39
PACIFIC PARTNERSHIP 2012 This brief is classified: UNCLASSIFIED 07 MAR 12 OPT Brief

PACIFIC PARTNERSHIP 2012

  • Upload
    chaz

  • View
    35

  • Download
    0

Embed Size (px)

DESCRIPTION

PACIFIC PARTNERSHIP 2012. 07 MAR 12 OPT Brief. This brief is classified: UNCLASSIFIED. Roll Call. CDS-7 State Dept – Mr. Weinz USNS MERCY AUS HQ JOC HQ JFNZ JSDF FLC-Yokosuka C7F. C3F CTF 76 351 st Civil Affairs Command DLA Troop Support - Pacific ETG 30 th NCR HSC-21 DET 2 - PowerPoint PPT Presentation

Citation preview

Page 1: PACIFIC PARTNERSHIP 2012

PACIFIC PARTNERSHIP 2012

This brief is classified:UNCLASSIFIED

07 MAR 12OPT Brief

Page 2: PACIFIC PARTNERSHIP 2012

2

UNCLASSIFIED

UNCLASSIFIED

Roll Call

• CDS-7• State Dept – Mr. Weinz• USNS MERCY• AUS HQ JOC• HQ JFNZ• JSDF• FLC-Yokosuka• C7F

• C3F• CTF 76• 351st Civil Affairs Command• DLA Troop Support - Pacific• ETG• 30th NCR• HSC-21 DET 2• MCAST

Blue: Normal participants not expected to attend VTC due to scheduling conflict.

Page 3: PACIFIC PARTNERSHIP 2012

3

UNCLASSIFIED

UNCLASSIFIED

PP 12 Weekly Planning Rhythm

Thurs Fri SatSun

1300-1500W OPT VTC

1100W read ahead slides

posted to APAN

1100W CA WG

1300W LOG WG

1200W MED WG

1300W FP WG Every other week

Mon Tues Wed

1000W COMMS WG 1430W Comm

Integration WG

CPF N3 Semi-Monthly Update

1200W ENG WG

Effective 22 FEB

Page 4: PACIFIC PARTNERSHIP 2012

4

UNCLASSIFIED

UNCLASSIFIED

SE

P

OC

T

NO

V

DE

C

JA

N

FE

B

MA

R

AP

R

MA

Y

JU

N

JU

L

AU

G

Mission Planning/CONOPS (CPF)

Meetings/Conferences (CPF/CDS)

Force Sourcing (CPFN3)

Interagency Coord (CPF N5)

NGO Coordination (CPF N5)

Partner Nations (CPF N5/C7F)

Final Transit Plan (CDS)

Funding/Auths (CPF N5/N00F)

Communications (CPF N6)

Assessment (CA WG)

Detailed CONOPS (CDS)

PDSS/Advanced Echelon (CDS)

Deployment (CDS)

Planning Timeline

Advanced Echelon

Deployment

MOU Letters Signed

EXORD

Systems

CPF RFF

Mid Planning Conference

Initial Planning Conference

Initial

PLANORD

PDSS

FSLO Letter

Final

Requirements

PN Invitation letters

Assessment plan

Country CONOPs

Page 5: PACIFIC PARTNERSHIP 2012

5

UNCLASSIFIED

UNCLASSIFIED

ADF Planning Status

General Planning• CJOPS Decision Brief for PP12 signed.

Command• CMDR Ken Walters, RAN confirmed as Commander Australian

Contingent.• Small number of ASNCE staff remain to be identified.

Engineering• 12 engineers confirmed to participate as FIE in Indonesia.

Medical • All Personnel for ADF Health PP12 positions identified.• Credentialing to follow.

No Change

Page 6: PACIFIC PARTNERSHIP 2012

6

UNCLASSIFIED

UNCLASSIFIED

ADF Participation

• Command Element– O-5 Commander and 4/5 support staff.

• CIMIC– 2 personnel.

• Engineering Section– 12 person section.– FIE Indonesia & SIE for remainder of mission.

