    LSP COMPLEX PROJECT

    Package A Olefins and Central Utility Plant

    ITB Volume I Annex CRev.: 0

    Long Son Petrochemicals Co., Ltd

    Document No.: PIP- 006 Sheet:1 of 24

    Confidential: This document is confidential and must not be copied or reproduced except with the express

    permission of Long Son Petrochemicals Co., Ltd.

    PROJECT TECHNICAL SPECIFICATION

    PIP 006

    STEAM TRACING PIPING

    0 15/09/2009 ISSUE FOR LSP PROJECT HHM PCS

    REV. DATE DESCRIPTION PREPARED CHECKED APPROVED

  • 5/26/2018 PIP-006 Steam Tracing Piping Rev.00

    2/24

    LSP COMPLEX PROJECT

    Package A Olefins and Central Utility Plant

    ITB Volume I Annex CRev.: 0

    Long Son Petrochemicals Co., Ltd

    Document No.: PIP- 006 Sheet:2 of 24

    TABLE OF CONTENTS

    1. GENERAL ...............................................................................................3

    1.1. Scope...................................................................................................................... 3

    1.2. Codes and Standards ............................................................................................. 3

    1.3. Related Engineering Specifications ........................................................................ 3

    1.4. Conflict .................................................................................................................... 3

    2.

    BASIC DESIGN.......................................................................................4

    2.1. General ................................................................................................................... 4

    2.2. Materials.................................................................................................................. 4

    2.3. Tracer Manifolds and Tracer Manifold Supplies ..................................................... 8

    2.4. Tracer...................................................................................................................... 8

    2.5. Condensate Pipes................................................................................................. 10

    2.6. Supports................................................................................................................ 10

  • 5/26/2018 PIP-006 Steam Tracing Piping Rev.00

    3/24

    LSP COMPLEX PROJECT

    Package A Olefins and Central Utility Plant

    ITB Volume I Annex CRev.: 0

    Long Son Petrochemicals Co., Ltd

    Document No.: PIP- 006 Sheet:3 of 24

    1. GENERAL

    1.1. Scope

    1.1.1. This specification contains requirements for the design and materials of steam tracing to be

    provided for the equipment, piping, in-line instrument in Olefins Plant.

    1.1.2. This specification covers all items requiring steam tracing, such as process and utility piping,

    in-line instrument and equipment as shown on the P & I Flow diagram (hereinafter referred

    to as P & I) and Utility Flow Diagram (hereinafter referred to as UFD). However, steams

    tracing piping to be supplied with the manufacturers proprietary or standardized equipment are

    excluded in general.

    1.2. Codes and Standards

    Design, fabrication, inspection and tests of steam tracing piping materials and its accessories,

    unless otherwise specified in this specification, shall be in accordance with the applicable codes

    and standards.

    1.3. Related Engineering Specifications

    The related Engineering Specifications to supplement this specification are as follows:

    Project specification of Piping Design Basis

    Project specification of Piping Material for Olefins Plant

    Project specification of Thermal Insulation Design

    1.4. Conflict

    If any conflicts exist, Contractor shall seek clarification from Owner before proceeding.

    Generally, the most stringent requirements shall apply.

  • 5/26/2018 PIP-006 Steam Tracing Piping Rev.00

    4/24

    LSP COMPLEX PROJECT

    Package A Olefins and Central Utility Plant

    ITB Volume I Annex CRev.: 0

    Long Son Petrochemicals Co., Ltd

    Document No.: PIP- 006 Sheet:4 of 24

    2. BASIC DESIGN

    2.1. General

    2.1.1. Steam tracing shall be provided on all lines, equipment, instruments, where, under expected

    ambient temperature, freezing, solidification, rise in viscosity or separation of fluid or

    condensation of water in corrosive gas etc., would cause trouble in normal operations and

    shut- down unless they are externally heated.

    2.1.2. All items requiring steam tracing, such as equipment, in-line instruments and piping shall be as

    shown on the applicable P & I and UFD by symbol.

    2.1.3. Insulation thickness shall be in accordance with the Thermal Insulation Design Specification

    based on the operation temperature of the line to be traced.

