3 4 5 6
A
B
C
D
E
21
A.4
1.3
101
102
103
104
105
106
108
107
109
110111112
113
114
115
116
117
118
119
121
122
123
125
126
127
128129
130131
132
133
134
135
1
138
139140
146
182
183
185
187
188 189
120
186
RECRUITER 2
LOBBY
RAPIDS
RECRUITER 1
STAIR 3
CORR 1
STOR 2 EMERGPOWER
PHYS
CORR 2
VEST 2
CORR 4
CORR 5
VEST 2
VEST 3
MENSHWR MEN
JAN 1
FAM T
WOMEN
WOMENSHWR
STAIR 1
MECHANICAL 1
KITCHEN
SCULLERYDRY STO
ASSEMBLY HALL
COMM SECTCLASSRM
ELEV
MDF
BOILER
STOR 3
SPKLRROOM
OPEN OFFICE 1
ELECPOWER
CORR 3
UNITSTORAGE
EQUIPSTOR
OFFICE 11
COPIER
OFFICE 5
STOR 1
CORR 7
OFFICE 3
OFFICE 4
OFFICE 1OFFICE 2
CO
VER
ED A
PRO
N
VEST 1
STORAGE
A
54321
D.4
D.6
1.8
B
C.1
D
E
C.4
C
6
A.4
5.9
D.2
D.7
6.1
A.6
1.3
D.8
D.9
B-1
AS-1ET-1
ET-2
AS-2
CHWP-1
CHWP-2
AHU-02A
AHU-01A
REFER TO SHEETM1.1 FOR CONTINUATION
HHWP-1HHWP-2
FCU-1N-2
VTU-01A-1
VTU-01A-9
VTU-01A-8
VTU-01A-14
VTU-01A-15VTU-01A-11
VTU-01A-2
VTU-01A-7
VTU-01A-6
VTU-01B-8
VTU-01A-3
VTU-01A-12
HOOD # 2
VTU-01A-5
VTU-01A-19
VTU-01A-20
VTU-01A-13
VTU-01A-4
VTU-01A-10
VTU-01A-16
VTU-01B-7
CU-1S
FCU-1S-1
T
T
T
T
T
T
T
T
TT
T
T
T
T
T
T
T
UH-01AFCU-1N-1
3/4" H
HWS
1 1/2" HHWR
1" H
HWR
3/4" HHWR
1 1/4"
HHW
R1 1
/4" H
HWS
1 1/4"
HHW
S1 1
/4" H
HWR
PIPING UPPIPING DOWN 2" HHWS
2" HHWR
3/4" H
HWS
3/4" H
HWR
1" H
HWS
1" H
HWR
PROVIDE A 3-WAY VALVE
PIPING UP
1" H
HWS
PROVIDE A 3-WAYVALVE
3/4" HHWS
1 1/4" HHWS1 1/4" HHWR
4" CHWS/ R &2" HHWS/ RUP TO JAN. 4ROOM # 170
KSF-1
L-3
HOOD # 1
HOOD # 3
(K15)
(K34)
(K22)
FCU-1N-3
INSTALL SINGLECND PUMPSERVING AHU-02AAND AHU-01A.ROUTE CND PIPINGTIGHT TO WALL.
1
CND
3/4"
CND 3/4"
ROUTE CONDENSATELINES DRY WELL.MAINTAIN A MINIMUM OF10' FROM BUILDINGFOUNDATION.
ROUTE MAU-01CONDENSATE LINE TODEDICATED FRENCHWELL. MAINTAIN AMINIMUM OF 10' FROMBUILDING FOUNDATION.
1 1
1
REFRIGERANT PIPINGFOR VRF SHALL BE SIZEDACCORDING TOMANUFACTURER'SRECOMMENDATION.
3/8" VRFS &3/4" VRFR UPTO 2ND FL
M3.13
T
TCO2
CO2
3/8" VRFS5/8" VRFR
3/8" VRFS5/8" VRFR
1/4" VRFS1/2" VRFR 1/4" VRFS
1/2" VRFR
3/8" VRFS5/8" VRFR
3/8" VRFS7/8" VRFR
3/8" VRFS5/8" VRFR
3/8" VRFS3/4" VRFR
1
1
1
11
100% BID FINAL
D.B.
JOB NO.C.B.
REVISIONS
ORA
NG
E PA
RK, F
LORI
DA
320
7313
29 K
ING
SLEY
AV
ENU
E, S
UIT
E C
LIC
. NO
. AA
C00
0569
PH. (
904)
264
-191
9
09005
JUNE 13, 2016DATE
FLO
RID
A A
RMY
NA
TIO
NA
L G
UA
RDA
IRPO
RT E
XEC
UTI
VE
DRI
VE
FLA
GLE
R CO
UN
TY, F
LORI
DA
CFM
O N
O. 1
2017
3
PALM
CO
AST
REA
DIN
ESS
CEN
TER
COA 15COA 15COA 15COA 15COA 15COA 15COA 15COA 15COA 15
1650 Prudential DriveSuite 200Jacksonville, Florida 32207
©Copyright 2015
Phone: 904-306-9111Fax: 904-306-9117
TLC NO:
E N G I N E E R I N GF O R A R C H I T E C T U R E
COA 15
TLC Engineering for Architecture, Inc.www.tlc-engineers.com
COA 15
Jeffrey J. Stone, P.E.Florida License # 71466
815082
A B
C D
KEY PLAN
E
F
C:\R
evit
2016
Loc
al M
odel
s\81
5082
_ME
P_R
16_a
mbe
r.kat
ada.
rvt
6/28
/201
6 5:
29:5
7 PM
READINESSBLDG - 1STFLOOR PLAN -NORTHWEST -PIPING
AAKJJS
M2.7 1/8" = 1'-0"1 LEVEL 1 - PIPING - NORTHWEST1 PROVIDE CONDENSATE PUMP.
DUCTS ABOVE CEILINGS REQUIRE ACCESS. PROVIDEPANELS AS REQUIRED.
PROVIDE CABLE CONTROL VOLUME DAMPERS. DUCTSARE NOT ACCESSIBLE IF EITHER LOCATED IN ATTIC ORABOVE HARD CEILINGS. GANG DEVICES ABOVECEILINGS NEAR ACCESS HATCHES.
NOT ALL MANUAL VOLUME DAMPERS ARE SHOWN.PROVIDE DAMPERS AT ALL LOCATIONS COVERED BYDUCT INSTALLATION DETAILS
FOR GREASE DUCTS PROVIDE ALL CODE REQUIREDACCESS HATCHES IN THE DUCT FOR CLEANING. SLOPETHE GREASE DUCT TO THE FUME HOOD. NOBALANCING DAMPERS ALLOWED IN GREASE DUCT.
ALL MOTORIZED DAMPERS TO BE 240 AND ALL POWERTO BE PROVIDED BY CONTROLS CONTRACTOR.
GENERAL NOTES:
1.
2.
3.
4.
5.
CO2
T
1 6-29-16 ADDENDUM#2
4 5 6 7 10
A
A.9
D
D.3
9
134
135
136
137
138
139140
141
142
143
(260) 24" SQ.SGL. LOCKERSWITH 4" CONC.
HOUSEKEEPING PAD
PHYS FITNESS
CORR 5
STAIR 1
GEAR LOCKERS
LOCKERBASIC
KITCHEN
SCULLERYDRY STO
JAN 2
TOILET
CANWASH
KIT OFFICE
CO
VER
ED A
PRO
N
A
1054
B
C.1
D
E
C.4
C
7
8
65.9 9
D.2
D.7
6.9 9.2 10.16.1
A.6
D.8
D.9
AS-1ET-1
ET-2
HHWP-1HHWP-2
VTU-01A-14
VTU-01A-15
VTU-01A-17
HOOD # 2 VTU-01-18
VTU-01A-19
VTU-01A-20
VTU-01A-13
VTU-01A-16
CU-1N
CU-1S
T
T
T
T
T
T
1" H
HWR
3/4" HHWR
3/4" H
HWS
3/4" H
HWR
1" H
HWS
1" H
HWR
PROVIDE A 3-WAY VALVE
PIPING UP
1" H
HWS
PROVIDE A 3-WAY VALVE
3/4" HHWS4" CHWS/ R &2" HHWS/ RUP TO JAN. 4ROOM # 170
L-4KSF-2KSF-1
L-3
HOOD # 1
HOOD # 3
(K15)
(K34)
(K22)
ROUTE CONDENSATELINES DRY WELL.MAINTAIN A MINIMUM OF10' FROM BUILDINGFOUNDATION.
REFRIGERANT PIPINGFOR VRF SHALL BE SIZEDACCORDING TOMANUFACTURER'SRECOMMENDATION.
1/2" VRFS1 1/8" VRFR
3/8" VRFS7/8" VRFR1
1
100% BID FINAL
D.B.
JOB NO.C.B.
REVISIONS
ORA
NG
E PA
RK, F
LORI
DA
320
7313
29 K
ING
SLEY
AV
ENU
E, S
UIT
E C
LIC
. NO
. AA
C00
0569
PH. (
904)
264
-191
9
09005
JUNE 13, 2016DATE
FLO
RID
A A
RMY
NA
TIO
NA
L G
UA
RDA
IRPO
RT E
XEC
UTI
VE
DRI
VE
FLA
GLE
R CO
UN
TY, F
LORI
DA
CFM
O N
O. 1
2017
3
PALM
CO
AST
REA
DIN
ESS
CEN
TER
COA 15COA 15COA 15COA 15COA 15COA 15COA 15COA 15COA 15
1650 Prudential DriveSuite 200Jacksonville, Florida 32207
©Copyright 2015
Phone: 904-306-9111Fax: 904-306-9117
TLC NO:
E N G I N E E R I N GF O R A R C H I T E C T U R E
COA 15
TLC Engineering for Architecture, Inc.www.tlc-engineers.com
COA 15
Jeffrey J. Stone, P.E.Florida License # 71466
815082
A B
C D
KEY PLAN
E
F
C:\R
evit
2016
Loc
al M
odel
s\81
5082
_ME
P_R
16_a
mbe
r.kat
ada.
rvt
6/28
/201
6 5:
29:5
9 PM
READINESSBLDG - 1STFLOOR PLAN -NORTHEAST -PIPING
AAKJJS
M2.8 1/8" = 1'-0"1 LEVEL 1 - PIPING - NORTHEAST
1 6-29-16 ADDENDUM#2
E
F
G
H
1
G.5
FUTURECUBICLES
101
105
106
138
144
145
146
149
150
153
154
157
158
159
161
162
163
165
169
170 171
172 173
174
175
177
176
178
179
180181
182
183
184
185
164
166 160167168
186
LOBBY
RAPIDS
STAIR 3
CORR 1
KITCHEN
ASSEMBLY HALL
CORR 6CORR 10
STAIR 2
ELEC 1
OPEN OFFICE 2
OFFICE 8 OFFICE 7
MECHANICAL 2
JANSTOR
MEN
WOMEN
CORR 11
FAMILYREADINESS
BREAK / VENDING
ELEV
VAULT 1
VAULT 3
VAULT 2
UNITSTORAGE 4
CORR 12 LEARNINGCENTER
OPEN OFFICE 3
STORAGE(TEMP.
INTERVIEW)
OFFICE 10
OFFICE 11
OFFICE 6
COPIER
OFFICE 9
LOCKEDUNIT
STORAGE
CORR 7
CORR 8
CORR 9
CO
VER
ED A
PRO
N
IDF 1
LIBRARY /CLASSRM
VENDING
STORAGE
TABLE ANDCHAIR STOR.
H
54321
D.4
D.6
1.8
E
F
G
6
G.5
5.9
D.7
1.3
D.8
D.9VTU-01B-8
VTU-01B-6
VTU-01B-4
VTU-01B-5
VTU-01B-3
VTU-01B-9VTU-01B-11
VTU-01B-10 VTU-01B-12
VTU-01B-13
FCU-1S-2
VTU-01B-1
AHU-01B
VTU-01B-2
VTU-01B-7
CU-1S
FCU-1S-1
T
T
T
T
T
T
T
T
T
T
T
T
1 1/4"
HHW
S
1 1/4" HHWR
3/4" H
HWS
3/4" H
HWS
1" HHWR1 1/4" HHWR
1" H
HWR
1" HHWS
1" H
HWS
DOWN FROM 2NDFLOOR MECHROOM # 249
1 1/4"
HHW
R
1 1/4"
HHW
S1 1
/4" H
HWR
1 1/4"
HHW
S
1 1/2" CHWS1 1/2" CHWR
1 1/4" CHWS 1 1/4" CHWR
2" C
HWR
2" C
HWS
1 1/4"
CHW
S1 1
/4" C
HWR
KSF-1
L-3
HOOD # 3(K34)
1
CND 1/2"
CND
1/2"
1
ROUTE CONDENSATELINES TO DRY WELL.MAINTAIN A MINIMUM OF10' FROM BUILDINGFOUNDATION.
