Pertamina Outlook in Energy Industry

and Sustainability

Investor Day Summit 2021 – July 14, 2021

Nicke Widyawati – CEO & President Director PT. Pertamina (Persero)

Page 2: Pertamina Outlook in Energy Industry and Sustainability

2

Journey into Indonesia Energy Transition

Indonesia Energy Demand by SectorMillion Terra Joule

0

1

2

3

4

5

6

7

8

9

10

11

20

25

20

19

20

26

20

32

20

20

20

39

20

21

20

22

20

23

20

24

20

27

20

28

20

29

20

30

20

31

20

33

20

34

20

35

20

36

20

37

20

38

20

40

+2.1%

CommercialIndustry

Transportation

Household

Others

Petrochemical, Fertilizer, Methanol

Source: Pertamina Analysis

Natural Gas

19,6%

Oil

37,3%

NRE

Coal

9,2%

33,9%

Coal

18,0%

NRE Natural Gas

Oil25,0%

22,0%

34,0%

2019

2040

• Pertamina Energy Portfolio will be

aligned with Energy Mix Target in

Indonesia National Energy Grand

Design in 2025. Most of energy will

be supplied fossil fuel with

aggressively New and Renewable

Energy (NRE) growth

• Projection in Indonesia energy demand

in Indonesia will be grow at 2.1%

per annum until 2035. Reduced

demand expected in 2020 and 2021

due to covid-19 pandemic.

• Energy mixed prospective to achieve

target 29% lower emission in 2030

from National Energy Demand 7

Million Tera Joule

Indonesia Energy Mixed TargetPercentage

Key Points

Page 3: Pertamina Outlook in Energy Industry and Sustainability

3

Pertamina Energy ProductionMillion Tera Joule

5

2

0

1

7

4

3

6

7

2020 20262021 2022 2023 2024 2025 2027 2028 2029 2030

5,3

Refined Products - exclude LPG Gas

Refined Products - LPG NRE

1,2

2030

7,0

0,4

2,4

3,1

Commercial

Industry

Transportation

Household

National Energy

Demand

71%

Pertamina’s

Energy

Supply

Pertamina Energy Mix

Source : Pertamina

Pertamina Energy Mix

Pertamina builds an integrated oil & gas supply chain to supply domestic demand and actively builds an NRE portfolio

using domestic resources.

In 2030, Pertamina will supplies ~71% of Indonesia's

total energy demand.

Align with the energy transition,

Pertamina adapt by building energy

supply for Indonesia in the 2020-2030

period by:

• Reducing the refined product & LPG

mix from 86% to 64%

• Increasing the gas mix from 13% to

19% and NRE from 1% to 17 %

83%

3%13%1%

61%

3%19%

17%

2019 2040

Page 4: Pertamina Outlook in Energy Industry and Sustainability

4

Pertamina Investment Strategy (2020 – 2024)

Pertamina allocates CAPEX of 9% for New and Renewable Energy which is

higher than the average IOC of 4.3%.

Pertamina's commitment is in line with efforts to use domestic resources to

supply domestic energy towards green development and decarbonization

• NRE will grow 4% per annum meanwhile

energy conventional will decrease 4% per

annum

• Oil and gas will be projected grow until

2035

Industry Capex

Profile

2018 - 2035

Oil & Gas Low – Carbon

Investment Strategies2015 - 2020

Benchmark

Upstream

~$64 Billion

~$45Bn: Merger & Acquisition*~$14Bn: Business Development~$5Bn: Non Business Development

Downstream

~$20 Billion

~$18Bn: New & Revamping Refinery & Petchem~$2Bn: Commercial & Distribution Infrastructure

Gas, Power & NRE

~$8 Billion

~$4Bn: Transportation & Distribution Pipeline~$0,3Bn: Liquefaction & Regasification unit~$3Bn: Integrated Power Plant~$0,7Bn: Other

• 53 billion low-carbon investment by the oil

and gas sector over 2015-2020

• 4.3% share of total sector capex spent on

low-carbon investment in 2020

• 7 Companies that spent more than 5% of

total capex on low carbon technology over

2015-2020 Source : BNEF

*subject to optimization into Petrochemical, Power & NRE

Page 5: Pertamina Outlook in Energy Industry and Sustainability

5

Opportunities Pertamina New & Renewables Energy Portfolio

Capacity enhancement from 672 MW in 2020 to

1128 MW in 2026.

Geothermal

Pertamina has started the initiatives for utilization of

green hydrogen in Indonesia which will use electricity

from Pertamina’s geothermal field with total potential

8.600 kilo gram hydrogen per day.