    2.1.4. Typical steam tracing piping system is as shown in Figure 1 of Attached figures.

    2.2. Materials

    2.2.1. Pipes, Valves and Fittings

    In general specifications of piping materials for steam tracing shall be the same as those

    applicable to the steam mains. However, the tracer (including tracer supply and return) may be

    connected with butt-weld and the branch of manifold fabricated with nozzle weld. Stainless steel

    tubes may be used in accordance with the requirements of this specification.

    2.2.2. Traps for steam Tracing System

    Traps shall be the thermostatic type with strainer.

    2.2.3. Fastening Materials

    Fastening materials for the tracers shall be as follows:

  • 5/26/2018 PIP-006 Steam Tracing Piping Rev.00

    5/24

    LSP COMPLEX PROJECT

    Package A Olefins and Central Utility Plant

    ITB Volume I Annex CRev.: 0

    Long Son Petrochemicals Co., Ltd

    Document No.: PIP- 006 Sheet:5 of 24

    MATERIAL DIMENSION

    Galvanized anneal steel wires S.W.G. #18

    Galvanized steel bands 0.4 mm x 13 mm

    304 Stainless steel wires S.W.G #18

    304 Stainless steel bands 0.4 mm x 13 mm

    Note: Stainless steel wires and bands shall be used forstainless steel piping and equipment.

    2.2.4. Stainless Steel Tube

    Stainless steel tube size shall generally be the inside diameter of 8mm and the outside

    diameter of 10mm.

    Stainless tube shall be soft annealed seamless tube of equal or higher grade than 304SS

    specified in ASTM, "Stainless Steel Pipes".

    All tube fittings shall be of bite type.

  • 5/26/2018 PIP-006 Steam Tracing Piping Rev.00

    6/24

    LSP COMPLEX PROJECT

    Package A Olefins and Central Utility Plant

    ITB Volume I Annex CRev.: 0

    Long Son Petrochemicals Co., Ltd

    Document No.: PIP- 006 Sheet:6 of 24

    Figure 1 Steam Tracing Piping System

  • 5/26/2018 PIP-006 Steam Tracing Piping Rev.00

    7/24

    LSP COMPLEX PROJECT

    Package A Olefins and Central Utility Plant

    ITB Volume I Annex CRev.: 0

    Long Son Petrochemicals Co., Ltd

    Document No.: PIP- 006 Sheet:7 of 24

    Figure 2 Tracer Insulated with Spacer

    Figure 3 Tracer Expansion Loop

    (1) Horizontal line

    (2) Vertical line

  • 5/26/2018 PIP-006 Steam Tracing Piping Rev.00

    8/24

    LSP COMPLEX PROJECT

    Package A Olefins and Central Utility Plant

    ITB Volume I Annex CRev.: 0

    Long Son Petrochemicals Co., Ltd

    Document No.: PIP- 006 Sheet:8 of 24

    Figure 4 Standard locations of Tracers

    2.3. Tracer Manifolds and Tracer Manifold Supplies

    2.3.1. Tracer manifold shall be provided only where there are a minimum 3 tracer supplies

    grouped within a 3 m radius, and its size shall generally be 2". Tracer supply other than stated

    above shall be directly branched from the steam mains.

    2.3.2. Block valves for tracer manifold supplies shall generally be installed at vicinity and horizontal

    of the branch part of the steam mains.

    2.3.3. Tracer manifold supply shall be branched from the top of steam main, and tracer supplies

    branched from t he top or hori zontal of trac er manifold.

    2.4. Tracer

    2.4.1. Size of tracer shall generally be of 1/2 (NPS). The tracer of size 3/4 (NPS) may be applied for

    large diameter piping and/or long distance piping such as interconnecting piping. Tube of

    outside diameter 10 mm and inside diameter 8 mm may be used for traced line size 4 (NPS)

    and smaller, equipment having irregular surface and in-line instrument.

    Note: When tube tracers of outside diameter 10 mm are applied, the tracer supplies and

    tracer returns shall be 1/2 (NPS). When tracers of 3/4 (NPS) are applied, the block valves and

    their up - stream in the tracer supplies, and the condensate traps and their down-stream in the

    tracer returns shall be 1/2 (NPS).

    2.4.2. The minimum number of parallel steam tracers for each tracer size shall be as shown in Attached

    Table 1.

