50
DaimlerChrysler Ford General Motors Part Submission Warrant Part Name Cust. Part Number Shown on Drawing No. Org. Part Number Engineering Change Level Dated Additional Engineering Changes Dated Safety and/or Government Regulation Purchase Order No. Weight (kg) Checking Aid No. Checking Aid Engineering Change Level Dated ORGANIZATION MANUFACTURING INFORMATION CUSTOMER SUBMITTAL INFORMATION Organization Name & Supplier/Vendor Code Customer Name/Division Street Address Buyer/Buyer Code Application MATERIALS REPORTING Has customer-required Substances of Concern information been reported? Submitted by IMDS or other customer format: Are polymeric parts identified with appropriate ISO marking codes? REASON FOR SUBMISSION (Check at least one) REQUESTED SUBMISSION LEVEL (Check one) SUBMISSION RESULTS The results for These results meet all design record requirements: Mold / Cavity / Production Process Compression Molding DECLARATION I affirm that the samples represented by this warrant are representative of our parts which were made by a process that meets all Production Part Approval Process Manual 4th Edition Requirements. I further affirm that these samples were produced at the production rate of / hours. I also certify that documented evidence of such compliance is on file and available for review. I have noted any deviations from this declaration below. EXPLANATION / COMMENTS: Is each Customer Tool properly tagged and numbered? Organization Authorized Signature Date Print Name Phone No. FAX No. Title E-mail PPAP Warrant Disposition: Customer Signature Date Print Name Customer Tracking Number (optional) Annual Re-Validation 41716 714 8/4/2016 Sarah Tomasek FOR CUSTOMER USE ONLY (IF APPLICABLE) 508-998-4105 508-998-4051 Sarah Tomasek PPAP Coordinator [email protected] IMDS # 104906521/1 Pat Noble 35000 8 N/A N/A N/A N/A None 0.0001 United States Country Automotive BC3Q-8527-BA 744 Belleville Ave. New Bedford City Region MA Postal Code 02742 O-Ring BC3Q-8527-BA Precix 1ACUS01 ELVF86077V 3/3/2008 NEW N/A Cooper Standard Automotive All locations Yes No Yes No n/a Yes No n/a Initial Submission Engineering Change(s) Tooling: Transfer, Replacement, Refurbishment, or additional Correction of Discrepancy Tooling Inactive > than 1 year Change to Optional Construction or Material Sub-Supplier or Material Source Change Change in Part Processing Parts Produced at Additional Location Other - please specify below Level 1 - Warrant only (and for designated appearance items, an Appearance Approval Report) submitted to customer. Level 2 - Warrant with product samples and limited supporting data submitted to customer. Level 3 - Warrant with product samples and complete supporting data submittted to customer. Level 4 - Warrant and other requirements as defined by customer. Level 5 - Warrant with product samples and complete supporting data reviewed at supplier's manufacturing location. dimensional measurements statistical process package appearance criteria material and functional tests Yes NO (If "NO" - Explanation Required) Yes No n/a Approved Rejected Other March CFG-1001 2006

Part Submission Warrantprecix.net/CooperRecerts/BC3Q-8527-BA_ELVF86077V.pdf · Production Part Approval Process Manual 4th Edition Requirements. I further affirm that these samples

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Part Submission Warrantprecix.net/CooperRecerts/BC3Q-8527-BA_ELVF86077V.pdf · Production Part Approval Process Manual 4th Edition Requirements. I further affirm that these samples

DaimlerChrysler Ford General Motors Part Submission WarrantPart Name Cust. Part Number

Shown on Drawing No. Org. Part Number

Engineering Change Level Dated

Additional Engineering Changes Dated

Safety and/or Government Regulation Purchase Order No. Weight (kg)

Checking Aid No. Checking Aid Engineering Change Level Dated

ORGANIZATION MANUFACTURING INFORMATION CUSTOMER SUBMITTAL INFORMATION

Organization Name & Supplier/Vendor Code Customer Name/Division

Street Address Buyer/Buyer Code

Application

MATERIALS REPORTING

Has customer-required Substances of Concern information been reported?

Submitted by IMDS or other customer format:

Are polymeric parts identified with appropriate ISO marking codes?

REASON FOR SUBMISSION (Check at least one)

REQUESTED SUBMISSION LEVEL (Check one)

SUBMISSION RESULTS

The results for

These results meet all design record requirements:

Mold / Cavity / Production Process Compression Molding

DECLARATION

I affirm that the samples represented by this warrant are representative of our parts which were made by a process that meets all

Production Part Approval Process Manual 4th Edition Requirements. I further affirm that these samples were produced at the

production rate of / hours. I also certify that documented evidence of such compliance is on file and available for

review. I have noted any deviations from this declaration below.

EXPLANATION / COMMENTS:

Is each Customer Tool properly tagged and numbered?

Organization Authorized Signature Date

Print Name Phone No. FAX No.

Title E-mail

PPAP Warrant Disposition:

Customer Signature Date

Print Name Customer Tracking Number (optional)

Annual Re-Validation

41716 714

8/4/2016Sarah Tomasek

FOR CUSTOMER USE ONLY (IF APPLICABLE)

508-998-4105508-998-4051Sarah Tomasek

PPAP Coordinator [email protected]

IMDS # 104906521/1

Pat Noble

35000 8

N/A

N/A N/AN/A

None 0.0001

United StatesCountry

Automotive

BC3Q-8527-BA

744 Belleville Ave.

New BedfordCity Region

MAPostal Code

02742

O-Ring BC3Q-8527-BA

Precix 1ACUS01

ELVF86077V

3/3/2008NEW

N/A

Cooper Standard Automotive All locations

Yes No

Yes No n/a

Yes No n/a

Initial Submission

Engineering Change(s)

Tooling: Transfer, Replacement, Refurbishment, or additional

Correction of Discrepancy

Tooling Inactive > than 1 year

Change to Optional Construction or Material

Sub-Supplier or Material Source Change

Change in Part Processing

Parts Produced at Additional Location

Other - please specify below

Level 1 - Warrant only (and for designated appearance items, an Appearance Approval Report) submitted to customer.

Level 2 - Warrant with product samples and limited supporting data submitted to customer.

Level 3 - Warrant with product samples and complete supporting data submittted to customer.

Level 4 - Warrant and other requirements as defined by customer.

Level 5 - Warrant with product samples and complete supporting data reviewed at supplier's manufacturing location.

dimensional measurements statistical process packageappearance criteriamaterial and functional tests

Yes NO (If "NO" - Explanation Required)

Yes No n/a

Approved Rejected Other

March CFG-1001 2006

Page 2: Part Submission Warrantprecix.net/CooperRecerts/BC3Q-8527-BA_ELVF86077V.pdf · Production Part Approval Process Manual 4th Edition Requirements. I further affirm that these samples

DaimlerChrysler Ford General MotorsORGANIZATION: PART NUMBER:

SUPPLIER/VENDOR CODE: PART NAME:

INSPECTION FACILITY: DESIGN RECORD CHANGE LEVEL:

ENGINEERING CHANGE DOCUMENTS:

O-Ring

N/AORGANIZATION MEASUREMENT

RESULTS (DATA) OK

NEW 3/3/2008

Precix1ACUS01

PrecixQTY.

TESTED

BC3Q-8527-BA

ITEM DIMENSION / SPECIFICATIONSPECIFICATION /

LIMITSNOT OK

TEST DATE

6.943 - 7.055 X1 ID: 6.87 - 7.13 7.00 +/- 0.13 7/21/16

Production Part Approval Dimensional Results

2 CS: 1.42 - 1.58 1.50 +/- 0.08 7/21/16 125 1.469 - 1.523 X

125

5 0.04 Max X3 Flash Extension Max 0.08 7/21/16

5 0.07 Max4 Flash Width Max 0.13 7/21/16

1 See attached lab report X5 MaterialSAEJ200M2HK810A110B3

7Z1 4/14/16

March

2006 CFG-1003

Blanket statements of conformance are unacceptable for any test results.

8/4/2016

DATE

PPAP Coordinator

TITLE

Sarah TomasekSIGNATURE

Page 2

Page 3: Part Submission Warrantprecix.net/CooperRecerts/BC3Q-8527-BA_ELVF86077V.pdf · Production Part Approval Process Manual 4th Edition Requirements. I further affirm that these samples

DaimlerChrysler Ford General MotorsORGANIZATION: PART NUMBER:

SUPPLIER/VENDOR CODE: PART NAME:

INSPECTION FACILITY: DESIGN RECORD CHANGE LEVEL:

ENGINEERING CHANGE DOCUMENTS:

NAME OF LABORATORY:

NEW 3/3/2008

Sarah TomasekSIGNATUREMarch

2006 CFG-1005

Blanket statements of conformance are unacceptable for any test results.

8/4/2016

DATE

PPAP Coordinator

TITLE

Production Part Approval Performance Test Results

ITEM DIMENSION / SPECIFICATIONSPECIFICATION /

LIMITSNOT OK

TEST DATE

QTY. TESTED

ORGANIZATION MEASUREMENT RESULTS (DATA) OK

Precix

Precix1ACUS01

Precix

BC3Q-8527-BAO-Ring

N/A

Page 3

Page 4: Part Submission Warrantprecix.net/CooperRecerts/BC3Q-8527-BA_ELVF86077V.pdf · Production Part Approval Process Manual 4th Edition Requirements. I further affirm that these samples

7/21/2016 8:43 6.96154 7/21/2016 8:44 7.00804 7/21/2016 8:45 7.00850 7/21/2016 8:46 6.99671 7/21/2016 8:47 7.00131 7/21/2016 8:48 7.01068 7/21/2016 8:49 7.00133 7/21/2016 8:50 6.97637 7/21/2016 8:51 7.02533 7/21/2016 8:52 7.04457 7/21/2016 8:53 7.00465 7/21/2016 8:54 7.02285 7/21/2016 8:55 6.96864 7/21/2016 8:56 6.99316 7/21/2016 8:57 7.05250 7/21/2016 8:58 7.01117 7/21/2016 8:59 7.03130 7/21/2016 9:00 6.98418 7/21/2016 9:01 6.99821 7/21/2016 9:02 6.96731 7/21/2016 9:03 7.00646 7/21/2016 9:04 7.02451 7/21/2016 9:05 6.99625

Page 5: Part Submission Warrantprecix.net/CooperRecerts/BC3Q-8527-BA_ELVF86077V.pdf · Production Part Approval Process Manual 4th Edition Requirements. I further affirm that these samples

7/21/2016 9:06 6.96712 7/21/2016 9:07 6.98340 7/21/2016 9:08 7.01101 7/21/2016 9:09 7.02466 7/21/2016 9:10 7.00208 7/21/2016 9:11 6.98660 7/21/2016 9:12 7.03839 7/21/2016 9:13 6.98504 7/21/2016 9:14 7.02547 7/21/2016 9:15 6.97387 7/21/2016 9:16 7.03385 7/21/2016 9:17 7.00107 7/21/2016 9:18 6.97943 7/21/2016 9:19 7.01740 7/21/2016 9:20 6.94353 7/21/2016 9:21 6.97501 7/21/2016 9:22 6.98880 7/21/2016 9:23 7.01546 7/21/2016 9:24 7.00348 7/21/2016 9:25 7.04510 7/21/2016 9:26 6.99476 7/21/2016 9:27 6.97713 7/21/2016 9:28 7.01688 7/21/2016 9:29 6.96215 7/21/2016 9:30 6.97086 7/21/2016 9:31 6.98562 7/21/2016 9:32 7.01057 7/21/2016 9:33 7.02771 7/21/2016 9:34 7.01384 7/21/2016 9:35 7.04103 7/21/2016 9:36 7.00329 7/21/2016 9:37 7.00421 7/21/2016 9:38 6.99780 7/21/2016 9:39 7.01439 7/21/2016 9:40 7.01368 7/21/2016 9:41 6.96574 7/21/2016 9:42 6.99899 7/21/2016 9:43 6.98695 7/21/2016 9:44 6.99122 7/21/2016 9:45 6.95581 7/21/2016 9:46 7.01348 7/21/2016 9:47 6.95096 7/21/2016 9:48 6.96474 7/21/2016 9:49 6.98818 7/21/2016 9:50 7.02375 7/21/2016 9:51 7.01535 7/21/2016 9:52 7.00642 7/21/2016 9:53 7.00699 7/21/2016 9:54 7.04138 7/21/2016 9:55 6.98205 7/21/2016 9:56 6.98864 7/21/2016 9:57 7.01489 7/21/2016 9:58 6.98020 7/21/2016 9:59 7.05505 7/21/2016 10:00 7.02370 7/21/2016 10:01 6.95452 7/21/2016 10:02 6.98500 7/21/2016 10:03 7.01655 7/21/2016 10:04 6.96861 7/21/2016 10:05 6.97430

