CGBA + PGBA Phase 3 (STS-110, STS-112) 1
Phase III Flight SafetyPGBA-04 Payload
BioServe Space TechnologiesA Life Sciences – NASA Commercial Space Center
Alex Hoehn Assoc. Director Engineering / Safety, BioServeSherry Woodard Engineering / Safety, BioServe
BioServe Space Technologies, 429, UCB, Boulder, CO 80309-0429, Tel. (303) 492-1005, Fax (303) 492-8883
CGBA
PGBA
CGBA + PGBA Phase 3 (STS-110, STS-112) 2
Acronyms
Gas Exchange (employs hydrophobic membrane for liquid containment).GE
Group Activation Pack.GAP
Isothermal Containment Module – a modular incubator for CGBA payload.ICM
Internal Motor – Group Activation Pack.IM-GAP
Failure Review Board.FRB
Express Rack.ER
Liquid Crystal Display, used in PGBA.LCD
EXpedite the PRocessing of Experiments to Space Station.EXPRESS
Electro-luminescent Display (yellow on back background), used in CGBA.EL-Display
Emergency Warning and Caution (0=nominal, 1=Advisory, 3=Warning=Shutdown).
EWAC / ECW
Fluid Processing Apparatus.FPA
Plant Generic BioProcessing Apparatus – a spaceflight greenhouse.PGBA
End of Mission in GMT time (expected Shuttle landing time).EOM
Commercial Generic BioProcessing Apparatus – payload name, uses ICM.CGBA
CGBA + PGBA Phase 3 (STS-110, STS-112) 3
PGBA-4 – STS-112 / ISS.9A
Payload Overview PGBA-4 / STS-112 – ISS.9A -> ISS.11A – Inc.5 :• Science Summary.• Reflight (4th) of PGBA, first ISS flight.• Modifications since STS-94.
» Split coolant system / dual pump.» Modified nutrient delivery for timed germination.
Plant Access on Orbit:• Reverification of plant chamber seal.
Re-baseline PGBA hazard reports:• Generic HR now in STD-PGBA (JSC-1230).• Updated unique HR to latest ISS references.• Review of Hazard Reports.
CGBA + PGBA Phase 3 (STS-110, STS-112) 4
Science Overview
Investigate time course of genetic changes due to microgravity exposure:
§ 30 Arabidopsis thaliana plants:
u Biologically simple (mustard-type plant).
u Fast growth rate – matures in 4-6 weeks.
u Entire genome sequenced.
n Two crops during Inc.5, automated, time-staggered germination, some germinatedpre-launch:
u 1st crop sown pre-flight, multiple automatedgerminations, single harvest, fixed on-orbit.
u 2nd crop sown in-flight, automated germination, fixed on ground post-flight.
Mature plant, 4-6 weeks.
Plant as harvested from PGBA, 3 weeks.
CGBA + PGBA Phase 3 (STS-110, STS-112) 5
PGBA Payload Overview
PGBA-03: STS-94 in Proto-EXPRESS / Spacelab. PGBA-04: Mufflers for ISS.
STS-77: 10 day missionSTS-83: 4 day aborted MSL-1STS-94: 16 day MSL-1
No PGBA anomalies,but:- transfer issues / lesson learned
CGBA + PGBA Phase 3 (STS-110, STS-112) 6
PGBA Faceplate with mufflers (ISS)
4 air inlets on inlet muffler.Mufflers attached with Velcro.
1 air outlet on exhaust muffler.
Standard EXPRESS power and data interfaces.
4 standard NSTS locker latches.
CGBA + PGBA Phase 3 (STS-110, STS-112) 7
PGBA Faceplate without mufflers (NSTS)
LCD display with touch screen,which can be enabled / disabled.Enabled: Touch screen responsive.Disabled: Touch screen will not respond.
Air inlet screen.
Air outlet
Standard NSTS locker latches with modified handles.
CGBA + PGBA Phase 3 (STS-110, STS-112) 8
PGBA Connectors & Switches
Standard EXPRESS power and data interfaces.
Mandatory tethered connector caps with Velcro.
Main Power circuit breaker / LED and touch screen enable switch (guarded).
Brace for Air Inlet muffler (Velcro attachment).
PFE Access
CGBA + PGBA Phase 3 (STS-110, STS-112) 9
PGBA Installation / GSE Equipment
• Red eyebolts for Spacehab Tunnel Installation• GSE handles for transport / overhead installation(captive fasteners not shown).
