of
CPA
ALC
SEPT 2021
NOVA PARKS
FOUR MILE RUN BRIDGE #2
1
4
RDG
1PLAN AND ELEVATION
Sheet No.
INDEX OF SHEETS
Description
LBCY CY
Steel
Reinforcing
Excav.
Struct.
Class A3
Concrete
Piles
Sheet
Reconstr.
Abutment
Masonry
Stone
SFSF
Total
ESTIMATED QUANTITIES
backwall
Face of
backwall
Back of
backwall
Back of
backwall
Face of
masonry wall
Face of
WEST ABUTMENT EAST ABUTMENTPLANNOT TO SCALE
+7'-11"
Edge of stream Edge of stream
Edge of stream
Timber deck
Asphalt Approach Asphalt Approach
Conduit pipe
Repair
Previousmasonry wall
Face of
FO
UR
MIL
E
RU
N
ELEVATIONNOT TO SCALE
FillFill
FillFill
+33'-0"
Finished grade
2'-
0"
min.
14'-
4"
4
3
2
1
14'-
6"
+
East Abutment
+North e
nd 14'-
4"
+So
uth e
nd 14'-
9"
Reinforcing Schedule and Bar Bending Diagrams
East Abutment Repair 2
East Abutment Repair 1
Plan, General Notes, and Estimated Quantities
span a
Face of rail
Face of rail
79
79
6
6
188
188
Ordinary high water
434
434
Finished grade
Edge of stream
geotechnical engineer will be on site.
Contractor shall be responsible to coordinate when the
depth will be considered a change to the original contract. The
to firm soils. Any additional work necessary to achieve this
NOVA Parks will hire a geotechnical engineer to verify the depth 18.
abutments remove temporary support.
After final inspection and approval of reconstructed bridge 17.
Repoint the east and west abutments. 16.
possibly finishing the placement with dry-packed concrete.
surface. The top course may require pumping the concrete or
be placed behind the stones filling to the undisturbed soil
Following placement of each course of stone, concrete should 15.
mortar sets.
Stones shall be gently placed with full mortar joints before 14.
and shall be set on a clean and well moistened mortar bed.
Each stone shall be cleaned and moistened before placement 13.
abutment breastwall.
Replace any missing stones discovered on the east and west 12.
armour, watching the original exterior face.
time, placing single row of stone inset 1'-6" around perimeter of
Replace and rebuild east abutment breastwall one course at 11.
5'-0" below the top of masonry abutment wall.
Place concrete along abutments as shown on the plans up to 10.
questionable support revealed through de-watering.
Remove any loose masonry and stabilize any masonry with 9.
de-water inside of sheeting.
Excavate approximately 2'-0" to 3'-0" of soil to firm material and 8.
abutment, embedded approximately 4'-0" below mud line.
Install sheeting, allowing minimum of 1'-6" from face of original 7.
stones available.
Probe creek in vicinity of bridge to salvage all large facing 6.
to protect workers and avoid damage to stones.
Remove stones with care for abutment reconstruction in order 5.
Concrete armour for abutments shall rest on firm material.4.
shall be Type S (f'm = 1800psi).
Mortar between masonry stones on reconstructed abutments 3.
subject to fabrication and construction tolerances.
to center of bars except where otherwise noted and are
60. All reinforcing bar dimensions on the detailed drawings are
Deformed reinforcment bars shall conform to ASTM A615, Grade 2.
Concrete in abutment shall be class A3 (f'c =3000psi).1.
Notes:
6
6
Brid
ge 2_S1_Pla
n and
Ele
vatio
n.d
gn
Plan No.STRUCTURE AND BRIDGE DIVISION Sheet No.
Checked: ..........
Designed: .........
Drawn: ..............
DATE: ...................................
FINAL PLAN REVISIONS SUBMITTAL DATE:
$DATE$Date & Time:
Plotted by:$USER
ProjectWise File Location: \$PWVARVAULTPATHDESC$
Pe
nTable:$
PE
NT
BLS$
$P
LT
DR
VS$
Plot
Driv
er :
ROUTE
FEDERAL AID
PROJECT ROUTE PROJECT
STATE SHEET
NO.
VA.
STATE
NO. DATE AUTH. DESCRIPTION NO. DATE AUTH. DESCRIPTION
10'-
3"
span a
33'-0"
PRIME AE Group, Inc.
of
CA
ALC
SEPT 2021
NOVA PARKS
FOUR MILE RUN BRIDGE #2
2
4
RDG
2EAST ABUTMENT REPAIR 1
A
A
masonry wall)
replace in kind (on
Stones salvaged and
abutment
Stone masonry
masonry wall)
replace in kind (on
Stones salvaged and
5'-0"
1'-
6"
+
wingwall
Stone masonry
wingwall
Stone masonry
C2 3
C2 3
B32
B2 3
E2 3
E32
D2 3
D32
LEGEND:
contractor to verify prior to commencing work and repair in kind.
end at the bottom. Dimension of void 10'-8" L x 7'-5" H x 4'-6" D
X = Void in the East Abutment masonry wall and backfill on north
abutment
masonry
Stone
14'-
6"
+
X
repair
concrete
Previous
6'-
6"
Scale: •" = 1'-0"
EAST ABUTMENT REPAIR
SECTION A-A
21'-
0"
+
6'-6"6'-6"14'-6"
1'-6"
AB0507
AB0506
AB0505
AB0504
5"
3"
+2'-6"
AB0503
10"
7-AB0502 spa.