Hydrogen

Participate in Indonesia Battery Company Joint

Venture with battery production 140 GWh in 2029.

Develop EV battery ecosystem including swapping &

charging business

EV Battery & Energy Storage System

Methanol Plant construction for gasification with

1000 ktpa capacity. Plan to on stream in 2025.

Gasification

Construction Green refinery with capacity 6 –

100 KTPA in 2025

Green Refinery

Pertamina plan to apply Circular Carbon

Economy in several area:

Recycle : Biomass, Biogas

Reduce : Solar PV, EV, LNG Bunkering

Reuse : CO2 for EOR and methanol

Circular Carbon Economy

• DME with capacity 5200 KTPA on stream 2025

• Generator capacity enhancement in 2020 – 2026:

• Solar PV 4 – 910 MW

• Wind 225 MW (2024)

• Hydro 200 – 400 MW

New Renewable Energy

Generator capacity enhancement in 2026, consist of:

Biomass/Biogas 153 MW, Bio blending Gasoil &

gasoline, Biocrude from algae and ethanol 1,000

KTPA on stream in 2025

Bio Energy

To Anticipate NRE growth in Indonesia energy mix, Pertamina develop several projects and activities to expand green

energy portfolio

1

2

3

4

5

6

7

8

Page 6: Pertamina Outlook in Energy Industry and Sustainability

6

Support in Geothermal Business Development at Pertamina

OWN OPERATION

DEVELOPMENT

EXPLORATION

JOC

The main problem of geothermal energy development in

Indonesia is the purchase price of electricity which is

considered low and below the economic value with a high

investment value. The policies and support needed are:

• Ratification of the Presidential Regulation concerning the

Purchase of EBT Electricity by PT PLN (Persero)

• Ratification of the New and Renewable Energy Draft (RUU

EBT)

672 MWINSTALLED

CAPACITY

Pertamina Geothermal Eenergy manages 15 Geothermal

Working Areas.

Total installed capacity 672 MW Self Operated and 1,205

MW Joint Operation Contract

Page 7: Pertamina Outlook in Energy Industry and Sustainability

7

Support in Hydrogen Development

SPPU, PT Pertamina (Persero) - Update Project Investasi Pertamina

2.5

Mt/day

Estimated National Hydrogen

Consumption in 2020

Progress• Pertamina is in the stage of reviewing the Pertamina's

Green and Blue Hydrogen roadmap

• Currently, the construction of a Green Hydrogen Plant

with a capacity of 22-100 kg/day is being planned from

the Ulubelu Geothermal Field with a Commerciao

Operation Date target in 2022.

Support Needed• Government upport regarding the hydrogen offtaker

market

• Acceleration of environmental permits and other

permits related to the green Hydrogen pilot plant.

• Ease of taxation and funding facilities

US$

40 Bn

National/Domestic Hydrogen

Market Potential

Hydrogen is a non-carbon emission energy source. Its

application can be used as an energy source such as

the use of feeding on polymer plants in refineries,

feeding on the chemical fertilizer industry, and vehicle

fuel cells.

