14
Pipeline Quick Reference Materials

Pipeline Quick Reference Materials · PMR Pipeline Maintenance at Receipt Location POR Point Off Rate PRD Confirming Party Reduction at Delivery Location PRR Confirming Party Reduction

Embed Size (px)

Citation preview

Page 1: Pipeline Quick Reference Materials · PMR Pipeline Maintenance at Receipt Location POR Point Off Rate PRD Confirming Party Reduction at Delivery Location PRR Confirming Party Reduction

Pipeline Quick Reference Materials

Page 2: Pipeline Quick Reference Materials · PMR Pipeline Maintenance at Receipt Location POR Point Off Rate PRD Confirming Party Reduction at Delivery Location PRR Confirming Party Reduction

2

Table of Contents – Southern Natural Gas Contact List – NAESB Scheduling Deadlines (Effective 4/1/16) – SNG Queue Charts – Transaction Type Reference – Reduction Reason Codes – Suggested Favorites in DART – Segment Map – DART Pooling Cross Reference – SNG Pipeline Path Rules – Cypress Route Indicator – Premier/Dart PIN Cross Reference

Page 3: Pipeline Quick Reference Materials · PMR Pipeline Maintenance at Receipt Location POR Point Off Rate PRD Confirming Party Reduction at Delivery Location PRR Confirming Party Reduction

3

Southern Natural Gas Contact List

Southern Natural Gas Hot Line Numbers

Scheduling Department 1-800-845-4383

Gas Control 1-800-252-5960

Account Managers 1-800-315-0575

Name: Phone: Email: AIM:

Katie Cornutt 713-420-5648 [email protected] Katie_Cornutt

Veronica Esparza 713-420-5213 [email protected] Veronica.Esparza

Tracy Minter 713-420-7030 [email protected] TracyLMinter

Jeremy Rainwater 713-420-6385 [email protected] Jeremy.Rainwater

Gina Mabry 713-420-3685 [email protected]

Southern Natural Gas Scheduling Manager

Southern Natural Gas Hotline Numbers

Southern Natural Gas DART Nom/Scheduling Training Team

Page 4: Pipeline Quick Reference Materials · PMR Pipeline Maintenance at Receipt Location POR Point Off Rate PRD Confirming Party Reduction at Delivery Location PRR Confirming Party Reduction

4

Scheduling Timeline

Nomination Cycle

Effective Flow Time

Nomination Deadline

Confirmation Deadline

Receipt of Final Scheduled Quantities

Cycle 3 Intraday 1 2:00 p.m. CCT 10:00 a.m. CCT 12:30 p.m. CCT 1:00 p.m. CCT

Cycle 1 Timely 9:00 a.m. CCT 1:00 p.m. CCT 4:30 p.m. CCT 5:00 p.m. CCT

Cycle 4 Intraday 2 6:00 p.m. CCT 2:30 p.m. CCT 5:00 p.m. CCT 5:30 p.m. CCT

Cycle 2 Evening 9:00 a.m. CCT 6:00 p.m. CCT 8:30 p.m. CCT 9:00 p.m. CCT

Cycle 5 Intraday 3 10:00 p.m. CCT 7:00 p.m. CCT 9:30 p.m. CCT 10:00 p.m. CCT

Page 5: Pipeline Quick Reference Materials · PMR Pipeline Maintenance at Receipt Location POR Point Off Rate PRD Confirming Party Reduction at Delivery Location PRR Confirming Party Reduction

5

Transportation Queue on Timely, Evening, ID1 & ID2

Scheduling Queue Position Allocation Method

Primary in Path (PIP) Prorata/Entitlement

In Path (IP) Prorata/Entitlement

Out of Path (OP) Previously Scheduled Prorata

Out of Path (OP) Incremental Prorata

Downstream Delivery Service (DDS) Previously Scheduled Prorata

Downstream Delivery Service (DDS) Incremental Prorata

IT & AO Previously Scheduled By Rate, Then Prorata

IT & AO Incremental By Rate, Then Prorata

Page 6: Pipeline Quick Reference Materials · PMR Pipeline Maintenance at Receipt Location POR Point Off Rate PRD Confirming Party Reduction at Delivery Location PRR Confirming Party Reduction

6

Transportation Queue on ID3

Scheduling Queue Position Allocation Method

Primary in Path (PIP) Previously Scheduled Prorata/Entitlement

In Path (IP) Previously Scheduled Prorata/Entitlement

Out of Path (OP) Previously Scheduled Prorata

Downstream Delivery Service (DDS) Previously Scheduled Prorata

IT & AO Previously Scheduled By Rate, Then Prorata

Primary in Path (PIP) Incremental Prorata/Entitlement

In Path (IP) Incremental Prorata

Out of Path (OP) Incremental Prorata

Downstream Delivery Service (DDS) Incremental Prorata

IT & AO Incremental By Rate, Then Prorata

Page 7: Pipeline Quick Reference Materials · PMR Pipeline Maintenance at Receipt Location POR Point Off Rate PRD Confirming Party Reduction at Delivery Location PRR Confirming Party Reduction

