Resettlement Plan
49215-001
Loan: 3260
August 2017
NEP: Earthquake Emergency Assistance Project
Belghari-Archalbot-Lamabagar-Sernabazar-Liture
Pachok Road Project
Prepared by the Government of Nepal for Asian Development Bank (ADB).
This resettlement plan is a document of the borrower. The views expressed herein do not necessarily
represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. Your
attention is directed to the terms of use section on ADB’s website. In preparing any country program or
strategy, financing any project, or by making any designation of or reference to a particular territory or
geographic area in this document, the Asian Development Bank does not intend to make any judgments
as to the legal or other status of any territory or area.
qEIRFT
Qit(@n:sGKl 6U.
Ett: &_bRo eY/o Y/11
ftrft:
",ft fu-dT i{rqtf,iT flqiqqq 5+'G,
ilqqResettlement p1nn kqa {trffrjrql I
sqtm vqc+qr ffi-?,t-icd-d-drr{FrTR-t-{zl!TR-@-qr++ ( 1?{3 f+f+) e-c+ 5+aiv
q].-d{r, rlfEq 5qftqilT qrPdf,€T qlz k4-d q* q-ffia ao vsrka q-sq' { srF q-e-{'} ?ffireTjqt{fi Eqfl qq=tff srqr+r orm qr}+ -rnqsq+ qf {Tq qrfl 'd6tr-q|e qlilt{a q-.q-fl?il
Fflffi qrFT qnn fik s-qflfr anihPa, RoeR' fr1 ss-r t +1 €q F-t (Y) qilfuq n.'ffir trfu sq'T
c +1 q.futdsrd vc+rft, qrdqt{fi r +qdl"i .'rIqI { q-{t qfu i c|qT ffi qrm qri'+ qq Frfi
{Ererql rqtco or;-+q +.+vn ffi qci Tft r*-qr fr"airur q-{ 1 wnn fik qqeft
4faqrfi 35rTfu q_argq fuft ?oey, oy, ol +1 s|qa Kfu tiliq tT\Iqiia P€ed Resettlement Plan
6"6a rrcil q6rE\rmT 6 | grF ffi q.T'2i ?'FrTk a-dfq{ FTtqTF.{qTr q+iia rrfrd t
\r4TAIq:
td@T Tq,rFI qfuM znl-qiqq, qEEH
Central lmplementation Support Consultant (CISC) ^s\ rJ./C\'\, K 11
q?.qan fuiqi3nfffir w-Frtqro
"'. .'Fr'-. -:,.';i'e.iaJi;. _, :
Government of Nepal Ministry of Federal Affairs and Local Development
Central Level Project Implementation Unit Earthquake Emergency Assistance Project
Lalitpur, Nepal
Earthquake Emergency Assistance Project (ADB Loan 3260-NEP)
Detailed Project Report
Belghari-Archalbot-Lamabagar-Sernabazar-
Liture-PachokRoad Subproject, Lamjung
Section III: Social Safeguard
Volume 2: Revised Resettlement Plan
August, 2017
Prepared by:
Central Implementation Support Consultant (CISC) AF-Iteco Ltd. Switzerland
Ekantakuna, Lalitpur
Table of Contents
ABBREVIATION .................................................................................................................... I
GLOSSARY OF TERMS ....................................................................................................... II
EXECUTIVE SUMMARY ..................................................................................................... III
1 PROJECT DESCRIPTION ............................................................................................. 1
1.1 Scope of Land Acquisition ........................................................................................... 2
1.2 Losses of Structures ............................................................................................... 3
1.3 Losses of Trees, Standing Crops ............................................................................ 6
2. SOCIO-ECONOMIC PROFILE OF THE AFFECTED HOUSEHOLDS .............................. 7
3. INFORMATION DISSEMINATION, CONSULTATION, PARTICIPATION, DISCLOSURE
........................................................................................................................................... 11
1 GRIEVANCE REDRESS MECHANISMS ..................................................................... 12
5. RESETTLEMENT POLICY AND LEGAL FRAMEWORK ............................................. 15
5.1 Nepal Government Applicable Legal and Policy Framework ................................. 15
5.2 ADB‘s Involuntary Resettlement Policy Requirement ............................................ 19
6. ENTITLEMENTS, ASSISTANCE AND BENEFITS ....................................................... 22
7 RELOCATION OF HOUSING AND SETTLEMENTS ................................................... 23
7.1 Valuation and Compensation Determination ......................................................... 23
8 INCOME RESTORATION AND REHABILITATION PROGRAM .................................. 24
9 RESETTLEMENT BUDGET......................................................................................... 24
9.1 Compensation for land ...................................................................................... 24
9.2 Compensation for structures .................................................................................. 25
9.3 Compensation for standing crops ...................................................................... 25
9.4 Compensation for trees ..................................................................................... 25
9.5 Other Supporting Cost ............................................................................................... 26
9.6 Total RP Cost Estimate of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-
Pachok Road Subproject ................................................................................................. 27
10. INSTITUTIONAL ARRANGEMENTS ........................................................................... 29
11. IMPLEMENTATION SCHEDULE ............................................................................. 30
12. MONITORING AND EVALUATION .......................................................................... 33
ii | P a g e
APPENDICES ..................................................................................................................... 34
Appendix I: List of Affected Households .............................................................................. 34
Appendix II: Poverty Analysis of Interviewed Households ................................................... 34
Appendix III: Details on Land Compensation Estimation ..................................................... 34
Appendix IV:Details on Structure Compensation Estimation ............................................... 34
Appendix V: Details on Crop Compensation Estimation ...................................................... 34
Appendix VI: Details on Private Trees Compensation Estimation ........................................ 34
Appendix VII: Details on CFUG Trees Compensation Estimation ........................................ 34
Appendix VIII: Details on Fruits Trees Compensation Estimation ........................................ 34
Appendix IX: Nepali Summary ............................................................................................ 34
Appendix X: Entitlement Matrix for Resettlement Plan under EEAP .................................... 34
Appendix XI: Consultation Meeting Minutes ........................................................................ 34
Appendix XII: Photographs of Road Alignment.................................................................... 34
iii | P a g e
List of Tables
Table 1: Land required by the Subproject .............................................................................. 2
Table 2: Summary of Affected Plots along the Alignment ...................................................... 2
Table 3: Summary of Land Loss ........................................................................................... 3
Table 4: Structure Losses along the Alignment ..................................................................... 4
Table 5: Affected Trees by the Road Alignment .................................................................... 6
Table 6: Summary of Affected Households by the Subproject ............................................... 7
Table 7: Food Sufficiency and Income level of the Affected Households ............................... 9
Table 8: Poverty Level of the Affected Households ............................................................... 8
Table 9: Key Difference between ADB Policy and GoN ....................................................... 21
Table 10: Details of Land Rate of the affected Plots ............................................................ 25
Table 11: Labor Requirement for Cutting and Transportation of Trees ................................ 25
Table 12: Summary of Harvesting and Transportation Cost of the Affected Trees .............. 26
Table 13: Budget for Resettlement Plan Implementation ..................................................... 28
Table 14: RP Implementation Schedule for Belghar-Archalbot-Lamabagar-Sernabazar-
Liture-Pachok Road Subproject, Lamjung ........................................................................... 31
I | P a g e
ABBREVIATION
ADB The Asian Development Bank AP(s) Affected Person(s)/People CDC Compensation Determination Committee CDO Chief District Officer CFUG Community Forest Users Group CLPIU CoI
Central Level Project Implementation Unit Corridor of Impact
DCC District Coordination Committee DLPIU District Level Project Implementation Unit DLRO District Land Revenue Office DMS Detailed Measurement Survey DISC District Implementation Support Consultants DSO District Survey Office DTO District Technical Officer EA EEAP
Executing Agency Earthquake Emergency Assistance Project
FGD Focus Group Discussion GESI GoN
Gender Equality and Social Inclusion Government of Nepal
GRM Grievance Redress Mechanism Ha Hectare HHs Households IA Implementing Agency IR Involuntary Resettlement LRO Land Revenue Office LEST Livelihood Enhancement Skills and Training MoFALD Ministry of Federal Affairs and Local Development NRA National Reconstruction Authority NRs Nepalese Rupees RF Resettlement Framework RP Resettlement Plan SPS Safeguard Policy Statement SPAF Severely Project Affected Family sqm Square meter VDC Village Development Committee
II | P a g e
GLOSSARY OF TERMS Affected Persons (APs)
All persons who as of the cut-off-date stand to lose for the project all or part of their land or other assets, irrespective of legal or ownership title.
Cut-off Date The date of census survey to count the APs and their affected land and assets.
Legalizable Those who do not have formal legal rights to land when APs are recorded, but could claim rights to such land under the law of Nepal.
Non-titled Those who have no recognizable rights or claims to the land that they are occupying. SPS defines them as illegal inhabitants; termed as squatters or encroachers. However illegal inhabitants as per law of Nepal will be excluded from non-titled.
Poverty Line The level of income below which an individual or a household is considered poor. Nepal‘s national poverty line which is based on a food consumption basket of 2,124 calories and an allowance for non food items of about two thirds of the cost of the basket will be adopted by the sub project to count APs under the poverty line. Whereas this poverty level may vary in accordance to district. Reference poverty line for poverty measurement 2015/16 for Lamjung District is NRs 28483.79, calculated on the basis of NRs. 18,428.00 for Rural hills- West Region. By Nepal Living Survey Standard 2010/11 The determination of poor households or persons will be based on the census and socio-economic survey and further confirmed by community meetings.
Project Affected Family
A family consisting of APs, his/her spouse, sons, unmarried daughters, daughters-in law, brothers or unmarried sisters, father, mother and other legally adopted members residing with him/her and dependent on him/her for their livelihood.
Severely Project Affected Family/People (SPAF)
A Project Affected Family that is affected by the project such as: a. There is a loss of land or income such that the affected family fall below the
poverty line; and/or b. There is a loss of residential house such that the family members are
physically displaced from housing. Titled APs who have formal legal rights to land, including any customary of traditional
rights recognized under the laws of Nepal.
Third Party An agency or organization to witness and/or verify ―no coercion‖ clause in an agreement with APs in case of voluntary land donation. One independent agency (i.e. not involved in project implementation), preferably working on rights aspect, will be recruited in each development region to serve this function.
Vulnerable Group Distinct group of people or persons who are considered to be more vulnerable to impoverishment risks than others. The poor, women-headed, Dalits and IPs households who may or may not fall below poverty line including all other APs who fall below poverty line will be counted as vulnerable APs.
Women-headed household
Household headed by women, the woman may be divorced, widowed or abandoned or her husband can be working away from the District for long periods of time, where the woman takes decision about the use of and access to household resources.
III | P a g e
EXECUTIVE SUMMARY
1. This Resettlement Plan (RP) has been prepared for the Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, Lamjung district under the Earthquake Emergency Assistance Project (EEAP). The major objective of the EEAP is to restore and re-establish use of earthquake damaged infrastructures within existing facilities and Corridor-of Impact (CoI) with minimal or no land acquisition. This RP is prepared following Resettlement Framework of EEAP and in accordance with Government of Nepal Land Acquisition Act 2034, The Reconstruction Related Act 2072 and its Working Procedures 2072, and ADB Safeguard Policy Statement 2009.
2. The objectives of the RP are to ensure adequate safeguard measures and appropriate entitlements are provided to affected persons wherever involuntary resettlement is observed. The RP explains process adopted for the preparation of the resettlement plan impact due to construction of road, mitigation measures and implementation arrangement.
3. The RF will guide the preparation of resettlement plans during the project implementation, according to which EEAP subprojects will avoid or minimize land acquisition and involuntary resettlement wherever possible. In unavoidable situation, the project will ensure the AP‘s rights and they will receive appropriate assistance.
4. APs have been informed and consulted about the involuntary resettlement during the survey of subproject. Special attention has been paid to ensure that the vulnerable groups and the women-headed households receive appropriate assistance. The national laws, regulation, resettlement framework of EEAP and ADB‘s resettlement safeguard policy have been followed during the planning and preparation of Resettlement Plan. During the survey consultations, none of the household has shown interest to donate their land except the area occupied by existing road. Thus, they will further consult about project norms and regulations regarding land donation. Since safeguard issues like land loss and involuntary resettlement have been properly addressed in RP, APs will not be affected by new cutting area of the road regarding their daily livelihood, local identity and physical displacement.
5. The total length of the Belghari-Archalbot-Lamabagar-Sernabazar-Liture-PachokRoad
Subproject, Lamjung is 12.59 km. The road starts from Belghari of Barte VDC and ends at
Pachok of Pachok VDC. The alignment of the road passes through Bharte, Archalbot,
Shree Bhanjyang, Nauthar and Pachok VDCs. Six major settlements namely Belghari,
Archalbot, Lamabagar, Serabazaar, Lituere, Pachok fall along the alignment. The existing
alignment is predominantly earthen and have average 4 m width, which is proposed to
upgrade to all weather gravel and Bituminous road (Premix Carpeting) by DDC Lamjung.
6. There are total 482 land plots to be acquired and deed transfer in the name of this road.
Among the total land plots to be acquired, 425 plots are privately owned .57 plots is public
land and 50 non-registered plots1 are not identified during the cadastral survey. As a part of
land acquisition process, a public notice will be published and informed among the local
people for the review and claim of these land plots in consultation with the LRO and DLPIU.
Non-registered plot owners shall get compensation of crops loss and other losses except
1 Non registered plots: - Land plots having no official land ownership in the District Land Revenue Office,
Lamjung
IV | P a g e
land compensation but land compensation will be provided if these owners come up with
land ownership certificate after notice publication.
7. Total 152 structures get affected due to widening the existing road and out of total 143 are
private structures and 9 are public which is reinstated during construction. Among the total
private structures 127 minor structures such as cattle sheds, kitchens, moveable shop and
toilets etc, and 16 are private residential buildings. Likewise, among the total private
residential building 4 residential structures which are lies in 10 m CoI had been fully
damaged by earthquake will be shifted beyond the CoI. Further 10 are residential building
which are partially affected needs to be repaired and only 2 residential building are fully
affected. Except 2 none of households will be physically displaced due to the road
construction. Further 4 residential building which had damaged by earthquake has already
got compensation from Government will only get shifting allowances by project. However
all structures owners except 4 earthquake structures owners will get compensation and
other allowances as per RF. Details of structures are mentioned in table 4.
8. Similarly, the road alignment involves cutting trees within the formation width. Total of 853
private trees, 468 private fruit trees, 20 CFUG fruit trees, 253 trees belonging to 3 CFUGs
need to be cleared for the road construction. In addition to the trees, standing crops from
the private plots are also affected during construction. Although various crops are found in
the affected plots, maize cultivation is in most of the plots.
9. The affected households verified from cadastral report showed that total of 267 HHs of
different socio-economic background are affected by the road subproject. A census socio-
economic and loss assessment survey of the project affected peoples was conducted in
order to study the project impact upon the affected HHs. Out of 267 HHs, 148 HHs were present for the interview and rest 119 HHs were found absent in the project area, meaning
they are living outside the project area. Out of total 267 HHs, 148 HHs of 834 persons were
available for socio-economic survey. Of the total households, 64 households belong to
Brahamin/Chhetri, 10 Newar, 11 Dalit, 63 Janajati and 7 families are headed by women.
10. In an average, the interviewed HHs have 0.90 ha of land which will reduce to 0.88 ha after
subproject intervention. The interviewed HHs have both agricultural and non-agricultural
sources of income. With the subproject intervention, nominal agricultural income will be
affected which is compensated. The average agricultural income of the 148 affected HHs is
NRs 122247.97 annually in the current situation which will decrease to NRs 118914.79 in a
year after the project intervention. This shows they will loss NRs 3333 in average in a year
after the loss of their land to the sub-project. Similarly, the average food sufficiency of the
APs from their own agriculture production is 9.18 months, which will slightly decrease to
8.94 months following the implementation of subproject. However, the APs major income
source is the non-agricultural sector which remains unaffected by the sub-project. The APs
are involved in small business activities, like grocery shop, tea shop, restaurants etc. The
other non-agricultural incomes of the interviewed HHs are remittance, private and
government services and wage labor. The APs will be incorporated in Income Restoration
and Rehabilitation Training program under RP.
V | P a g e
11. The data analysis of the APs shows that there are 148 interviewed households.15 HHs lose
more than 5 percent of their total land holding and 1 HHs are found below district poverty
level. All the project affected persons to be affected from road Right of Way (10 m) have
requested to be compensated in cash. The APs losing residential buildings have another
house for temporary shifting making them less vulnerable in terms of resettlement and all
the residential structure owners have either enough space in the same plots or other plots
nearby beyond CoI of the road in order to rebuild their house. Also, the earthquake affected
families, living in the temporary sheds, will be shifted in the land beyond the CoI Hence,
there is no need to find new land area to resettle for the APs. Earthquake affected families
have already got compensation through Government hence these families will get only
transportation allowance by project.
12. The project affected HHs shared that they were severely affected by the earthquake of
2014. And 63 janajati have their own language and traditions. Apart from the mainstream
festivities, ethnic communities celebrate festivals of their own. These indigenous APs lose
small strip of land plots due to widening the road alignments, but according to them, there
are no significant cultural resources that they are losing because of the subproject. Neither
the subproject intervention has any disturbances nor any impact on the customary rights of
these indigenous populations. Hence, the subproject intervention does not affect the culture
or harm the identity of the indigenous people along the alignment. So no adverse impact has
been assessed among indigenous households due to project intervention.
13. The interviewed indigenous APs have same level of access to the education, health and
government facilities and market networks compared to the other caste groups. Thus it is
expected that they have equal social status to enjoy the same level of benefits from this
subproject implementation in future. This road will provide better access to market,
education institutions, and health centers and government service offices.
14. A well-defined grievance redress and resolution mechanism has already been established to
resolve grievances and complaints in a timely and satisfactory manner. District Level Project
Implementation Unit (DLPIU) has been playing key role to effective implementation of GRM.
All affected persons will be made fully aware of their rights and GRM process. The detailed
grievance redress procedures will be publicized through an effective public information
campaign. First Level of GRM, Second Level of GRM, Third Level of GRM and Fourth Level
of GRM will be fully come into function after mobilization of contractors.
15. During the socioeconomic survey, 148 interviewed HHs have expressed their interest to be
the part of the training and benefit from entrepreneurial skills. Due to constraint of budget
only 162 APs will initially listed for training however priority will be given to Dalits, Janajatis,
women HH-heads and BPLs HHs. Further Income restoration program (IRP) will be
designed for the one person per family in 16-45 age-group. Different categories of trainings
are under finalization in the district through Training Need Assessment (TNA) and the
tentative cost of the training program is NRs 319584.56.
VI | P a g e
16. The total cost estimated for implementation of this RP is NRs 14.96 million in which NRs
11.75 million is direct compensation amount. The other RP expense title includes deed
transfer assistance amount, training amount for APs and 20 percent contingency of the total
cost for any unseen expenses during implementation period.
17. The National Reconstruction Authority (NRA) is the executing agency of the project. The
Central Level Project implementation Unit (CLPIU) under Ministry of Federal Affairs and
Local Development (MOFALD) supported by Central Implementation Support Consultant
(CISC) provides overall guide and monitoring of the project activities at central level. District
Level Project Implementation Unit (DLPIU) supported by District Level Implementation
Support Consultant (DISC) will be responsible to implement overall activities at district.
.
Resettlement Plan of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, Lamjung
1| P a g e
1 PROJECT DESCRIPTION
1. This Resettlement Plan(RP has been prepared for the Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, Lamjung district under the Earthquake Emergency Assistance Project (EEAP). The major objective of the EEAP is to restore and reestablish use of earthquake damaged infrastructures within existing facilities and rights-of-way (CoI) with minimal or no land acquisition This RP is prepared following Resettlement Framework of EEAP and in accordance with Government of Nepal Land Acquisition Act 2034, The Reconstruction Related Act 2072 and its Working Procedures 2072, and ADB Safeguard Policy Statement 2009.
2. The objectives of the RP are to ensure adequate safeguard measures and appropriate entitlements are provided to affected person wherever involuntary resettlement is observed. The RP explain process adopted for preparation of the resettlement plan impact due to construction of road, mitigation measures and implementation arrangement.
3. The RF will guide the preparation of resettlement plans during the project implementation, according to which EEAP subprojects will avoid or minimize land acquisition and involuntary resettlement wherever possible. In unavoidable situation, the project will ensure the AP‘s rights and they will receive assistance.
4. The National Reconstruction Authority (NRA) is the executing agency of the project. The
Central Level Project implementation Unit (CLPIU) under Ministry of Federal Affairs and
Local Development (MOFALD) supported by Central Implementation Support Consultant
(CISC) provides overall guide and monitoring of the project activities at central level. District
Level Project Implementation Unit (DLPIU) supported by District Level Implementation
Support Consultant (DISC) will be responsible to implement overall activities at district.
.
5. The total length of the Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road
Subproject, Lamjung is 12.59 km. Lamjung District is located in the Gandaki Zone in the
Western Development Region of Nepal. Its elevation ranges from 1266to 1366m.
Ecologically, it lies in the mountain region bordering Manang in North, Kaski in the North
West, Tanahun in the South and Gorkha in the West. The road starts from Belghari of Barte
VDC and ends at Pachok of Pachok VDC. The alignment of the road passes through
Bharte, Archalbot, Shree Bhanjyang, Nauthar and Pachok VDCs. Six major settlements
namely Belghari, Archalbot, Lamabagar, Serabazaar, Lituere, Pachok fall along the
alignment.The existing alignment is predominantly earthen, which is proposed to upgrade to
all weather gravel and Bituminous road (Premix Carpeting) by DDC Lamjung.
Resettlement Plan of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, Lamjung
2| P a g e
1.1 Scope of Land Acquisition
6. The road subproject requires 12.59 ha of land for its implementation. Out of total required
land, 9.78 ha of land are under private ownership in which 4.37ha is already occupied by the
existing road. Thus, 5.41ha of new private land need to be acquired as new cutting area.
Table 1 presents the detail of affected land to be acquired for the subproject.
Table 1: Land required by the Subproject
SN Land Requirement within the CoI (10 m) Area in hectare 1. Private land 9.78
1.1 Private land under existing area 4.37 1.2 Private land under new cut area 5.41
2 Public land 2.28 Total land area 12.59
Source: Cadastral Survey, March, 2017
7. Cadastral survey team was mobilized after the detailed design of the subproject. According
to the cadastral survey report, there are total 425 private land plots and 57 government plots
to be acquired by the subproject. Among the total land plots, 50 plots belong to non-
registered plots. (Refer Table 2).
Table 2: Summary of Affected Plots by the Subproject
SN Affected Plot Count
1 Total Interviewed Plots 231
2 Non-Interviewed Plots 144
3 Non-Registered Plots 50
4 Public Land Plots (Government of Nepal) 57
Total plots 482
Source: Cadastral Survey, March, 2017
8. There are 50 plots which are not verified officially in DLRO of Lamjung. These are labeled
as ‗non-registered‘ plots in this report. The Surveyor made field verifications checked the
field books and documents at DLRO but these plots lack other information except their plot
numbers. A public notice will be published and informed to local people for the review and
claim of these land plots. These land plots, during household survey, were found
uncultivated and none of house are found involved in that particular parcel.
Resettlement Plan of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, Lamjung
3| P a g e
9. The average land holding of affected households is 0.90ha which will reduce to 0.88ha after
land acquisition of the subproject. Out of 148 interviewed affected households, 15
households lose more than 5 percent but the percentage of loss does not cross more than
10% of total land holding. In average, these households lose 0.02 ha. Table 3 summarizes
extent of land loss in the road sub-project.
Table 3: Summary of Land Loss
Land Loss Measure Pre Project Post Project
Count Percent Count Percent 1. Land Holding
<0.5 ha 42 28.38 43 29.05
0.5-1.0 ha 57 38.51 59 39.86
>1.0 ha 49 33.11 46 31.08 Average Holding (ha) 0.90 0.88
2. Land Loss
Losing <5% 133 89.86
Losing >5% 15 10.14
Average Holding (ha) 0.02
Source: Household Survey, March, 2017
1.2 Losses of Structures
10. Apart from land, crops, tree loss, there will be loss of structures within the CoI. Altogether
152 structures out of these 9 structures are public and 143 structures belonging to 104
owners will be affected by the road subproject. Among the private structures, 16 residential
buildings are getting affected. Out of 16 residential buildings, only 6 buildings (including 4
earthquake-affected ones) will be fully affected and 10 residential buildings are partially
affected can be repaired and maintenance without shifting the APs. Remaining are minor
structures such as cattle sheds, kitchens, moveable kiosk and toilets etc. Public structures
include chautaras, tapstands, irrigation canals, temples and health post buildings. Moreover
Public structure will be restored during construction phase whereas private owners will get
compensation and allowances as per entitlement matrix. Table 4 below presents a brief account of affected structures whereas details have been tabulated in Appendix IV.
Resettlement Plan of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, Lamjung
4| P a g e
Table 4: Structure Losses along the Alignment
SN Structure Type Ownership
Count Remarks Physically Displaced (Yes/No)
1 Total Private structures
Private 143
1.1 Residence Private 2
Fully affected
Yes. Though they have other houses,
allowances have been allocated in accordance
with entitlement matrix
EQ Affected Residence
Private 4
Fully affected
Yes. Though they have other houses,
allowances have been allocated in accordance
with entitlement matrix
1.2 Residences Private 10
Partially affected
No, allowances have been allocated in accordance with entitlement matrix
Secondary Structures
Private 127
Allowances have been allocated in accordance with entitlement matrix
1.3 Kitchen Private 2
Fully affected
1.4 Shop Private 3
1 Fully affected and 2 are partially affected
1.5 Pali Private 25
Partially affected
1.6 Shaw Mill Private 1
Partially affected
1.7 Toilets Private 3
Fully affected
1.8 Toilets with Bio Gas Plant
Private 4
Fully affected
1.9 Bio Gas Plant Private 2
Fully affected
1.10 Courtyard Private 1
Fully affected
1.11 Roof top Private 1
Partially affected
1.12 Chautara Private 1
Partially affected
1.13 Pig sty Private 2
Partially affected
1.14 Cattleshed Private 3
Partially affected
1.15 Walls Private 56
48 dry walls and 8 masonry walls
1.16 Cabinet/Taharas
Private 9
CGI fully affected (Temporar
Resettlement Plan of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, Lamjung
5| P a g e
y shelters)
1.17 Cow/Cattle Sheds
Private 11
CGI Fully affected
1.18 Chicken Coop Private 3
CGI Fully affected
Total Private Structures 143
4 Total Public Structures Public 9
Allowances have been allocated in accordance with entitlement matrix
4.1 Community Chautara, Public 2 Public
4.2 Tap Stand Public 4 Public 4.3 Temple Public 1 Public
4.4 Irrigation Canal Public 1 Public
4.5 Health Post Public 1 Public
Total Public Structures 9
Source: Household Survey, March, 2017
11. Out of 143 structures affected with the road intervention, 78 are minor structures owned by
janajati and Dalit families. These structures don‘t make them physically displaced. It is
learnt that they have houses elsewhere for temporary shifting making them less vulnerable
in terms of resettlement. Similarly, all the residential structure owners have either enough
space in the same plot or other plot nearby beyond CoI of the road in order to rebuild their
houses. All structure owners will get compensation and allowances.
Resettlement Plan of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, Lamjung
6| P a g e
1.3 Losses of Trees, Standing Crops
12. The road alignment passes through three community forest areas, Raniswara Community
Forest Users Group (CFUG), Kerabari Community Forest Users Group (CFUG), Sikhra
Community Forest Users Group. Hence, the alignment requires cutting down of trees and
seedlings from the forest area and also from private land area. There are 253 trees from
CFUGs and 853 trees from private land (including fruit trees, bamboo clumps and cash
crops) which need to cut down and cleared for the road improvement. The affected trees are
Sal, Sisau, Chilaune and Badar timber by the community people. There are also fruit trees
like mango, banana, guava, pear and papaya from private land that needs to be cleared for
the construction of the road. In addition to the trees, standing crops from the private plots
are also affected during construction. Although various crops are found in the affected plots,
maize cultivation is gCoIn in most of the plots. Table 5 presents a brief account of affected
trees and crops (details have been tabulated in Appendix V).
Table 5: Affected Trees by the Road Alignment SN Ownership Count/ha. Remarks
1 Private trees 853 Private 2 Raniswara CFUG 123
3 Kerabari CFUG 3 4 Sikhra CFUG 127 5 CFUG Fruit Trees 20 6 Fruit Trees 468 Private 7 Standing Crop 5.41 Maize
Source: Household Survey, March, 2017
Resettlement Plan of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, Lamjung
7| P a g e
2. SOCIO-ECONOMIC PROFILE OF THE AFFECTED HOUSEHOLDS
13. A detailed socio-economic survey was conducted to investigate affected households‘ income, food sufficiency, livelihood options, loss of land, structures, trees and other assets.
The affected families are included only within the families from Ch 0+000 until Ch12+59.
The total affected households are 267. Socio-economic survey was carried for 148(55.43%)
households‘ having 834 populations. Out of total APs, 64HHs are from Brahmin/Chettri,
10HHs from Newar, 11 HH from Dalit and 63 HHs are from Janajati. There are 7 women-
headed HHs in the subproject area. The Table 6 provides summary of the affected
households.
Table 6: Summary of Affected Households by the Subproject
SN Variable Count
1 Total Affected HHs 267 2 Interviewed HHs 148 2.1 Dalit HHs 11 2.2 Janajati HHs 63 2.3 Newar HHs 10 2.4 Brahmin/Chettri HHs 64 3 Interviewed Population 834
3.1 Male 412 3.2 Female 422
3.3 Average HHs Size 5.64 3.4 Women headed HH 7 3.5 Non-Registered Plots (not included
in 267 HHs) 50
Source: Household Survey, March, 2017
14. As per the survey, the maximum families are engaged in agricultural activity and few families
are not engaged in agriculture. The families in agriculture occupation in this area are
involved in the cultivation of different crops (predominantly maize). The major sources of
income are running hotels, tea shops whereas remittances, pensions, petty businesses as
well as jobs in different institutions from other sources of income.
15. The food sufficiency of the affected families from their own land is 9.18 month per year in an
average which will reduce to 8.94 months after their land loss to the subproject. There are
86 families who reported that they have food sufficiency for 10-12 months. The food supply
during the deficit period is covered through income from non-agricultural sectors. The
income from agricultural income is expected to reduce by NRs 3333 due to the land loss.
Table 7 gives the details of the food sufficiency and other income level.
Resettlement Plan of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, Lamjung
8| P a g e
Table 7: Food Sufficiency and Income level of the Affected Households
Variables Pre-Project Post-Project
Frequency Percent Frequency Percent
1-3 Months 15 10.14 15 10.14
4-6 Months 35 23.65 35 23.65
7-9 Months 12 8.11 12 8.11
10-12 Months 86 58.11 86 58.11
Average (months) 9.18 8.94
1. Agriculture Income (HH)
<=12000 4 2.70 5 3.38
12000-25000 7 4.73 6 4.05
>=25000 137 92.57 137 92.57
Average (NRS) 122247.97 118914.79
2. Non-Agriculture Income (HH)
<=12000 11 7.43
12000-25000 1 0.68
>=25000 136 91.89
Average (NRS) 359705.47
3.Total Income (HH)
<=25000 0 0.99 0 0.99
25000-50000 0 0.00 0 0.00
>=50000 148 100.00 148 100.00
Average (NRS) 481953.38 478620.20
Source: Household Survey, March, 2017
Resettlement Plan of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, Lamjung
9| P a g e
16. Table 8 reveals that the poverty analysis shows that 1 households fall below the district poverty level before and after the sub-project and 15 households will lose more than 5 percent of their total land.
Table 8: Poverty Level of the Affected Households
Variables Pre-Project Post Project
Frequency Percent Frequency Percent
<5% Land Loss 131 88.51 131 88.51 Above Poverty Level 130 87.84 130 87.84 Below Poverty Level 1 0.68 1 0.68 >5% Land Loss 15 10.14 15 10.14 Above Poverty Level 15 10.14 15 10.14 Below Poverty Level 0 0.00 0 0.00
Source: Household Survey, March, 2017
17. The janajati APs have same level of access to the education, health and government
facilities and market networks compared to the other caste groups. Thus it is expected that
they have equal social status to enjoy the same level of benefits from this subproject
implementation in future. This road will provide better access to market, education
institutions, and health center and government service outlets.
18. The subproject has only one family that falls below poverty line. Before or after the project
implementation, no landless families, no elderly or single-women and children families and
neither disabled families that can be categorized under vulnerable group. This particular
family will also be prioritized for benefit schemes like income restoration program in the
subproject.
Resettlement Plan of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, Lamjung
10| P a g e
19. The interviewed families are updated about the market information; visit local and district
headquarters as per their need. Each family is active in community participation and
affiliated to at least one community institution. Every house has toilet and all the children are
immunized which shows that the affected families along the road alignment are well
informed, have access to social networks and benefits and are mobile in their everyday life.
20. It is noted from the survey that 63 families belonging to janajati category lose small strip of
land due to widening the road. Land impact is nominal because there is already existing
road and they will be paid replacement cost of that small strip of land However after
construction of road people will be more benefitted from the road in terms of their nominal
loss .On the other hand these janajati families have their own language, customs and
traditions. They celebrate Lhosar(Tamu Lhosar by Gurung community) once a year as an
important festival in addition to other popular Hindu festivals as per their belief. However,
project intervention doesn‘t hamper their cultural resources over the land nor any adverse
impact is observed due to project intervention
21. It is expected that the road improvement will provide better access to headquarters, market,
education institutions, and health centres and government offices. It will reduce the prices of
everyday necessities and also accelerate the earthquake emergency works. Similarly, the
janajati families have same level of access to the education, health and government
facilities and market networks compared to the other caste groups. Thus, it is expected that
they have equal social status to enjoy the same level of benefits from this subproject
implementation in future. The female headed families, families below poverty level, families
losing more than 5 percent of total land are the target population and will be prioritized for
benefit schemes like income restoration program in the subproject.
Resettlement Plan of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, Lamjung
11| P a g e
3. INFORMATION DISSEMINATION, CONSULTATION, PARTICIPATION, DISCLOSURE
22. The community meeting and interviews were carried out with the owners of land and
structures regarding the road upgrading program along the alignment.They were provided
information on ADB Policy on Involuntary resettlement, compensation and entitlement, RF of
the EEAP. The communities were explained about:
1. Relevancy of the road subproject scope and schedules,
2. RP and various degrees of project impact,
3. About land acquisition, donation, compensation and other entitlements schemes,
4. About Grievance redress mechanism , and
5. Special consideration and assistance of all vulnerable groups
6. Overall projects norms, guidelines, websites and contact person for more details.
23. There were public meetings with APs, and with the other stakeholders along the alignment.
The details of consultation meeting minutes have been presented in the Appendix XI. The
local leaders and the villagers also facilitated for consultations with the affected people
during cadastral and household listing and socio-economic and loss assessment survey of
the families. During the community consultations, people expressed that they would fully
support the project implementation. However, they also demanded compensation for the
land loss, additional activities to prevent flood and soil loss, if any. Until RP preparation no
complaints were received from affected people.
24. DLPIU will play lead role to publish notice of affected land as per the land acquisition act
2072 NRA with support of CISC and other public consultation program for RP
implementation is conducted by DISC with close consultation of DLPIU. In addition, project
affected people has already been informed about overall EEAP project norms, rules and
regulations during HHs survey. RP has been approved by NRA, and disclosure is under
process.
.
Resettlement Plan of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, Lamjung
12| P a g e
4. GRIEVANCE REDRESS MECHANISMS
25. The objective the grievance redress mechanism (GRM) is to resolve complaints as quickly
as possible and at the local level through a process of conciliation; and, if that is not
possible, to provide clear and transparent procedures for appeal. A well-defined grievance
redress and resolution mechanism is guided by the RF which will be fully informed and
made aware of the rights to the APs. The grievance redress process includes four levels
which is shown in the figure.
Figure 1: Grievance Redress Mechanism
15 days
7 days
1-2 days
Grievance
1st Level Grievance
2nd Level Grievance
3rd Level Grievance
4th Level
Grievance
Higher Authority
Court of Law
Field Level:
Contractor,
DISC,DLPIU
CLPIU
Grievance
Redress
Committee
Grievance
Redressed
Grievance
Redressed
Grievance
Redressed
Note: CLPIU-Central Level Project Implementation Unit, DLPIU-District Level Project Implementation
Unit, DISC-District Level Implementation Consultant
Resettlement Plan of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, Lamjung
13| P a g e
a. First level of GRM: The first level and most accessible and immediate contact for the fastest resolve of grievances are the contractors, and design and supervision consultants on site. Prior to construction of any works, the CLPIU and DLPIU will ensure local community meetings are held to notify local residents and businesses of any temporary disturbances, and to inform them of the Project. If a local area committee (LAC) exists in the area, they should also be informed. If any complaints arise, the contractors, consultants, and DLPIU can immediately resolve the complaint on site. The CLPIU can also be involved in grievance redress at this stage. The CLPIU and DLPIU office phone number will be posted in public areas within the subproject areas and construction sites. Any person with a grievance related to the project works can contact the project to file a complaint. The DLPIU offices will have a safeguards focal person to field and resolve complaints. The safeguards (environment and resettlement) focal person will document the complaint, and immediately address and resolve the issue with the contractor within 1-2 days, if the complaint remains unresolved at the field level. The DLPIU may seek the assistance of the consultant safeguards specialists (the environmental specialist or social safeguards specialist) to resolve the issue. The DIU safeguards focal person will notify the CLPIU safeguards focal person that a complaint was received, and whether it was resolved. The DLPIU safeguards focal person will fully document the following information: (i) name of the person; (ii) date complaint was received; (iii) nature of complaint; (iv) location, and (v) how the complaint was resolved.
b. Second level of GRM: If the grievances remain unresolved; the DLPIU will forward the
complaint to the CLPIU safeguards focal person. The person filing the grievance will be notified by DLPIU safeguards focal person that the grievance was forwarded to the CLPIU safeguards focal person. The CLPIU will address the grievance. Grievances will be resolved through continuous interactions with affected persons, and the CLPIU will answer queries and resolve grievances regarding various issues including environmental or social impacts. Corrective measures will be undertaken at the field level by the CLPIU safeguards focal person within 7 days. He/she will fully document the following information: (i) name of the person; (ii) date complaint was received; (iii) nature of complaint; (iv) location and (v) how the complaint was resolved.
c. Third level of GRM:If the grievance remain unresolved, the CLPIU‘s project director will activate the third level of the GRM by referring the issue (with written documentation) to a Grievance Redress Committee (GRC) constituted by the EA, which will, based on review of the grievances, address them in consultation with the CLPIU, DLPIU, and affected persons. The GRC will consist of safeguards focal person leadership, affected persons, and local area committee, among others—determined to provide impartial, balanced views on any issues. The GRC should consist of at least five persons. A hearing will be called with the GRC, if necessary, where the affected person can present his/her concern and issues. The process will promote conflict resolution through mediation. The GRC will meet as necessary when there are grievances to be addressed. The GRC will suggest corrective measures at the field level and assign clear responsibilities for implementing its decision within 15 days. The functions of the GRC are as follows: (i) to provide support to affected persons on problems arising from environmental or social disruption, asset acquisition (where required), and eligibility for entitlements, compensation, and assistance; (ii) to record grievances of affected persons, categorize and prioritize them, and provide solutions
Resettlement Plan of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, Lamjung
14| P a g e
within 15 days; and (iii) to report to the aggrieved parties developments regarding their grievances and decisions of the GRC. The safeguards focal person will be responsible for processing and placing all papers before the GRC, recording decisions, issuing minutes of the meetings, and taking follow-up action to see that formal orders are issued and the decisions carried out.
d. Fourth level of GRM: In the event that a grievance is not addressed by the contractor,
DISC, DLPIU, CLPIU or GRC, the affected person can seek legal redress of the grievance in the appropriate courts, the fourth level of the GRM, which is the formal legal court system. The GRM however does not prevent affected persons from seeking legal redress at any time.
26. A well-defined grievance redress and resolution mechanism has already been established to
resolve grievances and complaints in a timely and satisfactory manner. District Level Project Implementation Unit (DLPIU) has been playing key role to effective implementation of GRM. All affected persons will be made fully aware of their rights, and the detailed grievance redress procedures will be publicized through an effective public information campaign. First Level of GRM, Second Level of GRM, Third Level of GRM and Fourth Level of GRM will be fully come into function after mobilization of contractors. All the grievances will be recorded and resolved as per GRM defined in RF.
Resettlement Plan of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, Lamjung
15| P a g e
5. RESETTLEMENT POLICY AND LEGAL FRAMEWORK
5.1 Nepal Government Applicable Legal and Policy Framework
27. This section provides the review of national laws, policies of the donor agency and the
Resettlement Framework of the EEAP that applies to the project.
28. The Land Acquisition Act, 2034 (1977) is the main legal document on land acquisition and resettlement activities in Nepal. There is provision in Clause 3 of the Act to acquire land for any public purpose, subject to award of compensation. According to Clause 4, institutions seeking land acquisition may also request the Government of Nepal to acquire land under regular provisions, subject to compensation by such institutions. Clause 27 of the Act provides for land acquisition through negotiation with the plot owners, were all processes specified in the Act is not required.
29. The Reconstruction Related Act 2072 (2015)2 is the most recent Act promulgated after the earthquake of April 2015 for the reconstruction of earthquake affected structures. The Notice 2, Part 3 and Part 5 of this Act‘s Regulation explains the land acquisition and compensation determination process and procedures, named under, ‗the working procedures on land acquisition required for reconstruction of earthquake affected structures, 2072‘. The major clauses of these working procedures related to land acquisition are highlighted under: Clause 3-4: the land required for reconstruction project can acquire land from anywhere
for the project and reserves right to enter such land. Clause 5 (1): the project head should include the details of the land to be acquired and
send for approval to NRA secretary. Clause 5 (3): after NRA approval, the project head should publish the details of the land
plots to be acquired in national or local level newspaper requesting the land owners to register complain within 15 days if they do not agree.
Clause 5 (4-10): processes of keeping such land plots on hold and resolve disagreements of the land owners if any.
Clause 6 (1): the project head will write to land registration office for transferring the ownership of the land plots acquired according to Clause 5 (3) and Clause 5 (7) in the name of Government of Nepal.
Clause 8 (2): formation of Compensation Determination Committee (CDC). Clause 10 (1-2): CDC should determine the compensation rate on the basis of market
rate, vulnerability of the loss-owner and so on which should be stated in the decision minute.
Clause 10 (3): CDC should make the compensation decisions public as soon as possible to notify the landowners, publish in national or local newspapers, notice in VDC or municipality board about details of compensation amount recipients, date and place to receive compensation and about place and duration to complain if not agree with the compensation amount.
Clause 11 (1): Unsatisfied individuals can complain about the compensation amount within 15 days of the notice publication.
Clause 11 (2-4): process of resolving complains received as per Clause 11 (1).
2 This is unofficial translation extracted from Nepal Gazet, Regulations on Reconstruction of
Earthquake Affected Structures, 2072 (Nepali language), Part 3 and Part 5.
Resettlement Plan of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, Lamjung
16| P a g e
Clause 12 (1): compensation should be given to any standing crops or trees or plants of the land plots while entering in lands as per Clause 4.
Clause 13 (1-4): duration to receive compensation is 3 months from the date of notice publication as Clause 10(3). If not, the project head shall register the amount in the office and public the notice to receive the amount within 6 months. If the recipients still do not claim the amount, such amount will be no longer payable and register in reserve fund.
Clause 16: if any public land needs to acquire but occupied by any individual, government can compensate with other public land to those individual, if land is available.
Clause 17: If the remaining land area becomes unusable after land acquisition, the remaining land shall be acquired by the project if complained by the landowner within 35 days of notice publication as per Clause 10(3).
30. The National Policy on Land Acquisition, Resettlement and Rehabilitation in
Infrastructure Development Projects 2015 provide clear guidelines to screen, assess and
plan land acquisition and resettlement aspects in development projects. The Policy
highlights the need to handle resettlement issues with utmost care and forethought
particularly in case of vulnerable groups. There are provisions of voluntary land donation by
non-poor. Voluntary donation will be accepted if a) donation of land is <10% of his
agriculture land b) The donation is unforced, not the result of community pressure and MOU
should be signed and is witnessed by third party c) Land donating HHs should not be from
vulnerable group and poor families d) APs is fully consulted informed about their rights. Non-
titled (encroachers/squatters) are eligible for compensation for their property except land
compensation for structure; crops and tree should be calculated scientifically not less than
market price.
31. The Constitution of Nepal 2015 guarantees the fundamental rights and duties of a citizen.
Article 30(1) establishes the right to property for every citizen of Nepal, whereby every
citizen is entitled to earn, use, sell and exercise their right to property under existing laws.
Article 30 (2) states can impose taxes on the property of person as necessary on the basis
of principles of progressive taxation. Article 30(3) states shall not except in the public
interest, requisition or acquire, or otherwise create any encumbrance on, the property of the
people. But not apply to any property acquired in an illicit manner. Article 30 (4) in requisition
of private land for public interest according to sub-article (3), it shall be done on the basis of
compensation and procedural law. Article 30 (5), Nothing in sub –articles (3) and (4) shall be
deemed to prevent the state in enforcing land reform, management and regulation for the
purpose of increasing production and productivity of land, modernization and
commercialization of agriculture, environment preservation, organized housing and planned
urbanization.
32. The Guthi Corporation Act 1976, in case of Guthi Land acquisition must also comply with
the provisions set out in. The second amendment in 1993, section 43 of the Act states that if
Government of Nepal thinks that any Guthi land is required for social welfare or community
interest, such a lad can be acquired at a concessional rate. In addition, the Act states that
the compensation of Guthi land will be divided into Guthi and the tenants. The Guthi will
receive 33 percent and the tenant will receive 67 percent of the total compensatory amount.
Resettlement Plan of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, Lamjung
17| P a g e
33. The Public Roads Act 1974 empowers the government to acquire any land on a temporary basis for storage facilities, construction camps and so on during construction and upgrading of roads. Any buildings and other structures such as houses, sheds, schools, and temples are to be avoided wherever possible. The government is required to pay compensation for any damages caused to buildings, standing crops and trees. Compensation rates are negotiated between the government and the landowners.