Page 8: Pertamina Outlook in Energy Industry and Sustainability

D100 Product Specification Quality Test

results D100

D100 Production Trial

Dumai Refinery

Cap. 1,000 Bbl/day

Feed: RBDPO

D100 Production Trial

Cilacap Refinery

Cap. 800 Bbl/day

Feed: RBDPO

Revamping

Cilacap Phase-1

Cap. 3,000 Bbl/day

Feed: RBDPO

Ready to Produce D100

Cilacap Refinery

Cap. 800 Bbl/day

Feed: RBDPO

Revamping

Cilacap Phase-2

Cap. 6,000 Bbl/day

Feed: Multi-Feed

Support in Biorefinery and Biodiesel Development

Jul2020

Apr 2021

Dumai Cilacap

Cetane Number 92 94

Density 788 786

Viscosity 3.55 3.37

Sulphur 42 6

Flash Point 71 140

Water Content 96 63

Summary

D100 Biodiesel Production TrialPertamina has carried out a trial production of D100

at the Dumai and Cilacap refineries, with the result that

the D100 product specification in Cilacap complies

with International Benchmarks (ENI, Neste, EN),

while Dumai needs improvements in Sulphur and Visual

Market ExportAccording to the supply-demand analysis and

economic projections, the HVO D100 product will be

focused to the export market demand

Export Market Readiness ISCC certification for D100 is in progress. Furthermore,

the infrastructure of the Cilacap Refinery is ready for

the production of 800 Bbl/day D100

Production Capacity ImprovementThe production capacity in Cilacap will be increased

gradually, through:

1. Revamping Phase 1: Cap. 3,000 Bbl/day

2. Revamping Phase 2: Cap. 6,000 Bbl/day

1

2

3

4

Government SupportSupport for the certainty of supply and feedstock

prices, especially those related to the management

policy of Used Cooking Oil/UCO as an alternative

feed other than RBDPO/CPO, because UCO feeds

are more flexible in the export market*

Nov 2021

ISCC Certification Target

Completion for export market

penetration

RBDPO: Refined Bleached Deodorized Palm Oil CPO: Crude Palm Oil UCO: Used Cooking Oil / Minyak Jelantah

*Currently, a study of Used Cooking Oil / UCO is being carried out together with the Gadjah Mada University, as well as sourcing from restaurant outlets that manage UCO.8

Des 2021

Green Refinery

Plaju

Cap. 20,000 Bbl/day

Feed: CPO

Stakeholders discussion

It is carried out if there is

certainty of feed (through

cooperation with PTPN)

along with certainty of

domestic and export

demand

Feb 2021

Q42023

Page 9: Pertamina Outlook in Energy Industry and Sustainability

9

Support in DME (Dimethyl Eter) Development

SPPU, PT Pertamina (Persero) - Update Project Investasi Pertamina

5200

KTPA

DME development is expected to be a solution to

reduce national LPG imports

Pertamina has coordinated with government institutions to obtain

supports as follows:

Pertamina’s DME

Portfolio Target

in 2025

Progress• Pertamina has agreed to

cooperate with 6 Coal

Suppliers in DME Development

• Pertamina has signed

Cooperation Agreement and

Processing Service

Agreement for the Tanjung

Enim DME Project with PT

Bukit Asam and Air Product.

Government of the Republic of Indonesia• Assignment to Pertamina for :

a. Participate in coal processing activities into synthesis gas, methanol, DME

and/or other derivative products

b. Carry out processing, supply, purchase and/or distribution activities of

DME in the required quantities

• Providing subsidies to Pertamina for the implementation of the assignment

• Support in the form of guarantees for the change in law or political riskm

ease of licensing, tax, and customs facilities, funding support, exceptions to

fulfillment of domestic content level (TKDN/Tingkat Kandungan Dalam

Negeri) for Tanjung Enim coal gasification project

Ministry of Energy and Mineral Resources• Initial data collection of target for DME users, establishment of DME

distribution areas, and provision ofDME starter pack

• Regulation of benchmark price and retail selling price of DME

• Establishment of DME annual sales volume plan and quota per region

Ministry of Finance• Providing subsidies for the difference between the benchmark price and

the retail selling price of DME which is distributed to the public.