  • 5/26/2018 PIP-006 Steam Tracing Piping Rev.00

    9/24

    LSP COMPLEX PROJECT

    Package A Olefins and Central Utility Plant

    ITB Volume I Annex CRev.: 0

    Long Son Petrochemicals Co., Ltd

    Document No.: PIP- 006 Sheet:9 of 24

    2.4.3. The maximum allowable length of tracer (total length from tracer supplyline to condensate trap)by LS1 or MS2 are respectively as follows:

    MAXIMUM ALLOWABLE LENGTH (M)TRACER SIZE

    LS1 MS2

    Tube 10/8 60 60

    Pipe 1/2 (NPS) 60 100

    Pipe 3/4 (NPS) 70 120

    2.4.4. The pocket height of tracers shall not exceed 2 m for LS1 steam and 7m MS2 steam.

    2.4.5. Tracers need not have drains even if there should be any pocket.

    2.4.6. Each tracer line shall generally have its own steam supply valve and condensate trap.

    Where the tracers have no pocket and possibility of gravity flow of condensate from all

    connected tracer condensate lines (including horizontal piping) is assured, more than 2

    tracers may be connected with one trap. In this case, each tracer shall have equivalent lengthand the sum of tracer length shall not exceed the allowable length specified in Paragraph

    2.4.2.

    2.4.7. Sampling connections, drains, vents, and in-line instruments, such as pressure gauge etc.,

    attached to piping or equipment shall generally be traced with the tracer for the piping or

    equipment.

    2.4.8. The safety valves shall be traced as close as possible to valve seat to avoid malfunction.

    2.4.9. The tracer insulated with adequate spacer shall be applied for the following items. (Refer

    to Figure 2 of Attached Figures)

    Items to be protected from excessive heating, e.g. valves with non metallic seals, caustic

    lines.

    2.4.10. All tracers (including tracer supply and return) shall be extremely flattened.

    2.4.11. Tracers shall be fixed with steel bands or steel wire at approximately 1 m intervals; however

    such intervals shall be adequately shortened at the bent place where tracers are not

    contacted sufficiently with the pipe.

  • 5/26/2018 PIP-006 Steam Tracing Piping Rev.00

    10/24

    LSP COMPLEX PROJECT

    Package A Olefins and Central Utility Plant

    ITB Volume I Annex CRev.: 0

    Long Son Petrochemicals Co., Ltd

    Document No.: PIP- 006 Sheet:10 of 24

    2.4.12. Expansion loops shall be provided at approx. 24 m intervals. Loops at pipe fittings, changes indirection, valves, and flanges shall serve as expansion loops. (Refer to Figure 3 of Attached

    Figures)

    2.4.13. The standard locations of tracers are shown in Figure 4 of Attached Figures.

    2.5. Condensate Pipes

    2.5.1. If condensate is recovered, a block valve shall be installed in each outlet line of the condensate

    trap.

    2.5.2. Where condensate is recovered, the condensate manifold shall be, in general, provided only

    where there are a minimum 3 condensate or return lines grouped within a 3 meter radius and its

    size shall generally be 2(NPS).

    2.5.3. In case of condensate, the condensate shall be discharged to the sewer where the

    condensate discharge does not give hazard for personnel and not make corrosive

    environment for piping and steel structure.

    2.6. Supports

    All pipes including tracer supplies and returns shall be adequately supported in the field.

  • 5/26/2018 PIP-006 Steam Tracing Piping Rev.00

    11/24

    LSP COMPLEX PROJECT

    Package A Olefins and Central Utility Plant

    ITB Volume I Annex CRev.: 0

    Long Son Petrochemicals Co., Ltd

    Document No.: PIP- 006 Sheet:11 of 24

    Table 1: Minimum numbers of tracers

    Trace size 10 mm

    S S S

    1 S S S

    1 S S S

    2 S S S

    2 S S S

    3 S S S

    4 D S S

    5 D S S

    6 D S S

    8 D S S

    10 S S

    12 D S

    14 D D

    16 D D

    18 D D

    20 D D

    22 D D

    24 T D

    26 T D

    28 T D

    Pipe

    size

    (In

    ch)

    30 T T

    Note:

