1
CARBON CANYON REGIONAL PARK CHINO HILLS OPEN SPACE OLINDA RANCH PARK ORO PARK WESTERN HILLS PARK OV Orange County Transportation Authority · | } 142 · | } 90 C a r b o n C a n y o n C r e e k C a r b o n C a n y o n L i o n s C an y o n T e l e g r a p h C a n y o n S o n o m e C a n y o n S o q u e l C a n y o n Lilac Trl -3 Lilac Trl-1 Gilman Trl-2 Lilac Trl-5 Little Canyon Trl-1 Easy Street Trl-1 South Ridge Trl-13 Lilac Trl-2 Telegraph Canyon Trl-8 Gilman Trl-3 South Ridge Trl-15 Sycamore Trl-1 Telegraph Canyon Trl-7 Telegraph Canyon Trl-12 South Ridge Trl-16 Telegraph Canyon Trl-11 North Ridge Trl-1 Lilac Trl -4 West Tower Trl-1 North Ridge Trl-7 North Ridge Trl-2 Telegraph Canyon Trl-13 Lilac Spur -2 DC-2, West Tower Trl-1. Issue: Some improvements made by easement holder, including drainage outlets and asphalt, are unsustainable. Recommendation: Work with easement holder to identify appropriate re-engineering / re-construction necessary for sustainability. DC-1, Lilac Trl-2,3,4,5. Issue: Damaged Asphalt. Recommendation: Following consultation with easement holder, repair road surface and replace with suitable road base to maintain vehicle access. DC-3, North Ridge Trl-1. Issue: Trail closed due to landslide / slope failure. Road not necessary because vehicle access can be maintained via the Telegraph Canyon Trl. Recommendation: Install a foot bridge over landslide, and convert the road segment to a trail. DC-4, Telegraph Canyon Trl, Corridor. Issue: Trail parallels Telegraph Creek and is frequently inundated and washed out in places. This trail is a controlled access road that crosses Telegraph Creek in multiple locations. Crossing the creek in a vehicle is often difficult and causes streambank erosion. Recommendation: Minor re-routes and re-engineer where needed and feasible to improve sustainability and maintain vehicle access. DC-5, Lilac Spur-2. Issue: Trail provides no useful recreational connections, and access to the trail is potentially dangerous due to the lack of parking and the busy Carbon Canyon Road that is used to access it. Recommendation: Evaluate for potential conversion to "Admin Access Only" and closure to public use. DC-6, Casino Ridge Trail Connection. Issue: The City of Yorba Linda has plans to develop and maintain a trail from the Casino Ridge Staging Area. The SoCal Gas utility road would provide an important link to connect Yorba Linda's Casino Ridge Trail to trails in Chino Hills State Park. Recommendation: In consultation with SoCalGas, reconstruct/re-engineer SoCalGas Utility road as necessary for sustainability and add to the public trail system as multi-use (hike, bike, horse). Diemer Plant Quarter Horse Staging Area Casino Ridge Staging Area 1600 1200 1200 1000 1000 800 1000 800 800 600 1400 1000 1200 800 1200 1600 1600 1200 1400 1400 1400 1400 1000 1200 1200 1200 1200 1000 1000 800 1000 1000 800 800 400 400 1200 1200 800 800 800 Yorba Linda Feeder Lower Feeder Plan Recommendations CALIF STATE PARKS INLAND EMPIRE DISTRICT AND RECREATION PLANNING NOTES: Parcel boundaries are approximate and should not be considered legal descriptions. Maps are intended for study purposes only. o 0 0.1 0.2 0.3 0.4 0.5 Miles 1:30,688 Sources: Calif. Dept. of Parks & Recreation, Other Public Lands: GreenInfo, Inc. · | } 71 · | } 142 · | } 90 · | } 241 · | } 91 Bane Canyon / Rolling M Ranch Santa Ana River / Coal Canyon Discovery Center / Telegraph Canyon Santa Ana River Map Page Location Scale 1 inch = 2,557 feet Segment-Level Maintenance Recommendations Reroute / Remove old alignment Road to Trail Conversion Reconstruct / Re-engineer Monitor Maintain DISCOVERY CENTER / TELEGRAPH CANYON AREA Date: 12/29/2020 Chino Hills State Park Road and Trail Management Plan Chino Hills State Park Museum/Visitor center Other Public Lands Other Public Lands: Restricted Access Intermittent Stream Perennial Stream / River Water Pipelines Highway Other Agency Local Road

