55.85

270. 0937

30. 1

1 5.80.42523.31.34

0.1 190.436

69.30.256

0.140.1692.94

3. 389.718.94

0.006290. 0838

39.91.770.040.13

0.0141 3.7237

42.40. 0497

0.18536.321.569.52.2

1.560. 8350.279

1150.63745. 1

4. 5623.4

0. 039426.21 3.2

0.24920

0.920. 0536

0.25662.6

0.1360. 06550. 0822

2.2

FD 13FD 13FD 13

SP 14SP 14SP 14

FD 15FD 15FD 15FD 15SP 16SP 16SP 16

FD 17

Page 7 of 10

Point Depth (m) K Air (mD) K Liquid (mD) Comment

TUNDRA NORTH HARGRAVE 4-24-12-27

00/04-24-012-27 W1M

PROFILE PERMEAMETER INDEX

241 566.2409 4.39 3.38 FD 13

242 566.2568 11.8 9.71 FD 13

243 566.2701 11 8.94 FD 13

244 566.2905 0.0236 0.00629

245 566.3122 0.171 0.0838

246 566.3498 44.9 39.9

247 566.3767 2.42 1.77

248 566.4178 0.0947 0.04

249 566.4582 0.245 0.13

250 566.4973 0.0424 0.014

251 566.5384 16.3 13.7

252 566.5617 252 237

253 566.5731 47.6 42.4

254 566.6147 0.113 0.0497 SP 14

255 566.6296 0.33 0.185 SP 14

256 566.6487 41.1 36.3 SP 14

257 566.6687 24.9 21.5

258 566.7224 76.7 69.5

259 566.7527 2.95 2.2 FD 15

260 566.7847 2.15 1.56 FD 15

261 566.8102 1.22 0.835 FD 15

262 566.8326 0.468 0.279 FD 15

263 566.8646 125 115 SP 16

264 566.8834 0.959 0.637 SP 16

265 566.9059 50.5 45.1 SP 16

266 566.9543 5.85 4.56

267 566.9796 27 23.4

268 567.0031 0.0937 0.0394

269 567.0235 30.1 26.2

270 567.0401 15.8 13.2

271 567.0618 0.425 0.249

272 567.1062 23.3 20

273 567.1371 1.34 0.92

274 567.2005 0.119 0.0536

275 567.2292 0.436 0.256

276 567.2459 69.3 62.6

277 567.2664 0.256 0.136

278 567.3036 0.14 0.0655

279 567.3367 0.169 0.0822

280 567.3691 2.94 2.2 FD 17

Page 7 of 10

PROFILE PERMEAMETER INDEXTUNDRA NORTH HARGRAVE 4-24-12-27

OO/04-24-01 2-27 W1 M

Point Depth (m) K Air (mD) K Liquid (mD) Comment

281282283284285286287288289290291292293294295296297298299300301302303304305306307308309310311312313314315316317318319320

567. 3943567.41 6

567.4359567.4548567.4926567. 5331

567.561567. 5966567.61 '76567. 6404567. 6564567.6872567. 7035567. 7241567. 7521567. 781 4

567. 807567. 8254567. 8623567. 8894567. 9423567. 9747568. 0097568. 0323568. 0781

568.1 14568. 1 61 7568. 1 932568.2223568.2585568.2979568. 3322568. 3684568. 3936568.4344568.4868568. 51 48568. 5391568.561 1