• Medical – Contribution of 20 personnel in each contingent.

– Contingent 1 embark USNS MERCY in Guam and change out in Subic Bay Philippines.

– Contingent 2: embark USNS MERCY in Subic Bay Philippines and disembark at the conclusion of mission in Cambodia.

– HQJOC Health PP12 POC:• CMDR Kenneth Walters (SO1 Reg / Dom & Joint Ex Hlth Plans)

[email protected]

No Change

Page 7: PACIFIC PARTNERSHIP 2012

7

UNCLASSIFIED

UNCLASSIFIED

PP12 RFI Tracker

Number Status Date Req Responsible

Question Other

ADF-001 Closed 11 Nov 11 PACFLT Request a copy of the Indonesian PDSS itinerary

ADF-002 Closed 11 Nov 11 PACFLT Status of Partner Nation invitation letter

No Change

Page 8: PACIFIC PARTNERSHIP 2012

8

UNCLASSIFIED

UNCLASSIFIED

JSDF Planning Status

• CONOPS of Japan - Developing the CONOPS of Japan Country selection - Philippine - Vietnam Activities - Medical supports - Community service projects Introduction of culture etc. - Studying other activities Vehicles - JMSDF Ship   LST“OOSUMI” - JASDF Aircraft ( C-130   or KC-767× 1)             

Medical team       - Approximately 20~30

No Change

Page 9: PACIFIC PARTNERSHIP 2012

9

UNCLASSIFIED

UNCLASSIFIED

JSDF Planning Status

• PDSS -Re-survey Philippines with U.S. member in MAR 5 ~ MAR 9

• Humanitarian community in Japan - Recruit on 21 FEB

• POC - PLANNING PRI: LCDR Haga : [email protected] DSN:224-7714 or 7723 SEC: LCDR Yamaguchi : [email protected] - MED PRI: CDR Hayashizaki:[email protected] SEC: MAJ Yamasaki:[email protected] - PA CDR Maeyama: [email protected]

No Change

Page 10: PACIFIC PARTNERSHIP 2012

10

UNCLASSIFIED

UNCLASSIFIED

JSDF Planning Status

Number Status date WG Requests/Questions Comments

JPN -001 19 OCT PDSSDraft plan of PDSS in Philippine and Vietnam

JPN-002 30 NOV PDSSReq. re-survey with US survey member in FEB or MAR.

JPN-003 8 FEB OPSMERCY's arrival/departure port time at Calbayog and Vinh

JPN-0048 FEB

CMO1day seminar' s date,location,participant

No Change

Page 11: PACIFIC PARTNERSHIP 2012

11

UNCLASSIFIED

UNCLASSIFIED

NZDF Planning Status

No Change

NZDF will deploy a multi-disciplinary team of 8 personnel for the duration of the deployment to Vietnam 10 – 24 Jul 12. Exact composition is to be finalised in due course but likely to be as follows with specialties to be advised:

2 x Health Planners1 x Medical Officer 1 x Nursing Officer1 x Dentist or Dental Hygienist2 x Medics1 x Environmental Health Officer

Outline SOM: - Embark USNS MERCY in Subic Bay, Philippines on or prior to 6 July 12.- Conduct tasks as personnel embedded into appropriate health capability bricks.- Disembark at conclusion of Vietnam mission.- RTNZ via either Hanoi or Ho Chi Minh City.

Page 12: PACIFIC PARTNERSHIP 2012

12

UNCLASSIFIED

UNCLASSIFIED

CPF FOPS Update

- Manning Update- Approximately 70 billets being filled by FFC will be in 07MAR SDOB.

- USARC will fill the 16 CA billets.- PACOM will task USARPAC in EXORD.