34. The Land Reform Act 1964 is also relevant. As per the Act, a landowner may not be
compensated for more land than s/he is entitled to under the law. This Act also establishes
the tiller‘s right on the land which s/he is tilling. The land reform act additionally specifies the compensation entitlements of registered tenants on land sold by the owner or acquired for
the development purposes. The Act amendment most recently in 2001 has established a
rule that when state acquires land under tenancy, the tenant and the landlord will each be
entitled to 50 percent of the total compensation amount.
35. The Malpot Ain or Land Revenue (land administration and revenue) Act, 2034 is the main Act to carry out land administration including maintenance and updating records, collection of land revenue and settlement of the disputes after completion of survey and handing over the records to LRO by the Survey Parties. It authorizes the LRO for registration, ownership transfer and deed transfer of land. This Act also authorizes the LRO to transfer ownership and deeds of individual land, if any person applied for the ownership and deeds of individual land, if any person applied for the ownership transfer of his/her land with mutual understanding for public use with recommendation of relevant committee.
36. Local Self Governance Act 1999: The Clause 258 in the Part – 5, General Provisions
relating to Local Body Chapter – 3, Miscellaneous of the Local Self-Governance Act, 1999
has provision of land acquisition. The Clause states that in case the Local body has to
acquire land to carry out any development and construction works within its area, it may
acquire the land required for that work by following the requirements of the prevailing law
and providing compensation to the concerned land-owner for the land. The Clause 149 of the LSGA has provision of prohibition on construction of building without obtaining
approval. The clause states that no person shall, without obtaining construction approval from the Mayor, do 'construction of a building'3 in the municipal area. According to the
Clause 161(1) the Mayor may depute any engineer, overseer or employee to inquire
into the following matters in respect to any building constructed or being constructed
by anyone in the municipal area: Whether or not approval has been obtained pursuant to this Act to construct such a building, Whether or not such a building has been
constructed or is being constructed in accordance with the design approved pursuant to
this Act, and Whether or not any public land, road, temple, courtyard, sewerage, canal, pond etc. is encroached upon from such a building. (2) The person deputed to inquire into
the matters pursuant to Subsection (1) shall have to inquire into the matter according to the
prevailing law and submit a report, along with his/her suggestions, to the Mayor within
fifteen days of his/her deputation. (4) In case it is held, as per the report submitted
pursuant to Subsection (2) above, that anyone has constructed or is constructing a building
without obtaining approval pursuant to this Act or by encroaching upon any public land,
3 The act of "construction of building" means the act to construct a new building, to reconstruct by
demolishing the old building, to add a storey or to alter the facade, or to construct a window, door, veranda, attic, porch, shed, stable or garage or erecting a compound wall in alternation of the existing design
Resettlement Plan of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, Lamjung
18| P a g e
road, temple, courtyard sewerage, canal, pond, etc., the Mayor shall have to order to
demolish the building or any portion thereof. (5) In case it is held, as per the report submitted pursuant to Subsection (2), that any person has constructed or is constructing a
building by altering the design approved pursuant to this Act without obtaining approval of the Mayor, the Mayor may order to punish such a person with a fine of up to one hundred thousand rupees or to demolish the building or any portion thereof.
37. The Clause 163 (1) mentioned that in cases where an order has been issued pursuant to
Sub-section (4) or (5) of Clause 161 to demolish any building or any portion thereof, the
concerned person shall have to demolish such a building or any portion thereof according to
the order of the Mayor or the decision of the Appellate Court within thirty-five days of the
decision made by the Appellate Court requiring the demolition of such a building or any
portion thereof. (2) If the concerned person does not demolish such a building or any
portion thereof within the time-limit referred to in Sub-section (1), the Municipality itself may demolish such a building or any portion thereof, and the expenditures incurred for so demolishing shall be realized from the concerned person.
Resettlement Plan of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, Lamjung
19| P a g e
5.2 ADB’s Involuntary Resettlement Policy Requirement 38. The objectives of ADB‘s Safeguards Policy Statement, 2009 (SPS) with regard to
involuntary resettlement are: (i) to avoid involuntary resettlement wherever possible; (ii) to
minimize involuntary resettlement by exploring project and design alternatives; (iii) to
enhance, or at least restore, the livelihoods of all displaced persons in real terms relative to
pre-project levels; and (iv) to improve the standards of living of the displaced poor and other
vulnerable groups.
39. ADB‘s SPS covers permanent and temporary physical displacement (relocation, loss of residential land, or loss of shelter) and economic displacement (loss of land, assets, access
to assets, income sources, or means of livelihoods) as a result of (i) involuntary acquisition
of land, or (ii) involuntary restrictions on land use or on access to legally designated parks
and protected areas. The SPS covers them whether such losses and involuntary
restrictions are full or partial, permanent or temporary.
40. For any ADB operation requiring involuntary resettlement, resettlement planning is an
integral part of project design, to be dealt with from the earliest stages of the project cycle,
taking into account the following basic principles:
I. Screen the project early on to identify past, present, and future involuntary resettlement impacts and risks. Determine the scope of resettlement planning through a survey and/or census of displaced persons, including a gender analysis, specifically related to resettlement impacts and risks.
II. Carry out meaningful consultations with affected persons, host communities, and concerned nongovernment organizations (NGOs). Inform all displaced persons of their entitlements and resettlement options. Ensure their participation in planning, implementation, and monitoring and evaluation of resettlement programs. Pay particular attention to the needs of vulnerable groups, especially those below the poverty line, the landless, the elderly, women and children, and indigenous people, and those without legal title to land, and ensure their participation in consultations. Establish a grievance redress mechanism to receive and facilitate resolution of the affected persons‘ concerns. Support the social and cultural institutions of displaced persons and their host population. Where involuntary resettlement impacts and risks are highly complex and sensitive, compensation and resettlement decisions should be preceded by social preparation.
III. Improve, or at least restore, the livelihoods of all displaced persons through (a) land-based resettlement strategies when affected livelihoods are land-based, or cash compensation at replacement value for land when the loss of land does not undermine livelihoods; (b) prompt replacement of assets with access to assets of equal or higher value; (c) prompt compensation at full replacement cost for assets that cannot be restored; and (d) additional revenues and services through benefit sharing schemes where possible.
IV. Provide physically and economically displaced persons with needed assistant including the following: (a) if there is relocation, secured tenure to relocation land, better housing at resettlement sites with comparable access to employment and production opportunities, economic and social integration of resettled persons into their host communities, and extension of project benefits to host
Resettlement Plan of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, Lamjung
20| P a g e
communities; (b) transitional support and development assistance, such as land development, credit facilities, training, or employment opportunities; and (c) civic infrastructure and community services, as required.
V. Improve the standards of living of the displaced poor and other vulnerable groups, including women, to at least national minimum standards. In rural areas, provide them with legal and affordable access to land and resources, and in urban areas, provide them with appropriate income sources and legal and affordable access to adequate housing.
VI. Develop procedures in a transparent, consistent, and equitable manner if land acquisition is through negotiated settlement, to ensure that people who enter into negotiated settlements will maintain the same or better income and livelihood status.
VII. Ensure that displaced persons without titles to land or any recognizable legal rights to land are eligible for resettlement assistance and compensation for loss of non-land assets.
VIII. Prepare a resettlement plan elaborating on displaced persons‘ entitlements, the income and livelihood restoration strategy, institutional arrangements, monitoring and reporting framework, budget, and time-bound implementation schedule.
IX. Disclose a draft resettlement plan, including documentation of the consultation process in a timely manner, before project appraisal, in an accessible place and in a form and language(s) understandable to affected persons and other stakeholders. Disclose the final resettlement plan and its updates to affected persons and other stakeholders.
X. Conceive and execute involuntary resettlement as part of a development project or program. Include the full costs of resettlement in the presentation of the project‘s costs and benefits. For a project with significant involuntary resettlement impacts, consider implementing the involuntary resettlement component of the project as a stand-alone operation.
XI. Pay compensation and provide other resettlement entitlements before physical or economic displacement. Implement the resettlement plan under close supervision throughout project implementation.
XII. Monitor and assess resettlement outcomes, their impacts on the standards of living of displaced persons, and whether the objectives of the resettlement plan have been achieved by taking into account the baseline conditions and the results of resettlement monitoring. Disclose monitoring reports.
5.3 Gap Filling Between ADB and Government of Nepal Policies
41. The Government of Nepal‘s legal frameworks and ADB‘s SPS share the following: I. Both permanent and temporary involuntary resettlement shall be avoided to the
extent possible or minimized where feasible, exploring all viable alternative project designs.
II. Where displacement is unavoidable, people losing assets, livelihood, or other resources shall be assisted in improving status at no cost to them.
42. There are certain differences as shown in Table 9, and where different, ADB‘s SPS will be applied for subprojects.
Resettlement Plan of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, Lamjung
21| P a g e
5.4. Key Difference between ADB Policy and Government of Nepal LegalFramework
Table 9: Key Difference between ADB Policy and GoN
S.N. ADB Policy Government of Nepal Legal Framework
1 Compensation for assets regardless of legal ownership.
Legal ownership is required for compensation eligibility; however, tenants registered with the Land Revenue Office are also recognized.
2 Compensation to all affected persons regardless of tenure for all affected structures.
Encroachers are not entitled to compensation.
3 Compensation for affected assets at replacement cost.
Compensation is to be determined by the compensation Fixation Committee to be formed under the Chief District Office which may be replacement cost.
43. In cases where subprojects involve voluntary donation and no other land acquisition and
involuntary resettlement impacts, the subproject will be classified as Category C, but the
CLPIU will prepare a report to ADB (to be attached to the classification form) which will
document that: (i) the subproject site is selected in full consultation with landowners and
any non-titled affected persons; (ii) voluntary donations do not severely affect the living
standards of affected persons and the amount of agricultural or other productive land to be
acquired from each affected household does not exceed 5% of the total productive
landholdings of the household; (iii) voluntary donations are linked directly to benefits for the
affected persons; (iv) any voluntary donation will be confirmed through written record and
verified by an independent third party; (v) there is an adequate grievance process (vi) no
affected household will be displaced from housing and severely affected; (viii) no affected
household is vulnerable; and (ix) a process is in place to provide official documentation to
those who donated land of their landholding post- donation. In cases where the subproject
is classified as B and involves voluntary donation, the voluntary donation report will be
attached to the resettlement plan.
44. All involuntary land acquisition will be compensated at replacement cost so that the
economic and social future of APs will generally be as favorable as it would have been in
the absence of the project. The absence to formal title to land will not be a bar to
compensation assistance for loss of assets and special attention will be paid to ensuring that
households headed by women and other vulnerable groups receive appropriate assistance
to help them and improve their status. The APs whose land will be affected by the road was
informed by publishing notice during census survey, which will remain the ―cut-off-date (14-
03-2017) for the entitlement and owners (including non-titled) of affected assets. All the land
transaction which takes place between census survey and government notice publication is
also eligible for compensation. This issue will be resolved as per prevailing Act. Official
owners will come up with their valid documents to get compensation that will be
subsequently verified by concerned authorities. The entitlement policy/matrix is attached in
Appendix X.
Resettlement Plan of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, Lamjung
22| P a g e
6. ENTITLEMENTS, ASSISTANCE AND BENEFITS
45. The APs whose land is being affected by the road subproject was informed to the local people by publishing a general notice during the socioeconomic survey. The date of socio-economic survey, 14 March, 2017, will remain the cut-off-date for the entitlement that was informed to the interviewed families during the field survey and community meetings. The owners, including non-titled, of the affected assets till the cut-off-date are eligible to be categorized as APs.
46. The compensation to be paid for affected assets will be based on the principle of replacement cost, which is the amount needed to replace an affected asset without deduction for taxes and/or costs of transaction before displacement and which is operationally defined as follows:
i. Productive land (agricultural, ponds, and forest) based on replacement cost that reflect recent land sales, and in the absence of such recent sales, based on productive value;
ii. Residential land based on replacement cost that reflect recent land sales, and in the absence of such recent land sales, based on similar location attributes;
iii. Houses and other related structures based on replacement cost reflecting current market prices of materials and labor without depreciation nor deductions for salvaged building materials;
iv. Annual crops equivalent to current market value of crops at the time of compensation. v. For perennial corps and trees, cash compensation at replacement cost is equivalent to
current market value given the type, age, and productive value (future production) at the time of compensation. Timber trees based on diameter at four feet height at current market value;
vi. For temporary impacts, no compensation for land if returned to the legal owners, promissory and non-legal right users, and the land restored to pre-project condition within 3 months after use. If the land is not returned and restored to pre-project condition within 3 months, the affected person will receive compensation at replacement cost for the land. A penalty clause will be included in the contractor‘s contract to ensure that the cost of such compensation is recovered from the contractor.
47. The residential and commercial loss will be provided with allowances in order to support
their living condition. For the houses to be relocated, material transport allowances is provided. Similarly, if there is loss of income due to disruption of business or employment, material transport and one time assistance allowance is provided. Loss of standing crops and trees will also be compensated on the current market provision. Further the policies on compensation and other entitlements are attached in Appendix X.
48. A Gender Equality and Social Inclusion Action Plan (GESI/AP) has been prepared for the
Project and subprojects will be prepared and implemented in accordance with the
GESI/AP. Consistent with the GESI/AP, resettlement planning and implementation will
ensure that women, as members of the affected households, are adequately considered
when they are physically or economically displaced by subprojects. They will be given
equal opportunity for participation in public consultations. To ensure gender-sensitive and
culturally responsive measures, the executing agency and the implementing agencies will
adopt suitable strategies to ensure the active involvement of women consistent with the
GESI/AP.
Resettlement Plan of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, Lamjung
23| P a g e
7. RELOCATION OF HOUSING AND SETTLEMENTS
49. There are 152 structures affected by the road subproject in which 9 structures are public.
There are 143 private structures affected along the alignment. Out of 143 private structures,
only 2 structures will be relocated beyond the CoI whereas 4 earthquake damage structures
will get only material transportation allowances. Other eligible structure owners will be
entitled to get transportation and other reestablishment cost based on RF. Hence, the
relocation cost for structures along the sub-project is NRs. 16500(refer Appendix IV for
details).
50. Although these two families are being physically displaced by the subproject, it is learnt that
the families will manage another place for temporary shifting making them less vulnerable in
terms of resettlement. The structure owner has enough space in the same plot beyond CoI
in the same village of the road in order to rebuild the house.
51. RP has allocated full compensation amount for the physical structures and also allocated
material transport allowances and one time allowance for disruption of the economic activity.
The relocation of the affected residences will be completed before civil works starts at the
particular chainage.
52. APs will be compensated at replacement cost for any loss of assets in addition to other
assistance. Compensation will be provided as per replacement and relocation cost on the
basis of entitlement matrix. Further the replacement cost for land has been proposed at
25% increment to the government rate. As per the Reconstruction Related Act 2072, The
Notice 2, Part 3 and Part 5 of this Act‘s Regulation explain about the detail of CDC working
procedures. Clause 8 (2) states the composition of CDC as follows:
Chief District Officer – Chairperson
Land Revenue Officer – Member
Officer appointed by NRA – Member
President/Secretary/Executive Officer from VDC/Municipality – Member
Survey Officer –Member
Project Officer – Member Secretary
7.1 Valuation and Compensation Determination
53. The survey and valuation of affected HHs‘ properties were undertaken by Consultants on the basis of respective district rate. The replacement cost for land has been proposed at
25% increment to the government rate. Compensation for structures is calculated on
replacement cost on the basis of entitlement matrix provisioned in RF. Cadastral mapping
has verified the land plots of road alignment for the deed transfer.
Resettlement Plan of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, Lamjung
24| P a g e
8. INCOME RESTORATION AND REHABILITATION PROGRAM
54. During the socioeconomic survey, 148 interviewed HHs have expressed their interest to be
the part of the training and benefit from entrepreneurial skills. 162 HHs are proposed for the
training and priority will be given to Dalits, Janajatis, women HH-heads and BPLs HHs.
Income restoration program (IRP) will be designed for the one person per family in 16-45
age-group. List of trainings are being finalized in the district and the tentative cost of the
training program is NRs 319584.56.
55. 119 non-interviewed HHs, whenever they approach the project, will be given further
consultation on entitlement, compensation. The amount of compensation has been
separated in the reserve fund as the absentee assistance cost NRs 119000.00 for non-
interviewed owner as a precautionary measure.
9. RESETTLEMENT BUDGET
57. The total resettlement cost includes compensation and allowances, deed transfer fees,
operation and administration costs. A contingency of 20% will be included in these cost
estimates to be used as required during implementation of the resettlement plan.
58. The compensation package includes compensation for affected land plots and other
structures. The replacement cost for land has been proposed at 25% increment to the
government rate. Compensation for structures is calculated on replacement cost on the
basis of entitlement matrix provisioned in RF. Additionally, allowances for material transport
and business allowances for affected structures will also be estimated as per entitlement
matrix. Similarly, compensation of affected crops is valued on the basis of prevailing market
rate and trees are compensated on the reference provided by Department of Forest (DoF).
However, all these valuations will be endorsed by CDC before finalization of the
compensation package. The detail cost estimation and basis of compensation are described
under following paragraphs.
9.1 Compensation for land
59. The additional requirement of private lands (148 Interviewed HHs including 119 absentee
HHs with 50 non-registered plots) for upgrading is 5.41 ha it cost NRs 4833406.74 as per
the replacement cost for land. It has been proposed at 25% increment to the government
rate. The rate for land compensation is presented in the Table 10.
Resettlement Plan of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, Lamjung
25| P a g e
Table 10: Details of Land Rate of the affected Plots
S.N. Name of the VDC
DLRO Land Rate
per sqm.
Replacement cost rate per sqm.(25% increment)
1 Archalbot 88.45 110.57
2 Shreebhanjyang 45.21 56.51
3 Nauthar 74.69 93.37
4 Pachok 74.69 93.37
Source: District Land Revenue office, Lamjung District
9.2 Compensation for structures
60. There are 143 private and 9 public structures affected along the alignment. Compensation
amount for these structures is calculated by the technical team based on district norms
taking account of RF criteria and considering recent NRA norms. The total compensation
amount of the private affected structures is NRs.4445031.95 (except relocation cost) and
total compensation of public structures is NRs.898829.48.
9.3 Compensation for standing crops
61. The major crop cultivated in affected land is maize. However, compensation for affected
crops is calculated for all affected land plots on the basis of average Maize productivity of
the available data. One crop variety is compensated from the crop cycle of the local
agriculture calendar. In this road area, the amount of compensation for maize stands to
NRs.692891.39 of 5.41ha. (refer Appendix V for details).
9.4 Compensation for trees
62. The affected trees are compensated not for their timber value but only for harvesting and
transportation cost based on the girth and height of the tree. The man-days required for the
calculation is provided by the Ministry of Forest and Soil Conservation Norms 2060
explained in Table 11 and the unskilled wage rate NRS 550.(2072/73).
Table 11: Labor Requirement for Cutting and Transportation of Trees Girth of Tree Labor Requirement (Man days)
Above 12 cm to 30 cm 0.13
Above 31 cm to 60 cm 0.39
Above 61 cm to 90 cm 0.52
Above 91 cm to 120 cm 1.56
Above 121 cm to 180 cm 2.50
Above 181 cm to 240 cm 4.00
Above 242 cm to 300 cm 12.99
Above 300 cm 41.67
Distance between felling spot and stacking yard Labor Requirement (mandays)
First 10 m 0.5
For each additional 10 m 0.08
Resettlement Plan of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, Lamjung
26| P a g e
For first 1000 m 8.42
For each additional 1000 m 8.00
For first 5000 m 40.42
For small seedling less than 12 cm girth is NRs. 10 per seedling 4Source: Ministry of Forest and Soil Conservation, 2060
63. There are total 1106 trees affected along the road alignment in private and3CFUG forest
land areas. The harvesting and transportation cost of these trees are summarized in the
Table 12.
Table 12: Summary of Harvesting and Transportation Cost of the Affected Trees
S.N. Ownership Trees count Harvesting cost
Transportation cost Total cost
1 Private Trees 853 140552.5 21131.7 161684
3 Raniswara CFUG 123 53619.5 9027.19 62646.69
4 Sikhra CFUG 127 164669 12063.17 76732.17
5 Kerabari CFUG 3 1947 392.04 62646.69
Total 1106 360788 42614.1 363709.8
64. There are private and CFUG fruit trees affected along the road alignment. The private and
CFUG fruit trees are estimated to be NRs 462000.00 and 40000.00 respectively.
9.5 Other Supporting Cost
65. Other supporting costs in Resettlement Plan implementation includes, compensating the
time given by the affected households during deed transfer and other purposes. This cost
includes the amount required for management cost for APs‘ households and deed transfer fees in the district. The estimated amount for supporting cost is NRs 544000.
4MFSC. 2060. Norms, 2060. Ministry of Forests and Soil Conservation, Kathmandu.
Resettlement Plan of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, Lamjung
27| P a g e
9.6 Total RP Cost Estimate of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-
PachokRoadSubproject
66. Resettlement budget includes compensatory amounts, implementation and
management costs for APs‘. The total cost estimated for implementation of this proposed resettlement plan for Belghari-Archalbot-Lamabagar-Sernabazar-Liture-
Pachok Road subproject is NRs 14966427.49. Table 13 provides the details for the
resettlement implementation budgeting. The total direct compensatory cost in the road
subproject is NRs 11752369.11.The estimated training cost is NRs 319584.56.
Resettlement Plan of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, Lamjung
28| P a g e
Table 13: Budget for Resettlement Plan Implementation
S.N. Budget Unit Total loss
Amount (NRs.) Remarks
1. DIRECT COST
1.1 Land Compensation of Interviewed HHs Ha. 2.85 2655617.30 148 Interviewed HHs
1.2 Land Compensation of Absentees‘ HHs Ha. 1.83 1504586.33 119 Absentees‘ HHs
1.3 Compensation for Non-Registered Land Ha. 0.73 673203.11 50 Non-Registered Plots
1.4 Private Trees No. 853 161684.00
1.5 Private Fruit Trees No. 468 462000.00
1.6 CFUGs Trees No. 253 202025.54 3 CFUGs
1.7 CFUGs Fruit Trees No 20 40000.00 CFUG
1.8 Private Crops (Maize) Ha. 5.41 692891.39 247 HHs(including absentee HHs and 50 non-registered plots)
1.9 Private Structures No. 108 3914240.64
Total 108 structures out of this only 2 residences are fully affected and other structures are partial and small structures which details are attached in appendix IV.
1.1 Private Residence EQ No. 6 317985.42
Out of 6 EQ affected structures 4 are residences and 2 are affected only pali. Cost calculates only material transportation.
1.1 Temporary CGI /taharas No. 29 212805.89 29 Temporary CGI taharas, Cow/cattle sheds
1.1 Relocation /Transportation cost No. 2 16500.00 Relocate beyond the RoW.
1.1 Public Structures No. 9 898829.48 4 tapstands, 2 chautara, 1 irrigation canal, 1 temple and 1 health post
Sub Total 11752369.11
2. INDIRECT COST
2.1 Deed Transfer Fees plots 425 425000.00 @400
2.2 Deed Transfer Fees for Absentee HHs 119 119000.00 @1000
Sub Total 544000.00
3
Income Generation and
Livelihood Improvement
Program LS 162 319584.56 162 APs who are taken from dalit,janajatis, and women HHs
4 Contingency (20%) 2350473.82
GRAND TOTAL(1+2+3+4) 14966427.49
Resettlement Plan of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, Lamjung
29| P a g e
10. INSTITUTIONAL ARRANGEMENTS
67. The National Reconstruction Authority (NRA) is the executing agency of the project. The
Central Level Project implementation Unit (CLPIU) under Ministry of Federal Affairs and
Local Development (MOFALD) supported by Central Implementation Support
Consultant(CISC) provides overall guide and monitoring of the project activities at central
level. District Level Implementation Unit (DLPIU) supported by District Level Implementation
Support Consultant (DISC) will be responsible to implement overall activities at district
68. The DISCs together with the CLPIU and DLPIU, will assist in developing and updating resettlement plans through the conduct of the DMS in a participatory and transparent way and consistent with the project resettlement principles and the resettlement framework. Once approved by the NRA and reviewed and concurred by ADB, the CISC will provide technical advice in the implementation of the approved resettlement plan. The CISC will likewise provide capacity-building orientation, as needed, to concerned personnel of the CLPIU and DLPIU.
69. Together with the CLPIU and DLPIU, CISC and DISC will supervise civil works activities to
be carried out by contractor/s for quality assurance. Furthermore, the contractors will be
responsible to pay appropriate compensation if the land is taken temporarily such as for
labor camp, material storage etc. as stated in Resettlement Framework. In addition, CISC
will assist the CLPIU in regular monitoring of resettlement plan implementation.
Resettlement Plan of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, Lamjung
30| P a g e
11. IMPLEMENTATION SCHEDULE
70. An implementation schedule has been agreed for timely completion of implementation of
RP. Table 14 below presents time-bound action plan to complete identified activities of the
RP including compensation payment and transfer of deed of ownership. Draft Resettlement
Plan has been disclosed to the APs and Local Government at subproject site. A translated
copy of summary of resettlement plan (in Nepali) has also been shared with APs. The
objective of disclosure was to inform APs regarding their entitlement and working approach
and modality.
71. Though the contract has already been signed after approval of resettlement plan from NRA,
contractor‘s mobilization schedule has been synchronized with the RP implementation schedule. The contractor has been well instructed to initiate the works in the sections where
compensation payment is not required or the activity falls in public land. The RP
implementation schedule presented in the Tables below presents the section wise
implementation plan matching with contractor‘s mobilization schedule. DISC will monitor the implementation status and report to DLPIU and CISC in a periodic basis. In case of any
deviation from the agreed schedule, updated schedule will be agreed and implemented in
accordance with the new milestone. The DISC and DLPIU ensures that no physical
possession will be taken prior to compensation payment.
Resettlement Plan of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, Lamjung
31| P a g e
Road Alignment Status for construction works
S.N Chainage Land Trees Compensation
Distribution
Proposed
Completion Date
Planned
Contractor Remarks
From To Pub Prvt. Com Prvt
1 0+040 0+150
Yes
yes
Not yet, may be
start from 1st
November
25 Nov 2017 1st
Dec 2017 Will be started compensation
2 0+150 0+500 Yes
yes
Public land 10 Oct 2017
3 0+500 0+700
Yes
yes 30 Nov 2017 1st
Dec 2017 Will be started compensation
4 0+700 0+800
Yes
yes 30 Nov 2017 1st
Dec 2017 Will be started compensation
5 0+800 1+200
Yes
yes 25 Dec 2017 1st
Jan 2018 Will be started compensation
6 1+200 1+500 Yes
yes
Public land 8 Sept to 19 Sept Construction ongoing
7 1+500 3+000
Yes
yes 25 Dec 2017 1st
Jan 2018 Will be started compensation
8 3+020 Yes
1.Hadi Khola Bridge(under construction by DOR)
9 3+020 3+890
Yes
yes Not yet, may be
start from 1st
November
10th
Dec 2017 15th
Dec 2017 Will be started compensation
10 3+890 3+900 Yes
yes
Public land 22 Oct 2017
11 3+900 6+300
Yes
yes 10th
Dec 2017 15th
Dec 2017 Will be started compensation
12 6+300
2. Kesedi Khola Bridge DPR for Bridge construction underway by DDC
13 6+300 6+800
Yes
yes Not yet, may be
start from 1st
November
25 Dec 2017 1st
Jan 2018 Will be started compensation
14 6+800 7+140 Yes
yes
Public land
1st
Nov 2017
15 7+000 10+500
Yes
yes 25 Dec 2017 1st
Jan 2018 Will be started compensation
16 10+500
3.Saadhi Khola Bridge Slab culvert purposed
17 10+500 11+300
Yes
yes Not yet may be
start from 1st
November
30 Dec 2017 1st
Jan 2018 Will be started compensation
18 11+300 12+590
Yes
yes 30 Dec 2017 1
st Jan 2018
Will be started compensation
19 12+590
4.Karate Khola Bridge End Point of Road
Source: DLPIU/DISC, Lamjung
Resettlement Plan of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, Lamjung
32| P a g e
Table 14: RP Implementation Schedule for Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road
SN Activities
2017/18 Responsibility
Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
I 2 I 2 I 2 1 2 3 2 I 2 I 2 I 2 I 2 I 2 I 2 I 2 I 2 I 2 I 2 I 2
1
Co tra tor’s o ilizatio schedule
Joint construction survey, equipment mobilization
and HR mobilization
Excavation and civil
works in 2,6,10,14
Excavation and civil works in reset of the
sections (Private Land)
DLPIU/DISC/Contractor
2
Cadastral survey, Final list
of affected people,
consultation with APs
DLPIU/DISC
3
Consultation and
grievances resolution
Throughout project duration CLPIU/DLPIU/DISC/GRC
4
HH survey and field works,
data analysis, draft report
preparation
CLPIU/DLPIU/DISC
5
Submit final draft RP to
CLPIU/NRA/ADB for review
and approval
CLPIU/DLPIU/DISC
6
Draft RP disclosure in site
DLPIU/DISC
7
ADB comments
incorporated
CLPIU/DLPIU
8
Notice publication and
grievance collection
CLPIU/DLPIU/DISC
9
CDC meeting for
compensation
determination
CDO/NRA/CLPIU/DISC
10
Call APs application for
compensation claim
DLPIU/DISC
11
Verify application
documents
NRA/DLPIU/DISC
12 Pay compensation to APs
CLPIU/DLPIU/DISC
13 Deed Transfer
DLPIU/DISC
14
I ple e tatio of AP’s Trainings
CLPIU/DLPIU/DISC
15
Regular monitoring
Evaluation of RP
Implementation progress &
achievement
Throughout project duration NRA/CLPIU/DLPIU/DISC
Resettlement Plan of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, Lamjung
33| P a g e
12. MONITORING AND EVALUATION
72. The Project has a mechanism to monitor and evaluate the resettlement and compensation
process. The CLPIU through the DLPIU, CISC and DISC will conduct regular monitoring and
evaluation of the updating and implementation of the resettlement plan. Monitoring and
evaluation is intended to help ensure that the resettlement plan is prepared and
implemented according to the resettlement framework
73. The following key indicators will be monitored periodically by CLPIUs
(i) Compensation and entitlements are computed at rates and procedures as provided in the
approved resettlement plan; (ii) Affected households are paid as per agreement with project authorities; (iii) Public information, public consultation and grievance redress procedures are followed as
described in the approved resettlement plan; (iv) Public facilities and infrastructure affected by the Project are restored promptly; and,
(v) The transition between resettlement and civil works is smooth.
74. The NRA as the project executing agency can monitor and supervise overall RP
implementation and progress. CISC submits the monthly, quarterly semi-annual reports to
CLPIU/NRA and ADB. DLPIU is primarily responsible to submit the report to CLPIU. DISC
team will support to prepare the monthly report on behalf of DIPIU to be finally submitted to
CLPIU through CISC.
Resettlement Plan of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, Lamjung
34| P a g e
APPENDICES
Appendix I: List of Affected Households
Appendix II: Poverty Analysis of Interviewed Households
Appendix III: Details on Land Compensation Estimation
Appendix IV:Details on Structure Compensation Estimation
Appendix V: Details on Crop Compensation Estimation
Appendix VI: Details on Private Trees Compensation Estimation
Appendix VII: Details on CFUG Trees Compensation Estimation
Appendix VIII: Details on Fruits Trees Compensation Estimation
Appendix IX: Nepali Summary
Appendix X: Entitlement Matrix for Resettlement Plan under EEAP
Appendix XI: Consultation Meeting Minutes
Appendix XII: Photographs of Road Alignment
Poverty Analysis of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, Lamjung
Pre Project Scenerio Post Project Scenerio
S.N
.
Lan
d O
wn
er
Na
me
Ho
use
ho
ld h
ea
d
VD
C
Wa
rd N
o.
Fa
mil
y M
em
be
rs
Aff
ect
ed
Plo
t n
o.
Sh
ee
t n
o
To
tal
Lan
d h
old
ing
, sq
m
Ex
isit
ng
Are
a,
sqm
Ne
w C
ut
Are
a,
sqm
To
tal
Aff
ect
ed
are
a (
sqm
)
To
tal
foo
d s
uff
icie
ncy
, m
th
Ag
ricu
ltu
ral
Inco
me
No
n A
gri
cult
ura
l In
com
e
To
tal
Inco
me
Per
Cap
ita I
nco
me
Po
vert
y L
evel
Po
st
Lan
d H
old
ing
Po
st
Fo
od
Su
ffic
ien
cy
Mo
nth
Lan
d l
oss %
Po
st
Ag
ricu
ltu
ral
Inco
me
Po
st
To
tal
Inco
me
Po
st
Per
Cap
ita I
nco
me
Po
st
Po
vert
y L
evel
Rem
ark
s
1
Panchasingh,
Deumaya Gurung
Deumaya
Gurung Pachowk 1 5 46 094-0959 1996.83 58.28 71.31 129.59 12 190000 28000 218000 43600 1.5307 1925.52 12 3.57 183214.8 211215 42242.96 1.48 Interviewd
2 Karna bdr. Gurung
Lilamaya
Gurung Pachowk 1 4 337 094-0960 37876.31 989.85 1086.24 2076.09 12 191000 35000 226000 56500 1.98358 36790.07 12 2.87 185522.39 220522 55130.60 1.94 Interviewd
3 Sita Gurung Sita Gurung Pachowk 1 3 440 094-0959 2642.93 0 13.92 13.92 6 25000 130000 155000 51666.7 1.8139 2629.01 6 0.53 24868.328 154868 51622.78 1.81 Interviewd
4 Harka bdr.Gurung
Harka
bdr.Gurung Pachowk 1 6 443 094-0959 1720.6 0 17.8 17.8 12 90000 240000 330000 55000 1.93092 1702.8 12 1.03 89068.929 329069 54844.82 1.93 Interviewd
5 Nimba Gurung
Nimba
Gurung Pachowk 1 3 524 094-0959 10698.82 142.4 141.41 283.81 12 100000 240000 340000 113333 3.97887 10557.41 12 1.32 98678.265 338678 112892.76 3.96 Interviewd
6
Ser bdr
GurungSer bdr
Gurung Pachowk 1 6 336 094-0960 21210.24 25.78 38.8 64.58 4 30000 180000 210000 35000 1.22877 21171.44 4 0.18 29945.121 209945 34990.85 1.23 Interviewd
7
Bhairav/Makhhui
Gurung
Jivraj
Gurung Pachowk 2 8 468 094-1000 30913.36 848.62 1037.36 1885.98 12 146000 144000 290000 36250 1.27265 29876 12 3.36 141100.68 285101 35637.58 1.25 Interviewd
8
Som Bdr.
GurungSom Bdr.
Gurung Pachowk 2 6 595 094-1000 9592.05 0 2.65 2.65 12 69000 106000 175000 29166.7 1.02397 9589.4 12 0.03 68980.937 174981 29163.49 1.02 Interviewd
9
Aaita Bdr.
GurungAaita Bdr.
Gurung Pachowk 2 4 469 094-1000 9625.95 330.53 403.61 734.14 3 44000 80000 124000 31000 1.08834 9222.34 3 4.19 42155.108 122155 30538.78 1.07 Interviewd
10 Amar Gurung
Amar
Gurung Pachowk 2 5 467 094-1000 10738.89 208.04 177.63 385.67 12 45000 500000 545000 109000 3.82674 10561.26 12 1.65 44255.663 544256 108851.13 3.82 Interviewd
11 Bakhat Bdr. Gurung
Bakhat Bdr.
Gurung Pachowk 3 2 914 094-1000 14154.48 206.35 267.78 474.13 12 80000 84000 164000 82000 2.87883 13886.7 12 1.89 78486.529 162487 81243.26 2.85 Interviewd
Poverty Analysis of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, Lamjung
Pre Project Scenerio Post Project Scenerio
S.N
.
Lan
d O
wn
er
Na
me
Ho
use
ho
ld h
ea
d
VD
C
Wa
rd N
o.
Fa
mil
y M
em
be
rs
Aff
ect
ed
Plo
t n
o.
Sh
ee
t n
o
To
tal
Lan
d h
old
ing
, sq
m
Ex
isit
ng
Are
a,
sqm
Ne
w C
ut
Are
a,
sqm
To
tal
Aff
ect
ed
are
a (
sqm
)
To
tal
foo
d s
uff
icie
ncy
, m
th
Ag
ricu
ltu
ral
Inco
me
No
n A
gri
cult
ura
l In
com
e
To
tal
Inco
me
Per
Cap
ita I
nco
me
Po
vert
y L
evel
Po
st
Lan
d H
old
ing
Po
st
Fo
od
Su
ffic
ien
cy
Mo
nth
Lan
d l
oss %
Po
st
Ag
ricu
ltu
ral
Inco
me
Po
st
To
tal
Inco
me
Po
st
Per
Cap
ita I
nco
me
Po
st
Po
vert
y L
evel
Rem
ark
s
12 Dadman Gurung
Dadman
Gurung Pachowk 3 5 900 094-1000 4945.75 20.53 37.77 58.3 3 150000 0 150000 30000 1.05323 4907.98 3 0.76 148854.47 148854 29770.89 1.05 Interviewd
13 Gayin singh Gurung
Gayin singh
Gurung Pachowk 3 6 976 095-0961 15432.41 30.91 58.3 89.21 12 40000 146000 186000 31000 1.08834 15374.11 12 0.38 39848.889 185849 30974.81 1.09 Interviewd
14 Mann bdr. Gurung
Mann bdr.
Gurung Pachowk 3 9 951 094-1000 13369.14 66.86 50.19 117.05 3 20000 900000 920000 102222 3.58879 13318.95 3 0.38 19924.917 919925 102213.88 3.59 Interviewd
15
Iman singh(surya
Prasad)
Surya pd.
Gurung Pachowk 1 5 434 094-0959 7529.22 49.62 49.6 99.22 5 30000 480000 510000 102000 3.58098 7479.62 5 0.66 29802.37 509802 101960.47 3.58 Interviewd
16 Janga sub Gurung
Dudhmaya
Gurung Pachowk 1 8 447 094-0959 4635.68 170.71 214.38 385.09 3 107000 360000 467000 58375 2.04941 4421.3 3 4.62 102051.72 462052 57756.46 2.03 Interviewd
17
Sat
bdr.GurungManraj
Gurung Pachowk 1 5 925 094-1000 14635.37 0 10.47 10.47 5 147000 0 147000 29400 1.03217 14624.9 5 0.07 146894.84 146895 29378.97 1.03 Interviewd
18 Yubaraj Gurung
Yubaraj
Gurung Nauthar 8 4 555 094-0959 812.71 5.47 14.75 20.22 9 75000 90000 165000 41250 1.44819 797.96 9 1.81 73638.813 163639 40909.70 1.44 Interviewd
19 Ladimaya Gurung
Ladimaya
Gurung Nauthar 2 10 62 094-0997 10840.26 27.52 41.14 68.66 6 90000 230000 320000 32000 1.12345 10799.12 6 0.38 89658.44 319658 31965.84 1.12 Interviewd
20 Tulasi pd. Ghimire
Tulasi pd.
Shrestha Nauthar 8 6 115 094-0958 12182.8 10.1 19.36 29.46 8 310000 70000 380000 63333.3 2.22349 12163.44 8 0.16 309507.37 379507 63251.23 2.22 Interviewd
21 Badmaya Gurung
Badmaya
Gurung Nauthar 8 14 507 094-0959 4812.94 0 30.89 30.89 9 145000 800000 945000 67500 2.36977 4782.05 9 0.64 144069.37 944069 67433.53 2.37 Interviewd
22 Bimaya Gurung
Bimaya
Gurung Nauthar 5 4 465 094-0958 286.12 0 11.48 11.48 2 75000 1035000 1110000 277500 9.74238 274.64 2 4.01 71990.773 1106991 276747.69 9.72 Interviewd
Poverty Analysis of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, Lamjung
Pre Project Scenerio Post Project Scenerio
S.N
.
Lan
d O
wn
er
Na
me
Ho
use
ho
ld h
ea
d
VD
C
Wa
rd N
o.
Fa
mil
y M
em
be
rs
Aff
ect
ed
Plo
t n
o.
Sh
ee
t n
o
To
tal
Lan
d h
old
ing
, sq
m
Ex
isit
ng
Are
a,
sqm
Ne
w C
ut
Are
a,
sqm
To
tal
Aff
ect
ed
are
a (
sqm
)
To
tal
foo
d s
uff
icie
ncy
, m
th
Ag
ricu
ltu
ral
Inco
me
No
n A
gri
cult
ura
l In
com
e
To
tal
Inco
me
Per
Cap
ita I
nco
me
Po
vert
y L
evel
Po
st
Lan
d H
old
ing
Po
st
Fo
od
Su
ffic
ien
cy
Mo
nth
Lan
d l
oss %
Po
st
Ag
ricu
ltu
ral
Inco
me
Po
st
To
tal
Inco
me
Po
st
Per
Cap
ita I
nco
me
Po
st
Po
vert
y L
evel
Rem
ark
s
23 Chature sarki
Chature
sarki Nauthar 8 6 175 094-0958 7110.16 134.74 165.79 300.53 12 100000 320000 420000 70000 2.45754 6944.37 12 2.33 97668.266 417668 69611.38 2.44 Interviewd
24 Rajkumar Shrestha
Rajkumar
Shresth Nauthar 2 6 113 094-0997 2929.08 123.39 165.8 289.19 10 8000 300000 308000 51333.3 1.80219 2763.28 9 5.66 7547.1616 307547 51257.86 1.80 Interviewd
25 Nirmala Ghimire
Mohan
Pd.Ghimire Nauthar 2 4 678 094-0957 15374.96 129.54 164.01 293.55 12 105000 360000 465000 116250 4.08127 15210.95 12 1.07 103879.93 463880 115969.98 4.07 Interviewd
26 Dal subba Gurung
Dal subba
Gurung Nauthar 8 5 472 094-0959 13069.82 19.29 23.39 42.68 3 40000 110000 150000 30000 1.05323 13046.43 3 0.18 39928.415 149928 29985.68 1.05 Interviewd
27 Mayanath wagle Jeunath Nauthar 2 6 69 094-0997 1089 80.82 108.76 189.58 12 12200 3850000 3862200 643700 22.5988 980.24 11 9.99 10981.568 3860982 643496.93 22.59 Interviewd
28
Bipinchandra
Ghimire
Tripura
Ghimire Nauthar 8 6 164 094-0958 4590.43 0 7.2 7.2 7 77000 700000 777000 129500 4.54645 4583.23 7 0.16 76879.227 776879 129479.87 4.55 Interviewd
29 Nardev Gurung
Nardev
Gurung Nauthar 5 4 386 094-0958 6712.55 250.79 306.23 557.02 12 60000 480000 540000 135000 4.73954 6406.32 11 4.56 57262.769 537263 134315.69 4.72 Interviewd
30 Govinda wagle
Govinda
wagle Nauthar 2 5 71 094-0997 5048.87 115.76 109.87 225.63 12 80000 120000 200000 40000 1.40431 4939 12 2.18 78259.096 198259 39651.82 1.39 Interviewd
31
Ramraj Bista(now-
Kunimaya Shrestha)
Arun kumar
Shrestha Nauthar 2 4 1230 094-0997 309.91 0 21.29 21.29 6 25000 360000 385000 96250 3.37911 288.62 6 6.87 23282.566 383283 95820.64 3.36 Interviewd
32 Nalumaya Gurung
Yobir
Gurung Nauthar 2 7 1184 094-0997 6829.6 3.97 11.94 15.91 12 265000 0 265000 37857.1 1.32908 6817.66 12 0.17 264536.71 264537 37790.96 1.33 Interviewd
33
Kam singh
GurungKam singh
gurung Nauthar 8 5 441 094-0959 11503.53 113.87 133.92 247.79 12 65000 124000 189000 37800 1.32707 11369.61 12 1.16 64243.293 188243 37648.66 1.32 Interviewd
Poverty Analysis of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, Lamjung
Pre Project Scenerio Post Project Scenerio
S.N
.
Lan
d O
wn
er
Na
me
Ho
use
ho
ld h
ea
d
VD
C
Wa
rd N
o.
Fa
mil
y M
em
be
rs
Aff
ect
ed
Plo
t n
o.
Sh
ee
t n
o
To
tal
Lan
d h
old
ing
, sq
m
Ex
isit
ng
Are
a,
sqm
Ne
w C
ut
Are
a,
sqm
To
tal
Aff
ect
ed
are
a (
sqm
)
To
tal
foo
d s
uff
icie
ncy
, m
th
Ag
ricu
ltu
ral
Inco
me
No
n A
gri
cult
ura
l In
com
e
To
tal
Inco
me
Per
Cap
ita I
nco
me
Po
vert
y L
evel
Po
st
Lan
d H
old
ing
Po
st
Fo
od
Su
ffic
ien
cy
Mo
nth
Lan
d l
oss %
Po
st
Ag
ricu
ltu
ral
Inco
me
Po
st
To
tal
Inco
me
Po
st
Per
Cap
ita I
nco
me
Po
st
Po
vert
y L
evel
Rem
ark
s
34
Jabarsingh/Tulsi
Gurung
Man pd.
Gurung Nauthar 8 4 534 094-0959 12264.77 18.32 33.35 51.67 12 225000 300000 525000 131250 4.60788 12231.42 12 0.27 224388.19 524388 131097.05 4.60 Interviewd
35
Purnaa/Mekhraj
Gurung
Mekhraj
Gurung Nauthar 8 4 499 094-0959 9132.77 171.43 188.85 360.28 10 60000 600000 660000 165000 5.79277 8943.92 10 2.07 58759.303 658759 164689.83 5.78 Interviewd
36 Kum bdr. Gurung
Kum bdr.
