Oil Pipeline Risks: Issues to consider

By Louisette Lanteigne700 Star Flower Ave.

Waterloo Ont.N2V 2L2

[email protected]

Page 2: Pipelinespillsprevention

Issue #1: Seisemic Risks & Pipeline Welds

Page 3: Pipelinespillsprevention

Seismic Risks of Eastern Canadahttp://www.earthquakescanada.nrcan.gc.ca/zones/eastcan-eng.php

Page 4: Pipelinespillsprevention

Earthquakes & Oil Pipes

Pipeline damages from earthquakes can result in compression or wrinkling, joint weld cracking or separation, bending or shear from localized wrinkling and tension. Joints made with oxy-acetelyne welds break 100 times more than those with electric arc welded joints.

Source: USGS, The Shake Out Scenario Supplemental Studyhttp://books.google.ca/books/about/The_ShakeOut_Scenario_Supplemental_Study.html?id=7PU1A6N3ZOAC&redir_esc=y

Page 5: Pipelinespillsprevention

An earthquake occurs in the Western Quebec Seismic Zone every five days on average.

http://www.earthquakescanada.nrcan.gc.ca/zones/eastcan-eng.php

Page 6: Pipelinespillsprevention

A REVIEW OF NBCC 2005 SEISMIC HAZARD RESULTS FOR CANADA - THE INTERFACE TO THE GROUND AND PROGNOSIS FOR URBAN RISK MITIGATION

John Adams and Stephen HalchukGeological Survey of Canada, Natural Resources Canada,

Page 7: Pipelinespillsprevention

Earthquake risks should be identified within EA applications of pipelines so we can set reasonable design criteria to mitigate the risks, particularly with regards to pipeline welds.

Page 8: Pipelinespillsprevention

Issue #2: Bacterium & PE tape

Page 9: Pipelinespillsprevention

In May 2008, 16 year old Canadian boy named Daniel Burd from Waterloo Collegiate Institute found and isolated two naturally occurring bacterium, Spingomonas and Pseudomonas, that literally eats plastic.

He stored Spingomonas and Pseudomonas at 37 degree Celsius with plastic and in six weeks time, 43% of the plastic was consumed.

http://wiki.duke.edu/download/attachments/10715770/08burdreport.pdf

Spingomonas and Pseudomonas Eat Plastic

Page 10: Pipelinespillsprevention

Spingomonas and Pseudomonas naturally occurs in Canadian soil and water.

Enbridge pipelines travel across farmlands and waterways. These areas are suitable for Spingomonas and Pseudomonas because the bacterias thrives off nitrates in these locations.

To read Daniel Bird's study please visit here: https://wiki.duke.edu/download/attachments/10715770/08BurdReport.pdf

Page 11: Pipelinespillsprevention

Example of a PE tape issue; Kalamazoo Michigan Enbridge Oil Spill, 2010

The National Transportation Safety Board (NTSB) determines that the probable cause of the pipeline rupture was corrosion fatigue cracks that grew and coalesced from crack and corrosion defects under dis-bonded polyethylene tape coating, producing a substantial crude oil release that went undetected by the control centre for over 17 hours.

http://www.ntsb.gov/investigations/summary/PAR1201.html

Page 12: Pipelinespillsprevention

Questions:

Is there any data to either prove or disprove the role that Spingomonas and Pseudomonas may play in regards to “tenting” issues of PE tape?

Warmer weather and longer growing seasons associated with climate change may serve to increase the presence of these bacterium in the natural environment. If these bacteria are an issue, what measures can we take to avert risk in existing pipes?

How can we monitor for issues related to this?

Page 13: Pipelinespillsprevention

Issue #3: Climate Change:Plan for hotter, wetter weather

Page 14: Pipelinespillsprevention

Example: Rain and extream heat expected for the city of Toronto by 2040

Toronto will see almost 40 days per year with a humidex over 40˚C (current average is 9 per year).

Heat waves (3+ days of 32˚C) will occur 5 times a year, instead of once every two years.

We'll see 80% more summer rain in July, 50% more in August.

Extreme rain events will almost triple in size to 166mm in 24hrs from the current 66 mm.