Page 6: Part Submission Warrantprecix.net/CooperRecerts/BC3Q-8527-BA_ELVF86077V.pdf · Production Part Approval Process Manual 4th Edition Requirements. I further affirm that these samples

7/21/2016 10:06 6.99676 7/21/2016 10:07 6.96090 7/21/2016 10:08 7.01971 7/21/2016 10:09 6.98026 7/21/2016 10:10 7.01284 7/21/2016 10:11 6.96637 7/21/2016 10:12 6.98097 7/21/2016 10:13 7.02949 7/21/2016 10:14 7.01634 7/21/2016 10:15 7.00611 7/21/2016 10:16 6.99575 7/21/2016 10:17 6.99085 7/21/2016 10:18 7.00876 7/21/2016 10:19 7.00264 7/21/2016 10:20 6.98836 7/21/2016 10:21 7.03679 7/21/2016 10:22 6.98727 7/21/2016 10:23 7.01142 7/21/2016 10:24 7.02073 7/21/2016 10:25 7.01196 7/21/2016 10:26 6.97882 7/21/2016 10:27 6.99310 7/21/2016 10:28 6.95269 7/21/2016 10:29 7.00404 7/21/2016 10:30 6.99569 7/21/2016 10:31 6.99405 7/21/2016 10:32 7.00402 7/21/2016 10:33 6.98497 7/21/2016 10:34 6.97822 7/21/2016 10:35 7.02315 7/21/2016 10:36 7.03300 7/21/2016 10:37 6.96975 7/21/2016 10:38 6.99854 7/21/2016 10:39 7.01465 7/21/2016 10:40 6.98017 7/21/2016 10:41 6.97963 7/21/2016 10:42 6.99369 7/21/2016 10:43 7.02403 7/21/2016 10:44 6.98318 7/21/2016 10:45 6.98201 7/21/2016 10:46 6.95827 7/21/2016 10:47 7.01894 Variable N N* Mean SE Mean StDev Minimum Q1 Median Q3 Maximum C2 125 0 6.9988 0.00211 0.0236 6.9435 6.9815 6.9990 7.0151 7.0550

Page 7: Part Submission Warrantprecix.net/CooperRecerts/BC3Q-8527-BA_ELVF86077V.pdf · Production Part Approval Process Manual 4th Edition Requirements. I further affirm that these samples

7/21/2016 8:57 1.49944 7/21/2016 8:58 1.50891 7/21/2016 8:59 1.47112 7/21/2016 9:00 1.49414 7/21/2016 9:01 1.48657 7/21/2016 9:02 1.50825 7/21/2016 9:03 1.49911 7/21/2016 9:04 1.50420 7/21/2016 9:05 1.52326 7/21/2016 9:06 1.50668 7/21/2016 9:07 1.47952 7/21/2016 9:08 1.50437 7/21/2016 9:09 1.48832 7/21/2016 9:10 1.50089 7/21/2016 9:11 1.49994 7/21/2016 9:12 1.50146 7/21/2016 9:13 1.49520 7/21/2016 9:14 1.50042 7/21/2016 9:15 1.46965 7/21/2016 9:16 1.49257 7/21/2016 9:17 1.49691 7/21/2016 9:18 1.50872 7/21/2016 9:19 1.48672 7/21/2016 9:20 1.51273

Page 8: Part Submission Warrantprecix.net/CooperRecerts/BC3Q-8527-BA_ELVF86077V.pdf · Production Part Approval Process Manual 4th Edition Requirements. I further affirm that these samples

7/21/2016 9:21 1.49706 7/21/2016 9:22 1.49994 7/21/2016 9:23 1.50436 7/21/2016 9:24 1.47923 7/21/2016 9:25 1.50213 7/21/2016 9:26 1.49585 7/21/2016 9:27 1.51164 7/21/2016 9:28 1.47937 7/21/2016 9:29 1.50352 7/21/2016 9:30 1.49019 7/21/2016 9:31 1.49423 7/21/2016 9:32 1.49192 7/21/2016 9:33 1.50278 7/21/2016 9:34 1.51138 7/21/2016 9:35 1.48429 7/21/2016 9:36 1.50932 7/21/2016 9:37 1.47691 7/21/2016 9:38 1.49742 7/21/2016 9:39 1.49899 7/21/2016 9:40 1.48043 7/21/2016 9:41 1.50688 7/21/2016 9:42 1.49677 7/21/2016 9:43 1.48798 7/21/2016 9:44 1.48813 7/21/2016 9:45 1.50047 7/21/2016 9:46 1.48082 7/21/2016 9:47 1.50840 7/21/2016 9:48 1.51423 7/21/2016 9:49 1.50005 7/21/2016 9:50 1.49026 7/21/2016 9:51 1.51991 7/21/2016 9:52 1.48572 7/21/2016 9:53 1.48931 7/21/2016 9:54 1.49742 7/21/2016 9:55 1.50062 7/21/2016 9:56 1.50032 7/21/2016 9:57 1.48743 7/21/2016 9:58 1.48867 7/21/2016 9:59 1.47974 7/21/2016 10:00 1.48862 7/21/2016 10:01 1.48429 7/21/2016 10:02 1.47661 7/21/2016 10:03 1.49671 7/21/2016 10:04 1.47908 7/21/2016 10:05 1.49218 7/21/2016 10:06 1.49263 7/21/2016 10:07 1.50488 7/21/2016 10:08 1.49424 7/21/2016 10:09 1.49503 7/21/2016 10:10 1.49173 7/21/2016 10:11 1.47571 7/21/2016 10:12 1.48345 7/21/2016 10:13 1.51266 7/21/2016 10:14 1.49184 7/21/2016 10:15 1.51034 7/21/2016 10:16 1.49966 7/21/2016 10:17 1.50282 7/21/2016 10:18 1.47668 7/21/2016 10:19 1.49689 7/21/2016 10:20 1.50341

Page 9: Part Submission Warrantprecix.net/CooperRecerts/BC3Q-8527-BA_ELVF86077V.pdf · Production Part Approval Process Manual 4th Edition Requirements. I further affirm that these samples

7/21/2016 10:21 1.47076 7/21/2016 10:22 1.47970 7/21/2016 10:23 1.48123 7/21/2016 10:24 1.50930 7/21/2016 10:25 1.49511 7/21/2016 10:26 1.50312 7/21/2016 10:27 1.48136 7/21/2016 10:28 1.48947 7/21/2016 10:29 1.50428 7/21/2016 10:30 1.50649 7/21/2016 10:31 1.51094 7/21/2016 10:32 1.50566 7/21/2016 10:33 1.48899 7/21/2016 10:34 1.49073 7/21/2016 10:35 1.48557 7/21/2016 10:36 1.50024 7/21/2016 10:37 1.48310 7/21/2016 10:38 1.50835 7/21/2016 10:39 1.49055 7/21/2016 10:40 1.47177 7/21/2016 10:41 1.48483 7/21/2016 10:42 1.50730 7/21/2016 10:43 1.49517 7/21/2016 10:44 1.49550 7/21/2016 10:45 1.49058 7/21/2016 10:46 1.49178 7/21/2016 10:47 1.50595 7/21/2016 10:48 1.48453 7/21/2016 10:49 1.50327 7/21/2016 10:50 1.50038 7/21/2016 10:51 1.49102 7/21/2016 10:52 1.49753 7/21/2016 10:53 1.48347 7/21/2016 10:54 1.47607 7/21/2016 10:55 1.49412 7/21/2016 10:56 1.49481 7/21/2016 10:57 1.49679 7/21/2016 10:58 1.49969 7/21/2016 10:59 1.48335 7/21/2016 11:00 1.48433 7/21/2016 11:01 1.49402 Variable N N* Mean SE Mean StDev Minimum Q1 Median Q3 Maximum C2 125 0 1.4947 0.000990 0.0111 1.4697 1.4866 1.4952 1.5030 1.5233

Page 10: Part Submission Warrantprecix.net/CooperRecerts/BC3Q-8527-BA_ELVF86077V.pdf · Production Part Approval Process Manual 4th Edition Requirements. I further affirm that these samples

Page 1 of 1

DaimlerChrysler Ford General MotorsORGANIZATION: PART NUMBER:

SUPPLIER/VENDOR CODE: PART NAME:

MATERIAL SUPPLIER: DESIGN RECORD CHANGE LEVEL:

ENGINEERING CHANGE DOCUMENTS:

NAME OF LABORATORY:

TEST DATE

Z1 3/15/16

3/15/16

3/15/16

3/11/16

3/11/16

3/11/16

4/8/16

3/11/16

3/11/16

3/11/16

3/11/16

4/6/16

D-412

Durometer change, points

Elongation change, %

Tensile change, %

% Original Deflection

D573

D-395

B37

EF31

D-471

D-2240

HEAT AGING PROPERTIES

D-412

A1-10

Elongation, %

Durometer, Shore A pts

Tensile Strength, Mpa

Precix Duns #: 87-743-1916

*CUSTOMER SPECIFIED SUPPLIER/VENDOR CODE: ELV13728 F86

SPECIFICATION / LIMITS

*If source approval is req'd, include the Supplier (Source) & Customer assigned code.

BASIC REQUIREMENTS

O'RingNEW

N/A

SUPPLIER TEST RESULTS (DATA)

Precix, 744 Belleville Ave. New Bedford, MA

COMPRESSION SET

Production Part Approval Material Test Results

MATERIAL SPEC. NO. / REV/ DATE

SAE J200 M2HK810A1-10B37EF31F15Z1

Precix

NOT OK

QTY. TESTED OK

BC3Q-8527-BA

75 5 5

150 min 3 208

70H @ 250°C

0+10 max 5 -25 max 3 -12

7-25 max 3

22H @ 175°C

11 50 max 2

Volume change, %

Elongation change, %

F15

D-2137 Brittleness, nonbrittle

LOW TEMPERATURE

3

3 Mins @ -25°C

Pass 5

3

70H @ 23°C

PASS

FLUID AGING PROPERTIES

-25 max

0 / +10

FUEL C

5

-21 25

Tensile change, %

Durometer change, points

-18-20 max 3

2

2006 CFG-1004

Blanket statements of conformance are unacceptable for any test results.