@ 1'-0" = 6'-0"
Breastwall Armour
Brid
ge 2_S2_
East
Abut
me
nt-1.d
gn
Plan No.STRUCTURE AND BRIDGE DIVISION Sheet No.
Checked: ..........
Designed: .........
Drawn: ..............
DATE: ...................................
FINAL PLAN REVISIONS SUBMITTAL DATE:
$DATE$Date & Time:
Plotted by:$USER
ProjectWise File Location: \$PWVARVAULTPATHDESC$
Pe
nTable:$
PE
NT
BLS$
$P
LT
DR
VS$
Plot
Driv
er :
ROUTE
FEDERAL AID
PROJECT ROUTE PROJECT
STATE SHEET
NO.
VA.
STATE
NO. DATE AUTH. DESCRIPTION NO. DATE AUTH. DESCRIPTION
3"
+
+
15-AB0501 spa. @ 1'-0" = 14'-0"
3'-
7"
3"
Spa.
@ 10"
max.
= 3'-
1"
PRIME AE Group, Inc
3" ty
p.
3" ty
p.
3" ty
p.
min.
2'-
0"
3" ty
p.
+7'-5"
min.
2'-
0"
3"
min.
2'-
0"3'-
7"
8-AB0509 @ 1'-0"
7'-11"
5-
AB0508 spa.
@ 10"
max.
of
CA
ALC
SEPT 2021
NOVA PARKS
FOUR MILE RUN BRIDGE #2
3
4
RDG
3EAST ABUTMENT REPAIR 2
abutment
masonry
Stone wingwall
masonry
Stone
abutment
masonry
Stone
wingwall
masonry
Stone
3'-
7"
+
Scale: •" = 1'-0"
D3SECTION 2
E3SECTION 2
AB0510
AB0511
AB0510
AB0511
Repair
Concrete
Existing
AB0503
AB0504
AB0507
AB0503
AB0505
AB0507
AB0505
AB0506AB0506
AB0504
+2'-6"
B3SECTION 2
C3SECTION 2
+1'-6"
+3'-
7"
+to 2'-6"
+Varies 10"
AB0511
AB0510
AB0512
AB0512
AB0509
@ 1'-0" max.
5-AB0508 spa.
max. - 6'-5"
AB0502
AB0511
AB0510
AB0501
Brid
ge 2_S3_
East
Abut
me
nt-2.d
gn
Plan No.STRUCTURE AND BRIDGE DIVISION Sheet No.
Checked: ..........
Designed: .........
Drawn: ..............
DATE: ...................................
FINAL PLAN REVISIONS SUBMITTAL DATE:
$DATE$Date & Time:
Plotted by:$USER
ProjectWise File Location: \$PWVARVAULTPATHDESC$
Pe
nTable:$
PE
NT
BLS$
$P
LT
DR
VS$
Plot
Driv
er :
ROUTE
FEDERAL AID
PROJECT ROUTE PROJECT
STATE SHEET
NO.
VA.
STATE
NO. DATE AUTH. DESCRIPTION NO. DATE AUTH. DESCRIPTION
to 2'-11"Varies 10"
2'-11"
PRIME AE Group, Inc.
- - -- - -
East Abutment (CRR CLASS III)
2-05 2-00 3-01 5 3-01 7-04 114AB0501 15 5 3 3/4 22Breastwall
VARY VARY VARY 0 1/8 VARY 3-08 TO 7-02 39AB0502 7 5 3 3/4 22Breastwall
AB0502 1 A 4 7/8 2-03 7/8 3 7/8 D 4 3/4 1-11 1/8 3 1/8
P 3-01 3-01 0 Q 0 1/8 4 3/4 0 3/4
R 3-01 3-01 0
14-03 1-04 5/8 6-03 6-04 5/820-08 22AB0503 1 5 3 3/4 2Breastwall
14-03 1-05 5/8 6-03 6-04 7/820-08 22AB0504 1 5 3 3/4 2Breastwall
14-03 1-06 5/8 6-03 6-05 1/820-09 22AB0505 1 5 3 3/4 2Breastwall
14-03 1-07 5/8 6-03 6-05 3/820-09 22AB0506 1 5 3 3/4 2Breastwall
14-03 1-08 5/8 6-03 6-05 5/820-09 22AB0507 1 5 3 3/4 2Breastwall
VARY 6-11 TO 7-05 37AB0508 5 5 1WingwallAB0508 1 A 6-11 7-05 1 1/2
3-01 1-00 1-00 4-10 40AB0509 8 5 3 3/4 7Wingwall
18-0018-00 38AB0510 2 5 1Breastwall
20-06 20-06 43AB0511 2 5 1Breastwall
VARY 6-11 TO 7-05 15AB0512 2 5 1Wingwall
AB0512 1 A 6-11 7-05 6
TOTAL WEIGHT IN PRECEDING GROUP OF BARS 434
of
CA
ALC
SEPT 2021
NOVA PARKS
FOUR MILE RUN BRIDGE #2
4
4
RDG
4REINFORCING SCHEDULE
REINFORCING STEEL SCHEDULE DIMENSION TABLE
MARK NO.
SIZE
BAR LOCATION TYPE N
(LBS.)
