40
Perspectives and Recommendations for the Natural Gas Industry 1 John B. Vorderbrueggen, PE Chief, Pipeline and Hazardous Materials Investigations WRGC August 19, 2014

Perspectives and Recommendations for the Natural Gas Industry 1 John B. Vorderbrueggen, PE Chief, Pipeline and Hazardous Materials Investigations WRGC

Embed Size (px)

Citation preview

Page 1: Perspectives and Recommendations for the Natural Gas Industry 1 John B. Vorderbrueggen, PE Chief, Pipeline and Hazardous Materials Investigations WRGC

Perspectives and Recommendations for the Natural Gas Industry

1

John B. Vorderbrueggen, PE

Chief, Pipeline and Hazardous Materials Investigations

WRGC August 19, 2014

Page 2: Perspectives and Recommendations for the Natural Gas Industry 1 John B. Vorderbrueggen, PE Chief, Pipeline and Hazardous Materials Investigations WRGC

2

A Short Quiz

The NTSB “10 Most Wanted List” is

A. Candidates for the next NTSB Chairman

B. Best restaurants in DC

C. Board Advocacy Priorities

Page 3: Perspectives and Recommendations for the Natural Gas Industry 1 John B. Vorderbrueggen, PE Chief, Pipeline and Hazardous Materials Investigations WRGC

3

A Short Quiz

The NTSB 2014 budget is

A. $55 Million

B. $87.5 Million

C. $103 Million

D. $137 Million

Page 4: Perspectives and Recommendations for the Natural Gas Industry 1 John B. Vorderbrueggen, PE Chief, Pipeline and Hazardous Materials Investigations WRGC

4

A Short Quiz

The PHMSA 2014 budget is

A. $45 Million

B. $118.6 Million

C. $210 Million

D. $260.5 Million

Hazmat Division

Pipeline Division

2014 budget

Administration’s 2015 proposal

Page 5: Perspectives and Recommendations for the Natural Gas Industry 1 John B. Vorderbrueggen, PE Chief, Pipeline and Hazardous Materials Investigations WRGC

5

The NTSB Board MembersAugust 2014

Hon. Christopher A. Hart Acting Chairman

Hon. Robert L. Sumwalt

Hon. Mark R. Rosekind

Hon. Earl F. Weener

Page 6: Perspectives and Recommendations for the Natural Gas Industry 1 John B. Vorderbrueggen, PE Chief, Pipeline and Hazardous Materials Investigations WRGC

6

Natural Gas Pipeline Accidents

Cleburne, Texas

Sissonville, West Virginia

Birmingham, Alabama

Manhattan, New York

Page 7: Perspectives and Recommendations for the Natural Gas Industry 1 John B. Vorderbrueggen, PE Chief, Pipeline and Hazardous Materials Investigations WRGC

Enterprise Products Operating, LtdNatural Gas Transmission Pipeline Rupture and Fire Cleburne, TexasJune 7, 2010

7

Page 8: Perspectives and Recommendations for the Natural Gas Industry 1 John B. Vorderbrueggen, PE Chief, Pipeline and Hazardous Materials Investigations WRGC

8

Accident Summary

• 36-inch diameter carbon steel

• 1050 psig MAOP

• 950 psig Operating pressure

• 3rd Party damage

• 1 Fatality

• 6 Injuries

Page 9: Perspectives and Recommendations for the Natural Gas Industry 1 John B. Vorderbrueggen, PE Chief, Pipeline and Hazardous Materials Investigations WRGC

9

Page 10: Perspectives and Recommendations for the Natural Gas Industry 1 John B. Vorderbrueggen, PE Chief, Pipeline and Hazardous Materials Investigations WRGC

10

Improper pipeline locate work

• Two parallel pipelines – 30 feet apart

• November 2009 locate tickets for electric utility design phase− Energy Transfer pipeline marked

− Enterprise pipeline not marked

• Only one pipeline on survey map

Page 11: Perspectives and Recommendations for the Natural Gas Industry 1 John B. Vorderbrueggen, PE Chief, Pipeline and Hazardous Materials Investigations WRGC

11

Improper pipeline locate work

• June 2010 locate tickets for construction− Energy Transfer pipeline marked

− Enterprise pipeline not marked on three attempts to find the construction site

• Ticket closed – “all clear”