Gurung Nauthar 8 7 554 094-0959 2454.14 60.55 52.16 112.71 3 210000 300000 510000 72857.1 2.55785 2401.98 3 2.13 205536.68 505537 72219.53 2.54 Interviewd
37 Manmaya Sarki
Manmaya
Sarki Nauthar 8 6 621 094-0958 3262.87 90.55 91.01 181.56 7 225000 0 225000 37500 1.31654 3171.86 7 2.79 218724.16 218724 36454.03 1.28 Interviewd
38 Aasbahadur Gurung
Aasbahadur
Gurung Nauthar 8 4 552 094-0959 826.7 28.31 33.83 62.14 12 140000 400000 540000 135000 4.73954 792.87 12 4.09 134270.96 534271 133567.74 4.69 Interviewd
39 Kale Gurung Kale gurung Nauthar 8 3 156 094-0958 10891.95 311.21 390.64 701.85 6 290000 0 290000 96666.7 3.39374 10501.31 6 3.59 279599.14 279599 93199.71 3.27 Interviewd
40 Kamini sarki
Som
bahadur Nauthar 5 5 436 094-0958 15659.26 117.47 142.56 260.03 12 252000 0 252000 50400 1.76943 15516.7 12 0.91 249705.82 249706 49941.16 1.75 Interviewd
41 Chyangre Sarki
Chyangre
sarki Nauthar 8 2 466 094-0959 7311.17 57.19 103.13 160.32 12 210000 0 210000 105000 3.68631 7208.04 12 1.41 207037.78 207038 103518.89 3.63 Interviewd
42 Ram bdr. Gurung
Rishikumar
Gurung Nauthar 2 14 77 094-0997 19903.45 120.54 108.8 229.34 12 100000 804000 904000 64571.4 2.26695 19794.65 12 0.55 99453.361 903453 64532.38 2.27 Interviewd
43
Mait bahadur
Gurung
Mait
bahadur
Gurung Nauthar 2 4 1183 094-0997 1844.15 45.23 39.46 84.69 3 5000 360000 365000 91250 3.20358 1804.69 3 2.14 4893.013 364893 91223.25 3.20 Interviewd
44 Subba Gurung
Subba
Gurung Nauthar 5 5 437 094-0958 759.14 72.73 53.95 126.68 12 2500 270000 272500 54500 1.91337 705.19 11 7.11 2322.3318 272322 54464.47 1.91 Interviewd
Poverty Analysis of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, Lamjung
Pre Project Scenerio Post Project Scenerio
S.N
.
Lan
d O
wn
er
Na
me
Ho
use
ho
ld h
ea
d
VD
C
Wa
rd N
o.
Fa
mil
y M
em
be
rs
Aff
ect
ed
Plo
t n
o.
Sh
ee
t n
o
To
tal
Lan
d h
old
ing
, sq
m
Ex
isit
ng
Are
a,
sqm
Ne
w C
ut
Are
a,
sqm
To
tal
Aff
ect
ed
are
a (
sqm
)
To
tal
foo
d s
uff
icie
ncy
, m
th
Ag
ricu
ltu
ral
Inco
me
No
n A
gri
cult
ura
l In
com
e
To
tal
Inco
me
Per
Cap
ita I
nco
me
Po
vert
y L
evel
Po
st
Lan
d H
old
ing
Po
st
Fo
od
Su
ffic
ien
cy
Mo
nth
Lan
d l
oss %
Po
st
Ag
ricu
ltu
ral
Inco
me
Po
st
To
tal
Inco
me
Po
st
Per
Cap
ita I
nco
me
Po
st
Po
vert
y L
evel
Rem
ark
s
45
Krishna/Bhupati raj
Pandey
Krishna Raj
Pandey Nauthar 2 16 126 094-0997 13741.67 34.59 61.65 96.24 12 140000 750000 890000 55625 1.95287 13680.02 12 0.45 139371.91 889372 55585.74 1.95 Interviewd
46
Atimaya, Ram
bdr.SarkiAtimaya
Sarki Shreemjyang 2 2 183 094-1076 1879.87 0 25.44 25.44 12 124000 220000 344000 172000 6.03852 1854.43 12 1.35 122321.93 342322 171160.96 6.01 Interviewd
47 Dhan bdr. Shrestha
Gore
Shrestha Shreemjyang 8 6 887 094-0997 826.6 25.56 36.35 61.91 6 140000 60000 200000 33333.3 1.17026 790.25 6 4.40 133843.46 193843 32307.24 1.13 Interviewd
48 Om bdr.Gurung
Om
bdr.Gurung Shreemjyang 4 6 12 094-1037 9548.08 31.98 80.25 112.23 12 130000 420000 550000 91666.7 3.2182 9467.83 12 0.84 128907.37 548907 91484.56 3.21 Interviewd
49
Sukman
GurungSukman
Gurung Shreemjyang 8 8 921 094-0997 10603.67 237.97 276.4 514.37 7 100000 412000 512000 64000 2.24689 10327.27 7 2.61 97393.355 509393 63674.17 2.24 Interviewd
50
Balkrishna Upadhya
Ghimire
Balkrishna
Upadhya
Ghimire Shreemjyang 4 6 20 094-1037 12034.02 282.54 351.2 633.74 12 501200 168000 669200 111533 3.91568 11682.82 12 2.92 486573.01 654573 109095.50 3.83 Interviewd
51
Bhuwan singh
Gurung
Pushparaj
Gurung Shreemjyang 4 11 9 094-1037 12538.59 142.84 174.47 317.31 6 310000 350000 660000 60000 2.10646 12364.12 6 1.39 305686.46 655686 59607.86 2.09 Interviewd
52 Samser sarki Gopal Sarki Shreemjyang 2 3 188, 189 094-1076 8747.66 156.64 332.83 489.47 12 34000 102000 136000 45333.3 1.59155 8414.83 12 3.80 32706.372 134706 44902.12 1.58 Interviewd
53 Arjun kunwar
Arjun
kunwar Shreemjyang 2 4 239, 238 094-1076 12970.23 0 41.57 41.57 12 96000 100000 196000 49000 1.72028 12928.66 12 0.32 95692.317 195692 48923.08 1.72 Interviewd
54 Dambar bdr.Gurung
Dambar
bdr.Gurung Shreemjyang 8 6 82 094-0997 8321.83 61.73 39.17 100.9 12 60000 740000 800000 133333 4.68103 8282.66 12 0.47 59717.586 799718 133286.26 4.68 Interviewd
55 Ganesh Bdr. Kunwar
Ganesh Bdr.
Kunwar Shreemjyang 2 9 237 094-1076 14423.1 0 41.42 41.42 12 80000 600000 680000 75555.6 2.65258 14381.68 12 0.29 79770.257 679770 75530.03 2.65 Interviewd
Poverty Analysis of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, Lamjung
Pre Project Scenerio Post Project Scenerio
S.N
.
Lan
d O
wn
er
Na
me
Ho
use
ho
ld h
ea
d
VD
C
Wa
rd N
o.
Fa
mil
y M
em
be
rs
Aff
ect
ed
Plo
t n
o.
Sh
ee
t n
o
To
tal
Lan
d h
old
ing
, sq
m
Ex
isit
ng
Are
a,
sqm
Ne
w C
ut
Are
a,
sqm
To
tal
Aff
ect
ed
are
a (
sqm
)
To
tal
foo
d s
uff
icie
ncy
, m
th
Ag
ricu
ltu
ral
Inco
me
No
n A
gri
cult
ura
l In
com
e
To
tal
Inco
me
Per
Cap
ita I
nco
me
Po
vert
y L
evel
Po
st
Lan
d H
old
ing
Po
st
Fo
od
Su
ffic
ien
cy
Mo
nth
Lan
d l
oss %
Po
st
Ag
ricu
ltu
ral
Inco
me
Po
st
To
tal
Inco
me
Po
st
Per
Cap
ita I
nco
me
Po
st
Po
vert
y L
evel
Rem
ark
s
56 Aasbahadur Nepali
Aasbahadur
Nepali Shreemjyang 2 3 186 094-1076 1851.63 7.85 26.86 34.71 6 170000 200000 370000 123333 4.32995 1824.77 6 1.45 167533.96 367534 122511.32 4.30 Interviewd
57 Kumar Pandey
Kumar
Pandey Nauthar 2 5
1258,
109, 108 094-0997 5576.01 224.68 254.72 479.4 12 50000 432000 482000 96400 3.38438 5321.29 11 4.57 47715.929 479716 95943.19 3.37 Interviewd
58 Goth Bdr. Gurung
Goth Bdr.
Gurung Nauthar 5 6
254, 256,
438 094-0958 19403.28 742.6 900.34 1642.94 12 175000 180000 355000 59166.7 2.0772 18502.94 11 4.64 166879.75 346880 57813.29 2.03 Interviewd
59 Gaini GurungDhan Bdr.
Gurung Nauthar 8 2 551 094-0959 786.78 42.46 51.9 94.36 4 50000 20000 70000 35000 1.22877 734.88 4 6.60 46701.746 66702 33350.87 1.17 Interviewd
60 Aaita Sarki Aaita Sarki Shreemjyang 2 3 187, 182 094-1076 8631.76 412.23 329.34 741.57 9 110000 35000 145000 48333.3 1.69687 8302.42 9 3.82 105803.01 140803 46934.34 1.65 Interviewd
61
Sarki (Shor Bdr.
Gurung)
Shor Bdr.
Gurung Nauthar 8 10
456, 511,
26202,
422 094-0959 18778.93 415.68 523.33 939.01 12 70000 620000 690000 69000 2.42243 18255.6 12 2.79 68049.245 688049 68804.92 2.42 Interviewd
62 Nabraj Ghimire
Nabraj
Ghimire Shreemjyang 8 5 86, 094-0997 9271.93 172.58 125.86 298.44 12 90000 610000 700000 140000 4.91508 9146.07 12 1.36 88778.313 698778 139755.66 4.91 Interviewd
63 Paal Jung Gurung
Paal Jung
Gurung Shreemjyang 4 2 11, 5 094-1037 16052.23 497.8 653.57 1151.37 12 62000 500000 562000 281000 9.86526 15398.66 12 4.07 59475.657 559476 279737.83 9.82 Interviewd
64 Yagyanath Ghimire
Yagyanath
Ghimire Shreemjyang 8 4 65 094-0997 7460.02 289.28 225.23 514.51 3 205000 300000 505000 126250 4.43235 7234.79 3 3.02 198810.72 498811 124702.68 4.38 Interviewd
65
Gaumati Gurung,
Jabi Gurung Jabi Gurung Shreemjyang 8 14 67, 45 094-0997 37532.84 462.2 341.01 803.21 12 180000 950000 1130000 80714.3 2.83369 37191.83 12 0.91 178364.58 1128365 80597.47 2.83 Interviewd
66 Birdhoj Gurung
Birdhoj
Gurung Nauthar 5 2 250, 251 094-0958 5343.52 157.73 203.04 360.77 12 100000 50000 150000 75000 2.63308 5140.48 12 3.80 96200.258 146200 73100.13 2.57 Interviewd
Poverty Analysis of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, Lamjung
Pre Project Scenerio Post Project Scenerio
S.N
.
Lan
d O
wn
er
Na
me
Ho
use
ho
ld h
ea
d
VD
C
Wa
rd N
o.
Fa
mil
y M
em
be
rs
Aff
ect
ed
Plo
t n
o.
Sh
ee
t n
o
To
tal
Lan
d h
old
ing
, sq
m
Ex
isit
ng
Are
a,
sqm
Ne
w C
ut
Are
a,
sqm
To
tal
Aff
ect
ed
are
a (
sqm
)
To
tal
foo
d s
uff
icie
ncy
, m
th
Ag
ricu
ltu
ral
Inco
me
No
n A
gri
cult
ura
l In
com
e
To
tal
Inco
me
Per
Cap
ita I
nco
me
Po
vert
y L
evel
Po
st
Lan
d H
old
ing
Po
st
Fo
od
Su
ffic
ien
cy
Mo
nth
Lan
d l
oss %
Po
st
Ag
ricu
ltu
ral
Inco
me
Po
st
To
tal
Inco
me
Po
st
Per
Cap
ita I
nco
me
Po
st
Po
vert
y L
evel
Rem
ark
s
67
Mama Maya
Shrestha, Hiralal
Shrestha
Hiralal
Shrestha Shreemjyang 4 7
457, 29,
26, 33,
34, 470 094-1037 31528.15 573.6 730.93 1304.53 12 130000 620000 750000 107143 3.76154 30797.22 12 2.32 126986.16 746986 106712.31 3.75 Interviewd
68 Kum Bdr. Gurung
Kum Bdr.
Gurung Shreemjyang 8 11 57, 49 094-0997 10486.61 232.9 461.8 694.7 6 245000 500000 745000 67727.3 2.37775 10024.81 6 4.40 234210.91 734211 66746.45 2.34 Interviewd
69
Bishnu ghimire,
Rajya Prasad
Ghimire
Bishnu
Ghimire Shreemjyang 8 3 58, 55 094-0997 6400.61 212.51 248.16 460.67 6 110000 200000 310000 103333 3.62779 6152.45 6 3.88 105735.16 305735 101911.72 3.58 Interviewd
70 Rojina Gurung
Kamaljit
Gurung Nauthar 5 5
264, 263,
309, 310 094-0958 19919.88 576.18 665.66 1241.84 10 45000 168000 213000 42600 1.49559 19254.22 10 3.34 43496.241 211496 42299.25 1.49 Interviewd
71 Yesraj Thapa Magar Gaj Bd Archalbot 9 6 673 094-1116 3014.31 15.45 19.8 35.25 12 215000 348000 563000 93833.3 3.29427 2994.51 12 0.66 213587.74 561588 93597.96 3.29 Interviewd
72 Dhanamaya Adhikari
Dhana bdr.
Adhikari Archalbot 8 6 172 094-1116 2652.67 61.21 91.9 153.11 12 383900 630000 1013900 168983 5.93261 2560.77 12 3.46 370600.04 1000600 166766.67 5.85 Interviewd
73 Mina Poudel
Mina
Poudel Archalbot 9 6 316 094-1156 4620.22 50.16 64.11 114.27 7 150000 300000 450000 75000 2.63308 4556.11 7 1.39 147918.61 447919 74653.10 2.62 Interviewd
74 Hari bdr.Khadka
Hari
bdr.Khadka Archalbot 6 5 183 094-1076 7890.8 181.94 200.87 382.81 12 80000 400000 480000 96000 3.37034 7689.93 12 2.55 77963.502 477964 95592.70 3.36 Interviewd
75 Srijana Pariyar
Ram bdr.
Pariyar Archalbot 9 3 330 094-1156 510.72 11.41 12.05 23.46 6 15000 440000 455000 151667 5.32467 498.67 6 2.36 14646.088 454646 151548.70 5.32 Interviewd
76
Sushila
PariyarRamesh
Pariyar Archalbot 9 4 667 094-1156 3922.78 297.41 356.18 653.59 6 105000 55000 160000 40000 1.40431 3566.6 5 9.08 95466.225 150466 37616.56 1.32 Interviewd
77 Gopal Lamichhane
nanda
bdr.Lamichh
ane Archalbot 9 8 332 094-1156 4248.54 15.44 19.7 35.14 6 145000 600000 745000 93125 3.2694 4228.84 6 0.46 144327.65 744328 93040.96 3.27 Interviewd
Poverty Analysis of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, Lamjung
Pre Project Scenerio Post Project Scenerio
S.N
.
Lan
d O
wn
er
Na
me
Ho
use
ho
ld h
ea
d
VD
C
Wa
rd N
o.
Fa
mil
y M
em
be
rs
Aff
ect
ed
Plo
t n
o.
Sh
ee
t n
o
To
tal
Lan
d h
old
ing
, sq
m
Ex
isit
ng
Are
a,
sqm
Ne
w C
ut
Are
a,
sqm
To
tal
Aff
ect
ed
are
a (
sqm
)
To
tal
foo
d s
uff
icie
ncy
, m
th
Ag
ricu
ltu
ral
Inco
me
No
n A
gri
cult
ura
l In
com
e
To
tal
Inco
me
Per
Cap
ita I
nco
me
Po
vert
y L
evel
Po
st
Lan
d H
old
ing
Po
st
Fo
od
Su
ffic
ien
cy
Mo
nth
Lan
d l
oss %
Po
st
Ag
ricu
ltu
ral
Inco
me
Po
st
To
tal
Inco
me
Po
st
Per
Cap
ita I
nco
me
Po
st
Po
vert
y L
evel
Rem
ark
s
78 Min bdr. Bhujel
Min bdr.
Bhujel Archalbot 9 6 556 094-1116 8780.97 120.81 134.85 255.66 12 70000 472000 542000 90333.3 3.17139 8646.12 12 1.54 68925.005 540925 90154.17 3.17 Interviewd
79 Devi bhakta Regmi
Devi bhakta
Regmi Archalbot 9 4 516 094-1116 4348.06 68.07 157.78 225.85 6 60000 310000 370000 92500 3.24746 4190.28 6 3.63 57822.753 367823 91955.69 3.23 Interviewd
80 Krishna bdr. Gharti
Krishna bdr.
Gharti Archalbot 9 6 557 094-1116 6213.76 54.88 118.08 172.96 12 150000 300000 450000 75000 2.63308 6095.68 12 1.90 147149.55 447150 74524.93 2.62 Interviewd
81 Subhadra Regmi Milan Regmi Archalbot 9 5 97, 98 094-1116 16576.81 327.48 386.11 713.59 6 73000 420000 493000 98600 3.46162 16190.7 6 2.33 71299.671 491300 98259.93 3.45 Interviewd
82 Bimala Adhikari
Balram
Adhikari Archalbot 9 3 49 094-1116 5746.69 54.79 54.21 109 12 64500 375000 439500 146500 5.14328 5692.48 12 0.94 63891.555 438892 146297.18 5.14 Interviewd
83
Pashupati Thapa
Kunwar
Shanta
kumari
Kunwar Archalbot 7 5 619 094-1076 6422.32 43.19 52.53 95.72 12 19400 600000 619400 123880 4.34914 6369.79 12 0.82 19241.322 619241 123848.26 4.35 Interviewd
84
Amrit
LamichhaneBalkrishna
Lamichhane Archalbot 6 6 174 094-1076 910.01 35.71 40.13 75.84 9 52000 144000 196000 32666.7 1.14685 869.88 9 4.41 49706.882 193707 32284.48 1.13 Interviewd
85 Kalpana Adhikari
Bhart bdr.
Kunwar Archalbot 7 3 674 094-1116 374.35 34.53 28.26 62.79 6 5000 200000 205000 68333.3 2.39903 346.09 6 7.55 4622.5457 204623 68207.52 2.39 Interviewd
86 Kirtiman Kunwar
Kirtiman
Kunwar Archalbot 8 8 160 094-1116 9390.91 16.31 29.99 46.3 12 105000 500000 605000 75625 2.65502 9360.92 12 0.32 104664.68 604665 75583.09 2.65 Interviewd
87
Ram chandra
Adhikari
Ram
chandra
Adhikari Archalbot 6 3 793 094-1076 7302.68 53.79 86.73 140.52 12 140000 280000 420000 140000 4.91508 7215.95 12 1.19 138337.3 418337 139445.77 4.90 Interviewd
88 Sita devi kunwar
Maan bdr.
Kunwar Archalbot 7 4 664 094-1116 3022.48 47.59 47.69 95.28 6 85000 299000 384000 96000 3.37034 2974.79 6 1.58 83658.833 382659 95664.71 3.36 Interviewd
Poverty Analysis of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, Lamjung
Pre Project Scenerio Post Project Scenerio
S.N
.
Lan
d O
wn
er
Na
me
Ho
use
ho
ld h
ea
d
VD
C
Wa
rd N
o.
Fa
mil
y M
em
be
rs
Aff
ect
ed
Plo
t n
o.
Sh
ee
t n
o
To
tal
Lan
d h
old
ing
, sq
m
Ex
isit
ng
Are
a,
sqm
Ne
w C
ut
Are
a,
sqm
To
tal
Aff
ect
ed
are
a (
sqm
)
To
tal
foo
d s
uff
icie
ncy
, m
th
Ag
ricu
ltu
ral
Inco
me
No
n A
gri
cult
ura
l In
com
e
To
tal
Inco
me
Per
Cap
ita I
nco
me
Po
vert
y L
evel
Po
st
Lan
d H
old
ing
Po
st
Fo
od
Su
ffic
ien
cy
Mo
nth
Lan
d l
oss %
Po
st
Ag
ricu
ltu
ral
Inco
me
Po
st
To
tal
Inco
me
Po
st
Per
Cap
ita I
nco
me
Po
st
Po
vert
y L
evel
Rem
ark
s
89 Jit bdr. Lamichhane
Jit bdr.
Lamichhane Archalbot 9 9 76, 78 094-1116 11744.11 304.91 276.91 581.82 12 150000 696000 846000 94000 3.30012 11467.2 12 2.36 146463.21 842463 93607.02 3.29 Interviewd
90 Bishnulal Shrestha
Bishnulal
Shrestha Archalbot 9 7 492, 390 094-1156 3835.05 96.66 121.53 218.19 12 90000 800000 890000 127143 4.46369 3713.52 12 3.17 87147.964 887148 126735.42 4.45 Interviewd
91 Tankalal Shrestha
Teklal
Shrestha Archalbot 9 5
494, 427,
391 094-1156 6966.91 215.89 255.39 471.28 12 250000 600000 850000 170000 5.96831 6711.52 12 3.67 240835.61 840836 168167.12 5.90 Interviewd
92
Kalawati Rana
Magar
Janga Bdr.
Ale Magar Archalbot 9 5 633 094-1116 583.45 23.82 26.52 50.34 2 30000 600000 630000 126000 4.42357 556.93 2 4.55 28636.387 628636 125727.28 4.41 Interviewd
93
Badrinath
LamichhaneBadrinath
Lamichhane Archalbot 9 4 635, 538 094-1116 9375.11 35.64 52.22 87.86 12 60000 60000 120000 30000 1.05323 9322.89 12 0.56 59665.796 119666 29916.45 1.05 Interviewd
94 Gangamaya Suyal
Bishnu Bdr.
Suyal Archalbot 9 4
588, 591,
585 094-1156 13264.08 456.96 388.64 845.6 12 120000 35000 155000 38750 1.36042 12875.44 12 2.93 116483.98 151484 37870.99 1.33 Interviewd
95 Khem Kumari Joshi
Govindaraj
Joshi Shreemjyang 2 4
723, 443,
722 094-1037 10408.86 216.8 392.77 609.57 12 84000 230000 314000 78500 2.75595 10016.09 12 3.77 80830.327 310830 77707.58 2.73 Interviewd
96 Tilak Bdr. Kunwar
Tilak Bdr.
Kunwar Archalbot 8 14
155, 531,
534 094-1116 13357.53 400.79 436.28 837.07 6 135000 980000 1115000 79642.9 2.79608 12921.25 6 3.27 130590.67 1110591 79327.90 2.79 Interviewd
97
Shovita+Shrijana
Kunwar
Shovita
Kunwar Archalbot 8 3
477, 676,
675 094-1116 5659.42 272.52 283.99 556.51 12 75000 99000 174000 58000 2.03625 5375.43 11 5.02 71236.496 170236 56745.50 1.99 Interviewd
98 Ganga Kunwar
Dhub
Kunwar Archalbot 7 4 620 094-1076 10544.17 409.38 500.41 909.79 12 150000 480000 630000 157500 5.52946 10043.76 11 4.75 142881.23 622881 155720.31 5.47 Interviewd
99 Prasansha Kunwar
Bal Bdr.
Kunwar Archalbot 7 6 663 094-1116 5277.69 41.92 40.17 82.09 12 175000 276000 451000 75166.7 2.63893 5237.52 12 0.76 173668.03 449668 74944.67 2.63 Interviewd
Poverty Analysis of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, Lamjung
Pre Project Scenerio Post Project Scenerio
S.N
.
Lan
d O
wn
er
Na
me
Ho
use
ho
ld h
ea
d
VD
C
Wa
rd N
o.
Fa
mil
y M
em
be
rs
Aff
ect
ed
Plo
t n
o.
Sh
ee
t n
o
To
tal
Lan
d h
old
ing
, sq
m
Ex
isit
ng
Are
a,
sqm
Ne
w C
ut
Are
a,
sqm
To
tal
Aff
ect
ed
are
a (
sqm
)
To
tal
foo
d s
uff
icie
ncy
, m
th
Ag
ricu
ltu
ral
Inco
me
No
n A
gri
cult
ura
l In
com
e
To
tal
Inco
me
Per
Cap
ita I
nco
me
Po
vert
y L
evel
Po
st
Lan
d H
old
ing
Po
st
Fo
od
Su
ffic
ien
cy
Mo
nth
Lan
d l
oss %
Po
st
Ag
ricu
ltu
ral
Inco
me
Po
st
To
tal
Inco
me
Po
st
Per
Cap
ita I
nco
me
Po
st
Po
vert
y L
evel
Rem
ark
s
100 Narayan Kunwar
Narayan
Kunwar Archalbot 8 5 530, 535 094-1116 2289.25 65.35 139.09 204.44 2 196000 150000 346000 69200 2.42945 2150.16 2 6.08 184091.45 334091 66818.29 2.35 Interviewd
101 Gokul Prasad Regmi
Gokul
Prasad
Regmi Archalbot 9 6 541 094-1116 8781.15 95.23 97.38 192.61 12 180000 400000 580000 96666.7 3.39374 8683.77 12 1.11 178003.86 578004 96333.98 3.38 Interviewd
102
Harka Kumar
Shrestha
Harka
Kumar
Shrestha Archalbot 9 4 424 094-1156 4975.99 177.38 214.95 392.33 6 81000 120000 201000 50250 1.76416 4761.04 6 4.32 77501.008 197501 49375.25 1.73 Interviewd
103 Ram bdr.Parajuli
Ram
bdr.Parajuli Archalbot 9 8 425 094-1156 3066.19 128.82 145.16 273.98 6 103000 500000 603000 75375 2.64624 2921.03 6 4.73 98123.759 598124 74765.47 2.62 Interviewd
104 Bishnu Giri Bishnu Giri Archalbot 9 6 413 094-1156 554.88 21.77 53.58 75.35 5 196000 480000 676000 112667 3.95547 501.3 5 9.66 177073.96 657074 109512.33 3.84 Interviewd
105
Krishna Pd.
MaretaKrishna Pd.
Mareta Archalbot 8 5 585 094-1116 361.61 14.03 28.36 42.39 11 110000 50000 160000 32000 1.12345 333.25 10 7.84 101373.03 151373 30274.61 1.06 Interviewd
106
Ram bdr.Gharti
Bhujel
Ram
bdr.Gharti
Bhujel Archalbot 6 6
801, 181,
178, 799,
792 094-1076 11876.75 354.87 366.21 721.08 12 150000 384000 534000 89000 3.12458 11510.54 12 3.08 145374.87 529375 88229.15 3.10 Interviewd
107 Aaitimaya Pariyar
Hari bdr.
Pariyar Archalbot 9 6 329 094-1156 969.77 0 40.88 40.88 6 250000 108000 358000 59666.7 2.09476 928.89 6 4.22 239461.42 347461 57910.24 2.03 Interviewd
108
Muktinath
Lamichhane
Bhimnaya
Lamichhane Archalbot 9 6 636 094-1116 6643.06 57.72 126.7 184.42 12 185000 430000 615000 102500 3.59854 6516.36 12 1.91 181471.58 611472 101911.93 3.58 Interviewd
109 Hira devi Marhattha
Hira devi
Marhattha Archalbot 8 3 584 094-1116 1969.06 0.6 19.43 20.03 7 148000 0 148000 49333.3 1.73198 1949.63 7 0.99 146539.59 146540 48846.53 1.71 Interviewd
110 Ishwori pd. Regmi
Ishwori pd.
Regmi Archalbot 9 4 558 094-1116 2022.89 0 33.61 33.61 12 98000 360000 458000 114500 4.01983 1989.28 12 1.66 96371.745 456372 114092.94 4.01 Interviewd
Poverty Analysis of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, Lamjung
Pre Project Scenerio Post Project Scenerio
S.N
.
Lan
d O
wn
er
Na
me
Ho
use
ho
ld h
ea
d
VD
C
Wa
rd N
o.
Fa
mil
y M
em
be
rs
Aff
ect
ed
Plo
t n
o.
Sh
ee
t n
o
To
tal
Lan
d h
old
ing
, sq
m
Ex
isit
ng
Are
a,
sqm
Ne
w C
ut
Are
a,
sqm
To
tal
Aff
ect
ed
are
a (
sqm
)
To
tal
foo
d s
uff
icie
ncy
, m
th
Ag
ricu
ltu
ral
Inco
me
No
n A
gri
cult
ura
l In
com
e
To
tal
Inco
me
Per
Cap
ita I
nco
me
Po
vert
y L
evel
Po
st
Lan
d H
old
ing
Po
st
Fo
od
Su
ffic
ien
cy
Mo
nth
Lan
d l
oss %
Po
st
Ag
ricu
ltu
ral
Inco
me
Po
st
To
tal
Inco
me
Po
st
Per
Cap
ita I
nco
me
Po
st
Po
vert
y L
evel
Rem
ark
s
111
Ram pd.
PoudelRam pd.
Poudel Archalbot 9 10 ,317,649 094-1156 7016.21 199.15 236.14 435.29 12 92000 180000 180000 18000 0.63194 6780.07 12 3.37 88903.616 268904 26890.36 0.94 Interviewd
112 Klaimaya Kunwar
Ramdevi
Kunwar Archalbot 6 3 175 094-1076 3578.49 0 24.04 24.04 4 170000 200000 370000 123333 4.32995 3554.45 4 0.67 168857.95 368858 122952.65 4.32 Interviewd
113 Ishwori pd. Adhikari
Kausila
Adhikari Archalbot 8 5
170, 179,
578 094-1116 11118.45 432.74 516.69 949.43 12 160000 38400 198400 39680 1.39307 10601.76 11 4.65 152564.58 190965 38192.92 1.34 Interviewd
114 Sukumaya Ghale
Hasta bdr.
Ghale Nauthar 8 4 455, 460 094-0959 18057.63 166.24 191.94 358.18 12 80000 144000 224000 56000 1.96603 17865.69 12 1.06 79149.656 223150 55787.41 1.96 Interviewd
115 Ser Ghale Kali Ghale Nauthar 8 5 459, 469 094-0959 14973.08 350.58 434.39 784.97 12 70000 370000 440000 88000 3.08948 14538.69 12 2.90 67969.202 437969 87593.84 3.08 Interviewd
116 Tara devi Ghimire
Saharsha
jibi Ghimire Nauthar 5 3 378, 400 094-0958 9838.39 242.85 289.47 532.32 12 36000 600000 636000 212000 7.44283 9548.92 12 2.94 34940.79 634941 211646.93 7.43 Interviewd
117
Lila Poudel,
Mahendra Poudel
Rishiram
Poudel Archalbot 9 10
318, 315,
668 094-1156 9502.53 182.19 242.24 424.43 12 45000 1090000 1135000 113500 3.98472 9260.29 12 2.55 43852.853 1133853 113385.29 3.98 Interviewd
118
Mayadevi Thapa
Magar
Yesh raj
Thapa
magar Archalbot 9 8
411,326,
526 094-1156 5049.55 273.86 332.13 605.99 9 65000 210000 275000 34375 1.20683 4717.42 8 6.58 60724.678 270725 33840.58 1.19 Interviewd
119 Ram bdr.Gurung
Ram
bdr.Gurung Archalbot 9 3 564 094-1116 25462.02 27.78 20.63 48.41 12 190000 300000 490000 163333 5.73426 25441.39 12 0.08 189846.06 489846 163282.02 5.73 Interviewd
120 Chijmaya Gurung
Chijmaya
Gurung Archalbot 7 3 493 094-1116 695.43 34.69 38.58 73.27 3 20000 704000 724000 241333 8.47266 656.85 3 5.55 18890.471 722890 240963.49 8.46 Interviewd
121 Chandra bdr. Thapa
Prem bdr.
Thapa Archalbot 9 5 389, 333 094-1156 11932.41 92 135.76 227.76 12 295000 0 295000 59000 2.07135 11796.65 12 1.14 291643.66 291644 58328.73 2.05 Interviewd
Poverty Analysis of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, Lamjung
Pre Project Scenerio Post Project Scenerio
S.N
.
Lan
d O
wn
er
Na
me
Ho
use
ho
ld h
ea
d
VD
C
Wa
rd N
o.
Fa
mil
y M
em
be
rs
Aff
ect
ed
Plo
t n
o.
Sh
ee
t n
o
To
tal
Lan
d h
old
ing
, sq
m
Ex
isit
ng
Are
a,
sqm
Ne
w C
ut
Are
a,
sqm
To
tal
Aff
ect
ed
are
a (
sqm
)
To
tal
foo
d s
uff
icie
ncy
, m
th
Ag
ricu
ltu
ral
Inco
me
No
n A
gri
cult
ura
l In
com
e
To
tal
Inco
me
Per
Cap
ita I
nco
me
Po
vert
y L
evel
Po
st
Lan
d H
old
ing
Po
st
Fo
od
Su
ffic
ien
cy
Mo
nth
Lan
d l
oss %
Po
st
Ag
ricu
ltu
ral
Inco
me
Po
st
To
tal
Inco
me
Po
st
Per
Cap
ita I
nco
me
Po
st
Po
vert
y L
evel
Rem
ark
s
122 Maan bdr. Thapa
Maan bdr.
Thapa Archalbot 9 5
583, 587,
590 094-1156 7870.8 112.04 147.99 260.03 12 96000 750000 846000 169200 5.94022 7722.81 12 1.88 94194.969 844195 168838.99 5.93 Interviewd
123 Edhane Gurung
Eghane
Gurung Pachowk 2 6 439, 450 094-1000 9832.34 316.09 386.2 702.29 12 65000 199000 264000 44000 1.54474 9446.14 12 3.93 62446.895 261447 43574.48 1.53 Interviewd
124 Karna singh Ghale
Demraj
Ghale Pachowk 3 6 511, 915 094-1000 14085.25 212.1 259.4 471.5 12 42000 1210000 1252000 208667 7.3258 13825.85 12 1.84 41226.51 1251227 208537.75 7.32 Interviewd
125 Kami Gurung
Kami
Gurung Pachowk 3 6 953, 960 094-1000 4885.81 111.08 76.24 187.32 6 76000 300000 376000 62666.7 2.20008 4809.57 6 1.56 74814.068 374814 62469.01 2.19 Interviewd
126 Maya Gurungseni
Kumraj
Gurung Pachowk 3 5 886, 897 094-1000 12650.11 301.96 364.92 666.88 12 66000 448000 514000 102800 3.60907 12285.19 12 2.88 64096.086 512096 102419.22 3.60 Interviewd
127 Bhagawati Bhagawati Nauthar 5 5 80, 690 094-0957 10327.55 214.6 327.22 541.82 12 85000 208000 293000 58600 2.05731 10000.33 12 3.17 82306.844 290307 58061.37 2.04 Interviewd
128 Birta Gurung
Birta
Gurung Nauthar 5 6 420, 424 094-0958 10045.31 248.11 261.17 509.28 10 240000 400000 640000 106667 3.74482 9784.14 10 2.60 233760.19 633760 105626.70 3.71 Interviewd
129 Bamsyo Gurungseni
Jangasubba
Gurung Nauthar 5 4 479, 480 094-0958 9009.98 281.36 362.48 643.84 6 90000 550000 640000 160000 5.61723 8647.5 6 4.02 86379.215 636379 159094.80 5.59 Interviewd
130 Sitaram Gurung
Sitaram
Gurung Nauthar 5, 8 7
471, 620,
618, 377 094-0958 55959.16 248.65 303.9 552.55 12 42000 706000 748000 106857 3.75151 55655.26 12 0.54 41771.909 747772 106824.56 3.75 Interviewd
131 Sarba Singh Gurung
Sarba Singh
Gurung Nauthar 8 10 508, 563 094-0959 12457.34 423.42 533.26 956.68 6 600000 110000 710000 71000 2.49265 11924.08 6 4.28 574315.87 684316 68431.59 2.40 Interviewd
132 Nalu Kumari Gurung
Mauli
Gurung Nauthar 8 6 622 094-0958 4935.91 108.53 81.13 189.66 6 40000 516000 556000 92666.7 3.25331 4854.78 6 1.64 39342.533 555343 92557.09 3.25 Interviewd
Poverty Analysis of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, Lamjung
Pre Project Scenerio Post Project Scenerio
S.N
.
Lan
d O
wn
er
Na
me
Ho
use
ho
ld h
ea
d
VD
C
Wa
rd N
o.
Fa
mil
y M
em
be
rs
Aff
ect
ed
Plo
t n
o.
Sh
ee
t n
o
To
tal
Lan
d h
old
ing
, sq
m
Ex
isit
ng
Are
a,
sqm
Ne
w C
ut
Are
a,
sqm
To
tal
Aff
ect
ed
are
a (
sqm
)
To
tal
foo
d s
uff
icie
ncy
, m
th
Ag
ricu
ltu
ral
Inco
me
No
n A
gri
cult
ura
l In
com
e
To
tal
Inco
me
Per
Cap
ita I
nco
me
Po
vert
y L
evel
Po
st
Lan
d H
old
ing
Po
st
Fo
od
Su
ffic
ien
cy
Mo
nth
Lan
d l
oss %
Po
st
Ag
ricu
ltu
ral
Inco
me
Po
st
To
tal
Inco
me
Po
st
Per
Cap
ita I
nco
me
Po
st
Po
vert
y L
evel
Rem
ark
s
133 Dhanmaya Gurung
Pode
Gurung Pachowk 1 10
615, 442,
475 094-0959 10332.95 262.05 353.93 615.98 6 377000 0 377000 37700 1.32356 9979.02 6 3.43 364086.78 364087 36408.68 1.28 Interviewd
134
Hari Bdr. Kunwar,
Devi Kumari Kunwar
Hari Bdr.
Kunwar Archalbot 6 4 147, 752 094-1076 9071.59 287.19 301.81 589 6 107000 370000 477000 119250 4.18659 8769.78 6 3.33 103440.13 473440 118360.03 4.16 Interviewd
135 Aashkaji Shrestha
Aashkaji
Shrestha Archalbot 9 6 417 094-1156 3123.57 0 16.96 16.96 9 105000 710000 815000 135833 4.76879 3106.61 9 0.54 104429.88 814430 135738.31 4.77 Interviewd
136 Kshamamta Gurung
Lal Bd
Gurung Archalbot 7 5 677 094-1116 649.63 32.3 27.34 59.64 5 63000 115000 178000 35600 1.24983 622.29 5 4.21 60348.614 175349 35069.72 1.23 Interviewd
137 Gir Bdr. Kunwar
Gir Bdr.
Kunwar Archalbot 7 6 541 094-1076 12044.13 193.29 235.07 428.36 12 151000 300000 451000 75166.7 2.63893 11809.06 12 1.95 148052.87 448053 74675.48 2.62 Interviewd
138
Himraj+Umakanta
Paudel
Umakanta
Paudel Archalbot 9 3 327, 321 094-1156 10828.41 242.54 330.61 573.15 12 130000 250000 380000 126667 4.44697 10497.8 12 3.05 126030.88 376031 125343.63 4.40 Interviewd
139
Shiva Prasad
Adhikari
Shiva Prasad
Adhikari Archalbot 8 4 152 094-1116 6195.96 19.62 29.31 48.93 12 175000 350000 525000 131250 4.60788 6166.65 12 0.47 174172.16 524172 131043.04 4.60 Interviewd
140 Man Bdr. Thapa
Man Bdr.
Thapa Archalbot 7 3 617 094-1116 312.76 32.85 27.93 60.78 6 135000 242000 377000 125667 4.41187 284.83 5 8.93 122944.27 364944 121648.09 4.27 Interviewd
141 Devi Gurung Devi Gurung Archalbot 7 5 495 094-1116 669.61 13.72 26.45 40.17 2 45000 115000 160000 32000 1.12345 643.16 2 3.95 43222.473 158222 31644.49 1.11 Interviewd
142
Janaki Paudel,
Dinnath Paudel
Dinanath
Paudel Archalbot 9 7
565, 527,
525 094-1116 5724.91 31.33 34.8 66.13 12 120000 535000 655000 93571.4 3.28508 5690.11 12 0.61 119270.56 654271 93467.22 3.28 Interviewd
143
Rishiram Shrestha,
Gyanmaya Shrestha
Rishiram
Shrestha Archalbot 9 2
394, 395,
392 094-1156 8197.28 362.28 461.32 823.6 3 28000 52000 80000 40000 1.40431 7735.96 3 5.63 26424.238 78424 39212.12 1.38 Interviewd
Poverty Analysis of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, Lamjung
Pre Project Scenerio Post Project Scenerio
S.N
.
Lan
d O
wn
er
Na
me
Ho
use
ho
ld h
ea
d
VD
C
Wa
rd N
o.
Fa
mil
y M
em
be
rs
Aff
ect
ed
Plo
t n
o.
Sh
ee
t n
o
To
tal
Lan
d h
old
ing
, sq
m
Ex
isit
ng
Are
a,
sqm
Ne
w C
ut
Are
a,
sqm
To
tal
Aff
ect
ed
are
a (
sqm
)
To
tal
foo
d s
uff
icie
ncy
, m
th
Ag
ricu
ltu
ral
Inco
me
No
n A
gri
cult
ura
l In
com
e
To
tal
Inco
me
Per
Cap
ita I
nco
me
Po
vert
y L
evel
Po
st
Lan
d H
old
ing
Po
st
Fo
od
Su
ffic
ien
cy
Mo
nth
Lan
d l
oss %
Po
st
Ag
ricu
ltu
ral
Inco
me
Po
st
To
tal
Inco
me
Po
st
Per
Cap
ita I
nco
me
Po
st
Po
vert
y L
evel
Rem
ark
s
144 Bil Bdr. Shrestha
Bil Bdr.