CGBA + PGBA Phase 3 (STS-110, STS-112) 10
Transfer Operations: PGBA to / from ISS
n Powered transfer to maintain PGBA environmental control.
n Limit to 60 minutes power off time.n Locker replacement unit requires 8 captive
fastener for mounting (generic ISS tools).n Changes since MSL-1:
n Captive fasteners / radial float on PGBA.n PMPs remain in middeck.n No tether requirement for rapid safing.n Assume: transfers now ‘routine’.
n PD does not train astronauts on transfer operations.
PGBA Transfer: Middeck to Spacelab, STS-94.
CGBA + PGBA Phase 3 (STS-110, STS-112) 11
ISS Operations – Status Check / Maintenance
CGBA (ER#4, position 3):n √ Power LED On ?n √ Airflow at Exhaust ? n √ Set Temp = Actual Temp ?n √ Time Incrementing ?n Maintenance: Clean inlet screen on muffler.
(Mufflers remain attached)
Status Check per Cue Card:
PGBA (ER#4, position 7/8) :n √ Power LED On ?n √ Airflow at Exhaust ?n √ EWAC=0 ?n √ Time Incrementing ?n Maintenance: Clean inlet screens
(4) on muffler. (Mufflers remain attached)
CGBA + PGBA Phase 3 (STS-110, STS-112) 12
Operations: Open PGBA Faceplate
• 4 locker latches open.• Faceplate rotated around bottom edge(hinged).
Plant Chamber lid still closed:Inspect for free water.
CGBA + PGBA Phase 3 (STS-110, STS-112) 13
Remove Plant Chamber Lid Screws
10 captive fasteners (1-2 turns).
Pull lid uniformly (parallel) from chamber.
CGBA + PGBA Phase 3 (STS-110, STS-112) 14
Harvesting Plant
Reach in, rotate each insert 2-3 turns ccw, then remove insert with plant.
Repeat for all 30 plants, fix and store in CGBA.
Insert new seed plug, rotate cw until tight.
Harvesting / Insertion of new seed plug (30x) into PGBA.
CGBA + PGBA Phase 3 (STS-110, STS-112) 15
ISS Operations – Harvesting
n Remove fixative tube from CGBA, harvest plant, place plant in tube, attach plunger rod, inject fixative - slowly, store in CGBA.
n Repeat for entire PGBA crop 30x.
Plunger rod – connect after plant insertion
Fixative Tube
End cap – remove to insert plant
CGBA + PGBA Phase 3 (STS-110, STS-112) 16
Operations – Sowing
§ Place new dry seed plugs into PGBA root tray, one at a time (30x).
n Close chamber lid, hand-tighten 10 captive fasteners 2-3 times to ensure good seal.
n Close PGBA faceplate, aligning pins and locking latches (4x).
n Reconnect cables, power up PGBA.n Replace mufflers.n Perform PGBA Status Check.
Felt
Removable Plug
Plastic CoveredSteel Wire
Small PlasticCentrifuge
TubePlasticLine
CGBA + PGBA Phase 3 (STS-110, STS-112) 17
Re-Attach and Re-seal Plant Chamber Lid
Attach chamber lid and push down.
Tighten 10 captive fasteners (1-2 turns) going around perimeter until finger-tight.
Finger-tighten 1-2 more times to ensure proper seal.
(Optional battery-powered screw driver with Phillips head bit.)
Tighten screws 2-3 times around
1 2 3
4
5
2-3 times
CGBA + PGBA Phase 3 (STS-110, STS-112) 18
PGBA Plant Chamber
CGBA + PGBA Phase 3 (STS-110, STS-112) 19
Atmosphere Treatment System
CO2
O2
HydrophobicFilter
Return toCabin
Intake fromCabin
HydrophobicFilter
CO2
O2
Delta-PDelta-P
BaOHScrubber
ActivatedCarbonFilter
PGCReturn
IntakefromPGC
SealedPlantGrowthChamber
C2H4Scrubber
CO2
O2
Light
H2O
PressureTemperatureRelative Humidity
MixingCirculation
CGBA + PGBA Phase 3 (STS-110, STS-112) 20
Plant Growth Chamber - Intentionally Vented Container
CO2
O2
HydrophobicFilter
Return toCabin
Intake fromCabin
HydrophobicFilter
CO2
O2
Delta-PDelta-P
BaOHScrubber
ActivatedCarbonFilter
PGCReturn
IntakefromPGC
SealedPlantGrowthChamber
C2H4Scrubber
Max. Differential Pressure across one (1) Relief Valve
0.0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0 10 20 30 40 50 60
Time [sec]M
ax. T
ran
s-M
emb
ran
e D
iff.