568.601 2

1.7689.96.0494. 746.21 1.333.7

0. 99850.4

0.4071 0.93.4332.397.2137

54. 30.612.18

0.1550. 0892

3.443.1

0.1 160.36

0.4660.1540.1640.252

3. 530.72

0.081 90.536

1 .083.26

0.07411 .432.97

0. 9720.12

0.1 76

1 .2581.94.7386. 7

419.2429.5

0. 66244.9

0.2368.892.6

28.288.9127

48.70.381.58

0.07430.0371

2.62.32

0. 051 70.2050.277

0. 07360. 0795

0.1342.66

0.4570.0331

0. 3260. 7242.46

0.02910. 9882.22

0.6470. 054

0. 0865

FD 17FD 17FD 17FD 17

FD 18FD 18FD 18FD 18

Page 8 of 10

Point Depth (m) K Air (mD) K Liquid (mD) Comment

TUNDRA NORTH HARGRAVE 4-24-12-27

00/04-24-012-27 W1M

PROFILE PERMEAMETER INDEX

281 567.3943 1.76 1.25 FD 17

282 567.416 89.9 81.9 FD 17

283 567.4359 6.04 4.73 FD 17

284 567.4548 94.7 86.7 FD 17

285 567.4926 46.2 41

286 567.5331 11.3 9.24

287 567.561 33.7 29.5

288 567.5966 0.998 0.662

289 567.6176 50.4 44.9

290 567.6404 0.407 0.236

291 567.6564 10.9 8.89

292 567.6872 3.43 2.6

293 567.7035 32.3 28.2

294 567.7241 97.2 88.9

295 567.7521 137 127

296 567.7814 54.3 48.7

297 567.807 0.61 0.38

298 567.8254 2.18 1.58

299 567.8623 0.155 0.0743

300 567.8894 0.0892 0.0371

301 567.9423 3.44 2.6

302 567.9747 3.1 2.32

303 568.0097 0.116 0.0517

304 568.0323 0.36 0.205

305 568.0781 0.466 0.277

306 568.114 0.154 0.0736

307 568.1617 0.164 0.0795

308 568.1932 0.252 0.134

309 568.2223 3.53 2.66

310 568.2585 0.72 0.457

311 568.2979 0.0819 0.0331

312 568.3322 0.536 0.326

313 568.3684 1.08 0.724

314 568.3936 3.26 2.46

315 568.4344 0.0741 0.0291

316 568.4868 1.43 0.988 FD 18

317 568.5148 2.97 2.22 FD 18

318 568.5391 0.972 0.647 FD 18

319 568.5611 0.12 0.054 FD 18

320 568.6012 0.176 0.0865

Page 8 of 10

PROFILE PERMEAMETER INDEXTUNDRA NORTH HARGRAVE 4-24-12-27

OO/04-24-01 2-27 W1 M

Point Depth (m) K Air (mD) K Liquid (mD) Comment

321322323324325326327328329330331332333334335336337338339340341342343344345346347348349350351352353354355356357358359360

568.6308568.6647568.71 81568. 7542568. 7932568. 8305568. 8561568. 8822

568.9568. 9294568. 9691569. 0009569. 0324569. 0727

569. 1 1 1

569. 1 396569. 1 699

569. 1 93569.2272569.258

569.321 8569. 3684569.406

569.4452569.4909569. 5549569. 5855569.61 58569.6683569.6931569. 7231569. 7869569. 8351569. 8821569.91 93569. 9648570.0071570. 0448