Page 13: PACIFIC PARTNERSHIP 2012

13

UNCLASSIFIED

UNCLASSIFIED

Medical Update• Transition to new DMOP – CAPT David Tanen• Medical Assessment: PI report being chopped. CAM cancelled. RMI will go forward, need to determine dates, team, etc.• Staffing – 97/623 billets remain “un-named” – reportedly filled, names have not been forwarded. 7 positions “unfillable” due to cross-reference

with PDSS/ADVON (Gen surg X1, HCA/POMI/RSOI X1, Nurse Educator X 2, Vet X 2, Internist/CC = DMOP)• Credential requirements: Still being reviewed by PACFLT, latest from JAG is that we can provide requested information.• CONOPS – Medical Annexes PI, VN 90%, CAM, IND 75%. VET Annexes behind, vet now back from USAF ops.• MERCEX – SOE in place. OIC Notebook being developed.• RON – Hotel RON in IND and CAM discussed with MWG. Hotel reduces FHP risk, FP risk. PACFLT requesting data on RON requirements, similar

to what ENG provided.

Completed On-track Off-Track/Recoverable Off-Track not recoverable

Page 14: PACIFIC PARTNERSHIP 2012

14

UNCLASSIFIED

UNCLASSIFIED

Engineering Update

Site Survey Projects Recommended SMEE Request

Philippines 3 schools & 1 medical clinic P&E; Seawall Cambodia 3 health centers Water; Bldg DesignIndonesia 3 health centers & 1 school Seismic; Disaster Vietnam 2 health centers Disaster; Safety

Philippine Project Package preparation (ACB1 lead)Cambodia Project Package preparation (NMCB40 lead)Indonesia Project Package preparation (ADF lead/NMCB40 Alt)Vietnam Project Package preparation (NMCB40 lead)

Engineering SMEE Plan.

Completed On-track Off-Track/Recoverable Off-Track not recoverable

Page 15: PACIFIC PARTNERSHIP 2012

15

UNCLASSIFIED

UNCLASSIFIED

Logistics Update

• Logistics WG held 6 Mar 12

• Logistics Resource Matrix Completed– Identifying Medical Life Support items for Indonesia and Philippines

requiring contracted support

• Funding– APRI, ORF, OCO on track

• Pharmaceuticals and Consumables– Received 8 pallets initial MedSurge Consumables– Indonesia and Vietnam Estimated Contract Award April

• Donation Material – Received 48 pallets from LDSC

• Next Logistics WG meeting scheduled for 20 Mar 12

Page 16: PACIFIC PARTNERSHIP 2012

16

UNCLASSIFIED

UNCLASSIFIED

PP12 Supply and Logistics StatusFUNDING (7MAR12)

16 Completed On-track Off-Track/Recoverable Off-Track not recoverable

Item / Task Status Action Date Req Notes

APRI CPF/

SUPPO

5MAR12 - APRI ($1.7M of $1.9M required received)- $205K in queue earmarked for DLA MedSurge consumable procurement

ORF C7F/

CDS-7/

SUPPO

1APR12 - ORF plan developed- Draft message completed pending CDS-7 review and approval

OCO CPF/

SUPPO

15APR12 - Requirements data forwarded to CPF - Review in progress

Page 17: PACIFIC PARTNERSHIP 2012

17

UNCLASSIFIED

UNCLASSIFIED 17 17 Completed On-track Off-Track/Recoverable Off-Track not recoverable

Item / Task Status Action Date Req Notes

Indonesia Load List

SUPPO 31MAR12 - Estimated contract award April 2012 - DLA commenced initial purchase of standard consumable items- Initial MedSurge consumable items delivered 6 March

Philippines Load List

SUPPO 31MAR12 - Standard pharmaceutical items requisitioned- DLA commencing initial purchase of standard consumable items- Initial MedSurge consumable items delivered 6 March

Vietnam Load List

SUPPO 31MAR12 - Estimated contract award April 2012 - DLA commencing initial purchase of standard consumable items- Initial MedSurge consumable items delivered 6 March

Cambodia Load List

SUPPO 31MAR12 -Standard pharmaceutical items requisitioned-DLA commencing initial purchase of standard consumable items- Initial MedSurge consumable items delivered 6 March

