13
Place photo here 1 Entscheidungsgrundlagen mit Proof-of-Concept – SAP HANA Gerd Rieger – Panalpina Management AG

Panalpina Entscheidungsgrundlagen SAP HANA - IBM · PDF fileEntscheidungsgrundlagen ... • SAP CC: 45 FTE in 4 Location (Basel, Singapore, ... TM 8.0 Transport Management (Ocean freight)

  • Upload
    vumien

  • View
    214

  • Download
    1

Embed Size (px)

Citation preview

Page 1: Panalpina Entscheidungsgrundlagen SAP HANA - IBM · PDF fileEntscheidungsgrundlagen ... • SAP CC: 45 FTE in 4 Location (Basel, Singapore, ... TM 8.0 Transport Management (Ocean freight)

Place photo here

1

Entscheidungsgrundlagenmit Proof-of-Concept – SAP HANAGerd Rieger – Panalpina Management AG

Page 2: Panalpina Entscheidungsgrundlagen SAP HANA - IBM · PDF fileEntscheidungsgrundlagen ... • SAP CC: 45 FTE in 4 Location (Basel, Singapore, ... TM 8.0 Transport Management (Ocean freight)

2

Company Profile

SAP CC at Panalpina

Current Situation and Motivation

Reporting Environment and PoC SAP HANA

Results PoC SAP HANA

Agenda

Page 3: Panalpina Entscheidungsgrundlagen SAP HANA - IBM · PDF fileEntscheidungsgrundlagen ... • SAP CC: 45 FTE in 4 Location (Basel, Singapore, ... TM 8.0 Transport Management (Ocean freight)

3

Company Profile - Panalpina at a glanceCorporate figures 2010

• Among global top five in air and ocean freight

• 500 own offices in 80 countries

• Approximately 15 000 employees

• CHF 7,164 million net forwarding revenue

• CHF 1,480 million gross profit

• CHF 62 million EBITDA

• Volume Air Freight 892 000 Tons

• Volume Ocean Freight 1 241 000 TEU

• Listed at SIX (Swiss Stock Exchange)

Page 4: Panalpina Entscheidungsgrundlagen SAP HANA - IBM · PDF fileEntscheidungsgrundlagen ... • SAP CC: 45 FTE in 4 Location (Basel, Singapore, ... TM 8.0 Transport Management (Ocean freight)

4

• Global IT staffing: 430 FTE

• SAP CC: 45 FTE in 4 Location (Basel, Singapore, New York, Nuremberg)

• 5320 supported SAP users

• 14 productive SAP installations (IBM/AIX database DB2)• ERP (FI, CO, AM, SD), CRM, LES, GRC, Solution Manager, BW,

TM 8.0 Transport Management (Ocean freight)

• 2012 -> Upgrade TM 9.0 (incl. Air freight), HANA, TRM, SRM,

• Central datacenter for SAP (Basel) 50 TB of data

• Strategic SAP Partner for development and support are SAP AG and TATA

consultancy services (onsite / offshore)

SAP CC at Panalpina - Key Figures

Page 5: Panalpina Entscheidungsgrundlagen SAP HANA - IBM · PDF fileEntscheidungsgrundlagen ... • SAP CC: 45 FTE in 4 Location (Basel, Singapore, ... TM 8.0 Transport Management (Ocean freight)

5

• Panalpina has a solid, performant and highly developed BW environment in

the area of internal finance, statistics and operational reporting in place.

• Panalpina has a lot of workarounds in place to deliver information to the

customer according their demands. (combination from different sources and

merging of financial, operation and customer data) This so called external

customer reporting has been taken into account for the PoC.

�Solution approach: PoC SAP HANA together with SAP�Team

Solution Architecture - Mr. Marco Michel SAPHANA Business Case/Value for Panalpina - Mr. Harry Child SAPProject Manager - Mr. Andreas Krause SAPPanalpina Head BW development - Mr. René Meier

Current Situation and Motivation for the PoC

Page 6: Panalpina Entscheidungsgrundlagen SAP HANA - IBM · PDF fileEntscheidungsgrundlagen ... • SAP CC: 45 FTE in 4 Location (Basel, Singapore, ... TM 8.0 Transport Management (Ocean freight)

• Automotive

• Chemicals

• Consumer and retail

• Fashion

• Healthcare

• Hi-tech

• Industrial projects

• Manufacturing

• Oil and Gas

• Telecom

6

Current Situation and Motivation for the PoC – External CustomerReporting (approx.120 global accounts)

• Monthly volume and perfomance report

(region, origin, destination, tradelanes)

• Monthly air freight costs per carrier

• Container utilization report per tradelane,

• Global KPI report for all air transit times (Gateway)

• All sea freight FCL rates – shipments charged

• KPI Report all shipments, shipment delay report

• Total invoiced amount, +30, +60, +90 days in USD

• Claims and transport damages

� Very individual

� Specific in design, layout, format

� Standardization is difficult

Key industries

Page 7: Panalpina Entscheidungsgrundlagen SAP HANA - IBM · PDF fileEntscheidungsgrundlagen ... • SAP CC: 45 FTE in 4 Location (Basel, Singapore, ... TM 8.0 Transport Management (Ocean freight)