    1. S: Single

  • 5/26/2018 PIP-006 Steam Tracing Piping Rev.00

    12/24

    LSP COMPLEX PROJECT

    Package A Olefins and Central Utility Plant

    ITB Volume I Annex CRev.: 0

    Long Son Petrochemicals Co., Ltd

    Document No.: PIP- 006 Sheet:12 of 24

    2. D: Double

    3. T: Triple

    4. Steam (LSI): 147oC

    5. Fluid Temperature: 50oC

    6. Maintained Temperature: 50oC

  • 5/26/2018 PIP-006 Steam Tracing Piping Rev.00

    13/24

    LSP COMPLEX PROJECT

    Package A Olefins and Central Utility Plant

    ITB Volume I Annex CRev.: 0

    Long Son Petrochemicals Co., Ltd

    Document No.: PIP- 006 Sheet:13 of 24

    Table 2: Minimum numbers of tracers

    Trace size 10 mm

    S S S

    1 S S S

    1 S S S

    2 S S S

    2 S S S

    3 S S S

    4 D S S

    5 D S S

    6 D S S

    8 D S S

    10 D S S

    12 D S

    14 D S

    16 D D

    18 D D

    20 D D

    22 D D

    24 D D

    26 T D

    28 T D

    Pipe

    size

    (In

    ch)

    30 T D

    Note:

    1. S: Single

  • 5/26/2018 PIP-006 Steam Tracing Piping Rev.00

    14/24

    LSP COMPLEX PROJECT

    Package A Olefins and Central Utility Plant

    ITB Volume I Annex CRev.: 0

    Long Son Petrochemicals Co., Ltd

    Document No.: PIP- 006 Sheet:14 of 24

    2. D: Double

    3. T: Triple

    4. Steam (LSI): 147oC

    5. Fluid Temperature: 50oC T 100

    oC

    6. Maintained Temperature: 50oC

  • 5/26/2018 PIP-006 Steam Tracing Piping Rev.00

    15/24

    LSP COMPLEX PROJECT

    Package A Olefins and Central Utility Plant

    ITB Volume I Annex CRev.: 0

    Long Son Petrochemicals Co., Ltd

    Document No.: PIP- 006 Sheet:15 of 24

    Table 3: Minimum numbers of tracers

    Trace size 10 mm

    D S S

    1 D S S

    1 D S S

    2 S S

    2 D S

    3 D D

    4 D D

    5 D D

    6 D D

    8 T D

    10 T T

    12 T

    14 T

    16

    18

    20

    22

    24

    26

    28

    Pipe

    size

    (In

    ch)

    30

    Note:

    1. S: Single

  • 5/26/2018 PIP-006 Steam Tracing Piping Rev.00

    16/24

    LSP COMPLEX PROJECT

    Package A Olefins and Central Utility Plant

    ITB Volume I Annex CRev.: 0

    Long Son Petrochemicals Co., Ltd

    Document No.: PIP- 006 Sheet:16 of 24

    2. D: Double

    3. T: Triple

    4. Steam (LSI): 147oC

    5. Fluid Temperature: T 50oC

    6. Maintained Temperature: 80oC

  • 5/26/2018 PIP-006 Steam Tracing Piping Rev.00

    17/24

    LSP COMPLEX PROJECT

    Package A Olefins and Central Utility Plant

    ITB Volume I Annex CRev.: 0

    Long Son Petrochemicals Co., Ltd

    Document No.: PIP- 006 Sheet:17 of 24

    Table 4: Minimum numbers of tracers

    Trace size 10 mm

    D S S

    1 D S S

    1 D S S

    2 S S

    2 D S

    3 D D

    4 D D

    5 D D

    6 D D

    8 T D

    10 T D

    12 T T

    14 T

    16 T

    18

    20

    22

    24

    26

    28

    Pipe

    size

    (In

    ch)

    30

    Note:

    1. S: Single

  • 5/26/2018 PIP-006 Steam Tracing Piping Rev.00

    18/24

    LSP COMPLEX PROJECT

    Package A Olefins and Central Utility Plant

    ITB Volume I Annex CRev.: 0

    Long Son Petrochemicals Co., Ltd

    Document No.: PIP- 006 Sheet:18 of 24

    2. D: Double

    3. T: Triple

    4. Steam (LSI): 147oC

    5. Fluid Temperature: 50oC T 100

    oC (CKB, QOD)