Shrestha Archalbot 9 7 398 094-1156 1949.41 0 17.89 17.89 1 60000 150000 210000 30000 1.05323 1931.52 1 0.92 59449.372 209449 29921.34 1.05 Interviewd
145 Amrit Bdr. Thapa
Durga
Thapa Archalbot 9 3
584, 497,
589 094-1156 7459.39 163.98 210.99 374.97 12 145000 0 145000 48333.3 1.69687 7248.4 12 2.83 140898.65 140899 46966.22 1.65 Interviewd
146
Amrit(Amite),
Sommaya Bhujel
Amrit(Amite
) Gharti Archalbot 6 10
802, 799,
794 094-1076 11678.22 204.14 232.94 437.08 12 195000 500000 695000 69500 2.43998 11445.28 12 1.99 191110.43 691110 69111.04 2.43 Interviewd
147
Padamlal Paudel,
Manmaya Paudel
Manmaya
Paudel Archalbot 9 11
300, 53,
51, 50,
486, 485 094-1116 28417.47 781.51 974.87 1756.38 12 235000 500000 735000 66818.2 2.34583 27442.6 12 3.43 226938.25 726938 66085.30 2.32 Interviewd
148 Maansingh Gurung
Durga
bdr.Gurung Pachowk 1 5 476 094-0959 5849.99 226.83 271.75 498.58 6 160000 360000 520000 104000 3.6512 5578.24 6 4.65 152567.51 512568 102513.50 3.60 Interviewd
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
1 0+580 Rishiam Shrestha 395 941156 3.8 Archalbot-9
Type of StructureTotal Area
( sqm)
Affected
Area
(sqm)
StoreyRate
/sqm
Total
Amount
House (Fully) 90812.99
90812.99
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
2 1+130 Man Maya Paudel 486 941116 4 Archalbot-9
Type of StructureTotal Area
( sqm)
Affected
Area
(sqm)
StoreyRate
/sqm
Total
Amount
House(Partial) 59709.15
59709.15
Sub-Project: Belghari-Archalbot-Lamabagar-Sherabazar-Letaure-Pachok Road
District: Lamjung
Appendix 2.1 : Photographs of the Affected Structure with Estimated Cost(Private Structures)
1Remarks
as per estimate sheet
Land Owner Name: Man Maya Paudel Total
as per estimate sheet
Land Owner Name: Rishiam Shrestha Total
2Remarks
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
3 1+730 Man Maya Paudel 486 941116 4 Archalbot-9
Type of StructureTotal Area
( sqm)
Affected
Area
(sqm)
StoreyRate
/sqm
Total
Amount
Saw Mill(Partial) 46981.31
46981.31
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
4 1+540 Muktinath Lamichane 636 941116 4.5 Archalbot-9
Type of StructureTotal Area
( sqm)
Affected
Area
(sqm)
StoreyRate
/sqm
Total
Amount
House(Shop) Top
only37869.71
37869.71
3Remarks
as per estimate sheet
Land Owner Name: Muktinath Lamichane Total
as per estimate sheet
Land Owner Name: Man Maya Paudel Total
4Remarks
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
5 1+560 Badri Lamichane 635 941116 3.5 Archalbot-9
Type of StructureTotal Area
( sqm)
Affected
Area
(sqm)
StoreyRate
/sqm
Total
Amount
Houses Partially 37433.87
37433.87
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
6 1+570 Badri Lamichane 538 941116 3.5 Archalbot-9
Type of StructureTotal Area
( sqm)
Affected
Area
(sqm)
StoreyRate
/sqm
Total
Amount
Shop Partially 101756.98
101756.98
5Remarks
as per estimate sheet
Land Owner Name: Badri Lamichane Total
as per estimate sheet
Land Owner Name: Badri Lamichane Total
6Remarks
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
7 1+650 Kalika Lamichane 66 941116 4 Archalbot-9
Type of StructureTotal Area
( sqm)
Affected
Area
(sqm)
StoreyRate
/sqm
Total
Amount
House partially 84527.92
84527.92
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
8 1+720 Kalika Lamichane 491 941116 4 Archalbot-9
Type of StructureTotal Area
( sqm)
Affected
Area
(sqm)
StoreyRate
/sqm
Total
Amount
Shop Partially 80286.54
80286.54
7Remarks
as per estimate sheet
Land Owner Name: Kalika Lamichane Total
as per estimate sheet
Land Owner Name: Kalika Lamichane Total
8Remarks
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
9 1+770 Shubhadra Regmi 98 941116 3.2 Archalbot-9
Type of StructureTotal Area
( sqm)
Affected
Area
(sqm)
StoreyRate
/sqm
Total
Amount
House CGI Pali 16151.14
16151.14
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
10 1+930 Takraj Thapa magar 634 941116 3.8 Archalbot-9
Type of StructureTotal Area
( sqm)
Affected
Area
(sqm)
StoreyRate
/sqm
Total
Amount
2 Story
House(Shop) 368262.75
Partially
368262.75
9Remarks
as per estimate sheet
Land Owner Name: Takraj Thapa magar Total
as per estimate sheet
Land Owner Name: Shubhadra Regmi Total
10Remarks
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
11 2+530 Man Bahadur Rimal 496 941116 3.1 Archalbot
Type of StructureTotal Area
( sqm)
Affected
Area
(sqm)
StoreyRate
/sqm
Total
Amount
House (Full) 136942.41
136942.41
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
12 6+220Bijman Nepali(Ram bdr
gurung)3.8 Shreevanjyang
Type of StructureTotal Area
( sqm)
Affected
Area
(sqm)
StoreyRate
/sqm
Total
Amount
House(Partially) 52607.46
52607.46
11Remarks
7
as per estimate sheet
Land Owner Name: Ram Bdr Gurung Total
as per estimate sheet
Land Owner Name: Man Bahadur Rimal Total
12
Remarks
Public
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
13 6+660 Ladi Gurung 62 940997 2.8 Sherabazar
Type of StructureTotal Area
( sqm)
Affected
Area
(sqm)
StoreyRate
/sqm
Total
Amount
House (Partially) 19687.35
19687.35
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
14 6+760 Budhmaya(Shyamlal) Gurung 696 940997 4.3 Sherabazar
Type of StructureTotal Area
( sqm)
Affected
Area
(sqm)
StoreyRate
/sqm
Total
Amount
House
Kitchen(Partial) 29616.12
13Remarks
Nauthar-2
as per estimate sheet
as per estimate sheet
Land Owner Name: Ladi Gurung Total
14
Remarks
Nauthar-2
29616.12
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
15 10+120 Ram bdr gurung 77 940959 3 Nauthar
Type of StructureTotal Area
( sqm)
Affected
Area
(sqm)
StoreyRate
/sqm
Total
Amount
House (Partial) 57808.41
57808.41
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
16 10+130 Jabbar Sing gurung 534 940959 4.4 Nauthar
Type of StructureTotal Area
( sqm)
Affected
Area
(sqm)
StoreyRate
/sqm
Total
Amount
House (Partial) 188750.57
188750.57
Land Owner Name: Budhmaya(Shyamlal) Gurung Total
15Remarks
2
as per estimate sheet
Land Owner Name: Jabbar Sing gurung Total
as per estimate sheet
Land Owner Name: Ram bdr gurung Total
16Remarks
8
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
17 11+300 Chattur Bdr Gurung(Gamere) 2.6 Pachok
Type of StructureTotal Area
( sqm)
Affected
Area
(sqm)
StoreyRate
/sqm
Total
Amount
Shop (Full) 49852.33
49852.33
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
18 12+440 Teklal Gurung 4 Pachok
Type of StructureTotal Area
( sqm)
Affected
Area
(sqm)
StoreyRate
/sqm
Total
Amount
House (Partial) 87386.87
87386.87
17
Remarks
Public Land
as per estimate sheet
Land Owner Name: Ram bdr Ghale Total
as per estimate sheet
Land Owner Name: Gameere Gurung Total
18Remarks
Public Land
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
19 12+500 Shuv Raj gurung 979 950961 2 Pachok
Type of StructureTotal Area
( sqm)
Affected
Area
(sqm)
StoreyRate
/sqm
Total
Amount
House(Partial) 130590.47
130590.47
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
20 0+750 Aaitemaya Pariyar 329 941156 4 Archalbot-9
Type of StructureTotal Area
( sqm)
Affected
Area
(sqm)
StoreyRate
/sqm
Total
Amount
House CGI
Pali(Kitchen) 15108.28
15108.28
19Remarks
3
as per estimate sheet
Land Owner Name: Aaitemaya Pariyar Total
as per estimate sheet
Land Owner Name: Shuv Raj gurung Total
20Remarks
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
21 1+930 Bimala Adhikari 49 941116 4.5 Archalbot-9
Type of StructureTotal Area
( sqm)
Affected
Area
(sqm)
StoreyRate
/sqm
Total
Amount
House CGI Pali 37161.06
37161.06
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
22 2+000 Indra Prasad marahatha 4.2 Archalbot-9
Type of StructureTotal Area
( sqm)
Affected
Area
(sqm)
StoreyRate
/sqm
Total
Amount
House CGI Pali 16313.34
16313.34
21Remarks
as per estimate sheet
Land Owner Name: Indra Prasad marahatha Total
as per estimate sheet
Land Owner Name: Bimala Adhikari Total
22Remarks
Public Land
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
23 2+200 Narayan Pd Marahatha 4 Archalbot-9
Type of StructureTotal Area
( sqm)
Affected
Area
(sqm)
StoreyRate
/sqm
Total
Amount
House CGI Pali 6236.52
6236.52
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
24 2+280 Narayan Kubar 530 941116 4.35 Archalbot
Type of StructureTotal Area
( sqm)
Affected
Area
(sqm)
StoreyRate
/sqm
Total
Amount
House CGI Pali 6236.52
6236.52
23Remarks
Public Land
as per estimate sheet
Land Owner Name: Narayan Kubar Total
as per estimate sheet
Land Owner Name: Narayan Pd Marahatha Total
24Remarks
8
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
25 2+500 Chiz Maya gurung 493 941116 3.7 Archalbot
Type of StructureTotal Area
( sqm)
Affected
Area
(sqm)
StoreyRate
/sqm
Total
Amount
House CGI Pali,
Courtyard 12720.52
12720.52
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
26 3+890 Bimla Bhujel 3.4 Shreevanjyang
Type of StructureTotal Area
( sqm)
Affected
Area
(sqm)
StoreyRate
/sqm
Total
Amount
House CGI pali 7558.38
7558.38
25Remarks
7
as per estimate sheet
Land Owner Name: Bimla Bhujel Total
as per estimate sheet
Land Owner Name: Chiz Maya gurung Total
26Remarks
Public Land
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
27 5+170 Hiralal Shrestha 26 941037 3.4 Shreevanjyang
Type of StructureTotal Area
( sqm)
Affected
Area
(sqm)
StoreyRate
/sqm
Total
Amount
Hose CGI pali,
courtyard 24283.28
24283.28
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
28 5+170SuvadraGurung(ManjungGuru
ng)5 941037 4 Shreevanjyang
Type of StructureTotal Area
( sqm)
Affected
Area
(sqm)
StoreyRate
/sqm
Total
Amount
House CGI pali,
courtyard 29499.50
29499.50
27Remarks
4
as per estimate sheet
Land Owner Name: Pal Jung Gurung Total
as per estimate sheet
Land Owner Name: Hiralal Shrestha Total
28
Remarks
4
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
29 5+480 Goma ghimire 58 940997 4.2 Shreevanjyang
Type of StructureTotal Area
( sqm)
Affected
Area
(sqm)
StoreyRate
/sqm
Total
Amount
House pali and
courtyard 49656.55
49656.55
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
30 6+640 Kumar Pandey 1258 940997 4.7 Sherabazar
Type of StructureTotal Area
( sqm)
Affected
Area
(sqm)
StoreyRate
/sqm
Total
Amount
Courtyard 10935.84
10935.84
29Remarks
8
as per estimate sheet
Land Owner Name: Kumar Pandey Total
as per estimate sheet
Land Owner Name: Bishnu Ghimire Total
30Remarks
Nauthar-2
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
31 8+100 Subba Gurung 437 940958 2.5 Nauthar
Type of StructureTotal Area
( sqm)
Affected
Area
(sqm)
StoreyRate
/sqm
Total
Amount
House CGI Pali 21392.97
21392.97
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
32 8+952 Shuvi gurung 4 Jetaure
Type of StructureTotal Area
( sqm)
Affected
Area
(sqm)
StoreyRate
/sqm
Total
Amount
House CGI Pali 15190.17
15190.17
31Remarks
5
as per estimate sheet
Land Owner Name: Shuvi gurung Total
as per estimate sheet
Land Owner Name: Subba Gurung Total
32Remarks
NautharPublic Land
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
33 9+680 Dal Subba gurung 472 940959 3 Nauthar
Type of StructureTotal Area
( sqm)
Affected
Area
(sqm)
StoreyRate
/sqm
Total
Amount
House CGI Pali 20884.26
20884.26
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
34 10+100 Durga Bdr Gurung 4.8 Nauthar
Type of StructureTotal Area
( sqm)
Affected
Area
(sqm)
StoreyRate
/sqm
Total
Amount
House CGI Pali,
Courtyard 26136.94
26136.94
33Remarks
8
as per estimate sheet
Land Owner Name: Durga Bdr Gurung Total
as per estimate sheet
Land Owner Name: Dal Subba gurung Total
34Remarks
Public Land
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
35 10+120 Gaine Gurung 551 940959 3 Nauthar
Type of StructureTotal Area
( sqm)
Affected
Area
(sqm)
StoreyRate
/sqm
Total
Amount
House CGI Pali 20583.78
20583.78
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
36 11+260 Manmaya gurung 4 Pachok
Type of StructureTotal Area
( sqm)
Affected
Area
(sqm)
StoreyRate
/sqm
Total
Amount
House CGI Pali 12963.37
12963.37
35Remarks
8
as per estimate sheet
Land Owner Name: Manmaya gurung Total
as per estimate sheet
Land Owner Name: Gaine Gurung Total
36Remarks
Public Land
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
37 11+270 Shanata maya Gurung 3 Pachok
Type of StructureTotal Area
( sqm)
Affected
Area
(sqm)
StoreyRate
/sqm
Total
Amount
House CGI Pali 9221.84
9221.84
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
38 0+780 Maiya Pariyar 49 941116 4 Archalbot-9
Type of StructureTotal Area
( sqm)
Affected
Area
(sqm)
StoreyRate
/sqm
Total
Amount
Pig Farm 36933.32
36933.32
37Remarks
Public Land
as per estimate sheet
Land Owner Name: Maiya Pariyar Total
as per estimate sheet
Land Owner Name: Shanata maya Gurung Total
38Remarks
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
39 5+860 Dhan Bdr Shrestha 887 940997 2 Shreevanjyang
Type of StructureTotal Area
( sqm)
Affected
Area
(sqm)
StoreyRate
/sqm
Total
Amount
Pig Farm 12553.90
12553.90
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
40 9+680 Dal Subba gurung 472 940959 3 Nauthar
Type of StructureTotal Area
( sqm)
Affected
Area
(sqm)
StoreyRate
/sqm
Total
Amount
Cow farm 23725.19
23725.19
39Remarks
8
as per estimate sheet
Land Owner Name: Dal Subba gurung Total
as per estimate sheet
Land Owner Name: Dhan Bdr Shrestha Total
40Remarks
8
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
41 11+750 Buddhe Gurung 3 Pachok
Type of StructureTotal Area
( sqm)
Affected
Area
(sqm)
StoreyRate
/sqm
Total
Amount
Cow farm 37231.22
37231.22
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
42 12+160 Him Kumari gurung(Gausari) 4 Pachok VDCoff.
Type of StructureTotal Area
( sqm)
Affected
Area
(sqm)
StoreyRate
/sqm
Total
Amount
Caw Farm CGI
Pali 22571.30
22571.30
41Remarks
Public Land
as per estimate sheet
Land Owner Name: Gausari gurung Total
as per estimate sheet
Land Owner Name: Buddhe Gurung Total
42
Remarks
Public Land
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
43 0+750 Aaitemaya Pariyar 329 941156 4 Archalbot-9
Type of StructureTotal Area
( sqm)
Affected
Area
(sqm)
StoreyRate
/sqm
Total
Amount
Toilet and Gobar
Gas 39323.85
39323.85
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
44 0+780 Maiya Pariyar 588 941156 4 Archalbot-9
Type of StructureTotal Area
( sqm)
Affected
Area
(sqm)
StoreyRate
/sqm
Total
Amount
Toilet and
Gobargas 30487.08
43Remarks
as per estimate sheet
as per estimate sheet
Land Owner Name: Manjung Gurung Total
44Remarks
30487.08
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
45 1+770 Shree Bhakta Regmi 3 Archalbot-9
Type of StructureTotal Area
( sqm)
Affected
Area
(sqm)
StoreyRate
/sqm
Total
Amount
Toilet 34240.84
34240.84
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
46 2+420 Tirtha Raj Adhikari 476 941116 5 Archalbot-9
Type of StructureTotal Area
( sqm)
Affected
Area
(sqm)
StoreyRate
/sqm
Total
Amount
Toilet and
gobargas 31026.50
31026.50
Land Owner Name: Ganga Maya Suwal Total
45Remarks
Public Land
as per estimate sheet
Land Owner Name: Laxima Total
as per estimate sheet
Land Owner Name: Shree Bhakta Regmi Total
46Remarks
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
47 2+470 Tola Kumari lamichane 4 Archalbot-9
Type of StructureTotal Area
( sqm)
Affected
Area
(sqm)
StoreyRate
/sqm
Total
Amount
Toilet 29778.29
29778.29
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
48 2+510 Devi Gurung 495 941116 4 Archalbot-9
Type of StructureTotal Area
( sqm)
Affected
Area
(sqm)
StoreyRate
/sqm
Total
Amount
Gobar Gas 17543.14
17543.14
47Remarks
Public Land
as per estimate sheet
Land Owner Name: Devi Gurung Total
as per estimate sheet
Land Owner Name: Tola Kumari lamichane Total
48Remarks
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
49 2+510 Nabaraj Adhikari 5 Archalbot-9
Type of StructureTotal Area
( sqm)
Affected
Area
(sqm)
StoreyRate
/sqm
Total
Amount
Toilet and
Gobargas 47405.60
47405.60
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
50 6+660 Ladi Gurung 62 940997 3 Sherabazar
Type of StructureTotal Area
( sqm)
Affected
Area
(sqm)
StoreyRate
/sqm
Total
Amount
Gobargas 19297.61
19297.61
49Remarks
Public Land
as per estimate sheet
Land Owner Name: Ladi Gurung Total
as per estimate sheet
Land Owner Name: Nabaraj Adhikari Total
50Remarks
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
51 10+120 Gaine Gurung 551 940959 3 Nauthar
Type of StructureTotal Area
( sqm)
Affected
Area
(sqm)
StoreyRate
/sqm
Total
Amount
Toilet 23333.78
23333.78
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
52 0+850 Santa Bdr Pariyar 336 941156 4 Archalbot-9
Type of StructureTotal Area
( sqm)
Affected
Area
(sqm)
StoreyRate
/sqm
Total
Amount
Dry Wall 19737.30
19737.30
51Remarks
as per estimate sheet
Land Owner Name: Santa Bdr Pariyar Total
as per estimate sheet
Land Owner Name: Gaine Gurung Total
52Remarks
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
53 0+980 Mina Paudel 318 9841156 4 Archalbot-9
Type of StructureTotal Area
( sqm)
Affected
Area
(sqm)
StoreyRate
/sqm
Total
Amount
Masonary
Wall(Chautaro) 10184.00
10184.00
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
54 1+600 Ram Pd Paudel 649 941116 4 Archalbot-9
Type of StructureTotal Area
( sqm)
Affected
Area
(sqm)
StoreyRate
/sqm
Total
Amount
Dry Wall 56792.06
56792.06
53Remarks
as per estimate sheet
Land Owner Name: Ram Pd Paudel Total
as per estimate sheet
Land Owner Name: Lila Total
54Remarks
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
55 1+770 Shree Bhakta Regmi 3 Archalbot-9
Type of StructureTotal Area
( sqm)
Affected
Area
(sqm)
StoreyRate
/sqm
Total
Amount
Masonary Wall 58463.72
58463.72
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
56 1+740 Suvadra Regmi 98 941116 3 Archalbot-9
Type of StructureTotal Area
( sqm)
Affected
Area
(sqm)
StoreyRate
/sqm
Total
Amount
Dry Wall 19097.33
19097.33
55Remarks
Public Land
as per estimate sheet
Land Owner Name: Suvadra Regmi Total
as per estimate sheet
Land Owner Name: Shree Bhakta Regmi Total
56Remarks
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
57 2+205 Man Bdr Khadka 598 941116 3 Archalbot-9
Type of StructureTotal Area
( sqm)
Affected
Area
(sqm)
StoreyRate
/sqm
Total
Amount
Dry Wall 35168.28
35168.28
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
58 2+280 Narayan Kubar 530 941116 4 Archalbot-9
Type of StructureTotal Area
( sqm)
Affected
Area
(sqm)
StoreyRate
/sqm
Total
Amount
Masonary Wall 3486.52
3486.52
57Remarks
as per estimate sheet
Land Owner Name: Total
as per estimate sheet
Land Owner Name: Man Bdr Khadka Total
58Remarks
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
59 2+320 Tilak Kubar 531 941116 5 Archalbot 8
Type of StructureTotal Area
( sqm)
Affected
Area
(sqm)
StoreyRate
/sqm
Total
Amount
Masonary Wall 74594.65
74594.65
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
60 2+400 Sovita Kubar 477 941116 4 Archalbot-9
Type of StructureTotal Area
( sqm)
Affected
Area
(sqm)
StoreyRate
/sqm
Total
Amount
Dry Wall 95552.46
95552.46
59Remarks
as per estimate sheet
Land Owner Name: Sovita Kubar Total
as per estimate sheet
Land Owner Name: Tilak Kubar Total
60Remarks
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
61 2+400 Hari Bahadur Khadka 4 Archalbot-9
Type of StructureTotal Area
( sqm)
Affected
Area
(sqm)
StoreyRate
/sqm
Total
Amount
Masonary Wall 6064.23
6064.23
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
62 2+420 Tirtha Raj Adhikari 476 941116 5 Archalbot 8
Type of StructureTotal Area
( sqm)
Affected
Area
(sqm)
StoreyRate
/sqm
Total
Amount
Masonary wall 25526.50
25526.50
61Remarks
Public Land
as per estimate sheet
Land Owner Name: Tirtha Raj Adhikari Total
as per estimate sheet
Land Owner Name: Hari Bahadur Khadka Total
62Remarks
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
63 2+440 Kalpana Kubar 674 941116 4 Archalbot 7
Type of StructureTotal Area
( sqm)
Affected
Area
(sqm)
StoreyRate
/sqm
Total
Amount
Dry Wall 12057.70
12057.70
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
64 2+470 Sangita Adhikari 673 941116 4 Archalbot-9
Type of StructureTotal Area
( sqm)
Affected
Area
(sqm)
StoreyRate
/sqm
Total
Amount
Masonary Wall 58392.80
58392.80
63Remarks
as per estimate sheet
Land Owner Name: Sangita Adhikari Total
as per estimate sheet
Land Owner Name: Kalpana Kubar Total
64Remarks
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
65 2+470 Tola Kumari lamichane 4 Archalbot-9
Type of StructureTotal Area
( sqm)
Affected
Area
(sqm)
StoreyRate
/sqm
Total
Amount
Dry Wall 37680.30
37680.30
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
66 2+480 Devi Sannani suhel 419 941156 4 Archalbot-9
Type of StructureTotal Area
( sqm)
Affected
Area
(sqm)
StoreyRate
/sqm
Total
Amount
Dry Wall 17416.67
17416.67
65Remarks
Public Land
as per estimate sheet
Land Owner Name: Laxmi Gurung Total
as per estimate sheet
Land Owner Name: Tola Kumari lamichane Total
66Remarks
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
67 2+480 Man Bdr Thapa 617 941116 4 Archalbot 7
Type of StructureTotal Area
( sqm)
Affected
Area
(sqm)
StoreyRate
/sqm
Total
Amount
Dry and Brick Wall 33261.18
33261.18
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
68 2+280 Narayan Kubar 530 941156 4.35 Archalbot-9
Type of StructureTotal Area
( sqm)
Affected
Area
(sqm)
StoreyRate
/sqm
Total
Amount
Dry wall 13403.42
13403.42
67Remarks
as per estimate sheet
Land Owner Name: Narayan Kubar Total
as per estimate sheet
Land Owner Name: Man Bdr Thapa Total
68Remarks
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
69 2+510 Devi Gurung 495 941116 4 Archalbot 7
Type of StructureTotal Area
( sqm)
Affected
Area
(sqm)
StoreyRate
/sqm
Total
Amount
Dry Wall 15502.75
15502.75
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
70 2+510 Nabaraj Adhikari 5 Archalbot-9
Type of StructureTotal Area
( sqm)
Affected
Area
(sqm)
StoreyRate
/sqm
Total
Amount
Dry Wall 10137.80
10137.80
69Remarks
as per estimate sheet
Land Owner Name: Nabaraj Adhikari Total
as per estimate sheet
Land Owner Name: Devi Gurung Total
70Remarks
Public Land
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
71 2+530 Man Bahadur Rimal 496 941116 3 Archalbot 7
Type of StructureTotal Area
( sqm)
Affected
Area
(sqm)
StoreyRate
/sqm
Total
Amount
Dry Wall 13636.68
13636.68
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
72 2+540 Sita devi Kubar 664 941116 3 Archalbot 7
Type of StructureTotal Area
( sqm)
Affected
Area
(sqm)
StoreyRate
/sqm
Total
Amount
Dry wall 20634.45
20634.45
71Remarks
as per estimate sheet
Land Owner Name: Sita devi Kubar Total
as per estimate sheet
Land Owner Name: Man Bahadur Rimal Total
72Remarks
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
73 2+580 Parsamsa Kubar 663 941116 3 Archalbot 7
Type of StructureTotal Area
( sqm)
Affected
Area
(sqm)
StoreyRate
/sqm
Total
Amount
Dry wall 26125.01
26125.01
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
74 2+470 Sangita Adhikari 673 941116 3.8 Archalbot 7
Type of StructureTotal Area
( sqm)
Affected
Area
(sqm)
StoreyRate
/sqm
Total
Amount
Dry wall and
courtyard 34974.33
34974.33
73Remarks
as per estimate sheet
Land Owner Name: Sangita Adhikari Total
as per estimate sheet
Land Owner Name: Gamere Gurung Total
74Remarks
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
75 2+600 Ramesh Raj Kubar 4 Archalbot-9
Type of StructureTotal Area
( sqm)
Affected
Area
(sqm)
StoreyRate
/sqm
Total
Amount
Dry wall and
courtyard 45988.85
45988.85
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
76 2+610 Sabitra Kubar 4 Archalbot-9
Type of StructureTotal Area
( sqm)
Affected
Area
(sqm)
StoreyRate
/sqm
Total
Amount
Dry wall 27318.22
27318.22
75Remarks
Public Land
as per estimate sheet
Land Owner Name: Gausari Gurung Total
as per estimate sheet
Land Owner Name: Ramesh Raj Kubar Total
76Remarks
Public Land
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
77 2+640 Gir bdr Kubar 541 941076 4 Archalbot 7
Type of StructureTotal Area
( sqm)
Affected
Area
(sqm)
StoreyRate
/sqm
Total
Amount
Dry wall 49594.45
49594.45
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
78 2+660 Pabitra Thapa Kubar 4 Archalbot-9
Type of StructureTotal Area
( sqm)
Affected
Area
(sqm)
StoreyRate
/sqm
Total
Amount
Dry wall and
courtyard 35385.06
35385.06
77Remarks
as per estimate sheet
Land Owner Name: Pabitra Thapa Kubar Total
as per estimate sheet
Land Owner Name: Gir bdr Kubar Total
78Remarks
Public Land
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
79 2+720 Ganga Kubar 620 941076 5 Archalbot 7
Type of StructureTotal Area
( sqm)
Affected
Area
(sqm)
StoreyRate
/sqm
Total
Amount
Dry wall and
courtyard 57508.46
57508.46
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
80 2+880 Ram bdr gharti Bhujel 178 941076 5 Archalbot 6
Type of StructureTotal Area
( sqm)
Affected
Area
(sqm)
StoreyRate
/sqm
Total
Amount
Dry wall 86485.26
86485.26
79Remarks
as per estimate sheet
Land Owner Name: Ram bdr gharti Bhujel Total
as per estimate sheet
Land Owner Name: Ganga Kubar Total
80Remarks
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
81 3+890 Bimla Bhujel 3 Shreevanjyang
Type of StructureTotal Area
( sqm)
Affected
Area
(sqm)
StoreyRate
/sqm
Total
Amount
Dry wall 4934.33
4934.33
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
82 3+900 Nalmaya Bohara 3 Shreevanjyang
Type of StructureTotal Area
( sqm)
Affected
Area
(sqm)
StoreyRate
/sqm
Total
Amount
Dry wall 12685.70
12685.70
81Remarks
Public Land
as per estimate sheet
Land Owner Name: Nalmaya Bohara Total
as per estimate sheet
Land Owner Name: Bimla Bhujel Total
82Remarks
Public Land
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
83 8+970 Sher bdr Gurung 45 940997 3 Jetaure
Type of StructureTotal Area
( sqm)
Affected
Area
(sqm)
StoreyRate
/sqm
Total
Amount
Dry wall 14802.98
14802.98
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
84 5+860 Dhan Bdr Shrestha 887 940997 2 Shreevanjyang
Type of StructureTotal Area
( sqm)
Affected
Area
(sqm)
StoreyRate
/sqm
Total
Amount
Dry wall 39474.60
39474.60
83Remarks
as per estimate sheet
Land Owner Name: Dhan Bdr Shrestha Total
as per estimate sheet
Land Owner Name: Gaumati Gurung Total
84Remarks
8
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
85 5+900 Laxmi B.K 888 940997 3 Shreevanjyang
Type of StructureTotal Area
( sqm)
Affected
Area
(sqm)
StoreyRate
/sqm
Total
Amount
Dry wall 31699.30
31699.30
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
86 6+010 Bishnu Kumar Shrestha 804 940997 4 Shreevanjyang
Type of StructureTotal Area
( sqm)
Affected
Area
(sqm)
StoreyRate
/sqm
Total
Amount
Dry wall 47324.66
47324.66
85Remarks
8
as per estimate sheet
Land Owner Name: Bishnu Kumar Shrestha Total
as per estimate sheet
Land Owner Name: Bishnu Kr. Shrestha Total
86Remarks
8
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
87 6+030 Indrajit Gurung 3 Shreevanjyang
Type of StructureTotal Area
( sqm)
Affected
Area
(sqm)
StoreyRate
/sqm
Total
Amount
Dry wall 47698.48
47698.48
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
88 6+660 Ladi Gurung 62 940997 3 Sherabazar
Type of StructureTotal Area
( sqm)
Affected
Area
(sqm)
StoreyRate
/sqm
Total
Amount
Dry wall 22069.89
22069.89
87Remarks
Public Land
as per estimate sheet
Land Owner Name: Ladi Gurung Total
as per estimate sheet
Land Owner Name: Indrajit Gurung Total
88Remarks
Nauthar 2
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
89 6+680 Ram bdr gurung 77 940997 3 Sherabazar
Type of StructureTotal Area
( sqm)
Affected
Area
(sqm)
StoreyRate
/sqm
Total
Amount
Dry wall 12918.96
12918.96
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
90 6+700 Nalumaya Gurung 1184 940997 2 Sherabazar
Type of StructureTotal Area
( sqm)
Affected
Area
(sqm)
StoreyRate
/sqm
Total
Amount
Dry wall 43296.46
43296.46
89Remarks
Nauthar 2
as per estimate sheet
Land Owner Name: Nalumaya Gurung Total
as per estimate sheet
Land Owner Name: Ram bdr gurung Total
90Remarks
Nauthar 2
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
91 6+760 Budhmaya(Shyamlal) Gurung 696 940997 4 Sherabazar
Type of StructureTotal Area
( sqm)
Affected
Area
(sqm)
StoreyRate
/sqm
Total
Amount
Dry Wall 22877.33
22877.33
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
92 7+500 Palman Magar 81 940957 2 Nauthar
Type of StructureTotal Area
( sqm)
Affected
Area
(sqm)
StoreyRate
/sqm
Total
Amount
Dry wall 6280.05
6280.05
91
Remarks
Nauthar 2
as per estimate sheet
Land Owner Name: Palman Magar Total
as per estimate sheet
Land Owner Name: Budhmaya(Shyamlal) Gurung Total
92Remarks
5
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
93 8+100 Subba Gurung 437 940958 3 Nauthar
Type of StructureTotal Area
( sqm)
Affected
Area
(sqm)
StoreyRate
/sqm
Total
Amount
Dry wall 12021.81
12021.81
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
94 8+600 Kamsi gurung 441 940959 5 Nauthar
Type of StructureTotal Area
( sqm)
Affected
Area
(sqm)
StoreyRate
/sqm
Total
Amount
Dry Wall 12596.95
12596.95
93Remarks
5
as per estimate sheet
Land Owner Name: Kamsi gurung Total
as per estimate sheet
Land Owner Name: Subba Gurung Total
94Remarks
8
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
95 8+930 Bamse guruseni 479 940958 4 Jetaure
Type of StructureTotal Area
( sqm)
Affected
Area
(sqm)
StoreyRate
/sqm
Total
Amount
Masonary wall for
Tap 21065.10
21065.10
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
96 8+945 varat gurung 397 940958 4 Jetaure
Type of StructureTotal Area
( sqm)
Affected
Area
(sqm)
StoreyRate
/sqm
Total
Amount
Dry wall 4859.56
4859.56
95Remarks
Nauthar 5
as per estimate sheet
Land Owner Name: Birkha Total
as per estimate sheet
Land Owner Name: Bamse guruseni Total
96Remarks
Nauthar-5
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
97 8+952 Shuvi gurung 4 Jetaure
Type of StructureTotal Area
( sqm)
Affected
Area
(sqm)
StoreyRate
/sqm
Total
Amount
Dry wall 20395.21
20395.21
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
98 8+970 Sher bdr Gurung 469 940959 3 Jetaure
Type of StructureTotal Area
( sqm)
Affected
Area
(sqm)
StoreyRate
/sqm
Total
Amount
Dry wall 24596.86
24596.86
97Remarks
NautharPublic Land
as per estimate sheet
Land Owner Name: Sher Bd. Ghale Total
as per estimate sheet
Land Owner Name: Shuvi gurung Total
98Remarks
Nauthar 8
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
99 8+990 Kumar gurung 3 Jetaure
Type of StructureTotal Area
( sqm)
Affected
Area
(sqm)
StoreyRate
/sqm
Total
Amount
Dry wall for tap
pad 3364.31
3364.31
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
100 9+470 Kal bahadur gurung 156 940958 3 Nauthar
Type of StructureTotal Area
( sqm)
Affected
Area
(sqm)
StoreyRate
/sqm
Total
Amount
Dry wall 10765.80
10765.80
99Remarks
NautharPublic Land
as per estimate sheet
Land Owner Name: Kal bahadur gurung Total
as per estimate sheet
Land Owner Name: Kumar gurung Total
100Remarks
8
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
101 9+660 Kamala Ghale 3 Nauthar
Type of StructureTotal Area
( sqm)
Affected
Area
(sqm)
StoreyRate
/sqm
Total
Amount
Dry wall 6280.05
6280.05
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
102 9+795 Kamsing Gurung 441 940959 3 Nauthar
Type of StructureTotal Area
( sqm)
Affected
Area
(sqm)
StoreyRate
/sqm
Total
Amount
Dry wall 17494.43
101Remarks
Public Land
as per estimate sheet
as per estimate sheet
Land Owner Name: Kamala Ghale Total
102Remarks
8
17494.43
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
103 9+795 Sur bahadur gurung 456 940959 4 Nauthar
Type of StructureTotal Area
( sqm)
Affected
Area
(sqm)
StoreyRate
/sqm
Total
Amount
Dry wall 5024.04
5024.04
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
104 11+270 Shanata maya Gurung 3 Pachok
Type of StructureTotal Area
( sqm)
Affected
Area
(sqm)
StoreyRate
/sqm
Total
Amount
Dry wall 8522.93
Land Owner Name: Kamsing Gurung Total
103Remarks
8
as per estimate sheet
as per estimate sheet
Land Owner Name: Bhairab Total
104Remarks
Public Land
8522.93
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
105 11+300 Chattur Bdr Gurung(Gamere) 3 Pachok
Type of StructureTotal Area
( sqm)
Affected
Area
(sqm)
StoreyRate
/sqm
Total
Amount
Dry Wall 10909.34
10909.34
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
106 12+017 Chunu Ghale 3 Pachok
Type of StructureTotal Area
( sqm)
Affected
Area
(sqm)
StoreyRate
/sqm
Total
Amount
Dry wall 6728.63
Land Owner Name: Shanata maya Gurung Total
105
Remarks
Public Land
as per estimate sheet
as per estimate sheet
Land Owner Name: Gameere Gurung Total
106Remarks
Public Land
6728.63
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
107 12+160 Him Kumari gurung(Gausari) 4 Pachok VDCoff.
Type of StructureTotal Area
( sqm)
Affected
Area
(sqm)
StoreyRate
/sqm
Total
Amount
Dry Wall 17071.30
17071.30
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
108 12+440 Teklal Gurung 4 Pachok
Type of StructureTotal Area
( sqm)
Affected
Area
(sqm)
StoreyRate
/sqm
Total
Amount
Dry wall 18242.05
Land Owner Name: Gameere Gurung Total
107
Remarks
Public Land
as per estimate sheet
as per estimate sheet
Land Owner Name: Gausari Gurung Total
108Remarks
Public Land
18242.05
.
Land Owner Name: Teklal Gurung Total
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
109 2+540 Sita devi Kubar 664 941116 3 Archalbot 7
Type of StructureTotal Area
( sqm)
Affected
Area
(sqm)
StoreyRate
/sqm
Total
Amount
EQ affected House 111384.29
111384.29
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
110 2+540 Shanti Kubar 3 Archalbot-9
Type of StructureTotal Area
( sqm)
Affected
Area
(sqm)
StoreyRate
/sqm
Total
Amount
EQ affected House 101706.64
101706.64
2Remarks
Sub-Project: Belghari-Archalbot-Lamabagar-Sherabazar-Letaure-Pachok Road
District: Lamjung
Appendix 2.2 : Photographs of the Affected Structure with Estimated Cost(EQ Effected Structures)
1Remarks
Material transporttaion and relocatio cost only
Land Owner Name: Sita devi Kubar Total
Material transporttaion and relocatio cost only
Land Owner Name: Shanti Kubar Total
Public Land
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
111 5+630 Yeggyenath Ghimere 65 940997 4.2 Shreevanjyang
Type of StructureTotal Area
( sqm)
Affected
Area
(sqm)
StoreyRate
/sqm
Total
Amount
EQ affected CGI Pali 1383.23
1383.23
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
112 8+600 Kamsi gurung 441 940959 4.8 Nauthar
Type of StructureTotal Area
( sqm)
Affected
Area
(sqm)
StoreyRate
/sqm
Total
Amount
EQ affected CGI Pali 3853.63
3853.63
4Remarks
8
3
Remarks
8
Material transporttaion and relocatio cost only
Land Owner Name: Yeggyenath Ghimere Total
Material transporttaion and relocatio cost only
Land Owner Name: Kamsi gurung Total
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
113 8+930 Bamse guruseni 479 940958 3.5 Jetaure
Type of StructureTotal Area
( sqm)
Affected
Area
(sqm)
StoreyRate
/sqm
Total
Amount
EQ affected House 32065.78
32065.78
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
114 12+450 Ram Bdr Ghale 2 Pachok
Type of StructureTotal Area
( sqm)
Affected
Area
(sqm)
StoreyRate
/sqm
Total
Amount
EQ affected House 67591.86
67591.86
Remarks
Nauthar 5
as per estimate sheet
Land Owner Name: Bamse guruseni Total
Public Land
as per estimate sheet
Land Owner Name: Ram Bdr Ghale Total
6Remarks
5
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
115 2+000 Indra Prasad marahatha 612 941116 4.2 Archalbot 8
Type of StructureTotal Area
( sqm)
Affected
Area (sqm)Storey
Rate
/sqm
Total
Amount
2750.00
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
116 2+060 Ishwori Adhikari 170 941116 4 Archalbot 8
Type of StructureTotal Area
( sqm)
Affected
Area (sqm)Storey
Rate
/sqm
Total
Amount
7938.47
Goat Cabinet as per estimate sheet 2750.00
Land Owner Name: Indra Prasad marahatha Total
Sub-Project: Belghari-Archalbot-Lamabagar-Sherabazar-Letaure-Pachok Road
District: Lamjung
Appendix 2.3 : Photographs of the Affected Structure with Estimated Cost(Tin Taharas)
1Remarks
Land Owner Name: Ishwori Adhikari Total
2Remarks
House Pali and Cow
Farmas per estimate sheet 7938.47
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
117 2+205 Man Bdr Khadka 598 941116 3.3 Archalbot 8
Type of StructureTotal Area
( sqm)
Affected
Area (sqm)Archalbot 8
Rate
/sqm
Total
Amount
2750.00
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
118 2+480 Man Bdr Thapa 617 941116 3.7 Archalbot 7
Type of StructureTotal Area
( sqm)
Affected
Area (sqm)Storey
Rate
/sqm
Total
Amount
2750.00
3Remarks
4Remarks
Goat Cabinet as per estimate sheet 2750.00
Goat Cabinet as per estimate sheet 2750.00
Land Owner Name: Man Bdr Khadka Total
Land Owner Name: Man Bdr Thapa Total
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
119 2+510 Nabaraj Adhikari 531 941116 4.5 Archalbot 8
Type of StructureTotal Area
( sqm)
Affected
Area (sqm)Storey
Rate
/sqm
Total
Amount
2750.00
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
120 2+860 Som Maya Bhujel 799 941076 3.4 Archalbot 6
Type of StructureTotal Area
( sqm)
Affected
Area (sqm)Storey
Rate
/sqm
Total
Amount
25558.83
Goat Cabinet as per estimate sheet 2750.00
Land Owner Name: Nabaraj Adhikari Total
5Remarks
Land Owner Name: Som Maya Bhujel Total
6Remarks
Tahara CGI as per estimate sheet 25558.83
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
121 3+570 Joikane Gurung 3.5 Shreevanjyang
Type of StructureTotal Area
( sqm)
Affected
Area (sqm)Storey
Rate
/sqm
Total
Amount
1487.44
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
122 5+142 Gorey Tamang(Hiralal Shrestha) 470 941037 4.7 Shreevanjyang
Type of StructureTotal Area
( sqm)
Affected
Area (sqm)Storey
Rate
/sqm
Total
Amount
7359.79
7Remarks
Public Land
8
Remarks
4
CGI Tahara as per estimate sheet 7359.79
CGI pali as per estimate sheet 1487.44
Land Owner Name: Joikane Gurung Total
Land Owner Name: Hiralal Shrestha Total
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
123 6+010 Bishnu Kumar Shrestha 804 940997 3.5 Shreevanjyang
Type of StructureTotal Area
( sqm)
Affected
Area (sqm)Storey
Rate
/sqm
Total
Amount
2750.00
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
124 6+700 Govinda Wagle 71 940997 3.8 Sherabazar
Type of StructureTotal Area
( sqm)
Affected
Area (sqm)Storey
Rate
/sqm
Total
Amount
8575.82
Goat Cabinet as per estimate sheet 2750.00
Land Owner Name: Hiralal Shrestha Total
9Remarks
8
Land Owner Name: Govinda Wagle Total
10
Remarks
Nauthar 2
CGI Cabinet as per estimate sheet 8575.82
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
125 6+760 Budhmaya(Shyamlal) Gurung 696 940997 4.3 Sherabazar
Type of StructureTotal Area
( sqm)
Affected
Area (sqm)Storey
Rate
/sqm
Total
Amount
2750.00
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
126 7+500 Palman Magar 2.4 Nauthar
Type of StructureTotal Area
( sqm)
Affected
Area (sqm)Storey
Rate
/sqm
Total
Amount
5500.00
11Remarks
Nauthar 2
12Remarks
cow theched roof as per estimate sheet 5500.00
Goat Cabinet as per estimate sheet 2750.00
Land Owner Name: Budhmaya(Shyamlal) Gurung Total
Public Land
Land Owner Name: Palman Magar Total
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
127 8+952 Shuvi gurung 4 Jetaure
Type of StructureTotal Area
( sqm)
Affected
Area (sqm)Storey
Rate
/sqm
Total
Amount
2750.00
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
128 8+960 Vaye Gurung 442 940958 4 Jetaure
Type of StructureTotal Area
( sqm)
Affected
Area (sqm)Storey
Rate
/sqm
Total
Amount
2457.42
Goat Cabinet as per estimate sheet 2750.00
Land Owner Name: Shuvi gurung Total
13Remarks
Public Land
Land Owner Name: Vaye Gurung Total
14Remarks
Nauthar 5
CGI House Pali as per estimate sheet 2457.42
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
129 8+940 Suman gurung 4.3 Jetaure
Type of StructureTotal Area
( sqm)
Affected
Area (sqm)Storey
Rate
/sqm
Total
Amount
1100.00
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
130 9+200 Mangle Guruseni 4.1 Nauthar
Type of StructureTotal Area
( sqm)
Affected
Area (sqm)Storey
Rate
/sqm
Total
Amount
16105.91
15Remarks
NautharPublic Land
16Remarks
CGI House and CGI
khoras per estimate sheet 16105.91
Chicken Khor as per estimate sheet 1100.00
Land Owner Name: Suman gurung Total
Public Land
Land Owner Name: Mangle Guruseni Total
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
131 9+220 Sher Bdr gurung 4.2 Nauthar
Type of StructureTotal Area
( sqm)
Affected
Area (sqm)Storey
Rate
/sqm
Total
Amount
17244.09
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
132 9+270 Mangalsing Gurung 4.1 Nauthar
Type of StructureTotal Area
( sqm)
Affected
Area (sqm)Storey
Rate
/sqm
Total
Amount
6374.17
CGI House and CGI
kitchenas per estimate sheet 17244.09
Land Owner Name: Sher Bdr gurung Total
17Remarks
Public Land
Land Owner Name: Mangalsing Gurung Total
18Remarks
CGI Ghumti as per estimate sheet 6374.17
Public Land
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
133 9+560 Bhimraj gurung 2.6 Nauthar
Type of StructureTotal Area
( sqm)
Affected
Area (sqm)Storey
Rate
/sqm
Total
Amount
9169.50
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
134 9+660 Jalsupa Gurung 2.9 Nauthar
Type of StructureTotal Area
( sqm)
Affected
Area (sqm)Storey
Rate
/sqm
Total
Amount
5894.13
19Remarks
Public Land
20Remarks
Cow farm as per estimate sheet 5894.13
Cow farm as per estimate sheet 9169.50
Land Owner Name: Bhimraj gurung Total
Public Land
Land Owner Name: Jalsupa Gurung Total
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
135 10+250 Gum Bdr Gurung 4.7 Nauthar end
Type of StructureTotal Area
( sqm)
Affected
Area (sqm)Storey
Rate
/sqm
Total
Amount
2750.00
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
136 10+700 Aaita sing gurung 469 941000 3.5 Pachok
Type of StructureTotal Area
( sqm)
Affected
Area (sqm)Storey
Rate
/sqm
Total
Amount
9260.28
Chicken Khor as per estimate sheet 2750.00
Land Owner Name: Public Land Total
21Remarks
Public Land
Land Owner Name: Aaita sing gurung Total
22Remarks
House CGI Pali and
Khoras per estimate sheet 9260.28
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
137 10+710 Mani gurung 3.8 Pachok
Type of StructureTotal Area
( sqm)
Affected
Area (sqm)Storey
Rate
/sqm
Total
Amount
4818.12
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
138 10+720 Shanta kumari Gurung 3.2 Pachok
Type of StructureTotal Area
( sqm)
Affected
Area (sqm)Storey
Rate
/sqm
Total
Amount
8235.96
23Remarks
Public Land
24Remarks
CGI Cabinet as per estimate sheet 8235.96
Chicken Khor as per estimate sheet 4818.12
Land Owner Name: Mani gurung Total
Public Land
Land Owner Name: Shanta kumari Gurung Total
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
139 11+690 Aaitemaya Gurung(Maikhu) 468 941000 3 Pachok
Type of StructureTotal Area
( sqm)
Affected
Area (sqm)Storey
Rate
/sqm
Total
Amount
13655.49
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
140 11+690 Yupeni gurung(Amar gurung) 467 941000 2.6 Pachok
Type of StructureTotal Area
( sqm)
Affected
Area (sqm)Storey
Rate
/sqm
Total
Amount
11469.59
Chiken Khor and
CGI Houseas per estimate sheet 13655.49
Land Owner Name: Maikhu Gurung Total
25Remarks
2
Land Owner Name: Amar Gurung Total
26Remarks
2
CGI cabinet as per estimate sheet 11469.59
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
141 12+080 Kharjung Gurung 479 940959 4.7 Pachok
Type of StructureTotal Area
( sqm)
Affected
Area (sqm)Storey
Rate
/sqm
Total
Amount
4690.75
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
142 12+120 Ram Bdr Gurung(Gausari) 4.1 Pachok
Type of StructureTotal Area
( sqm)
Affected
Area (sqm)Storey
Rate
/sqm
Total
Amount
12910.15
27Remarks
1
28Remarks
CGI Cabinet and
CGI khoras per estimate sheet 12910.15
CGI Cow farm as per estimate sheet 4690.75
Land Owner Name: Guman Sing Total
Public Land
Land Owner Name: Gausari Gurung Total
Structure No Chainage House Owner Name Plot no Sheet noDistance
from CLAddress
143 12+500 Shuv Raj gurung 979 950961 2 Pachok
Type of StructureTotal Area
( sqm)
Affected
Area (sqm)Storey
Rate
/sqm
Total
Amount
11000.00
212805.89
Chiken farm as per estimate sheet 11000.00
Land Owner Name: Gausari Gurung Total
29Remarks
3
Structure
NoChainage
House Owner
NamePlot no Sheet no Distance from CL Address
1 1+540 Public Strcuture 4 Archalbot
Type of
Structure
Total Area
( sqm)
Affected Area
(sqm)Storey Rate /sqm Total Amount
Tap Stand 19784.98
19784.98
Structure
NoChainage
House Owner
NamePlot no Sheet no Distance from CL Address
2 1+980 Public Structure 3 Archalbot
Type of
Structure
Total Area
( sqm)
Affected Area
(sqm)Storey Rate /sqm Total Amount
Krishna Mandir 111790.04
111790.04
1
Remarks
Sub-Project: Belghari-Archalbot-Lamabagar-Sherabazar-Letaure-Pachok RoadDistrict: Lamjung
Photographs of Public Affected Structure with Estimated Cost(Public Structures)
as per estimate sheet
Land Owner Public Strcuture Total
2Remarks
as per estimate sheet
Land Owner Public Structure Total
Structure
NoChainage
House Owner
NamePlot no Sheet no Distance from CL Address
3 2+307 Public Strcuture 4 Archalbot
Type of
Structure
Total Area
( sqm)
Affected Area
(sqm)Storey Rate /sqm Total Amount
Tap Stand 19784.98
19784.98
Structure
NoChainage House Owner Name Plot no Sheet no Distance from CL Address
4 2+350 Public Strcuture 4 Archalbot
Type of
Structure
Total Area
( sqm)
Affected Area
(sqm)Storey Rate /sqm Total Amount
Tap Stand 19784.98
19784.98
as per estimate sheet
as per estimate sheet
Land Owner Public Strcuture Total
Remarks4
3Remarks
Land Owner Public Strcuture Total
Structure
NoChainage
House Owner
NamePlot no Sheet no Distance from CL Address
5 2+530 Public Strcuture 3 Archalbot
Type of
Structure
Total Area
( sqm)
Affected Area
(sqm)Storey Rate /sqm Total Amount
Chautaro 10927.48
10927.48
Structure
NoChainage
House Owner
NamePlot no Sheet no Distance from CL Address
6 3+925 Public Strcuture 3.2Shreevanjyan
g
Type of
Structure
Total Area
( sqm)
Affected Area
(sqm)Storey Rate /sqm Total Amount
Chautaro 10927.48
10927.48
as per estimate sheet
6
Land Owner Public Strcuture Total
Remarks
5Remarks
as per estimate sheet
Land Owner Public Strcuture Total
Structure
NoChainage
House Owner
NamePlot no Sheet no Distance from CL Address
7 5+540 Public Strcuture 3.6Shreevanjyan
g
Type of
Structure
Total Area
( sqm)
Affected Area
(sqm)Storey Rate /sqm Total Amount
Chautaro 9839.80
9839.80
Structure
NoChainage
House Owner
NamePlot no Sheet no Distance from CL Address
8 5+700 Public Strcuture 3.5Shreevanjyan
g
Type of
Structure
Total Area
( sqm)
Affected Area
(sqm)Storey Rate /sqm Total Amount
Irrigation Canal 289351.60
289351.60
7
Remarks
as per estimate sheet
Land Owner Public Strcuture Total
8
Remarks
as per estimate sheet
Land Owner Public Strcuture Total
Structure
NoChainage
House Owner
NamePlot no Sheet no Distance from CL Address
9 12+450 Public Structure 1.9 Pachok
Type of
Structure
Total Area
( sqm)
Affected Area
(sqm)Storey Rate /sqm Total Amount
Pachok Health
Post and Dry
wall
397780.63
397780.63
9Remarks
as per estimate sheet
Land Owner Public Structure Total
Cost Calculation of Lands of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, LamjungS
.N.