PP12 Supply and Logistics StatusPHARMACEUTICALS and CONSUMABLES (6MAR12)

Page 18: PACIFIC PARTNERSHIP 2012

18

UNCLASSIFIED

UNCLASSIFIED 18 18 Completed On-track Off-Track/Recoverable Off-Track not recoverable

Item / Task Status Action Date Req Notes

Load Plan MSC/

SUPPO

31JAN12 - Load plan developed and approved by MSC MERCY- 240 pallet maximum established

Project Handclasp

SUPPO 5APR12 - 40 pallets scheduled for delivery 15 MAR- Goal established at 60 pallets total

LDSC SUPPO 5APR12 - 48 pallets received 6 MAR- 93 pallets total received- Weekly deliveries scheduled

Worldwide VETs

SUPPO 15MAR12 - 2 Pallets Received

PP12 Supply and Logistics StatusDONATION MATERIAL (7MAR12)

Page 19: PACIFIC PARTNERSHIP 2012

19

UNCLASSIFIED

UNCLASSIFIED 19 19 Completed On-track Off-Track/Recoverable Off-Track not recoverable

Item / Task Status Action Date Req Notes

IT & Radio Operator Manning

CPF N3/ CDS /

15MAR12 - JCSE IEP (3 ea +OIC= 7 pers ) approved 05DEC Funding issue.- 4+Remote MEDCAP manning - IMEF providing 4 PERS/ 6 PRC-117 Radios

Annex K /

COMM Plan

CPF/ C3F/CTF-76/CDS

15MAR12

- IAW NTTP 3-57 Navy HCA OPS and NWP 3-29- Country CIS inventory and CONOPS Plan developed at MPC.- OPTASK COMMS will include daily plan based on CONOPS and Japanese ship COMMs capability

BGAN SATCOM

CPF N6/

CDS POST-MPC

- Not required for PDSS. (17OCT11 CDS-7 N6 email).- OPTEST CPF BGANs (MAR12).- Develop CONOPS for BGAN use.- ADVON BGAN training by MERCY TBD

Host Nation Spectrum Mgt

C7F/CTF-76 /CDS

01MAR12 - Awaiting C7F response to CDS-7 01FEB request for frequency assignments and restrictions for each host nation. Info rcvd 21FEB12.

ENCAP CIS

Requirements

CDS 15MAR12 - CDS determine CIS requirements.

PP12 CIS Information Systems Status(07MAR12)

Page 20: PACIFIC PARTNERSHIP 2012

20

UNCLASSIFIED

UNCLASSIFIED 20 20 Completed On-track Off-Track/Recoverable Off-Track not recoverable

Item / Task Status Action Date Req

Notes

PAO Network CPF PAO/N6

/ CDS/

MERCY

15MAR12 - Defense Video & Imagery Distribution System (DVIDS) : PAO confirmed system is available. Ashore use only.- Verified Fast File Transfer (FFT) SW (version 2.43) Installed in MERCY. FFT ATO pkg in development at DMA. PAO assist in progress

PN-NGO Business Center

(SSC LANT CHARLESTON)

CPF N6 / CDS

/MERCY

APR12 -SPAWAR PN-NGO Business Center (Wireless and terminals) is the afloat solution. - MERCY to coordinate refresh/OPTEST/training in San Diego by SPAWAR. Funding transfer to SPAWAR in progress- CDS procure printer consumables for entire mission.- IA/business rules provided CDS-7 N6 03NOV11.

Partner Nation Interoperability

CPF N6 / CDS

POST-MPC

- Identify JS OOSUMI (LST) CIS POC and CIS capability in progress- Develop CIS Interoperability Matrix in Annex K.

Health Engagement Information System (HEIS)

CIS WG/

CDS N6

TBD - HERS from MARFORPAC Experimental Center (MEC) is not available-Medical information collection is not a mission requirement. No further action required.

