Pile Driving Data

Embed Size (px)

Citation preview

  • 7/26/2019 Pile Driving Data

    1/1

    P I L E D R I V I N G D A T A

    Pr oj ect Name: Wi deni ng of Permanent Bri dges to more than Two (2) Lanes, CARLATAN BRI DGE

    Pr oj ec t Locat i on: San Fernando Ci ty, La Uni on

    PI LE DAT FORMULA USED (Dynam ic Formu la):

    Requi r ed Bear i ng Power P = 167 x ehEh W r + 0.16W p

    Type of Hammer S + 2.54 W r + W p

    Pi l e Locat i on Wher e :

    Si ze/ Lengt h of Pi l e P Pile Bearing Capacity (kN)

    Pi l e Ti p El ev at i on eh Hammer Efficiency

    Cut - Of f El evat i on eh

    Gr ound El evat i on Eh Hammer Energy Rating (kN-m)

    Wei ght of Pi l e Eh

    Wt . Of Spl i ce Wr Weight of Ram (kN)

    Weat her Wr

    Dat e Dr i ven Wp Weight of Pile and other driven weights (kN)Dr i v i ng Ti me ( St ar t ) S Average penetration per blow for the

    Dr i v i ng Ti me ( Fi ni sh) last 150mm of driving (mm)

    Ref er ence Poi nt

    Pile Tip Pile Total No. of Fall of Average Computed Pile

    Elevation Embedment Penetration Blows Ra Penetration Capacity R E M A R K S

    (m.) (m.) (cm.) (cm.) (mm./blow) (kN)

    Prepared By: Checked By: Reviewed By:

    CRISTIAN E. GAPASIN ALEXANDER PAUL B. VILLANUEVA

    Engineering Assistant Project Engineer Roadtech Construction/ R.S. SepianConstruction & Trucking/ H.G. Lopez

    Construction(JV)