Page 12: Perspectives and Recommendations for the Natural Gas Industry 1 John B. Vorderbrueggen, PE Chief, Pipeline and Hazardous Materials Investigations WRGC

12

Improper pipeline locate work

• Second ticket issued three days later− Locator and contractor presumed it was

a duplicate of first

• Ticket closed – “all clear”

Locator never surveyed the right-of-way on four visits

Page 13: Perspectives and Recommendations for the Natural Gas Industry 1 John B. Vorderbrueggen, PE Chief, Pipeline and Hazardous Materials Investigations WRGC

13

Improper pipeline locate work

Accident date• Marked Energy Transfer pipeline

• Mowed right-of-way

• Contractor moved dig marker to increase distance from the marked pipeline…

Page 14: Perspectives and Recommendations for the Natural Gas Industry 1 John B. Vorderbrueggen, PE Chief, Pipeline and Hazardous Materials Investigations WRGC

14

Improper pipeline locate work

DIRECTLY ABOVE THE UNMARKED ENTERPRISE PIPELINE

Page 15: Perspectives and Recommendations for the Natural Gas Industry 1 John B. Vorderbrueggen, PE Chief, Pipeline and Hazardous Materials Investigations WRGC

15

Page 16: Perspectives and Recommendations for the Natural Gas Industry 1 John B. Vorderbrueggen, PE Chief, Pipeline and Hazardous Materials Investigations WRGC

16

Page 17: Perspectives and Recommendations for the Natural Gas Industry 1 John B. Vorderbrueggen, PE Chief, Pipeline and Hazardous Materials Investigations WRGC

17

The NTSB Probable Cause

• Contractor power auger punctured the unmarked buried pipeline

• Contributing factors− No permanent pipeline markers

− Pipeline locator did not mark pipeline before excavation work

Page 18: Perspectives and Recommendations for the Natural Gas Industry 1 John B. Vorderbrueggen, PE Chief, Pipeline and Hazardous Materials Investigations WRGC

18

Closeout Actions

• Enterprise Products Ltd. improved the locate ticket procedure and technician training

• Final Accident Brief issued September 9, 2013− No recommendations issued

Page 19: Perspectives and Recommendations for the Natural Gas Industry 1 John B. Vorderbrueggen, PE Chief, Pipeline and Hazardous Materials Investigations WRGC

Columbia Gas TransmissionPipeline RuptureSissonville, West VirginiaDecember 11, 2012 12:41 pm

19

Page 20: Perspectives and Recommendations for the Natural Gas Industry 1 John B. Vorderbrueggen, PE Chief, Pipeline and Hazardous Materials Investigations WRGC

20

Page 21: Perspectives and Recommendations for the Natural Gas Industry 1 John B. Vorderbrueggen, PE Chief, Pipeline and Hazardous Materials Investigations WRGC

21

Accident Summary

• 20-inch diameter carbon steel, 0.281 inch wall thickness

• 1,000 psig MAOP

• 929 psig Operating pressure

• Installed 1967

• “Not piggable”

Page 22: Perspectives and Recommendations for the Natural Gas Industry 1 John B. Vorderbrueggen, PE Chief, Pipeline and Hazardous Materials Investigations WRGC

22

Page 23: Perspectives and Recommendations for the Natural Gas Industry 1 John B. Vorderbrueggen, PE Chief, Pipeline and Hazardous Materials Investigations WRGC

23

Page 24: Perspectives and Recommendations for the Natural Gas Industry 1 John B. Vorderbrueggen, PE Chief, Pipeline and Hazardous Materials Investigations WRGC

24

Pipeline Integrity Management

• Three parallel, interconnected lines− 30-inch diameter in HCA

− 26-inch diameter in HCA

− 20-inch diameter (not in HCA)

• Interstate highway does not count

Page 25: Perspectives and Recommendations for the Natural Gas Industry 1 John B. Vorderbrueggen, PE Chief, Pipeline and Hazardous Materials Investigations WRGC

25

The NTSB Probable Cause

• External corrosion of the pipe wall − deteriorated coating

− ineffective cathodic protection

• Corrosion not detected− Not inspected or tested since 1988

Page 26: Perspectives and Recommendations for the Natural Gas Industry 1 John B. Vorderbrueggen, PE Chief, Pipeline and Hazardous Materials Investigations WRGC