    6. Maintained Temperature: 80oC

  • 5/26/2018 PIP-006 Steam Tracing Piping Rev.00

    19/24

    LSP COMPLEX PROJECT

    Package A Olefins and Central Utility Plant

    ITB Volume I Annex CRev.: 0

    Long Son Petrochemicals Co., Ltd

    Document No.: PIP- 006 Sheet:19 of 24

    Table 4: Minimum numbers of tracers

    Trace size 10 mm

    S S S

    1 S S S

    1 D S S

    2 D S S

    2 D S S

    3 D S S

    4 D S S

    5 D S S

    6 D S

    8 D S

    10 D D

    12 D D

    14 D D

    16 T D

    18 T D

    20 T T

    22 T T

    24 T T

    26 T

    28 T

    Pipe

    size

    (In

    ch)

    30 T

    Note:

    1. S: Single

  • 5/26/2018 PIP-006 Steam Tracing Piping Rev.00

    20/24

    LSP COMPLEX PROJECT

    Package A Olefins and Central Utility Plant

    ITB Volume I Annex CRev.: 0

    Long Son Petrochemicals Co., Ltd

    Document No.: PIP- 006 Sheet:20 of 24

    2. D: Double

    3. T: Triple

    4. Steam (MS 2): 191oC

    5. Fluid Temperature: 50oC T 100

    oC

    6. Maintained Temperature: 80oC

  • 5/26/2018 PIP-006 Steam Tracing Piping Rev.00

    21/24

    LSP COMPLEX PROJECT

    Package A Olefins and Central Utility Plant

    ITB Volume I Annex CRev.: 0

    Long Son Petrochemicals Co., Ltd

    Document No.: PIP- 006 Sheet:21 of 24

    Table 5: Minimum numbers of tracers

    Trace size 10 mm

    D S S

    1 D S S

    1 D S S

    2 D S S

    2 D S S

    3 D S S

    4 D S S

    5 S S

    6 D S

    8 D D

    10 D D

    12 D D

    14 D D

    16 T D

    18 T D

    20 T T

    22 T T

    24 T

    26 T

    28 T

    Pipe

    size

    (In

    ch)

    30

    Note:

    1. S: Single

  • 5/26/2018 PIP-006 Steam Tracing Piping Rev.00

    22/24

    LSP COMPLEX PROJECT

    Package A Olefins and Central Utility Plant

    ITB Volume I Annex CRev.: 0

    Long Son Petrochemicals Co., Ltd

    Document No.: PIP- 006 Sheet:22 of 24

    2. D: Double

    3. T: Triple

    4. Steam (MS 2): 191oC

    5. Fluid Temperature: 100oC T 150

    oC

    6. Maintained Temperature: 80oC

  • 5/26/2018 PIP-006 Steam Tracing Piping Rev.00

    23/24

    LSP COMPLEX PROJECT

    Package A Olefins and Central Utility Plant

    ITB Volume I Annex CRev.: 0

    Long Son Petrochemicals Co., Ltd

    Document No.: PIP- 006 Sheet:23 of 24

    Table 6: Minimum numbers of tracers

    Trace size 10 mm

    D S S

    1 D S S

    1 D S S

    2 D S S

    2 D S S

    3 D S S

    4 D S S

    5 D S

    6 D S

    8 D D

    10 D D

    12 D D

    14 D D

    16 D D

    18 T D

    20 T D

    22 T T

    24 T T

    26 T

    28 T

    Pipe

    size

    (In

    ch)

    30

    Note:

    1. S: Single

  • 5/26/2018 PIP-006 Steam Tracing Piping Rev.00

    24/24

    LSP COMPLEX PROJECT

    Package A Olefins and Central Utility Plant

    ITB Volume I Annex CRev.: 0

    Long Son Petrochemicals Co., Ltd

    Document No.: PIP- 006 Sheet:24 of 24

    2. D: Double

    3. T: Triple

    4. Steam (MS 2): 191oC

    5. Fluid Temperature: 150oC T 200

    oC

    6. Maintained Temperature: 80oC