570. 085570. 1 024

0.350.4060. 0530.2360.2060. 3630. 3580.244

1 7.8338

0.2470.0381

5.1 1

0.1950. 0959

0. 7480.191

0.150.1442.8

0. 3460.162

0. 05520.202

0.31.34

0. 869343

21.34.7

0. 03670. 357

0. 02250.01 13

2.053.28

132.624.3

9. 58

0.1980.235

0.01 880.1240.1050.2060.2030.129

15320

0.1310.01 21

3.970.09810. 0406

0.4780. 09570.071 30. 0655

37.90.195

0. 07850.01 99

0.1020.1650.91 90. 568

3241 8.23.62

0.01 150.202

0.005910.00223

1 .482.471 0.71 .933.287. 75

FD 19FD 19FD 19FD 19FD 19

FD 20FD 20FD 20FD 20

Page 9 of 10

Point Depth (m) K Air (mD) K Liquid (mD) Comment

TUNDRA NORTH HARGRAVE 4-24-12-27

00/04-24-012-27 W1M

PROFILE PERMEAMETER INDEX

321 568.6308 0.35 0.198

322 568.6647 0.406 0.235

323 568.7181 0.053 0.0188

324 568.7542 0.236 0.124

325 568.7932 0.206 0.105

326 568.8305 0.363 0.206 FD 19

327 568.8561 0.358 0.203 FD 19

328 568.8822 0.244 0.129 FD 19

329 568.9 17.8 15 FD 19

330 568.9294 338 320 FD 19

331 568.9691 0.247 0.131

332 569.0009 0.0381 0.0121

333 569.0324 5.11 3.97

334 569.0727 0.195 0.0981

335 569.111 0.0959 0.0406 FD 20

336 569.1396 0.748 0.478 FD 20

337 569.1699 0.191 0.0957 FD 20

338 569.193 0.15 0.0713 FD 20

339 569.2272 0.14 0.0655

340 569.258 42.8 37.9

341 569.3218 0.346 0.195

342 569.3684 0.162 0.0785

343 569.406 0.0552 0.0199

344 569.4452 0.202 0.102

345 569.4909 0.3 0.165

346 569.5549 1.34 0.919

347 569.5855 0.869 0.568

348 569.6158 343 324

349 569.6683 21.3 18.2

350 569.6931 4.7 3.62

351 569.7231 0.0367 0.0115

352 569.7869 0.357 0.202

353 569.8351 0.0225 0.00591

354 569.8821 0.0113 0.00223

355 569.9193 2.05 1.48

356 569.9648 3.28 2.47

357 570.0071 13 10.7

358 570.0448 2.62 1.93

359 570.085 4.3 3.28

360 570.1024 9.58 7.75

Page 9 of 10

PROFILE PERMEAMETER INDEXTUNDRA NORTH HARGRAVE 4-24-12-27

00/04-24-01 2-27 W1 M

Point Depth (m) K Air (mD) K Liquid (mD) Comment

361362363364365366367368369370371372373374375376377378379380381382383384385386

570. 1 732570. 1 952570.2391570. 2754570. 3038570.341 6570. 3798

570.41570.436

570.4695570.499

570.541 3570. 5805570.624

570.6872570. 7239570. 7524570. 7973570. 8229570. 8731570.921 3570. 9806571 .0253

571 .086571 . 1 444571.1831

7.480. 077

94. 70.495

68. 1

2.487.43506

0.4840.12

0. 9863.84449

0. 09680. 0294

0.2330. 05250. 0643

300. 08390. 0644

1 7.30. 0952

0.770.0661

0.501

5.930. 0307

86.40.298

61.61 .835.89483

0.2890.0541

0.6582.94427

0.04120.00852

0.1220.01 860. 0243

26. 1

0. 03420. 0243

1 4.60. 0403

0.4980. 0252

0. 303

Page 10 of 10

Point Depth (m) K Air (mD) K Liquid (mD) Comment

TUNDRA NORTH HARGRAVE 4-24-12-27

00/04-24-012-27 W1M

PROFILE PERMEAMETER INDEX

361 570.1732 7.48 5.93

362 570.1952 0.077 0.0307

363 570.2391 94.7 86.4

364 570.2754 0.495 0.298

365 570.3038 68.1 61.6

366 570.3416 2.48 1.83

367 570.3798 7.43 5.89

368 570.41 506 483

369 570.436 0.484 0.289

370 570.4695 0.12 0.0541

371 570.499 0.986 0.658

372 570.5413 3.84 2.94

373 570.5805 449 427

374 570.624 0.0968 0.0412

375 570.6872 0.0294 0.00852

376 570.7239 0.233 0.122

377 570.7524 0.0525 0.0186

378 570.7973 0.0643 0.0243

379 570.8229 30 26.1

380 570.8731 0.0839 0.0342

381 570.9213 0.0644 0.0243

382 570.9806 17.3 14.6

383 571.0253 0.0952 0.0403

384 571.086 0.77 0.498

385 571.1444 0.0661 0.0252

386 571.1831 0.501 0.303

Page 10 of 10

PROFILE PERMEAMETRY

TUNDRA NORTH HARGRAVE 4-24-12-27 W1MJURASSIC / LODGEPOLE ( 553.00 - 572.00 m )

10 cm - 24.0 mCore Laboratories Canada Ltd.

TUNDRA OIL & GAS PARTNERSHIP

GAMMA RAY (API)

1:240MD in M

DEPTH PROFILE PERMEABILITY

Total Gamma0 API 150

Uranium Free Gamma0 API 150

Profile Permeability Kair0.001 MD 10,000

545

550

555

560

565

570

575

GAMMA RAY (API)

1:240MD in M

DEPTH PROFILE PERMEABILITY

Total Gamma0 API 150

Uranium Free Gamma0 API 150

Profile Permeability Kair0.001 MD 10,000

C~~&Q

C~~W+

PROFILE PERMEAMETRY

TUNDRA NORTH HARGRAVE 4-24-12-27 W1MJURASSIC / LODGEPOLE ( 553.00 - 572.00 m )

10 cm - 4.8 mCore Laboratories Canada Ltd.

TUNDRA OIL & GAS PARTNERSHIP

GAMMA RAY (API)

1:48MD in M

DEPTH PROFILE PERMEABILITY

Total Gamma0 API 150

Uranium Free Gamma0 API 150

Profile Permeability Kair0.001 MD 10,000

552.5

555

557.5

560

562.5

565

567.5

570

572.5

GAMMA RAY (API)

1:48MD in M

DEPTH PROFILE PERMEABILITY

Total Gamma0 API 150

Uranium Free Gamma0 API 150

Profile Permeability Kair0.001 MD 10,000

PROFILE PERMEAMETRY

TUNDRA NORTH HARGRAVE 4-24-12-27 W1MJURASSIC / LODGEPOLE (553.00 - 572.00 m )

10 cm - 4.8 cmCore Laboratories Canada Ltd.