4/14/2016

DATE

Analytical Lab Manager

TITLE

Paul Raposa

SIGNATUREMarch

72

10 min 3 14.2

Page 11: Part Submission Warrantprecix.net/CooperRecerts/BC3Q-8527-BA_ELVF86077V.pdf · Production Part Approval Process Manual 4th Edition Requirements. I further affirm that these samples

Minitab Project Report

Part-to-PartReprodRepeatGage R&R

100

50

0

Per

cent

% Contribution

% Study Var

% Tolerance

10 9 8 7 6 5 4 3 2 110 9 8 7 6 5 4 3 2 110 9 8 7 6 5 4 3 2 1

0.008

0.004

0.000

PART

Sam

ple

Ran

ge

_R=0.002455

UCL=0.006321

LCL=0

1329 2720 7386

10 9 8 7 6 5 4 3 2 110 9 8 7 6 5 4 3 2 110 9 8 7 6 5 4 3 2 1

2.25

2.22

2.19

PART

Sam

ple

Mea

n

__X=2.20399UCL=2.20650LCL=2.20147

1329 2720 7386

10987654321

2.25

2.22

2.19

PART

738627201329

2.25

2.22

2.19

EMPLOYEE

10987654321

2.25

2.22

2.19

PART

Ave

rage

1329

2720

7386

EMPLOYEE

ART

LOYEE

action

Gage name: MITUTO YO 01579Date of study : 1/6/16

Reported by : D. HEA DTolerance: +/-.08Misc: C S

Components of Variation

R Chart by EMPLOYEE

Xbar Chart by EMPLOYEE

TRIAL by P

TRIAL by EMP

PART * EMPLOYEE Inter

Cooper FAMILY 1 HIGH CS 1-6-16 908

Gage R&R for TRIAL Gage name: MITUTOYO 01579 Date of study: 1/6/16 Reported by: D. HEAD Tolerance: +/-.08 Misc: CS

Two-Way ANOVA Table With Interaction Source DF SS MS F P PART 9 0.0354999 0.0039444 317.655 0.000 EMPLOYEE 2 0.0002840 0.0001420 11.436 0.001 PART * EMPLOYEE 18 0.0002235 0.0000124 4.558 0.000 Repeatability 60 0.0001634 0.0000027 Total 89 0.0361708 Alpha to remove interaction term = 0.25

Gage R&R %Contribution Source VarComp (of VarComp) Total Gage R&R 0.0000103 2.30 Repeatability 0.0000027 0.61 Reproducibility 0.0000076 1.69 EMPLOYEE 0.0000043 0.97

Page 12: Part Submission Warrantprecix.net/CooperRecerts/BC3Q-8527-BA_ELVF86077V.pdf · Production Part Approval Process Manual 4th Edition Requirements. I further affirm that these samples

EMPLOYEE*PART 0.0000032 0.72 Part-To-Part 0.0004369 97.70 Total Variation 0.0004472 100.00 Process tolerance = 0.16 Study Var %Study Var %Tolerance Source StdDev (SD) (6 * SD) (%SV) (SV/Toler) Total Gage R&R 0.0032054 0.019233 15.16 12.02 Repeatability 0.0016505 0.009903 7.80 6.19 Reproducibility 0.0027479 0.016487 12.99 10.30 EMPLOYEE 0.0020784 0.012470 9.83 7.79 EMPLOYEE*PART 0.0017975 0.010785 8.50 6.74 Part-To-Part 0.0209019 0.125412 98.84 78.38 Total Variation 0.0211463 0.126878 100.00 79.30 Number of Distinct Categories = 9 EMPLOYEE PART TRIAL 7386 1 2.1946 7386 2 2.1946 7386 3 2.2403 7386 4 2.2022 7386 5 2.2022 7386 6 2.2073 7386 7 2.1971 7386 8 2.2428 7386 9 2.1742 7386 10 2.2123 7386 1 2.1920 7386 2 2.1946 7386 3 2.2428 7386 4 2.1996 7386 5 2.1996 7386 6 2.2073 7386 7 2.1946 7386 8 2.2428 7386 9 2.1793 7386 10 2.2123 7386 1 2.1946 7386 2 2.1920 7386 3 2.2454 7386 4 2.2022 7386 5 2.1996 7386 6 2.2047 7386 7 2.1946 7386 8 2.2377 7386 9 2.1819 7386 10 2.2098 2720 1 2.1895 2720 2 2.1946 2720 3 2.2403 2720 4 2.1946 2720 5 2.1920 2720 6 2.1996

Page 13: Part Submission Warrantprecix.net/CooperRecerts/BC3Q-8527-BA_ELVF86077V.pdf · Production Part Approval Process Manual 4th Edition Requirements. I further affirm that these samples

2720 7 2.1920 2720 8 2.2428 2720 9 2.1742 2720 10 2.2098 2720 1 2.1895 2720 2 2.1920 2720 3 2.2377 2720 4 2.1946 2720 5 2.1946 2720 6 2.1996 2720 7 2.1920 2720 8 2.2428 2720 9 2.1742 2720 10 2.2073 2720 1 2.1895 2720 2 2.1946 2720 3 2.2428 2720 4 2.1920 2720 5 2.1946 2720 6 2.1996 2720 7 2.1895 2720 8 2.2403 2720 9 2.1742 2720 10 2.2098 1329 1 2.1920 1329 2 2.1920 1329 3 2.2403 1329 4 2.1971 1329 5 2.1920 1329 6 2.2022 1329 7 2.1920 1329 8 2.2327 1329 9 2.1742 1329 10 2.2098 1329 1 2.1895 1329 2 2.1920 1329 3 2.2403 1329 4 2.1996 1329 5 2.1946 1329 6 2.2022 1329 7 2.1895 1329 8 2.2327 1329 9 2.1742 1329 10 2.2098 1329 1 2.1920 1329 2 2.1920 1329 3 2.2403 1329 4 2.1996 1329 5 2.1971 1329 6 2.2047 1329 7 2.1895 1329 8 2.2352 1329 9 2.1742 1329 10 2.2098

Page 14: Part Submission Warrantprecix.net/CooperRecerts/BC3Q-8527-BA_ELVF86077V.pdf · Production Part Approval Process Manual 4th Edition Requirements. I further affirm that these samples

Minitab Project Report

Part-to-PartReprodRepeatGage R&R

100

50

0

Per

cent

% Contribution

% Study Var

% Tolerance

10 9 8 7 6 5 4 3 2 110 9 8 7 6 5 4 3 2 11 0 9 8 7 6 5 4 3 2 1

0.0008

0.0004

0.0000

PART

Sam

ple

Ran

ge

_R=0.00028

UCL=0.0007208

LCL=0

7363 7381 7386

10 9 8 7 6 5 4 3 2 110 9 8 7 6 5 4 3 2 11 0 9 8 7 6 5 4 3 2 1

10.92

10.90

10.88

PART

Sam

ple

Mea

n

__X=10.90211UCL=10.90240LCL=10.90183

7363 7381 7386

10987654321

10.92

10.90

10.88

PART

738673817363

10.92

10.90

10.88

EMPLOYEE

10987654321

10.92

10.90

10.88

PART

Ave

rage

7363

7381

7386

EMPLOYEE

ART

PLOYEE

action

Gage name: MIC RO V U 4Date of study : 1/8/16

Reported by : D. HEA DTolerance: +-.13MMMisc: ID

Components of Variation

R Chart by EMPLOYEE

Xbar Chart by EMPLOYEE

TRIAL by P

TRIAL by EM

PART * EMPLOYEE Inter

Cooper FAMILY 1 HIGH ID 1-8-16 013

Gage R&R Study - ANOVA Method Gage R&R for TRIAL Gage name: MICRO VU 4 Date of study: 1/8/16 Reported by: D. HEAD Tolerance: +-.13MM Misc: ID

Two-Way ANOVA Table With Interaction Source DF SS MS F P PART 9 0.0238719 0.0026524 461.216 0.000 EMPLOYEE 2 0.0000179 0.0000089 1.554 0.239 PART * EMPLOYEE 18 0.0001035 0.0000058 178.478 0.000 Repeatability 60 0.0000019 0.0000000 Total 89 0.0239952 Alpha to remove interaction term = 0.25

Gage R&R %Contribution Source VarComp (of VarComp) Total Gage R&R 0.0000020 0.69 Repeatability 0.0000000 0.01

Page 15: Part Submission Warrantprecix.net/CooperRecerts/BC3Q-8527-BA_ELVF86077V.pdf · Production Part Approval Process Manual 4th Edition Requirements. I further affirm that these samples

Reproducibility 0.0000020 0.68 EMPLOYEE 0.0000001 0.04 EMPLOYEE*PART 0.0000019 0.64 Part-To-Part 0.0002941 99.31 Total Variation 0.0002961 100.00 Process tolerance = 0.26 Study Var %Study Var %Tolerance Source StdDev (SD) (6 * SD) (%SV) (SV/Toler) Total Gage R&R 0.0014299 0.008579 8.31 3.30 Repeatability 0.0001795 0.001077 1.04 0.41 Reproducibility 0.0014186 0.008511 8.24 3.27 EMPLOYEE 0.0003258 0.001955 1.89 0.75 EMPLOYEE*PART 0.0013807 0.008284 8.02 3.19 Part-To-Part 0.0171486 0.102892 99.65 39.57 Total Variation 0.0172081 0.103249 100.00 39.71 Number of Distinct Categories = 16 EMPLOYEE PART TRIAL 7386 1 10.9204 7386 2 10.8830 7386 3 10.8818 7386 4 10.9192 7386 5 10.9145 7386 6 10.9063 7386 7 10.9139 7386 8 10.9013 7386 9 10.8712 7386 10 10.9053 7386 1 10.9205 7386 2 10.8829 7386 3 10.8816 7386 4 10.9191 7386 5 10.9146 7386 6 10.9063 7386 7 10.9138 7386 8 10.9009 7386 9 10.8712 7386 10 10.9053 7386 1 10.9203 7386 2 10.8829 7386 3 10.8817 7386 4 10.9190 7386 5 10.9144 7386 6 10.9061 7386 7 10.9138 7386 8 10.9010 7386 9 10.8710 7386 10 10.9053 7363 1 10.9214 7363 2 10.8837 7363 3 10.8843 7363 4 10.9221

Page 16: Part Submission Warrantprecix.net/CooperRecerts/BC3Q-8527-BA_ELVF86077V.pdf · Production Part Approval Process Manual 4th Edition Requirements. I further affirm that these samples

7363 5 10.9154 7363 6 10.9055 7363 7 10.9132 7363 8 10.9000 7363 9 10.8710 7363 10 10.9037 7363 1 10.9215 7363 2 10.8839 7363 3 10.8842 7363 4 10.9222 7363 5 10.9154 7363 6 10.9055 7363 7 10.9135 7363 8 10.9000 7363 9 10.8712 7363 10 10.9040 7363 1 10.9214 7363 2 10.8837 7363 3 10.8839 7363 4 10.9217 7363 5 10.9151 7363 6 10.9057 7363 7 10.9136 7363 8 10.8998 7363 9 10.8704 7363 10 10.9037 7381 1 10.9216 7381 2 10.8815 7381 3 10.8856 7381 4 10.9215 7381 5 10.9178 7381 6 10.9040 7381 7 10.9134 7381 8 10.9005 7381 9 10.8750 7381 10 10.9070 7381 1 10.9208 7381 2 10.8811 7381 3 10.8849 7381 4 10.9212 7381 5 10.9176 7381 6 10.9040 7381 7 10.9133 7381 8 10.9006 7381 9 10.8751 7381 10 10.9071 7381 1 10.9213 7381 2 10.8814 7381 3 10.8854 7381 4 10.9213 7381 5 10.9178 7381 6 10.9041 7381 7 10.9134 7381 8 10.9004 7381 9 10.8750 7381 10 10.9073

Page 17: Part Submission Warrantprecix.net/CooperRecerts/BC3Q-8527-BA_ELVF86077V.pdf · Production Part Approval Process Manual 4th Edition Requirements. I further affirm that these samples