CND
2"
CND FROM 2ND FL.
CND 1 1/4"
1
T
REFRIGERANT PIPINGFOR VRF SHALL BE SIZEDACCORDING TOMANUFACTURER'SRECOMMENDATION.
3/8" VRFS &5/8" VRFR UPTO 2ND FL
TCO2
CO2
CO2
CO2
3/8" VRFS7/8" VRFR
3/8" VRFS5/8" VRFR
3/8" VRFS5/8" VRFR
1/2" VRFS1/4" VRFR
11
1
1
100% BID FINAL
D.B.
JOB NO.C.B.
REVISIONS
ORA
NG
E PA
RK, F
LORI
DA
320
7313
29 K
ING
SLEY
AV
ENU
E, S
UIT
E C
LIC
. NO
. AA
C00
0569
PH. (
904)
264
-191
9
09005
JUNE 13, 2016DATE
FLO
RID
A A
RMY
NA
TIO
NA
L G
UA
RDA
IRPO
RT E
XEC
UTI
VE
DRI
VE
FLA
GLE
R CO
UN
TY, F
LORI
DA
CFM
O N
O. 1
2017
3
PALM
CO
AST
REA
DIN
ESS
CEN
TER
COA 15COA 15COA 15COA 15COA 15COA 15COA 15COA 15COA 15
1650 Prudential DriveSuite 200Jacksonville, Florida 32207
©Copyright 2015
Phone: 904-306-9111Fax: 904-306-9117
TLC NO:
E N G I N E E R I N GF O R A R C H I T E C T U R E
COA 15
TLC Engineering for Architecture, Inc.www.tlc-engineers.com
COA 15
Jeffrey J. Stone, P.E.Florida License # 71466
815082
A B
C D
KEY PLAN
E
F
C:\R
evit
2016
Loc
al M
odel
s\81
5082
_ME
P_R
16_a
mbe
r.kat
ada.
rvt
6/28
/201
6 5:
30:0
4 PM
READINESSBLDG - 1STFLOOR PLAN -SOUTHWEST -PIPING
AAKJJS
M2.9 1/8" = 1'-0"1 LEVEL 1 - PIPING - SOUTHWEST
1 PROVIDE CONDENSATE PUMP.
1 6-29-16 ADDENDUM#2
116.1
E
E.4
G.7
H
10.19.1
145
146
147
148
149
150152
153
154
155
156
157
CORR 6
BATT DHTD STORVAULT 1
VAULT OFF 1
VAULT 3 BATT CHTD STOR
VAULT 2HHB
HTD STOR
CORR 7
CORR 8
CORR 9
VAULT OFF 2
VAULT OFF 3
CO
VER
ED A
H
54
11
E
F
G
G.7
8
65.9
E.4
9.2 10.1
D.9
DHU-1C
DHU-1B
DHU-1A
CU-1S
T
T
T
1" H
HWR
3/4" H
HWR
FCU-1C
FCU-1B
FCU-1A
1" H
HWS
1" H
HWR
3/4" H
HWS
1" H
HWS
3/4" H
HWS
3/4" H
HWR
PROVIDE A 3-WAY VALVE
1" C
HWR
1" C
HWS
1 1/4" CHWR1 1/4" CHWS
1/2" C
ND
ENSURE THAT CONDENSATELINES SLOPE DOWNTOWARD TERMINATION OFPIPE 1/4" PER 12'. PROVIDECONDENSATE PUMP.
REFRIGERANT PIPINGFOR VRF SHALL BE SIZEDACCORDING TOMANUFACTURER'SRECOMMENDATION.
3/8" VRFS &5/8" VRFR UPTO 2ND FL
3/8" VRFS7/8" VRFR1
100% BID FINAL
D.B.
JOB NO.C.B.
REVISIONS
ORA
NG
E PA
RK, F
LORI
DA
320
7313
29 K
ING
SLEY
AV
ENU
E, S
UIT
E C
LIC
. NO
. AA
C00
0569
PH. (
904)
264
-191
9
09005
JUNE 13, 2016DATE
FLO
RID
A A
RMY
NA
TIO
NA
L G
UA
RDA
IRPO
RT E
XEC
UTI
VE
DRI
VE
FLA
GLE
R CO
UN
TY, F
LORI
DA
CFM
O N
O. 1
2017
3
PALM
CO
AST
REA
DIN
ESS
CEN
TER
COA 15COA 15COA 15COA 15COA 15COA 15COA 15COA 15COA 15
1650 Prudential DriveSuite 200Jacksonville, Florida 32207
©Copyright 2015
Phone: 904-306-9111Fax: 904-306-9117
TLC NO:
E N G I N E E R I N GF O R A R C H I T E C T U R E
COA 15
TLC Engineering for Architecture, Inc.www.tlc-engineers.com
COA 15
Jeffrey J. Stone, P.E.Florida License # 71466
815082
A B
C D
KEY PLAN
E
F
C:\R
evit
2016
Loc
al M
odel
s\81
5082
_ME
P_R
16_a
mbe
r.kat
ada.
rvt
6/28
/201
6 5:
30:0
9 PM
READINESSBLDG - 1STFLOOR PLAN -SOUTHEAST -PIPING
AAKJJS
M2.10 1/8" = 1'-0"1 LEVEL 1 - PIPING - SOUTHEAST
1 6-29-16 ADDENDUM#2
3 4 5 6
A
B
C
D
E
21
A.4
1.3
201
202
203
204
205
206
207
208
209210
211
213
214
215
216217
218
219
220
221
223
224225
226
227
228
229
230
238
250
255 257256
258
WINDOWS UNDERENTRY
CO
PIER
OPEN TOBELOW
OPEN TO
BELOW
STAIR 3
CORRIDOR 13
CLASSROOM 1
G6 ROOM
OFFICE 12
TRAININGCLASSROOM
WOMENMEN
CORR 15
CORR 17
OPEN OFFICE 5
CORR 14
ELEC 3
IDF 2
STAIR 1
ELEC 2
CLASSROOM 2
JAN 4
TREQUIP
LG OFFICEOFFICE 14
OFFICE 15
OFFICE 19
STOR 3
CLASSROOM 4
CLASSROOM 5
CORR 16
OPEN OFFICE 4
OFFICE 16
OFFICE 17
OFFICE 18
OFFICE 13
COPY/STOR 1
CORR 18
OFFICE 28 OFFICE 29 OFFICE 30
A
D.4
D.6
1.8
B
C.1
D
E
C.4
C
A.4
D.2
D.7
A.6
D.8
D.9
AHU-02C
MAU-01
HHW
S 1 1
/2"
HHW
R 1 1
/2"
3" C
HWS
3" C
HWR
1" H
HWR
1" H
HWS
3 1/2"
CHW
R3 1
/2" C
HWS
3" CHWR3" CHWS
VTU-02A-3
VTU-02A-2
VTU-02A-1
VTU-02A-15
VTU-02A-14
VTU-02A-13
VTU-02A-12
VTU-02A-9
VTU-02A-10
VTU-02A-4
VTU-02A-5
VTU-02A-6
VTU-02B-3
VTU-02B-2
VTU-02B-4
VTU-02A-11VTU-02A-7 VTU-02A-8
T
T
T
TT
T
T
TT
T
T
T T T
T
T
T
4" CHWS/ R &2" HHWS/ RFROM 1ST FLOORMECH ROOM # 124
PROVIDE A 3-WAY VALVE
PROVIDE A 3-WAY VALVE
3/4" H
HWS
3/4" H
HWR
3/4" H
HWR
3/4" H
HWS 3/4" HHWR
3/4" HHWS 1" HHWS1" HHWRUPDWN
1 1/2"
HHW
R
2" HHWS2" HHWR
1 1/2" HHWS
1 1/2" HHWR
FCU-2N-1
CND LINES ROUTE DWNTO GRND LEVEL
CND
3/4"
CND
1 1/4"
FCU-2N-2
FCU-2N-3
CND 3/4"
CND 3/4"
CND 3/4"
VRF PIPINGFRM 1ST FL
T-STAT ON 1ST FL
1/4" VRFS1/2" VRFR
3/8" VRFS5/8" VRFR
3/8" VRFS5/8" VRFR
1/4" VRFS1/2" VRFR
3/8" VRFS3/4" VRFR
1
1
1
100% BID FINAL
D.B.
JOB NO.C.B.
REVISIONS
ORA
NG
E PA
RK, F
LORI
DA
320
7313
29 K
ING
SLEY
AV
ENU
E, S
UIT
E C
LIC
. NO
. AA
C00
0569
PH. (
904)
264
-191
9
09005
JUNE 13, 2016DATE
FLO
RID
A A
RMY
NA
TIO
NA
L G
UA
RDA
IRPO
RT E
XEC
UTI
VE
DRI
VE
FLA
GLE
R CO
UN
TY, F
LORI
DA
CFM
O N
O. 1
2017
3
PALM
CO
AST
REA
DIN
ESS
CEN
TER
COA 15COA 15COA 15COA 15COA 15COA 15COA 15COA 15COA 15
1650 Prudential DriveSuite 200Jacksonville, Florida 32207
©Copyright 2015
Phone: 904-306-9111Fax: 904-306-9117
TLC NO:
E N G I N E E R I N GF O R A R C H I T E C T U R E
COA 15
TLC Engineering for Architecture, Inc.www.tlc-engineers.com
COA 15
Jeffrey J. Stone, P.E.Florida License # 71466
815082
A B
C D
KEY PLAN
E
F
C:\R
evit
2016
Loc
al M
odel
s\81
5082
_ME
P_R
16_a
mbe
r.kat
ada.
rvt
6/28
/201
6 5:
30:2
2 PM
READINESSBLDG - 2NDFLOOR PLAN -NORTH - PIPING
AAKJJS
M2.11 1/8" = 1'-0"1 LEVEL 2 - PIPING - NORTH
1
1 PROVIDE CONDENSATE PUMP.
CO2CO2
CO2
CO2
1 6-29-16 ADDENDUM#2
E
F
G
H
6.11
G.5
10.19.1
231
232
233
234
235
236
237
238
240
241
242
243
244245
246
247
248
250
251
252
253254
255 257256
258
CO
PIER
COPIER
BELOW
STAIR 3
IDF 3
CORR 20
CORR 21
ELEC 3
CORR 22
STAIR 2
TRAININGDEVICE
SIM CENTER
EQUIP
CONTROLCTR
OPEN OFFICE 6
OPEN OFFICE 7
OFFICE 22
OFFICE 24
OFFICE 23
CLASSROOM 4
CLASSROOM 3
CLASSROOM 5
OFFICE 20
OFFICE 21
COPY/STOR 2
STORAGE 4CORR 19
OFFICE 25
OFFICE 26OFFICE 27
OFFICE 28 OFFICE 29 OFFICE 30
H
54321 1.8
E
F
G
7
8
6
G.5
5.9
E.4
9.2 10.11.3
D.8
D.9
AHU-02C
3" CHWR3" CHWS
3" C
HWS
3" C
HWR
VTU-02B-3
VTU-02B-2
VTU-02B-4
VTU-02B-5
VTU-02B-6
VTU-02B-8
VTU-02B-7 VTU-02B-10
VTU-02B-9
VTU-02B-13
VTU-02B-14
VTU-02B-17
VTU-02B-18
VTU-02B-16
VTU-02B-19VTU-02B-15
VTU-02B-1
1 1/2" CHWR1 1/2" CHWS
2" CHWS2" CHWR
VTU-02B-11
VTU-02B-12
VTU-02B-20
T
T
TT
T
T
T
T T T
T
T
T
T
T
T
T
T
2" CHWS / R DOWNTO 1ST FLOOR MECHROOM # 170
PROVIDE A 3-WAY VALVE
2 1/2"
CHW
S
2 1/2"
CHW
R
1" H
HWR
1" H
HWS
1" HHWS1" HHWR
1" HHWS1" HHWR
1 1/4" HHWS1 1/4" HHWR
1 1/2" HHWS1 1/2" HHWR
1 1/2"
HHW
S1 1
/2" H
HWR
T
CND
1 1/4"
CND 1 1/4"
1'-1/4" CONDENSATEDOWN TO 1ST FL.