7

Reporting Environment BW

BWA

DB/2

SAP ERP

Systems

SCP

Operational

Data

ODW

Panbase

Customer and Logistic Data

Intrac

Pantrace

COM

MS SQL Reporting Services (Frontend)

Financial and Operational Data

ODBC

Internal Reporting

External Reporting

Hundreds of Local Excel Solutions to combine financial data with shipment and customer data

MS SQL SolutionLack of control and visibility Bad performanceHigh manual workload

Data Load daily

3000 User worldwideGood performance

Problem

BW

Presentation

Layer

SAP Bex Web Analyser

Page 8: Panalpina Entscheidungsgrundlagen SAP HANA - IBM · PDF fileEntscheidungsgrundlagen ... • SAP CC: 45 FTE in 4 Location (Basel, Singapore, ... TM 8.0 Transport Management (Ocean freight)

8

Panbase and

Excel-Solution SAP HANA

Business WarehouseBWA

+ Good Performance

- Flexiblilty

- Development costs

- Lot of cubes

- ETL workload

- Data integration

from other systems

Reporting Environment - Where to develop the new reporting ?

- Bad performance

+ Flexibililty

- Development Costs

- Complex SQL statements

- Tuning necessary

- Different Excel Solutions

+ Good performance

+ Flexibility

+ development costs

+ change management

+ Less tuning

Investments / Licenses

Chosen Environment

Page 9: Panalpina Entscheidungsgrundlagen SAP HANA - IBM · PDF fileEntscheidungsgrundlagen ... • SAP CC: 45 FTE in 4 Location (Basel, Singapore, ... TM 8.0 Transport Management (Ocean freight)

9

PoC SAP HANA – Criteria

• ”Real Time“ replication (< 5 Sec response time in Reporting)

• Fast information delivery – latest operational changes to be included

• Data model 1:1 from SCP to HANA (Reporting on source model and structure)

• Prevent definition of complex data modelling, cubes, queries and aggregates

• Usage of logical views in HANA to access and process data

• Flexibility (development, maintenance, change requests)

• High flexibility and fast reaction to perform all upcoming changes

• Easy transformation of data

• Reporting on source model and structure

• Minimize latency time, fast delivery of results

• Strong performance

Page 10: Panalpina Entscheidungsgrundlagen SAP HANA - IBM · PDF fileEntscheidungsgrundlagen ... • SAP CC: 45 FTE in 4 Location (Basel, Singapore, ... TM 8.0 Transport Management (Ocean freight)

10

BWA

DB/2

SAP ERP

Systems

SCP

Operational

Data

Presentation

Layer

SAP Bex Web

Analyser

Customer and Logistic Data

Intrac

Pantrace

COM

Financial and Operational Data

Internal Reporting

Data Load daily

InfoSphereReplication Server SLT

ReplicationServer

Transit Database SLT server

System Landscape Transformation (SLT)

R/3 Net Weaver System

Replication

DB/2

SAP HANA

IBM Systems Solution for SAP HANA

SAP HANA

IBM General Parallel File System (GPFS)

Novell Suse Linux for SAP Applications

IBM x3690 X5 – 2 Socket – 256 GB RAM

Interal disks: SDD & HDD

3 Y

ea

r Ma

int.

Data Model

SAP Business Objects

Web Intelligence

ODW

BW

PoC SAP HANA – Set-up External Customer Reporting

Page 11: Panalpina Entscheidungsgrundlagen SAP HANA - IBM · PDF fileEntscheidungsgrundlagen ... • SAP CC: 45 FTE in 4 Location (Basel, Singapore, ... TM 8.0 Transport Management (Ocean freight)

11

Task SAP BW SAP HANA

Define Info Objects, Fields, Tables, Basic

data (DSO Data Store Objects)

4 hours 5 min

Define Info Provider (OLAP Cubes), ETL logic, (HANA logical view)

5 days 1 day

Bulk Data Load (Initial Load ca. 10 tables)(200 Million records)

24 hours(280 GB)

5 hours(30 GB)

Delta Load – BW (inbound layer)

HANA realtime replication

60 min 1 sec

Customer Report for 2 customer(data selection one month)

15 min 13 sec

Change reports (maintenance cube, query) 1 days 1 hour

PoC SAP HANA Results for Development and Reporting

� Significant reduction of time and effort

Page 12: Panalpina Entscheidungsgrundlagen SAP HANA - IBM · PDF fileEntscheidungsgrundlagen ... • SAP CC: 45 FTE in 4 Location (Basel, Singapore, ... TM 8.0 Transport Management (Ocean freight)

12

PoC SAP HANA - Conclusions

• SAP HANA will fit as accelerator for our customer reporting environment

and can be good integrated in our existing SAP landscape.

• On the long run it can replace our existing SAP NetWeaver BWA and the

current database DB2 for SAP BW. (SAP strategy)

We could close the PoC with positive results.

PoC Effort: 52 PD external consultancy / Duration in Q4. 2011 approx. 5

weeks

Hardware: IBM x3690 X5 Compliance and existing in-house server

Software: SAP HANA test licences, InfoSphere Licences, SAP BO Licences

Page 13: Panalpina Entscheidungsgrundlagen SAP HANA - IBM · PDF fileEntscheidungsgrundlagen ... • SAP CC: 45 FTE in 4 Location (Basel, Singapore, ... TM 8.0 Transport Management (Ocean freight)

13

Thank you for your attention