Minitab Project Report

Part-to-PartReprodRepeatGage R&R

100

50

0

Per

cent

% Contribution

% Study Var

% Tolerance

10 9 8 7 6 5 4 3 2 110 9 8 7 6 5 4 3 2 110 9 8 7 6 5 4 3 2 1

0.010

0.005

0.000

PART

Sam

ple

Ran

ge

_R=0.00347

UCL=0.00892

LCL=0

1329 2720 7381

10 9 8 7 6 5 4 3 2 110 9 8 7 6 5 4 3 2 110 9 8 7 6 5 4 3 2 1

1.82

1.80

1.78

PART

Sam

ple

Mea

n

__X=1.80937UCL=1.81291LCL=1.80582

1329 2720 7381

10987654321

1.82

1.80

1.78

PART

738127201329

1.82

1.80

1.78

EMPLOYEE

10987654321

1.82

1.80

1.78

PART

Ave

rage

1329

2720

7381

EMPLOYEE

ART

LOYEE

action

Gage name: MITUTO YO 01579Date of study : 1/6/16

Reported by : D. HEA DTolerance: +/-.08Misc: C S

Components of Variation

R Chart by EMPLOYEE

Xbar Chart by EMPLOYEE

TRIAL by P

TRIAL by EMP

PART * EMPLOYEE Inter

Cooper FAMILY 1 LOW CS 1-7-16 008

Gage name: MITUTOYO 01579 Date of study: 1/6/16 Reported by: D. HEAD Tolerance: +/-.08 Misc: CS

Two-Way ANOVA Table With Interaction Source DF SS MS F P PART 9 0.0160596 0.0017844 1007.92 0.000 EMPLOYEE 2 0.0000008 0.0000004 0.23 0.800 PART * EMPLOYEE 18 0.0000319 0.0000018 0.37 0.990 Repeatability 60 0.0002907 0.0000048 Total 89 0.0163829 Alpha to remove interaction term = 0.25

Two-Way ANOVA Table Without Interaction Source DF SS MS F P PART 9 0.0160596 0.0017844 431.530 0.000 EMPLOYEE 2 0.0000008 0.0000004 0.097 0.908 Repeatability 78 0.0003225 0.0000041 Total 89 0.0163829

Gage R&R

Page 18: Part Submission Warrantprecix.net/CooperRecerts/BC3Q-8527-BA_ELVF86077V.pdf · Production Part Approval Process Manual 4th Edition Requirements. I further affirm that these samples

%Contribution Source VarComp (of VarComp) Total Gage R&R 0.0000041 2.05 Repeatability 0.0000041 2.05 Reproducibility 0.0000000 0.00 EMPLOYEE 0.0000000 0.00 Part-To-Part 0.0001978 97.95 Total Variation 0.0002019 100.00 Process tolerance = 0.16 Study Var %Study Var %Tolerance Source StdDev (SD) (6 * SD) (%SV) (SV/Toler) Total Gage R&R 0.0020335 0.0122009 14.31 7.63 Repeatability 0.0020335 0.0122009 14.31 7.63 Reproducibility 0.0000000 0.0000000 0.00 0.00 EMPLOYEE 0.0000000 0.0000000 0.00 0.00 Part-To-Part 0.0140644 0.0843863 98.97 52.74 Total Variation 0.0142106 0.0852637 100.00 53.29 Number of Distinct Categories = 9 EMPLOYEE PART TRIAL 7381 1 1.827 7381 2 1.812 7381 3 1.810 7381 4 1.788 7381 5 1.806 7381 6 1.807 7381 7 1.791 7381 8 1.815 7381 9 1.816 7381 10 1.829 7381 1 1.834 7381 2 1.810 7381 3 1.811 7381 4 1.786 7381 5 1.800 7381 6 1.806 7381 7 1.788 7381 8 1.813 7381 9 1.816 7381 10 1.826 7381 1 1.832 7381 2 1.810 7381 3 1.809 7381 4 1.782 7381 5 1.810 7381 6 1.805 7381 7 1.786 7381 8 1.810 7381 9 1.815 7381 10 1.829 2720 1 1.826

Page 19: Part Submission Warrantprecix.net/CooperRecerts/BC3Q-8527-BA_ELVF86077V.pdf · Production Part Approval Process Manual 4th Edition Requirements. I further affirm that these samples

2720 2 1.811 2720 3 1.811 2720 4 1.789 2720 5 1.806 2720 6 1.807 2720 7 1.790 2720 8 1.814 2720 9 1.814 2720 10 1.827 2720 1 1.828 2720 2 1.811 2720 3 1.812 2720 4 1.788 2720 5 1.801 2720 6 1.804 2720 7 1.788 2720 8 1.812 2720 9 1.814 2720 10 1.827 2720 1 1.831 2720 2 1.809 2720 3 1.810 2720 4 1.787 2720 5 1.811 2720 6 1.807 2720 7 1.787 2720 8 1.811 2720 9 1.816 2720 10 1.830 1329 1 1.829 1329 2 1.812 1329 3 1.811 1329 4 1.787 1329 5 1.806 1329 6 1.805 1329 7 1.790 1329 8 1.814 1329 9 1.817 1329 10 1.827 1329 1 1.829 1329 2 1.811 1329 3 1.811 1329 4 1.788 1329 5 1.802 1329 6 1.804 1329 7 1.789 1329 8 1.812 1329 9 1.816 1329 10 1.827 1329 1 1.831 1329 2 1.810 1329 3 1.811 1329 4 1.786 1329 5 1.811 1329 6 1.805 1329 7 1.787

Page 20: Part Submission Warrantprecix.net/CooperRecerts/BC3Q-8527-BA_ELVF86077V.pdf · Production Part Approval Process Manual 4th Edition Requirements. I further affirm that these samples

1329 8 1.812 1329 9 1.815 1329 10 1.830

Page 21: Part Submission Warrantprecix.net/CooperRecerts/BC3Q-8527-BA_ELVF86077V.pdf · Production Part Approval Process Manual 4th Edition Requirements. I further affirm that these samples

Minitab Project Report

Part-to-PartReprodRepeatGage R&R

100

50

0

Per

cent

% Contribution

% Study Var

% Tolerance

10 9 8 7 6 5 4 3 2 110 9 8 7 6 5 4 3 2 11 0 9 8 7 6 5 4 3 2 1

0.0030

0.0015

0.0000

PART

Sam

ple

Ran

ge

_R=0.000323UCL=0.000832LCL=0

7363 7381 7386

10 9 8 7 6 5 4 3 2 110 9 8 7 6 5 4 3 2 11 0 9 8 7 6 5 4 3 2 1

2.91

2.88

2.85

PART

Sam

ple

Mea

n

__X=2.88397UCL=2.88430LCL=2.88364

7363 7381 7386

10987654321

2.91

2.88

2.85

PART

738673817363

2.91

2.88

2.85

EMPLOYEE

10987654321

2.91

2.88

2.85

PART

Ave

rage

7363

7381

7386

EMPLOYEE

ART

LOYEE

action

Gage name: MIC RO V U 4Date of study : 1/8/16

Reported by : D. HEA DTolerance: +/-.13MMMisc: ID

Components of Variation

R Chart by EMPLOYEE

Xbar Chart by EMPLOYEE

TRIAL by P

TRIAL by EMP

PART * EMPLOYEE Inter

Cooper FAMILY 1 LOW ID 1-8-16 006

Gage R&R Study - ANOVA Method Gage R&R for TRIAL Gage name: MICRO VU 4 Date of study: 1/8/16 Reported by: D. HEAD Tolerance: +/-.13MM Misc: ID

Two-Way ANOVA Table With Interaction Source DF SS MS F P PART 9 0.0639869 0.0071097 2687.37 0.000 EMPLOYEE 2 0.0000338 0.0000169 6.39 0.008 PART * EMPLOYEE 18 0.0000476 0.0000026 16.69 0.000 Repeatability 60 0.0000095 0.0000002 Total 89 0.0640778 Alpha to remove interaction term = 0.25

Gage R&R %Contribution Source VarComp (of VarComp) Total Gage R&R 0.0000015 0.18 Repeatability 0.0000002 0.02

Page 22: Part Submission Warrantprecix.net/CooperRecerts/BC3Q-8527-BA_ELVF86077V.pdf · Production Part Approval Process Manual 4th Edition Requirements. I further affirm that these samples

Reproducibility 0.0000013 0.16 EMPLOYEE 0.0000005 0.06 EMPLOYEE*PART 0.0000008 0.10 Part-To-Part 0.0007897 99.82 Total Variation 0.0007911 100.00 Process tolerance = 0.26 Study Var %Study Var %Tolerance Source StdDev (SD) (6 * SD) (%SV) (SV/Toler) Total Gage R&R 0.0012095 0.007257 4.30 2.79 Repeatability 0.0003982 0.002389 1.42 0.92 Reproducibility 0.0011421 0.006852 4.06 2.64 EMPLOYEE 0.0006894 0.004137 2.45 1.59 EMPLOYEE*PART 0.0009105 0.005463 3.24 2.10 Part-To-Part 0.0281010 0.168606 99.91 64.85 Total Variation 0.0281270 0.168762 100.00 64.91 Number of Distinct Categories = 32 EMPLOYEE PART TRIAL 7386 1 2.8752 7386 2 2.8769 7386 3 2.8997 7386 4 2.8454 7386 5 2.8539 7386 6 2.9043 7386 7 2.9048 7386 8 2.9269 7386 9 2.8564 7386 10 2.9077 7386 1 2.8750 7386 2 2.8769 7386 3 2.8998 7386 4 2.8452 7386 5 2.8519 7386 6 2.9042 7386 7 2.9047 7386 8 2.9268 7386 9 2.8564 7386 10 2.9076 7386 1 2.8750 7386 2 2.8768 7386 3 2.8999 7386 4 2.8451 7386 5 2.8519 7386 6 2.9042 7386 7 2.9046 7386 8 2.9238 7386 9 2.8564 7386 10 2.9076 7363 1 2.8738 7363 2 2.8742 7363 3 2.9005 7363 4 2.8402

Page 23: Part Submission Warrantprecix.net/CooperRecerts/BC3Q-8527-BA_ELVF86077V.pdf · Production Part Approval Process Manual 4th Edition Requirements. I further affirm that these samples

7363 5 2.8512 7363 6 2.9035 7363 7 2.9029 7363 8 2.9261 7363 9 2.8560 7363 10 2.9067 7363 1 2.8739 7363 2 2.8742 7363 3 2.9003 7363 4 2.8400 7363 5 2.8513 7363 6 2.9036 7363 7 2.9031 7363 8 2.9261 7363 9 2.8559 7363 10 2.9066 7363 1 2.8740 7363 2 2.8742 7363 3 2.9004 7363 4 2.8401 7363 5 2.8513 7363 6 2.9037 7363 7 2.9030 7363 8 2.9262 7363 9 2.8559 7363 10 2.9067 7381 1 2.8739 7381 2 2.8746 7381 3 2.9003 7381 4 2.8400 7381 5 2.8512 7381 6 2.9036 7381 7 2.9031 7381 8 2.9263 7381 9 2.8560 7381 10 2.9067 7381 1 2.8739 7381 2 2.8747 7381 3 2.9005 7381 4 2.8402 7381 5 2.8512 7381 6 2.9036 7381 7 2.9030 7381 8 2.9262 7381 9 2.8560 7381 10 2.9066 7381 1 2.8740 7381 2 2.8741 7381 3 2.9001 7381 4 2.8401 7381 5 2.8512 7381 6 2.9034 7381 7 2.9032 7381 8 2.9262 7381 9 2.8559 7381 10 2.9066

Page 24: Part Submission Warrantprecix.net/CooperRecerts/BC3Q-8527-BA_ELVF86077V.pdf · Production Part Approval Process Manual 4th Edition Requirements. I further affirm that these samples