FCU-2S-1
CND
1/2"
AHU-02B
HHWS 3/4"HHWR 3/4"
CND LINES ROUTE DWNTO GRND LEVEL
3/8" VRFS &5/8" VRFR UPFRM 1ST FL
T-STAT ON 1ST FL
1
100% BID FINAL
D.B.
JOB NO.C.B.
REVISIONS
ORA
NG
E PA
RK, F
LORI
DA
320
7313
29 K
ING
SLEY
AV
ENU
E, S
UIT
E C
LIC
. NO
. AA
C00
0569
PH. (
904)
264
-191
9
09005
JUNE 13, 2016DATE
FLO
RID
A A
RMY
NA
TIO
NA
L G
UA
RDA
IRPO
RT E
XEC
UTI
VE
DRI
VE
FLA
GLE
R CO
UN
TY, F
LORI
DA
CFM
O N
O. 1
2017
3
PALM
CO
AST
REA
DIN
ESS
CEN
TER
COA 15COA 15COA 15COA 15COA 15COA 15COA 15COA 15COA 15
1650 Prudential DriveSuite 200Jacksonville, Florida 32207
©Copyright 2015
Phone: 904-306-9111Fax: 904-306-9117
TLC NO:
E N G I N E E R I N GF O R A R C H I T E C T U R E
COA 15
TLC Engineering for Architecture, Inc.www.tlc-engineers.com
COA 15
Jeffrey J. Stone, P.E.Florida License # 71466
815082
A B
C D
KEY PLAN
E
F
C:\R
evit
2016
Loc
al M
odel
s\81
5082
_ME
P_R
16_a
mbe
r.kat
ada.
rvt
6/28
/201
6 5:
30:2
9 PM
READINESSBLDG - 2NDFLOOR PLAN -SOUTH - PIPING
AAKJJS
M2.12 1/8" = 1'-0"1 LEVEL 2 - PIPING - SOUTH
1
1 PROVIDE CONDENSATE PUMP.
CO2
CO2
CO2
CO2
1 6-29-16 ADDENDUM#2
KEY NOTES
JANITOR
MEN WOMEN
MDF
FAC. MAINT./STORAGE
SUPPLYROOM
TEMP SUPERVISOROFFICE
LIBRARY
CORR.
MECH/ELEC.
TOOLROOM
WORK BAYS
15 19 20
K
L
M
N
181716
302
303 304
311
306
310
309305
301
307
308
312
K
L
M
N
20
1
2
REFRIGERANT S/R PIPING
AHU-01M
CU-01M
EH-02M
EH-04M
EH-01M
EH-03M
AHU-02MCU-02M
EF-01MA
VEF-01M
VEF-02M
3
EF-01MB
EF-01MCDRYWELL 10' MINFROM STRUCTURE
TPROGRAMMABLE DIGITALTHERMOSTAT W/ TIME OFDAY SCHEDULING
1
100% BID FINAL
D.B.
JOB NO.C.B.
REVISIONS
ORA
NG
E PA
RK, F
LORI
DA
320
7313
29 K
ING
SLEY
AV
ENU
E, S
UIT
E C
LIC
. NO
. AA
C00
0569
PH. (
904)
264
-191
9
09005
JUNE 13, 2016DATE
FLO
RID
A A
RMY
NA
TIO
NA
L G
UA
RDA
IRPO
RT E
XEC
UTI
VE
DRI
VE
FLA
GLE
R CO
UN
TY, F
LORI
DA
CFM
O N
O. 1
2017
3
PALM
CO
AST
REA
DIN
ESS
CEN
TER
COA 15COA 15COA 15COA 15COA 15COA 15COA 15COA 15COA 15
1650 Prudential DriveSuite 200Jacksonville, Florida 32207
©Copyright 2015
Phone: 904-306-9111Fax: 904-306-9117
TLC NO:
E N G I N E E R I N GF O R A R C H I T E C T U R E
COA 15
TLC Engineering for Architecture, Inc.www.tlc-engineers.com
COA 15
Jeffrey J. Stone, P.E.Florida License # 71466
815082
A B
C D
KEY PLAN
E
F
C:\R
evit
2016
Loc
al M
odel
s\81
5082
_ME
P_R
16_a
mbe
r.kat
ada.
rvt
6/28
/201
6 5:
30:3
5 PM
VEHICLEMAINTENANCEBLDG - PIPING
BSAJJS
M2.14 1/8" = 1'-0"1 LEVEL 1 - PIPING - MAINTENANCE BUILDING
SUPPLY AND RETURN REFRIGERANT PIPING UNDERGROUND. PIPING SIZE SHALLCOORDINATE WITH MANUFACTUERER'S RECOMMENDATIONS.
NOTES:
1
CONDENSATE PIPING ROUTED DOWN TO DRYWELL. CONTRACTOR SHALL SIZECONDENSATE PIPING BASED ON MANUFACTURER'S RECOMMENDATION FORELEVATION CHANGES, ROUTING, AND LENGTH OF PIPING.
2
SUPPLY AND RETURN REFRIGERANT PIPING ROUTED ALONG BUILDING EXTERIORWALL. PIPING SIZE SHALL COORDINATE WITH MANUFACTUERER'SRECOMMENDATIONS.
3
1 6-29-16 ADDENDUM#2
124
125
BOILER
170MECHANICAL 2
Q
170MECHANICAL 2
Q
125
MECHANICAL 1
BOILER
138
139140
141
142
143KITCHEN
SCULLERYDRY STO
JAN 2
TOILET
KIT OFFICE138
139140
141
142
143KITCHEN
SCULLERYDRY STO
JAN 2
TOILET
KIT OFFICE
4
B
B-1
CHWP-2
CHWP-1
ET-2
AS-2
HHWP-1HHWP-2
ET-1AS-1
D 300
36x14 RA
50x16 SA
38x12 RA
(STACKED)
AHU-02A
AHU-01A
32x14 SA UP TO2ND FLOOR
32x14 EA UP TO2ND FLOOR
3"HHWR
46x14 EA UP TOMAU-01 ON 2ND FLR
30x16 EA
1M3.4
2M3.4
9M3.4
10M3.4
MIN 24"CLEARANCEFOR FILTERMEAINTENANCE
MIN 24"CLEARANCE FORFILTERMEAINTENANCE
1M3.5
M
C 300
M
M
C 100D 100
3M3.5
M
M
OA DUCT CONNECTSTO BACK OF AHU-01A
6ø S
A
6x6 R
A14
x12 R
A
60x12 RA38x12 RA
OA DUCT CONNECTS TOBACK OF AHU-02A
22x1
4 OA
16x2
0 OA
14x16 EA
6ø E
A
6ø O
A
M
M
AF
AF
AHU-02A
E
F
AHU-01B
22x1
6 RA
26x1
4 OA
32x14 RA
44x1
4 SA
18x1
4 SA
20x20 EA DUCTUP TO 2ND FL
26x14 OA UP TOSECOND FL
5M3.4
6M3.4
MIN 24" CLEARANCE FORFILTER MAINTENANCE
20x2
0 EA
D 240
30x14 OA 12x12 OA
M
M
AF
28x12
EA
26x1
2 SA
12x1
2 EA
16x26
RA
VRFRVRFS
CND 1/2"
CHWS 1 1/2"CHWR 1 1/2"
CND
1 1/4"
M
A
4
B
1M3.4
2M3.4
9M3.4
10M3.4
1M3.5
3M3.5
HHWP-1HHWP-2
(STACKED)
2"HHWBYPASS
3"HHWR
2"HHWS&R
CND 1"
CHW
S 2 1
/2" CHW
R 2 1
/2"
CHW
R 6"
CHW
S 6"
HHW
S 3"
HHW
R 3"
HHWR 2"
CHW
S 4"
CHW
R 6"
VRFR 1"VRFS 1"
CND
1 1/4"
CND 3/4"
CHW
S 2" CH
WR
2"
B-1
AHU-02A
AHU-01AAS-1
ET-1
AS-2
ET-2
CHWP-1
CHWP-2
CND 1 1/4"
STACKEDPIPING. KEEPTIGHT TO WALL.
VRF PIPING UP TO 2ND FL
CHWR 4"CHWS 4" UP TO JAN. 4
RM 170HHWS 2"
5
D
765.9
D.2
D.7
6.9
22x8 EA
B 100
14x1
2 SA
18x1
4 SA
12ø SA
10ø EA
A 50
10x8 SA
A 50
B 100
B 5010x8 EA
B 200
18x12 SA
20x1
0 SA
B 200
A 195
B 120
KSF-220x20 SA40x12 SA
18x12 SA12x12 SA16x8 SA
10x12 SA6x12 SA
HOOD # 3
L-3
12x1
2 SA
KSF-1
16x1
2 SA
HOOD # 1
10x10 SA
12ø EA
10x10 SAA 300
A 325
A 200
8ø SA
8x12
EA
B 50
VTU-01A-19
VTU-01-18
VTU-01A-20
HOOD # 2
10" S.S. DISHWASHEREXHAUST DUCT FROMK22 TO KEF-22 ON ROOF525 CFM
(1) 12Ø EA DUCT TOKITCHNE HOOD K15, 1500CFM. WRAP GREASE DUCTUP TO ROOF PENETRATIONW/ 1HR FIRE WRAP.
(4) 28x6 OA DUCT TOKITCHEN HOOD K15, 320EACH.
(4) 16x8 SUPPLYDUCTWORK DWN TOKITCHEN HOOD K-34,250 CFM EACH. (2) 14Ø S.S. GREASE EA DUCT FROM
KITCHEN HOOD K-34, 1650 EACH AND20x20 UP TO KEF-34, FLR ABOVE.WRAP GREASE DUCT UP TO ROOFPENETRATION W/ 1HR FIRE WRAP.
(4) 24x12 OA DUCT DWNTO KITCHEN HOOD K-34,675 CFM EACH.
UP TO KEF-15
UP TO KEF-22
425
M
DN
UP
UP
DN
UP
L-4
M
DN
UP
UP
UP
100% BID FINAL
D.B.
JOB NO.C.B.
REVISIONS
ORA
NG
E PA
RK, F
LORI
DA
320
7313
29 K
ING
SLEY
AV
ENU
E, S
UIT
E C
LIC
. NO
. AA
C00
0569
PH. (
904)
264
-191
9
09005
JUNE 13, 2016DATE
FLO
RID
A A
RMY
NA
TIO
NA
L G
UA
RDA
IRPO
RT E
XEC
UTI
VE
DRI
VE
FLA
GLE
R CO
UN
TY, F
LORI
DA
CFM
O N
O. 1
2017
3
PALM
CO
AST
REA
DIN
ESS
CEN
TER
COA 15COA 15COA 15COA 15COA 15COA 15COA 15COA 15COA 15
1650 Prudential DriveSuite 200Jacksonville, Florida 32207
©Copyright 2015
Phone: 904-306-9111Fax: 904-306-9117
TLC NO:
E N G I N E E R I N GF O R A R C H I T E C T U R E
COA 15
TLC Engineering for Architecture, Inc.www.tlc-engineers.com
COA 15
Jeffrey J. Stone, P.E.Florida License # 71466
815082
C:\R
evit
2016
Loc
al M
odel
s\81
5082
_ME
P_R
16_a
mbe
r.kat
ada.
rvt
6/28
/201
6 5:
30:4
2 PM
READINESSBLDG - 1ST FLENLGD MECHROOMS &KITCHEN
BSAJJS
M3.1
1/4" = 1'-0"1 READINESS BLDG - 1ST FLOOR ENLARGED MECHANICAL ROOM #124 and #125
1/4" = 1'-0"2 READINESS BLDG - 1ST FLOOR ENLARGED MECHANICAL ROOM #170
1/4" = 1'-0"3 READINESS BLDG - 1ST FLOOR ENLARGED MECHANICAL ROOM #124 PIPING
ALL AIR HANDLERS, PUMPS, BOILER, AND WATERHEATER TO BE MOUNTED ON 4" HOUSEKEEPING PADS.