WEIGHT
BENDING DIAGRAM
DIMENSION VARIATION TABLE
MARK
LEN.
EA.
NO.
SIO
N
DIM
EN-
SIO
N
DIM
EN-
FT-IN
PIN DIA.
FT-IN FT-IN
LENGTH
FT-IN
A
FT-IN
B
FT-IN
C
FT-IN
D
FT-IN
P
E
FT-IN
Q
F
FT-IN
R
G
FT-IN
H
FT-IN
S
I
FT-IN
T
J
FT-IN
U
K
FT-IN
L
FT-IN
V
FT-IN
FROM
FT-IN
TO
FT-IN
VARY BY
FT-IN
FROM
FT-IN
TO
FT-IN
VARY BY
Brid
ge 2_S4_
Reinf
Sche
dule.d
gn
3
in the deck superstructure at no extra cost to the Department.
Straight bars (top and bottom) may be substituted for truss bars (SB series)
alternate bars shall be located in different bays.
Splices shall be located approximately at points of contraflexure and splices in
bars are required, bars shall have the least number of Class B splices possible.
If fabrication of deck slab bar is not possible for length detailed and multiple
Weights in schedule are based on density of 490 lb/ft.
Dimensions in Bending Diagram are out-to-out of bars.
NOTES:
Type 1
A
Type 2
Q
A
P
R
Type 7
B
C
D
Type 22
D
A
Q
P
R
Brid
ge 2_S4_
Reinf
Sche
dule.d
gn
Plan No.STRUCTURE AND BRIDGE DIVISION Sheet No.
Checked: ..........
Designed: .........
Drawn: ..............
DATE: ...................................
FINAL PLAN REVISIONS SUBMITTAL DATE:
$DATE$Date & Time:
Plotted by:$USER
ProjectWise File Location: \$PWVARVAULTPATHDESC$
Pe
nTable:$
PE
NT
BLS$
$P
LT
DR
VS$
Plot
Driv
er :
ROUTE
FEDERAL AID
PROJECT ROUTE PROJECT
STATE SHEET
NO.
VA.
STATE
NO. DATE AUTH. DESCRIPTION NO. DATE AUTH. DESCRIPTION
PRIME AE Group, Inc.
of
DWH
ALC
SEPT 2021
NOVA PARKS
FOUR MILE RUN BRIDGE #3
1
4
RDG
1PLAN AND ELEVATION
Description
Piles
Sheet
Reconstr.
Abutment
Masonry
Stone
SFSF
Total
ESTIMATED QUANTITIES
FillFill
grade
Finished
typical
railing
Approach
Bridge railing
+51'-3
Conduit pipe
grade
Finished
ELEVATIONNOT TO SCALE
+So
uth e
nd 11'-
0"
+North e
nd 4-10" +
So
uth e
nd 1'-
5"
+North e
nd 7-11"
backwall
Face of
backwall
Back of
backwall
Back of
backwall
Face of
masonry wall
Face of
Bridge railing
Timber deck
Bridge railing
Asphalt approach
typical
railing
Approach
stream
Edge of
Conduit pipe
stream
Edge of
Asphalt approach
Edge of stream
Edge of stream
WEST ABUTMENTEAST ABUTMENT
PLANNOT TO SCALE
masonry wall
Face of
1'-
6"
+
9'-11" +
East Abutment
4
3
2
1
Face of rail
Face of rail
span a
Reinforcing Schedule and Rebar Bending Diagrams
East Abutment Repair 2
East Abutment Repair 1
Plan, General Notes, and Estimated Quantities
22
22
4
4
140
140
502
502
CYLBCY
Class A3
Concrete
Steel
Reinforcing
Excav.
Struct.
Sheet No.
INDEX OF SHEETS
FO
UR
MIL
E
RU
N
geotechnical engineer will be on site.
Contractor shall be responsible to coordinate when the
depth will be considered a change to the original contract. The
to firm soils. Any additional work necessary to achieve this
NOVA Parks will hire a geotechnical engineer to verify the depth 18.
abutments remove temporary support.
After final inspection and approval of reconstructed bridge 17.
Repoint the east and west stone masonry abutments.16.
finishing the placement with dry-packed concrete.
The top course may require pumping the concrete or possibly
placed behind the stones filling to the undisturbed soil surface.
Following placement of each course of stone, concrete should be 15.
mortar sets.
Stones shall be gently placed with full mortar joints before 14.
shall be set on a clean and well moistened mortar bed.
Each stone shall be cleaned and moistened before placement and 13.
abutment breastwalls.
Replace any missing stones discovered on east and west 12.
armour, watching the original exterior face.
time, placing single row of stone inset 1'-6" around perimeter of
Replace and rebuild east abutment breastwall one course at 11.
3'-0" below the top of masonry.
Place concrete along abutments as shown on the plans up to 10.
questionable support revealed through de-watering.
Remove any loose masonry and stabilize any masonry with 9.
de-water inside of sheeting.
Excavate approximately 2'-0" to 3'-0" of soil to firm material and 8.
abutment, embedded approximately 4'-0" below mud line.
Install sheeting, allowing minimum of 1'-6" from face of original 7.
stones available.
Probe creek in vicinity of bridge to salvage all large facing 6.
to protect workers and avoid damage to stones.
Remove stones with care for abutment reconstruction in order 5.