Minitab Project Report

Part-to-PartReprodRepeatGage R&R

100

50

0

Per

cent

% Contribution

% Study Var% Tolerance

10 9 8 7 6 5 4 3 2 110 9 8 7 6 5 4 3 2 110 9 8 7 6 5 4 3 2 1

0.008

0.004

0.000

PART

Sam

ple

Ran

ge

_R=0.002455

UCL=0.006321

LCL=0

1329 2720 7386

10 9 8 7 6 5 4 3 2 110 9 8 7 6 5 4 3 2 110 9 8 7 6 5 4 3 2 1

2.25

2.22

2.19

PART

Sam

ple

Mea

n

__X=2.20399UCL=2.20650LCL=2.20147

1329 2720 7386

10987654321

2.25

2.22

2.19

PART

738627201329

2.25

2.22

2.19

EMPLOYEE

10987654321

2.25

2.22

2.19

PART

Ave

rage

1329

27207386

EMPLOYEE

ART

LOYEE

action

Gage name: MITUTO YO 01579Date of study : 1/6/16

Reported by : D. HEA DTolerance: +/-.08Misc: C S

Components of Variation

R Chart by EMPLOYEE

Xbar Chart by EMPLOYEE

TRIAL by P

TRIAL by EMP

PART * EMPLOYEE Inter

Cooper FAMILY 2 HIGH CS 1-6-16 908

Gage R&R for TRIAL Gage name: MITUTOYO 01579 Date of study: 1/6/16 Reported by: D. HEAD Tolerance: +/-.08 Misc: CS

Two-Way ANOVA Table With Interaction Source DF SS MS F P PART 9 0.0354999 0.0039444 317.655 0.000 EMPLOYEE 2 0.0002840 0.0001420 11.436 0.001 PART * EMPLOYEE 18 0.0002235 0.0000124 4.558 0.000 Repeatability 60 0.0001634 0.0000027 Total 89 0.0361708 Alpha to remove interaction term = 0.25

Gage R&R %Contribution Source VarComp (of VarComp) Total Gage R&R 0.0000103 2.30 Repeatability 0.0000027 0.61 Reproducibility 0.0000076 1.69 EMPLOYEE 0.0000043 0.97

Page 25: Part Submission Warrantprecix.net/CooperRecerts/BC3Q-8527-BA_ELVF86077V.pdf · Production Part Approval Process Manual 4th Edition Requirements. I further affirm that these samples

EMPLOYEE*PART 0.0000032 0.72 Part-To-Part 0.0004369 97.70 Total Variation 0.0004472 100.00 Process tolerance = 0.16 Study Var %Study Var %Tolerance Source StdDev (SD) (6 * SD) (%SV) (SV/Toler) Total Gage R&R 0.0032054 0.019233 15.16 12.02 Repeatability 0.0016505 0.009903 7.80 6.19 Reproducibility 0.0027479 0.016487 12.99 10.30 EMPLOYEE 0.0020784 0.012470 9.83 7.79 EMPLOYEE*PART 0.0017975 0.010785 8.50 6.74 Part-To-Part 0.0209019 0.125412 98.84 78.38 Total Variation 0.0211463 0.126878 100.00 79.30 Number of Distinct Categories = 9 EMPLOYEE PART TRIAL 7386 1 2.1946 7386 2 2.1946 7386 3 2.2403 7386 4 2.2022 7386 5 2.2022 7386 6 2.2073 7386 7 2.1971 7386 8 2.2428 7386 9 2.1742 7386 10 2.2123 7386 1 2.1920 7386 2 2.1946 7386 3 2.2428 7386 4 2.1996 7386 5 2.1996 7386 6 2.2073 7386 7 2.1946 7386 8 2.2428 7386 9 2.1793 7386 10 2.2123 7386 1 2.1946 7386 2 2.1920 7386 3 2.2454 7386 4 2.2022 7386 5 2.1996 7386 6 2.2047 7386 7 2.1946 7386 8 2.2377 7386 9 2.1819 7386 10 2.2098 2720 1 2.1895 2720 2 2.1946 2720 3 2.2403 2720 4 2.1946 2720 5 2.1920 2720 6 2.1996

Page 26: Part Submission Warrantprecix.net/CooperRecerts/BC3Q-8527-BA_ELVF86077V.pdf · Production Part Approval Process Manual 4th Edition Requirements. I further affirm that these samples

2720 7 2.1920 2720 8 2.2428 2720 9 2.1742 2720 10 2.2098 2720 1 2.1895 2720 2 2.1920 2720 3 2.2377 2720 4 2.1946 2720 5 2.1946 2720 6 2.1996 2720 7 2.1920 2720 8 2.2428 2720 9 2.1742 2720 10 2.2073 2720 1 2.1895 2720 2 2.1946 2720 3 2.2428 2720 4 2.1920 2720 5 2.1946 2720 6 2.1996 2720 7 2.1895 2720 8 2.2403 2720 9 2.1742 2720 10 2.2098 1329 1 2.1920 1329 2 2.1920 1329 3 2.2403 1329 4 2.1971 1329 5 2.1920 1329 6 2.2022 1329 7 2.1920 1329 8 2.2327 1329 9 2.1742 1329 10 2.2098 1329 1 2.1895 1329 2 2.1920 1329 3 2.2403 1329 4 2.1996 1329 5 2.1946 1329 6 2.2022 1329 7 2.1895 1329 8 2.2327 1329 9 2.1742 1329 10 2.2098 1329 1 2.1920 1329 2 2.1920 1329 3 2.2403 1329 4 2.1996 1329 5 2.1971 1329 6 2.2047 1329 7 2.1895 1329 8 2.2352 1329 9 2.1742 1329 10 2.2098

Page 27: Part Submission Warrantprecix.net/CooperRecerts/BC3Q-8527-BA_ELVF86077V.pdf · Production Part Approval Process Manual 4th Edition Requirements. I further affirm that these samples

Minitab Project Report

Part-to-PartReprodRepeatGage R&R

100

50

0

Per

cent

% Contribution

% Study Var

% Tolerance

10 9 8 7 6 5 4 3 2 110 9 8 7 6 5 4 3 2 11 0 9 8 7 6 5 4 3 2 1

0.0010

0.0005

0.0000

PART

Sam

ple

Ran

ge

_R=0.00034

UCL=0.000875

LCL=0

2720 7363 7381

10 9 8 7 6 5 4 3 2 110 9 8 7 6 5 4 3 2 11 0 9 8 7 6 5 4 3 2 1

18.82

18.80

18.78

PART

Sam

ple

Mea

n

__X=18.80207UCL=18.80242LCL=18.80172

2720 7363 7381

10987654321

18.82

18.80

18.78

PART

738173632720

18.82

18.80

18.78

EMPLOYEE

10987654321

18.82

18.80

18.78

PART

Ave

rage

2720

7363

7381

EMPLOYEE

ART

PLOYEE

action

Gage name: MIC O R V U 4Date of study : 1/8/16

Reported by : D. HEA DTolerance: +-.23MMMisc: ID

Components of Variation

R Chart by EMPLOYEE

Xbar Chart by EMPLOYEE

TRIAL by P

TRIAL by EM

PART * EMPLOYEE Inter

COOPER FAMILY 2 HIGH ID 1/8/16 018

Gage R&R Study - ANOVA Method Gage R&R for TRIAL Gage name: MICOR VU 4 Date of study: 1/8/16 Reported by: D. HEAD Tolerance: +-.23MM Misc: ID

Two-Way ANOVA Table With Interaction Source DF SS MS F P PART 9 0.0321091 0.0035677 69316.9 0.000 EMPLOYEE 2 0.0000004 0.0000002 3.6 0.050 PART * EMPLOYEE 18 0.0000009 0.0000001 1.0 0.426 Repeatability 60 0.0000030 0.0000000 Total 89 0.0321134 Alpha to remove interaction term = 0.25

Two-Way ANOVA Table Without Interaction Source DF SS MS F P PART 9 0.0321091 0.0035677 71725.5 0.000 EMPLOYEE 2 0.0000004 0.0000002 3.7 0.029 Repeatability 78 0.0000039 0.0000000

Page 28: Part Submission Warrantprecix.net/CooperRecerts/BC3Q-8527-BA_ELVF86077V.pdf · Production Part Approval Process Manual 4th Edition Requirements. I further affirm that these samples

Total 89 0.0321134

Gage R&R %Contribution Source VarComp (of VarComp) Total Gage R&R 0.0000001 0.01 Repeatability 0.0000000 0.01 Reproducibility 0.0000000 0.00 EMPLOYEE 0.0000000 0.00 Part-To-Part 0.0003964 99.99 Total Variation 0.0003965 100.00 Process tolerance = 0.46 Study Var %Study Var %Tolerance Source StdDev (SD) (6 * SD) (%SV) (SV/Toler) Total Gage R&R 0.0002328 0.001397 1.17 0.30 Repeatability 0.0002230 0.001338 1.12 0.29 Reproducibility 0.0000668 0.000401 0.34 0.09 EMPLOYEE 0.0000668 0.000401 0.34 0.09 Part-To-Part 0.0199099 0.119459 99.99 25.97 Total Variation 0.0199112 0.119467 100.00 25.97 Number of Distinct Categories = 120 EMPLOYEE PART TRIAL 7381 1 18.7843 7381 2 18.7963 7381 3 18.8354 7381 4 18.8162 7381 5 18.7769 7381 6 18.8159 7381 7 18.7932 7381 8 18.8262 7381 9 18.7950 7381 10 18.7831 7381 1 18.7838 7381 2 18.7957 7381 3 18.8354 7381 4 18.8162 7381 5 18.7769 7381 6 18.8157 7381 7 18.7932 7381 8 18.8262 7381 9 18.7947 7381 10 18.7837 7381 1 18.7840 7381 2 18.7953 7381 3 18.8351 7381 4 18.8162 7381 5 18.7766 7381 6 18.8160 7381 7 18.7934 7381 8 18.8259

Page 29: Part Submission Warrantprecix.net/CooperRecerts/BC3Q-8527-BA_ELVF86077V.pdf · Production Part Approval Process Manual 4th Edition Requirements. I further affirm that these samples

7381 9 18.7947 7381 10 18.7835 2720 1 18.7836 2720 2 18.7954 2720 3 18.8352 2720 4 18.8164 2720 5 18.7766 2720 6 18.8158 2720 7 18.7931 2720 8 18.8261 2720 9 18.7951 2720 10 18.7832 2720 1 18.7834 2720 2 18.7954 2720 3 18.8350 2720 4 18.8164 2720 5 18.7769 2720 6 18.8157 2720 7 18.7933 2720 8 18.8263 2720 9 18.7950 2720 10 18.7838 2720 1 18.7838 2720 2 18.7954 2720 3 18.8350 2720 4 18.8162 2720 5 18.7767 2720 6 18.8160 2720 7 18.7934 2720 8 18.8261 2720 9 18.7948 2720 10 18.7825 7363 1 18.7836 7363 2 18.7953 7363 3 18.8354 7363 4 18.8161 7363 5 18.7767 7363 6 18.8156 7363 7 18.7931 7363 8 18.8261 7363 9 18.7953 7363 10 18.7831 7363 1 18.7833 7363 2 18.7954 7363 3 18.8351 7363 4 18.8162 7363 5 18.7767 7363 6 18.8156 7363 7 18.7933 7363 8 18.8262 7363 9 18.7950 7363 10 18.7833 7363 1 18.7837 7363 2 18.7953 7363 3 18.8348 7363 4 18.8163

Page 30: Part Submission Warrantprecix.net/CooperRecerts/BC3Q-8527-BA_ELVF86077V.pdf · Production Part Approval Process Manual 4th Edition Requirements. I further affirm that these samples

7363 5 18.7767 7363 6 18.8158 7363 7 18.7934 7363 8 18.8261 7363 9 18.7948 7363 10 18.7828

Page 31: Part Submission Warrantprecix.net/CooperRecerts/BC3Q-8527-BA_ELVF86077V.pdf · Production Part Approval Process Manual 4th Edition Requirements. I further affirm that these samples