PP12 CIS Information Systems Status(07MAR12)

Page 21: PACIFIC PARTNERSHIP 2012

21

UNCLASSIFIED

UNCLASSIFIED 21 21 Completed On-track Off-Track/Recoverable Off-Track not recoverable

Item / Task Status Action Date Req

Notes

Remote MED-DENCAP /CC Comms Arch

CDS / CPF

PRE-MPC

- Draft CIS Element architecture and inventory under review at CDS-7 (20JAN12)- Completed at MPC.

Host Nation

MIL C4

PDSS OIC

PDSS AAR

- PDSS OICs for assessment action.

- Training provided to Blue Team 21OCT11.

Host Nation

CIVIL Comms

PDSS OIC

PDSS AAR

- PDSS OICs for assessment action.

- Training provided to Blue Team 21OCT11.

Remote Site US Mission CIS

Assessment

PDSS OIC/

AOIC

PDSS

AAR

- JCSE Planner not included in PDSS. PDSS AOIC to conduct assessments with provided checklists and guidance.- Command Center (CC) Comms assessment.- Training provided to Blue Team 21OCT11.

PDSS CIS

Comms

CPF/ CDS PDSS OICs

PRE-PDSS

- Iridium Phones: CPF N6 issued phone to Blue OIC.- In country cell phones: MERCY to provide from PP10 mission phones.- Automated Data Collection (8 cell phones app) issued to OIC.

PP12 CIS Information Systems Status(07MAR12)

No Change

Page 22: PACIFIC PARTNERSHIP 2012

22

UNCLASSIFIED

UNCLASSIFIED 22 22 Completed On-track Off-Track/Recoverable Off-Track not recoverable

Item / Task Status Action Date Req

Notes

Knowledge Management /Data Protection

CDS/

MERCY

7MAR12 - MEDCAP/CDS/Mission Data storage and protection

Command Center Ashore CIS

CDS PDSS

AAR

- Identify configuration and location in each country.- Completed at MPC

IT SMEE

Requests

CDS PDSS AAR

- PDSS determine scope (SYSADMIN, repair, training, etc.).- No IT SMEE were requested by the host nations

SATCOM Requests

C3F/

C7F/

CDS

MAR12 - Standard USN process.

Mission COMMs Readiness

CDS /

MERCY

APR12 - Pre-deployment COMM Checks (DVIDS, FTP, FFT, NMCI FAS, MERCY COMMs Suite)

PP12 CIS Information Systems Status (07MAR12)

Page 23: PACIFIC PARTNERSHIP 2012

23

UNCLASSIFIED

UNCLASSIFIED 23 23 Completed On-track Off-Track/Recoverable Off-Track not recoverable

Item / Task Status Action Date Req

Notes

FSET on MERCY

CPF /

MSC

13APR12 - Field Service Engineering Team (FSET) rqmt for San Diego to Guam cost estimate from SPAWAR received 16FEB12. SD-Guam

-Funding transfer to SPAWAR in progress.

End of Mission CIS Exit Plan

CPF/

CDS

TBD - Hardware: Transfer custody of loaned CIS items back to CPF-Data Exit Plan: TBD

VHF Handheld Radios

CPF/

CDS

MAR12 -CDS determine required quantities

ADVON CIS CDS MAR12 -Requirements determined at MPC. Under review at CPF N6/N3

Embarked Documentary Team

CDS Ongoing -CDS determine requirements and set expectations

-Afloat connectivity limited to NGO Business Center

Rehearsal CIS CDS 01MAR12 -15FEB CDS requirements: Cell phones and 1 UHF voice net.