Concrete abutments shall rest on firm material.4.
shall be Type S (f'm = 1800psi).
Mortar between masonry stones on reconstructed abutments 3.
subject to fabrication and construction tolerances.
to center of bars except where otherwise noted and are
60. All reinforcing bar dimensions on the detailed drawings are
Deformed reinforcment bars shall conform to ASTM A615, Grade 2.
Concrete in abutment shall be class A3 (f'c =3000psi).1.
Notes:
10
10
Brid
ge 3_S1_Pla
n and
Ele
vatio
n.d
gn
Plan No.STRUCTURE AND BRIDGE DIVISION Sheet No.
Checked: ..........
Designed: .........
Drawn: ..............
DATE: ...................................
FINAL PLAN REVISIONS SUBMITTAL DATE:
$DATE$Date & Time:
Plotted by:$USER
ProjectWise File Location: \$PWVARVAULTPATHDESC$
Pe
nTable:$
PE
NT
BLS$
$P
LT
DR
VS$
Plot
Driv
er :
ROUTE
FEDERAL AID
PROJECT ROUTE PROJECT
STATE SHEET
NO.
VA.
STATE
NO. DATE AUTH. DESCRIPTION NO. DATE AUTH. DESCRIPTION
10'-
3"
span a
51'-3"
6'-
4"
2'-
0"
min.
PRIME AE Group, Inc.
of
CA
ALC
SEPT 2021
NOVA PARKS
FOUR MILE RUN BRIDGE #3
2
4
RDG
2EAST ABUTMENT REPAIR 1
A
A
replace in kind
Missing backfill
wingwall
Stone masonry
C2 3
C2 3
D32
D2 3
LEGEND:
contractor to verify prior to commencing work and repair in kind.
end at the bottom. Dimension of void 6'-7" L x 5'-4" H" x 5'-0" D
X = Void in the East Abutment masonry wall and backfill on south
1'-6" +
21'-
‡"
+
X
Scale: •" = 1'-0"
SECTION A-A
2'-
0"
min
EAST ABUTMENT REPAIR
3" typ.10-AB0501 @ 1'-0"
6'-
8"
+
+1'-11" 1'-0"
masonry wall)
replace in kind (on
Stones salvaged and
abutment
Stone masonry
wingwall
Stone masonry
9'-0"
E32
E3 2
5'-6"
AB0505
AB0506
AB0507
AB0502
AB0508
AB0514
B32
B2 3
5'-
6"
6'-
6‡
"
AB0509
AB0513
6 AB0510 @ 1'-0"
+10"
7 spa.
@ 1'-
0"
max.
Brid
ge 3_S2_
East
Abut
me
nt-1.d
gn
Plan No.STRUCTURE AND BRIDGE DIVISION Sheet No.
Checked: ..........
Designed: .........
Drawn: ..............
DATE: ...................................
FINAL PLAN REVISIONS SUBMITTAL DATE:
$DATE$Date & Time:
Plotted by:$USER
ProjectWise File Location: \$PWVARVAULTPATHDESC$
Pe
nTable:$
PE
NT
BLS$
$P
LT
DR
VS$
Plot
Driv
er :
ROUTE
FEDERAL AID
PROJECT ROUTE PROJECT
STATE SHEET
NO.
VA.
STATE
NO. DATE AUTH. DESCRIPTION NO. DATE AUTH. DESCRIPTION
+
+
+
9'-
0"
7'-0"
PRIME AE Group, Inc.
2'-
0"
min.
of
CA
ALC
SEPT 2021
NOVA PARKS
FOUR MILE RUN BRIDGE #3
3
4
RDG
3EAST ABUTMENT REPAIR 2
wingwall
masonry
Stone
wingwall
masonry
Stone
wingwall
masonry
Stone
B3SECTION 2
C3SECTION 2
D3SECTION 2
Scale: ƒ" = 1'-0"
AB0504
2'-
0"
min.
3" typ.
3"
3"
+8'-11"
+1'-11"
3"
+1'-11"
+6'-
8"
+6'-
8"
AB0514
AB0507
AB0508
AB0506
AB0505
AB0502
AB0512
AB0511
AB0508AB0509
AB0513
AB0511
AB0512
@ 1'-0" max.
8-AB0503 spa.
AB0515
AB0515 10 AB0504 @ 1'-0" max. = 8'-6"
8-
AB0503 spa.
@ 1'-
0"
max.
AB0501
wingwall
masonry
Stone
E3SECTION 2
3"
AB0514
AB0507
AB0508
AB0506
AB0505
AB0502
AB0512
AB0511
AB0508AB0509
AB0513
AB0511
AB0512
AB0510
+to 1'-11"
+Varies 10"
+to 2'-11"
+Varies 10"
+2'-11"
Brid
ge 3_S3_
East
Abut
me
nt-2.d
gn
Plan No.STRUCTURE AND BRIDGE DIVISION Sheet No.
Checked: ..........
Designed: .........
Drawn: ..............
DATE: ...................................
FINAL PLAN REVISIONS SUBMITTAL DATE:
$DATE$Date & Time:
Plotted by:$USER
ProjectWise File Location: \$PWVARVAULTPATHDESC$
Pe
nTable:$
PE
NT
BLS$
$P
LT
DR
VS$
Plot
Driv
er :
ROUTE
FEDERAL AID
PROJECT ROUTE PROJECT
STATE SHEET
NO.