26

Contributing Cause

• Rocky backfill degraded corrosion protection

• Shutdown delay− SCADA alarms and alerts

configuration delayed controller response

− No automatic shutoff or remote control valves

Page 27: Perspectives and Recommendations for the Natural Gas Industry 1 John B. Vorderbrueggen, PE Chief, Pipeline and Hazardous Materials Investigations WRGC

27

Key Findings

• Automatic SCADA trend data alerts would improve recognition of system problems

• Line would have required integrity management had highway proximity to pipeline been included in HCA decisions

Page 28: Perspectives and Recommendations for the Natural Gas Industry 1 John B. Vorderbrueggen, PE Chief, Pipeline and Hazardous Materials Investigations WRGC

28

NTSB Recommendations

• Columbia Gas Transmission− Implement a process for determining

alarm and alert setpoints and response actions

− Provide system trend data and assign alarm function to critical trend variations

Page 29: Perspectives and Recommendations for the Natural Gas Industry 1 John B. Vorderbrueggen, PE Chief, Pipeline and Hazardous Materials Investigations WRGC

29

NTSB Recommendations

• PHMSA− Add principal arterial roadways such

as interstate highways to “identified sites” for HCA determination

Page 30: Perspectives and Recommendations for the Natural Gas Industry 1 John B. Vorderbrueggen, PE Chief, Pipeline and Hazardous Materials Investigations WRGC

30

Columbia Gas Corrective Actions• Conducted inline inspections on the

non-HCA 20-inch pipeline

• Performed close interval survey

• Reassessed the pipeline coating using AC and DC voltage gradient testing

• SCADA instrument upgrades on looped systems

Page 31: Perspectives and Recommendations for the Natural Gas Industry 1 John B. Vorderbrueggen, PE Chief, Pipeline and Hazardous Materials Investigations WRGC

Ongoing Investigations

Birmingham, Alabama Manhattan, New York

31

Page 32: Perspectives and Recommendations for the Natural Gas Industry 1 John B. Vorderbrueggen, PE Chief, Pipeline and Hazardous Materials Investigations WRGC

32

Birmingham, Alabama• Alagasco

• December 17, 2013 2:30 am

• Cast iron distribution line (1951)

• 25 psig MAOP

• 19 psig operating

• 1 Fatality

• 4 injuries

Page 33: Perspectives and Recommendations for the Natural Gas Industry 1 John B. Vorderbrueggen, PE Chief, Pipeline and Hazardous Materials Investigations WRGC

33

Page 34: Perspectives and Recommendations for the Natural Gas Industry 1 John B. Vorderbrueggen, PE Chief, Pipeline and Hazardous Materials Investigations WRGC

34

Page 35: Perspectives and Recommendations for the Natural Gas Industry 1 John B. Vorderbrueggen, PE Chief, Pipeline and Hazardous Materials Investigations WRGC

35

Manhattan, New York (Harlem)• Consolidated Edison

• March 12, 2014 9:30 am

• 8-inch cast iron/plastic distribution line (1890 / 2011)

• 8 in wc MAOP, 6 in wc operating

• 8 Fatalities

• 48 injuries

Page 36: Perspectives and Recommendations for the Natural Gas Industry 1 John B. Vorderbrueggen, PE Chief, Pipeline and Hazardous Materials Investigations WRGC

36

Page 37: Perspectives and Recommendations for the Natural Gas Industry 1 John B. Vorderbrueggen, PE Chief, Pipeline and Hazardous Materials Investigations WRGC

37

Page 38: Perspectives and Recommendations for the Natural Gas Industry 1 John B. Vorderbrueggen, PE Chief, Pipeline and Hazardous Materials Investigations WRGC

38

Page 39: Perspectives and Recommendations for the Natural Gas Industry 1 John B. Vorderbrueggen, PE Chief, Pipeline and Hazardous Materials Investigations WRGC

39

Test Your Alertness - Just Before Lunch!

My closing comment on the NTSB annual budget quiz was:

It is Not Enough!

Page 40: Perspectives and Recommendations for the Natural Gas Industry 1 John B. Vorderbrueggen, PE Chief, Pipeline and Hazardous Materials Investigations WRGC

40

John B. Vorderbrueggen, PE

Chief, Pipeline and Hazardous Materials Investigations