Minitab Project Report

Part-to-PartReprodRepeatGage R&R

100

50

0

Per

cent

% Contribution

% Study Var% Tolerance

10 9 8 7 6 5 4 3 2 110 9 8 7 6 5 4 3 2 110 9 8 7 6 5 4 3 2 1

0.008

0.004

0.000

PART

Sam

ple

Ran

ge

_R=0.002455

UCL=0.006321

LCL=0

1329 2720 7386

10 9 8 7 6 5 4 3 2 110 9 8 7 6 5 4 3 2 110 9 8 7 6 5 4 3 2 1

2.25

2.22

2.19

PART

Sam

ple

Mea

n

__X=2.20399UCL=2.20650LCL=2.20147

1329 2720 7386

10987654321

2.25

2.22

2.19

PART

738627201329

2.25

2.22

2.19

EMPLOYEE

10987654321

2.25

2.22

2.19

PART

Ave

rage

1329

27207386

EMPLOYEE

ART

LOYEE

action

Gage name: MITUTO YO 01579Date of study : 1/6/16

Reported by : D. HEA DTolerance: +/-.08Misc: C S

Components of Variation

R Chart by EMPLOYEE

Xbar Chart by EMPLOYEE

TRIAL by P

TRIAL by EMP

PART * EMPLOYEE Inter

Cooper FAMILY 2 LOW CS 1-6-16 908

Gage R&R for TRIAL Gage name: MITUTOYO 01579 Date of study: 1/6/16 Reported by: D. HEAD Tolerance: +/-.08 Misc: CS

Two-Way ANOVA Table With Interaction Source DF SS MS F P PART 9 0.0354999 0.0039444 317.655 0.000 EMPLOYEE 2 0.0002840 0.0001420 11.436 0.001 PART * EMPLOYEE 18 0.0002235 0.0000124 4.558 0.000 Repeatability 60 0.0001634 0.0000027 Total 89 0.0361708 Alpha to remove interaction term = 0.25

Gage R&R %Contribution Source VarComp (of VarComp) Total Gage R&R 0.0000103 2.30 Repeatability 0.0000027 0.61 Reproducibility 0.0000076 1.69 EMPLOYEE 0.0000043 0.97

Page 32: Part Submission Warrantprecix.net/CooperRecerts/BC3Q-8527-BA_ELVF86077V.pdf · Production Part Approval Process Manual 4th Edition Requirements. I further affirm that these samples

EMPLOYEE*PART 0.0000032 0.72 Part-To-Part 0.0004369 97.70 Total Variation 0.0004472 100.00 Process tolerance = 0.16 Study Var %Study Var %Tolerance Source StdDev (SD) (6 * SD) (%SV) (SV/Toler) Total Gage R&R 0.0032054 0.019233 15.16 12.02 Repeatability 0.0016505 0.009903 7.80 6.19 Reproducibility 0.0027479 0.016487 12.99 10.30 EMPLOYEE 0.0020784 0.012470 9.83 7.79 EMPLOYEE*PART 0.0017975 0.010785 8.50 6.74 Part-To-Part 0.0209019 0.125412 98.84 78.38 Total Variation 0.0211463 0.126878 100.00 79.30 Number of Distinct Categories = 9 EMPLOYEE PART TRIAL 7386 1 2.1946 7386 2 2.1946 7386 3 2.2403 7386 4 2.2022 7386 5 2.2022 7386 6 2.2073 7386 7 2.1971 7386 8 2.2428 7386 9 2.1742 7386 10 2.2123 7386 1 2.1920 7386 2 2.1946 7386 3 2.2428 7386 4 2.1996 7386 5 2.1996 7386 6 2.2073 7386 7 2.1946 7386 8 2.2428 7386 9 2.1793 7386 10 2.2123 7386 1 2.1946 7386 2 2.1920 7386 3 2.2454 7386 4 2.2022 7386 5 2.1996 7386 6 2.2047 7386 7 2.1946 7386 8 2.2377 7386 9 2.1819 7386 10 2.2098 2720 1 2.1895 2720 2 2.1946 2720 3 2.2403 2720 4 2.1946 2720 5 2.1920 2720 6 2.1996

Page 33: Part Submission Warrantprecix.net/CooperRecerts/BC3Q-8527-BA_ELVF86077V.pdf · Production Part Approval Process Manual 4th Edition Requirements. I further affirm that these samples

2720 7 2.1920 2720 8 2.2428 2720 9 2.1742 2720 10 2.2098 2720 1 2.1895 2720 2 2.1920 2720 3 2.2377 2720 4 2.1946 2720 5 2.1946 2720 6 2.1996 2720 7 2.1920 2720 8 2.2428 2720 9 2.1742 2720 10 2.2073 2720 1 2.1895 2720 2 2.1946 2720 3 2.2428 2720 4 2.1920 2720 5 2.1946 2720 6 2.1996 2720 7 2.1895 2720 8 2.2403 2720 9 2.1742 2720 10 2.2098 1329 1 2.1920 1329 2 2.1920 1329 3 2.2403 1329 4 2.1971 1329 5 2.1920 1329 6 2.2022 1329 7 2.1920 1329 8 2.2327 1329 9 2.1742 1329 10 2.2098 1329 1 2.1895 1329 2 2.1920 1329 3 2.2403 1329 4 2.1996 1329 5 2.1946 1329 6 2.2022 1329 7 2.1895 1329 8 2.2327 1329 9 2.1742 1329 10 2.2098 1329 1 2.1920 1329 2 2.1920 1329 3 2.2403 1329 4 2.1996 1329 5 2.1971 1329 6 2.2047 1329 7 2.1895 1329 8 2.2352 1329 9 2.1742 1329 10 2.2098

Page 34: Part Submission Warrantprecix.net/CooperRecerts/BC3Q-8527-BA_ELVF86077V.pdf · Production Part Approval Process Manual 4th Edition Requirements. I further affirm that these samples

Minitab Project Report

Part-to-PartReprodRepeatGage R&R

100

50

0

Per

cent

% Contribution

% Study Var% Tolerance

10 9 8 7 6 5 4 3 2 110 9 8 7 6 5 4 3 2 11 0 9 8 7 6 5 4 3 2 1

0.0008

0.0004

0.0000

PART

Sam

ple

Ran

ge

_R=0.00028

UCL=0.0007208

LCL=0

7363 7381 7386

10 9 8 7 6 5 4 3 2 110 9 8 7 6 5 4 3 2 11 0 9 8 7 6 5 4 3 2 1

10.92

10.90

10.88

PART

Sam

ple

Mea

n

__X=10.90211UCL=10.90240LCL=10.90183

7363 7381 7386

10987654321

10.92

10.90

10.88

PART

738673817363

10.92

10.90

10.88

EMPLOYEE

10987654321

10.92

10.90

10.88

PART

Ave

rage

73637381

7386

EMPLOYEE

ART

PLOYEE

action

Gage name: MIC RO V U 4Date of study : 1/8/16

Reported by : D. HEA DTolerance: +-.13MMMisc: ID

Components of Variation

R Chart by EMPLOYEE

Xbar Chart by EMPLOYEE

TRIAL by P

TRIAL by EM

PART * EMPLOYEE Inter

Cooper FAMILY 2 LOW ID 1-8-16 013

Gage R&R Study - ANOVA Method Gage R&R for TRIAL Gage name: MICRO VU 4 Date of study: 1/8/16 Reported by: D. HEAD Tolerance: +-.13MM Misc: ID

Two-Way ANOVA Table With Interaction Source DF SS MS F P PART 9 0.0238719 0.0026524 461.216 0.000 EMPLOYEE 2 0.0000179 0.0000089 1.554 0.239 PART * EMPLOYEE 18 0.0001035 0.0000058 178.478 0.000 Repeatability 60 0.0000019 0.0000000 Total 89 0.0239952 Alpha to remove interaction term = 0.25

Gage R&R %Contribution Source VarComp (of VarComp) Total Gage R&R 0.0000020 0.69 Repeatability 0.0000000 0.01

Page 35: Part Submission Warrantprecix.net/CooperRecerts/BC3Q-8527-BA_ELVF86077V.pdf · Production Part Approval Process Manual 4th Edition Requirements. I further affirm that these samples

Reproducibility 0.0000020 0.68 EMPLOYEE 0.0000001 0.04 EMPLOYEE*PART 0.0000019 0.64 Part-To-Part 0.0002941 99.31 Total Variation 0.0002961 100.00 Process tolerance = 0.26 Study Var %Study Var %Tolerance Source StdDev (SD) (6 * SD) (%SV) (SV/Toler) Total Gage R&R 0.0014299 0.008579 8.31 3.30 Repeatability 0.0001795 0.001077 1.04 0.41 Reproducibility 0.0014186 0.008511 8.24 3.27 EMPLOYEE 0.0003258 0.001955 1.89 0.75 EMPLOYEE*PART 0.0013807 0.008284 8.02 3.19 Part-To-Part 0.0171486 0.102892 99.65 39.57 Total Variation 0.0172081 0.103249 100.00 39.71 Number of Distinct Categories = 16 EMPLOYEE PART TRIAL 7386 1 10.9204 7386 2 10.8830 7386 3 10.8818 7386 4 10.9192 7386 5 10.9145 7386 6 10.9063 7386 7 10.9139 7386 8 10.9013 7386 9 10.8712 7386 10 10.9053 7386 1 10.9205 7386 2 10.8829 7386 3 10.8816 7386 4 10.9191 7386 5 10.9146 7386 6 10.9063 7386 7 10.9138 7386 8 10.9009 7386 9 10.8712 7386 10 10.9053 7386 1 10.9203 7386 2 10.8829 7386 3 10.8817 7386 4 10.9190 7386 5 10.9144 7386 6 10.9061 7386 7 10.9138 7386 8 10.9010 7386 9 10.8710 7386 10 10.9053 7363 1 10.9214 7363 2 10.8837 7363 3 10.8843 7363 4 10.9221

Page 36: Part Submission Warrantprecix.net/CooperRecerts/BC3Q-8527-BA_ELVF86077V.pdf · Production Part Approval Process Manual 4th Edition Requirements. I further affirm that these samples

7363 5 10.9154 7363 6 10.9055 7363 7 10.9132 7363 8 10.9000 7363 9 10.8710 7363 10 10.9037 7363 1 10.9215 7363 2 10.8839 7363 3 10.8842 7363 4 10.9222 7363 5 10.9154 7363 6 10.9055 7363 7 10.9135 7363 8 10.9000 7363 9 10.8712 7363 10 10.9040 7363 1 10.9214 7363 2 10.8837 7363 3 10.8839 7363 4 10.9217 7363 5 10.9151 7363 6 10.9057 7363 7 10.9136 7363 8 10.8998 7363 9 10.8704 7363 10 10.9037 7381 1 10.9216 7381 2 10.8815 7381 3 10.8856 7381 4 10.9215 7381 5 10.9178 7381 6 10.9040 7381 7 10.9134 7381 8 10.9005 7381 9 10.8750 7381 10 10.9070 7381 1 10.9208 7381 2 10.8811 7381 3 10.8849 7381 4 10.9212 7381 5 10.9176 7381 6 10.9040 7381 7 10.9133 7381 8 10.9006 7381 9 10.8751 7381 10 10.9071 7381 1 10.9213 7381 2 10.8814 7381 3 10.8854 7381 4 10.9213 7381 5 10.9178 7381 6 10.9041 7381 7 10.9134 7381 8 10.9004 7381 9 10.8750 7381 10 10.9073

Page 37: Part Submission Warrantprecix.net/CooperRecerts/BC3Q-8527-BA_ELVF86077V.pdf · Production Part Approval Process Manual 4th Edition Requirements. I further affirm that these samples