BOILER B-1 IS A CONDENSING BOILER. PROVIDECORROSIVE RESISTANT FLUE. PROVIDE ACIDNEUTRALIZER TANK AND ROUTE CONDENSATE TOFLOOR DRAIN.
GENERAL NOTES:
1.
2.
1 6-29-16 ADDENDUM#2
1/4" = 1'-0"4 LEVEL 1 - ENLARGED KITCHEN
1
KEY NOTES:
1 PROVIDE ACCESS HATCH FOR VTU MAINTENANCE
UP UP TO ATTIC SPACE. DIRECTION BASED ON AIRFLOWDIRECTION.
DN DOWN FROM ATTIC SPACE. DIRECTION BASED ONAIRFLOW DIRECTION.
1
1
A
4
B
54x2
0 EA
72x48 EA
60x2
2 OA
MAU-01
C 235
D 235
L2
38x16 EA
6ø EA
48x14 RA
36x14 SA
18x10 RA
10ø RA
10ø RA
10ø R
A
8ø RA
6ø R
A
60x2
0 EA
MIN 24" CLEARANCEFOR FILTERMAINTENANCE
MIN 24" CLEARANCEFOR FILTERMAINTENANCE
1M3.5
UC75
FCU-2N-1
4M3.5
2M3.5
3M3.5 6ø OA
6ø EA
FRM BOILER
22x14 EA
M
B 75
42x1
8 OA
BOTTOM TAP.DWN TO 1ST FL
UP
DN
E
F
42x14 SA
48x1
6 OA
C 125
34x14 RA24x14 SA
30x14 OA
44x1
4 RA
AHU-02C
16x8 SA
DWN TO 1ST FL
20x16 SA
13M3.4
14M3.4
17M3.4
18M3.4
16x20 EA
AHU-02B
MIN 24" CLEARANCE FORFILTER MAINTENANCE
MIN 24" CLEARANCE FORFILTER MAINTENANCE
M
38x18 RA50x14 RA
MAF
M
MAF
M
1
B 125
DN
100% BID FINAL
D.B.
JOB NO.C.B.
REVISIONS
ORA
NG
E PA
RK, F
LORI
DA
320
7313
29 K
ING
SLEY
AV
ENU
E, S
UIT
E C
LIC
. NO
. AA
C00
0569
PH. (
904)
264
-191
9
09005
JUNE 13, 2016DATE
FLO
RID
A A
RMY
NA
TIO
NA
L G
UA
RDA
IRPO
RT E
XEC
UTI
VE
DRI
VE
FLA
GLE
R CO
UN
TY, F
LORI
DA
CFM
O N
O. 1
2017
3
PALM
CO
AST
REA
DIN
ESS
CEN
TER
COA 15COA 15COA 15COA 15COA 15COA 15COA 15COA 15COA 15
1650 Prudential DriveSuite 200Jacksonville, Florida 32207
©Copyright 2015
Phone: 904-306-9111Fax: 904-306-9117
TLC NO:
E N G I N E E R I N GF O R A R C H I T E C T U R E
COA 15
TLC Engineering for Architecture, Inc.www.tlc-engineers.com
COA 15
Jeffrey J. Stone, P.E.Florida License # 71466
815082
C:\R
evit
2016
Loc
al M
odel
s\81
5082
_ME
P_R
16_a
mbe
r.kat
ada.
rvt
6/28
/201
6 5:
34:4
9 PM
READINESSBLDG -2ND FLENLARGEDMECHANICALROOMS
DesignerApprover
M3.2
1/4" = 1'-0"1 READINESS BLDG - 2ND FLOOR ENLARGED MECHANICAL ROOM #222 1/4" = 1'-0"2 READINESS BLDG - 2ND FLOOR ENLARGED MECHANICAL ROOM #249
M
1 6-29-16 ADDENDUM#2
KEY NOTES:
UP UP TO ATTIC SPACE. DIRECTION BASED ON AIRFLOWDIRECTION.
DN DOWN FROM ATTIC SPACE. DIRECTION BASED ONAIRFLOW DIRECTION.
1
ROOF BEARING26'-8"
14M3.4
14x24 SA
EA SIDE TAPINTO RA
14x34 RA
M
M
4" CONCRETEHOUSEKEEPING PAD
FAN CC
FILT
ERS
MXB
M
AF
M
2ND FLR TOS13'-6 1/2"
LOW ROOF BEARING12'-0"
AHU-01A
16x5
0 SA 20
x92 R
A
2M3.4
20x16 OA
M
M
FAN
MXB
FILT
ERS
4" CONCRETEHOUSEKEEPING PAD
AF
2ND FLR TOS13'-6 1/2"
LOW ROOF BEARING12'-0"
AHU-01A
50x1
6 SA
38x12 RA
30x1
6 EA
4" CONCRETEHOUSEKEEPING PAD
TOSL0"
2ND FLR TOS13'-6 1/2"
LOW ROOF BEARING12'-0"
AHU-01B
6M3.4
44x1
4 SA
12x28 EA
M
4" CONCRETEHOUSEKEEPING PAD
TOSL0"
LOW ROOF BEARING12'-0"
5M3.4
AHU-01B
16x6
4 RA
AF M
14x4
4 SA
12x28 EA
MXB
FILT
ERS
FAN
CC
M
4" CONCRETEHOUSEKEEPING PAD
14x3
6 SA
12x6
0 RA
10M3.4
AHU-02A MXB
FAN
FILT
ERS
MM
AF
CC
9M3.4
AHU-02A
36x1
4 SA
48x1
4 RAROOF BEARING
26'-8"
13M3.4
24x1
4 SA
80x20 SA
AHU-02B
4" CONCRETEHOUSEKEEPING PAD
ROOF BEARING26'-8"
AHU-02C
14x4
2 SA
30x1
4 RA
FAN
CC
FILT
ERS
MXB
14x3
2 OA
4" CONCRETEHOUSEKEEPING PAD
M
AF
M
ROOF BEARING26'-8"
E
17M3.4
AHU-02C
42x1
4 SA
1
100% BID FINAL
D.B.
JOB NO.C.B.
REVISIONS
ORA
NG
E PA
RK, F
LORI
DA
320
7313
29 K
ING
SLEY
AV
ENU
E, S
UIT
E C
LIC
. NO
. AA
C00
0569
PH. (
904)
264
-191
9
09005
JUNE 13, 2016DATE
FLO
RID
A A
RMY
NA
TIO
NA
L G
UA
RDA
IRPO
RT E
XEC
UTI
VE
DRI
VE
FLA
GLE
R CO
UN
TY, F
LORI
DA
CFM
O N
O. 1
2017
3
PALM
CO
AST
REA
DIN
ESS
CEN
TER
COA 15COA 15COA 15COA 15COA 15COA 15COA 15COA 15COA 15
1650 Prudential DriveSuite 200Jacksonville, Florida 32207
©Copyright 2015
Phone: 904-306-9111Fax: 904-306-9117
TLC NO:
E N G I N E E R I N GF O R A R C H I T E C T U R E
COA 15
TLC Engineering for Architecture, Inc.www.tlc-engineers.com
COA 15
Jeffrey J. Stone, P.E.Florida License # 71466
815082
C:\R
evit
2016
Loc
al M
odel
s\81
5082
_ME
P_R
16_a
mbe
r.kat
ada.
rvt
6/28
/201
6 5:
30:4
6 PM
AHU SECTIONS
AAKJJS
M3.4
1/4" = 1'-0"13 AHU-02B FRONT 1/4" = 1'-0"1 AHU-01A FRONT
1/4" = 1'-0"2 AHU-01A LEFT
1/4" = 1'-0"5 AHU-01B FRONT
1/4" = 1'-0"6 AHU-01B LEFT
1/4" = 1'-0"9 AHU-02A FRONT
1/4" = 1'-0"10 AHU-02A LEFT 1/4" = 1'-0"14 AHU-02B LEFT
1/4" = 1'-0"17 AHU-02C FRONT
1/4" = 1'-0"18 AHU-02C LEFT
4" CONCRETEHOUSEKEEPING PAD
4" CONCRETEHOUSEKEEPING PAD
4" CONCRETEHOUSEKEEPING PAD
1 6-29-16 ADDENDUM#2
SLOPE TO DRAIN
COOLING COIL
UNION
DRAIN PAN
CASING SLEEVE
THREADED CAP, HAND TIGHTENED
THREADED CAP WITH 1/4" DIA.HOLE DRILLED IN TOP, HANDTIGHTENED.
CONDENSATE DRAIN PIPING DIMENSIONS:
A = FULL SIZE OF UNIT DRAIN CONNECTIONB > 1-1/2" TIMES FAN SUCTION STATIC PRESSUREC > FAN DISCHARGE STATIC PRESSURE PLUS 1/2" INCH
COORDINATE MOUNTING/CURB HEIGHT AS REQUIRED TO PROVIDE PROPER CONDENSATE DRAINAGE.
CB
A
CHWSPRESSUREGAUGE (TYP.)
CHWR
BUTTERFLY VALVE (TYP.)
TEMPERATURETRANSMITTER (TYP.)
THERMOMTE(TYP.)
FLOW SWITCH
FLEX CONNECTION (TYP.)
6" MIN. ALL FOUR SIDES
CONCRETEHOUSEKEEPING PAD
CONTROL PANEL
NEC CLEARANCE 4'-0"
DRAIN VALVE
PIPE TO FLOOR DRAIN
UNION (TYP.)
PUMP SUCTION LINE
PUMP DISCHARGE LINE
FILL FUNNEL W/WEATHERPROOFCOVER
MANUAL AIR VENT
1-1/2" TO 2 GALLON, HOT-DIP GALVANIZED TANK
BALL VALVE(TYP.)
MAXIMUM 2 PIPES PERCONDUIT, TYP.
TO AHU COOLING COIL
INSULATION (SUCTION LINEONLY)
6" ABOVE FINISHED FLOOR,ROOF OR GROUND
LIQUID AND SUCTION LINES UNDER GRADE ENCASEDIN SCHEDULE 40 PVC PIPE CONDUIT. REFRIGERANTLINES IN PVC PIPE SHALL BE SOFT COPPER,SEAMLESS WITHOUT JOINTS.
LIQUID AND SUCTION LINES UP FROMBELOW GRADE
CONDENSING UNIT ONCONCRETE PAD
6" ABOVE GRADE
SEAL WATER-TIGHT
ET-1
AS-1
AS-1: TANGENTIAL TYPE AIR SEPARATOR
ET-1: DIAPHRAGM TYPE PRE-PRESSURIZED EXPANSION TANK
NOTE: ALL PIPE ACCESSORIES SHALL BE FULL LINE SIZE.
DRAIN
CONNECT TO SIDEOF MAIN
TO PUMPSUCTION
_"BUTTERFLYVALVE (TYP.)
PRESSURE GAUGE
AUTOMATICAIR VENT
AUTOMATIC HIGHCAPACITY AIR VENT
EXTEND NEW MAKE-UP WATER LINEAS REQUIRED PIPE TO F.D.
RELIEFVALVE
PRESSURE REDUCING VALVEW/ CHECK
UNION (TYP.)
COLD WATER PIPE TO DOMESTICWATER MAKE-UP
GATE VALVE (TYP.)
REDUCED PRESSURE BACKFLOWPREVENTER
STRAINER
B.F.P. DRAIN TO F.D.CHECK VALVE
GLOBE VALVE
WATER METER
LOOP WATER RETURN
SUPPORT STRUCTURE
BLOWDOWN VALVE PIPETO F.D.
TAP, TYPICAL 45 DEGREEBOOT
DAMPER, TYPICAL MANUALBALANCING
RADIUS ELBOWS MAY BEUSED IN LIEU OF SQUAREELBOWS
PRESSURE RELIEF VALVEPIPE TO BUILDING EXTERIOR ANDTERMINATE POINTING DOWN 6" FROM GRADE
6" MIN.
REGULATOR 7" w.c.
GAS SHUTOFFDIRT LEG
GAS LINE
HHWS
HHWR
CONDENSATE TO DRYWELL
ACIDNEUTRALIZERTANK(WITH AIRVENT)
DRAIN VALVE
CONDENSATEDRAIN TRAP
BUTTERFLY VALVE
FLUE PIPE(SPECIAL GAS VENT FOR CONDENSINGBOILER. AL29-4 STAINLESS STEEL, SINGLE WALL)
4" HOUSEKEEPINGPAD
100% BID FINAL
D.B.
JOB NO.C.B.
