PICKERING ‘A’ UNIT 4 BOILER 6 HOT SOURCE. Scott Cameron Pickering B RPM. OUR GOAL. The Elimination or Control of this Hazard will allow P941 Outage work to proceed safely while minimizing extra dose to workers. >450,000 rem/h ESTIMATED CONTACT GAMMA DOSE RATE @ 1cm 18,000 rem/h @ 5cm - PowerPoint PPT Presentation

Citation preview

Page 1: PICKERING ‘A’ UNIT 4 BOILER 6 HOT SOURCE

PICKERING ‘A’UNIT 4 BOILER 6 HOT SOURCE

Scott Cameron

Pickering B RPM

Page 2: PICKERING ‘A’ UNIT 4 BOILER 6 HOT SOURCE

OUR GOAL

The Elimination or Control of this Hazard will allow P941 Outage work to proceed safely while minimizing extra dose to workers.

Page 3: PICKERING ‘A’ UNIT 4 BOILER 6 HOT SOURCE

PROBLEM STATEMENT

High Energy Source Identified in the Cold Leg Drain Line of Unit 4, Boiler 6

>450,000 rem/h ESTIMATED CONTACT

GAMMA DOSE RATE @ 1cm18,000 rem/h @ 5cm500 rem/h @ 30cm

350 rem/h JUST BELOW HOT LEG

DRAIN LINE

Hot Leg Drain Line

Cold Leg Drain Line

manway

Archived Photo Without Insulation On This is Boiler 12 Not Boiler 6

Page 4: PICKERING ‘A’ UNIT 4 BOILER 6 HOT SOURCE

SD

C 3

Ha

tch

Pre

ssu

rizin

gP

um

ps

PR

D P

an

els

SD

C 4

SD

C 2

LZ

De

lay

Ta

nk

Isolation Valves 1-6Isolation Valves 13-18

Isolation Valves 7-12Isolation Valves 19-24

SD

C 1

Re

activ

ityD

eck

AL

6

P5

P6

P7

P8

P1

3

P1

4

P1

5

P1

6

P1

P2

P3

P4

P9

P1

0

P1

1

P1

2

Bo

iler

4

Bo

iler

5

Bo

iler

6

Bo

iler

10

Bo

iler

11

Bo

iler

12

Bo

iler

1

Bo

iler

2

Bo

iler

3

Bo

iler

7

Bo

iler

8

Bo

iler

9

33

61

-CV

1 to

CV

43

33

1-P

13

33

1-P

2

MV

1

MV

2

MV

3

MV

4

MV

5

MV

6

MV

13

MV

14

MV

15

MV

16

MV

17

MV

18

MV

24

MV

23

MV

22

MV

21

MV

20

MV

19

MV

12

MV

11

MV

10

MV

9

MV

8

MV

7

MV

29

MV

30

MV

31

MV

32

MV

37

MV

38

MV

39

MV

40

MV

36

MV

35

MV

34

MV

33

MV

28

MV

27

MV

26

MV

25

Pre

ssu

reR

elie

fP

latfo

rm

AL

/5

MV

19

1

MV

19

0

MV

19

5

MV

19

4

MV

20

0

MV

19

9

MV

19

8

MV

19

7

N

Ble

ed

An

dF

ee

d P

latfo

rm

AREA THAT SOURCE AFFECTS

40’ top of stairs

27’ btm strs

29’ WPW wall

26’ top strs to feeders

35’ BO12-BO6

18’ to flange drain line

12’ danceflr

2900 mrem/h

450 mrem/h

2500 mrem/h

225 mrem/h

4500 mrem/h

200 mrem/h

Page 5: PICKERING ‘A’ UNIT 4 BOILER 6 HOT SOURCE

CLICK HERE TO RETURN TO

PREVIOUS SLIDE

>450,000 rem/h @ 1cm On Boiler Drain Line Elbow

500 rem/h @ 30cm

Boiler Base Boiler Base Pedestals Pedestals BOILER - 6BOILER - 6

1” to 3” of insulation to get to drain line

Page 6: PICKERING ‘A’ UNIT 4 BOILER 6 HOT SOURCE

PICTURES OF AREAPICTURES OF AREA

Drain Line Valve Drain Line Valve Under PHT Pumps Under PHT Pumps Along HT Catwalk, Along HT Catwalk, Flanged Off.Flanged Off.