VA.
STATE
NO. DATE AUTH. DESCRIPTION NO. DATE AUTH. DESCRIPTION
+1'-6" +
2'-
0"
min.
3" ty
p.
3" ty
p.
+6'-
8"
9'-11"2'-
0"
min.
3" ty
p.
+6'-
8"
PRIME AE Group, Inc.
East Abutment (CRR CLASS III)
2-05 1-05 6-02 1-00 6-02 5/8 9-11 103AB0501 10 5 3 3/4 22Breastwall
8-09 9 7/8 5-03 5-03 5/814-01 15AB0502 1 5 3 3/4 2Breastwall
VARY 8-05 TO 9-05 74AB0503 8 5 1WingwallAB0503 1 A 8-05 9-05 1 3/4
6-02 1-00 1-00 7-11 82AB0504 10 5 3 3/4 7Wingwall
8-09 11 3/8 5-03 5-03 7/814-01 15AB0505 1 5 3 3/4 2Breastwall
8-09 1-00 7/8 5-03 5-04 1/814-02 15AB0506 1 5 3 3/4 2Breastwall
8-09 1-02 3/8 5-03 5-04 1/214-02 15AB0507 1 5 3 3/4 2Breastwall
8-09 1-03 7/8 5-03 5-04 7/814-02 15AB0508 1 5 3 3/4 2Breastwall
8-09 1-05 3/8 5-03 5-05 1/414-03 15AB0509 1 5 3 3/4 2Breastwall
VARY VARY VARY 0 5/8 VARY 6-09 TO 9-09 51AB0510 6 5 3 3/4 22Breastwall
AB0510 1 A 5 1/4 2-03 3/4 4 1/2 D 4 5/8 1-04 3/8 2 3/8
P 6-02 6-02 1/4 0 Q 0 5/8 11 3/8 2 1/8
R 6-02 6-02 3/4 0 1/8
11-10 11-10 25AB0511 2 5 1Breastwall
14-0014-00 29AB0512 2 5 1Breastwall
8-09 1-06 7/8 5-03 5-05 5/814-03 15AB0513 1 5 3 3/4 2Breastwall
8-09 1-08 3/8 5-03 5-06 14-03 15AB0514 1 5 3 3/4 2Breastwall
VARY 8-05 TO 9-05 19AB0515 2 5 1Wingwall
AB0515 1 A 8-05 9-05 1-00
TOTAL WEIGHT IN PRECEDING GROUP OF BARS 502
of
CA
ALC
SEPT 2021
NOVA PARKS
FOUR MILE RUN BRIDGE #3
4
4
RDG
4REINFORCING SCHEDULE
REINFORCING STEEL SCHEDULE DIMENSION TABLE
MARK NO.
SIZE
BAR LOCATION TYPE N
(LBS.)
WEIGHT
BENDING DIAGRAM
DIMENSION VARIATION TABLE
MARK
LEN.
EA.
NO.
SIO
N
DIM
EN-
SIO
N
DIM
EN-
FT-IN
PIN DIA.
FT-IN FT-IN
LENGTH
FT-IN
A
FT-IN
B
FT-IN
C
FT-IN
D
FT-IN
P
E
FT-IN
Q
F
FT-IN
R
G
FT-IN
H
FT-IN
S
I
FT-IN
T
J
FT-IN
U
K
FT-IN
L
FT-IN
V
FT-IN
FROM
FT-IN
TO
FT-IN
VARY BY
FT-IN
FROM
FT-IN
TO
FT-IN
VARY BY
Brid
ge 3_S4_
Reinf
Sche
dule.d
gn
3
in the deck superstructure at no extra cost to the Department.
Straight bars (top and bottom) may be substituted for truss bars (SB series)
alternate bars shall be located in different bays.
Splices shall be located approximately at points of contraflexure and splices in
bars are required, bars shall have the least number of Class B splices possible.
If fabrication of deck slab bar is not possible for length detailed and multiple
Weights in schedule are based on density of 490 lb/ft.
Dimensions in Bending Diagram are out-to-out of bars.
NOTES:
Type 1
A
Type 2
Q
A
P
R
Type 7
B
C
D
Type 22
D
A
Q
P
R
Brid
ge 3_S4_
Reinf
Sche
dule.d
gn
Plan No.STRUCTURE AND BRIDGE DIVISION Sheet No.
Checked: ..........
Designed: .........
Drawn: ..............
DATE: ...................................
FINAL PLAN REVISIONS SUBMITTAL DATE:
$DATE$Date & Time:
Plotted by:$USER
ProjectWise File Location: \$PWVARVAULTPATHDESC$
Pe
nTable:$
PE
NT
BLS$
$P
LT
DR
VS$
Plot
Driv
er :
ROUTE
FEDERAL AID
PROJECT ROUTE PROJECT
STATE SHEET
NO.
VA.
STATE
NO. DATE AUTH. DESCRIPTION NO. DATE AUTH. DESCRIPTION
PRIME AE Group, Inc.
of
DWH
ALC
SEPT 2021
NOVA PARKS
FOUR MILE RUN BRIDGE #4
1
6
RDG
1PLAN AND ELEVATION
LBCY CY
Steel
Reinforcing
Excav.
Struct.
Class A3
Concrete
Piles
Sheet
Reconstr.