REVISIONS
ORA
NG
E PA
RK, F
LORI
DA
320
7313
29 K
ING
SLEY
AV
ENU
E, S
UIT
E C
LIC
. NO
. AA
C00
0569
PH. (
904)
264
-191
9
09005
JUNE 13, 2016DATE
FLO
RID
A A
RMY
NA
TIO
NA
L G
UA
RDA
IRPO
RT E
XEC
UTI
VE
DRI
VE
FLA
GLE
R CO
UN
TY, F
LORI
DA
CFM
O N
O. 1
2017
3
PALM
CO
AST
REA
DIN
ESS
CEN
TER
COA 15COA 15COA 15COA 15COA 15COA 15COA 15COA 15COA 15
1650 Prudential DriveSuite 200Jacksonville, Florida 32207
©Copyright 2015
Phone: 904-306-9111Fax: 904-306-9117
TLC NO:
E N G I N E E R I N GF O R A R C H I T E C T U R E
COA 15
TLC Engineering for Architecture, Inc.www.tlc-engineers.com
COA 15
Jeffrey J. Stone, P.E.Florida License # 71466
815082
C:\R
evit
2016
Loc
al M
odel
s\81
5082
_ME
P_R
16_a
mbe
r.kat
ada.
rvt
6/28
/201
6 5:
30:4
7 PM
MECHANICALDETAILS
AAKJJS
M4.3
No ScaleAHU CONDENSATE DRAIN TRAP 2
No ScaleAIR COOLED CHILLER PIPING 3
No ScaleCHEMICAL SHOT FEEDER 4
No ScaleREFRIGERANT PIPING DIAGRAM 1No Scale 5FLOOR MOUNTED EXPANSION TANK/AIR SEPARATOR PIPING
No ScaleTYPICAL PRESSURE DUCTWORK 6No Scale
BOILER CONNECTIONS 7
1 6-29-16 ADDENDUM#2
1
A
B
C
D
E
F
G
H
D.7
G.5
A.4
A
A.9
D
D.3
E
E.4
G.7
H
9
FUTURECUBICLES
101
102
103
104
105
106
108
107
109
110111112
113
114
115
116
117
118
119
121
122
123
124
126
127
128129
130131
132
133
134
135
136
137
138
139140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
161
162
163
165
169
170 171
172 173
174
175
177
176
178
179
180181
182
183
184
184X
185
187
188 189
164
120
166 160167168
186
(260) 24" SQ.SGL. LOCKERSWITH 4" CONC.
HOUSEKEEPING PAD
RECRUITER 2
LOBBY
RAPIDS
RECRUITER 1
STAIR 3
CORR 1
STOR 2 EMERGPOWER
PHYS FITNESS
CORR 2
VEST 2
CORR 4
CORR 5
VEST 2
VEST 3
MENSHWR MEN
JAN 1
FAM T
WOMEN
WOMENSHWR
STAIR 1
MECHANICAL 1
GEAR LOCKERS
LOCKERBASIC
KITCHEN
SCULLERYDRY STO
JAN 2
TOILET
CANWASH
KIT OFFICE
ASSEMBLY HALL
CORR 6CORR 10
STAIR 2
ELEC 1
OPEN OFFICE 2
OFFICE 8
COMM SECTCLASSRM
OFFICE 7
MECHANICAL 2
JANSTOR
MEN
WOMEN
ELEV EQ
CORR 11
FAMILYREADINESS
BREAK / VENDING
ELEV
MDF
STOR 3
ROOM
BATT DHTD STORVAULT 1
VAULT OFF 1
VAULT 3 BATT CHTD STOR
VAULT 2HHB
HTD STOR
OPEN OFFICE 1
ELECPOWER
UNITSTORAGE 4
CORR 12 LEARNINGCENTER
CORR 3
UNITSTORAGE
EQUIP
OPEN OFFICE 3
STORAGE(TEMP.
INTERVIEW)
OFFICE 10
OFFICE 11
OFFICE 6
COPIER
OFFICE 5
STOR 1
OFFICE 9
LOCKEDUNIT
STORAGE
CORR 7
CORR 8
CORR 9
VAULT OFF 2
VAULT OFF 3
OFFICE 3
OFFICE 4
OFFICE 1OFFICE 2
CO
VER
EDAP
RO
N
VEST 1
IDF 1
LIBRARY /CLASSRM
VENDING
STORAGE
TABLE ANDCHAIR STOR.
H
A
D.4
D.6
1.8
11
B
C.1
D
E
F
G
G.7
C.4
C
8
G.5
A.4
E.4
D.2
D.7
A.6
D.8
D.9
4"F, REFER TOSHEET F0.1 FORCONTINUATION
4" x 2-1/2" x 2-1/2"FIRE DEPARTMENTCONNECTION
4" SPRINKLER RISER,REFER TO SHEET F3.1DETAIL #1.
FIRST FLOORSPRINKLER SYSTEM
SPRINKLER MAIN UPTO SECOND FLOOR
2ND FL SPRINKLER MAIN
ATTIC SPRINKLER MAIN
SPRINKLER MAIN UP TO ATTIC
KITCHEN HOOD FIRE SUPPRESION SYSTEM.COORDINATE REQUIREMENTS WITH KITCHENHOOD (K34) ON ARCHITECTURAL SHEETS1A15.1 AND 1A15.2.
BASIS OF DESIGN:ANSUL R-102 RESTAURANT FIRE SUPPRESION SYSTEM
KITCHEN HOOD FIRE SUPPRESION SYSTEM.COORDINATE REQUIREMENTS WITH KITCHENHOOD (K34) ON ARCHITECTURAL SHEETS1A15.1 AND 1A15.2.
BASIS OF DESIGN:ANSUL R-102 RESTAURANT FIRE SUPPRESION SYSTEM
1
100% BID FINAL
D.B.
JOB NO.C.B.
REVISIONS
ORA
NG
EPA
RK,F
LORI
DA
3207
313
29K
ING
SLEY
AV
ENU
E,SU
ITE
CLI
C.N
O.A
AC0
0056
9PH
.(90
4)26
4-19
19
09005
JUNE 13, 2016DATE
FLO
RID
AA
RMY
NA
TIO
NA
LG
UA
RDA
IRPO
RTEX
ECU
TIV
ED
RIV
EFL
AG
LER
COU
NTY
,FLO
RID
AC
FMO
NO
.120
173
PALM
CO
AST
REA
DIN
ESS
CEN
TER
COA 15COA 15COA 15COA 15COA 15COA 15COA 15COA 15COA 15
1650 Prudential DriveSuite 200Jacksonville, Florida 32207
©Copyright 2015
Phone: 904-306-9111Fax: 904-306-9117
TLC NO:
E N G I N E E R I N GF O R A R C H I T E C T U R E
COA 15
TLC Engineering for Architecture, Inc.www.tlc-engineers.com
COA 15
Jeffrey J. Stone, P.E.Florida License # 71466
815082
C:\R
evit
2016
Loca
lMod
els\
8150
82_M
EP_R
16_c
lint.f
erna
ndez
.rvt
6/28
/201
61:
52:5
6P
M
READINESSBLDG - 1STFLOOROVERALL PLAN- FIREPROTECTION
Designer
Approver
F2.1
NO
RTH SCALE: 3/32" = 1'-0"
READINESS BLDG - 1ST FLOOR OVERALL PLAN - FIRE PROTECTION
1 6-29-16 ADDENDUM#2
J
JJ
J J
J
UTILITYTRANSFORMER
GENERATOR
UTILITYTRANSFORMER -
MAINT
MDP
MSB GDP
NHS1
CONNECTION TO EXISTINGELECTRICAL PRIMARY LINE BY FP&L.COORDINATE WITH LOCAL UTILITY(FP&L) FOR EXACT LOCATION ANDREQUIREMENTS
UTILITY CONDUITS SHALL BE RUNINSIDE SILT FENCE WITHIN THEMITIGATED AREAS. COORDINATEEXACT ROUTING WITH LOCAL UTILITY(FP&L) AND CIVIL ENGINEER
EL1A-1,3
SECURITY GATECOORDINATE EXACTLOCATION WITH GATECONTROLLER PROVIDERPRIOR TO ROUGH-IN
EL1A-2,4SECURITY GATECOORDINATE EXACTLOCATION WITH GATECONTROLLER PROVIDERPRIOR TO ROUGH-IN
WP
WP
IRRIGATIONCONTROLLER
IRRIGATION PUMP
NL1B-70
NL1B-72,74
FP
FP
FLAG POLELIGHTINGFIXTURES
LSH1-10
LSH1-11,13 SLA2 SLA2 SLA2
SLA2SLA2SLA2
SLA2 SLA2 SLA2
SLA3SLA3SLA3SLA3
SLBSLBSLB
SLA3
SLA2SLA2
SLA3
SLA2
SLA2 SLA2
SLA2
SLA2SLA2
SLC
SLA2 SLA2
SLA3 SLA3 SLA3 SLA3 SLA3
SLB SLB
SLBSLBSLB
NH1A-6,8
NH1A-7,9
NH1B-7,9
LSH1-12,14
NH1B-11,13
NH1B-8,10
NH1A-10,12
1" EMPTY SCH. 80 PVCWITH NYLON PULLSTRING STUBBED ANDSTAKED 6' BEYOND ROAD
SG2
SG2
SG2
SG2
NH1A-11
12"x12" IN-GROUND PULL BOXAT BOTTOM OF FLAG POLEFOR WIRE TRANSITION.PROVIDE IN-LINE FUSE ASREQUIRED. TYPICAL FOREACH POLE
SB
SB
T SB
SB
48"x 48" SPLICE BOX. PROVIDED BYUTILITY (FP&L), INSTALLED BYCONTRACTOR. COORDINATE WITHFP&L REPRESENTATIVE. (TYPICAL)
2
2
UTILITY TRANSFORMERW/ CONCRETE PAD FORLIFT STATION
REFER TO ONE-LINEDIAGRAM ON SHEET E5.2 FORSERVICE SECONDARY SIZE
100A SERVICE DISCONNECTAT LIFT STATION BYCIVIL/SITE CONTRACTOR
2
2
NH1B-6
VIA LIGHTINGCONTACTOR "ELC-1"
VIA LIGHTINGCONTACTOR "LC-1"
REFER TO ONE-LINEDIAGRAM SHEET E5.2 FORSERVICE SECONDARY SIDE
VIA LIGHTINGCONTACTOR "LC-1"
VIA LIGHTINGCONTACTOR "LC-1"
VIA LIGHTINGCONTACTOR "ELC-1"
VIA LIGHTINGCONTACTOR "LC-1"
VIA LIGHTINGCONTACTOR "LC-1"
WP
SPARE 1" CONDUIT FORGATE CONTROL TO MDFROOM
WP
SPARE 1" CONDUIT FORGATE CONTROL TO MDFROOM
2
2
REFER TO ONE-LINEDIAGRAM ON SHEET E5.2 FORSERVICE SECONDARY ANDGENERATOR FEEDER SIZING
LP TANK
CONTRWASTE
FLAMMTLS
MAINTENANCEBLDG
UNHEATEDSTOR. BLDG.
READINESSBUILDING
HHNLM1
1
VIA LIGHTINGCONTACTOR "LC-1"
SLA3
SLA3
3
3
VIA LIGHTINGCONTACTOR "ELC-1"
NF30AR
3R
NF30AR
3R
WPWP
100% BID FINAL
D.B.
JOB NO.
C.B.
REVISIONS
OR
AN
GE
PA
RK
, F
LO
RID
A 3
2073
1329 K
ING
SL
EY
AV
EN
UE
, S
UIT
E C
LIC
. N
O. A
AC
000569
PH
. (9
04)
264-1
919
09005
JUNE 13, 2016DATE
FL
OR
IDA
AR
MY
NA
TIO
NA
L G
UA
RD
AIR
PO
RT
EX
EC
UT
IVE
DR
IVE
FL
AG
LE
R C
OU
NT
Y, F
LO
RID
A
CF
MO
NO
. 120173
PA
LM
CO
AS
T R
EA
DIN
ES
S C
EN
TE
R
COA 15COA 15COA 15COA 15COA 15COA 15COA 15COA 15COA 15
1650 Prudential DriveSuite 200Jacksonville, Florida 32207
©Copyright 2015
Phone: 904-306-9111Fax: 904-306-9117
TLC NO:
E N G I N E E R I N GF O R A R C H I T E C T U R E
COA 15
TLC Engineering for Architecture, Inc.
www.tlc-engineers.com
COA 15
Ryan D. Fryman, P.E.