Minitab Project Report

Part-to-PartReprodRepeatGage R&R

100

50

0

Per

cent

% Contribution

% Study Var% Tolerance

10 9 8 7 6 5 4 3 2 110 9 8 7 6 5 4 3 2 110 9 8 7 6 5 4 3 2 1

0.008

0.004

0.000

PART

Sam

ple

Ran

ge

_R=0.002455

UCL=0.006321

LCL=0

1329 2720 7386

10 9 8 7 6 5 4 3 2 110 9 8 7 6 5 4 3 2 110 9 8 7 6 5 4 3 2 1

2.25

2.22

2.19

PART

Sam

ple

Mea

n

__X=2.20399UCL=2.20650LCL=2.20147

1329 2720 7386

10987654321

2.25

2.22

2.19

PART

738627201329

2.25

2.22

2.19

EMPLOYEE

10987654321

2.25

2.22

2.19

PART

Ave

rage

1329

27207386

EMPLOYEE

ART

LOYEE

action

Gage name: MITUTO YO 01579Date of study : 1/6/16

Reported by : D. HEA DTolerance: +/-.08Misc: C S

Components of Variation

R Chart by EMPLOYEE

Xbar Chart by EMPLOYEE

TRIAL by P

TRIAL by EMP

PART * EMPLOYEE Inter

Cooper FAMILY 3 HIGH CS 1-6-16 908

Gage R&R for TRIAL Gage name: MITUTOYO 01579 Date of study: 1/6/16 Reported by: D. HEAD Tolerance: +/-.08 Misc: CS

Two-Way ANOVA Table With Interaction Source DF SS MS F P PART 9 0.0354999 0.0039444 317.655 0.000 EMPLOYEE 2 0.0002840 0.0001420 11.436 0.001 PART * EMPLOYEE 18 0.0002235 0.0000124 4.558 0.000 Repeatability 60 0.0001634 0.0000027 Total 89 0.0361708 Alpha to remove interaction term = 0.25

Gage R&R %Contribution Source VarComp (of VarComp) Total Gage R&R 0.0000103 2.30 Repeatability 0.0000027 0.61 Reproducibility 0.0000076 1.69 EMPLOYEE 0.0000043 0.97

Page 38: Part Submission Warrantprecix.net/CooperRecerts/BC3Q-8527-BA_ELVF86077V.pdf · Production Part Approval Process Manual 4th Edition Requirements. I further affirm that these samples

EMPLOYEE*PART 0.0000032 0.72 Part-To-Part 0.0004369 97.70 Total Variation 0.0004472 100.00 Process tolerance = 0.16 Study Var %Study Var %Tolerance Source StdDev (SD) (6 * SD) (%SV) (SV/Toler) Total Gage R&R 0.0032054 0.019233 15.16 12.02 Repeatability 0.0016505 0.009903 7.80 6.19 Reproducibility 0.0027479 0.016487 12.99 10.30 EMPLOYEE 0.0020784 0.012470 9.83 7.79 EMPLOYEE*PART 0.0017975 0.010785 8.50 6.74 Part-To-Part 0.0209019 0.125412 98.84 78.38 Total Variation 0.0211463 0.126878 100.00 79.30 Number of Distinct Categories = 9 EMPLOYEE PART TRIAL 7386 1 2.1946 7386 2 2.1946 7386 3 2.2403 7386 4 2.2022 7386 5 2.2022 7386 6 2.2073 7386 7 2.1971 7386 8 2.2428 7386 9 2.1742 7386 10 2.2123 7386 1 2.1920 7386 2 2.1946 7386 3 2.2428 7386 4 2.1996 7386 5 2.1996 7386 6 2.2073 7386 7 2.1946 7386 8 2.2428 7386 9 2.1793 7386 10 2.2123 7386 1 2.1946 7386 2 2.1920 7386 3 2.2454 7386 4 2.2022 7386 5 2.1996 7386 6 2.2047 7386 7 2.1946 7386 8 2.2377 7386 9 2.1819 7386 10 2.2098 2720 1 2.1895 2720 2 2.1946 2720 3 2.2403 2720 4 2.1946 2720 5 2.1920 2720 6 2.1996

Page 39: Part Submission Warrantprecix.net/CooperRecerts/BC3Q-8527-BA_ELVF86077V.pdf · Production Part Approval Process Manual 4th Edition Requirements. I further affirm that these samples

2720 7 2.1920 2720 8 2.2428 2720 9 2.1742 2720 10 2.2098 2720 1 2.1895 2720 2 2.1920 2720 3 2.2377 2720 4 2.1946 2720 5 2.1946 2720 6 2.1996 2720 7 2.1920 2720 8 2.2428 2720 9 2.1742 2720 10 2.2073 2720 1 2.1895 2720 2 2.1946 2720 3 2.2428 2720 4 2.1920 2720 5 2.1946 2720 6 2.1996 2720 7 2.1895 2720 8 2.2403 2720 9 2.1742 2720 10 2.2098 1329 1 2.1920 1329 2 2.1920 1329 3 2.2403 1329 4 2.1971 1329 5 2.1920 1329 6 2.2022 1329 7 2.1920 1329 8 2.2327 1329 9 2.1742 1329 10 2.2098 1329 1 2.1895 1329 2 2.1920 1329 3 2.2403 1329 4 2.1996 1329 5 2.1946 1329 6 2.2022 1329 7 2.1895 1329 8 2.2327 1329 9 2.1742 1329 10 2.2098 1329 1 2.1920 1329 2 2.1920 1329 3 2.2403 1329 4 2.1996 1329 5 2.1971 1329 6 2.2047 1329 7 2.1895 1329 8 2.2352 1329 9 2.1742 1329 10 2.2098

Page 40: Part Submission Warrantprecix.net/CooperRecerts/BC3Q-8527-BA_ELVF86077V.pdf · Production Part Approval Process Manual 4th Edition Requirements. I further affirm that these samples

Minitab Project Report

Part-to-PartReprodRepeatGage R&R

100

50

0

Per

cent

% Contribution

% Study Var

% Tolerance

10 9 8 7 6 5 4 3 2 110 9 8 7 6 5 4 3 2 11 0 9 8 7 6 5 4 3 2 1

0.0002

0.0001

0.0000

PART

Sam

ple

Ran

ge

_R=0.0000343

UCL=0.0000884

LCL=0

1329 2720 7381

10 9 8 7 6 5 4 3 2 110 9 8 7 6 5 4 3 2 11 0 9 8 7 6 5 4 3 2 1

2.695

2.690

2.685

PART

Sam

ple

Mea

n

__X=2.68960UCL=2.68964LCL=2.68957

1329 2720 7381

10987654321

2.695

2.690

2.685

PART

738127201329

2.695

2.690

2.685

EMPLOYEE

10987654321

2.695

2.690

2.685

PART

Ave

rage

1329

2720

7381

EMPLOYEE

ART

PLOYEE

action

Gage name: MIC RO V U 4Date of study : 1/7/16

Reported by : D. HEA DTolerance: +-.022"Misc: ID

Components of Variation

R Chart by EMPLOYEE

Xbar Chart by EMPLOYEE

TRIAL by P

TRIAL by EM

PART * EMPLOYEE Inter

COOPER FAMILY 3 HIGH ID 1/7/16 147

Gage R&R Study - ANOVA Method Gage R&R for TRIAL Gage name: MICRO VU 4 Date of study: 1/7/16 Reported by: D. HEAD Tolerance: +-.022" Misc: ID

Two-Way ANOVA Table With Interaction Source DF SS MS F P PART 9 0.0017115 0.0001902 130679 0.000 EMPLOYEE 2 0.0000000 0.0000000 8 0.003 PART * EMPLOYEE 18 0.0000000 0.0000000 2 0.025 Repeatability 60 0.0000000 0.0000000 Total 89 0.0017115 Alpha to remove interaction term = 0.25

Gage R&R %Contribution Source VarComp (of VarComp) Total Gage R&R 0.0000000 0.01 Repeatability 0.0000000 0.00

Page 41: Part Submission Warrantprecix.net/CooperRecerts/BC3Q-8527-BA_ELVF86077V.pdf · Production Part Approval Process Manual 4th Edition Requirements. I further affirm that these samples

Reproducibility 0.0000000 0.00 EMPLOYEE 0.0000000 0.00 EMPLOYEE*PART 0.0000000 0.00 Part-To-Part 0.0000211 99.99 Total Variation 0.0000211 100.00 Process tolerance = 0.044 Study Var %Study Var %Tolerance Source StdDev (SD) (6 * SD) (%SV) (SV/Toler) Total Gage R&R 0.0000363 0.0002175 0.79 0.49 Repeatability 0.0000271 0.0001624 0.59 0.37 Reproducibility 0.0000241 0.0001447 0.52 0.33 EMPLOYEE 0.0000185 0.0001108 0.40 0.25 EMPLOYEE*PART 0.0000155 0.0000931 0.34 0.21 Part-To-Part 0.0045966 0.0275797 100.00 62.68 Total Variation 0.0045968 0.0275806 100.00 62.68 Number of Distinct Categories = 178 EMPLOYEE PART TRIAL 7381 1 2.69563 7381 2 2.69126 7381 3 2.69148 7381 4 2.69590 7381 5 2.68696 7381 6 2.68455 7381 7 2.68110 7381 8 2.68796 7381 9 2.69029 7381 10 2.69145 7381 1 2.69545 7381 2 2.69121 7381 3 2.69143 7381 4 2.69583 7381 5 2.68695 7381 6 2.68452 7381 7 2.68111 7381 8 2.68792 7381 9 2.69026 7381 10 2.69143 7381 1 2.69544 7381 2 2.69120 7381 3 2.69145 7381 4 2.69583 7381 5 2.68695 7381 6 2.68450 7381 7 2.68112 7381 8 2.68790 7381 9 2.69026 7381 10 2.69142 2720 1 2.69543 2720 2 2.69121 2720 3 2.69146 2720 4 2.69584

Page 42: Part Submission Warrantprecix.net/CooperRecerts/BC3Q-8527-BA_ELVF86077V.pdf · Production Part Approval Process Manual 4th Edition Requirements. I further affirm that these samples

2720 5 2.68696 2720 6 2.68448 2720 7 2.68109 2720 8 2.68788 2720 9 2.69025 2720 10 2.69141 2720 1 2.69539 2720 2 2.69115 2720 3 2.69142 2720 4 2.69579 2720 5 2.68694 2720 6 2.68448 2720 7 2.68113 2720 8 2.68788 2720 9 2.69025 2720 10 2.69141 2720 1 2.69542 2720 2 2.69117 2720 3 2.69141 2720 4 2.69578 2720 5 2.68695 2720 6 2.68448 2720 7 2.68114 2720 8 2.68787 2720 9 2.69025 2720 10 2.69140 1329 1 2.69539 1329 2 2.69116 1329 3 2.69144 1329 4 2.69580 1329 5 2.68697 1329 6 2.68449 1329 7 2.68116 1329 8 2.68789 1329 9 2.69025 1329 10 2.69138 1329 1 2.69541 1329 2 2.69118 1329 3 2.69145 1329 4 2.69581 1329 5 2.68698 1329 6 2.68449 1329 7 2.68114 1329 8 2.68786 1329 9 2.69023 1329 10 2.69138 1329 1 2.69540 1329 2 2.69118 1329 3 2.69145 1329 4 2.69580 1329 5 2.68698 1329 6 2.68448 1329 7 2.68114 1329 8 2.68786 1329 9 2.69022 1329 10 2.69138

Page 43: Part Submission Warrantprecix.net/CooperRecerts/BC3Q-8527-BA_ELVF86077V.pdf · Production Part Approval Process Manual 4th Edition Requirements. I further affirm that these samples