Abutment
Masonry
Stone
SFSF
Total
ESTIMATED QUANTITIES
Sheet No.
INDEX OF SHEETS
Description
ELEVATIONNOT TO SCALE
FillFill
+North end 2'-7"
+South end 8'-7"
+North e
nd 15'-
0"
+So
uth e
nd 13'-
1"
grade
Finished48'-7" grade
Finished
2'-
0"
min.
1'-
3"
Conduit pipe
backwall
Face of
backwall
Back of
backwall
Back of
backwall
Face of
masonry wall
Face of
WEST ABUTMENTEAST ABUTMENT
PLANNOT TO SCALE
Timber deck Asphalt approachAsphalt approach
masonry wall
Face of
6'-
6"
+12'-8"
West Abutment
stream
Edge of
stream
Edge of
RU
N
span a
Face of rail
Face of rail
+10'-
8"
FO
UR
MIL
E
13
41
10
40
3
11
142
926
stream
Edge of 1'-
6"
1'-6"
pipe
Conduit
21'-
3„
"
stream
Edge of
1'-6"
2'-11"
1'-5"
2'-
0"
12'-
0ƒ
"
Reinforcing Schedule and Rebar Bending Diagrams
East Abutment Repair 2
East Abutment Repair 1
West Abutment Repair 2
West Abutment Repair 1
Plan, General Notes, and Estimated Quantities
6
5
4
3
2
1
East Abutment 2830 8 7841326
435
1761
below top of concrete wall on each abutment.
Stream bed to be graded such that stream bed is 3'-0" 19.
geotechnical engineer will be on site.
Contractor shall be responsible to coordinate when the
depth will be considered a change to the original contract. The
to firm soils. Any additional work necessary to achieve this
NOVA Parks will hire a geotechnical engineer to verify the depth 18.
abutments remove temporary support.
After final inspection and approval of reconstructed bridge 17.
Repoint the east and west stone masonry abutments.16.
finishing the placement with dry-packed concrete.
The top course may require pumping the concrete or possibly
placed behind the stones filling to the undisturbed soil surface.
Following placement of each course of stone, concrete should be 15.
mortar sets.
Stones shall be gently placed with full mortar joints before 14.
shall be set on a clean and well moistened mortar bed.
Each stone shall be cleaned and moistened before placement and 13.
abutment breastwalls.
Replace any missing stones discovered on east and west 12.
armour, watching the original exterior face.
time, placing single row of stone inset 1'-6" around perimeter of
Replace and rebuild west abutment breastwall one course at a 11.
1'-3" below the top of masonry abutment wall.
Place concrete along abutments as shown on the plans up to 10.
questionable support revealed through de-watering.
Remove any loose masonry and stabilize any masonry with 9.
de-water inside of sheeting.
Excavate approximately 2'-0" to 3'-0" of soil to firm material and 8.
abutment, embedded approximately 4'-0" below mud line.
Install sheeting, allowing minimum of 1'-6" from face of original 7.
stones available.
Probe creek in vicinity of bridge to salvage all large facing 6.
to protect workers and avoid damage to stones.
Remove stones with care for abutment reconstruction in order5.
Concrete abutments shall rest on firm material.4.
shall be Type S (f'm = 1800psi).
Mortar between masonry stones on reconstructed abutments3.
and are subject to fabrication and construction tolerances.
drawings are to center of bars except where otherwise noted
Grade 60. All reinforcing bar dimensions on the detailed
Deformed reinforcment bars shall conform to ASTM A615,2.
Concrete in abutment shall be class A3 (f'c =3000psi).1.
Notes:
Brid
ge 4_S1_Pla
n and
Ele
vatio
n.d
gn
Plan No.STRUCTURE AND BRIDGE DIVISION Sheet No.
Checked: ..........
Designed: .........
Drawn: ..............
DATE: ...................................
FINAL PLAN REVISIONS SUBMITTAL DATE:
$DATE$Date & Time:
Plotted by:$USER
ProjectWise File Location: \$PWVARVAULTPATHDESC$
Pe
nTable:$
PE
NT
BLS$
$P
LT
DR
VS$
Plot
Driv
er :
ROUTE
FEDERAL AID
PROJECT ROUTE PROJECT
STATE SHEET
NO.
VA.
STATE
NO. DATE AUTH. DESCRIPTION NO. DATE AUTH. DESCRIPTION
span a
48'-7"
9'-9" ++
PRIME AE Group, Inc.
of
CA
ALC
SEPT 2021
NOVA PARKS
FOUR MILE RUN BRIDGE #4
2
6
RDG
2WEST ABUTMENT REPAIR 1
A
A
abutment
Stone masonry
masonry wall)
replace in kind (on
Stones salvaged and
replace in kind
Missing backfill
wingwall
Stone masonry
1'-5"
C2 3
C2 3
D32
B32
D2 3
B2 3
LEGEND:
contractor to verify prior to commencing work and repair in kind.
end at the bottom. Dimension of void 2'-11" L x 5'-4" H x 5'-2" D
X = Void in the West Abutment masonry wall and backfill on north
X
Scale: •" = 1'-0"
SECTION A-A
_3" typ.
9'-9" ++
9'-
4"
+
24'-
4"
+
17'-
10"
+
1'-
6"
6'-
6"
7 - AB0501 spa.