Florida License # 55472
815082
AB
C D
KEY PLAN
E
F
C:\R
evit 2
01
6 L
ocal M
od
els
\81
508
2_
ME
P_
R1
6_
kyle
.jo
ne
s.r
vt
6/2
8/2
016
8:5
0:2
1 A
M
SITE PLAN -ELECTRICAL
MAR
RDF
E1.1
SCALE: 1" = 60'-0"E1.1
1 SITE PLAN - ELECTRICAL
SITE PLAN ELECTRICAL KEYNOTES:
1 PROVIDE AND INSTALL (2) 3/4" SCH. 80 PVC CONDUITS FROM PANEL "NLM1" TO NEWHANDHOLE. ONCE MODULAR BUILDINGS ARE INSTALLED PROVIDE AND INSTALL (1) 3/4"C. FROM HANDHOLE TO FACTORY INSTALLED LOAD CENTER ON EACH MODULARBUILDING. CONNECT EACH BUILDING WITH (1) 120V, 20A CIRCUIT FROM PANEL "NLM1"FOR LIGHTING AND POWER. COORDINATE EXACT CONDUIT ROUTING FROMMAINTENANCE BUILDING IN FIELD.
UNDERGROUND ELECTRICAL PRIMARY LINE ROUTING. CONDUIT PROVIDED BY UTILITY(FP&L). INSTALLED BY CONTRACTOR, COORDINATE WITH FP&L REPRESENTATIVE.
PROVIDE AND INSTALL ONE (1) 5/8" DIA. x 10'-0" COPPER CLAD GROUND ROD. CONNECTGROUND ROD TO STATIC GROUNDING LUG ON MODULAR BUILDING WITH (1) #4 AWGCOPPER CONDUCTOR USING APPROVED CONNECTION METHOD.
2
3
1 6-29-16 ADDENDUM#2
1
1
1
3 4 5 6
A
B
C
D
E
21
A.4
1.3
101
102
103
104
105
106
108
107
109
110111112
113
114
115
116
117
118
119
121
122
123
124
125
126
127
128129
130131
132
133
134
135
136
138
139
140
146
182
183
185
187
188 189
120
186
RECRUITER 2
LOBBY
RAPIDS
RECRUITER 1
STAIR 3
CORR 1
STOR 2EMERG
POWER
PHYS FITNESS
CORR 2
VEST 2
CORR 4
CORR 5
VEST 2
VEST 3
MEN
SHWR MEN
JAN 1
FAM T
WOMEN
WOMEN
SHWR
STAIR 1
MECHANICAL 1
KITCHEN
SCULLERY
DRY STO
ASSEMBLY HALL
COMM SECT
CLASSRM
ELEV
MDF
BOILER
STOR 3
SPKLR
ROOM
OPEN OFFICE 1
ELEC
POWER
CORR 3
UNIT
STORAGE
EQUIP
STOR
OFFICE 11
COPIER
OFFICE 5
STOR 1
CORR 7
OFFICE 3
OFFICE 4
OFFICE 1OFFICE 2
CO
VER
ED
APR
ON
VEST 1
STORAGE
J
J
J
J
J
J
J JJ
J
J
110
MDF
E2.10
1
E2.1
2
2
2
2
2
2
WP
44
4
NF30AR
1
1
1
11
5
S M
6
WP
4
4
4
4
WP
WP
1
NL1A-65
9
9
NL1A-67
NL1A-61
NL1A-59
NL1A-27,29,31
NL1A-33,35,37
NL1A-21,23,25
NL1A-45,47,49NL1A-39,41,43
NL1A-55
NL1A-2
NL1A-8
NL1A-19
NL1A-4
NL1A-18
NL1A-16
EL1A-8
NL1A-3
NL1A-15
NL1A-13
NL1A-11
NL1A-9
NL1B-64
NL1A-42
NL1A-22
NL1A-48
NL1A-50
NL1A-52
PROJECTORSCREEN
PROJECTOR
NL1A-17
NH1A-13,15,17
EL1A-10
NL1B-13
NL1A-26NL1A-24
NL1A-44
NL1A-46
NL1A-63
NL1A-51
NL1A-57
NL1A-5
NL1A-7
NL1A-6
CU-1S
EEQH1-2,4,6
NF30AR
3R
NL1B-66
9
9
UH-01A
SM
EL1A-18
NL1A-1
ROLL-UPDOOR
2
D
FACP
7
8
NEMAL6-30R
8
8
8
EL1A-16
EL1A-5
EL1A-7
EL1A-9
EL1A-11
EL1A-13,15
GND
EL1A-6
LSL1-1
SECFCU-1N-3
EL1
A-1
7,19
NF30AR
1
100% BID FINAL
D.B.
JOB NO.
C.B.
REVISIONS
OR
AN
GE
PA
RK
, F
LO
RID
A 3
2073
1329 K
ING
SL
EY
AV
EN
UE
, S
UIT
E C
LIC
. N
O. A
AC
000569
PH
. (9
04)
264-1
919
09005
JUNE 13, 2016DATE
FL
OR
IDA
AR
MY
NA
TIO
NA
L G
UA
RD
AIR
PO
RT
EX
EC
UT
IVE
DR
IVE
FL
AG
LE
R C
OU
NT
Y, F
LO
RID
A
CF
MO
NO
. 120173
PA
LM
CO
AS
T R
EA
DIN
ES
S C
EN
TE
R
COA 15COA 15COA 15COA 15COA 15COA 15COA 15COA 15COA 15
1650 Prudential DriveSuite 200Jacksonville, Florida 32207
©Copyright 2015
Phone: 904-306-9111Fax: 904-306-9117
TLC NO:
E N G I N E E R I N GF O R A R C H I T E C T U R E
COA 15
TLC Engineering for Architecture, Inc.
www.tlc-engineers.com
COA 15
Ryan D. Fryman, P.E.
Florida License # 55472
815082
AB
C D
KEY PLAN
E
F
C:\R
evit 2
01
6 L
ocal M
od
els
\81
508
2_
ME
P_
R1
6_
kyle
.jo
ne
s.r
vt
6/2
8/2
016
8:5
0:2
2 A
M
READINESSBLDG - 1STFLOOR PLAN -NORTHWEST -POWER
MAR
RDF
E2.1SCALE: 1/8" = 1'-0"E2.1
1 1ST FLOOR - READINESS BLDG - NORTHWEST - POWER
POWER PLAN KEY NOTES:
1
PROVIDE 120V EMERGENCY CIRCUIT FOR DOOR SECURITY HARDWARE.2
PROVIDE 120V BRANCH CIRCUIT(S) AS SHOWN FOR FURNITURE FEED(S). COORDINATEEXACT LOCATION OF J-BOX(S) WITH PLACEMENT OF FURNITURE AND MANUFACTURER'SREQUIREMENTS. PROVIDE MEANS TO SIMULTANEOUSLY DISCONNECT ALL GROUNDEDCONDUCTORS PER NEC 605.6 AND 605.7. PROVIDE A DEDICATED NEUTRAL FOR EACHCIRCUIT. REFER TO GENERAL NOTES ON SHEET E0.1.
3
COORDINATE EXACT LOCATION OF RECEPTACLE WITH FITNESS EQUIPMENTSUPPLIER WITH ROOM LAYOUT AND OWNER REPRESENTATIVE PRIOR TO ROUGH-IN.
TV OUTLET RECEPTACLE. COORDINATE EXACT MOUNTING HEIGHT WITH OWNERREP PRIOR TO ROUGH-IN.
4
SCALE: 1/4" = 1'-0"E2.1
2 1ST FLOOR ENLARGED I.T. 1 - POWER
5
6
PROVIDE 120V CIRCUIT FOR MOTORIZED PROJECTOR SCREEN. PROVIDE MOTORRATED, UP-DOWN SWITCH. COORDINATE EXACT MOUNTING HEIGHT AND LOCATIONWITH A/V CONTRACTOR PRIOR TO ROUGH-IN.
PROVIDE 120V DUPLEX RECEPTACLE IN FLOOR FOR PROJECTOR. COORDINATEEXACT LOCATION WITH A/V CONTRACTOR PRIOR TO ROUGH-IN.
SECURITY ACCESS CONTROL PANEL RECEPTACLE. COORDINATE EXACT LOCATIONWITH EQUIPMENT PROVIDER.
7
RECEPTACLE MOUNTED ON TOP OF RACK FACING FORWARD. REFER TO RACKPOWER ON SHEET T6.2
8
COORDINATE MOUNTING HEIGHT AND LOCATIONS OF RECEPTACLES WITHARCHITECTURAL ELEVATIONS AND CASEWORK.
9
1 6-29-16 ADDENDUM#2
POWER CIRCUITING NOTE:
ALL HOMERUN CIRCUIT DESIGNATIONS WERE REVISED TO PROVIDE MOREAPPROPRIATE BREAKER LAYOUT IN PANELS. THE PANLEBOARD DESIGNATIONSWERE NOT CHANGED; ONLY THE CIRCUIT NUMBERS.
1
4 5 6 7 10
A
A.9
D
D.3
9
134
135
136
137
138
139
140
141
142
143
(260) 24" SQ.
SGL. LOCKERS
WITH 4" CONC.
HOUSEKEEPING PAD
PHYS FITNESS
CORR 5
STAIR 1
GEAR LOCKERS
LOCKERBASIC
KITCHEN
SCULLERY
DRY STO
JAN 2
TOILET
CANWASH
KIT OFFICE
CO
VER
ED
APR
ON
J
J
J
J
E2.9
1
2
2
2
44 4
4 4 4
TV3
NF30AR
1
4
4
4
4
4
4
4
4
WP
WP
WP
WP
CH-1
400AR300AF
3R
NL1A-11
NL1A-42
NL1A-36
NL1A-22
NL1A-48 NL1A-28
NL1A-50
NL1A-52 EL1A-14
NL1A-40 NL1A-38
NL1A-34
NL1A-32
NL1A-30
NL1A-26NL1A-24
NL1A-44
NL1A-46
CU-1S
CU-1N
EEQH1-2,4,6
NF30AR
3R
WP
NF30AR
3R
EEQH1-1,3,5
MSB-12
ROLL-UPDOOR
NF30AR
1
NH1A-14,16,18
ROLL-UPDOOR
100% BID FINAL
D.B.
JOB NO.
C.B.
REVISIONS
OR
AN
GE
PA
RK
, F
LO
RID
A 3
2073
1329 K
ING
SL
EY
AV
EN
UE
, S
UIT
E C
LIC
. N
O. A
AC
000569
PH
. (9
04)
264-1
919
09005
JUNE 13, 2016DATE
FL
OR
IDA
AR
MY
NA
TIO
NA
L G
UA
RD
AIR
PO
RT
EX
EC
UT
IVE
DR
IVE
FL
AG
LE
R C
OU
NT
Y, F
LO
RID
A
CF
MO
NO
. 120173
PA
LM
CO
AS
T R
EA
DIN
ES
S C
EN
TE
R
COA 15COA 15COA 15COA 15COA 15COA 15COA 15COA 15COA 15
1650 Prudential DriveSuite 200Jacksonville, Florida 32207
©Copyright 2015
Phone: 904-306-9111Fax: 904-306-9117
TLC NO:
E N G I N E E R I N GF O R A R C H I T E C T U R E
COA 15
TLC Engineering for Architecture, Inc.
www.tlc-engineers.com
COA 15
Ryan D. Fryman, P.E.
Florida License # 55472
815082
AB
C D
KEY PLAN
E
F
C:\R
evit 2
01
6 L
ocal M
od
els
\81
508
2_
ME
P_
R1
6_
kyle
.jo
ne
s.r
vt
6/2
8/2
016
8:5
0:2
3 A
M
READINESSBLDG - 1STFLOOR PLAN -NORTHEAST -POWER
MAR
RDF
E2.2SCALE: 1/8" = 1'-0"E2.2
1 1ST FLOOR - READINESS BLDG - NORTHEAST - POWER
POWER PLAN KEY NOTES:
1
2
3
NOT USED.
PROVIDE 120V EMERGENCY CIRCUIT FOR DOOR SECURITY HARDWARE.
TV OUTLET RECEPTACLE. COORDINATE EXACT MOUNTING HEIGHT WITH OWNERREP PRIOR TO ROUGH-IN.