7

Transaction Type Reference Vol Type - Transaction Type Description TT Buy (Current Business) 01 Sell (Current Business) 01 Transport (Current Business) 01 Trans(Authorized Contract Overrun) 02 Payback (Imbalance Payback From TSP) 03 Payback (Imbalance Payback To TSP) 04 Injection (Storage Injection) 06 Withdrawal (Storage Withdrawal) 07 Pooling 08 Off-system Market 117 Off-system Supply 118 Park 26 Park Withdrawal 27 Loan 28 Loan Payback 29 Purchase 119 Sale 120 Downstream Delivery/Receipt Service 14

Page 8: Pipeline Quick Reference Materials · PMR Pipeline Maintenance at Receipt Location POR Point Off Rate PRD Confirming Party Reduction at Delivery Location PRR Confirming Party Reduction

8

Transaction Types for Supply/Market • General Rules for nominations at the

PIN level

– Gas coming on or off our system directly will have off system supply or market transaction type (117/118)

– Buy or Sell transactions between third parties will use transaction type 01

Page 9: Pipeline Quick Reference Materials · PMR Pipeline Maintenance at Receipt Location POR Point Off Rate PRD Confirming Party Reduction at Delivery Location PRR Confirming Party Reduction

9

Nomination Status in Dart

Status Meaning Action

Submitted/Nominated Successfully Submitted No further actions required

Not Submitted/Holding Not Submitted Holding for System Verification

Not Submitted/Draft Not Submitted Draft Saved- Not Submitted

Not Submitted/Error Not Submitted Pending Error Correction

Not Submitted/Waiting for Approval Validated Requires Pipeline Approval

Page 10: Pipeline Quick Reference Materials · PMR Pipeline Maintenance at Receipt Location POR Point Off Rate PRD Confirming Party Reduction at Delivery Location PRR Confirming Party Reduction

10

DART Confirmation Reduction Codes

CAP Confirming Party’s Capacity Constraint

CBL Contract Balancing

CPR Confirming Party Reduction

CRN Confirmation Response not Received

DSU Displacement Gas Unavailable for Backhaul

FMJ Force Majeure

GQS Gas Quality Specifications not Met

IMB Imbalance Payback Quantity Exceeded

OBA OBA Payback

PLM Pipeline Maintenance

PMD Pipeline Maintenance at Delivery Location

PMR Pipeline Maintenance at Receipt Location

POR Point Off Rate

PRD Confirming Party Reduction at Delivery Location

PRR Confirming Party Reduction at Receipt Location

Page 11: Pipeline Quick Reference Materials · PMR Pipeline Maintenance at Receipt Location POR Point Off Rate PRD Confirming Party Reduction at Delivery Location PRR Confirming Party Reduction

11

DART Scheduling Reduction Codes

BMP Quantity reduced due to bumping

CBL Contract Balancing

CCD Pipeline Capacity Constraint at Delivery Location

CCR Pipeline Capacity Constraint at Receipt Location

CRE Capacity Recalled

CRI Credit Issues

DSU Displacement Gas Unavailable for Backhaul

ECM Exceeded Contract MDQ

FMJ Force Majeure

GQS Gas Quality Specification Not Met

IMB Imbalance Payback Quantity Exceeded

NGD Downstream Service Requester did not have the Market or did not Submit a nomination

NGU Upstream Service Requester did not have the Gas or did not Submit a nomination

PCC Pipeline Capacity Constraint

PLC Pipeline Curtailment

PLM Pipeline Maintenance

PMD Pipeline Maintenance at Delivery Location

PMR Pipeline Maintenance at Receipt Location

POR Point Off Rate

Page 12: Pipeline Quick Reference Materials · PMR Pipeline Maintenance at Receipt Location POR Point Off Rate PRD Confirming Party Reduction at Delivery Location PRR Confirming Party Reduction

12

Suggested Favorites in DART

• Nominations: Not Submitted

• Nominations: Submitted

• Nominations: Buy/Sell Mismatches List

• Confirmation

• Capacity/End-Point Splits

• Scheduled Quantity: Sched Qty Shipper

• Scheduling Cut Queue

• Contractual Imbalance

Page 13: Pipeline Quick Reference Materials · PMR Pipeline Maintenance at Receipt Location POR Point Off Rate PRD Confirming Party Reduction at Delivery Location PRR Confirming Party Reduction

13

SNG & EEC Lines and Segments With Pooling Points

Page 14: Pipeline Quick Reference Materials · PMR Pipeline Maintenance at Receipt Location POR Point Off Rate PRD Confirming Party Reduction at Delivery Location PRR Confirming Party Reduction

14

Pool PINs for the DART Conversion