PP12 CIS Information Systems Status(07MAR12)

No Change

Page 24: PACIFIC PARTNERSHIP 2012

24

UNCLASSIFIED

UNCLASSIFIED

Force Protection Update

– USN Force Protection Asset Status

• MESG1 Det Guam (24 EST, 24 Shore, 2 OIC & AOIC)

– Travel Reqs nearly complete for FP Element

– On The Horizon

• EST Mercy FAM and Training (8-9MAR)

– 24 EST Personnel participating in FP Scenarios

• Mission Rehearsal Exercise (12-14MAR)

– 24 EST Personnel participating in FP Scenarios

• ADVON Travel Tracker Completion

– Needed to complete APACS request

– Due 30MAR12

– POC’s: Blue – LCDR Weatherup / LT Adams, Gold – LCDR

Palacios / LT Nutting

Page 25: PACIFIC PARTNERSHIP 2012

25

UNCLASSIFIED

UNCLASSIFIED

Pre-Deployment Travel Requirements

Force Protection Update

ADVON/FIE• ISOPREP

– Completed/validated by parent command within last 6 months

– https://prmsglobal.prms.af.smil.mil/prms215/default.htm

• AOR location specific brief– Completed by parent command N2 or FPO

• Level I ATFP (OCONUS)– NKO eLearning within last 6 months– https://wwwa.nko.navy.mil/portal/home/

• SERE 100 B– NKO eLearning within last 18 months– https://wwwa.nko.navy.mil/portal/home/

• IATP / APACS– Completed by ADVON OIC/AOIC for

ADVON and ENG OIC for FIE• https://iatp.pacom.mil/• https://apacs.dtic.mil/apacs/

SIE (Mil)• ISOPREP

– Completed/validated by parent command within last 6 months

– https://prmsglobal.prms.af.smil.mil/prms215/default.htm

• AOR location specific brief– Completed by embarked N2, NCIS, or FP

OIC

• Level I ATFP (OCONUS)– NKO eLearning within last 6 months

– https://wwwa.nko.navy.mil/portal/home/

• SERE 100 B– NKO eLearning within last 18 months

– https://wwwa.nko.navy.mil/portal/home/

Page 26: PACIFIC PARTNERSHIP 2012

26

UNCLASSIFIED

UNCLASSIFIED

CAWG Update (29 FEB)

Item / Task Status Action Date Req Notes

CJ-CMCC Concept Paper Dev CPF N5 15 FEB

-Completed-Chops received and incorporated from DESRON, PP 09, 10, 11 reps, COE-DMHA (IHC) -CMCC concept document inputs received during MPC TTX.

CMCC Battle Rhythm Sych DESRON 19 JAN - Inputs submitted to DESRON.

Non-Medical SMEE CONOPS Draft Plan CAWG 23 JAN

-Complete- Plan details will continue to be added, as possible, between now and ADVON deployment. However, CONOP finalization will not occur until ADVON.

Operational Assessment Plan CAWG MAR 12

- Assessment WG has produced draft task list which will be socialized and refined during WGs.-Geared toward MOPs

NGO and Partner Nation Engagement Process

CAWG /

CPF N5

MPC

- 90% plan post MPC but add-ins will be ongoing.

No Change

Page 27: PACIFIC PARTNERSHIP 2012

27

UNCLASSIFIED

UNCLASSIFIED

CAWG Update (29 FEB)

Item / Task Status Action Date Req Notes

PN Participation CAWG 01 MAR 12

-Singapore will participate in VT only -Costa Rica drops out-Probably French add soon- Expect PN manning lists end of Feb

NGO Specialties Assignment

CAWG /

MWG

Mid-March

Specialty requests are back from NGOs/PN and will distribute this list back to MTF for additional input, comments & requests. -95% details by 01 MAR- 90% by name by 15 MAR

Donation Plan

CAWG

DESRON 01 MAR 12

- Philippines and Cambodia donation lists with DESRON for approval- Indonesia and Vietnam lists still with USEMB

No Change

Page 28: PACIFIC PARTNERSHIP 2012

28

UNCLASSIFIED

UNCLASSIFIED

Projected HN/PN Participation by Mission CountryProjected HN/PN Participation by Mission Country (29 FEB 2012) (29 FEB 2012)

Host / Partner Nation

Material / Platform Support

Personnel Participation by Port

SD HI GU ID RP RP VN KM GU HI SD POC

Indonesia FP, Engineers, Medical                    LCDR Chris [email protected]

PhilippinesFP, Engineers, Medical

                 LCDR Scott [email protected]

VietnamFP, Engineers, Medical

                   LTC Wayne [email protected]

CambodiaFP, Engineers, Medical

                   LTC Kristin Means [email protected]

AustraliaMedical 15-20 PAXEngineer Section

                   

CMDR Kenneth Walters:[email protected] Owen Gardner, [email protected].