COORDINATE EXACT LOCATION OF RECEPTACLE WITH FITNESS EQUIPMENTSUPPLIER WITH ROOM LAYOUT AND OWNER REPRESENTATIVE PRIOR TO ROUGH-IN.
4
1 6-29-16 ADDENDUM#2
POWER CIRCUITING NOTE:
ALL HOMERUN CIRCUIT DESIGNATIONS WERE REVISED TO PROVIDE MOREAPPROPRIATE BREAKER LAYOUT IN PANELS. THE PANLEBOARD DESIGNATIONSWERE NOT CHANGED; ONLY THE CIRCUIT NUMBERS.
1
E
F
G
H
6.11
G.5
FUTURE
CUBICLES
101
105
106
138
143
144
145
146
149
150
153
154
157
158
159
161
162
163
165
169
170171
172173
174
175
177
176
178
179
180181
182
183
184
184X
185
164
166 160167168
186
LOBBY
RAPIDS
STAIR 3
CORR 1
KITCHEN KIT OFFICE
ASSEMBLY HALL
CORR 6CORR 10
STAIR 2
ELEC 1
OPEN OFFICE 2
OFFICE 8 OFFICE 7
MECHANICAL 2
JAN
STOR
MEN
WOMEN
ELEV EQ
CORR 11
FAMILYREADINESS
BREAK / VENDING
ELEV
VAULT 1
VAULT 3
VAULT 2
UNITSTORAGE 4
CORR 12 LEARNINGCENTER
OPEN OFFICE 3
STORAGE(TEMP.
INTERVIEW)
OFFICE 10
OFFICE 11
OFFICE 6
COPIER
OFFICE 9
LOCKEDUNIT
STORAGE
CORR 7
CORR 8
CORR 9
CO
VER
ED
APR
ON
IDF 1
LIBRARY /
CLASSRM
VENDING
STORAGE
TABLE AND
CHAIR STOR.
J
J
J
J
J
J
JJ
J
J
J
J
J
JJ
J J
J
J
J
159
160
ELEC 1
IDF 1
E2.10
2
E2.3
3
2
2
2
2
2
2
4
IDS
4
IDS
4
IDS
WP
NF30AR
1
5
SM
6
1
1
3
TV
WP
WP
11
1
11
WP
EL1A-8
NL1A-11
NL1A-9
NL1B-18
NL1B-50,52,54
NL1B-56,58,60
NL1B-22
NL1B-24
NL1B-28
NL1B-20
NL1B-2
NL1B-64
NL1B-46
NL1B-17
NL1B-19
NL1B-21
NL1B-33
EL1B-7
EL1B-9
EL1B-11
NL1B-43,45,47
NL1B-67,69,71
NL1B-61,63,65
NL1B-55,57,59
NL1B-49,51,53
NL1B-15
NL1B-16
PROJECTORSCREEN
PROJECTOR
NL1A-17
NH1A-13,15,17
NL1B-13
NL1B-12
NL1B-41
NL1B-8NL1B-10
CU-1S
NL1B-48
NL1B-30NL1
B-4
0
NL1
B-3
8
NL1
B-3
2
NL1
B-3
4
NL1
B-3
6
NL1B-26
NL1B-39
NL1B-4
NL1B-6
IDS4
EL1B-5
IDS4
EL1B-3
IDS4
EL1B-1
DHU-1B
DHU-1C
DHU-1A
NL1B-27
NL1B-378
NL1B-318
NL1B-258
EEQH1-2,4,6
NF30AR
3R
NL1B-66
NL1B-62
NL1B-42
NL1B-44
NL1A-1
ROLL-UPDOOR
EL1B-13
4
NH1B
NL1BNL1C
EL1B
GND
FUTURE
FCU-1S-2
EL1B-10
EL1B-6
EL1B-8
EL1B-2,4
GND
7
7
7EL1B-16,18
NF30AR
1
NEMAL6-30R
100% BID FINAL
D.B.
JOB NO.
C.B.
REVISIONS
OR
AN
GE
PA
RK
, F
LO
RID
A 3
2073
1329 K
ING
SL
EY
AV
EN
UE
, S
UIT
E C
LIC
. N
O. A
AC
000569
PH
. (9
04)
264-1
919
09005
JUNE 13, 2016DATE
FL
OR
IDA
AR
MY
NA
TIO
NA
L G
UA
RD
AIR
PO
RT
EX
EC
UT
IVE
DR
IVE
FL
AG
LE
R C
OU
NT
Y, F
LO
RID
A
CF
MO
NO
. 120173
PA
LM
CO
AS
T R
EA
DIN
ES
S C
EN
TE
R
COA 15COA 15COA 15COA 15COA 15COA 15COA 15COA 15COA 15
1650 Prudential DriveSuite 200Jacksonville, Florida 32207
©Copyright 2015
Phone: 904-306-9111Fax: 904-306-9117
TLC NO:
E N G I N E E R I N GF O R A R C H I T E C T U R E
COA 15
TLC Engineering for Architecture, Inc.
www.tlc-engineers.com
COA 15
Ryan D. Fryman, P.E.
Florida License # 55472
815082
AB
C D
KEY PLAN
E
F
C:\R
evit 2
01
6 L
ocal M
od
els
\81
508
2_
ME
P_
R1
6_
kyle
.jo
ne
s.r
vt
6/2
8/2
016
8:5
0:2
3 A
M
READINESSBLDG - 1STFLOOR PLAN -SOUTHWEST -POWER
MAR
RDF
E2.3
SCALE: 1/8" = 1'-0"E2.3
1 1ST FLOOR - READINESS BLDG - SOUTHWEST - POWER
POWER PLAN KEY NOTES:
1
PROVIDE 120V EMERGENCY CIRCUIT FOR DOOR SECURITY HARDWARE.2
PROVIDE 120V BRANCH CIRCUIT(S) AS SHOWN FOR FURNITURE FEED(S). COORDINATEEXACT LOCATION OF J-BOX(S) WITH PLACEMENT OF FURNITURE AND MANUFACTURER'SREQUIREMENTS. PROVIDE MEANS TO SIMULTANEOUSLY DISCONNECT ALL GROUNDEDCONDUCTORS PER NEC 605.6 AND 605.7. PROVIDE A DEDICATED NEUTRAL FOR EACHCIRCUIT. REFER TO GENERAL NOTES ON SHEET E0.1.
3
PROVIDE 120V EMERGENCY CIRCUIT FOR O.F.O.I. INTRUSION DETECTION SYSTEM(IDS). MOUNT 6" BELOW CEILING/DECKING.
5
TV OUTLET RECEPTACLE. COORDINATE EXACT MOUNTING HEIGHT WITH OWNERREP PRIOR TO ROUGH-IN.
6
PROVIDE 120V CIRCUIT FOR MOTORIZED PROJECTOR SCREEN. PROVIDE MOTORRATED, UP-DOWN SWITCH. COORDINATE EXACT MOUNTING HEIGHT AND LOCATIONWITH A/V CONTRACTOR PRIOR TO ROUGH-IN.
PROVIDE 120V DUPLEX RECEPTACLE IN FLOOR FOR PROJECTOR. COORDINATEEXACT LOCATION WITH A/V CONTRACTOR PRIOR TO ROUGH-IN.
4
SCALE: 1/4" = 1'-0"E2.3
3 1ST FLOOR ENLARGED ELECTRICAL ROOM SOUTH
7 RECEPTACLE MOUNTED ON TOP OF RACK FACING FORWARD. REFER TO RACK POWERON SHEET T6.2
MOUNT ELECTRICAL DEVICE 6" BELOW CEILING FOR MECHANICAL EQUIPMENT.8
1 6-29-16 ADDENDUM#2
1
POWER CIRCUITING NOTE:
ALL HOMERUN CIRCUIT DESIGNATIONS WERE REVISED TO PROVIDE MOREAPPROPRIATE BREAKER LAYOUT IN PANELS. THE PANLEBOARD DESIGNATIONSWERE NOT CHANGED; ONLY THE CIRCUIT NUMBERS.
116.1
E
E.4
G.7
H
10.19.1
145
146
147
148
149
150
151
152
153
154
155
156
157
CORR 6
BATT D
HTD STORVAULT 1
VAULT OFF 1
VAULT 3BATT C
HTD STOR
VAULT 2
HHB
HTD STOR
CORR 7
CORR 8
CORR 9
VAULT OFF 2
VAULT OFF 3
CO
VER
ED
APR
ON
J
J
J
J
J
JJ
J
J
J
J
2
2
2
2
2
4
IDS
4
IDS
4
IDS
NF30AR
1
WP
WP
WP
NL1B-17
NL1B-21
NL1B-33
EL1B-7
EL1B-9
EL1B-11
CU-1S
IDS4
EL1B-5
IDS4
EL1B-3
IDS4
EL1B-1
DHU-1B
DHU-1C
DHU-1A
NL1B-35
FCU-1C
FCU-1B
FCU-1A
NL1B-29
NL1B-27
NL1B-1,3
NL1B-5,7
NL1B-9,11
NL1B-23
8
8
NL1B-378
8
NL1B-318
NL1B-258
EEQH1-2,4,6
NF30AR
3R
ROLL-UPDOOR
NF30AR
1
NF30AR
1
NF30AR
1
EL1B-13
100% BID FINAL
D.B.
JOB NO.
C.B.
REVISIONS
OR
AN
GE
PA
RK
, F
LO
RID
A 3
2073
1329 K
ING
SL
EY
AV
EN
UE
, S
UIT
E C
LIC
. N
O. A
AC
000569
PH
. (9
04)
264-1
919
09005
JUNE 13, 2016DATE
FL
OR
IDA
AR
MY
NA
TIO
NA
L G
UA
RD
AIR
PO
RT
EX
EC
UT
IVE
DR
IVE
FL
AG
LE
R C
OU
NT
Y, F
LO
RID
A
CF
MO
NO
. 120173
PA
LM
CO
AS
T R
EA
DIN
ES
S C
EN
TE
R
COA 15COA 15COA 15COA 15COA 15COA 15COA 15COA 15COA 15
1650 Prudential DriveSuite 200Jacksonville, Florida 32207
©Copyright 2015
Phone: 904-306-9111Fax: 904-306-9117
TLC NO:
E N G I N E E R I N GF O R A R C H I T E C T U R E
COA 15
TLC Engineering for Architecture, Inc.
www.tlc-engineers.com
COA 15
Ryan D. Fryman, P.E.
Florida License # 55472
815082
AB
C D
KEY PLAN
E
F
C:\R
evit 2
01
6 L
ocal M
od
els
\81
508
2_
ME
P_
R1
6_
kyle
.jo
ne
s.r
vt
6/2
8/2
016
8:5
0:2
4 A
M
READINESSBLDG - 1STFLOOR PLAN -SOUTHEAST -POWER
MAR
RDF
E2.4
SCALE: 1/8" = 1'-0"E2.4
1 1ST FLOOR - READINESS BLDG - SOUTHEAST - POWER
POWER PLAN KEY NOTES:
1
PROVIDE 120V EMERGENCY CIRCUIT FOR DOOR SECURITY HARDWARE.2
NOT USED
3 NOT USED.
4
5 NOT USED.
6 NOT USED.
7 NOT USED.
PROVIDE 120V EMERGENCY CIRCUIT FOR O.F.O.I. INTRUSION DETECTION SYSTEM (IDS).
8 MOUNT ELECTRICAL DEVICE 6" BELOW CEILING FOR MECHANICAL EQUIPMENT.
1 6-29-16 ADDENDUM#2
POWER CIRCUITING NOTE:
ALL HOMERUN CIRCUIT DESIGNATIONS WERE REVISED TO PROVIDE MOREAPPROPRIATE BREAKER LAYOUT IN PANELS. THE PANLEBOARD DESIGNATIONSWERE NOT CHANGED; ONLY THE CIRCUIT NUMBERS.