Pre
ssu
re [p
sid
]
-24 psi/min- 9 psi/min
40 liter plant chamber volume, Circle Seal 259-2PP Relief Valve, 0.3 psid
0.567 psid @ -24psi/min
0.398 psid @ -9psi/min
Water trap
CGBA + PGBA Phase 3 (STS-110, STS-112) 21
Atmosphere Treatment System
CO2
O2
HydrophobicFilter
Return toCabin
Intake fromCabin
HydrophobicFilter
CO2
O2
Delta-PDelta-P
BaOHScrubber
ActivatedCarbonFilter
PGCReturn
IntakefromPGC
SealedPlantGrowthChamber
C2H4Scrubber
Atmosphere Treatment Cartridge:• Barium Hydroxide• Activated Charcoal
3 levels of containment:• Stainless steel frit• Glass mesh• Stainless steel screen
CGBA + PGBA Phase 3 (STS-110, STS-112) 22
Humidity Control / Condensate Recovery
Root PackRemovable
Lid
Root PackBottom
Soil Needle
RubberSepta
Base
Comb
Root PackRemovable
Lid
Root PackBottom
Soil Needle
RubberSepta
Base
Comb
CGBA + PGBA Phase 3 (STS-110, STS-112) 23
Electric Subsystem
CGBA + PGBA Phase 3 (STS-110, STS-112) 24
Data Acquisition and Control
CGBA + PGBA Phase 3 (STS-110, STS-112) 25
Shock Hazard / Power Distribution
LCD Backlighting
LCD Backlighting
CGBA + PGBA Phase 3 (STS-110, STS-112) 26
Thermal Subsystem
CGBA + PGBA Phase 3 (STS-110, STS-112) 27
Pressurized Systems – Atmosphere Treatment System
CGBA + PGBA Phase 3 (STS-110, STS-112) 28
Pressurized Systems – Temperature Control Loop
CGBA + PGBA Phase 3 (STS-110, STS-112) 29
Pressurized Systems – Humidity Control Loop
CGBA + PGBA Phase 3 (STS-110, STS-112) 30
Pressurized Systems – Nutrient Delivery System
CGBA + PGBA Phase 3 (STS-110, STS-112) 31
On-orbit Plant Access
• Plants are non-hazardous.• Hardware failure resulting in free water know prior to crew
access, or visible prior to lid opening.• Lid re-sealing only necessary if:
» Humidity control system would subsequently fail and free condensate is created.» Nutrient Delivery System malfunctions and delivers excess water to single bag rather
than distributed bag (bags can hold all water if uniformly delivered).
• If 50% of screws are sealed in a symmetric pattern, lid is watertight at MDP.
• Computer verifies if lid is attached and chamber can be pressurized to relief valve opening pressure.» ECW = 1 if lid seal not established.
CGBA + PGBA Phase 3 (STS-110, STS-112) 32
PGBA “Old” Hazard Reports
HR Title STS-112 Status
PGBA-1 Sharp Edges deleted, see new STD-PGBA, item 04, updated.
PGBA-2 Structural Failure due to Launch,…
updated; PGBA is a dual replacement locker.
PGBA-3 Frangible Materials deleted, see new STD-PGBA, item 05, updated.
PGBA-4 Rotating Devices deleted, see new STD-PGBA, item 13, updated.
PGBA-5 Toxic Offgassing deleted, see new STD-PGBA, item 07, updated.
PGBA-6 Flammable Materials deleted, see new STD-PGBA, item 06, updated.
PGBA-7 Leakage of Fluid Samples updated for on-orbit crew access / harvesting.
PGBA-8 Temperature Extremes deleted, see new STD-PGBA, item 10, updated.
PGBA-9 Ignition Sources / Electrical deleted, see new STD-PGBA, item 11, updated.
PGBA-10 Electric Shock updated, PGBA contains high voltage AC sources.
PGBA-11 Rupture/Leakage Batteries updated, PGBA battery doesn’t meet JSC form 1230-item 9.
PGBA-12 EMI deleted, see new STD-PGBA, item 08, updated. PGBA-13 Pressurized System Plant Chamber: vented container, see STD-PGBA, item
03. Liquid Coolant System, updated.
CGBA + PGBA Phase 3 (STS-110, STS-112) 33
PGBA “New” Hazard Reports
HR Title STS-112 Status
STD-PGBA
Generic PGBA Hazard Controls
New – derived from individual hazard reports from STS-77.
PGBA-2 Structural Failure due to Launch,…
Updated; PGBA is a dual replacement locker.
PGBA-7 Leakage of Fluid Samples Updated; for on-orbit crew access / harvesting.
PGBA-10 Electric Shock updated; PGBA contains high voltage AC sources.
PGBA-11 Rupture/Leakage Batteries updated; PGBA battery doesn’t meet JSC form 1230-item 9. PGBA-13 Pressurized System Plant Chamber: vented container, see STD-PGBA, item 03.
Liquid Coolant System, updated.