Canada Medical/Dental 9 May

15 Pax

15 Pax

15 Pax

4 July 15 Pax 15 Pax 15 Pax 4 SepCAPT Lee Gagne [email protected]

JapanJMSDF Ship Aircraft (C-130 or KC-767)Medical Team: 20-30 pax

                    LCDR Haga : [email protected]

New Zealand 8-12 PAX Medical TeamMAJ Andrew [email protected]

Singapore Medical teamMajor Chow Weien: [email protected]

ThailandMedical, Engineers and CA Approx 15 Pax

LCDR Jason Starmer [email protected]

ROKCAPT Steve [email protected]

Chile 1 PAXMedical 5 July

24 July

LCDR Julian [email protected]

Costa Rica 1 PAX Medical 25 APR

LCDR David L [email protected]

UAE 1 PAX Medical CDR James C. [email protected]

No Change

Page 29: PACIFIC PARTNERSHIP 2012

29

UNCLASSIFIED

UNCLASSIFIED

Projected NGO Participation by Mission CountryProjected NGO Participation by Mission Country (29 FEB 2012) (29 FEB 2012)

Host / Partner Nation

Material / Platform Support

Personnel Participation by Port

SD HI GU ID RP RP VN KM GU HI SD POC

LDSMedical, Engineering, SMEEs, Donations

     35 57     51 67       Dr. Susan [email protected]

UCSD PDSMedical, Engineering, SMEEs

     51 53+    54+   50+    Dr. Irv [email protected]

Project HopeMedical , SMEES

    16 16     16  16      Lynn [email protected]

World VetsVeterinary, SMEEs

     6  6   7  6       Katie [email protected]

UH Nursing Medical     5  5     4 4    Kristine [email protected]

UH Engineering Engineering 2 2 2 2Ashish [email protected]

Project Handclasp

Donations 0 0 0 0LT Aron [email protected]

Global Grins Donations 0 0 0 0

Joselyn [email protected]

Vietnam Medical Assistance Program

Medical TBD Nguyen [email protected]

Totals 115 139 134 145

In-Country NGOs

Indonesia Philippines Vietnam Cambodia

Help for Orphans(?) Calbayog Rotary Club Compassion Flower TDBHope World Wide GIZ (TBD) Vietnam Woman’s Union

ASWHO

No Change

Page 30: PACIFIC PARTNERSHIP 2012

30

UNCLASSIFIED

UNCLASSIFIED

Public Affairs Update

- Admin• Working to replace PA ADVON Lead for IND• Asst ADVON for VNM, KHM identified

- Media Coordination• Coordinating Defense Logistics Agency (DLA) request to take B-roll,

still photography of PP12 load-on and interview MERCY Suppo week of 23 APR. Purpose: Education videos and AFN spots

Page 31: PACIFIC PARTNERSHIP 2012

31

UNCLASSIFIED

UNCLASSIFIED

Public Affairs Update

Item/Task Status Action Suspense Date

Notes

PAG CDS PACPF PA

TBD Draft to CDRE 15 DECRouting will happen D-30 to 45 daysPreparing MRX

DC media trip/mission announcement

CDS PA APR 2012 Coordinating draft concept w/ MSC and BUMED Public Affairs.