1
3 4 5 6
A
B
C
D
E
21
A.4
1.3
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
238
250
255 257256
258
WINDOWS UNDER
ENTRY
CO
PIE
R
OPEN TO
BELOW
OPEN TO
BELOW
STAIR 3
CORRIDOR 13
CLASSROOM 1
G6 ROOM
OFFICE 12
TRAINING
CLASSROOM
WOMEN
MEN
CORR 15
CORR 17
OPEN OFFICE 5
CORR 14
ELEC 3
IDF 2
STAIR 1MECHANICAL 3
ELEC 2
CLASSROOM 2
JAN 4
TR
EQUIP
LG OFFICE
OFFICE 14
OFFICE 15
OFFICE 19
STOR 3
CLASSROOM 4
CLASSROOM 5
CORR 16
OPEN OFFICE 4
OFFICE 16
OFFICE 17
OFFICE 18
OFFICE 13
COPY/STOR 1
CORR 18
OFFICE 28OFFICE 29 OFFICE 30
J
J
J
JJ J J
J
J J
J
J
J
J
219
ELEC 2
VF
D
VF
D
204
IDF 2
E2.5
2
1
1
11
1
1
E2.5
3
12
SM
3
PROJECTOR
PROJECTORSCREEN
3
PROJECTOR
2
SM
3
PROJECTOR
2
SM
IDS
4
NL2A-33
NL2A-27
NL2A-37NL2A-35
11
NL2A-43,45,47 NL2A-49,51,53NL2A-55,57,59
1
NL2A-42,44,46 NL2A-36,38,40
NL2A-48,50,52
NL2A-9,11,13
NL2A-29
NL2A-31
NL2A-39
NL2A-41
NL2A-2
NL2A-4
NL2A-6
NL2A-10
NL2A-1
NL2A-12
NL2A-34
NL2A-18
NL2B-80
NL2B-76
NL2B-78
NL2B-70NL2B-72
NL2B-74
NL2B-17
NL2B-21
NL2B-23NL2B-1
NL2B-5
NL2A-26,28,30
NL2A-7
NL2A-3
NL2A-32
NL2A-24
NL2A-22
NL2A-20
NL2A-21,23,25
NL2A-15,17,19
FCU-2N-3
EL2A-9,11
NF30AR
1
NL2A-5
EL2B-7
PROJECTORSCREEN
PROJECTORSCREEN
NL2A-8
NF30AR
1
A
4
B
T-NLDP2NLDP2
NL2ANH2A NEQH2
EEQH2 LSH2 EL2A
FUTURE
FUTURE
MAU-01 5
NL2A-14
FCU-2N-1 EL2A-6
NF30AR
1
EL2A-1,3
NL2A-16
GND
NEQH2-1,3,5
NEQH2-7,9,11
NEQH2-13,15,17
NF30AR
1
2
D
6
6
PATC
FCU-2N-2
EL2A-2
EL2A-4NL2A-54
GND
EL2A-8
EL2A-5,7NF
30AR1
100% BID FINAL
D.B.
JOB NO.
C.B.
REVISIONS
OR
AN
GE
PA
RK
, F
LO
RID
A 3
2073
1329 K
ING
SL
EY
AV
EN
UE
, S
UIT
E C
LIC
. N
O. A
AC
000569
PH
. (9
04)
264-1
919
09005
JUNE 13, 2016DATE
FL
OR
IDA
AR
MY
NA
TIO
NA
L G
UA
RD
AIR
PO
RT
EX
EC
UT
IVE
DR
IVE
FL
AG
LE
R C
OU
NT
Y, F
LO
RID
A
CF
MO
NO
. 120173
PA
LM
CO
AS
T R
EA
DIN
ES
S C
EN
TE
R
COA 15COA 15COA 15COA 15COA 15COA 15COA 15COA 15COA 15
1650 Prudential DriveSuite 200Jacksonville, Florida 32207
©Copyright 2015
Phone: 904-306-9111Fax: 904-306-9117
TLC NO:
E N G I N E E R I N GF O R A R C H I T E C T U R E
COA 15
TLC Engineering for Architecture, Inc.
www.tlc-engineers.com
COA 15
Ryan D. Fryman, P.E.
Florida License # 55472
815082
AB
C D
KEY PLAN
E
F
C:\R
evit 2
01
6 L
ocal M
od
els
\81
508
2_
ME
P_
R1
6_
kyle
.jo
ne
s.r
vt
6/2
8/2
016
8:5
0:2
5 A
M
READINESSBLDG - 2NDFLOOR PLAN -NORTH - POWER
MAR
RDF
E2.5SCALE: 1/8" = 1'-0"E2.5
1 2ND FLOOR - READINESS BLDG - NORTH - POWER
SCALE: 1/4" = 1'-0"E2.5
2 2ND FLOOR ENLARGED ELECTRICAL AND MECHANICAL ROOM NORTH
SCALE: 1/4" = 1'-0"E2.5
3 2ND FLOOR ENLARGED I.T. 2
POWER PLAN KEY NOTES:
1PROVIDE 120V BRANCH CIRCUIT(S) AS SHOWN FOR FURNITURE FEED(S). COORDINATEEXACT LOCATION OF J-BOX(S) WITH PLACEMENT OF FURNITURE AND MANUFACTURER'SREQUIREMENTS. PROVIDE MEANS TO SIMULTANEOUSLY DISCONNECT ALL GROUNDEDCONDUCTORS PER NEC 605.6 AND 605.7. PROVIDE A DEDICATED NEURAL FOR EACHCIRCUIT. REFER TO GENERAL NOTES ON SHEET E0.1.
PROVIDE 120V EMERGENCY CIRCUIT FOR O.F.O.I. INTRUSION DETECTION SYSTEM (IDS).4
PROVIDE 120V CIRCUIT FOR MOTORIZED PROJECTOR SCREEN. PROVIDE MOTORRATED, UP-DOWN SWITCH. COORDINATE EXACT MOUNTING HEIGHT AND LOCATIONWITH A/V CONTRACTOR PRIOR TO ROUGH-IN.
PROVIDE 120V DUPLEX RECEPTACLE, CEILING MOUNTED FOR PROJECTOR.COORDINATE EXACT LOCATION WITH A/V CONTRACTOR PRIOR TO ROUGH-IN.
3
2
PROVIDE 120V POWER SUPPLY FOR HVAC CONTROLS WITH 32 OUTPUTS. BASIS OFDESIGN ALTRONIX MODEL #ALTV2432600UL, 600 WATTS.
5
RECEPTACLE MOUNTED ON TOP OF RACK FACING FORWARD. REFER TO RACKPOWER ON SHEET T6.2
6
1 6-29-16 ADDENDUM#2
POWER CIRCUITING NOTE:
ALL HOMERUN CIRCUIT DESIGNATIONS WERE REVISED TO PROVIDE MOREAPPROPRIATE BREAKER LAYOUT IN PANELS. THE PANLEBOARD DESIGNATIONSWERE NOT CHANGED; ONLY THE CIRCUIT NUMBERS.
1
E
F
G
H
6.11
G.5
10.19.1
231
232
233
234
235
236
237
238
239
240
241
242
243
244245
246
247
248249
250
251
252
253254
255 257256
258
CO
PIE
R
COPIER
BELOW
STAIR 3
IDF 3
MECHANICAL 4
CORR 20
CORR 21
ELEC 3
CORR 22
STAIR 2
TRAINING
DEVICE
SIM CENTER
EQUIP
CONTROL
CTR
OPEN OFFICE 6
OPEN OFFICE 7
OFFICE 22
OFFICE 24
OFFICE 23
CLASSROOM 4
CLASSROOM 3
CLASSROOM 5
OFFICE 20
OFFICE 21
COPY/STOR 2
STORAGE 4
CORR 19
OFFICE 25
OFFICE 26OFFICE 27
OFFICE 28OFFICE 29 OFFICE 30
JJ
J
JJ
JJ
JJJ
J J
J
J
J
J
J
J
J
J
J
E2.10
3
E2.10
4
3
PROJECTOR
2
SM
1
1
1
1
1
1
1
1
1
1
1
1
1 1
11
IDS
4
IDS4
55
WEAPONSSIMULATOREQUIPMENT
WEAPONSSIMULATOREQUIPMENT
3
PROJECTOR
2 SM
3
PROJECTOR
2
SM
NL2B-80
NL2B-76
NL2B-78
NL2B-70NL2B-72
NL2B-74NL2B-16
NL2B-17
NL2B-64
NL2B-6
NL2B-12
NL2B-66
NL2B-21
NL2B-23
NL2B-25NL2B-22,24,26
NL2B-28,30,32
NL2B-58,60,62
NL2B-52,54,56
NL2B-40,42,44
NL2B-46,48,50NL2B-34,36,38
NL2B-2
NL2B-4
NL2B-8
NL2B-10
NL2B-51,53,55NL2B-45,47,49NL2B-39,41,43
NL2B-33,35,37 NL2B-27,29,31
PROJECTORSCREEN
NL2B-9
NL2B-1
NL2B-3
NL2B-1
NL2B-5
NL2B-13
NL2B-11
NL2B-15
NL2B-7
EL2B-7
NL2B-69,71,73
NL2B-75,77,79
NL2B-57,59,61
NL2B-63,65,67
PROJECTORSCREEN
NL2B-14
NL2B-68
100% BID FINAL
D.B.
JOB NO.
C.B.
REVISIONS
OR
AN
GE
PA
RK
, F
LO
RID
A 3
2073
1329 K
ING
SL
EY
AV
EN
UE
, S
UIT
E C
LIC
. N
O. A
AC
000569
PH
. (9
04)
264-1
919
09005
JUNE 13, 2016DATE
FL
OR
IDA
AR
MY
NA
TIO
NA
L G
UA
RD
AIR
PO
RT
EX
EC
UT
IVE
DR
IVE
FL
AG
LE
R C
OU
NT
Y, F
LO
RID
A
CF
MO
NO
. 120173
PA
LM
CO
AS
T R
EA
DIN
ES
S C
EN
TE
R
COA 15COA 15COA 15COA 15COA 15COA 15COA 15COA 15COA 15
1650 Prudential DriveSuite 200Jacksonville, Florida 32207
©Copyright 2015
Phone: 904-306-9111Fax: 904-306-9117
TLC NO:
E N G I N E E R I N GF O R A R C H I T E C T U R E
COA 15
TLC Engineering for Architecture, Inc.
www.tlc-engineers.com
COA 15
Ryan D. Fryman, P.E.
Florida License # 55472
815082
AB
C D
KEY PLAN
E
F
C:\R
evit 2
01
6 L
ocal M
od
els
\81
508
2_
ME
P_
R1
6_
kyle
.jo
ne
s.r
vt
6/2
8/2
016
8:5
0:2
5 A
M
READINESSBLDG - 2NDFLOOR PLAN -SOUTH - POWER
MAR
RDF
E2.6
SCALE: 1/8" = 1'-0"E2.6
1 2ND FLOOR - READINESS BLDG - SOUTH - POWER
PROVIDE 120V EMERGENCY CIRCUIT FOR O.F.O.I. INTRUSION DETECTION SYSTEM (IDS).4
5 COORDINATE EXACT LOCATION OF RECEPTACLE WITH WEAPONS SIMULATOR EQUIPMENTSUPPLIER AND OWNER REPRESENTATIVE PRIOR TO ROUGH-IN.
PROVIDE 120V CIRCUIT FOR MOTORIZED PROJECTOR SCREEN. PROVIDE MOTORRATED, UP-DOWN SWITCH. COORDINATE EXACT MOUNTING HEIGHT AND LOCATIONWITH A/V CONTRACTOR PRIOR TO ROUGH-IN.
PROVIDE 120V DUPLEX RECEPTACLE, CEILING MOUNTED FOR PROJECTOR.COORDINATE EXACT LOCATION WITH A/V CONTRACTOR PRIOR TO ROUGH-IN.
POWER PLAN KEY NOTES:
1 PROVIDE 120V BRANCH CIRCUIT(S) AS SHOWN FOR FURNITURE FEED(S). COORDINATEEXACT LOCATION OF J-BOX(S) WITH PLACEMENT OF FURNITURE AND MANUFACTURER'SREQUIREMENTS. PROVIDE MEANS TO SIMULTANEOUSLY DISCONNECT ALL GROUNDEDCONDUCTORS PER NEC 605.6 AND 605.7. PROVIDE A DEDICATED NEURAL FOR EACHCIRCUIT. REFER TO GENERAL NOTES ON SHEET E0.1.
3
2
1 6-29-16 ADDENDUM#2
POWER CIRCUITING NOTE:
ALL HOMERUN CIRCUIT DESIGNATIONS WERE REVISED TO PROVIDE MOREAPPROPRIATE BREAKER LAYOUT IN PANELS. THE PANLEBOARD DESIGNATIONSWERE NOT CHANGED; ONLY THE CIRCUIT NUMBERS.
1