Minitab Project Report

Part-to-PartReprodRepeatGage R&R

100

50

0

Per

cent

% Contribution

% Study Var% Tolerance

10 9 8 7 6 5 4 3 2 110 9 8 7 6 5 4 3 2 110 9 8 7 6 5 4 3 2 1

0.008

0.004

0.000

PART

Sam

ple

Ran

ge

_R=0.002455

UCL=0.006321

LCL=0

1329 2720 7386

10 9 8 7 6 5 4 3 2 110 9 8 7 6 5 4 3 2 110 9 8 7 6 5 4 3 2 1

2.25

2.22

2.19

PART

Sam

ple

Mea

n

__X=2.20399UCL=2.20650LCL=2.20147

1329 2720 7386

10987654321

2.25

2.22

2.19

PART

738627201329

2.25

2.22

2.19

EMPLOYEE

10987654321

2.25

2.22

2.19

PART

Ave

rage

1329

27207386

EMPLOYEE

ART

LOYEE

action

Gage name: MITUTO YO 01579Date of study : 1/6/16

Reported by : D. HEA DTolerance: +/-.08Misc: C S

Components of Variation

R Chart by EMPLOYEE

Xbar Chart by EMPLOYEE

TRIAL by P

TRIAL by EMP

PART * EMPLOYEE Inter

Cooper FAMILY 3 LOW CS 1-6-16 908

Gage R&R for TRIAL Gage name: MITUTOYO 01579 Date of study: 1/6/16 Reported by: D. HEAD Tolerance: +/-.08 Misc: CS

Two-Way ANOVA Table With Interaction Source DF SS MS F P PART 9 0.0354999 0.0039444 317.655 0.000 EMPLOYEE 2 0.0002840 0.0001420 11.436 0.001 PART * EMPLOYEE 18 0.0002235 0.0000124 4.558 0.000 Repeatability 60 0.0001634 0.0000027 Total 89 0.0361708 Alpha to remove interaction term = 0.25

Gage R&R %Contribution Source VarComp (of VarComp) Total Gage R&R 0.0000103 2.30 Repeatability 0.0000027 0.61 Reproducibility 0.0000076 1.69 EMPLOYEE 0.0000043 0.97

Page 44: Part Submission Warrantprecix.net/CooperRecerts/BC3Q-8527-BA_ELVF86077V.pdf · Production Part Approval Process Manual 4th Edition Requirements. I further affirm that these samples

EMPLOYEE*PART 0.0000032 0.72 Part-To-Part 0.0004369 97.70 Total Variation 0.0004472 100.00 Process tolerance = 0.16 Study Var %Study Var %Tolerance Source StdDev (SD) (6 * SD) (%SV) (SV/Toler) Total Gage R&R 0.0032054 0.019233 15.16 12.02 Repeatability 0.0016505 0.009903 7.80 6.19 Reproducibility 0.0027479 0.016487 12.99 10.30 EMPLOYEE 0.0020784 0.012470 9.83 7.79 EMPLOYEE*PART 0.0017975 0.010785 8.50 6.74 Part-To-Part 0.0209019 0.125412 98.84 78.38 Total Variation 0.0211463 0.126878 100.00 79.30 Number of Distinct Categories = 9 EMPLOYEE PART TRIAL 7386 1 2.1946 7386 2 2.1946 7386 3 2.2403 7386 4 2.2022 7386 5 2.2022 7386 6 2.2073 7386 7 2.1971 7386 8 2.2428 7386 9 2.1742 7386 10 2.2123 7386 1 2.1920 7386 2 2.1946 7386 3 2.2428 7386 4 2.1996 7386 5 2.1996 7386 6 2.2073 7386 7 2.1946 7386 8 2.2428 7386 9 2.1793 7386 10 2.2123 7386 1 2.1946 7386 2 2.1920 7386 3 2.2454 7386 4 2.2022 7386 5 2.1996 7386 6 2.2047 7386 7 2.1946 7386 8 2.2377 7386 9 2.1819 7386 10 2.2098 2720 1 2.1895 2720 2 2.1946 2720 3 2.2403 2720 4 2.1946 2720 5 2.1920 2720 6 2.1996

Page 45: Part Submission Warrantprecix.net/CooperRecerts/BC3Q-8527-BA_ELVF86077V.pdf · Production Part Approval Process Manual 4th Edition Requirements. I further affirm that these samples

2720 7 2.1920 2720 8 2.2428 2720 9 2.1742 2720 10 2.2098 2720 1 2.1895 2720 2 2.1920 2720 3 2.2377 2720 4 2.1946 2720 5 2.1946 2720 6 2.1996 2720 7 2.1920 2720 8 2.2428 2720 9 2.1742 2720 10 2.2073 2720 1 2.1895 2720 2 2.1946 2720 3 2.2428 2720 4 2.1920 2720 5 2.1946 2720 6 2.1996 2720 7 2.1895 2720 8 2.2403 2720 9 2.1742 2720 10 2.2098 1329 1 2.1920 1329 2 2.1920 1329 3 2.2403 1329 4 2.1971 1329 5 2.1920 1329 6 2.2022 1329 7 2.1920 1329 8 2.2327 1329 9 2.1742 1329 10 2.2098 1329 1 2.1895 1329 2 2.1920 1329 3 2.2403 1329 4 2.1996 1329 5 2.1946 1329 6 2.2022 1329 7 2.1895 1329 8 2.2327 1329 9 2.1742 1329 10 2.2098 1329 1 2.1920 1329 2 2.1920 1329 3 2.2403 1329 4 2.1996 1329 5 2.1971 1329 6 2.2047 1329 7 2.1895 1329 8 2.2352 1329 9 2.1742 1329 10 2.2098

Page 46: Part Submission Warrantprecix.net/CooperRecerts/BC3Q-8527-BA_ELVF86077V.pdf · Production Part Approval Process Manual 4th Edition Requirements. I further affirm that these samples

Minitab Project Report

Part-to-PartReprodRepeatGage R&R

100

50

0

Per

cent

% Contribution

% Study Var

% Tolerance

10 9 8 7 6 5 4 3 2 110 9 8 7 6 5 4 3 2 11 0 9 8 7 6 5 4 3 2 1

0.0010

0.0005

0.0000

PART

Sam

ple

Ran

ge

_R=0.00052

UCL=0.001339

LCL=0

1329 2720 7386

10 9 8 7 6 5 4 3 2 110 9 8 7 6 5 4 3 2 11 0 9 8 7 6 5 4 3 2 1

23.50

23.35

23.20

PART

Sam

ple

Mea

n __X=23.4408UCL=23.4414LCL=23.4403

1329 2720 7386

10987654321

23.50

23.35

23.20

PART

738627201329

23.50

23.35

23.20

EMPLOYEE

10987654321

23.50

23.35

23.20

PART

Ave

rage

1329

2720

7386

EMPLOYEE

ART

PLOYEE

action

Gage name: MIC RO V U 4Date of study : 1/8/16

Reported by : D. HEA DTolerance: +-.25MMMisc: ID

Components of Variation

R Chart by EMPLOYEE

Xbar Chart by EMPLOYEE

TRIAL by P

TRIAL by EM

PART * EMPLOYEE Inter

Cooper FAMILY 3 LOW ID 1-8-16 213

Gage R&R Study - ANOVA Method Gage R&R for TRIAL Gage name: MICRO VU 4 Date of study: 1/8/16 Reported by: D. HEAD Tolerance: +-.25MM Misc: ID

Two-Way ANOVA Table With Interaction Source DF SS MS F P PART 9 0.914463 0.101607 947521 0.000 EMPLOYEE 2 0.000000 0.000000 2 0.193 PART * EMPLOYEE 18 0.000002 0.000000 1 0.444 Repeatability 60 0.000006 0.000000 Total 89 0.914472 Alpha to remove interaction term = 0.25

Two-Way ANOVA Table Without Interaction Source DF SS MS F P PART 9 0.914463 0.101607 967660 0.000 EMPLOYEE 2 0.000000 0.000000 2 0.165 Repeatability 78 0.000008 0.000000

Page 47: Part Submission Warrantprecix.net/CooperRecerts/BC3Q-8527-BA_ELVF86077V.pdf · Production Part Approval Process Manual 4th Edition Requirements. I further affirm that these samples

Total 89 0.914472

Gage R&R %Contribution Source VarComp (of VarComp) Total Gage R&R 0.0000001 0.00 Repeatability 0.0000001 0.00 Reproducibility 0.0000000 0.00 EMPLOYEE 0.0000000 0.00 Part-To-Part 0.0112897 100.00 Total Variation 0.0112898 100.00 Process tolerance = 0.5 Study Var %Study Var %Tolerance Source StdDev (SD) (6 * SD) (%SV) (SV/Toler) Total Gage R&R 0.000329 0.001971 0.31 0.39 Repeatability 0.000324 0.001944 0.30 0.39 Reproducibility 0.000054 0.000326 0.05 0.07 EMPLOYEE 0.000054 0.000326 0.05 0.07 Part-To-Part 0.106253 0.637517 100.00 127.50 Total Variation 0.106253 0.637520 100.00 127.50 Number of Distinct Categories = 455 EMPLOYEE PART TRIAL 7386 1 23.3718 7386 2 23.5036 7386 3 23.5016 7386 4 23.4991 7386 5 23.4311 7386 6 23.5301 7386 7 23.5322 7386 8 23.3158 7386 9 23.5040 7386 10 23.2180 7386 1 23.3720 7386 2 23.5034 7386 3 23.5014 7386 4 23.4996 7386 5 23.4312 7386 6 23.5307 7386 7 23.5317 7386 8 23.3148 7386 9 23.5048 7386 10 23.2181 7386 1 23.3719 7386 2 23.5036 7386 3 23.5016 7386 4 23.4994 7386 5 23.4314 7386 6 23.5312 7386 7 23.5316 7386 8 23.3147

Page 48: Part Submission Warrantprecix.net/CooperRecerts/BC3Q-8527-BA_ELVF86077V.pdf · Production Part Approval Process Manual 4th Edition Requirements. I further affirm that these samples

7386 9 23.5050 7386 10 23.2177 2720 1 23.3718 2720 2 23.5032 2720 3 23.5014 2720 4 23.4994 2720 5 23.4316 2720 6 23.5314 2720 7 23.5319 2720 8 23.3157 2720 9 23.5044 2720 10 23.2180 2720 1 23.3716 2720 2 23.5034 2720 3 23.5014 2720 4 23.4995 2720 5 23.4315 2720 6 23.5307 2720 7 23.5317 2720 8 23.3151 2720 9 23.5052 2720 10 23.2189 2720 1 23.3717 2720 2 23.5032 2720 3 23.5013 2720 4 23.4997 2720 5 23.4317 2720 6 23.5311 2720 7 23.5319 2720 8 23.3157 2720 9 23.5055 2720 10 23.2183 1329 1 23.3718 1329 2 23.5034 1329 3 23.5013 1329 4 23.4995 1329 5 23.4315 1329 6 23.5307 1329 7 23.5316 1329 8 23.3148 1329 9 23.5041 1329 10 23.2192 1329 1 23.3719 1329 2 23.5032 1329 3 23.5014 1329 4 23.4993 1329 5 23.4318 1329 6 23.5311 1329 7 23.5319 1329 8 23.3150 1329 9 23.5049 1329 10 23.2187 1329 1 23.3720 1329 2 23.5034 1329 3 23.5014 1329 4 23.4998

Page 49: Part Submission Warrantprecix.net/CooperRecerts/BC3Q-8527-BA_ELVF86077V.pdf · Production Part Approval Process Manual 4th Edition Requirements. I further affirm that these samples

1329 5 23.4312 1329 6 23.5304 1329 7 23.5315 1329 8 23.3156 1329 9 23.5047 1329 10 23.2180

Page 50: Part Submission Warrantprecix.net/CooperRecerts/BC3Q-8527-BA_ELVF86077V.pdf · Production Part Approval Process Manual 4th Edition Requirements. I further affirm that these samples
mperry
Text Box
APCO ELVF86077V Cooper Standard P/N BC3Q-8527-BA Rev. New dated 3/3/08 Mold: 41716
stomasek
Rectangle
stomasek
Rectangle
stomasek
Rectangle
stomasek
Rectangle
stomasek
Rectangle
stomasek
Typewritten Text
1
stomasek
Typewritten Text
2
stomasek
Typewritten Text
3
stomasek
Typewritten Text
4
stomasek
Typewritten Text
5