Plan ·|} 142 Recommendations

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

SANANTONIO

PARK

CARBON CANYON

REGIONAL PARK

CHINOHILLS

OPEN SPACE

OLINDARANCH PARK

RIO DELORO PARK

WESTERNHILLSPARK

OV

Orange County Transportation Authority

·|}142

·|}90

Carbon

Canyon Creek

Carbon

Canyon

Lions

Canyon

Te legraphCanyon

Sonome

Canyon

Soque l

Canyon

Lilac Trl-3

Lilac Trl-1

Gilm

anTrl

-2

LilacTrl-5

LittleCanyon

Trl-1

Easy

Stre

etTrl

-1

South

Ridge

Trl-13

LilacTrl-2

Telegraph

CanyonTrl-8

Gilman Trl-3

South Ridge Trl-15

Sycamore

Trl-1Telegraph Canyon Trl-7

TelegraphCanyon

Trl-12South Ridge Trl-16

Telegraph Canyon Trl-11

North Ridge Trl-1

LilacTrl-4

WestTower

Trl-1

NorthRidgeTrl-7 North Ridge Trl-2

TelegraphCanyonTrl-13

Lilac Spur-2

DC-2, West Tower Trl-1.Issue: Some improvements made by easement holder, including drainage outlets and asphalt, areunsustainable.Recommendation: Work with easement holder to identify appropriate re-engineering / re-construction necessary for sustainability.

DC-1, Lilac Trl-2,3,4,5.Issue: Damaged Asphalt. Recommendation: Following consultation with easement holder, repair road surface and replace withsuitable road base to maintain vehicleaccess.

DC-3, North Ridge Trl-1.Issue: Trail closed due to landslide / slope failure.Road not necessary because vehicle access canbe maintained via the Telegraph Canyon Trl.Recommendation: Install a foot bridge overlandslide, and convert the road segment to a trail.

DC-4, Telegraph Canyon Trl, Corridor.Issue: Trail parallels Telegraph Creek and is frequentlyinundated and washed out in places. This trail is a controlled access road that crosses Telegraph Creek inmultiple locations. Crossing the creek in a vehicle isoften difficult and causes streambank erosion.Recommendation: Minor re-routes and re-engineer where needed and feasible to improvesustainability and maintain vehicle access.

DC-5, Lilac Spur-2.Issue: Trail provides no useful recreational connections,and access to the trail is potentially dangerous due to thelack of parking and the busy Carbon Canyon Road that isused to access it. Recommendation: Evaluate for potential conversionto "Admin Access Only" and closure to public use.

DC-6, Casino Ridge Trail Connection.Issue: The City of Yorba Linda has plans to develop and maintain a trail from the Casino Ridge StagingArea. The SoCal Gas utility road would provide an important link to connect Yorba Linda's Casino Ridge Trail to trails in Chino Hills State Park.Recommendation: In consultation with SoCalGas, reconstruct/re-engineer SoCalGas Utility road asnecessary for sustainability and add to the public trail system as multi-use (hike, bike, horse).

Diemer Plant

Quarter HorseStaging Area

Casino RidgeStaging Area

1600

1200

1200

1000

1000 800

1000

800

800

600

1400

1000

1200

800

1200

1600

1600

1200

1400

1400

1400

1400

1000

1200

1200

1200

1200

1000

1000

800

1000

1000

800

800

400

400

1200

1200800

800800

Yorb

a Lind

a Fee

der

Lower Feeder

Plan Recommendations

CALIF STATEPARKS

INLAND EMPIREDISTRICT

ANDRECREATIONPLANNING

NOTES:Parcel boundaries are approximate and should not be consideredlegal descriptions. Maps are intended for study purposes only.

o0 0.1 0.2 0.3 0.4 0.5

Miles

1:30,688

Sources: Calif. Dept. of Parks & Recreation,Other Public Lands: GreenInfo, Inc.

·|}71

·|}142

·|}90

·|}241

·|}91

BaneCanyon /Rolling M

Ranch

Santa AnaRiver /

Coal Canyon

DiscoveryCenter /

TelegraphCanyon

Santa Ana River

Map Page Location

Scale

1 inch = 2,557 feet

Segment-Level Maintenance Recommendations

Reroute / Remove old alignmentRoad to Trail ConversionReconstruct / Re-engineerMonitorMaintain

DISCOVERY CENTER / TELEGRAPH CANYON AREA

Date: 12/29/2020

Chino Hills State ParkRoad and Trail Management Plan

Chino Hills State ParkMuseum/Visitor centerOther Public LandsOther Public Lands:Restricted Access

Intermittent StreamPerennial Stream / RiverWater PipelinesHighwayOther AgencyLocal Road

ERLOOKPARK