Page 7: PICKERING ‘A’ UNIT 4 BOILER 6 HOT SOURCE

Perimeter Perimeter Walk WayWalk Way

200 mrem/h

Page 8: PICKERING ‘A’ UNIT 4 BOILER 6 HOT SOURCE

PICTURES OF AREAPICTURES OF AREA

Dance Floor

2.5 rem/h at Surveyor Position

Page 9: PICKERING ‘A’ UNIT 4 BOILER 6 HOT SOURCE

CATWALK

DANCE FLOOR

TRIM VALVE PLATFORM

TRIM VALVE PLATFORM

PERIMETER WALK WAY

Page 10: PICKERING ‘A’ UNIT 4 BOILER 6 HOT SOURCE

OPTIONS

1. FLUSH AND CAPTURE

2. IF FLUSH AND CAPTURE FAILS: 1) SHIELD BOILER 6 (USING LONG HANDLED TOOLS, ROPES) 2) RUN PARALLEL PLAN TO DO WORK ON EAST SIDE, DEVELOP PLAN FOR CUT OUT DURING P1041 OUTAGE

OR

3. DEVELOP PLAN FOR CUT OUT DURING THIS OUTAGE IF TIME PERMITS.

Page 11: PICKERING ‘A’ UNIT 4 BOILER 6 HOT SOURCE

OPTION DETAILS (cont’d)

1. FLUSH AND CAPTURE

OPERATIONAL METHOD:

Forced drain to a shielded catch container (particle will progress in drain line/drain hose to two IX Columns in parallel.

Risk-particle doesn’t move

Contingency- See Option 2 Above

Risk- Particle becomes lodged on route in steel line drain line before reaching tygon hose.

Contingency- Shield (depending on location). Continue with boiler campaign on west side, develop plan for next outage to cut out.

Page 12: PICKERING ‘A’ UNIT 4 BOILER 6 HOT SOURCE

DRAWING OF FLUSH AND CAPTURE OPTION 2

In Station Flasks With IX Column

Inside

Ice Plug Here For Double Isolation

Drain Manifold Flanged

Drain Valve 4-3311-V11

Drain Line - 18ft

CRANE

311’ B/R North

TOTE

Hot Spot Cold Leg Drain Line

TOTE

SIDE VIEW BOILER 6

Page 13: PICKERING ‘A’ UNIT 4 BOILER 6 HOT SOURCE

PREREQUISITE ACTIVITIES

1. Draft Work Plan

2. Address assessing requirements

3. Develop and procure tooling

4. Set up mock up

5. Acquire resources

6. Train

7. Transfer of Particle Issues

8. Target Dates

9. Approval of Back-Up Schedule and Implementation

Page 14: PICKERING ‘A’ UNIT 4 BOILER 6 HOT SOURCE

RISKS

a) Resources

b) Timeline

c) Cost

d) Dose Assignment

e) If particle has changed locations and no longer where we think it is

Page 15: PICKERING ‘A’ UNIT 4 BOILER 6 HOT SOURCE

OPTIONS FLOWSHEET

FLUSH AND CAPTURE PARTICLE

YES

IS CAPTURE SUCCESSFUL?

PROCEED WITH REGULAR OUTAGE

SCOPE

NOSHIELD BOILER 6 AS BEST AS POSSIBLE.

MOVE TO EAST BOILERS AND LEAVE FOR NEXT OUTAGE 1041 OR CUT OUT IN PARALLEL ON 941.