Upload
reilly
View
68
Download
0
Tags:
Embed Size (px)
DESCRIPTION
Patent Prosecution Highway (PPH). United States Patent and Trademark Office. Background. 2006 Cross filing Applications among IP5 Offices. PPH: Fast Track Examination of Applications. What is PPH? - PowerPoint PPT Presentation
Citation preview
1United States Patent and Trademark Office – www.uspto.gov
Patent Prosecution Highway (PPH)
United States Patent and Trademark Office
2
Background
2006 Cross filing Applications among IP5 Offices
3
PPH: Fast Track Examination of Applications
• What is PPH?– When claims are determined to be allowable in the
Office of First Filing (OFF), a corresponding application filed in the Office of Second Filing (OSF) may be advanced out of turn.
• What is the Purpose of PPH?– OSF can utilize the search and examination results of
the OFF thereby avoiding duplication of work and expediting the examination process in the OSF.
4
What Are the Benefits of PPH?
PPH Benefits for Applicant• Provides quicker patentability determination in
multiple jurisdictions.
• Decreases costs of prosecution.
5
What Are the Benefits of PPH?
PPH Benefits for Offices– Avoid redundant work by reuse of OFF
work product
– Claims reduced in number and narrowed in focus to what was previously allowed
– Reduced Pendency
6
PPH Requirements
Claim Correspondence
All claims in each U.S. application must “sufficiently correspond” to the allowable claims in the application in the OFF.
7
PPH Requirements (cont’d)
Qualifying Applications
– Current PPH Programs, generally speaking• Paris priority applications
• PCT Bridge filings
• Certain non-binding work product e.g. EPO’s EESR
– Future PCT-PPH Pilot• PCT-PPH pilot among the Trilateral Offices
– Positive international search reports, written opinions, and international preliminary examination reports
8
Current PPH Programs
PPH Pilot to Full implementation Japan (JPO)
Effective on January 4, 2008 Korea (KIPO)
Effective on January 29, 2009
9
Current PPH Pilot Programs
Current Pilots Australia (IPAU) Canada (CIPO) Denmark (DKPTO) European Patent Office (EPO) Finland (NBPR) Germany (DPMA) Singapore (IPOS) United Kingdom (UK IPO) Rospatent (in discussions) Trilateral PCT-PPH (January 2010)
10
PPH Requests
First Office Start Date Requests (as of 1 Nov. 2009)
JPO July 2006 1657 278 (Pilot)
1379 (Perm)
UKIPO Sept 2007 69 KIPO Jan. 2008 351
134 (Pilot) 217 (Perm)
Total
CIPO Jan. 2008 21 2,164IPAU April 2008 24 EPO Sept. 2008 21
DKPTO Nov. 2008 9 DPMA April 2009 10 IPOS Feb 2009 1 NBPR July 2009 1
Rospatent End of 2009 --
11
Cumulative Number of PPH Requests
0
500
1000
1500
2000
2500
2006
.07
2006
.09
2006
.11
2007
.01
2007
.03
2007
.05
2007
.07
2007
.09
2007
.11
2008
.01
2008
.03
2008
.05
2008
.07
2008
.09
2008
.11
2009
.01
2009
.03
2009
.05
2009
.07
2009
.09
Cumulative total
12
Number of PPH Requests by Technical Center
0100200300400500600700800900
TC1600
TC1700
TC2100
TC2400
TC2600
TC2800
TC3600
TC3700
Technical Center
PPH
Req
uest
sIPOSNBPRDPMADKPTOEPOIPAU CIPOKIPOUKIPOJPO
13
Important PPH Metrics*
• Average First Action (FA) Pendency from Grant of PPH Request– Non-PPH
• 25 months (from filing date of application to FA)– PPH
• 2-3 months (from grant of PPH request** to FA)
• Overall Allowance Rate– PPH cases: 91%– Non-PPH cases: 44%
• Actions per disposal– PPH cases: 1.7– Non-PPH cases: 2.7
** application must have completed all its pre-exam processing and is ready for examination.
*As of November 2009
14
Future Plans
• USPTO Action Plan to enhance PPH: define target numerical goals and develop global strategy to reach those goals
• Align PCT with PPH via the Trilateral pilot program• Conduct PPH awareness campaigns, internationally and
domestically
• Plurilateral PPH Cooperation– Streamline procedures– Share best practices and statistics– Provide users with one stop access to information
15
The Expanding PPH Network
GPTO
IP Australia
Mar. 2008
DKPTO
UKIPO
KIPO
CIPO
EPOSep. 2008
ROSPATENT
IPOS
NBPR
Feb.
200
9
APO
Apr. 200
8
Sep. 2007
Jan. 2008
Mar. 2009Apr. 2007
Nov. 2008
May 2009
Apr. 2009
Jul. 2008
Apr. 2009 Jul. 2009
HPO
Jul. 2006
Jan.
200
8
Jul. 2
007
USPTO
: under consideration
: full implementation : pilot implementation
Jul. 2009
Oct
. 200
9
Nov. 2009
Aug.
200
9Jul. 2009
JPO
Oct. 2009
Oct. 2009
Jan 2010
16
• Thank you