Lan
d O
wn
er
Na
me
Ho
use
ho
ld h
ea
d
VD
C
Wa
rd N
o.
Aff
ect
ed
Plo
t n
o.
Ex
isit
ng
Are
a,
sqm
Ne
w C
ut
Are
a,
sqm
To
tal
Aff
ect
ed
are
a (
sqm
)
Re
pla
cem
en
t co
st r
ate
pe
r
sqm
.(2
5%
in
cre
me
nt)
To
tal
Co
st N
Rs.
Rem
ark
s
1
Panchasingh, Deumaya
Gurung Deumaya Gurung Pachowk 1 46 58.28 71.31 129.59 93.37 6658.21 Interviewed
2 Karna bdr. Gurung Lilamaya Gurung Pachowk 1 337 989.85 1086.24 2076.09 93.37 101422.23 Interviewed
3 Sita Gurung Sita Gurung Pachowk 1 440 0 13.92 13.92 93.37 1299.71 Interviewed
4 Harka bdr.Gurung Harka bdr.Gurung Pachowk 1 443 0 17.8 17.8 93.37 1661.99 Interviewed
5 Nimba Gurung Nimba Gurung Pachowk 1 524 142.4 141.41 283.81 93.37 13203.45 Interviewed
6 Ser bdr Gurung Ser bdr Gurung Pachowk 1 336 25.78 38.8 64.58 93.37 3622.76 Interviewed
7 Makhhui Gurung Jivraj Gurung Pachowk 2 468 848.62 1037.36 1885.98 93.37 96858.30 Interviewed
8 Som Bdr. Gurung Som Bdr. Gurung Pachowk 2 595 0 2.65 2.65 93.37 247.43 Interviewed
9 Aaita Bdr. Gurung Aaita Bdr. Gurung Pachowk 2 469 330.53 403.61 734.14 93.37 37685.07 Interviewed
10 Amar Gurung Amar Gurung Pachowk 2 467 208.04 177.63 385.67 93.37 16585.31 Interviewed
11 Bakhat Bdr. Gurung Bakhat Bdr. Gurung Pachowk 3 914 206.35 267.78 474.13 93.37 25002.62 Interviewed
12 Dadman Gurung Dadman Gurung Pachowk 3 900 20.53 37.77 58.3 93.37 3526.58 Interviewed
13 Gayin singh Gurung Gayin singh Gurung Pachowk 3 976 30.91 58.3 89.21 93.37 5443.47 Interviewed
14 Mann bdr. Gurung Mann bdr. Gurung Pachowk 3 951 66.86 50.19 117.05 93.37 4686.24 Interviewed
15 Iman singh(surya Prasad) Surya pd. Gurung Pachowk 1 434 49.62 49.6 99.22 93.37 4631.15 Interviewed
16 Janga sub Gurung Dudhmaya Gurung Pachowk 1 447 170.71 214.38 385.09 93.37 20016.66 Interviewed
17 Sat bdr.Gurung Manraj Gurung Pachowk 1 925 0 10.47 10.47 93.37 977.58 Interviewed
18 Yubaraj Gurung Yubaraj Gurung Nauthar 8 555 5.47 14.75 20.22 93.37 1377.21 Interviewed
19 Ladimaya Gurung Ladimaya Gurung Nauthar 2 62 27.52 41.14 68.66 93.37 3841.24 Interviewed
20 Tulasi pd. Ghimire Tulasi pd. Shrestha Nauthar 8 115 10.1 19.36 29.46 93.37 1807.64 Interviewed
21 Badmaya Gurung Badmaya Gurung Nauthar 8 507 0 30.89 30.89 93.37 2884.20 Interviewed
22 Bimaya Gurung Bimaya Gurung Nauthar 5 465 0 11.48 11.48 93.37 1071.89 Interviewed
23 Chature sarki Chature sarki Nauthar 8 175 134.74 165.79 300.53 93.37 15479.81 Interviewed
24 Rajkumar Shresth Rajkumar Shresth Nauthar 2 113 123.39 165.8 289.19 93.37 15480.75 Interviewed
25 Nirmala Ghimire Mohan Pd.Ghimire Nauthar 2 678 129.54 164.01 293.55 93.37 15313.61 Interviewed
26 Dal subba Gurung Dal subba Gurung Nauthar 8 472 19.29 23.39 42.68 93.37 2183.92 Interviewed
27 Mayanath wagle Jeunath Nauthar 2 69 80.82 108.76 189.58 93.37 10154.92 Interviewed
28 Bipinchandra Ghimire Tripura Ghimire Nauthar 8 164 0 7.2 7.2 93.37 672.26 Interviewed
29 Nardev Gurung Nardev Gurung Nauthar 5 386 250.79 306.23 557.02 93.37 28592.70 Interviewed
30 Govinda wagle Govinda wagle Nauthar 2 71 115.76 109.87 225.63 93.37 10258.56 Interviewed
31
Ramraj Bista(now-
Kunimaya Shrestha) Arun kumar Shrestha Nauthar 2 1230 0 21.29 21.29 93.37 1987.85 Interviewed
32 Nalumaya Gurung Yobir Gurung Nauthar 2 1184 3.97 11.94 15.91 93.37 1114.84 Interviewed
33 Kam singh gurung Kam singh gurung Nauthar 8 441 113.87 133.92 247.79 93.37 12504.11 Interviewed
34 Jabarsingh/Tulsi Gurung Man pd. Gurung Nauthar 8 534 18.32 33.35 51.67 93.37 3113.89 Interviewed
35 Purnaa/Mekhraj Gurung Mekhraj Gurung Nauthar 8 499 171.43 188.85 360.28 93.37 17632.92 Interviewed
36 Kum bdr. Gurung Kum bdr. Gurung Nauthar 8 554 60.55 52.16 112.71 93.37 4870.18 Interviewed
37 Manmaya Sarki Manmaya Sarki Nauthar 8 621 90.55 91.01 181.56 93.37 8497.60 Interviewed
38 Aasbahadur Gurung Aasbahadur Gurung Nauthar 8 552 28.31 33.83 62.14 93.37 3158.71 Interviewed
39 Kale Gurung Kale gurung Nauthar 8 156 311.21 390.64 701.85 93.37 36474.06 Interviewed
40 Kamini sarki Som bahadur Nauthar 5 436 117.47 142.56 260.03 93.37 13310.83 Interviewed
41 Chyangre Sarki Chyangre sarki Nauthar 8 466 57.19 103.13 160.32 93.37 9629.25 Interviewed
42 Ram bdr. Gurung Rishikumar Gurung Nauthar 2 77 120.54 108.8 229.34 93.37 10158.66 Interviewed
Cost Calculation of Lands of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, LamjungS
.N.
Lan
d O
wn
er
Na
me
Ho
use
ho
ld h
ea
d
VD
C
Wa
rd N
o.
Aff
ect
ed
Plo
t n
o.
Ex
isit
ng
Are
a,
sqm
Ne
w C
ut
Are
a,
sqm
To
tal
Aff
ect
ed
are
a (
sqm
)
Re
pla
cem
en
t co
st r
ate
pe
r
sqm
.(2
5%
in
cre
me
nt)
To
tal
Co
st N
Rs.
Rem
ark
s
43 Mait bahadur Gurung Mait bahadur Gurung Nauthar 2 1183 45.23 39.46 84.69 93.37 3684.38 Interviewed
44 Subba Gurung Subba Gurung Nauthar 5 437 72.73 53.95 126.68 93.37 5037.31 Interviewed
45
Krishna/Bhupati raj
Pandey Krishna Raj Pandey Nauthar 2 126 34.59 61.65 96.24 93.37 5756.26 Interviewed
46 Atimaya, Ram bdr.Sarki Atimaya Sarki
Shreebhanjya
ng 2 183 0 25.44 25.44 56.51 1437.61 Interviewed
47 Dhan bdr. Shrestha Gore Shrestha
Shreebhanjya
ng 8 887 25.56 36.35 61.91 56.51 2054.14 Interviewed
48 Om bdr.Gurung Om bdr.Gurung
Shreebhanjya
ng 4 12 31.98 80.25 112.23 56.51 4534.93 Interviewed
49 Sukman Gurung Sukman Gurung
Shreebhanjya
ng 8 921 237.97 276.4 514.37 56.51 15619.36 Interviewed
50
Balkrishna Upadhya
Ghimire
Balkrishna Upadhya
Ghimire
Shreebhanjya
ng 4 20 282.54 351.2 633.74 56.51 19846.31 Interviewed
51 Bhuwan singh Gurung Pushparaj Gurung
Shreebhanjya
ng 4 9 142.84 174.47 317.31 56.51 9859.30 Interviewed
52 Samser sarki Gopal Sarki
Shreebhanjya
ng 2
188,
189 156.64 332.83 489.47 56.51 18808.22 Interviewed
53 Arjun kunwar Arjun kunwar
Shreebhanjya
ng 2
239,
238 0 41.57 41.57 56.51 2349.12 Interviewed
54 Dambar bdr.Gurung Dambar bdr.Gurung
Shreebhanjya
ng 8 82 61.73 39.17 100.9 56.51 2213.50 Interviewed
55 Ganesh Bdr. Kunwar Ganesh Bdr. Kunwar
Shreebhanjya
ng 2 237 0 41.42 41.42 56.51 2340.64 Interviewed
56 Aasbahadur Nepali Aasbahadur Nepali
Shreebhanjya
ng 2 186 7.85 26.86 34.71 56.51 1517.86 Interviewed
57 Kumar Pandey Kumar Pandey Nauthar 2
1258,
109,
108 224.68 254.72 479.4 93.37 23783.21 Interviewed
58 Goth Bdr. Gurung Goth Bdr. Gurung Nauthar 5
254,
256,
438 742.6 900.34 1642.94 93.37 84064.75 Interviewed
59 Gaini Gurung Dhan Bdr. Gurung Nauthar 8 551 42.46 51.9 94.36 93.37 4845.90 Interviewed
60 Aaita Sarki Aaita Sarki
Shreebhanjya
ng 2
187,
182 412.23 329.34 741.57 56.51 18611.00 Interviewed
61 Sarki (Shor Bdr. Gurung) Shor Bdr. Gurung Nauthar 8
456,
511,
26202
, 422 415.68 523.33 939.01 93.37 48863.32 Interviewed
62 Nabraj Ghimire Nabraj Ghimire
Shreebhanjya
ng 8 86, 172.58 125.86 298.44 56.51 7112.35 Interviewed
63 Paal Jung Gurung Paal Jung Gurung
Shreebhanjya
ng 4 11, 5 497.8 653.57 1151.37 56.51 36933.24 Interviewed
64 Yagyanath Ghimire Yagyanath Ghimire
Shreebhanjya
ng 8 65 289.28 225.23 514.51 56.51 12727.75 Interviewed
65
Gaumati Gurung, Jabi
Gurung Jabi Gurung
Shreebhanjya
ng 8 67, 45 462.2 341.01 803.21 56.51 19270.48 Interviewed
66 Birdhoj Gurung Birdhoj Gurung Nauthar 5
250,
251 157.73 203.04 360.77 93.37 18957.84 Interviewed
67
Mama Maya Shrestha,
Hiralal Shrestha Hiralal Shrestha
Shreebhanjya
ng 4
457,
29,
26,
33,
34,
470 573.6 730.93 1304.53 56.51 41304.85 Interviewed
68 Kum Bdr. Gurung Kum Bdr. Gurung
Shreebhanjya
ng 8 57, 49 232.9 461.8 694.7 56.51 26096.32 Interviewed
Cost Calculation of Lands of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, LamjungS
.N.
Lan
d O
wn
er
Na
me
Ho
use
ho
ld h
ea
d
VD
C
Wa
rd N
o.
Aff
ect
ed
Plo
t n
o.
Ex
isit
ng
Are
a,
sqm
Ne
w C
ut
Are
a,
sqm
To
tal
Aff
ect
ed
are
a (
sqm
)
Re
pla
cem
en
t co
st r
ate
pe
r
sqm
.(2
5%
in
cre
me
nt)
To
tal
Co
st N
Rs.
Rem
ark
s
69
Bishnu ghimire, Rajya
Prasad Ghimire Bishnu Ghimire
Shreebhanjya
ng 8
58,
55 212.51 248.16 460.67 56.51 14023.52 Interviewed
70 Rojina Gurung Kamaljit Gurung Nauthar 5
264,
263,
309,
310 576.18 665.66 1241.84 93.37 62152.67 Interviewed
71 Yesraj Thapa Magar Gaj Bd Archalbot 9 673 15.45 19.8 35.25 110.57 2189.29 Interviewed
72 Dhanamaya Adhikari Dhana bdr. Adhikari Archalbot 8 172 61.21 91.9 153.11 110.57 10161.38 Interviewed
73 Mina Poudel Mina Poudel Archalbot 9 316 50.16 64.11 114.27 110.57 7088.64 Interviewed
74 Hari bdr.Khadka Hari bdr.Khadka Archalbot 6 183 181.94 200.87 382.81 110.57 22210.20 Interviewed
75 Srijana Pariyar Ram bdr. Pariyar Archalbot 9 330 11.41 12.05 23.46 110.57 1332.37 Interviewed
76 Sushila Pariyar Ramesh Pariyar Archalbot 9 667 297.41 356.18 653.59 110.57 39382.82 Interviewed
77 Gopal Lamichhane nanda bdr.Lamichhane Archalbot 9 332 15.44 19.7 35.14 110.57 2178.23 Interviewed
78 Min bdr. Bhujel Min bdr. Bhujel Archalbot 9 556 120.81 134.85 255.66 110.57 14910.36 Interviewed
79 Devi bhakta Regmi Devi bhakta Regmi Archalbot 9 516 68.07 157.78 225.85 110.57 17445.73 Interviewed
80 Krishna bdr. Gharti Krishna bdr. Gharti Archalbot 9 557 54.88 118.08 172.96 110.57 13056.11 Interviewed
81 Subhadra Regmi Milan Regmi Archalbot 9 97, 98 327.48 386.11 713.59 110.57 42692.18 Interviewed
82 Bimala Adhikari Balram Adhikari Archalbot 9 49 54.79 54.21 109 110.57 5994.00 Interviewed
83 Pashupati Thapa Kunwar Shanta kumari Kunwar Archalbot 7 619 43.19 52.53 95.72 110.57 5808.24 Interviewed
84 Amrit Lamichhane Balkrishna Lamichhane Archalbot 6 174 35.71 40.13 75.84 110.57 4437.17 Interviewed
85 Kalpana Adhikari Bhart bdr. Kunwar Archalbot 7 674 34.53 28.26 62.79 110.57 3124.71 Interviewed
86 Kirtiman Kunwar Kirtiman Kunwar Archalbot 8 160 16.31 29.99 46.3 110.57 3315.99 Interviewed
87 Ram chandra Adhikari Ram chandra Adhikari Archalbot 6 793 53.79 86.73 140.52 110.57 9589.74 Interviewed
88 Sita devi kunwar Maan bdr. Kunwar Archalbot 7 664 47.59 47.69 95.28 110.57 5273.08 Interviewed
89 Jit bdr. Lamichhane Jit bdr. Lamichhane Archalbot 9 76, 78 304.91 276.91 581.82 110.57 30617.94 Interviewed
90 Bishnulal Shrestha Bishnulal Shrestha Archalbot 9
492,
390 96.66 121.53 218.19 110.57 13437.57 Interviewed
91 Tankalal Shrestha Teklal Shrestha Archalbot 9
494,
427,
391 215.89 255.39 471.28 110.57 28238.47 Interviewed
92 Kalawati Rana Magar Janga Bdr. Ale Magar Archalbot 9 633 23.82 26.52 50.34 110.57 2932.32 Interviewed
93 Badrinath Lamichhane Badrinath Lamichhane Archalbot 9
635,
538 35.64 52.22 87.86 110.57 5773.97 Interviewed
94 Gangamaya Suyal Bishnu Bdr. Suyal Archalbot 9
588,
591,
585 456.96 388.64 845.6 110.57 42971.92 Interviewed
95 Khem Kumari Joshi Govindaraj Joshi
Shreebhanjya
ng 2
723,
443,
722 216.8 392.77 609.57 56.51 22195.43 Interviewed
96 Tilak Bdr. Kunwar Tilak Bdr. Kunwar Archalbot 8
155,
531,
534 400.79 436.28 837.07 110.57 48239.48 Interviewed
97 Shovita+Shrijana Kunwar Shovita Kunwar Archalbot 8
477,
676,
675 272.52 283.99 556.51 110.57 31400.77 Interviewed
98 Ganga Kunwar Dhub Kunwar Archalbot 7 620 409.38 500.41 909.79 110.57 55330.33 Interviewed
99 Prasansha Kunwar Bal Bdr. Kunwar Archalbot 7 663 41.92 40.17 82.09 110.57 4441.60 Interviewed
Cost Calculation of Lands of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, LamjungS
.N.
Lan
d O
wn
er
Na
me
Ho
use
ho
ld h
ea
d
VD
C
Wa
rd N
o.
Aff
ect
ed
Plo
t n
o.
Ex
isit
ng
Are
a,
sqm
Ne
w C
ut
Are
a,
sqm
To
tal
Aff
ect
ed
are
a (
sqm
)
Re
pla
cem
en
t co
st r
ate
pe
r
sqm
.(2
5%
in
cre
me
nt)
To
tal
Co
st N
Rs.
Rem
ark
s
100 Narayan Kunwar Narayan Kunwar Archalbot 8
530,
535 65.35 139.09 204.44 110.57 15379.18 Interviewed
101 Gokul Prasad Regmi Gokul Prasad Regmi Archalbot 9 541 95.23 97.38 192.61 110.57 10767.31 Interviewed
102 Harka Kumar Shrestha Harka Kumar Shrestha Archalbot 9 424 177.38 214.95 392.33 110.57 23767.02 Interviewed
103 Ram bdr.Parajuli Ram bdr.Parajuli Archalbot 9 425 128.82 145.16 273.98 110.57 16050.34 Interviewed
104 Bishnu Giri Bishnu Giri Archalbot 9 413 21.77 53.58 75.35 110.57 5924.34 Interviewed
105 Krishna Pd. Mareta Krishna Pd. Mareta Archalbot 8 585 14.03 28.36 42.39 110.57 3135.77 Interviewed
106 Ram bdr.Gharti Bhujel Ram bdr.Gharti Bhujel Archalbot 6
801,
181,
178,
799,
792 354.87 366.21 721.08 110.57 40491.84 Interviewed
107 Aaitimaya Pariyar Hari bdr. Pariyar Archalbot 9 329 0 40.88 40.88 110.57 4520.10 Interviewed
108 Muktinath Lamichhane Bhimnaya Lamichhane Archalbot 9 636 57.72 126.7 184.42 110.57 14009.22 Interviewed
109 Hira devi Marhattha Hira devi Marhattha Archalbot 8 584 0.6 19.43 20.03 110.57 2148.38 Interviewed
110 Ishwori pd. Regmi Ishwori pd. Regmi Archalbot 9 558 0 33.61 33.61 110.57 3716.26 Interviewed
111 Ram pd. Poudel Ram pd. Poudel Archalbot 9
,317,6
49 199.15 236.14 435.29 110.57 26110.00 Interviewed
112 Klaimaya Kunwar Ramdevi Kunwar Archalbot 6 175 0 24.04 24.04 110.57 2658.10 Interviewed
113 Ishwori pd. Adhikari Kausila Adhikari Archalbot 8
170,
179,
578 432.74 516.69 949.43 110.57 57130.41 Interviewed
114 Sukumaya Ghale Hasta bdr. Ghale Nauthar 8
455,
460 166.24 191.94 358.18 93.37 17921.44 Interviewed
115 Ser Ghale Kali Ghale Nauthar 8
459,
469 350.58 434.39 784.97 93.37 40558.99 Interviewed
116 Tara devi Ghimire Saharsha jibi Ghimire Nauthar 5
378,
400 242.85 289.47 532.32 93.37 27027.81 Interviewed
117
Lila Poudel, Mahendra
Poudel Rishiram Poudel Archalbot 9
318,
315,
668 182.19 242.24 424.43 110.57 26784.48 Interviewed
118 Mayadevi Thapa Magar Yesh raj Thapa magar Archalbot 9
411,3
26,
526 273.86 332.13 605.99 110.57 36723.61 Interviewed
119 Ram bdr.Gurung Ram bdr.Gurung Archalbot 9 564 27.78 20.63 48.41 110.57 2281.06 Interviewed
120 Chijmaya Gurung Chijmaya Gurung Archalbot 7 493 34.69 38.58 73.27 110.57 4265.79 Interviewed
121 Chandra bdr. Thapa Prem bdr. Thapa Archalbot 9
389,
333 92 135.76 227.76 110.57 15010.98 Interviewed
122 Maan bdr. Thapa Maan bdr. Thapa Archalbot 9
583,
587,
590 112.04 147.99 260.03 110.57 16363.25 Interviewed
123 Edhane Gurung Eghane Gurung Pachowk 2
439,
450 316.09 386.2 702.29 93.37 36059.49 Interviewed
124 Karna singh Ghale Demraj Ghale Pachowk 3
511,
915 212.1 259.4 471.5 93.37 24220.18 Interviewed
125 Kami Gurung Kami Gurung Pachowk 3
953,
960 111.08 76.24 187.32 93.37 7118.53 Interviewed
126 Maya Gurungseni Kumraj Gurung Pachowk 3
886,
897 301.96 364.92 666.88 93.37 34072.58 Interviewed
127 Bhagawati Bhagawati Nauthar 5 690 214.6 327.22 541.82 93.37 30552.53 Interviewed
128 Birta Gurung Birta Gurung Nauthar 5
420,
424 248.11 261.17 509.28 93.37 24385.44 Interviewed
129 Bamsyo Gurungseni Jangasubba Gurung Nauthar 5
479,
480 281.36 362.48 643.84 93.37 33844.76 Interviewed
Cost Calculation of Lands of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, LamjungS
.N.
Lan
d O
wn
er
Na
me
Ho
use
ho
ld h
ea
d
VD
C
Wa
rd N
o.
Aff
ect
ed
Plo
t n
o.
Ex
isit
ng
Are
a,
sqm
Ne
w C
ut
Are
a,
sqm
To
tal
Aff
ect
ed
are
a (
sqm
)
Re
pla
cem
en
t co
st r
ate
pe
r
sqm
.(2
5%
in
cre
me
nt)
To
tal
Co
st N
Rs.
Rem
ark
s
130 Sitaram Gurung Sitaram Gurung Nauthar 5, 8
471,
620,
618,
377 248.65 303.9 552.55 93.37 28375.14 Interviewed
131 Sarba Singh Gurung Sarba Singh Gurung Nauthar 8
508,
563 423.42 533.26 956.68 93.37 49790.49 Interviewed
132 Nalu Kumari Gurung Mauli Gurung Nauthar 8 622 108.53 81.13 189.66 93.37 7575.11 Interviewed
133 Dhanmaya Gurung Pode Gurung Pachowk 1
615,
442,
475 262.05 353.93 615.98 93.37 33046.44 Interviewed
134
Hari Bdr. Kunwar, Devi
Kumari Kunwar Hari Bdr. Kunwar Archalbot 6
147,
752 287.19 301.81 589 110.57 33371.13 Interviewed
135 Aashkaji Shrestha Aashkaji Shrestha Archalbot 9 417 0 16.96 16.96 110.57 1875.27 Interviewed
136 Kshamamta Gurung Lal Bd Gurung Archalbot 7 677 32.3 27.34 59.64 110.57 3022.98 Interviewed
137 Gir Bdr. Kunwar Gir Bdr. Kunwar Archalbot 7 541 193.29 235.07 428.36 110.57 25991.69 Interviewed
138 Himraj+Umakanta Paudel Umakanta Paudel Archalbot 9
327,
321 242.54 330.61 573.15 110.57 36555.55 Interviewed
139 Shiva Prasad Adhikari Shiva Prasad Adhikari Archalbot 8 152 19.62 29.31 48.93 110.57 3240.81 Interviewed
140 Man Bdr. Thapa Man Bdr. Thapa Archalbot 7 617 32.85 27.93 60.78 110.57 3088.22 Interviewed
141 Devi Gurung Devi Gurung Archalbot 7 495 13.72 26.45 40.17 110.57 2924.58 Interviewed
142
Janaki Paudel, Dinnath
Paudel Dinanath Paudel Archalbot 9
565,
527,
525 31.33 34.8 66.13 110.57 3847.84 Interviewed
143
Rishiram Shrestha,
Gyanmaya Shrestha Rishiram Shrestha Archalbot 9
394,
395,
392 362.28 461.32 823.6 110.57 51008.15 Interviewed
144 Bil Bdr. Shrestha Bil Bdr. Shrestha Archalbot 9 398 0 17.89 17.89 110.57 1978.10 Interviewed
145 Amrit Bdr. Thapa Durga Thapa Archalbot 9
584,
497,
589 163.98 210.99 374.97 110.57 23329.16 Interviewed
146
Amrit(Amite), Sommaya
Bhujel Amrit(Amite) Gharti Archalbot 6
802,
799,
794 204.14 232.94 437.08 110.57 25756.18 Interviewed
147
Padamlal Paudel,
Manmaya Paudel Manmaya Paudel Archalbot 9
300,
53,
51,
50,
486,
485 781.51 974.87 1756.38 110.57 107791.38 Interviewed
148 Maansingh Gurung Durga bdr.Gurung Pachowk 1 476 226.83 271.75 498.58 93.37 25373.30 Interviewed
231 23566.28 28516.32 52082.6 2655617.301
1 Bimaya Gurung Khushiram Archalbot 9 496 36.64 32.54 69.18 110.57 3597.95 Non-Interview
2 Laxmi Gurung Tej Bdr Archalbot 9 419 0 438 438 110.57 48429.66 Non-Interview
3 Santa Bdr Damai Harka Bdr Archalbot 9 336 11.56 34.49 46.05 110.57 3813.56 Non-Interview
4 Mayadevi maretha Bhimnath Archalbot 8 177 128.38 157.13 285.51 110.57 17373.86 Non-Interview
5 Bishnumaya Adhikari Kedarnath Archalbot 8 589 0 3.58 3.58 110.57 395.84 Non-Interview
6 Gita thapa Kunwar Indra bdr. Archalbot 8 555 19.5 25.17 44.67 110.57 2783.05 Non-Interview
7 Laxima Adhikari Tirtharaj Archalbot 8 476 20.35 20.78 41.13 110.57 2297.64 Non-Interview
8 Krishna bdr Gurung Balaram Archalbot 8 476 0 79.22 79.22 110.57 8759.36 Non-Interview
9 Ojraj sedai Ramchandra Archalbot 7 337 100.18 145.98 246.16 110.57 16141.01 Non-Interview
10 Amrit bdr.Kunwar Hari bdr. Archalbot 7 538 40.73 48.94 89.67 110.57 5411.30 Non-Interview
11 Ganga Kuwar Babu Laxman Archalbot 6 822 248.42 213.13 461.55 110.57 23565.78 Non-Interview
12 Devi kunwar chhetri surya bdr. Archalbot 6
177,
173 43.12 107.57 150.69 110.57 11894.01 Non-Interview
13 Gyan bdr.Kunwar Pahalman Archalbot 6 151 231.69 291.94 523.63 110.57 32279.81 Non-Interview
Total
Cost Calculation of Lands of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, LamjungS
.N.
Lan
d O
wn
er
Na
me
Ho
use
ho
ld h
ea
d
VD
C
Wa
rd N
o.
Aff
ect
ed
Plo
t n
o.
Ex
isit
ng
Are
a,
sqm
Ne
w C
ut
Are
a,
sqm
To
tal
Aff
ect
ed
are
a (
sqm
)
Re
pla
cem
en
t co
st r
ate
pe
r
sqm
.(2
5%
in
cre
me
nt)
To
tal
Co
st N
Rs.
Rem
ark
s
14 Apsara Kunwar Thapa Sashi thapa
Shreebhanjya
ng 2 223 0 12.89 12.89 56.51 728.41 Non-Interview
15 Gyanraj gurung Prithiman
Shreebhanjya
ng 2 473 139.39 166.22 305.61 56.51 9393.09 Non-Interview
Gyanraj gurung Prithiman
Shreebhanjya
ng 2 474 139.39 162.65 302.04 56.51 9191.35 Non-Interview
16 Jit jung gurung Udaya jung
Shreebhanjya
ng 2
181,
169 279.35 309.43 588.78 56.51 17485.89 Non-Interview
17 Lalman gurung Harkaman
Shreebhanjya
ng 2
770,
777 575.31 575.36 1150.67 56.51 32513.59 Non-Interview
18 Sabita sarki Nepali Jag bdr
Shreebhanjya
ng 2 768 52.58 65.02 117.6 56.51 3674.28 Non-Interview
19 Harka Bdr Sarki Lato
Shreebhanjya
ng 2 476 499.11 625.87 1124.98 56.51 35367.91 Non-Interview
20 Hari Kumari Sedhai Laxman
Shreebhanjya
ng 2 478 176.53 124.19 300.72 56.51 7017.98 Non-Interview
21
Bod Kumari Gurung (aka
Budh Kumari Gurung) Bhupal Pd
Shreebhanjya
ng 2 766 272.4 333.76 606.16 56.51 18860.78 Non-Interview
22 Faud Bdr Khadka Bal Bdr
Shreebhanjya
ng 2 405 48.05 65.83 113.88 56.51 3720.05 Non-Interview
23
Nyepu (Ajuti Maya
Gurung) Nanda Jung
Shreebhanjya
ng 2 170 361.71 425.41 787.12 56.51 24039.92 Non-Interview
24 Govinda Jung Gurung Udaya jung
Shreebhanjya
ng 2 168 0 15.16 15.16 56.51 856.69 Non-Interview
25 Gopal Raj Joshi Devi Raman
Shreebhanjya
ng 2 724 40.8 52.48 93.28 56.51 2965.64 Non-Interview
26 Gopal Jung Gurung Udaya jung
Shreebhanjya
ng 2 167 137.76 179.24 317 56.51 10128.85 Non-Interview
27 Aash Bdr Gurung Dholi
Shreebhanjya
ng 2 469 481.74 597.12 1078.86 56.51 33743.25 Non-Interview
28 Seti Gurung Raj Kumar
Shreebhanjya
ng 2
445,
444 507.67 498.28 1005.95 56.51 28157.80 Non-Interview
29
Ram Chandra + Laxman
Sedhai Dayanidhi
Shreebhanjya
ng 2 441 70.1 81.69 151.79 56.51 4616.30 Non-Interview
30 Tularaj Gurung Khamba Singh
Shreebhanjya
ng 4 458 3.66 36.35 40.01 56.51 2054.14 Non-Interview
31 Tej Bahadur Gurung Reshamlal
Shreebhanjya
ng 4
36,
35, 22 160.67 266.78 427.45 56.51 15075.74 Non-Interview
32 Mayanath Ghimire Gangadatta
Shreebhanjya
ng 4 39 0 13.52 13.52 56.51 764.02 Non-Interview
33 Aaita Singh Gurung Shukaman
Shreebhanjya
ng 4 4 162.8 194.75 357.55 56.51 11005.32 Non-Interview
34 Bir Bdr Gurung Gunjaman
Shreebhanjya
ng 8
48,
47, 40 0 128.71 128.71 56.51 7273.40 Non-Interview
35 Dinesh Ghimire Lekhnath
Shreebhanjya
ng 8 66 91.31 80.28 171.59 56.51 4536.62 Non-Interview
36 Bishnukumar shrestha Buddhiman
Shreebhanjya
ng 8
889,
888,
804,
753,
15, 84 206.5 347.6 554.1 56.51 19642.88 Non-Interview
37 Surya bdr. Bhujel Jitbdr
Shreebhanjya
ng 8 890 3.76 44.43 48.19 56.51 2510.74 Non-Interview
38 Aita kumari Gurung Mohanman
Shreebhanjya
ng 8 85 45.71 80.37 126.08 56.51 4541.71 Non-Interview
39 Lalmati Gurung Nairaj
Shreebhanjya
ng 8
13,
206 78.47 91.21 169.68 56.51 5154.28 Non-Interview
Cost Calculation of Lands of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, LamjungS
.N.
Lan
d O
wn
er
Na
me
Ho
use
ho
ld h
ea
d
VD
C
Wa
rd N
o.
Aff
ect
ed
Plo
t n
o.
Ex
isit
ng
Are
a,
sqm
Ne
w C
ut
Are
a,
sqm
To
tal
Aff
ect
ed
are
a (
sqm
)
Re
pla
cem
en
t co
st r
ate
pe
r
sqm
.(2
5%
in
cre
me
nt)
To
tal
Co
st N
Rs.
Rem
ark
s
40 Purna pd. Ghimire Mayanath
Shreebhanjya
ng 8 204 170.37 161.72 332.09 56.51 9138.80 Non-Interview
41 Krishna hari Wagle Dolnath
Shreebhanjya
ng 8 207 185.17 221.29 406.46 56.51 12505.10 Non-Interview
42 Sun bdr gurung Kaam singh
Shreebhanjya
ng 8 918 0 7.67 7.67 56.51 433.43 Non-Interview
43 Kopila Wagle Chetnath
Shreebhanjya
ng 8 230 2.16 34.41 36.57 56.51 1944.51 Non-Interview
44 Jhamdi Gurung Ganesh bdr.
Shreebhanjya
ng 8 231, 1 269.42 266.01 535.43 56.51 15032.23 Non-Interview
45 Mohani Gurung Pancha bdr. Nauthar 8 623 83.78 184.99 268.77 93.37 17272.52 Non-Interview
46 Tula kumari Pandey Dilliraj Nauthar 2 120 142.28 166.33 308.61 93.37 15530.23 Non-Interview
47 Chini kumari Pandey Khilnidhi Nauthar 2 121 4.79 18.15 22.94 93.37 1694.67 Non-Interview
48 Dilliram Pandey Khaganidhi Nauthar 2 123 14.74 12.86 27.6 93.37 1200.74 Non-Interview
49 Ram Kumar Thapa Prem bahadur Nauthar 2 115 74.24 93.9 168.14 93.37 8767.44 Non-Interview
50 Kum raj Gurung Gangaram Nauthar 2 61 16.01 45.29 61.3 93.37 4228.73 Non-Interview
51 Chetnath Wagle Bishnu datta Nauthar 2
63,
1182 83.47 150.25 233.72 93.37 14028.84 Non-Interview
52 Suk bdr.Tamang Gagan bdr. Nauthar 2 1042 106.07 71.32 177.39 93.37 6659.15 Non-Interview
53 Arun kumar Shrestha Rajkumar Nauthar 2 78 134.78 163.71 298.49 93.37 15285.60 Non-Interview
54 Bhagawati Wagle Devi prasad. Nauthar 2 84 0 3.71 3.71 93.37 346.40 Non-Interview
55 Loknath Wagle Laxman Nauthar 2 85 127.56 148.45 276.01 93.37 13860.78 Non-Interview
56 Budhamaya Gurung Chitraman Nauthar 2 696 0 7.46 7.46 93.37 696.54 Non-Interview
57 Bishnumaya Adhikari Padam Pd. Nauthar 8 517 192.96 220.77 413.73 93.37 20613.29 Non-Interview
58 Chandra kanta Wagle Bamdev Nauthar 2 697 219.37 210.01 429.38 93.37 19608.63 Non-Interview
59 Dipendra Ghimire Ramkrishna Nauthar 2 680 142.99 174.75 317.74 93.37 16316.41 Non-Interview
60 Pashupatinath Ghimire Laxmi pd. Nauthar 2 687 233.32 282.58 515.9 93.37 26384.49 Non-Interview
61 Dipak babu Ghimire ShreeKrishna Nauthar 2 688 257.62 264.87 522.49 93.37 24730.91 Non-Interview
62 Sharman, Pahalman Magar Krishna bdr. Nauthar 5 81 0 18.13 18.13 93.37 1692.80 Non-Interview
63 Laxima pd. Bhatta Motiram Nauthar 5 79 97.65 103.57 201.22 93.37 9670.33 Non-Interview
64 Bhagawati Devi Ghimire Purosuttom Nauthar 5 80 194.59 268.7 463.29 93.37 25088.52 Non-Interview
65 Liladevi Ghimire Kumar pd. Nauthar 5 419 0 16.12 16.12 93.37 1505.12 Non-Interview
66 Jire Gurung Nardhoj Nauthar 5 426 17.68 37.38 55.06 93.37 3490.17 Non-Interview
67 Jagdish Ghimire Purushottam Nauthar 5 240 30.66 98.76 129.42 93.37 9221.22 Non-Interview
68 Usha Ghimire Chetnath Nauthar 5
242,
243 4.42 79.34 83.76 93.37 7407.98 Non-Interview
69 Shree krishna Ghimire Yogyenidhi Nauthar 5 241 450.74 407.6 858.34 93.37 38057.61 Non-Interview
70 Pashupatinath Ghimire Bhabilal Nauthar 5 247 0 10.98 10.98 93.37 1025.20 Non-Interview
71 Shree bhakta Ghimire Ramchandra Nauthar 5 249 113.9 119.56 233.46 93.37 11163.32 Non-Interview
72 Sita Ghimire Tirtharaj Nauthar 5 266 2.56 45.49 48.05 93.37 4247.40 Non-Interview
73 Singha raas gurung Dhanlal Nauthar 5 262 86.97 104.84 191.81 93.37 9788.91 Non-Interview
74 Tul bdr. Gurung Gaj bdr. Nauthar 5 260 3.85 40.44 44.29 93.37 3775.88 Non-Interview
75 Sabitra Gurung Sukman Nauthar 5 396 95.01 115.99 211 93.37 10829.99 Non-Interview
76 Brikh bdr. Gurung Amardhoj Nauthar 5 397 42.25 50.79 93.04 93.37 4742.26 Non-Interview
77 Dattamaya Gurung Chatursingh Nauthar 5 467 64.07 67.84 131.91 93.37 6334.22 Non-Interview
78 Gunmaya Tamang Purna bdr. Nauthar 5
401,
402 119.01 153.25 272.26 93.37 14308.95 Non-Interview
Gunmaya Tamang Purna bdr. Nauthar 5 401 119.01 142.04 261.05 93.37 13262.27 Non-Interview
Cost Calculation of Lands of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, LamjungS
.N.
Lan
d O
wn
er
Na
me
Ho
use
ho
ld h
ea
d
VD
C
Wa
rd N
o.
Aff
ect
ed
Plo
t n
o.
Ex
isit
ng
Are
a,
sqm
Ne
w C
ut
Are
a,
sqm
To
tal
Aff
ect
ed
are
a (
sqm
)
Re
pla
cem
en
t co
st r
ate
pe
r
sqm
.(2
5%
in
cre
me
nt)
To
tal
Co
st N
Rs.
Rem
ark
s
79 Laxmi Ramtel Chitra bdr. Nauthar 5 470 3.42 6.64 10.06 93.37 619.98 Non-Interview
80 Anita Gurung Singhram Nauthar 8 150 183.35 208.61 391.96 93.37 19477.92 Non-Interview
81 Prabin Ghimire Taramali Nauthar 8 558 0 38.28 38.28 93.37 3574.20 Non-Interview
82 Surya narayan Ghimire Taramali Nauthar 8 559 220.72 281.73 502.45 93.37 26305.13 Non-Interview
83 Kamala devi Ghimire Pashupati Nauthar 8 114 148.45 169.63 318.08 93.37 15838.35 Non-Interview
84 Kedar bdr. Sarki Chyangre Nauthar 8 176 145.67 178.96 324.63 93.37 16709.50 Non-Interview
85 Mahendra raj Malla Badriraj Nauthar 8 467 109.57 153.65 263.22 93.37 14346.30 Non-Interview
86 Purna bdr Gurung Lal bdr. Nauthar 8 470 29.62 36.02 65.64 93.37 3363.19 Non-Interview
87 Gopiraj Gurung N/A Pachowk 1 579 66.65 91.92 158.57 93.37 8582.57 Non-Interview
88
Chandraman/Rudra
bdr.Shrestha Bhakti pd Pachowk 1
44,
480 256.64 314.52 571.16 93.37 29366.73 Non-Interview
89 Guman singh Gurung Pancha subba Pachowk 1 479 96 115.15 211.15 93.37 10751.56 Non-Interview
90 Sovraj gurung Gaj bdr. Pachowk 1 481 35.78 38.08 73.86 93.37 3555.53 Non-Interview
91 Durga singh Gurung Kaam singh Pachowk 1 523 70.85 121.1 191.95 93.37 11307.11 Non-Interview
92 Indra Gurung Indra Pachowk 1 531 80.9 97.33 178.23 93.37 9087.70 Non-Interview
93 Kamal jit Gurung Ajamsingh Pachowk 1 521 317.29 387.66 704.95 93.37 36195.81 Non-Interview
94 Udd Bd. Gurung Gore Pachowk 1 520 163.26 199.66 362.92 93.37 18642.25 Non-Interview
95 Chitra maya Gurung Khadgasingh Pachowk 1 331 151.62 185.67 337.29 93.37 17336.01 Non-Interview
96 Shreemati Parwati Gurung suk bdr Pachowk 1 335 292.86 350.34 643.2 93.37 32711.25 Non-Interview
97 Bindhoj Gurung Bhakta Pachowk 2 547 0 59.94 59.94 93.37 5596.60 Non-Interview
98 Reju Gurseni,Amar Gurung N/A Pachowk 2 449 0 13.47 13.47 93.37 1257.69 Non-Interview
99 Kabiraj Gurung Paanbir Pachowk 2 451 170.15 206.76 376.91 93.37 19305.18 Non-Interview
100 Maisari Gurung Chamar Singh Pachowk 2 466 158.92 175.21 334.13 93.37 16359.36 Non-Interview
101 Singharaj Gurung Madan singh Pachowk 2 627 29.48 113.16 142.64 93.37 10565.75 Non-Interview
102 Gaj bdr. Gurung Naram singh Pachowk 2 510 58.96 62.35 121.31 93.37 5821.62 Non-Interview
103 Badmaya Gurung Gujman Pachowk 2 508 123.08 155.24 278.32 93.37 14494.76 Non-Interview
104 Adar Gurung Sukalal Pachowk 2 507 88.63 108.32 196.95 93.37 10113.84 Non-Interview
105 Dhanmaan Ghale Chandra Pachowk 3 901 47 56.7 103.7 93.37 5294.08 Non-Interview
106 Chandraman Guruung Sanke Pachowk 3 899 90.61 100.42 191.03 93.37 9376.22 Non-Interview
107 Mankauri Ghale Udbdr. Pachowk 3 908 126.38 160.09 286.47 93.37 14947.60 Non-Interview
108 Gore Gurung Dal bdr. Pachowk 3 662 18.45 24.68 43.13 93.37 2304.37 Non-Interview
109 Dasir gurung Garja bdr. Pachowk 3 526 375.07 417.98 793.05 93.37 39026.79 Non-Interview
110 Asur Gurung chandrasingh Pachowk 3 529 0 4.98 4.98 93.37 464.98 Non-Interview
111 Tak bdr.Ghale Maan bdr Pachowk 3
952,
963 346.05 451.32 797.37 93.37 42139.75 Non-Interview
112 Balbir Gurung Hukke Pachowk 3 950 0 3.16 3.16 93.37 295.05 Non-Interview
113 Karansingh Gurung Top Pachowk 3 49 0 5.36 5.36 93.37 500.46 Non-Interview
114 Rabi Gurung Bagan singh Pachowk 3 961 2.4 26.31 28.71 93.37 2456.56 Non-Interview
115 Giujman Gurung Harka Bdr Pachowk 3 954 39.99 130.81 170.8 93.37 12213.73 Non-Interview
116 Amar singh gurung Agam Pachowk 3
957,
959,
977 390.96 726.63 1117.59 93.37 67845.44 Non-Interview
117 Mangale/man bdr. Gurung Aaitasingh Pachowk 3 956 6.27 75.02 81.29 93.37 7004.62 Non-Interview
118 Mana Gurung Bahadur Pachowk 3 978 11.11 13.44 24.55 93.37 1254.89 Non-Interview
119 Kaami Gurung Dilbahadur Pachowk 3 1072 233.99 262.62 496.61 93.37 24520.83 Non-Interview
144 14009 18293.3 32302.27 1504586.34
1 Archalbot 8 564 106.82 60.79 167.61 110.57 6721.55 Non-Registered
Total
Non-Registered
Cost Calculation of Lands of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, LamjungS
.N.