• Providing incentives and access to funding for the utilization of Greenhouse

Gas (GHG) emissions

Page 10: Pertamina Outlook in Energy Industry and Sustainability

10

Support in CCUS (Carbon Capture, Utilization, Storage) Development

SPPU, PT Pertamina (Persero) - Update Project Investasi Pertamina

18 Million

tCO2

Pertamina is preparing a Decarbonization Roadmap to support global climate change control, in which CCUS will be one of the initiatives

with a significant impact on carbon reduction

Emissions generated from the Oil

Field are injected to increase

productivity

• 3 million tCO2 for 10 years from

CCUS Gundih

• 15 million tCO2 for 25 years from

CCUS Sukowati

CCUS Implementation Progress at PertaminaPertamina has collaborated with several companies and institutions to conduct studies with CCUS,

among others:

Support NeededPreparation of a regulatory framework

that regulates the implementation of CCUS

including CO2 transport, CO2 injection and

CO2 monitoring.

• The current regulatory basis is limited to

compensation provided for carbon

sequestration and storage (Government

Regulation Number 46/2017

Environmental Economic Instruments)

• Regulations that facilitate the utilization

of Upstream working areas for the

implementation of the CCUS Project

JSA

Gundih

MoU

Sukowati

MoU

Mitsui

Exxon

Meeting

MoU

LPDP

MoUMinistry of

Education &

Culture

1 2 3 4 5 6

With Japan NUS,

JGC, J-Power, ITB

on June 18, 2021

With JAPEX and

Lemigas on Juni

18, 2021

One of them is

regarding studies

in the field of

Carbon Solution on

June 18, 2021

CCUS

Development

Commitment in

May 2021

Submission for further

study collaboration on

Direct Electrolysis of CO2

into methanol using

Kedaireka's matching fund

scheme with the Ministry of

Education and Culture.

Further study

collaboration Direct

electrolysis of CO2

into methanol using

the Kedaireka

scheme

Captured

Utilization (CCU) Sequestration (CCS)

Non Conversion Conversion

Enhanced Oil Recovery, Enhanced Geothermal,

Enhanced Cool Bed Methane

Carbon Neutral Fuel, Chemical Synthesis,

Carbon Mineralization, Algae Cultivation

CCUS ConsepIntegrated CO2 System

Potential Utilization of CO2 in Upstream

CCUS Partnership Documentations

Page 11: Pertamina Outlook in Energy Industry and Sustainability

11

Support in the Development of Electric Vehicles at PertaminaSeveral activities have been developed and planned by Pertamina to accelerate the EV ecosystem in Indonesia, including charging stations, swapping stations,

and battery packs.

Charging Station

Pertamina has built 4 (four) Electric Vehicle

Charging Stations for Public (SPKLU/Stasiun

Pengisian Kenadaraan Listrik Umum) in Jakarta,

one of which has been operating since

December 2020. Currently in the phase of

commercial trial.

1 EV2W Swap Station

Pertamina and one of the largest online

transportation companies have agreed to

develop an MoU and a trial phase for a 2-

wheel battery exchange station in Indonesia

2Battery Pack

3

Power & NRE Subholding together with other

SOEs have built a 500 kWh Prototype of

Battery Energy Storage System (BESS), with a

capacity of 1 kWh has been planned to be

followed by Certification, Assembly plant

design plant

Proposed Tariff

Policy and

Charging Station

Licensing

Ministry of Energy

& Mineral

Resources

1. Prospective charging station investors need an IUPTL permit approved by the

Minister of Energy and Mineral Resources in accordance with Minister of

Energy and Mineral Resources Regulation 47 of 2018

• Currently, electricity tariffs for end users are determined by the party that

granted the IUPTL permit (local goverment or Ministry of Energy and Mineral

Resources

2. The charging station business requires contributions from private investors to

ensure that the EV and EV Battery Ecosystem can be built quickly in Indonesia

• It is very important to ensure that the business is attractive to private investors

Facilitate Charging Station licensing for

private investors through the issuance of

IUJPTL (Izin Usaha Jasa Penunjang Tenaga

Listrik/Electric Power Support Services

Business License), so charging station

investors do not need to apply for an

IUJPTL permit

Charging Station Licensing and Tariff ConsiderationsSupport needed Proposed Government support