KEY
Currently growing + evolving, we reserve the right to change plans, specifications, materials, features without notice
1 sleeping
2 bathing
3 cooking
4 dining
5 living
6 garage
P L A C E H
O U S E M E D I U M
front elevation
upper floor plan
main floor plan
3 bedroom family style or 2 bedroom + loft models
footprint: 1525 sf
living area: 1660 sf
decks & patios (as drawn): 353 sf
garage: 278 sf
total sq footage: 2531 sf
Intended to fit on a typical 40’ Seattle City lot
1 1
2 2
2
34
5
32’
61’
26’
M
6
1
back elevation
8/3/2019 Place Home #2
http://slidepdf.com/reader/full/place-home-2 2/3
PLACE HOUSES, LLCwww.placehouses.com 206.281.8225
Currently growing + evolving, we reserve the right to change plans, specifications, materials, features without notice
P L A C E H
O U S E M E D I U M
front
back
M
8/3/2019 Place Home #2
http://slidepdf.com/reader/full/place-home-2 3/3
PLACE HOUSES, LLCwww.placehouses.com 206.281.8225
questions?
Currently growing + evolving, we reserve the right to change plans, specifications, materials, features without notice
Cost per square foot typ: $180 - $220. Costs based on estimates for the greater Seattle area. Prices will vary according to location.
call:
write:
(206) 281 8225
W H A T ’ S I N C L U D E D ?
Standard for flat site:
•Grading
•Excavation
•Site Backfill
•On-site storm water management (utilizing elements of Low Impact Development)
•Concrete Slab Foundation
(Subject to site conditions. Budgets have been established for an ideal construction scenario)
•Concrete Finishing
•Patio/Deck (Exact location, size, & material depends on the site)
•Light landscaping with drought tolerant plants
•Entry walk
•Choice of three finish packages, to include:
Lighting & communication
Fixtures
Appliances
•1 year’s worth of green tags to offset the polluting effects of your energy use by supporting
the development of clean renewable energy.
Generally, site specific work is not included.
•Site specific engineering: snow loads/steep slope/earthquake zones/local requirements
•Site design and site plan drawing
•Site survey, inspections & soil testing
•Paving and Surfacing
•Taxes
•Permits
•City/county fees
•Hourly consulting fees to expedite permit process
•Utility fees and connections
•Full basement/crawlspace
•Demolition of any existing structure
•Finish & equipment upgrades
•Design customization (hourly consulting fee)
•Engineering fees for custom design
•Site access equipment
•Freight outside of Seattle area•Detached garages
•Additional consulting and contracting fees for building outside of the Seattle area
•AC upgrade
•Super Green upgrade
W H A T ’ S N O T I N C L U D E D ?