Lan
d O
wn
er
Na
me
Ho
use
ho
ld h
ea
d
VD
C
Wa
rd N
o.
Aff
ect
ed
Plo
t n
o.
Ex
isit
ng
Are
a,
sqm
Ne
w C
ut
Are
a,
sqm
To
tal
Aff
ect
ed
are
a (
sqm
)
Re
pla
cem
en
t co
st r
ate
pe
r
sqm
.(2
5%
in
cre
me
nt)
To
tal
Co
st N
Rs.
Rem
ark
s
2 Archalbot 9 412 64.51 28 92.51 110.57 3095.96 Non-Registered
3 Archalbot 9 429 998.42 1218.91 2217.33 110.57 134774.88 Non-Registered
4 Archalbot 9 504 66.32 75.05 141.37 110.57 8298.28 Non-Registered
5 Archalbot 9 702 31.56 38.38 69.94 110.57 4243.68 Non-Registered
6 Archalbot 9 701 50.98 63.37 114.35 110.57 7006.82 Non-Registered
7 Archalbot 9 700 73.57 88.65 162.22 110.57 9802.03 Non-Registered
8 Archalbot 9 337 4.44 35.3 39.74 110.57 3903.12 Non-Registered
9 Archalbot 9 77 10.11 36.99 47.1 110.57 4089.98 Non-Registered
10 Archalbot 9 75 0 27.68 27.68 110.57 3060.58 Non-Registered
11 Archalbot 9 491 160.45 156.84 317.29 110.57 17341.80 Non-Registered
12 Archalbot 9 66 197.39 165.43 362.82 110.57 18291.60 Non-Registered
13 Archalbot 9 634 17.28 27.06 44.34 110.57 2992.02 Non-Registered
14 Archalbot 8 614 151.9 144.25 296.15 110.57 15949.72 Non-Registered
15 Archalbot 8 613 1.23 17.14 18.37 110.57 1895.17 Non-Registered
16 Archalbot 8 612 97.18 120.19 217.37 110.57 13289.41 Non-Registered
17 Archalbot 8 611 83.8 81.12 164.92 110.57 8969.44 Non-Registered
18 Archalbot 8 598 90.41 111.31 201.72 110.57 12307.55 Non-Registered
19 Archalbot 8 563 35.94 47.31 83.25 110.57 5231.07 Non-Registered
20 Archalbot 8 120 170.91 161.51 332.42 110.57 17858.16 Non-Registered
21 Archalbot 8 119 67.38 134.35 201.73 110.57 14855.08 Non-Registered
22 Archalbot 7 496 123.14 154.93 278.07 110.57 17130.61 Non-Registered
23 Archalbot 7 257 160.06 196.4 356.46 110.57 21715.95 Non-Registered
24 Archalbot 6 171 0 2.14 2.14 110.57 236.62 Non-Registered
25
Shreebhanjya
ng 2 471 253.08 301.28 554.36 56.51 17025.33 Non-Registered
26
Shreebhanjya
ng 2 442 282.13 337.74 619.87 56.51 19085.69 Non-Registered
27
Shreebhanjya
ng 4 484 117.23 95.64 212.87 56.51 5404.62 Non-Registered
28
Shreebhanjya
ng 4 483 0 4.63 4.63 56.51 261.64 Non-Registered
29
Shreebhanjya
ng 8 908 0 3.4 3.4 56.51 192.13 Non-Registered
30
Shreebhanjya
ng 8 907 0 41.78 41.78 56.51 2360.99 Non-Registered
31
Shreebhanjya
ng 8 891 0.02 49.63 49.65 56.51 2804.59 Non-Registered
32
Shreebhanjya
ng 8 203 294.79 354.73 649.52 56.51 20045.79 Non-Registered
33
Shreebhanjya
ng 8 81 44.54 28.27 72.81 56.51 1597.54 Non-Registered
34
Shreebhanjya
ng 8 14 0 92.85 92.85 56.51 5246.95 Non-Registered
35
Shreebhanjya
ng 8 885 0 25.07 25.07 56.51 1416.71 Non-Registered
36
Shreebhanjya
ng 8 205 347.03 439.83 786.86 56.51 24854.79 Non-Registered
37 Nauthar 2 9801 135.08 192.63 327.71 93.37 17985.86 Non-Registered
38 Nauthar 2 1229 68.87 43.11 111.98 93.37 4025.18 Non-Registered
39 Nauthar 2 116 146.53 163.23 309.76 93.37 15240.79 Non-Registered
40 Nauthar 2 1041 0 48.81 48.81 93.37 4557.39 Non-Registered
41 Nauthar 2 72 0 9.98 9.98 93.37 931.83 Non-Registered
42 Nauthar 2 679 162.59 198.5 361.09 93.37 18533.95 Non-Registered
Non-Registered
Non-Registered
Non-Registered
Non-Registered
Non-Registered
Non-Registered
Non-Registered
Non-Registered
Non-Registered
Non-Registered
Non-Registered
Non-Registered
Non-Registered
Non-Registered
Non-Registered
Non-Registered
Non-Registered
Non-Registered
Non-Registered
Non-Registered
Non-Registered
Non-Registered
Non-Registered
Non-Registered
Non-Registered
Non-Registered
Non-Registered
Non-Registered
Non-Registered
Non-Registered
Non-Registered
Non-Registered
Non-Registered
Non-Registered
Non-Registered
Non-Registered
Non-Registered
Non-Registered
Non-Registered
Non-Registered
Non-Registered
Cost Calculation of Lands of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, LamjungS
.N.
Lan
d O
wn
er
Na
me
Ho
use
ho
ld h
ea
d
VD
C
Wa
rd N
o.
Aff
ect
ed
Plo
t n
o.
Ex
isit
ng
Are
a,
sqm
Ne
w C
ut
Are
a,
sqm
To
tal
Aff
ect
ed
are
a (
sqm
)
Re
pla
cem
en
t co
st r
ate
pe
r
sqm
.(2
5%
in
cre
me
nt)
To
tal
Co
st N
Rs.
Rem
ark
s
43 Nauthar 5 237 307.25 332.7 639.95 93.37 31064.20 Non-Registered
44 Nauthar 5 387 182.48 204.67 387.15 93.37 19110.04 Non-Registered
45 Nauthar 5 442 36.74 48.16 84.9 93.37 4496.70 Non-Registered
46 Nauthar 8 458 58.21 97.8 156.01 93.37 9131.59 Non-Registered
47 Nauthar 8 457 105.08 113.07 218.15 93.37 10557.35 Non-Registered
48 Pachowk 1 460 329.62 358.19 687.81 93.37 33444.20 Non-Registered
49 Pachowk 2 440 399.09 485.11 884.2 93.37 45294.72 Non-Registered
50 Pachowk 3 979 47.73 58.6 106.33 93.37 5471.48 Non-Registered
50 6081.89 7322.51 13404.4 673203.11
425 43657 54132 97789.27 4833406.75Grand Total
Non-Registered
Non-Registered
Non-Registered
Non-Registered
Total
Non-Registered
Non-Registered
Non-Registered
Non-Registered
S.N
.
Lan
d O
wn
er
Na
me
Ho
use
ho
ld h
ea
d
VD
C
Wa
rd N
o.
Aff
ect
ed
Plo
t n
o.
Ex
isit
ng
Are
a,
sqm
Ne
w C
ut
Are
a,
sqm
To
tal
Aff
ect
ed
are
a (
sqm
)
Na
me
of
the
Cro
ps
Pro
du
ctio
n k
g p
er
sqm
.
Dis
tric
t R
ate
pe
r sq
m.
To
tal
Co
st N
Rs.
Rem
ark
s
1
Panchasingh, Deumaya
Gurung Deumaya Gurung Pachowk 1 46 58.28 71.31 129.59 Maize 0.32 40 912.768 Interviewed
2 Karna bdr. Gurung Lilamaya Gurung Pachowk 1 337 989.85 1086.24 2076.09 Maize 0.32 40 13903.872 Interviewed
3 Sita Gurung Sita Gurung Pachowk 1 440 0 13.92 13.92 Maize 0.32 40 178.176 Interviewed
4 Harka bdr.Gurung Harka bdr.Gurung Pachowk 1 443 0 17.8 17.8 Maize 0.32 40 227.84 Interviewed
5 Nimba Gurung Nimba Gurung Pachowk 1 524 142.4 141.41 283.81 Maize 0.32 40 1810.048 Interviewed
6 Ser bdr Gurung Ser bdr Gurung Pachowk 1 336 25.78 38.8 64.58 Maize 0.32 40 496.64 Interviewed
7 Makhhui Gurung Jivraj Gurung Pachowk 2 468 848.62 1037.36 1885.98 Maize 0.32 40 13278.208 Interviewed
8 Som Bdr. Gurung Som Bdr. Gurung Pachowk 2 595 0 2.65 2.65 Maize 0.32 40 33.92 Interviewed
9 Aaita Bdr. Gurung Aaita Bdr. Gurung Pachowk 2 469 330.53 403.61 734.14 Maize 0.32 40 5166.208 Interviewed
10 Amar Gurung Amar Gurung Pachowk 2 467 208.04 177.63 385.67 Maize 0.32 40 2273.664 Interviewed
11 Bakhat Bdr. Gurung Bakhat Bdr. Gurung Pachowk 3 914 206.35 267.78 474.13 Maize 0.32 40 3427.584 Interviewed
12 Dadman Gurung Dadman Gurung Pachowk 3 900 20.53 37.77 58.3 Maize 0.32 40 483.456 Interviewed
13 Gayin singh Gurung Gayin singh Gurung Pachowk 3 976 30.91 58.3 89.21 Maize 0.32 40 746.24 Interviewed
14 Mann bdr. Gurung Mann bdr. Gurung Pachowk 3 951 66.86 50.19 117.05 Maize 0.32 40 642.432 Interviewed
15 Iman singh(surya Prasad) Surya pd. Gurung Pachowk 1 434 49.62 49.6 99.22 Maize 0.32 40 634.88 Interviewed
16 Janga sub Gurung Dudhmaya Gurung Pachowk 1 447 170.71 214.38 385.09 Maize 0.32 40 2744.064 Interviewed
17 Sat bdr.Gurung Manraj Gurung Pachowk 1 925 0 10.47 10.47 Maize 0.32 40 134.016 Interviewed
18 Yubaraj Gurung Yubaraj Gurung Nauthar 8 555 5.47 14.75 20.22 Maize 0.32 40 188.8 Interviewed
19 Ladimaya Gurung Ladimaya Gurung Nauthar 2 62 27.52 41.14 68.66 Maize 0.32 40 526.592 Interviewed
20 Tulasi pd. Ghimire Tulasi pd. Shrestha Nauthar 8 115 10.1 19.36 29.46 Maize 0.32 40 247.808 Interviewed
21 Badmaya Gurung Badmaya Gurung Nauthar 8 507 0 30.89 30.89 Maize 0.32 40 395.392 Interviewed
22 Bimaya Gurung Bimaya Gurung Nauthar 5 465 0 11.48 11.48 Maize 0.32 40 146.944 Interviewed
23 Chature sarki Chature sarki Nauthar 8 175 134.74 165.79 300.53 Maize 0.32 40 2122.112 Interviewed
24 Rajkumar Shresth Rajkumar Shresth Nauthar 2 113 123.39 165.8 289.19 Maize 0.32 40 2122.24 Interviewed
25 Nirmala Ghimire Mohan Pd.Ghimire Nauthar 2 678 129.54 164.01 293.55 Maize 0.32 40 2099.328 Interviewed
26 Dal subba Gurung Dal subba Gurung Nauthar 8 472 19.29 23.39 42.68 Maize 0.32 40 299.392 Interviewed
27 Mayanath wagle Jeunath Nauthar 2 69 80.82 108.76 189.58 Maize 0.32 40 1392.128 Interviewed
28 Bipinchandra Ghimire Tripura Ghimire Nauthar 8 164 0 7.2 7.2 Maize 0.32 40 92.16 Interviewed
29 Nardev Gurung Nardev Gurung Nauthar 5 386 250.79 306.23 557.02 Maize 0.32 40 3919.744 Interviewed
30 Govinda wagle Govinda wagle Nauthar 2 71 115.76 109.87 225.63 Maize 0.32 40 1406.336 Interviewed
31
Ramraj Bista(now-
Kunimaya Shrestha) Arun kumar Shrestha Nauthar 2 1230 0 21.29 21.29 Maize 0.32 40 272.512 Interviewed
32 Nalumaya Gurung Yobir Gurung Nauthar 2 1184 3.97 11.94 15.91 Maize 0.32 40 152.832 Interviewed
33 Kam singh gurung Kam singh gurung Nauthar 8 441 113.87 133.92 247.79 Maize 0.32 40 1714.176 Interviewed
34 Jabarsingh/Tulsi Gurung Man pd. Gurung Nauthar 8 534 18.32 33.35 51.67 Maize 0.32 40 426.88 Interviewed
35 Purnaa/Mekhraj Gurung Mekhraj Gurung Nauthar 8 499 171.43 188.85 360.28 Maize 0.32 40 2417.28 Interviewed
36 Kum bdr. Gurung Kum bdr. Gurung Nauthar 8 554 60.55 52.16 112.71 Maize 0.32 40 667.648 Interviewed
37 Manmaya Sarki Manmaya Sarki Nauthar 8 621 90.55 91.01 181.56 Maize 0.32 40 1164.928 Interviewed
38 Aasbahadur Gurung Aasbahadur Gurung Nauthar 8 552 28.31 33.83 62.14 Maize 0.32 40 433.024 Interviewed
39 Kale Gurung Kale gurung Nauthar 8 156 311.21 390.64 701.85 Maize 0.32 40 5000.192 Interviewed
40 Kamini sarki Som bahadur Nauthar 5 436 117.47 142.56 260.03 Maize 0.32 40 1824.768 Interviewed
41 Chyangre Sarki Chyangre sarki Nauthar 8 466 57.19 103.13 160.32 Maize 0.32 40 1320.064 Interviewed
42 Ram bdr. Gurung Rishikumar Gurung Nauthar 2 77 120.54 108.8 229.34 Maize 0.32 40 1392.64 Interviewed
43 Mait bahadur Gurung Mait bahadur Gurung Nauthar 2 1183 45.23 39.46 84.69 Maize 0.32 40 505.088 Interviewed
Cost Calculation of Crops of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, Lamjung
S.N
.
Lan
d O
wn
er
Na
me
Ho
use
ho
ld h
ea
d
VD
C
Wa
rd N
o.
Aff
ect
ed
Plo
t n
o.
Ex
isit
ng
Are
a,
sqm
Ne
w C
ut
Are
a,
sqm
To
tal
Aff
ect
ed
are
a (
sqm
)
Na
me
of
the
Cro
ps
Pro
du
ctio
n k
g p
er
sqm
.
Dis
tric
t R
ate
pe
r sq
m.
To
tal
Co
st N
Rs.
Rem
ark
s
Cost Calculation of Crops of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, Lamjung
44 Subba Gurung Subba Gurung Nauthar 5 437 72.73 53.95 126.68 Maize 0.32 40 690.56 Interviewed
45
Krishna/Bhupati raj
Pandey Krishna Raj Pandey Nauthar 2 126 34.59 61.65 96.24 Maize 0.32 40 789.12 Interviewed
46 Atimaya, Ram bdr.Sarki Atimaya Sarki
Shreebhanjya
ng 2 183 0 25.44 25.44 Maize 0.32 40 325.632 Interviewed
47 Dhan bdr. Shrestha Gore Shrestha
Shreebhanjya
ng 8 887 25.56 36.35 61.91 Maize 0.32 40 465.28 Interviewed
48 Om bdr.Gurung Om bdr.Gurung
Shreebhanjya
ng 4 12 31.98 80.25 112.23 Maize 0.32 40 1027.2 Interviewed
49 Sukman Gurung Sukman Gurung
Shreebhanjya
ng 8 921 237.97 276.4 514.37 Maize 0.32 40 3537.92 Interviewed
50
Balkrishna Upadhya
Ghimire
Balkrishna Upadhya
Ghimire
Shreebhanjya
ng 4 20 282.54 351.2 633.74 Maize 0.32 40 4495.36 Interviewed
51 Bhuwan singh Gurung Pushparaj Gurung
Shreebhanjya
ng 4 9 142.84 174.47 317.31 Maize 0.32 40 2233.216 Interviewed
52 Samser sarki Gopal Sarki
Shreebhanjya
ng 2
188,
189 156.64 332.83 489.47 Maize 0.32 40 4260.224 Interviewed
53 Arjun kunwar Arjun kunwar
Shreebhanjya
ng 2
239,
238 0 41.57 41.57 Maize 0.32 40 532.096 Interviewed
54 Dambar bdr.Gurung Dambar bdr.Gurung
Shreebhanjya
ng 8 82 61.73 39.17 100.9 Maize 0.32 40 501.376 Interviewed
55 Ganesh Bdr. Kunwar Ganesh Bdr. Kunwar
Shreebhanjya
ng 2 237 0 41.42 41.42 Maize 0.32 40 530.176 Interviewed
56 Aasbahadur Nepali Aasbahadur Nepali
Shreebhanjya
ng 2 186 7.85 26.86 34.71 Maize 0.32 40 343.808 Interviewed
57 Kumar Pandey Kumar Pandey Nauthar 2
1258,
109,
108 224.68 254.72 479.4 Maize 0.32 40 3260.416 Interviewed
58 Goth Bdr. Gurung Goth Bdr. Gurung Nauthar 5
254,
256,
438 742.6 900.34 1642.94 Maize 0.32 40 11524.352 Interviewed
59 Gaini Gurung Dhan Bdr. Gurung Nauthar 8 551 42.46 51.9 94.36 Maize 0.32 40 664.32 Interviewed
60 Aaita Sarki Aaita Sarki Shreemjyang 2
187,
182 412.23 329.34 741.57 Maize 0.32 40 4215.552 Interviewed
61 Sarki (Shor Bdr. Gurung) Shor Bdr. Gurung Nauthar 8
456,
511,
26202
, 422 415.68 523.33 939.01 Maize 0.32 40 6698.624 Interviewed
62 Nabraj Ghimire Nabraj Ghimire
Shreebhanjya
ng 8 86, 172.58 125.86 298.44 Maize 0.32 40 1611.008 Interviewed
63 Paal Jung Gurung Paal Jung Gurung
Shreebhanjya
ng 4 11, 5 497.8 653.57 1151.37 Maize 0.32 40 8365.696 Interviewed
64 Yagyanath Ghimire Yagyanath Ghimire
Shreebhanjya
ng 8 65 289.28 225.23 514.51 Maize 0.32 40 2882.944 Interviewed
65
Gaumati Gurung, Jabi
Gurung Jabi Gurung
Shreebhanjya
ng 8 67, 45 462.2 341.01 803.21 Maize 0.32 40 4364.928 Interviewed
66 Birdhoj Gurung Birdhoj Gurung Nauthar 5
250,
251 157.73 203.04 360.77 Maize 0.32 40 2598.912 Interviewed
67
Mama Maya Shrestha,
Hiralal Shrestha Hiralal Shrestha
Shreebhanjya
ng 4
457,
29,
26,
33,
34,
470 573.6 730.93 1304.53 Maize 0.32 40 9355.904 Interviewed
68 Kum Bdr. Gurung Kum Bdr. Gurung
Shreebhanjya
ng 8 57, 49 232.9 461.8 694.7 Maize 0.32 40 5911.04 Interviewed
69
Bishnu ghimire, Rajya
Prasad Ghimire Bishnu Ghimire
Shreebhanjya
ng 8
58,
55 212.51 248.16 460.67 Maize 0.32 40 3176.448 Interviewed
S.N
.
Lan
d O
wn
er
Na
me
Ho
use
ho
ld h
ea
d
VD
C
Wa
rd N
o.
Aff
ect
ed
Plo
t n
o.
Ex
isit
ng
Are
a,
sqm
Ne
w C
ut
Are
a,
sqm
To
tal
Aff
ect
ed
are
a (
sqm
)
Na
me
of
the
Cro
ps
Pro
du
ctio
n k
g p
er
sqm
.
Dis
tric
t R
ate
pe
r sq
m.
To
tal
Co
st N
Rs.
Rem
ark
s
Cost Calculation of Crops of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, Lamjung
70 Rojina Gurung Kamaljit Gurung Nauthar 5
264,
263,
309,
310 576.18 665.66 1241.84 Maize 0.32 40 8520.448 Interviewed
71 Yesraj Thapa Magar Gaj Bd Archalbot 9 673 15.45 19.8 35.25 Maize 0.32 40 253.44 Interviewed
72 Dhanamaya Adhikari Dhana bdr. Adhikari Archalbot 8 172 61.21 91.9 153.11 Maize 0.32 40 1176.32 Interviewed
73 Mina Poudel Mina Poudel Archalbot 9 316 50.16 64.11 114.27 Maize 0.32 40 820.608 Interviewed
74 Hari bdr.Khadka Hari bdr.Khadka Archalbot 6 183 181.94 200.87 382.81 Maize 0.32 40 2571.136 Interviewed
75 Srijana Pariyar Ram bdr. Pariyar Archalbot 9 330 11.41 12.05 23.46 Maize 0.32 40 154.24 Interviewed
76 Sushila Pariyar Ramesh Pariyar Archalbot 9 667 297.41 356.18 653.59 Maize 0.32 40 4559.104 Interviewed
77 Gopal Lamichhane nanda bdr.Lamichhane Archalbot 9 332 15.44 19.7 35.14 Maize 0.32 40 252.16 Interviewed
78 Min bdr. Bhujel Min bdr. Bhujel Archalbot 9 556 120.81 134.85 255.66 Maize 0.32 40 1726.08 Interviewed
79 Devi bhakta Regmi Devi bhakta Regmi Archalbot 9 516 68.07 157.78 225.85 Maize 0.32 40 2019.584 Interviewed
80 Krishna bdr. Gharti Krishna bdr. Gharti Archalbot 9 557 54.88 118.08 172.96 Maize 0.32 40 1511.424 Interviewed
81 Subhadra Regmi Milan Regmi Archalbot 9 97, 98 327.48 386.11 713.59 Maize 0.32 40 4942.208 Interviewed
82 Bimala Adhikari Balram Adhikari Archalbot 9 49 54.79 54.21 109 Maize 0.32 40 693.888 Interviewed
83 Pashupati Thapa Kunwar Shanta kumari Kunwar Archalbot 7 619 43.19 52.53 95.72 Maize 0.32 40 672.384 Interviewed
84 Amrit Lamichhane Balkrishna Lamichhane Archalbot 6 174 35.71 40.13 75.84 Maize 0.32 40 513.664 Interviewed
85 Kalpana Adhikari Bhart bdr. Kunwar Archalbot 7 674 34.53 28.26 62.79 Maize 0.32 40 361.728 Interviewed
86 Kirtiman Kunwar Kirtiman Kunwar Archalbot 8 160 16.31 29.99 46.3 Maize 0.32 40 383.872 Interviewed
87 Ram chandra Adhikari Ram chandra Adhikari Archalbot 6 793 53.79 86.73 140.52 Maize 0.32 40 1110.144 Interviewed
88 Sita devi kunwar Maan bdr. Kunwar Archalbot 7 664 47.59 47.69 95.28 Maize 0.32 40 610.432 Interviewed
89 Jit bdr. Lamichhane Jit bdr. Lamichhane Archalbot 9 76, 78 304.91 276.91 581.82 Maize 0.32 40 3544.448 Interviewed
90 Bishnulal Shrestha Bishnulal Shrestha Archalbot 9
492,
390 96.66 121.53 218.19 Maize 0.32 40 1555.584 Interviewed
91 Tankalal Shrestha Teklal Shrestha Archalbot 9
494,
427,
391 215.89 255.39 471.28 Maize 0.32 40 3268.992 Interviewed
92 Kalawati Rana Magar Janga Bdr. Ale Magar Archalbot 9 633 23.82 26.52 50.34 Maize 0.32 40 339.456 Interviewed
93 Badrinath Lamichhane Badrinath Lamichhane Archalbot 9
635,
538 35.64 52.22 87.86 Maize 0.32 40 668.416 Interviewed
94 Gangamaya Suyal Bishnu Bdr. Suyal Archalbot 9
588,
591,
585 456.96 388.64 845.6 Maize 0.32 40 4974.592 Interviewed
95 Khem Kumari Joshi Govindaraj Joshi
Shreebhanjya
ng 2
723,
443,
722 216.8 392.77 609.57 Maize 0.32 40 5027.456 Interviewed
96 Tilak Bdr. Kunwar Tilak Bdr. Kunwar Archalbot 8
155,
531,
534 400.79 436.28 837.07 Maize 0.32 40 5584.384 Interviewed
97 Shovita+Shrijana Kunwar Shovita Kunwar Archalbot 8
477,
676,
675 272.52 283.99 556.51 Maize 0.32 40 3635.072 Interviewed
98 Ganga Kunwar Dhub Kunwar Archalbot 7 620 409.38 500.41 909.79 Maize 0.32 40 6405.248 Interviewed
99 Prasansha Kunwar Bal Bdr. Kunwar Archalbot 7 663 41.92 40.17 82.09 Maize 0.32 40 514.176 Interviewed
100 Narayan Kunwar Narayan Kunwar Archalbot 8
530,
535 65.35 139.09 204.44 Maize 0.32 40 1780.352 Interviewed
101 Gokul Prasad Regmi Gokul Prasad Regmi Archalbot 9 541 95.23 97.38 192.61 Maize 0.32 40 1246.464 Interviewed
102 Harka Kumar Shrestha Harka Kumar Shrestha Archalbot 9 424 177.38 214.95 392.33 Maize 0.32 40 2751.36 Interviewed
S.N
.
Lan
d O
wn
er
Na
me
Ho
use
ho
ld h
ea
d
VD
C
Wa
rd N
o.
Aff
ect
ed
Plo
t n
o.
Ex
isit
ng
Are
a,
sqm
Ne
w C
ut
Are
a,
sqm
To
tal
Aff
ect
ed
are
a (
sqm
)
Na
me
of
the
Cro
ps
Pro
du
ctio
n k
g p
er
sqm
.
Dis
tric
t R
ate
pe
r sq
m.
To
tal
Co
st N
Rs.
Rem
ark
s
Cost Calculation of Crops of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, Lamjung
103 Ram bdr.Parajuli Ram bdr.Parajuli Archalbot 9 425 128.82 145.16 273.98 Maize 0.32 40 1858.048 Interviewed
104 Bishnu Giri Bishnu Giri Archalbot 9 413 21.77 53.58 75.35 Maize 0.32 40 685.824 Interviewed
105 Krishna Pd. Mareta Krishna Pd. Mareta Archalbot 8 585 14.03 28.36 42.39 Maize 0.32 40 363.008 Interviewed
106 Ram bdr.Gharti Bhujel Ram bdr.Gharti Bhujel Archalbot 6
801,
181,
178,
799,
792 354.87 366.21 721.08 Maize 0.32 40 4687.488 Interviewed
107 Aaitimaya Pariyar Hari bdr. Pariyar Archalbot 9 329 0 40.88 40.88 Maize 0.32 40 523.264 Interviewed
108 Muktinath Lamichhane Bhimnaya Lamichhane Archalbot 9 636 57.72 126.7 184.42 Maize 0.32 40 1621.76 Interviewed
109 Hira devi Marhattha Hira devi Marhattha Archalbot 8 584 0.6 19.43 20.03 Maize 0.32 40 248.704 Interviewed
110 Ishwori pd. Regmi Ishwori pd. Regmi Archalbot 9 558 0 33.61 33.61 Maize 0.32 40 430.208 Interviewed
111 Ram pd. Poudel Ram pd. Poudel Archalbot 9
,317,6
49 199.15 236.14 435.29 Maize 0.32 40 3022.592 Interviewed
112 Klaimaya Kunwar Ramdevi Kunwar Archalbot 6 175 0 24.04 24.04 Maize 0.32 40 307.712 Interviewed
113 Ishwori pd. Adhikari Kausila Adhikari Archalbot 8
170,
179,
578 432.74 516.69 949.43 Maize 0.32 40 6613.632 Interviewed
114 Sukumaya Ghale Hasta bdr. Ghale Nauthar 8
455,
460 166.24 191.94 358.18 Maize 0.32 40 2456.832 Interviewed
115 Ser Ghale Kali Ghale Nauthar 8
459,
469 350.58 434.39 784.97 Maize 0.32 40 5560.192 Interviewed
116 Tara devi Ghimire Saharsha jibi Ghimire Nauthar 5
378,
400 242.85 289.47 532.32 Maize 0.32 40 3705.216 Interviewed
117
Lila Poudel, Mahendra
Poudel Rishiram Poudel Archalbot 9
318,
315,
668 182.19 242.24 424.43 Maize 0.32 40 3100.672 Interviewed
118 Mayadevi Thapa Magar Yesh raj Thapa magar Archalbot 9
411,3
26,
526 273.86 332.13 605.99 Maize 0.32 40 4251.264 Interviewed
119 Ram bdr.Gurung Ram bdr.Gurung Archalbot 9 564 27.78 20.63 48.41 Maize 0.32 40 264.064 Interviewed
120 Chijmaya Gurung Chijmaya Gurung Archalbot 7 493 34.69 38.58 73.27 Maize 0.32 40 493.824 Interviewed
121 Chandra bdr. Thapa Prem bdr. Thapa Archalbot 9
389,
333 92 135.76 227.76 Maize 0.32 40 1737.728 Interviewed
122 Maan bdr. Thapa Maan bdr. Thapa Archalbot 9
583,
587,
590 112.04 147.99 260.03 Maize 0.32 40 1894.272 Interviewed
123 Edhane Gurung Eghane Gurung Pachowk 2
439,
450 316.09 386.2 702.29 Maize 0.32 40 4943.36 Interviewed
124 Karna singh Ghale Demraj Ghale Pachowk 3
511,
915 212.1 259.4 471.5 Maize 0.32 40 3320.32 Interviewed
125 Kami Gurung Kami Gurung Pachowk 3
953,
960 111.08 76.24 187.32 Maize 0.32 40 975.872 Interviewed
126 Maya Gurungseni Kumraj Gurung Pachowk 3
886,
897 301.96 364.92 666.88 Maize 0.32 40 4670.976 Interviewed
127 Bhagawati Bhagawati Nauthar 5 690 214.6 327.22 541.82 Maize 0.32 40 4188.416 Interviewed
128 Birta Gurung Birta Gurung Nauthar 5
420,
424 248.11 261.17 509.28 Maize 0.32 40 3342.976 Interviewed
129 Bamsyo Gurungseni Jangasubba Gurung Nauthar 5
479,
480 281.36 362.48 643.84 Maize 0.32 40 4639.744 Interviewed
130 Sitaram Gurung Sitaram Gurung Nauthar 5, 8
471,
620,
618,
377 248.65 303.9 552.55 Maize 0.32 40 3889.92 Interviewed
131 Sarba Singh Gurung Sarba Singh Gurung Nauthar 8
508,
563 423.42 533.26 956.68 Maize 0.32 40 6825.728 Interviewed
132 Nalu Kumari Gurung Mauli Gurung Nauthar 8 622 108.53 81.13 189.66 Maize 0.32 40 1038.464 Interviewed
S.N
.
Lan
d O
wn
er
Na
me
Ho
use
ho
ld h
ea
d
VD
C
Wa
rd N
o.
Aff
ect
ed
Plo
t n
o.
Ex
isit
ng
Are
a,
sqm
Ne
w C
ut
Are
a,
sqm
To
tal
Aff
ect
ed
are
a (
sqm
)
Na
me
of
the
Cro
ps
Pro
du
ctio
n k
g p
er
sqm
.
Dis
tric
t R
ate
pe
r sq
m.
To
tal
Co
st N
Rs.
Rem
ark
s
Cost Calculation of Crops of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, Lamjung
133 Dhanmaya Gurung Pode Gurung Pachowk 1
615,
442,
475 262.05 353.93 615.98 Maize 0.32 40 4530.304 Interviewed
134
Hari Bdr. Kunwar, Devi
Kumari Kunwar Hari Bdr. Kunwar Archalbot 6
147,
752 287.19 301.81 589 Maize 0.32 40 3863.168 Interviewed
135 Aashkaji Shrestha Aashkaji Shrestha Archalbot 9 417 0 16.96 16.96 Maize 0.32 40 217.088 Interviewed
136 Kshamamta Gurung Lal Bd Gurung Archalbot 7 677 32.3 27.34 59.64 Maize 0.32 40 349.952 Interviewed
137 Gir Bdr. Kunwar Gir Bdr. Kunwar Archalbot 7 541 193.29 235.07 428.36 Maize 0.32 40 3008.896 Interviewed
138 Himraj+Umakanta Paudel Umakanta Paudel Archalbot 9
327,
321 242.54 330.61 573.15 Maize 0.32 40 4231.808 Interviewed
139 Shiva Prasad Adhikari Shiva Prasad Adhikari Archalbot 8 152 19.62 29.31 48.93 Maize 0.32 40 375.168 Interviewed
140 Man Bdr. Thapa Man Bdr. Thapa Archalbot 7 617 32.85 27.93 60.78 Maize 0.32 40 357.504 Interviewed
141 Devi Gurung Devi Gurung Archalbot 7 495 13.72 26.45 40.17 Maize 0.32 40 338.56 Interviewed
142
Janaki Paudel, Dinnath
Paudel Dinanath Paudel Archalbot 9
565,
527,
525 31.33 34.8 66.13 Maize 0.32 40 445.44 Interviewed
143
Rishiram Shrestha,
Gyanmaya Shrestha Rishiram Shrestha Archalbot 9
394,
395,
392 362.28 461.32 823.6 Maize 0.32 40 5904.896 Interviewed
144 Bil Bdr. Shrestha Bil Bdr. Shrestha Archalbot 9 398 0 17.89 17.89 Maize 0.32 40 228.992 Interviewed
145 Amrit Bdr. Thapa Durga Thapa Archalbot 9
584,
497,
589 163.98 210.99 374.97 Maize 0.32 40 2700.672 Interviewed
146
Amrit(Amite), Sommaya
Bhujel Amrit(Amite) Gharti Archalbot 6
802,
799,
794 204.14 232.94 437.08 Maize 0.32 40 2981.632 Interviewed
147
Padamlal Paudel,
Manmaya Paudel Manmaya Paudel Archalbot 9
300,
53,
51,
50,
486,
485 781.51 974.87 1756.38 Maize 0.32 40 12478.336 Interviewed
148 Maansingh Gurung Durga bdr.Gurung Pachowk 1 476 226.83 271.75 498.58 Maize 0.32 40 3478.4 Interviewed
231 23566.28 28516.32 52082.6 365008.896
1 Bimaya Gurung Khushiram Archalbot 9 496 36.64 32.54 69.18 Maize 0.32 40 416.512 Non-Interview
2 Laxmi Gurung Tej Bdr Archalbot 9 419 0 438 438 Maize 0.32 40 5606.4 Non-Interview
3 Santa Bdr Damai Harka Bdr Archalbot 9 336 11.56 34.49 46.05 Maize 0.32 40 441.472 Non-Interview
4 Mayadevi maretha Bhimnath Archalbot 8 177 128.38 157.13 285.51 Maize 0.32 40 2011.264 Non-Interview
5 Bishnumaya Adhikari Kedarnath Archalbot 8 589 0 3.58 3.58 Maize 0.32 40 45.824 Non-Interview
6 Gita thapa Kunwar Indra bdr. Archalbot 8 555 19.5 25.17 44.67 Maize 0.32 40 322.176 Non-Interview
7 Laxima Adhikari Tirtharaj Archalbot 8 476 20.35 20.78 41.13 Maize 0.32 40 265.984 Non-Interview
8 Krishna bdr Gurung Balaram Archalbot 8 476 0 79.22 79.22 Maize 0.32 40 1014.016 Non-Interview
9 Ojraj sedai Ramchandra Archalbot 7 337 100.18 145.98 246.16 Maize 0.32 40 1868.544 Non-Interview
10 Amrit bdr.Kunwar Hari bdr. Archalbot 7 538 40.73 48.94 89.67 Maize 0.32 40 626.432 Non-Interview
11 Ganga Kuwar Babu Laxman Archalbot 6 822 248.42 213.13 461.55 Maize 0.32 40 2728.064 Non-Interview
12 Devi kunwar chhetri surya bdr. Archalbot 6
177,
173 43.12 107.57 150.69 Maize 0.32 40 1376.896 Non-Interview
13 Gyan bdr.Kunwar Pahalman Archalbot 6 151 231.69 291.94 523.63 Maize 0.32 40 3736.832 Non-Interview
14 Apsara Kunwar Thapa Sashi thapa
Shreebhanjya
ng 2 223 0 12.89 12.89 Maize 0.32 40 164.992 Non-Interview
15 Gyanraj gurung Prithiman
Shreebhanjya
ng 2 473 139.39 166.22 305.61 Maize 0.32 40 2127.616 Non-Interview
Gyanraj gurung Prithiman
Shreebhanjya
ng 2 474 139.39 162.65 302.04 Maize 0.32 40 2081.92 Non-Interview
16 Jit jung gurung Udaya jung
Shreebhanjya
ng 2
181,
169 279.35 309.43 588.78 Maize 0.32 40 3960.704 Non-Interview
Total
S.N
.
Lan
d O
wn
er
Na
me
Ho
use
ho
ld h
ea
d
VD
C
Wa
rd N
o.
Aff
ect
ed
Plo
t n
o.
Ex
isit
ng
Are
a,
sqm
Ne
w C
ut
Are
a,
sqm
To
tal
Aff
ect
ed
are
a (
sqm
)
Na
me
of
the
Cro
ps
Pro
du
ctio
n k
g p
er
sqm
.
Dis
tric
t R
ate
pe
r sq
m.
To
tal
Co
st N
Rs.
Rem
ark
s
Cost Calculation of Crops of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, Lamjung
17 Lalman gurung Harkaman
Shreebhanjya
ng 2
770,
777 575.31 575.36 1150.67 Maize 0.32 40 7364.608 Non-Interview
18 Sabita sarki Nepali Jag bdr
Shreebhanjya
ng 2 768 52.58 65.02 117.6 Maize 0.32 40 832.256 Non-Interview
19 Harka Bdr Sarki Lato
Shreebhanjya
ng 2 476 499.11 625.87 1124.98 Maize 0.32 40 8011.136 Non-Interview
20 Hari Kumari Sedhai Laxman
Shreebhanjya
ng 2 478 176.53 124.19 300.72 Maize 0.32 40 1589.632 Non-Interview
21
Bod Kumari Gurung (aka
Budh Kumari Gurung) Bhupal Pd
Shreebhanjya
ng 2 766 272.4 333.76 606.16 Maize 0.32 40 4272.128 Non-Interview
22 Faud Bdr Khadka Bal Bdr
Shreebhanjya
ng 2 405 48.05 65.83 113.88 Maize 0.32 40 842.624 Non-Interview
23
Nyepu (Ajuti Maya
Gurung) Nanda Jung
Shreebhanjya
ng 2 170 361.71 425.41 787.12 Maize 0.32 40 5445.248 Non-Interview
24 Govinda Jung Gurung Udaya jung
Shreebhanjya
ng 2 168 0 15.16 15.16 Maize 0.32 40 194.048 Non-Interview
25 Gopal Raj Joshi Devi Raman
Shreebhanjya
ng 2 724 40.8 52.48 93.28 Maize 0.32 40 671.744 Non-Interview
26 Gopal Jung Gurung Udaya jung
Shreebhanjya
ng 2 167 137.76 179.24 317 Maize 0.32 40 2294.272 Non-Interview
27 Aash Bdr Gurung Dholi
Shreebhanjya
ng 2 469 481.74 597.12 1078.86 Maize 0.32 40 7643.136 Non-Interview
28 Seti Gurung Raj Kumar
Shreebhanjya
ng 2
445,
444 507.67 498.28 1005.95 Maize 0.32 40 6377.984 Non-Interview
29
Ram Chandra + Laxman
Sedhai Dayanidhi
Shreebhanjya
ng 2 441 70.1 81.69 151.79 Maize 0.32 40 1045.632 Non-Interview
30 Tularaj Gurung Khamba Singh
Shreebhanjya
ng 4 458 3.66 36.35 40.01 Maize 0.32 40 465.28 Non-Interview
31 Tej Bahadur Gurung Reshamlal
Shreebhanjya
ng 4
36,
35, 22 160.67 266.78 427.45 Maize 0.32 40 3414.784 Non-Interview
32 Mayanath Ghimire Gangadatta
Shreebhanjya
ng 4 39 0 13.52 13.52 Maize 0.32 40 173.056 Non-Interview
33 Aaita Singh Gurung Shukaman
Shreebhanjya
ng 4 4 162.8 194.75 357.55 Maize 0.32 40 2492.8 Non-Interview
34 Bir Bdr Gurung Gunjaman
Shreebhanjya
ng 8
48,
47, 40 0 128.71 128.71 Maize 0.32 40 1647.488 Non-Interview
35 Dinesh Ghimire Lekhnath
Shreebhanjya
ng 8 66 91.31 80.28 171.59 Maize 0.32 40 1027.584 Non-Interview
36 Bishnukumar shrestha Buddhiman
Shreebhanjya
ng 8
889,
888,
804,
753,
15, 84 206.5 347.6 554.1 Maize 0.32 40 4449.28 Non-Interview
37 Surya bdr. Bhujel Jitbdr
Shreebhanjya
ng 8 890 3.76 44.43 48.19 Maize 0.32 40 568.704 Non-Interview
38 Aita kumari Gurung Mohanman
Shreebhanjya
ng 8 85 45.71 80.37 126.08 Maize 0.32 40 1028.736 Non-Interview
39 Lalmati Gurung Nairaj
Shreebhanjya
ng 8
13,
206 78.47 91.21 169.68 Maize 0.32 40 1167.488 Non-Interview
40 Purna pd. Ghimire Mayanath
Shreebhanjya
ng 8 204 170.37 161.72 332.09 Maize 0.32 40 2070.016 Non-Interview
41 Krishna hari Wagle Dolnath
Shreebhanjya
ng 8 207 185.17 221.29 406.46 Maize 0.32 40 2832.512 Non-Interview
42 Sun bdr gurung Kaam singh
Shreebhanjya
ng 8 918 0 7.67 7.67 Maize 0.32 40 98.176 Non-Interview
43 Kopila Wagle Chetnath
Shreebhanjya
ng 8 230 2.16 34.41 36.57 Maize 0.32 40 440.448 Non-Interview
44 Jhamdi Gurung Ganesh bdr.
Shreebhanjya
ng 8 231, 1 269.42 266.01 535.43 Maize 0.32 40 3404.928 Non-Interview
S.N
.
Lan
d O
wn
er
Na
me
Ho
use
ho
ld h
ea
d
VD
C
Wa
rd N
o.
Aff
ect
ed
Plo
t n
o.
Ex
isit
ng
Are
a,
sqm
Ne
w C
ut
Are
a,
sqm
To
tal
Aff
ect
ed
are
a (
sqm
)
Na
me
of
the
Cro
ps
Pro
du
ctio
n k
g p
er
sqm
.
Dis
tric
t R
ate
pe
r sq
m.
To
tal
Co
st N
Rs.