@ 1'-0" = 6'-0"
WEST ABUTMENT REPAIR
1'-6" ++
1'-6"
Brid
ge 4_S2_
West
Abut
me
nt-1.d
gn
Plan No.STRUCTURE AND BRIDGE DIVISION Sheet No.
Checked: ..........
Designed: .........
Drawn: ..............
DATE: ...................................
FINAL PLAN REVISIONS SUBMITTAL DATE:
$DATE$Date & Time:
Plotted by:$USER
ProjectWise File Location: \$PWVARVAULTPATHDESC$
Pe
nTable:$
PE
NT
BLS$
$P
LT
DR
VS$
Plot
Driv
er :
ROUTE
FEDERAL AID
PROJECT ROUTE PROJECT
STATE SHEET
NO.
VA.
STATE
NO. DATE AUTH. DESCRIPTION NO. DATE AUTH. DESCRIPTION
+
+
+
3"
6'-6"10-
AB0502 spa.
@ 1'-
0"
max.
PRIME AE Group, Inc.
of
CA
ALC
SEPT 2021
NOVA PARKS
FOUR MILE RUN BRIDGE #4
3
6
RDG
3WEST ABUTMENT REPAIR 2
Stone masonry wingwall
+
wingwall
masonry
Stone
wingwall
masonry
Stone
B3SECTION 2
C3SECTION 2
D3SECTION 2
Scale: ƒ" = 1'-0"
+
9'-
4"
+
3" ty
p.
3" ty
p.
3" ty
p.
AB0501
12'-8" +
1'-6" +11'-3" +
2'-
0"
2'-
0"
9'-
4"
++
min.
min.
1'-6" +
AB0504
AB0502
@ 1'-2" = 2'-4"
3 - AB0502 spa.
AB0503
10-
AB0503 spa.
@ 1'-
0"
max.
11-AB0504 spa. @ 1'-0" max.
AB0505
9'-
4"
AB0502AB0505
AB0505
Brid
ge 4_S3_
West
Abut
me
nt-2.d
gn
Plan No.STRUCTURE AND BRIDGE DIVISION Sheet No.
Checked: ..........
Designed: .........
Drawn: ..............
DATE: ...................................
FINAL PLAN REVISIONS SUBMITTAL DATE:
$DATE$Date & Time:
Plotted by:$USER
ProjectWise File Location: \$PWVARVAULTPATHDESC$
Pe
nTable:$
PE
NT
BLS$
$P
LT
DR
VS$
Plot
Driv
er :
ROUTE
FEDERAL AID
PROJECT ROUTE PROJECT
STATE SHEET
NO.
VA.
STATE
NO. DATE AUTH. DESCRIPTION NO. DATE AUTH. DESCRIPTION
+
+
+
+
2'-11"
PRIME AE Group, Inc.
of
CA
ALC
SEPT 2021
NOVA PARKS
FOUR MILE RUN BRIDGE #4
4
6
RDG
4EAST ABUTMENT REPAIR 1
LEGEND:
Scale: •" = 1'-0"
SECTION A-A
EAST ABUTMENT REPAIR
full length of wall
5' below ordinary water level,
Voided area under wall,
A
A
11'-
4"
Contractor to verify prior to commencing work.
See Sheet 5 for details of void in East Abutment masonry wall.
12'-
0ƒ
"
21'-
3„
"
backwall
Back of
backwall
Face of
masonry wall
Face of
1'-6"
stream
Edge of
2'-
0"
2'-
0"
15'-
9" 13'-
10"
B B
AB0509
spa.
@ 1'-
0"
max.
14-
AB0506
3" ty
p.
3 spa.
@ 1'-
0"
= 3'-
0"
AB05081'-5"
11'-4" 21'-3„"
1'-
3"
15'-
0"
+
Sto
ne
wall (N
orth e
nd)
+
1'-
3"
13'-
1"
+
Sto
ne
wall (S
outh e
nd)
+
3 spa.
@ 4•
" = 1'-
1•
"
AB0507
13-AB0510 spa. @ 1'-0" max. 22-AB0511 spa. @ 1'-0" max.
Brid
ge 4_S4_
East
Abut
me
nt-1.d
gn
Plan No.STRUCTURE AND BRIDGE DIVISION Sheet No.
Checked: ..........
Designed: .........
Drawn: ..............
DATE: ...................................
FINAL PLAN REVISIONS SUBMITTAL DATE:
$DATE$Date & Time:
Plotted by:$USER
ProjectWise File Location: \$PWVARVAULTPATHDESC$
Pe
nTable:$
PE
NT
BLS$
$P
LT
DR
VS$
Plot
Driv
er :
ROUTE
FEDERAL AID
PROJECT ROUTE PROJECT
STATE SHEET
NO.
VA.
STATE
NO. DATE AUTH. DESCRIPTION NO. DATE AUTH. DESCRIPTION
PRIME AE Group, Inc.
of
CA
ALC
SEPT 2021
NOVA PARKS
FOUR MILE RUN BRIDGE #4
5
6
RDG
5EAST ABUTMENT REPAIR 2
abutment
masonry
Stone
B5SECTION 4
Scale: ƒ" = 1'-0"
3" ty
p.
1'-6" +
2'-
0"
min.
13'-
10" to 15'-
9"
+1'-
3"
AB0510 or AB0511
AB0507
AB0506
AB0508
@ 1'-2" = 2'-4"
3 - AB0509 spa.