Page 15: Pipelinespillsprevention

Source: TORONTO'S FUTURE WEATHER & CLIMATE DRIVER STUDY: OUTCOMES REPORT

Summary of the SENES Consultants Ltd Study by

Toronto Environment Office October 30, 2012

http://www.toronto.ca/legdocs/mmis/2012/pe/bgrd/backgroundfile-51653.pdf

Page 16: Pipelinespillsprevention

Enbridge's 'Line 9' pipeline exposed in the Rouge River, Toronto. Credit: Adam Scott/Environmental Defence

Page 17: Pipelinespillsprevention

Pipelines and Aquifers: the need to examine groundwater influences of subsurface geology

Page 18: Pipelinespillsprevention

Topography isn't enough to delineate watersheds or prevent water risks.

.

Page 19: Pipelinespillsprevention

Draw down effects bring contaminates towards the nearest wells regardless of topography. Professor Mike Stone: chloride loadings to

Waterloo Regional wells reveals this fact.

Page 20: Pipelinespillsprevention

Understanding the subsurface geology and localized well data in proximity to pipes can help contain spills.

Mapping subsurface geology is critical data to have in order to quickly and reasonably isolate and contain spills. It allows us to view which aquifers may be impacted, which wells to shut off to immediately stop the draw down spread of contaminates shoud a spill occur.

EA processes could mandate that firms have that data prior to final approvals in order to make sure they are reasonably capable of swift responses should a spill occur along that route.

Page 21: Pipelinespillsprevention

Arctic Risk #1 Upheaval buckling

Thermal expansion occurs when a buried steel pipeline is operated at a temperature and pressure higher than that experienced during installation. In hard frozen areas the pipeline is not free to expand so the axial compressive force serves to push the pipe up leading to risks of ruptures.

Page 22: Pipelinespillsprevention

Arctic Risk #2: Ice gouging by pressure ridges and icebergs in shallow water depths.

Page 23: Pipelinespillsprevention

Arctic Risk #3: Permafrost thaw settlement.

Page 24: Pipelinespillsprevention

Arctic Risk #4 Strudel Scour Strudel scour occurs when fresh water in rivers and streams flows over frozen ice along the shores. The overflow water drains through cracks, holes, even breathing holes in ice sheets

eroding supporting sediments underneith pipes.

Page 25: Pipelinespillsprevention

What is a reasonable depth to avoid these risks?

Based on the literature review of the research on subgouge deformations, the industry is still in need of direct rule of thumb that provides safe and economical burial depth for pipelines. From one hand, pipes must be trenched sufficiently far beneath the influence zone of soil displaced below ice keel to limit pipe bending to acceptable limits. On the other hand, designers must not go to an over-conservative solution and consequently a non-economical one. Therefore, the desired burial depth is the minimum depth needed for the survival of the pipeline during its design life time. Such depth has not been established.

Source: The Technical Challenges of Designing Oil and Gas Pipelines in the Arctic - Basel Abdalla PhD PE, Paul Jukes PhD, Ayman Eltaher PhD PE, and Billy Duron

Page 26: Pipelinespillsprevention

Issue #5: The Public Finds the Spills.

A newly published draft report by the US department of Transportation Pipeline and Hazardous Materials Safety Administration reveals that it is up to the public to find oil and gas leaks.

Pipeline leaks, ruptures and spills are “systematically causing more and more property damage…in a bad year you can have up to $5 billion in property damages due to pipeline related accidents.”

Given the volume of public property damage, pipeline companies would be “probably justified” in spending $490,000 a year for every 400 miles of pipeline but the reality is that “right now companies might spend a tenth of that figure."

Here is a published news article regarding this:

http://oilandgas-investments.com/2012/energy-services/leak-detection-pipeline-industry/

Page 27: Pipelinespillsprevention

Here is the link to the actual Draft report:

U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration

Draft Report: Leak Detection Study – DTPH56-11-D- 000001

Dr. David Shaw, Dr. Martin Phillips, Ron Baker, Eduardo Munoz, Hamood Rehman, Carol Gibson, Christine Mayernik

September 28, 2012

https://primis.phmsa.dot.gov/meetings/FilGet.mtg?fil=397

This report clearly shows that we need more money invested in prevention and better science to reasonably mitigate the risks!