Rem
ark
s
Cost Calculation of Crops of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, Lamjung
45 Mohani Gurung Pancha bdr. Nauthar 8 623 83.78 184.99 268.77 Maize 0.32 40 2367.872 Non-Interview
46 Tula kumari Pandey Dilliraj Nauthar 2 120 142.28 166.33 308.61 Maize 0.32 40 2129.024 Non-Interview
47 Chini kumari Pandey Khilnidhi Nauthar 2 121 4.79 18.15 22.94 Maize 0.32 40 232.32 Non-Interview
48 Dilliram Pandey Khaganidhi Nauthar 2 123 14.74 12.86 27.6 Maize 0.32 40 164.608 Non-Interview
49 Ram Kumar Thapa Prem bahadur Nauthar 2 115 74.24 93.9 168.14 Maize 0.32 40 1201.92 Non-Interview
50 Kum raj Gurung Gangaram Nauthar 2 61 16.01 45.29 61.3 Maize 0.32 40 579.712 Non-Interview
51 Chetnath Wagle Bishnu datta Nauthar 2
63,
1182 83.47 150.25 233.72 Maize 0.32 40 1923.2 Non-Interview
52 Suk bdr.Tamang Gagan bdr. Nauthar 2 1042 106.07 71.32 177.39 Maize 0.32 40 912.896 Non-Interview
53 Arun kumar Shrestha Rajkumar Nauthar 2 78 134.78 163.71 298.49 Maize 0.32 40 2095.488 Non-Interview
54 Bhagawati Wagle Devi prasad. Nauthar 2 84 0 3.71 3.71 Maize 0.32 40 47.488 Non-Interview
55 Loknath Wagle Laxman Nauthar 2 85 127.56 148.45 276.01 Maize 0.32 40 1900.16 Non-Interview
56 Budhamaya Gurung Chitraman Nauthar 2 696 0 7.46 7.46 Maize 0.32 40 95.488 Non-Interview
57 Bishnumaya Adhikari Padam Pd. Nauthar 8 517 192.96 220.77 413.73 Maize 0.32 40 2825.856 Non-Interview
58 Chandra kanta Wagle Bamdev Nauthar 2 697 219.37 210.01 429.38 Maize 0.32 40 2688.128 Non-Interview
59 Dipendra Ghimire Ramkrishna Nauthar 2 680 142.99 174.75 317.74 Maize 0.32 40 2236.8 Non-Interview
60 Pashupatinath Ghimire Laxmi pd. Nauthar 2 687 233.32 282.58 515.9 Maize 0.32 40 3617.024 Non-Interview
61 Dipak babu Ghimire ShreeKrishna Nauthar 2 688 257.62 264.87 522.49 Maize 0.32 40 3390.336 Non-Interview
62 Sharman, Pahalman Magar Krishna bdr. Nauthar 5 81 0 18.13 18.13 Maize 0.32 40 232.064 Non-Interview
63 Laxima pd. Bhatta Motiram Nauthar 5 79 97.65 103.57 201.22 Maize 0.32 40 1325.696 Non-Interview
64 Bhagawati Devi Ghimire Purosuttom Nauthar 5 80 194.59 268.7 463.29 Maize 0.32 40 3439.36 Non-Interview
65 Liladevi Ghimire Kumar pd. Nauthar 5 419 0 16.12 16.12 Maize 0.32 40 206.336 Non-Interview
66 Jire Gurung Nardhoj Nauthar 5 426 17.68 37.38 55.06 Maize 0.32 40 478.464 Non-Interview
67 Jagdish Ghimire Purushottam Nauthar 5 240 30.66 98.76 129.42 Maize 0.32 40 1264.128 Non-Interview
68 Usha Ghimire Chetnath Nauthar 5
242,
243 4.42 79.34 83.76 Maize 0.32 40 1015.552 Non-Interview
69 Shree krishna Ghimire Yogyenidhi Nauthar 5 241 450.74 407.6 858.34 Maize 0.32 40 5217.28 Non-Interview
70 Pashupatinath Ghimire Bhabilal Nauthar 5 247 0 10.98 10.98 Maize 0.32 40 140.544 Non-Interview
71 Shree bhakta Ghimire Ramchandra Nauthar 5 249 113.9 119.56 233.46 Maize 0.32 40 1530.368 Non-Interview
72 Sita Ghimire Tirtharaj Nauthar 5 266 2.56 45.49 48.05 Maize 0.32 40 582.272 Non-Interview
73 Singha raas gurung Dhanlal Nauthar 5 262 86.97 104.84 191.81 Maize 0.32 40 1341.952 Non-Interview
74 Tul bdr. Gurung Gaj bdr. Nauthar 5 260 3.85 40.44 44.29 Maize 0.32 40 517.632 Non-Interview
75 Sabitra Gurung Sukman Nauthar 5 396 95.01 115.99 211 Maize 0.32 40 1484.672 Non-Interview
76 Brikh bdr. Gurung Amardhoj Nauthar 5 397 42.25 50.79 93.04 Maize 0.32 40 650.112 Non-Interview
77 Dattamaya Gurung Chatursingh Nauthar 5 467 64.07 67.84 131.91 Maize 0.32 40 868.352 Non-Interview
78 Gunmaya Tamang Purna bdr. Nauthar 5
401,
402 119.01 153.25 272.26 Maize 0.32 40 1961.6 Non-Interview
Gunmaya Tamang Purna bdr. Nauthar 5 401 119.01 142.04 261.05 Maize 0.32 40 1818.112 Non-Interview
79 Laxmi Ramtel Chitra bdr. Nauthar 5 470 3.42 6.64 10.06 Maize 0.32 40 84.992 Non-Interview
80 Anita Gurung Singhram Nauthar 8 150 183.35 208.61 391.96 Maize 0.32 40 2670.208 Non-Interview
81 Prabin Ghimire Taramali Nauthar 8 558 0 38.28 38.28 Maize 0.32 40 489.984 Non-Interview
82 Surya narayan Ghimire Taramali Nauthar 8 559 220.72 281.73 502.45 Maize 0.32 40 3606.144 Non-Interview
83 Kamala devi Ghimire Pashupati Nauthar 8 114 148.45 169.63 318.08 Maize 0.32 40 2171.264 Non-Interview
84 Kedar bdr. Sarki Chyangre Nauthar 8 176 145.67 178.96 324.63 Maize 0.32 40 2290.688 Non-Interview
85 Mahendra raj Malla Badriraj Nauthar 8 467 109.57 153.65 263.22 Maize 0.32 40 1966.72 Non-Interview
86 Purna bdr Gurung Lal bdr. Nauthar 8 470 29.62 36.02 65.64 Maize 0.32 40 461.056 Non-Interview
87 Gopiraj Gurung N/A Pachwok 1 579 66.65 91.92 158.57 Maize 0.32 40 1176.576 Non-Interview
S.N
.
Lan
d O
wn
er
Na
me
Ho
use
ho
ld h
ea
d
VD
C
Wa
rd N
o.
Aff
ect
ed
Plo
t n
o.
Ex
isit
ng
Are
a,
sqm
Ne
w C
ut
Are
a,
sqm
To
tal
Aff
ect
ed
are
a (
sqm
)
Na
me
of
the
Cro
ps
Pro
du
ctio
n k
g p
er
sqm
.
Dis
tric
t R
ate
pe
r sq
m.
To
tal
Co
st N
Rs.
Rem
ark
s
Cost Calculation of Crops of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, Lamjung
88
Chandraman/Rudra
bdr.Shrestha Bhakti pd Pachwok 1
44,
480 256.64 314.52 571.16 Maize 0.32 40 4025.856 Non-Interview
89 Guman singh Gurung Pancha subba Pachwok 1 479 96 115.15 211.15 Maize 0.32 40 1473.92 Non-Interview
90 Sovraj gurung Gaj bdr. Pachwok 1 481 35.78 38.08 73.86 Maize 0.32 40 487.424 Non-Interview
91 Durga singh Gurung Kaam singh Pachwok 1 523 70.85 121.1 191.95 Maize 0.32 40 1550.08 Non-Interview
92 Indra Gurung Indra Pachwok 1 531 80.9 97.33 178.23 Maize 0.32 40 1245.824 Non-Interview
93 Kamal jit Gurung Ajamsingh Pachwok 1 521 317.29 387.66 704.95 Maize 0.32 40 4962.048 Non-Interview
94 Udd Bd. Gurung Gore Pachwok 1 520 163.26 199.66 362.92 Maize 0.32 40 2555.648 Non-Interview
95 Chitra maya Gurung Khadgasingh Pachwok 1 331 151.62 185.67 337.29 Maize 0.32 40 2376.576 Non-Interview
96 Shreemati Parwati Gurung suk bdr Pachwok 1 335 292.86 350.34 643.2 Maize 0.32 40 4484.352 Non-Interview
97 Bindhoj Gurung Bhakta Pachwok 2 547 0 59.94 59.94 Maize 0.32 40 767.232 Non-Interview
98 Reju Gurseni,Amar Gurung N/A Pachwok 2 449 0 13.47 13.47 Maize 0.32 40 172.416 Non-Interview
99 Kabiraj Gurung Paanbir Pachwok 2 451 170.15 206.76 376.91 Maize 0.32 40 2646.528 Non-Interview
100 Maisari Gurung Chamar Singh Pachwok 2 466 158.92 175.21 334.13 Maize 0.32 40 2242.688 Non-Interview
101 Singharaj Gurung Madan singh Pachwok 2 627 29.48 113.16 142.64 Maize 0.32 40 1448.448 Non-Interview
102 Gaj bdr. Gurung Naram singh Pachwok 2 510 58.96 62.35 121.31 Maize 0.32 40 798.08 Non-Interview
103 Badmaya Gurung Gujman Pachwok 2 508 123.08 155.24 278.32 Maize 0.32 40 1987.072 Non-Interview
104 Adar Gurung Sukalal Pachwok 2 507 88.63 108.32 196.95 Maize 0.32 40 1386.496 Non-Interview
105 Dhanmaan Ghale Chandra Pachwok 3 901 47 56.7 103.7 Maize 0.32 40 725.76 Non-Interview
106 Chandraman Guruung Sanke Pachwok 3 899 90.61 100.42 191.03 Maize 0.32 40 1285.376 Non-Interview
107 Mankauri Ghale Udbdr. Pachwok 3 908 126.38 160.09 286.47 Maize 0.32 40 2049.152 Non-Interview
108 Gore Gurung Dal bdr. Pachwok 3 662 18.45 24.68 43.13 Maize 0.32 40 315.904 Non-Interview
109 Dasir gurung Garja bdr. Pachwok 3 526 375.07 417.98 793.05 Maize 0.32 40 5350.144 Non-Interview
110 Asur Gurung chandrasingh Pachwok 3 529 0 4.98 4.98 Maize 0.32 40 63.744 Non-Interview
111 Tak bdr.Ghale Maan bdr Pachwok 3
952,
963 346.05 451.32 797.37 Maize 0.32 40 5776.896 Non-Interview
112 Balbir Gurung Hukke Pachwok 3 950 0 3.16 3.16 Maize 0.32 40 40.448 Non-Interview
113 Karansingh Gurung Top Pachwok 3 49 0 5.36 5.36 Maize 0.32 40 68.608 Non-Interview
114 Rabi Gurung Bagan singh Pachwok 3 961 2.4 26.31 28.71 Maize 0.32 40 336.768 Non-Interview
115 Giujman Gurung Harka Bdr Pachwok 3 954 39.99 130.81 170.8 Maize 0.32 40 1674.368 Non-Interview
116 Amar singh gurung Agam Pachwok 3
957,
959,
977 390.96 726.63 1117.59 Maize 0.32 40 9300.864 Non-Interview
117 Mangale/man bdr. Gurung Aaitasingh Pachwok 3 956 6.27 75.02 81.29 Maize 0.32 40 960.256 Non-Interview
118 Mana Gurung Bahadur Pachwok 3 978 11.11 13.44 24.55 Maize 0.32 40 172.032 Non-Interview
119 Kaami Gurung Dilbahadur Pachwok 3 1072 233.99 262.62 496.61 Maize 0.32 40 3361.536 Non-Interview
144 14009 18293.3 32302.27 234154.368
1 Archalbot 8 564 106.82 60.79 167.61 Maize 0.32 40 778.112 Non-Registered
2 Archalbot 9 412 64.51 28 92.51 Maize 0.32 40 358.4 Non-Registered
3 Archalbot 9 429 998.42 1218.91 2217.33 Maize 0.32 40 15602.048 Non-Registered
4 Archalbot 9 504 66.32 75.05 141.37 Maize 0.32 40 960.64 Non-Registered
5 Archalbot 9 702 31.56 38.38 69.94 Maize 0.32 40 491.264 Non-Registered
6 Archalbot 9 701 50.98 63.37 114.35 Maize 0.32 40 811.136 Non-Registered
7 Archalbot 9 700 73.57 88.65 162.22 Maize 0.32 40 1134.72 Non-Registered
8 Archalbot 9 337 4.44 35.3 39.74 Maize 0.32 40 451.84 Non-Registered
9 Archalbot 9 77 10.11 36.99 47.1 Maize 0.32 40 473.472 Non-Registered
10 Archalbot 9 75 0 27.68 27.68 Maize 0.32 40 354.304 Non-Registered
11 Archalbot 9 491 160.45 156.84 317.29 Maize 0.32 40 2007.552 Non-Registered
12 Archalbot 9 66 197.39 165.43 362.82 Maize 0.32 40 2117.504 Non-Registered
Non-Registered
Non-Registered
Non-Registered
Non-Registered
Non-Registered
Non-Registered
Non-Registered
Non-Registered
Non-Registered
Total
Non-Registered
Non-Registered
Non-Registered
S.N
.
Lan
d O
wn
er
Na
me
Ho
use
ho
ld h
ea
d
VD
C
Wa
rd N
o.
Aff
ect
ed
Plo
t n
o.
Ex
isit
ng
Are
a,
sqm
Ne
w C
ut
Are
a,
sqm
To
tal
Aff
ect
ed
are
a (
sqm
)
Na
me
of
the
Cro
ps
Pro
du
ctio
n k
g p
er
sqm
.
Dis
tric
t R
ate
pe
r sq
m.
To
tal
Co
st N
Rs.
Rem
ark
s
Cost Calculation of Crops of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, Lamjung
13 Archalbot 9 634 17.28 27.06 44.34 Maize 0.32 40 346.368 Non-Registered
14 Archalbot 8 614 151.9 144.25 296.15 Maize 0.32 40 1846.4 Non-Registered
15 Archalbot 8 613 1.23 17.14 18.37 Maize 0.32 40 219.392 Non-Registered
16 Archalbot 8 612 97.18 120.19 217.37 Maize 0.32 40 1538.432 Non-Registered
17 Archalbot 8 611 83.8 81.12 164.92 Maize 0.32 40 1038.336 Non-Registered
18 Archalbot 8 598 90.41 111.31 201.72 Maize 0.32 40 1424.768 Non-Registered
19 Archalbot 8 563 35.94 47.31 83.25 Maize 0.32 40 605.568 Non-Registered
20 Archalbot 8 120 170.91 161.51 332.42 Maize 0.32 40 2067.328 Non-Registered
21 Archalbot 8 119 67.38 134.35 201.73 Maize 0.32 40 1719.68 Non-Registered
22 Archalbot 7 496 123.14 154.93 278.07 Maize 0.32 40 1983.104 Non-Registered
23 Archalbot 7 257 160.06 196.4 356.46 Maize 0.32 40 2513.92 Non-Registered
24 Archalbot 6 171 0 2.14 2.14 Maize 0.32 40 27.392 Non-Registered
25
Shreebhanjya
ng 2 471 253.08 301.28 554.36 Maize 0.32 40 3856.384 Non-Registered
26
Shreebhanjya
ng 2 442 282.13 337.74 619.87 Maize 0.32 40 4323.072 Non-Registered
27
Shreebhanjya
ng 4 484 117.23 95.64 212.87 Maize 0.32 40 1224.192 Non-Registered
28
Shreebhanjya
ng 4 483 0 4.63 4.63 Maize 0.32 40 59.264 Non-Registered
29
Shreebhanjya
ng 8 908 0 3.4 3.4 Maize 0.32 40 43.52 Non-Registered
30
Shreebhanjya
ng 8 907 0 41.78 41.78 Maize 0.32 40 534.784 Non-Registered
31
Shreebhanjya
ng 8 891 0.02 49.63 49.65 Maize 0.32 40 635.264 Non-Registered
32
Shreebhanjya
ng 8 203 294.79 354.73 649.52 Maize 0.32 40 4540.544 Non-Registered
33
Shreebhanjya
ng 8 81 44.54 28.27 72.81 Maize 0.32 40 361.856 Non-Registered
34
Shreebhanjya
ng 8 14 0 92.85 92.85 Maize 0.32 40 1188.48 Non-Registered
35
Shreebhanjya
ng 8 885 0 25.07 25.07 Maize 0.32 40 320.896 Non-Registered
36
Shreebhanjya
ng 8 205 347.03 439.83 786.86 Maize 0.32 40 5629.824 Non-Registered
37 Nauthar 2 9801 135.08 192.63 327.71 Maize 0.32 40 2465.664 Non-Registered
38 Nauthar 2 1229 68.87 43.11 111.98 Maize 0.32 40 551.808 Non-Registered
39 Nauthar 2 116 146.53 163.23 309.76 Maize 0.32 40 2089.344 Non-Registered
40 Nauthar 2 1041 0 48.81 48.81 Maize 0.32 40 624.768 Non-Registered
41 Nauthar 2 72 0 9.98 9.98 Maize 0.32 40 127.744 Non-Registered
42 Nauthar 2 679 162.59 198.5 361.09 Maize 0.32 40 2540.8 Non-Registered
43 Nauthar 5 237 307.25 332.7 639.95 Maize 0.32 40 4258.56 Non-Registered
44 Nauthar 5 387 182.48 204.67 387.15 Maize 0.32 40 2619.776 Non-Registered
45 Nauthar 5 442 36.74 48.16 84.9 Maize 0.32 40 616.448 Non-Registered
46 Nauthar 8 458 58.21 97.8 156.01 Maize 0.32 40 1251.84 Non-Registered
47 Nauthar 8 457 105.08 113.07 218.15 Maize 0.32 40 1447.296 Non-Registered
48 Pachok 1 460 329.62 358.19 687.81 Maize 0.32 40 4584.832 Non-Registered
49 Pachok 2 440 399.09 485.11 884.2 Maize 0.32 40 6209.408 Non-Registered
50 Pachok 3 979 47.73 58.6 106.33 Maize 0.32 40 750.08 Non-Registered
50 6081.89 7322.51 13404.4 93728.128
425 43657 54132 97789.27 692891.392
Total
Grand Total
Non-Registered
Non-Registered
Non-Registered
Non-Registered
Non-Registered
Non-Registered
Non-Registered
Non-Registered
Non-Registered
Non-Registered
Non-Registered
Non-Registered
Non-Registered
Non-Registered
Non-Registered
Non-Registered
Non-Registered
Non-Registered
Non-Registered
Non-Registered
Non-Registered
Non-Registered
Non-Registered
Non-Registered
Non-Registered
Non-Registered
Non-Registered
Non-Registered
Non-Registered
Non-Registered
Non-Registered
Non-Registered
Non-Registered
Non-Registered
Non-Registered
Non-Registered
Non-Registered
Non-Registered
From
1
Harka
Kumar
Shrestha 0+000Khadayo Archal
bot-9
5 50.00 5 0.39 214.50 1072.50 0.04 30 0.66 0.03 550 14.18 70.90 1143.40
KhadayoArchal
bot-96 80.00 7 0.52 286.00 1716.00 0.14 30 0.66 0.09 550 50.82 304.92 2020.92
11 3164.32
2
Bishnu lal
Shrestha 0+170Khadayo
Archal
bot-95 80.00 7 0.52 286.00 1430.00 0.14 30 0.66 0.09 550 50.82 254.10 1684.10
Khadayo 1 160.00 10 2.50 1375.00 1375.00 0.80 30 0.66 0.53 550 290.40 290.40 1665.40
6 3349.50
3
Bill Bdr.
Shrestha 0+480 Badar
Archal
bot-93 50.00 5 0.39 214.50 643.50 0.04 30 0.66 0.03 550 14.18 42.54 686.04
3 686.04
4
Rishi Ram
Shrestha 0+560 Siris
Archal
bot-91 50.00 5 0.39 214.50 214.50 0.04 30 0.66 0.03 550 14.18 14.18 228.68
Siris
Archal
bot-91 80.00 7 0.52 286.00 286.00 0.14 30 0.66 0.09 550 50.82 50.82 336.82
2 565.50
5
Ganga
maya
Suyal 0+580 Khadayo
Archal
bot-9 6
50.00 5 0.39 214.50 1287.00 0.04 30 0.66 0.03 550 14.18 85.08 1372.08
80.00 7 0.52 286.00 572.00 0.14 30 0.66 0.09 550 50.82 101.64 673.64
Total 8 2045.72
6
Hemraj +
Umakanta
Paudel 0+700 Badar
Archal
bot-9
1 50.00 5 0.39 214.50 214.50 0.04 30 0.66 0.03 550 14.18 14.18 228.68
0+935 Khadayo 7 50.00 5 0.39 214.50 1501.50 0.04 30 0.66 0.03 550 14.18 99.26 1600.76
Khadayo 8 80.00 7 0.52 286.00 2288.00 0.14 30 0.66 0.09 550 50.82 406.56 2694.56
Total 16 4524
7
Aaiti maya
Pariyar 0+750 Siris
Archal
bot-92 50.00 5 0.39 214.50 429.00 0.04 30 0.66 0.03 550 14.18 28.36 457.36
Cost calculation of Private Trees: Belghari-Archalbot-Lamabagar-Serabazar-Letaure-Pachok Road, Lamjung
S.N
Owner
Name Ch.
Species
Addres
s
No
Girth
(cm)
Height
(m)
Man
days
Tranport
Cost/nos
Transportat
ion Cost
(NRs.)
Total Cost
(NRs.)
Sub-Total
Sub-Total
Harvesting
Cost (NRs.)
Total
Harvesting
Cost (NRs.)
Vol
ume
Dista
nce
(m)
MDs/cu
m
MDs/
Tree
Sub-Total
Sub-Total
District
Rate
From
Cost calculation of Private Trees: Belghari-Archalbot-Lamabagar-Serabazar-Letaure-Pachok Road, Lamjung
S.N
Owner
Name Ch.
Species
Addres
s
No
Girth
(cm)
Height
(m)
Man
days
Tranport
Cost/nos
Transportat
ion Cost
(NRs.)
Total Cost
(NRs.)
Harvesting
Cost (NRs.)
Total
Harvesting
Cost (NRs.)
Vol
ume
Dista
nce
(m)
MDs/cu
m
MDs/
Tree
District
Rate
Siris
Archal
bot-91 80.00 7 0.52 286.00 286.00 0.14 30 0.66 0.09 550 50.82 50.82 336.82
Total 3 794.18
8
Amrit Bdr.
Thapa 0+870 Bakaino
Archal
bot-98 50.00 5 0.39 214.50 1716.00 0.04 30 0.66 0.03 550 14.18 113.44 1829.44
0+890 Bakaino
Archal
bot-91 50.00 5 0.39 214.50 214.50 0.04 30 0.66 0.03 550 14.18 14.18 228.68
0+933 Bakaino
Archal
bot-97 50.00 5 0.39 214.50 1501.50 0.04 30 0.66 0.03 550 14.18 99.26 1600.76
0+940 Bamboo
Archal
bot-920 30.00 15 0.13 71.50 1430.00 0.04 30 0.66 0.03 550 15.31 306.28 1736.28
1+505 Bakaino
Archal
bot-91 80.00 7 0.52 286.00 286.00 0.14 30 0.66 0.09 550 50.82 50.82 336.82
1+505 Bakaino
Archal
bot-91 160.00 10 2.50 1375.00 1375.00 0.80 30 0.66 0.53 550 290.40 290.40 1665.40
Total 38 7397.38
9
Santa
Bdr.Damai 0+825 Khadayo
Archal
bot-92 50.00 5 0.39 214.50 429.00 0.04 30 0.66 0.03 550 14.18 28.36 457.36
Total 2 457.36
10
Maya Devi
Thapa
Magar 0+920 Bakaino
Archal
bot-9
3 50.00 5 0.39 214.50 643.50 0.04 30 0.66 0.03 550 14.18 42.54 686.04
Bakaino
Archal
bot-92 80.00 7 0.52 286.00 572.00 0.14 30 0.66 0.09 550 50.82 101.64 673.64
Total 5 1359.68
11
Ram
Prasad
Paudel 0+945 Bakaino
1 80.00 7 0.52 286.00 286.00 0.14 30 0.66 0.09 550 50.82 50.82 336.82
Total 1 336.82
12
Sushila
Pariyar 0+980 Bakaino5 50.00 5 0.39 214.50 1072.50 0.04 30 0.66 0.03 550 14.18 70.90 1143.40
Total 5 1143.40
From
Cost calculation of Private Trees: Belghari-Archalbot-Lamabagar-Serabazar-Letaure-Pachok Road, Lamjung
S.N
Owner
Name Ch.
Species
Addres
s
No
Girth
(cm)
Height
(m)
Man
days
Tranport
Cost/nos
Transportat
ion Cost
(NRs.)
Total Cost
(NRs.)
Harvesting
Cost (NRs.)
Total
Harvesting
Cost (NRs.)
Vol
ume
Dista
nce
(m)
MDs/cu
m
MDs/
Tree
District
Rate
13 Lila Paudel 1+000 Bakaino12 50.00 5 0.39 214.50 2574.00 0.04 30 0.66 0.03 550 14.18 170.16 2744.16
Bakaino 7 80.00 7 0.52 286.00 2002.00 0.14 30 0.66 0.09 550 50.82 355.74 2357.74
Bakaino 1 160.00 10 2.50 1375.00 1375.00 0.80 30 0.66 0.53 550 290.40 290.40 1665.40
Total 20 6767.30
14
Padam Lal
Paudel 1+510 Badar
Archal
bot-94 50.00 5 0.39 214.50 858.00 0.04 30 0.66 0.03 550 14.18 56.72 914.72
Bamboo
Archal
bot-940 30.00 15 0.13 71.50 2860.00 0.04 30 0.66 0.03 550 15.31 612.56 3472.56
Bakaino
Archal
bot-92 80.00 7 0.52 286.00 572.00 0.14 30 0.66 0.09 550 50.82 101.64 673.64
Bakaino
Archal
bot-95 160.00 10 2.50 1375.00 6875.00 0.80 30 0.66 0.53 550 290.40 1452.00 8327.00
1+740 Bakaino
Archal
bot-93 50.00 5 0.39 214.50 643.50 0.04 30 0.66 0.03 550 14.18 42.54 686.04
Bakaino
Archal
bot-93 80.00 7 0.52 286.00 858.00 0.14 30 0.66 0.09 550 50.82 152.46 1010.46
Total 57 15084.42
15
Muktinath
Lamichhan
e 1+520 Khadayo
Archal
bot-9
2 50.00 5 0.39 214.50 429.00 0.04 30 0.66 0.03 550 14.18 28.36 457.36
Bamboo
Archal
bot-940 30.00 15 0.13 71.50 2860.00 0.04 30 0.66 0.03 550 15.31 612.56 3472.56
Badar
Archal
bot-95 80.00 7 0.52 286.00 1430.00 0.14 30 0.66 0.09 550 50.82 254.10 1684.10
Bakaino
Archal
bot-91 160.00 10 2.50 1375.00 1375.00 0.80 30 0.66 0.53 550 290.40 290.40 1665.40
Total 48 7279.42
16
Jit
Bdr.Lamich
hane 1+530 Khadayo
Archal
bot-9
2 50.00 5 0.39 214.50 429.00 0.04 30 0.66 0.03 550 14.18 28.36 457.36
Khadayo
Archal
bot-98 80.00 7 0.52 286.00 2288.00 0.14 30 0.66 0.09 550 50.82 406.56 2694.56
From
Cost calculation of Private Trees: Belghari-Archalbot-Lamabagar-Serabazar-Letaure-Pachok Road, Lamjung
S.N
Owner
Name Ch.
Species
Addres
s
No
Girth
(cm)
Height
(m)
Man
days
Tranport
Cost/nos
Transportat
ion Cost
(NRs.)
Total Cost
(NRs.)
Harvesting
Cost (NRs.)
Total
Harvesting
Cost (NRs.)
Vol
ume
Dista
nce
(m)
MDs/cu
m
MDs/
Tree
District
Rate
Total 10 3151.92
17
Kalika
Lamichhan
e 1+620 Khadayo
Archal
bot-9
4 50.00 5 0.39 214.50 858.00 0.04 30 0.66 0.03 550 14.18 56.72 914.72
Khadayo
Archal
bot-93 80.00 7 0.52 286.00 858.00 0.14 30 0.66 0.09 550 50.82 152.46 1010.46
Total 7 1925.18
18
Dev Bhakta
Regmi 1+710 Khadayo
Archal
bot-9
3 50.00 5 0.39 214.50 643.50 0.04 30 0.66 0.03 550 14.18 42.54 686.04
Total 3 686.04
19
Manmaya
Paudel 1+720 Khadayo
Archal
bot-93 80.00 7 0.52 286.00 858.00 0.14 30 0.66 0.09 550 50.82 152.46 1010.46
Khadayo
Archal
bot-91 160.00 10 2.50 1375.00 1375.00 0.80 30 0.66 0.53 550 290.40 290.40 1665.40
Total 4 2675.86
20
Min Bdr.
Bhujel 1+730 Bakaino
Archal
bot-93 80.00 7 0.52 286.00 858.00 0.14 30 0.66 0.09 550 50.82 152.46 1010.46
Total 3 1010.46
21
Man Bdr.
Khadka 1+750 Bakaino
Archal
bot-82 50.00 5 0.39 214.50 429.00 0.04 30 0.66 0.03 550 14.18 28.36 457.36
Total 2 457.36
22
Nawraj
Adhikari 1+760 Bakaino
Archal
bot-72 80.00 7 0.52 286.00 572.00 0.14 30 0.66 0.09 550 50.82 101.64 673.64
Sub-
Total2
673.64
23
Kamal
Bdr.Rimal 1+765 Bakaino
Archal
bot-71 50.00 5 0.39 214.50 214.50 0.04 30 0.66 0.03 550 14.18 14.18 228.68
Sub-
Total1
228.68
From
Cost calculation of Private Trees: Belghari-Archalbot-Lamabagar-Serabazar-Letaure-Pachok Road, Lamjung
S.N
Owner
Name Ch.
Species
Addres
s
No
Girth
(cm)
Height
(m)
Man
days
Tranport
Cost/nos
Transportat
ion Cost
(NRs.)
Total Cost
(NRs.)
Harvesting
Cost (NRs.)
Total
Harvesting
Cost (NRs.)
Vol
ume
Dista
nce
(m)
MDs/cu
m
MDs/
Tree
District
Rate
24
Sita Devi
kunwar 1+770 Badar
Archal
bot-71 50.00 5 0.39 214.50 214.50 0.04 30 0.66 0.03 550 14.18 14.18 228.68
Sub-
Total1
228.68
25
Hari Bdr.
Khadka 1+780 Bakaino
Archal
bot-72 50.00 5 0.39 214.50 429.00 0.04 30 0.66 0.03 550 14.18 28.36 457.36
Sub-
Total2
457.36
26
Ram Bdr.
Gharti
Bhujel 2+790 Bakaino
Archal
bot-7
11 50.00 5 0.39 214.50 2359.50 0.04 30 0.66 0.03 550 14.18 155.98 2515.48
Sub-
Total11
2515.48
27
Som Maya
Bhujel 2+800 Bakaino
Archal
bot-75 50.00 5 0.39 214.50 1072.50 0.04 30 0.66 0.03 550 14.18 70.90 1143.40
Sub-
Total5
1143.40
28
Hari Bdr.
Kunwar 2+830 Khadayo
Archal
bot-65 50.00 5 0.39 214.50 1072.50 0.04 30 0.66 0.03 550 14.18 70.90 1143.40
Bamboo
Archal
bot-625 30.00 15 0.13 71.50 1787.50 0.04 30 0.66 0.03 550 15.31 382.85 2170.35
Sub-
Total30 3314
29
Karna Bdr
Adhikari 2+780 Bamboo
Archal
bot-750 30.00 15 0.13 71.50 3575.00 0.04 30 0.66 0.03 550 15.31 765.70 4340.70
Sub-
Total50 4341
From
Cost calculation of Private Trees: Belghari-Archalbot-Lamabagar-Serabazar-Letaure-Pachok Road, Lamjung
S.N
Owner
Name Ch.
Species
Addres
s
No
Girth
(cm)
Height
(m)
Man
days
Tranport
Cost/nos
Transportat
ion Cost
(NRs.)
Total Cost
(NRs.)
Harvesting
Cost (NRs.)
Total
Harvesting
Cost (NRs.)
Vol
ume
Dista
nce
(m)
MDs/cu
m
MDs/
Tree
District
Rate
30
Gyan Bdr.
Kunwar 2+810 Bamboo
Archal
bot-740 30.00 15 0.13 71.50 2860.00 0.04 30 0.66 0.03 550 15.31 612.56 3472.56
Sub-
Total40 3473
31
Laxmi
Kunwar 2+910 Bamboo
Archal
bot-760 30.00 15 0.13 71.50 4290.00 0.04 30 0.66 0.03 550 15.31 918.84 5208.84
Sub-
Total60 5209
32
Gyan Raj
Gurung Khadayo
Shree
Bhanjy
ang-2
2 50.00 5 0.39 214.50 429.00 0.04 30 0.66 0.03 550 14.18 28.36 457.36
Sub-
Total2
457.36
33
Aaita
Bdr.Nepali 3+850 Khadayo
Shree
Bhanjy
ang-2
4 50.00 5 0.39 214.50 858.00 0.04 30 0.66 0.03 550 14.18 56.72 914.72
Bamboo
Shree
Bhanjy
ang-2
20 30.00 15 0.13 71.50 1430.00 0.04 30 0.66 0.03 550 15.31 306.28 1736.28
Bakaino
Shree
Bhanjy
ang-2
4 50.00 5 0.39 214.50 858.00 0.04 30 0.66 0.03 550 14.18 56.72 914.72
Sub-
Total28 3565.72
34
Samser bdr
Nepali 3+860 Bamboo
Shree
Bhanjy
ang-2
60 30.00 15 0.13 71.50 4290.00 0.04 30 0.66 0.03 550 15.31 918.84 5208.84
Badar
Shree
Bhanjy
ang-3
1 50.00 5 0.39 214.50 214.50 0.04 30 0.66 0.03 550 14.18 14.18 228.68
From
Cost calculation of Private Trees: Belghari-Archalbot-Lamabagar-Serabazar-Letaure-Pachok Road, Lamjung
S.N
Owner
Name Ch.
Species
Addres
s
No
Girth
(cm)
Height
(m)
Man
days
Tranport
Cost/nos
Transportat
ion Cost
(NRs.)
Total Cost
(NRs.)
Harvesting
Cost (NRs.)
Total
Harvesting
Cost (NRs.)
Vol
ume
Dista
nce
(m)
MDs/cu
m
MDs/
Tree
District
Rate
Sub-
Total61 5438
35
Aash
Bdr.Nepali Khadayo
Shree
Bhanjy
ang-2
2 50.00 5 0.39 214.50 429.00 0.04 30 0.66 0.03 550 14.18 28.36 457.36
Sub-
Total2
457.36
36
Ram
Bdr.Nepali Badar
Shree
Bhanjy
ang-2
7 50.00 5 0.39 214.50 1501.50 0.04 30 0.66 0.03 550 14.18 99.26 1600.76
Sub-
Total7
1600.76
37
Lal man
Gurung Khadayo
Shree
Bhanjy
ang-2
1 50.00 5 0.39 214.50 214.50 0.04 30 0.66 0.03 550 14.18 14.18 228.68
Bamboo
Shree
Bhanjy
ang-2
20 30.00 15 0.13 71.50 1430.00 0.04 30 0.66 0.03 550 15.31 306.28 1736.28
Sub-
Total21 1964.96
38
Jit jung
Gurung Dabdabe
Shree
Bhanjy
ang-2
2 50.00 5 0.39 214.50 429.00 0.04 30 0.66 0.03 550 14.18 28.36 457.36
Pipal
Shree
Bhanjy
ang-2
1 200.00 12 4.00 2200.00 2200.00 1.50 30 0.66 0.99 550 544.50 544.50 2744.50
Sub-
Total3 3201.86
From
Cost calculation of Private Trees: Belghari-Archalbot-Lamabagar-Serabazar-Letaure-Pachok Road, Lamjung
S.N
Owner
Name Ch.
Species
Addres
s
No
Girth
(cm)
Height
(m)
Man
days
Tranport
Cost/nos
Transportat
ion Cost
(NRs.)
Total Cost
(NRs.)
Harvesting
Cost (NRs.)
Total
Harvesting
Cost (NRs.)
Vol
ume
Dista
nce
(m)
MDs/cu
m
MDs/
Tree
District
Rate
39
Aash Bdr.
Bhujel Khadayo
Shree
Bhanjy
ang-2
1 50.00 5 0.39 214.50 214.50 0.04 30 0.66 0.03 550 14.18 14.18 228.68
Sub-
Total1
228.68
40
Sati
Gurung 4+200 Aaijel
Shree
Bhanjy
ang-2
1 50.00 5 0.39 214.50 214.50 0.04 30 0.66 0.03 550 14.18 14.18 228.68
Sub-
Total1
228.68
41
Raj kumar
Gurung 4+300 Bakaino
Shree
Bhanjy
ang-2
6 50.00 5 0.39 214.50 1287.00 0.04 30 0.66 0.03 550 14.18 85.08 1372.08
Sub-
Total6
1372.08
42
Mam Maya
Shrestha Siris
Shree
Bhanjy
ang-2
3 50.00 5 0.39 214.50 643.50 0.04 30 0.66 0.03 550 14.18 42.54 686.04
Sub-
Total3
686.04
43
Hira lal
Shrestha Siris
Shree
Bhanjy
ang-4
3 50.00 5 0.39 214.50 643.50 0.04 30 0.66 0.03 550 14.18 42.54 686.04
Sub-
Total3
686.04
44
Bhuwan
Sing
Gurung 5+300 Bakaino
Shree
Bhanjy
ang-4
1 50.00 5 0.39 214.50 214.50 0.04 30 0.66 0.03 550 14.18 14.18 228.68
From
Cost calculation of Private Trees: Belghari-Archalbot-Lamabagar-Serabazar-Letaure-Pachok Road, Lamjung
S.N
Owner
Name Ch.
Species
Addres
s
No
Girth
(cm)
Height
(m)
Man
days
Tranport
Cost/nos
Transportat
ion Cost
(NRs.)
Total Cost
(NRs.)
Harvesting
Cost (NRs.)
Total
Harvesting
Cost (NRs.)
Vol
ume
Dista
nce
(m)
MDs/cu
m
MDs/
Tree
District
Rate
Sub-
Total1
228.68
45
Aait Sing
Gurung 5+300 Khadayo
Shree
Bhanjy
ang-4
1 50.00 5 0.39 214.50 214.50 0.04 30 0.66 0.03 550 14.18 14.18 228.68
Sub-
Total1
228.68
46
Bishnu
Ghimire 5+660 Bakaino
Shree
Bhanjy
ang-8
4 50.00 5 0.39 214.50 858.00 0.04 30 0.66 0.03 550 14.18 56.72 914.72
Bamboo
Shree
Bhanjy
ang-2
30 30.00 15 0.13 71.50 2145.00 0.04 30 0.66 0.03 550 15.31 459.42 2604.42
Sub-
Total34 3519.14
47
Bishow
Bdr.
Gurung 5+670 Bakaino
Shree
Bhanjy
ang-8
4 50.00 5 0.39 214.50 858.00 0.04 30 0.66 0.03 550 14.18 56.72 914.72
Bakaino
Shree
Bhanjy
ang-8
1 80.00 7 0.52 286.00 286.00 0.14 30 0.66 0.09 550 50.82 50.82 336.82
Bakaino
Shree
Bhanjy
ang-8
1 50.00 5 0.39 214.50 214.50 0.04 30 0.66 0.03 550 14.18 14.18 228.68
Sub-
Total6 1480.22
48
Yagya nath
Ghimire 5+680 Khadayo
Shree
Bhanjy
ang-8
9 50.00 5 0.39 214.50 1930.50 0.04 30 0.66 0.03 550 14.18 127.62 2058.12
From
Cost calculation of Private Trees: Belghari-Archalbot-Lamabagar-Serabazar-Letaure-Pachok Road, Lamjung
S.N
Owner
Name Ch.
Species
Addres
s
No
Girth
(cm)
Height
(m)
Man
days
Tranport
Cost/nos
Transportat
ion Cost
(NRs.)
Total Cost
(NRs.)
Harvesting
Cost (NRs.)
Total
Harvesting
Cost (NRs.)
Vol
ume
Dista
nce
(m)
MDs/cu
m
MDs/
Tree
District
Rate
Khadayo
Shree
Bhanjy
ang-8
5 80.00 7 0.52 286.00 1430.00 0.14 30 0.66 0.09 550 50.82 254.10 1684.10
Bamboo
Shree
Bhanjy
ang-8
25 30.00 15 0.13 71.50 1787.50 0.04 30 0.66 0.03 550 15.31 382.85 2170.35
Shree
Bhanjy
ang-8
3 160.00 10 2.50 1375.00 4125.00 0.80 30 0.66 0.53 550 290.40 871.20 4996.20
Sub-
Total42 10908.77
49
Dhan Bdr.
Shrestha 5+860 Badar
Shree
Bhanjy
ang-8
9 50.00 5 0.39 214.50 1930.50 0.04 30 0.66 0.03 550 14.18 127.62 2058.12
Sub-
Total9
2058.12
50
Bishnu
Kumar
Shrestha 6+010 Bakaino
Shree
Bhanjy
ang-8
5 50.00 5 0.39 214.50 1072.50 0.04 30 0.66 0.03 550 14.18 70.90 1143.40
Shree
Bhanjy
ang-8
7 80.00 7 0.52 286.00 2002.00 0.14 30 0.66 0.09 550 50.82 355.74 2357.74
Sub-
Total12 3501.14
51 Laxmi B.K 5+900 Chilaune
Shree
Bhanjy
ang-4
5 50.00 5 0.39 214.50 1072.50 0.04 30 0.66 0.03 550 14.18 70.90 1143.40
Sub-
Total5
1143.40
From
Cost calculation of Private Trees: Belghari-Archalbot-Lamabagar-Serabazar-Letaure-Pachok Road, Lamjung
S.N
Owner
Name Ch.
Species
Addres
s
No
Girth
(cm)
Height
(m)
Man
days
Tranport
Cost/nos
Transportat
ion Cost
(NRs.)
Total Cost
(NRs.)
Harvesting
Cost (NRs.)
Total
Harvesting
Cost (NRs.)
Vol
ume
Dista
nce
(m)
MDs/cu
m
MDs/
Tree
District
Rate
52
Lalmati
Gurung 6+220 Siris
Shree
Bhanjy
ang-8
1 50.00 5 0.39 214.50 214.50 0.04 30 0.66 0.03 550 14.18 14.18 228.68
Sub-
Total1
228.68
53
Krishna
Hari Wagle 6+220 Siris
Shree
Bhanjy
ang-8
4 50.00 5 0.39 214.50 858.00 0.04 30 0.66 0.03 550 14.18 56.72 914.72
Sub-
Total4
914.72
54
Chetnath
Wagle 6+645 Badar
Nautha
r-23 50.00 5 0.39 214.50 643.50 0.04 30 0.66 0.03 550 14.18 42.54 686.04
Sub-
Total3
686.04
55
Ram Bdr.
Gurung Siris
Nautha
r-21 80.00 7 0.52 286.00 286.00 0.14 30 0.66 0.09 550 50.82 50.82 336.82
Sub-
Total1
336.82
56
Nalu Maya
Gurung Bakaino
Nautha
r-21 50.00 5 0.39 214.50 214.50 0.04 30 0.66 0.03 550 14.18 14.18 228.68
Sub-
Total1
228.68
57
Kopila
Wagle 6+800 Khadayo
Shree
Bhanjy
ang-8
1 80.00 7 0.52 286.00 286.00 0.14 30 0.66 0.09 550 50.82 50.82 336.82
Sub-
Total1
336.82
From
Cost calculation of Private Trees: Belghari-Archalbot-Lamabagar-Serabazar-Letaure-Pachok Road, Lamjung
S.N
Owner
Name Ch.
Species
Addres
s
No
Girth
(cm)
Height
(m)
Man
days
Tranport
Cost/nos
Transportat
ion Cost
(NRs.)
Total Cost
(NRs.)
Harvesting
Cost (NRs.)
Total
Harvesting
Cost (NRs.)
Vol
ume
Dista
nce
(m)
MDs/cu
m
MDs/
Tree
District
Rate
58
Maya
Gururng Bakaino
Shree
Bhanjy
ang-8
2 50.00 5 0.39 214.50 429.00 0.04 30 0.66 0.03 550 14.18 28.36 457.36
Bakaino
Shree
Bhanjy
ang-8
1 80.00 7 0.52 286.00 286.00 0.14 30 0.66 0.09 550 50.82 50.82 336.82
Sub-
Total3 794.18
59
Nirmal
Ghimire Siris
Nautha
r-23 50.00 5 0.39 214.50 643.50 0.04 30 0.66 0.03 550 14.18 42.54 686.04
Siris 1 80.00 7 0.52 286.00 286.00 0.14 30 0.66 0.09 550 50.82 50.82 336.82
Sub-
Total4 1022.86
60
Bhagwati
Devi
Ghimire Badar
Nautha
r-5
3 50.00 5 0.39 214.50 643.50 0.04 30 0.66 0.03 550 14.18 42.54 686.04
Badar
Nautha
r-51 160.00 10 2.50 1375.00 1375.00 0.80 30 0.66 0.53 550 290.40 290.40 1665.40
Sub-
Total4 2351.44
61
Got Bdr.
Gurung Siris
Nautha
r-52 50.00 5 0.39 214.50 429.00 0.04 30 0.66 0.03 550 14.18 28.36 457.36
Siris
Nautha
r-51 80.00 7 0.52 286.00 286.00 0.14 30 0.66 0.09 550 50.82 50.82 336.82
Sub-
Total3 794.18
62
Kam Sing
Gurung Khadayo
Nautha
r-52 50.00 5 0.39 214.50 429.00 0.04 30 0.66 0.03 550 14.18 28.36 457.36
From
Cost calculation of Private Trees: Belghari-Archalbot-Lamabagar-Serabazar-Letaure-Pachok Road, Lamjung
S.N
Owner
Name Ch.
Species
Addres
s
No
Girth
(cm)
Height
(m)
Man
days
Tranport
Cost/nos
Transportat
ion Cost
(NRs.)
Total Cost
(NRs.)
Harvesting
Cost (NRs.)
Total
Harvesting
Cost (NRs.)
Vol
ume
Dista
nce
(m)
MDs/cu
m
MDs/
Tree
District
Rate
Sub-
Total2
457.36
63
Kamal
Gurung Siris
Nautha
r-51 80.00 7 0.52 286.00 286.00 0.14 30 0.66 0.09 550 50.82 50.82 336.82
Bamboo
Nautha
r-510 30.00 15 0.13 71.50 715.00 0.04 30 0.66 0.03 550 15.31 153.14 868.14
Sub-
Total11 1204.96
64
Bamasyo
Gurungseni Siris
Nautha
r-5
1 220.00 12 4.00 2200.00 2200.00 1.82 30 0.66 1.20 550 658.85 658.85 2858.85
Bamboo
Nautha
r-510 30.00 15 0.13 71.50 715.00 0.04 30 0.66 0.03 550 15.31 153.14 868.14
Sub-
Total11 3726.99
65
Datta
maya
Gurung Khadayo
Nautha
r-5
2 50.00 5 0.39 214.50 429.00 0.04 30 0.66 0.03 550 14.18 28.36 457.36
Sub-
Total2
457.36
66
Tara Devi
Ghimire Bakaino
Nautha
r-52 80.00 7 0.52 286.00 572.00 0.14 30 0.66 0.09 550 50.82 101.64 673.64
Sub-
Total2
673.64
67
Sita Ram
Gurung Khadayo
Nautha
r-52 50.00 5 0.39 214.50 429.00 0.04 30 0.66 0.03 550 14.18 28.36 457.36
Sub-
Total2
457.36
From
Cost calculation of Private Trees: Belghari-Archalbot-Lamabagar-Serabazar-Letaure-Pachok Road, Lamjung
S.N
Owner
Name Ch.
Species
Addres
s
No
Girth
(cm)
Height
(m)
Man
days
Tranport
Cost/nos
Transportat
ion Cost
(NRs.)
Total Cost
(NRs.)
Harvesting
Cost (NRs.)
Total
Harvesting
Cost (NRs.)