AB0506
Brid
ge 4_S5_
East
Abut
me
nt-2.d
gn
Plan No.STRUCTURE AND BRIDGE DIVISION Sheet No.
Checked: ..........
Designed: .........
Drawn: ..............
DATE: ...................................
FINAL PLAN REVISIONS SUBMITTAL DATE:
$DATE$Date & Time:
Plotted by:$USER
ProjectWise File Location: \$PWVARVAULTPATHDESC$
Pe
nTable:$
PE
NT
BLS$
$P
LT
DR
VS$
Plot
Driv
er :
ROUTE
FEDERAL AID
PROJECT ROUTE PROJECT
STATE SHEET
NO.
VA.
STATE
NO. DATE AUTH. DESCRIPTION NO. DATE AUTH. DESCRIPTION
+
2'-11"
PRIME AE Group, Inc.
West Abutment (CRR CLASS III)
2-05 1-00 8-10 1-05 8-11 12-02 89AB0501 7 5 3 3/4 22Breastwall
6-00 6-00 81AB0502 13 5 1Breastwall
VARY10-09 TO 12-02 120AB0503 10 5 1WingwallAB0503 1 A 10-09 12-02 1 7/8
8-10 1-00 1-0010-07 121AB0504 11 5 3 3/4 7Wingwall
VARY10-09 TO 12-02 24AB0505 2 5 1Wingwall AB0505 1 A 10-09 12-02 1-05
TOTAL WEIGHT IN PRECEDING GROUP OF BARS 435
East Abutment (CRR CLASS III)
21-00 1/8 4-01 5/8 11-01 1/8 11-09 7/832-10 514AB0506 15 5 3 3/4 2Breastwall
21-00 1/4 4-01 5/8 11-01 3/8 11-10 1/832-11 34AB0507 1 5 3 3/4 2Breastwall
21-00 7/8 4-01 5/8 11-02 1/4 11-10 7/833-00 34AB0508 1 5 3 3/4 2Breastwall
21-01 3/4 4-01 5/8 11-01 7/8 11-10 5/833-01 103AB0509 3 5 3 3/4 2Breastwall
2-05 1-00 VARY 1-05 VARY17-10 TO 18-06 246AB0510 13 5 3 3/4 22Breastwall
AB0510 1 P 14-06 5/8 15-02 3/4 0 5/8 Q 1-05 1-07 1/8 0 1/8
R 14-07 1/4 15-03 1/2 0 3/4
2-05 1-00 VARY 1-05 VARY16-07 TO 17-10 394AB0511 22 5 3 3/4 22Breastwall
AB0511 1 P 13-03 5/8 14-06 1/4 0 3/4 Q 1-05 1-08 0 1/8
R 13-04 1/4 14-07 1/8 0 3/4
TOTAL WEIGHT IN PRECEDING GROUP OF BARS 1326
of
CA
ALC
SEPT 2021
NOVA PARKS
FOUR MILE RUN BRIDGE #4
6
6
RDG
6REINFORCING SCHEDULE
REINFORCING STEEL SCHEDULE DIMENSION TABLE
MARK NO.
SIZE
BAR LOCATION TYPE N
(LBS.)
WEIGHT
BENDING DIAGRAM
DIMENSION VARIATION TABLE
MARK
LEN.
EA.
NO.
SIO
N
DIM
EN-
SIO
N
DIM
EN-
FT-IN
PIN DIA.
FT-IN FT-IN
LENGTH
FT-IN
A
FT-IN
B
FT-IN
C
FT-IN
D
FT-IN
P
E
FT-IN
Q
F
FT-IN
R
G
FT-IN
H
FT-IN
S
I
FT-IN
T
J
FT-IN
U
K
FT-IN
L
FT-IN
V
FT-IN
FROM
FT-IN
TO
FT-IN
VARY BY
FT-IN
FROM
FT-IN
TO
FT-IN
VARY BY
3
Type 1
A
Type 2
Q
A
P
R
Type 7
B
C
D
Type 22
D
A
Q
P
R
in the deck superstructure at no extra cost to the Department.
Straight bars (top and bottom) may be substituted for truss bars (SB series)
alternate bars shall be located in different bays.
Splices shall be located approximately at points of contraflexure and splices in
bars are required, bars shall have the least number of Class B splices possible.
If fabrication of deck slab bar is not possible for length detailed and multiple
Weights in schedule are based on density of 490 lb/ft.
Dimensions in Bending Diagram are out-to-out of bars.
NOTES:
Brid
ge 4_S6_
Reinf
Sche
dule.d
gn
Plan No.STRUCTURE AND BRIDGE DIVISION Sheet No.
Checked: ..........
Designed: .........
Drawn: ..............
DATE: ...................................
FINAL PLAN REVISIONS SUBMITTAL DATE:
$DATE$Date & Time:
Plotted by:$USER
ProjectWise File Location: \$PWVARVAULTPATHDESC$
Pe
nTable:$
PE
NT
BLS$
$P
LT
DR
VS$
Plot
Driv
er :
ROUTE
FEDERAL AID
PROJECT ROUTE PROJECT
STATE SHEET
NO.
VA.
STATE
NO. DATE AUTH. DESCRIPTION NO. DATE AUTH. DESCRIPTION
PRIME AE Group, Inc.