8/8/2019 Peripheral Forecast Rev 1
1/31
8/8/2019 Peripheral Forecast Rev 1
2/31
8/8/2019 Peripheral Forecast Rev 1
3/31
8/8/2019 Peripheral Forecast Rev 1
4/31
8/8/2019 Peripheral Forecast Rev 1
5/31
8/8/2019 Peripheral Forecast Rev 1
6/31
8/8/2019 Peripheral Forecast Rev 1
7/31
8/8/2019 Peripheral Forecast Rev 1
8/31
8/8/2019 Peripheral Forecast Rev 1
9/31
8/8/2019 Peripheral Forecast Rev 1
10/31
8/8/2019 Peripheral Forecast Rev 1
11/31
8/8/2019 Peripheral Forecast Rev 1
12/31
Peripheral Forecast -Process Gap Considerations
Solution for how the Peripheral Forecast flows into MRP (Proteus today)?
Exceptions reporting to identify unassigned MODS, new SKU through alertsin DM.
Data Governance Planning Item/NSRD BOM flow into DM fromWindshield.
NSRD (Wind-chill) to DM feed
Create an alert that a new NSRD or Speed-bump is available to thecorrect LOB contact
Not all Base Codes/Planning Items in an NSRD will be launched. DMneeds to be able to flag those that will not need to be forecasted. Mayvary by region too.
Ability to create a baseline forecast using a like itemData Governance - Consistent Planning Item naming convention for commodities planned across several LOBs
8/8/2019 Peripheral Forecast Rev 1
13/31
WHY DIFFERENCESRegional process alignment will be enabled with the rollout of i2 DM in 12 24months. In the interim, process disparity will continue to exist amongst regions,with the primary difference being Proteus management by the SCP team in theAmericas.
Data governance for Planning item will be globally available in FY10 Peripheral planning enablement in I2 DM expected in FY10
Forecast cycle: 18+ months - Historical detail, for family-Parent18+ months- Seasonality reviews by Segment,by product- Peripheral attach rate data isrefreshed with IT supported data
Planning Level: Planning Item /SKU
- Aligns with future state process- SCP team translates into mod leveldemand- Global planning item availability
Fcst cycle: 4-6 months
- Proteus historical data limited- Does not support Seasonalityanalysis
Planning Level: Mod
- MOD level planning is inherentlycomplex- MS support to load mods intoProteus
AMERICAS PROCESS APJ/EMEA PROTEUS
8/8/2019 Peripheral Forecast Rev 1
14/3114
Peripheral Planning
Notes: Attach Rate percents do not necessarily have to add up to 100% for all Commodities Planning Item 2 for Commodity 1 may be shared with multiple FAM/FAM PAR with very different AR% for each.
Example
8/8/2019 Peripheral Forecast Rev 1
15/31
Peripheral Forecast Calendar
i2 DM exceptions reporting and alerts will drive the weekly forecast management cycle.
8/8/2019 Peripheral Forecast Rev 1
16/31
er p era ann ng SIPOC Objective OwnersGenerate Forecast for the Peripherals CoC Segment DPT
Supplier/Input Process Output/Customer Sales Segment/Finance : Promo roadmap Salesforce.com LOT
CoC Pricing: Cost/Price assumptions
CoC LOB DPT MPP
System Actuals at Planning
Item/SKU level
PG Peripherals roadmap FAP
SCP Supportability of
Peripherals Exceptions Feedback Performance to plan
Peripheral Forecast Procurement GBP
Key Reports to Support the Process
Performance to Plan
Analyze History: Generate a baseline Attach Rate Forecast using statisticaltechniques, historical adjustments based on time phased attribution for peripherals
(what was 1 st up-sell 2 quarters back is now base model)
Run supportability analysis: Attach Rate Forecast is applied to MSP to generatevolume plan for Peripherals. Master Planning provides the supportability based on
supply constraints
Analyze Performance to Plan:Under runners, over runners, QTD trend analysis
Over runners cannibalizing under runners
Make adjustments based on supportability analysis results. Finalize theAttach Rate Forecast. Generate Peripherals forecast by multiplying MSP with
attach rates
Make adjustments to the baseline Attach Rate Forecast: Correction for under runners & over runners
Based on Cost Package, peripherals roadmap, FAP
8/8/2019 Peripheral Forecast Rev 1
17/31
8/8/2019 Peripheral Forecast Rev 1
18/31
Regional & Global CoCs(Commercial and Consumer)
e2e D/S Planning Architecture Systems View
18
Customer / Sales Master Planning
MSP Planning
MPP SystemsPlanning
MPP PeripheralPlanning
Proteus
Global DemandReview
Demand Planning Platform
WWP / ODM Planners
Global SupplyPlanning
SCP
D\S Interlock
Demand Planning Platform
Global
MRPSCP
Supplier Collaboration
ODMCollaboration
DISC-P
Supply Chain MDM
Regional CapacityPlanning
SCP
8/8/2019 Peripheral Forecast Rev 1
19/31
er p era orecas -Guidelines for CoC -Americas
Complete SKU attribution for new SKUs.