Vol
ume
Dista
nce
(m)
MDs/cu
m
MDs/
Tree
District
Rate
68
Nara Dev
Gurung Bamboo
Nautha
r-510 30.00 15 0.13 71.50 715.00 0.04 30 0.66 0.03 550 15.31 153.14 868.14
Sub-
Total10
868.14
69
Bipin
Chandra
Ghimire 9+270 Siris
Nautha
r-8
1 50.00 5 0.39 214.50 214.50 0.04 30 0.66 0.03 550 14.18 14.18 228.68
Sub-
Total1
228.68
70
Bhu Maya
Ghale 9+270 Siris
Nautha
r-82 50.00 5 0.39 214.50 429.00 0.04 30 0.66 0.03 550 14.18 28.36 457.36
Sub-
Total2
457.36
71
Purna Bdr.
Gurung Khadayo
Nautha
r-81 50.00 5 0.39 214.50 214.50 0.04 30 0.66 0.03 550 14.18 14.18 228.68
Bamboo
Nautha
r-825 30.00 15 0.13 71.50 1787.50 0.04 30 0.66 0.03 550 15.31 382.85 2170.35
Sub-
Total26 2399.03
72
Surwa Sing
Gurung 9+290 Khadayo
Nautha
r-8
1 50.00 5 0.39 214.50 214.50 0.04 30 0.66 0.03 550 14.18 14.18 228.68
Sub-
Total1
228.68
73
Durga Sing
Gurung Khadayo
Nautha
r-83 50.00 5 0.39 214.50 643.50 0.04 30 0.66 0.03 550 14.18 42.54 686.04
Sub-
Total3
686.04
From
Cost calculation of Private Trees: Belghari-Archalbot-Lamabagar-Serabazar-Letaure-Pachok Road, Lamjung
S.N
Owner
Name Ch.
Species
Addres
s
No
Girth
(cm)
Height
(m)
Man
days
Tranport
Cost/nos
Transportat
ion Cost
(NRs.)
Total Cost
(NRs.)
Harvesting
Cost (NRs.)
Total
Harvesting
Cost (NRs.)
Vol
ume
Dista
nce
(m)
MDs/cu
m
MDs/
Tree
District
Rate
74
Kam Sing
Gurung Siris
Nautha
r-82 50.00 5 0.39 214.50 429.00 0.04 30 0.66 0.03 550 14.18 28.36 457.36
Sub-
Total2
457.36
75
Nepu
Gurung Siris
Pachok-
15 50.00 5 0.39 214.50 1072.50 0.04 30 0.66 0.03 550 14.18 70.90 1143.40
Sub-
Total5
1143.40
76
Sita
Gurung Khadayo
Pachok-
11 50.00 5 0.39 214.50 214.50 0.04 30 0.66 0.03 550 14.18 14.18 228.68
Khadayo
Pachok-
11 80.00 7 0.52 286.00 286.00 0.14 30 0.66 0.09 550 50.82 50.82 336.82
Sub-
Total2 565.50
77
Pothe
Gurung Khadayo
Pachok-
13 50.00 5 0.39 214.50 643.50 0.04 30 0.66 0.03 550 14.18 42.54 686.04
Sub-
Total3
686.04
78
Harka Bdr.
Gurung siris
Pachok-
13 50.00 5 0.39 214.50 643.50 0.04 30 0.66 0.03 550 14.18 42.54 686.04
Siris
Pachok-
11 80.00 7 0.52 286.00 286.00 0.14 30 0.66 0.09 550 50.82 50.82 336.82
Sub-
Total4 1022.86
79
Jug Subba
Gurung Chilaune
Pachok-
19 50.00 5 0.39 214.50 1930.50 0.04 30 0.66 0.03 550 14.18 127.62 2058.12
Chilaune
Pachok-
11 80.00 7 0.52 286.00 286.00 0.14 30 0.66 0.09 550 50.82 50.82 336.82
From
Cost calculation of Private Trees: Belghari-Archalbot-Lamabagar-Serabazar-Letaure-Pachok Road, Lamjung
S.N
Owner
Name Ch.
Species
Addres
s
No
Girth
(cm)
Height
(m)
Man
days
Tranport
Cost/nos
Transportat
ion Cost
(NRs.)
Total Cost
(NRs.)
Harvesting
Cost (NRs.)
Total
Harvesting
Cost (NRs.)
Vol
ume
Dista
nce
(m)
MDs/cu
m
MDs/
Tree
District
Rate
Sub-
Total10 2394.94
80
Aashpati
Gurung Chilaune
Pachok-
13 50.00 5 0.39 214.50 643.50 0.04 30 0.66 0.03 550 14.18 42.54 686.04
Siris
Pachok-
11 80.00 7 0.52 286.00 286.00 0.14 30 0.66 0.09 550 50.82 50.82 336.82
Sub-
Total4 1022.86
81
Mir sing
Gurung Chilaune
Pachok-
11 80.00 7 0.52 286.00 286.00 0.14 30 0.66 0.09 550 50.82 50.82 336.82
Sub-
Total1
336.82
82
Buddhi
Maya
Gurung Siris
Pachok-
1
3 80.00 7 0.52 286.00 858.00 0.14 30 0.66 0.09 550 50.82 152.46 1010.46
Sub-
Total3
1010.46
83
Som Raj
Gurung Bakaino
Pachok-
13 50.00 5 0.39 214.50 643.50 0.04 30 0.66 0.03 550 14.18 42.54 686.04
Bakaino
Pachok-
11 80.00 7 0.52 286.00 286.00 0.14 30 0.66 0.09 550 50.82 50.82 336.82
Sub-
Total4 1022.86
84
Mimmwa
Gurung Khadayo
Pachok-
11 80.00 7 0.52 286.00 286.00 0.14 30 0.66 0.09 550 50.82 50.82 336.82
Sub-
Total1
336.82
From
Cost calculation of Private Trees: Belghari-Archalbot-Lamabagar-Serabazar-Letaure-Pachok Road, Lamjung
S.N
Owner
Name Ch.
Species
Addres
s
No
Girth
(cm)
Height
(m)
Man
days
Tranport
Cost/nos
Transportat
ion Cost
(NRs.)
Total Cost
(NRs.)
Harvesting
Cost (NRs.)
Total
Harvesting
Cost (NRs.)
Vol
ume
Dista
nce
(m)
MDs/cu
m
MDs/
Tree
District
Rate
85
Man Raj
Gurung Chilaune
Pachok-
14 50.00 5 0.39 214.50 858.00 0.04 30 0.66 0.03 550 14.18 56.72 914.72
Sub-
Total4
914.72
86
Karna
Bahadur
Gurung Chilaune
Pachok-
1
4 50.00 5 0.39 214.50 858.00 0.04 30 0.66 0.03 550 14.18 56.72 914.72
Sub-
Total4
914.72
87
Maikhu
Gurung Badar
Pachok-
22 50.00 5 0.39 214.50 429.00 0.04 30 0.66 0.03 550 14.18 28.36 457.36
Sub-
Total2
457.36
88
Gausari
Gurung Chilaune
Pachok-
32 50.00 5 0.39 214.50 429.00 0.04 30 0.66 0.03 550 14.18 28.36 457.36
Sub-
Total2
457.36
853 161684Grand Total
Cost Calculation of Private Fruit Trees: Belghari-Archalbot-Lamabagar-Serabazar-Letaure-Pachok Road, Lamjung
S.N Owners Name Address Chainage Species No Rate/ Tree Total Cost (NRs.) Remarks
1Rishi Ram Shrestha
Archalbot-90+560 Mango 1 3000 3000
Banana 7 1000 7000
Mango 2 3000 6000
3 Aaiti maya Pariyar Archalbot-90+745 Banana 15 1000 15000
4 Santa Bdr Pariyar Archalbot-9Papaya 1 1500 1500
5Maya Devi Thapa
Archalbot-90+940 Banana 4 1000 4000
Archalbot-9 1+065 Banana 3 1000 3000
Pear 1 1000 1000
Archalbot-9 1+550 Banana 10 1000 10000
Lemon 2 1000 2000
8 Kalika Lamichhane Archalbot-9 1+550 Banana 81000 8000
9 Padam Lal Paudel Archalbot-9 1+750 Gauva 4 700 2800
Gauva 2 700 1400
10 Bal Ram Adhikari Archalbot-9 1+900 Banana 9 1000 9000
11 Tula Kumari Khanal Archalbot-8 2+200 Banana 8 1000 8000
Gauva 13 700 9100
12 Rama kunwar khadka Archalbot-7 2+300 Banana 14 1000 14000
13 Tola Maya lamichhane Archalbot-7 2+500 Mango 1 3000 3000
14 San nani suyal Thapa Archalbot-7 Banana 10 100 1000
15 Nabraj Adhikari Archalbot-7 Banana 8 1000 8000
16 Man Bdr. Khadka Archalbot-8 2+500 Banana 4 1000 4000
17 Sita Devi Kunwar Archalbot-7 Banana 5 1000 5000
Archalbot-7 2+650 Banana 15 1000 15000
18 Rajan Gurug Archalbot-7 2+600 Banana 5 1000 5000
Gauva 2 700 1400
19 Ganga Devi Kunwar Archalbot-7 Banana 30 1000 30000
20 Ram Bdr. Bhujel Archalbot-6 Banana 5 1000 5000
21 Hari Bdr.Kunwar Archalbot-6 Banana 13 1000 13000
22 Som maya Bhujel Archalbot-6 Banana 6 1000 6000
23 Ram Bdr. Bhujel Archalbot-6 2+800 Mango 1 3000 3000
24 Gyan Raj Gurung Shree Bhanjyanj-2 3+000 Banana 5 10005000
25 Samsher Bdr. Sarki Shree Bhanjyanj-2 Banana 30 100030000
26 Jit jung Gurung Shree Bhanjyanj-2 3+090 Banana 6 10006000
27 Raj Kumar Gurung Shree Bhanjyanj-2 3+690 Banana 6 10006000
Pear 2 1000 2000
Gauva 3 700 2100
28 Bal Krishna Ghimire Shree Bhanjyanj-4 5+300 Gauva 1 700700
29 Aaita Sing Gurung Shree Bhanjyanj-4 5+300 Banana 1 10001000
2 Amrit Bdr. Thapa Archalbot-9
6 Sushila Pariyar
7 Bishnu lal Shrestha
Cost Calculation of Private Fruit Trees: Belghari-Archalbot-Lamabagar-Serabazar-Letaure-Pachok Road, Lamjung
S.N Owners Name Address Chainage Species No Rate/ Tree Total Cost (NRs.) Remarks
30 Laxmi B.K Shree Bhanjyanj-4 Mango 1 10001000
Papaya 1 1000 1000
Aaru 1 1000 1000
31 Nalu Maya Gurung Nauthar-2 Banana 15 1000 15000
32 Kamasoye Gurung Nauthar-5 Banana 5 1000 5000
33 Santa Bdr. Gurung Nauthar-8 Banana 4 1000 4000
34 Kale Gurung Nauthar-8 Banana 110 1000 110000
35 Durga Gurung Nauthar-8 Banana 2 1000 2000
36 Gaini Gurung Nauthar-8 Banana 10 1000 10000
37 Sarv Sing Gurung Nauthar-8 9+290 Banana 13 1000 13000
Nauthar-8 Banana 13 1000 13000
38 Durga Sing Gurung Nauthar-8 Banana 2 1000 2000
39 Gaini Gurung Nauthar-8 Banana 10 1000 10000
40 Karna Bdr.Gurung Pachok-1 Banana 6 1000 6000
41 Maikhu Gurung Pachok-2 Banana 2 1000 2000
42 Buddhe Gurung Pachok-2 Banana 10 1000 10000
468 462000Total Amount
0+200 Chilaune 1 80 7 0.52 286.00 286.00 0.14 30 0.66 0.09 550 50.82 50.82 336.82
Chilaune 1 150 10 2.5 1,375.00 1,375.00 0.70 30 0.66 0.46 550 255.23 255.23 1630.23
0+210 Chilaune 1 80 7 0.52 286.00 286.00 0.14 30 0.66 0.09 550 50.82 50.82 336.82
Chilaune 1 150 10 2.5 1,375.00 1,375.00 0.70 30 0.66 0.46 550 255.23 255.23 1630.23
0+220 Chilaune 2 40 5 0.39 214.50 429.00 0.03 30 0.66 0.02 550 9.08 18.15 447.15
Chilaune 4 80 7 0.52 286.00 1,144.00 0.14 30 0.66 0.09 550 50.82 203.28 1347.28
Chilaune 1 200 12 4 2,200.00 2,200.00 1.50 30 0.66 0.99 550 544.50 544.50 2744.50
0+250 Chilaune 1 80 7 0.52 286.00 286.00 0.14 30 0.66 0.09 550 50.82 50.82 336.82
Chilaune 1 150 10 2.5 1,375.00 1,375.00 0.70 30 0.66 0.46 550 255.23 255.23 1630.23
0+255 Chilaune 1 40 5 0.39 214.50 214.50 0.03 30 0.66 0.02 550 9.08 9.08 223.58
Chilaune 2 85 7 0.52 286.00 572.00 0.16 30 0.66 0.10 550 57.37 114.74 686.74
0+260 Bakaino 2 70 7 0.52 286.00 572.00 0.11 30 0.66 0.07 550 38.91 77.82 649.82
Bakaino 1 50 5 0.39 214.50 214.50 0.04 30 0.66 0.03 550 14.18 14.18 228.68
Bakaino 1 160 10 2.5 1,375.00 1,375.00 0.80 30 0.66 0.53 550 290.40 290.40 1665.40
0+280 Bakaino 1 80 7 0.52 286.00 286.00 0.14 30 0.66 0.09 550 50.82 50.82 336.82
Chilaune 1 150 10 2.5 1,375.00 1,375.00 0.70 30 0.66 0.46 550 255.23 255.23 1630.23
0+290 Chilaune 2 50 5 0.39 214.50 429.00 0.04 30 0.66 0.03 550 14.18 28.36 457.36
0+300 Chilaune 3 50 5 0.39 214.50 643.50 0.04 30 0.66 0.03 550 14.18 42.54 686.04
0+320 Chilaune 4 50 5 0.39 214.50 858.00 0.04 30 0.66 0.03 550 14.18 56.72 914.72
Chilaune 9 80 7 0.52 286.00 2,574.00 0.14 30 0.66 0.09 550 50.82 457.38 3031.38
0+340 Badar 5 80 7 0.52 286.00 1,430.00 0.14 30 0.66 0.09 550 50.82 254.10 1684.10
0+350 Chilaune 6 80 7 0.52 286.00 1,716.00 0.14 30 0.66 0.09 550 50.82 304.92 2020.92
0+360 Chilaune 3 50 5 0.39 214.50 643.50 0.04 30 0.66 0.03 550 14.18 42.54 686.04
Chilaune 8 80 7 0.52 286.00 2,288.00 0.14 30 0.66 0.09 550 50.82 406.56 2694.56
Chilaune 1 160 10 2.5 1,375.00 1,375.00 0.80 30 0.66 0.53 550 290.40 290.40 1665.40
0+370 Chilaune 9 50 5 0.39 214.50 1,930.50 0.04 30 0.66 0.03 550 14.18 127.62 2058.12
0+400 Chilaune 1 50 5 0.39 214.50 214.50 0.04 30 0.66 0.03 550 14.18 14.18 228.68
0+520 Chilaune 4 50 5 0.39 214.50 858.00 0.04 30 0.66 0.03 550 14.18 56.72 914.72
Chilaune 1 70 7 0.52 286.00 286.00 0.11 30 0.66 0.07 550 38.91 38.91 324.91
0+570 Badar 4 80 7 0.52 286.00 1,144.00 0.14 30 0.66 0.09 550 50.82 203.28 1347.28
1+200 Badar 5 50 5 0.39 214.50 1,072.50 0.04 30 0.66 0.03 550 14.18 70.90 1143.40
Badar 6 70 7 0.52 286.00 1,716.00 0.11 30 0.66 0.07 550 38.91 233.45 1949.45
Badar 3 140 10 2.5 1,375.00 4,125.00 0.61 30 0.66 0.40 550 222.34 667.01 4792.01
1+450 Badar 10 80 7 0.52 286.00 2,860.00 0.14 30 0.66 0.09 550 50.82 508.20 3368.20
VolumeDistance
(m)MDs/cum
MDs/
TreeChainage Species No
Girth
(cm)
Height
(m)
Man
days
Harvesting
Cost
Total
Harvesting
Cost Calculation of Raniswara Shakhar Pakhar CFUG Belghari-Archalbot-Lamabagar-Serabazar-Letaure-Pachok Road, LamjungTransportation
Cost
Total Cost
(NRs.)
District
Rate
Tranport
Cost/nos
VolumeDistance
(m)MDs/cum
MDs/
TreeChainage Species No
Girth
(cm)
Height
(m)
Man
days
Harvesting
Cost
Total
Harvesting
Transportation
Cost
Total Cost
(NRs.)
District
Rate
Tranport
Cost/nos
Badar 9 160 10 2.5 1,375.00 12,375.00 0.80 30 0.66 0.53 550 290.40 2613.60 14988.60
1+500 Badar 8 50 5 0.39 214.50 1,716.00 0.04 30 0.66 0.03 550 14.18 113.44 1829.44
123 62646.69Total
3+890 Chilaune 1 80 7 0.52 286.00 286.00 0.14 30 0.66 0.09 550 50.82 50.82 336.82
Chilaune 1 160 10 2.50 1,375.00 1,375.00 0.80 30 0.66 0.53 550 290.40 290.40 1,665.40
3+900 Chilaune 1 80 7 0.52 286.00 286.00 0.14 30 0.66 0.09 550 50.82 50.82 336.82
3 62,646.69 Total
Volume Distance (m) MDs/cumMDs/
Tree
Cost calculation of Kerabari CFUG: Belghari-Archalbot-Lamabagar-Serabazar-Letaure-Pachok Road, Lamjung
Chainage Species No Girth (cm)Height
(m)
Man
days
Harvesting
Cost
Total
Harvesting
Cost
Transportation
CostTotal Cost
District
Rate
Tranport
Cost/nos
6+800 Chilaune 8 50 5 0.39 214.50 1,716.00 0.04 30 0.66 0.03 550 14.18 113.44 1,829.44
Chilaune 9 80 7 0.52 286.00 2,574.00 0.14 30 0.66 0.09 550 50.82 457.38 3,031.38
Bakaino 4 160 10 2.5 1,375.00 5,500.00 0.80 30 0.66 0.53 550 290.40 1,161.60 6,661.60
6+820 Bakaino 2 80 7 0.52 286.00 572.00 0.14 30 0.66 0.09 550 50.82 101.64 673.64
Chilaune 5 160 10 2.5 1,375.00 6,875.00 0.80 30 0.66 0.53 550 290.40 1,452.00 8,327.00
6+830 Chilaune 3 80 7 0.52 286.00 858.00 0.14 30 0.66 0.09 550 50.82 152.46 1,010.46
6+840 Chilaune 4 50 5 0.39 214.50 858.00 0.04 30 0.66 0.03 550 14.18 56.72 914.72
Sisau 27 80 7 0.52 286.00 7,722.00 0.14 30 0.66 0.09 550 50.82 1,372.14 9,094.14
Sisau 4 160 10 2.5 1,375.00 5,500.00 0.80 30 0.66 0.53 550 290.40 1,161.60 6,661.60
6+860 Sisau 18 80 7 0.52 286.00 5,148.00 0.14 30 0.66 0.09 550 50.82 914.76 6,062.76
6+870 Sisau 3 50 5 0.39 214.50 643.50 0.04 30 0.66 0.03 550 14.18 42.54 686.04
Chilaune 4 80 7 0.52 286.00 1,144.00 0.14 30 0.66 0.09 550 50.82 203.28 1,347.28
Chilaune 7 160 10 2.5 1,375.00 9,625.00 0.80 30 0.66 0.53 550 290.40 2,032.80 11,657.80
6+880 Chilaune 6 50 5 0.39 214.50 1,287.00 0.04 30 0.66 0.03 550 14.18 85.08 1,372.08
Chilaune 2 160 10 2.5 1,375.00 2,750.00 0.80 30 0.66 0.53 550 290.40 580.80 3,330.80
6+890 Saal 1 50 5 0.39 214.50 214.50 0.04 30 0.66 0.03 550 14.18 14.18 228.68
Saal 4 80 7 0.52 286.00 1,144.00 0.14 30 0.66 0.09 550 50.82 203.28 1,347.28
Saal 6 160 10 2.5 1,375.00 8,250.00 0.80 30 0.66 0.53 550 290.40 1,742.40 9,992.40
6+900 Saal 3 50 5 0.39 214.50 643.50 0.04 30 0.66 0.03 550 14.18 42.54 686.04
Saal 2 80 7 0.52 286.00 572.00 0.14 30 0.66 0.09 550 50.82 101.64 673.64
6+920 Saal 1 50 5 0.39 214.50 214.50 0.04 30 0.66 0.03 550 14.18 14.18 228.68
6+950 Saal 4 50 5 0.39 214.50 858.00 0.04 30 0.66 0.03 550 14.18 56.72 914.72
127 76,732.17
Cost calculation of Sikhra CFUG: Belghari-Archalbot-Lamabagar-Serabazar-Letaure-Pachok Road, Lamjung
Total
Volume
Dista
nce
(m)
MDs/c
um
MDs/
Tree
Man
days
Harvesting
Cost
Total
Harvesting
Cost
Transportation
CostTotal Cost
Distri
ct
Rate
Tranport
Cost/nosChainage Species No Girth (cm)
Height
(m)
Cost calculation of Fruit Trees: Belghari-Archalbot-Lamabagar-Serabazar-Letaure-Pachok Road,Lamjung
S.N Owners Name Address
Chainag
e Species No Rate/ Tree Total Cost (NRs.) Remarks
Archalbot-9 1+250 Lapsi 10 2000 20000
Archalbot-9 1+450 Lapsi 10 2000 20000
20 40000Total Amount
1Ranishawara
Community
Page- 1
a]n3f/L—cRfn]af]6–nfdfju/–z]gf{ahf/–ln6"/]–kfRff]s ;8s v08 pkcfof]hgf -!@=%( ls=dL _, ndh'Ë = k'g{af; of]hgfs]f sfo{sf/L ;f/+z
!=o; k'g{jf; of]hgf -Resettlement Plan_ n] cfktsflng e'sDk ;xfotf of]hgf -EEAP_
cGtu{t ;+rflnt a]n3f/L—cRfn]af]6–nfdfju/–z]gf{ahf/–ln6"/]–kfRff]s ;8s v08 pk–cfof]hgfaf6 k|efljt 3/ w'/Lsf] ;fdflhs–cfly{s cj:yf, To; pk cfof]hgf jf6 x'g] Iflt tyf IfltnfO{ Go"lgs/0f ug}{ pkfox? ;fy} cfof]hgfaf6 k'Ug] kmfO{bf tyf d"ntM c:j]lR5s k'g{af; of]hgfsf] k|s[of tyf gLltnfO{ JofVof u/]sf]] 5 . of] k'gjf{; of]hgf g]kfn ;/sf/sf] d'nt hUuf k|flKt P]g @)#$ tyf k'glg{df{0f ;DaGwL P]g / To;sf] sfo{ljlw @)&@ nfO{ cfwf/ dfGb} Pl;ofnL lasfz a}+ssf] ;'/Iff gLlt @))( cg'?k agfO{Psf] 5 .
@=k"gjf{; of]hgfsf] k|d'v p2]Zo c:j]+lR5s k'gjf{;sf sf/0faf6 x'g] gsf/fTds c;/nfO{ Go"lgs/0f u/L k|efljt kl/jf/nfO{ Ifltk"lt{ tyf ljleGg tflndsf dfWodaf6 nfeflGjt
u/fpg' xf] . EEAP cGt/ut cfof]hgfsf] k"g{jf; gLlt tyf lgb]{lzsf -RF) n] Joj:yf
u/] cg';f/ c:j]+lR5s k"g{jf;sf] sf/0faf6 x'g] ;a} k|sf/sf] ;DktLsf] Ifltsf] nflu k|lt:yfkg d"No a/fj/sf] Ifltk"lt{ k|bfg ul/g]5 . c:j]+lR5s k"g{jf;nfO{ ;s];Dd lg?T;flxt u/L o; k"g{jf; of]hgfaf6 k|efljt JolQmutsf] hLjg:t/df ;'wf/ Nofpg] gLlt cg'?k o; k'g{jf; of]hgf tof/ ul/Psf] 5 .
#=k"g{jf; gLlt tyf lgb]{lzsf -RF_ sf l;4fGtnfO{ k"0f{tof kfng u/L cfjZos k/fdz{,
e]nf, 5nkmn uf=lj=;= 6f]n a}7s / 3/w'/L ;a]{If0fsf] tYof+ssf] cfwf/df k'g{jf; of]hgf tof/ ul/Psf] xf] . o; k"gjf{; of]hgfsf] k|efjsf/L sfof{Gjogsf] nflu lgb]{lzt gLlt adf]lhd rflxg] cfjZos ljleGg ;ldltx? u7g ul/g]5 . o; k'g{jf; of]hgfdf hf]lvddf /x]sf kl/jf/, dlxnf 3/d'nL /x]sf] kl/jf/, blnt hghflt kl/jf/x?nfO{ ljz]if Wofg k'¥ofOPsf] 5 . lkmN8 ;e]{sf] bf}/fg s'g} klg kl/jf/n] hUuf bfgsf] OR5f gb]vfPsf] x'Fbf hUufwgLx?nfO{ hUuf bfgsf] lgDtL hf]8 ul/Psf] 5}g . To;y{, ;8sdf rflxg] ;Dk'0f{ gofF hldgnfO{ d'cfAhfsf] lglDt cufl8 a8fOPsf] 5 .
$=of] ;8s pk–cfof]hgf klZrdf~rn ljsf; If]q cGtu{t u08sL c~rnsf] ndh'Ë =lhNnfdf kb{5 . o; cfof]hgf ndh'Ë lhNnfsf] a]n3f/Lsf] etf{ uf lj ; af6 z'? eO{ kfrf]s sf] kfrf]s uf lj ; df uO{ cGTo x'G5 . o; ;8s pkcfof]hgf a]n3f/Lsf] etf{ uf lj ; x'b} cRfn]af]6, >LemmHofË, gf}y/ clg kfrf]s x'Fb} hfG5 . ctM lhNnfsf] ;du| ljsf;df o; pkcfof]hgfsf] ljz]if dxTj /x]sf] 5 . a]n3f/L—cRfn]af]6–nfdfju/–z]gf{ahf/–ln6"/]–kfRff]s ;8s v08 cfof]hgfsf] s"n nDafO{ !@=%( ls=dL= /x]sf] 5 clg !) ld6/ ef]uclwsf/ If]q (RoW) tf]lsPsf] 5 .
%=o; pkcfo]fhgf ;a} df};ddf rNg], !) ld rf}8fO ePsf], ;]G6/nfOgaf6 % ld bfofF / afofF, sfnf] kq] ul/g]5 . lsQfgfkL gS;f ;j]{If0f cg';f/ o; pkcfof]hgfn]] hDdf !@=%(
Page- 2
x]S6/ hldg lng]5, h; cGt/ut $=#& x] klxNo} ;8sdf k/]sf] 5 / cGo %=$! x] gofF hldg lng' kg]{5 . o; pk–cfof]hgfn] JolQmut hldg afx]s ;fd"bflos jg pkef]Qmf, ;d"x, /fli6«o jgsf] pkef]Qmf ;d"x / e"–efu ;d]tsf] hUuf clws/0f ug'{ kg]{ b]lvG5 .
^=s'n @^& 3/w'/Ldf dWo] !$* 3/w'/L ;j]{If0fsf] ;do e]6 eP]sf]]n] lt 3/w'/Lx?sf] lj:t[t
;j]{If0fdf ljz]ifu/L k|efljt kl/jf/sf] cfly{s cj:yf, cfo Joo, s[lif hGo pTkfbgaf6 vfgk'Ug] dlxgf, of]hgf k"j{ tyf kZrft k|efljt kl/jf/sf] cfly{s cj:yfdf kg]{ k|efj, hflto jlu{s/0f tyf kx'Frsf] af/]df ljZn]if0f ul/Psf] 5 . ;j]{If0fsf] tYof+s cg';f/ !$* k|efljt 3/w'/L dWo] !! 3/w'/L blnt, ^# 3/w'/L hghftL , !) 3/w'/L g]jf/L tyf afFsL ^$ 3/w'/L a|Xdf0f÷If]qL÷7s'/L÷/x]sf 5g\ . !% 3/w'/Ln] s'n hldgsf] %Ü eGbf a9L hldg u'dfpg] tYof+saf6 b]lvG5 . slif k]zf b]zsf] cu| k]zf ePem} o; cfof]hgfsf cfwsf+z kl/jf/n] s[lif k]zf c+ufn]sf 5g\ tyfkL s[lif pTkfbgaf6 pgLx?nfO{ jif{ el/ vfgk'Ug] cj:yf g/x]sf] kfO{G5 . k|lt 3/w'/Lsf] cf}ift cfDbfgL ?= !@@@$&=(& /x]sf] / To;sf] s]jn @%=#&Ü dfq s[lif If]qsf] of]ubfg /x]sf] 5 . of]hgfsf] sfof{Gjog kZrft k|efljt 3/w'/LnfO{ kg]{ k|efjnfO{ x]bf{ s[lifdf x'g] cfodf cf}ift ?= $)!% sd x'g] tYof+saf6 b]lvG5 . ctM o; pk–cfof]hgfsf] afl;Gbfsf] d'Vo cfDbfgLsf] >f]t u}/ s[lif ePsf]n] ;Dk"0f{ k|efljt kl/jf/sf] u}/ s[lifIf]qsf] cfDbfgLdf s'g} c;/ gkg]{ b]lvG5 .
&=k|fljlws 6f]nLsf] lj:t[t k|fljlws cWoog -Detail Technical Design and
Survey_ kZrft lsQf gfkL gS;f -Cadastral Survey_ sf] cfwf/df tof/
ul/Psf] ;Dkltsf] Ifltsf] ljj/0f adf]lhd !@=%( ls=ld= ;8s v08af6 k|efljt 3/w'/Lsf] ;fdflhs tyf cfly{s cj:yfsf] hfgsf/Lsf] nflu 3/w'/L ;j]{If0f tyf k/fdz{ kZrft of] k'gjf{; of]hgf tof/ ul/Psf] xf] .
*=lsQf gfkL gS;f ;j]{If0f cg';f/ o; pk–cfof]hgfn] @^& 3/w'/Lsf] s"n $@% lsQfaf6 !@=%( x]S6/ JolQmut tyf gLlh hUuf clws/0f ug'{ kg]{ b]vfp5 . ;fy} s'n !@=%( x]S6/ dWo] (=&* x]S6/ dfq JolQmut tyf gLlh hUuf clws/0f ug'{ kg]{ x'Fbf k|efljt hldgsf] clwsf+z e"–efu ;/sf/L hldg jf ;d"bflos jg If]qaf6 ;8s /]vfª\g uPsf] b]lvG5 . t;y{ s"n JolQmut hUufsf] Iflt Go"g ePsf] xf] . JolQmut s'n *%# ?v lj?jf -gLlh_, # j6f ;fd"bflos agaf6 @%# j6f ?v lj?jf, @) j6f ;fd"bflos kmnkm'nsf] af]6, $^* kmnkm'nsf] af]6 x6fpg' kg]{ / !$# j6f JolQmut ;+/rgf tyf ( j6f ;fd"bflos ;+/rgf, s'n u/]/ !%@ j6f ;+/rgf x6fpg' kg]{ b]lvG5 . o; x6fpg' kg]{ ;+/rgfx?df -hDdf ^ j6f JolQmut 3/df, $ j6f e'sDkaf6 Iflt ePsf]]_, @ j6f lsrg, # j6f zf}rfno, $ j6f zf}rfno / afof]Uof;, @ j6f afof]Uof;, !! j6f uf]7 , % j6f s'v'/fsf] vf]/ k"g{:yfkgf ug'{kg]{ b]lvG5 . ;;fgf !!) j6f JolQmut ;+/rgfx? klg Iflt eP]sf]n] k"g{:yfkgf ug'{kg]{ b]lvG5 . ;fy} (j6f ;d"bflos ;+/rgfx? klg k"g{:yfkgf ug'{kg]{ b]lvG5 .
Page- 3
(=o; pk–cfof]hgfsf kl/jf/sf] cf}ift s"n hUuf )=() x]S6/ tyf cf}iftdf )=** x]S6/ hldg ;8ssf] sf/0fn] u'dfpg] tYof+sn] b]vfp5 . oxfFsf] kfl/jfl/s cj:yf slif tyf u}/ s[lif k]zfdf ;+Nug /x]sf 5g\ . tfyflk ;8ss]f sf/0f s[lifhGo cfodf Åf; cfpg]5 . k|lt 3/w'/Lsf] cf}ift s[lif cfDbfgL ?=!@@@$&=(& /x]sf] 5 h'g ;8sdf hldg u'dfP jfkt ? !!*@##=)$ df emg]{ b]lvG5 . o;/L ;8ssf sf/0f k|lt kl/jf/ cf}iftdf ?= $)!% aflif{s ?kdf u'd]sf] b]lvPtf klg of] Iflt ;fdfGo ?kdf dfGg ;lsG5 . lsgls oxfFsf kl/jf/x?sf] s[lifaf6 s]xL cfDbfgL ePtf klg pgLx? u}/ s[lif If]qdf klg cfl>t 5g\ . To:t} cf}ift cfkm\gf] pTkfbgaf6 *^ 3/w'/LnfO{ !) b]lv !@ dlxgf vfg k'Ug] b]lvG5 . t/ ;du|df o; pk–cfof]hgfsf] afl;Gbfsf] d'Vo cfDbfgLsf] >f]t u}/ s[lif ePsf]n] ;Dk"0f{ k|efljt kl/jf/sf] lhjg:t/df kg]{ c;/ Ifl0fs dfq x'g]5 . ;fgf k;n, k]g;g, a}b]lzs /f]huf/ tyf Hofnf dhb'/L h:tf u}/ s[lif If]qsf] cfDbfgLdf TofxfFsf kl/jf/x? cfl;|t 5g\ h'g k]zfdf ;8sn] s'g} g/fd|f] c;/ gkg]{ b]lvG5 . k|efljt kl/jf/sf] hLjg:t/ psf:gsf] lglDt o; pkcfof]hgfn] tflnd of]hgf klg o; k'g{af; of]hgfn] ;d]6\5 .
!)=3/w'/L ;j]{If0fn] !% kl/jf/n] s'n hldg :jfldTjsf] % k|ltzt eGbf w]/} hldg ;8sdf kg]{ b]vfp5 eg] dfq ! kl/jf/ ul/aLsf] /]vf d'gL kg]{ b]lvG5 . ;Dk'0f{ kl/jf/sf] yˆ cfjZos hldgsf] d'cfAhfsf] k|s[ofdf nluPsf] 5 . 3/af;df c;/ k'Ug] kl/jf/sf] cGo a:g] 7fpF /x]sf] x'bfF pSt kl/jf/nfO{ k'g{af;sf] w]/} hl6ntf cfpg] 5}g elg ;f]lrPsf] 5 . To;t} cGo ;+/rgfjfnfx?sf] ;f]lx hldgsf] aflsF cz+df 3/ ;fg]{ of]hgf /x]sf] 5 . t;y{ k'g{af;sf] lgDtL o; ;8s v08df s'g} klg gofF hldgsf] cfjZostf b]lvb}g .
!!=o; ;8s v08df hghftL kl/jf/x?nfO{ c;/ kg]{ ePtf klg o; ;8s /]vfdf pgLx?sf] s'g} ;f+:s[lts tyf wflds{ cf:yfsf] hldg kg]{ 5}g . To; cy{df of] ;8sn] Toxf a;f]af; ul//x]sf hghflt ;d'bfonfO{ pgLx?sf klxrfgsf] ljifodf 7f]; c;/ kg]{ b]lvb}g . ;j]{If0f ul/Psf] hghflt kl/jf/sf] cfly{s, z}lIfs / cGo ;fdflhs :t/ cGo ;d'bfosf] t'ngfdf p:t} b]lvPsf] 5 . To;}n] o; ;8sn] Nofpg] ;sf/fTds kl/jt{g tyf cGo ;'ljwfx?df klg hghftL ;d'bfon] cGo ;d'bfo ;/x nfe p7fpg ;Sg] 7flgPsf] 5 . o; ;8sn] o; If]qsf afl;Gbfx?nfO{ ahf/, lzIff, :jf:Yo / ;/sf/L lgsfosf ;]jfx? cem} /fd|f] lnª\s k'¥ofpg]5 .
!@=cg'kl:yt 3/w'/Lsf ;b:ox? of]hgf :yndf kms]{kl5 pgLx?sf] cfly{s cj:yf x]/L Ifltk"lt{ ljt/0f ug]{ of]hgf agfO{Psf] 5 . To:t} u'gf;f] lgbfg ;ldtLx? klxnf], bf];|f], t];|f] / rf}yf] n]en ul/ rf/ r/0fsf] aGg]5 . t/ k|d'v lhNnf clwsf/Lsf] cWoIftfdf ! k6ssf] a}7saf6 hUuf, / ;+/rgfsf] Ifltk"lt /]6 / /sd lg0f{o ul/G5 .
Page- 4
!#= ;Dk'0f{ hldgsf] s'n d'cfAhf /sd ? #%#(^@#=^* /x]sf] 5 . hDdf !%@ j6f k|efljt ;+/rgf dWo] JolQmut !$# JolQmut ;+/rgfsf]] d'cfAhf /sd ? $$$%)#!=(% /x]sf]5 ;fy} @ j6f 3/sf] d]l6l/on 6«;kf]6];g /sd ? !^%))=)) eg] ;a} ( j6f ;fd"bflos ;+/rgfsf] d'cfAhf/sd ? *(**@(=$* /x]sf]5 .
!$=3/w'/L ;j]{If0fsf] s|ddf ;Dk'0f{ kl/jf/n] cfo:t/ a[l¢ tflnddf efu lng] OR5f b]vfPsf 5g\ . To;}n] of]hgf sfJo{gogsf a]nf cfj:ostf klxrfg ul/ hLljsf]kfh{g ;'wf/ lzk
ljsf; tflnd g]kfn lzk kl/If0f jf]8{ -NSTB_af6 lgwf{l/t dfkb08 adf]lhd :t/–!
a/fj/sf] cfjfl;o tflndsf] of]hgf agfOg] 5 . o;} cfwf/df !^–$% jif{ leqsf ;b:ox?, blnt, hghflt, dlxnf 3/d'nL ePsf ;b:ox?nfO{ u|fxotfdf /flvg]5 . xfn o; tflnd of]hgfnfO{ rflxg] /sd ? @*&$^)=#@ k|:tfj ul/Psf] 5 .
!%=o; k'g{af; of]hgfsf] sfof{Gjogsf nflu sl/a ! s/f]8 $( nfv #$ xhf/ # ;o # ¿k}of @% k};f ?k}of vr{ nfUg]5 h'g cGt/ut ! s/f]8 !& nfv %@ xhf/ # ;o #* ¿k}of $% k};f k|ToIf vr{ d'cfAhfdf ljt/0f x'g]5 . cGo k'g{af; of]hgf vr{ cGt/ut hldgsf] nfut s§f u/fpg nfUg] vr{, tflnd vr{ / @) k|ltzt eljiodf e}kl/ cfpg] vr{sf] nflu 5'§fOPsf]5 .
28 August, 2017
ADB's Comments Incorporation for Involuntary Resettlement Plan of Belghari-Aarchalbot
Road Sub-Project, Lamjung
S.N ADB Comment on Resettlement Plan Response
Section
1:
a) Project description, introduction of
RP, project information and
subproject information are mixed with
each other. Present related
information in one paragraph for one
aspect.
Incorporated and avoiding the repetitions.
b) Number of plots given in text and
table are not matching. The statement
given in the paragraphs does not
clearly mentioned whether all plots
will be affected or part of the plot is
affected. The sentence in this regards
may be interpreted as impact on all
land parcel. Maintain consistency and
revise the presentations.
Tallied and consistency made.
c) Mentioned that 50 plots are lacking
official land ownership. But the report
does ’t e plai how the are treated for impact and compensation.
Whether the plots are cultivated by
people or not, whether there is
customary claim or land use claim by
the affected persons exists or not.
Further assessment on land use
pattern and status, customary claim is
needed. Further elaborate last two
sentence written in the paragraph.
Land is barren and none of households
have claimed their right over the land
during household survey. People can claim
after notice publication and they will be
paid if claim is genuine.
d) review all paragraphs in relation to
impact assessment for loss of
different types of structures. The
definition of physical displacement
has been interpreted differently. As
per SPS 2009- physical displacement is
relo atio , loss of reside tial la d, or loss of shelter as a result of (i)
involuntary acquisition of land, or (ii)
involuntary restrictions on land use or
on access to legally designated parks
Incorporated.
a d prote ted areas.
e) States that most of the private
structures owned by indigenous
people but the assessment of impact
on them have been presented in
generic way using standard language
for all RPs. Further, assessment of
impact on indigenous people is
needed.
IPs are categorized (Tamang and Gurung)
impact is well defined. IPs loses minor
structure and only two structures are fully
affected and only one structure owned by
Newar.
2 The paragraphs written in section-2:
socio-economic analysis contains differing
statements, figures and analysis. The
analysis presented in para 10,11 and 13
have different sets of interpretation on
income loss and livelihood strategy of the
affected persons. The interpretation
presented in paragraphs and figures
presented in table are not complementing
each other. Carefully review the section
and revise interpretation and analysis of
the information in line with figures and
numbers.
Socioeconomic analysis data regarding
agricultural and non-agricultural incomes
are verified and corrected. Thus,
contradictions are sorted out.
a) Last sentence of para 19 talk about
impact on their customary right. But
the impact assessment section
explains that there is no customary
claim of land as all land are titled or
recorded in the cadastral map and are
individually owned. Further elaborate
what type of customary rights exists in
the area and how they are not
affected.
No impact on cultural heritages due to
project intervention.
Impact on customary rights is omitted.
b) Para 20 explains that most of affected
families are earth quake affected
families. Further assessment is
needed to those families whether
they will be further vulnerable due to
land acquisition or not.
None of the affected HHs found vulnerable
due to land acquisition.
3 Para 16 states that the RP will be disclosed
to APs as soon as DLPIU is formed. As we
know all required offices and committees
have already formed. Revise the text
Para 16; Comments incorporated.
accordingly. The disclosure of draft RP is
required prior to approval. Ensure that RP
is duly disclosed.
4 Para 26 revised the text in relation to
formation of DLPIU. Follow the
resettlement framework provision
regarding timing of GRM formation.
Revised.
5 Para 43: There is long gap between date
of census and government notice
publication of for land acquisition. Assess
whether the cutoff date is still valid or not.
If there is transaction of the land in
between then there could be problem in
paying entitlement. Refer second last
sentence of the para and revise
accordingly, if needed.
Yes, there is long gap between date of
census and government notice. All the land
transaction which takes place between
census survey and government notice
publication is also eligible for
compensation. This issue will be resolved as
per prevailing Act.
6 Para 48 and other para: regarding
allowances and other assistance, the
recommendation has been proposed
based on ad hoc basis. There are clear
provisions in the entitlement policy matrix
attached to the RP. Revise all
recommendation adopting provisions
specified in entitlement matrix.
Allowances and assistances have been
revised as per entitlement matrix.
7 Para 53-56: Explain rationale for
recommendation of life skill training. It
seems that the skill trainings are proposed
by assumptions. If the impact assessment
identified that there will be impact on
income source or livelihood strategy, the
skill development training could be one of
mitigation measure and strategy to
restore income and livelihood. In that
case, the name of affected person,
required skill, other stipends need to be
finalized in advance and to be included in
RP with details of implementation
arrangement and budget. If it is only for
enhancement measure in addition to
mitigation measures explain it very
clearly. The eligibility of APs for skill
training is not clearly defined and not
consistent with skill training provisions in
entitlement matrix. Review the
Number of trainees has been identified as
per training criteria and lump sum budget
has been mentioned.
presentation on these paras and revise it
following scope of income/livelihood
restoration and entitlement matrix.
8 Para 58: The recommendation of land
compensation is based on LRO rate. It is
not clear whether the recommended rate
represent the replacement cost. As per
entitlement matrix and SPS requirement
all compensation must be paid in
replacement cost principle. So, assess the
replacement cost for land and
recommend in line with policy provisions.
Proposed cost is included in the report.
After finalized by CDC, cost will be updated.
9 Table 13: The total loss by category and
re o e ded udget does ’t represe t the multiple of rate and loss of land. In the
section 1 it is mentioned that the loss in
new cutting (due to project cause) is less
compare to area of land loss in the table.
Verify the figures and revise accordingly.
Revise recommendation for allowances
following provisions in entitlement matrix.
The cost and source for management cost
for absentee is not clear. Revise it
accordingly.
Verified and revised.
10 Revise the sentences in institutional
arrangement with updated information on
formation of different institutions for
project implementation. Elaborate the
section how the RP will be implemented
and develop TOR if any new arrangement
other than DISC and CISC is proposed.
Revised.
11 The attached implementation schedule
given in table 14 is blank. Revise the table
comparing activity of civil works and
provisions of loan agreement and
covenants.
Complete table is revised and attached.
12 Section 1.2 monitoring and evaluation:
Revise name of different institution
proposed for monitoring and supervision
following updated institutional
arrangement for project implementation.
Revised.
13 Para 74: NRA cannot be external monitor
as it is executing agency. Revise the
provision and propose new arrangement if
external monitoring deemed necessary.
The last sentence of the para has
proposed for post-resettlement
implementation evaluation study. Develop
TOR for the activity with cost estimate and
procurement process.
Unnecessary lines are omitted and
corrections are made where necessary.
14 Appendix III: Review the loss area. In
number of cases the area of land loss is
significantly big. So, further impact
assessment is required for those who lose
large area of land despite the %loss is less
than 10% of total productive assets.
Reviled.
15 There is special provision in entitlement
matrix for the households losing more
than 10% of their productive assets. But,
no entitlements have been recommended
for this category despite there is record of
>10% loss. Verify the information and
revise the entitlements.
Verified at field level and corrected in RP
too.
16 Appendix IV: Cross verify the
recommendation of valuation of
structures as there are omissions, and
cross posting of value and allowances.
Verified.
17 Revise executive summary following
revisions in the main report.
Revision is made
18 Above are the major comments minor
comments are written in hard copies.
While revising the documents please go
through all sections and paragraphs to
avoid omission, repetitions, and unclear
sentences.
Comments are incorporated step by step.