TUNDRA OIL & GAS PARTNERSHIP

CORE GAMMAGRAIN DENSITY

1:48MD in M

DEPTH PERMEABILITY PERMEABILITY POROSITYBULK DENSITY INDEX

Total Gamma0 API 150

Core Grain Density2500 KG/M3 3500

Profile Permeameter Kair0.001 MD 10,000

Permeability Kmax0.001 MD 10,000

Permeability Kv0.001 MD 10,000

Profile Permeameter Kair0.001 MD 10,000

Profile Permeameter Kliquid0.001 MD 10,000

Helium Porosity0 FRACTION 0.4

Bulk Density Index2 GM/CC 3

552.5

555

557.5

560

562.5

565

567.5

570

572.5

CORE GAMMAGRAIN DENSITY

1:48MD in M

DEPTH PERMEABILITY PERMEABILITY POROSITYBULK DENSITY INDEX

Total Gamma0 API 150

Core Grain Density2500 KG/M3 3500

Profile Permeameter Kair0.001 MD 10,000

Permeability Kmax0.001 MD 10,000

Permeability Kv0.001 MD 10,000

Profile Permeameter Kair0.001 MD 10,000

Profile Permeameter Kliquid0.001 MD 10,000

Helium Porosity0 FRACTION 0.4

Bulk Density Index2 GM/CC 3

Innovation, Energy and Mines

INITIALPRODUCTION REPORT

Two (2) copies of this report are to be completed and submitted to the dishict office within days

following the fifth after the well has been placed on normal production.

Completion Interval(s): 562.5 m to 565.0 m mto m

Open Hole: Perforated: H

Completion Oil:Source of Completion Oil (Co. & location):

Formation: ~Re olith

Volume Supplied: m3

Date Supplied:* / /YY MM DD

(Continue on separate sheet ifnecessary)

Disposition of Recovered Completion Oil:

On-Production Date:e 15/8/21

YY MM DD

m3

(Co. & location)

* Official on-production date (i.e. date of first new oil production after completion oil recovered).* Date in which the well produces oil in excess of the volume of completion oil used.

Production Test:

W. R. Jenkins V.P. Prod. 0 erations 204-748-3095(Submitted By) (Position) (Telephone)

Remarks: Au st 21 2015 12.0m3 new oil recovered u on com letion

INITIAL PRODUCTION REPORT

Two (2) copies of this report are to be completed and submitted to the district office within days

following the fifth after the well has been placed on normal production.

Well Name:

Tundra North Hargrave Lic #10414 04-24-012-27W1

License Number:

Operating Company: Tundra Oil And Gas Partnership

Battery Well Produced To (name & locations): 04-23-12-27 Battery

Completion Interval(s): 562.5 m to 565.0 m m to m

Open Hole: Perforated: Formation: Regolith

Completion Oil:

Source of Completion Oil (Co. & location):

Volume Supplied: m3

Date Supplied:* / /

YY MM DD

Date

YY MM DD DD

Completion Oil

Used

(m3)

Completion Oil

Recovered (m3)

Completion Oil

To Be Recovered

(m3)

Water

Produces (m3)

(Continue on separate sheet if necessary)

Disposition of Recovered Completion Oil: m3 to

(Co. & location)

On-Production Date:* 15/8/21

YY MM DD

* Official on-production date (i.e. date of first new oil production after completion oil recovered).

* Date in which the well produces oil in excess of the volume of completion oil used.

Production Test:

Date

YY MM DD DD

Hours

Produced

Oil

Produced

m3

Water

Produced

m3

Pumping Flowing Gas-Oil

Ratio

(m3/ m3)

Oil

Density

(kg/ m3)

16 1 14 24 47.1 21.2 x 20.0 0.8799

16 1 15 22 51.3 10.2 x 20.0 0.8799

16 1 16 22 58.1 3.2 x 20.0 0.8799

16 1 17 24 62.4 3.7 x 20.0 0.8799

16 1 18 24 62.5 3.8 x 20.0 0.8799

Totals 114

116

281.4

42.1

W. R. Jenkins V.P. Prod. Operations 204-748-3095

(Submitted By) (Position) (Telephone)

Remarks: August 21, 2015 12.0m3 new oil recovered upon completion