Review new SKUs with PLM & Pricing teams.
Validate the update of the Attach Files.Confirm each platform has a tab.
Confirm the list of commodities.
Prepare the forecast file and link to Attach file.
Update the Forecast file for guidance communication:Review of historical attach (at least 3 months average)
Update to be completed and communicated by Wed of weeks 2, 6 and11 of each quarter.
Make changes weekly where needed (full review monthly)
Communicate the new forecast guidance to Regional SCP.
8/8/2019 Peripheral Forecast Rev 1
20/31
er p era orecas -Guidelines for CoC EMEA/APJ
Review new MODS with product & cost team
Engage with product/cost team to integrate any component transitions
Review historical attach (at least 3 months average)
Adjust/review over & under performing MODs from information provided
by Regional SCP in MOD exception files.
Adjust % rates in Proteus directly (notify Regional SCP where needed
e.g. large deal inclusion and promo plans)Make changes weekly where needed (full review monthly)
Confirm back to Regional SCP when changes have been done and/or
summary on monthly overall changes
h l
8/8/2019 Peripheral Forecast Rev 1
21/31
Peripheral Forecast - Guidelines for SCP -Americas
Add/Delete new MODs to Proteus templates.
Review COC Peripheral Forecast guidance provided at thePlanning Noun
Load the COC Peripheral Forecast guidance into Proteus at theMOD level.
Validate dependent MODs (e.g. loading a cable and battery forecastfor every PERC card).
Validate MRP matches guidance loaded into Proteus.
Provide 13-week supportability feedback.
Provide exception feedback.
Complete site split and geo capacity planning.
Publish and track overselling/underselling MODs working withCOC for plan of action.
Publish and track LTS.
i h l
8/8/2019 Peripheral Forecast Rev 1
22/31
Peripheral Forecast - Guidelines for SCP EMEA/APJ
Add/delete new MODs to Proteus template
Notify COC that new forecast needed
Chase NPI for complete mod list and MOD availability 120 days
before RTS.
Produce MOD accuracy report weekly (on a Monday)
Validate MRP output matches forecast loaded into Proteus.
Complete site split and geo capacity planning.
RTS DSI readiness (Optimal DSI target) and notification to CoC
8/8/2019 Peripheral Forecast Rev 1
23/31
Peripheral Forecast - Guidelines for GBP
Use Peripheral Forecast guidance from MRP output to generate
POs.
Drive optimal DSI targets by rationalizing the MRP demand
signal against current inventory levels.
Automatically activate deviation/repoint/regional balancing if
shortage/backlog arise in any plants.
Provide SCP with cost and timeline information for air freights and
confirm COC approval before initiating air freights.
8/8/2019 Peripheral Forecast Rev 1
24/31
Peripheral Forecast Mod Accuracy EMEA
Identification of outlying performing mods
8/8/2019 Peripheral Forecast Rev 1
25/31
Peripheral Forecast Mod Accuracy EMEA
Identification of Mods via pivot drill
h l
8/8/2019 Peripheral Forecast Rev 1
26/31
Peripheral Forecast Mod Accuracy EMEA
Identification of performance, and mod details toenable mod correction
8/8/2019 Peripheral Forecast Rev 1
27/31
Tool Training Screenshots
Screenshot of theAmericasAttach fileupdatedby DIS.The Nounsare theattributedSKUs per AttributionTool.
8/8/2019 Peripheral Forecast Rev 1
28/31
Tool Training Screenshots
Screen shot of the Americas Peripheral Forecast filecommunicated to DAO for review and Proteus input.
T i i M i l
8/8/2019 Peripheral Forecast Rev 1
29/31
Training MaterialScreenshots
Screenshots of Proteus A/R views
Supportability Reports/Meeting Schedules
Supportability Views/Snapshots
DiscP/Hyperion views
Daily/Weekly scenario/decision based activities
Add screenshots
I K k
8/8/2019 Peripheral Forecast Rev 1
30/31
DELL CONFIDENTIAL 30
Important Key take-aways
Proteus Template lines with the status of 'Inactive' do not createoutput in the MRP. How do you accept a Transferred template line in the Proteus
PeripheralTemplate? By changing the Line 'Status' from
'Transferred' to 'ActiveIn the Proteus Peripheral Template, the 'Manual Adjustment'
forecast type can be a positive number, but manual adjustments areallowed. If the total forecast is less than zero for a time period, zerois passed to the MRP.
When copying inserting a Template line in the Proteus PeripheralTemplate, what do you do?Click anywere in the line
8/8/2019 Peripheral Forecast Rev 1
31/31
Peripheral Forecast
Change Control
Date (MM/DD/YY) Version Description Revised By
11/03/08 1.0 Initial document release.Process flows :
- Americas As Is = Rev 1 Sep 9, 2008- EMEA / APJ As Is = Rev 1 = Oct 20, 2008- Future State = Rev 1 = Oct 20, 2008Deck = Rev 1 = Nov 3 rd , 2008
Stephane Martini