PP Fact Sheet CDS PA, CPF PA

30 DEC Mission info to NAVINFO WEST for vetting

Smartphone SOP

CIWG, CPF Social Media

15 MAR

Online presence/Social Media

CDS PA, CPF PA

9 DEC 07 MAR CPF PA telecon re: online presence/social media plans.

31 Completed On-track Off-Track/Recoverable Off-Track not recoverable

Page 32: PACIFIC PARTNERSHIP 2012

32

UNCLASSIFIED

UNCLASSIFIED

Public Affairs Update

Item/Task Status Action Suspense Date

Notes

Equipment requirements

CDS PA, NPASE

31 MAR Dialogue initiated w/ MERCY on 04 JANBGAN support- emergency use only, provided by CPF COMCAM

PO&AM inputs CDS PA, CPF PA

14 DEC Due to FOPS.PA-specific updates in progress

Media Training Plan

CDS PA

30 APR 05 MAR – Basic media/TV media training w/ MTF CO12 MAR – MRX media prep w/ leadership

COMREL purchase list

CPF PA

24 FEB CPF PA commencing w/ purchase order

32 Completed On-track Off-Track/Recoverable Off-Track not recoverable

Page 33: PACIFIC PARTNERSHIP 2012

33

UNCLASSIFIED

UNCLASSIFIED

PP12 Communication Integration

• Identified initial list of communication “products” at MPC– Posters, gifts, backpacks, SMEE aids, etc.

• Coordinating communication assessment support for PP12 (MAY – SEP 12)

– Working with CPF N01H and N5 to develop assessment approach

– Linguist candidates to support in-country media analysis, and CA/PA engagement

• IND (1), TAG (3), VIET (2), CAMB (0)

• CIWG will transition to the PAWG.

Page 34: PACIFIC PARTNERSHIP 2012

34

UNCLASSIFIED

UNCLASSIFIED

PP12 Communication Integration

34 Completed On-track Off-Track/Recoverable Off-Track not recoverable

Item / Task Status Action Date Req Notes

Stakeholder Analysis

CIWG 15 NOV - Initial product completed. Briefing with Commodore Morgan scheduled for early Dec.

Characterize Information Environment

CPF N2/N39

15 NOV – 30 JAN

-Political Military Economic Social Infrastructure and Information (PMESII) product status is as follows: Cambodia 100%, Indonesia 100%, Vietnam 100%, Philippines 100%.

Communication Strategy/ Implementation Plan

CPF N2/N39

31 DEC - This product will detail integrated approach for internal, external messaging. This product will be a draft until finalized as an Annex to the CPF PP12 Campaign Plan.

Identify/Coordinate key messaging events

CIWG 15 JAN - Identified; coordinating CIWG support:-- ETG Leadership Training-- MPC Assessment planning-- SLV support

Develop messaging products

CIWG/ CPF N2/N39, PA

15 APR - Identified initial information products to support mission execution. Researching feasibility, and working with mission SMEE coordinators to ID additional requirements; coordinating with PACOM, SOCPAC, USARPAC, in-country teams.

NO CHANGE

Page 35: PACIFIC PARTNERSHIP 2012

35

UNCLASSIFIED

UNCLASSIFIED

PP12 Communication Integration

35 Completed On-track Off-Track/Recoverable Off-Track not recoverable

Item / Task Status Action Date Req Notes

Develop communication MOE Indicators

CIWG/ N2/N39

15 JAN - Draft indicators developed as part of overall PP12 assessment effort.

Define Communication assessment methodology

CPF N2/N39

30 JAN - Completed communication assessment framework and methodology for incorporation into overall PP12 assessment effort.

Coordinate and monitor communication during execution

CPF N2/N39

During PP12

- Identified initial monitoring requirements, resources and tools to support communication assessment, such as media analysis.

Conduct communication assessment

CIWG During PP12

- Not started.

Develop AAR CPF N2/N39, PA

30 SEP - Not started.

NO CHANGE

Page 36: PACIFIC PARTNERSHIP 2012

36 36

Planning Timeline

UPDATED: 07MAR12

Page 37: PACIFIC PARTNERSHIP 2012

37

UNCLASSIFIED

UNCLASSIFIED

Mission Commander Priorities

• Country CONOPS Development– 29FEB: CONOPS and Medical/Eng Annexes forwarded to CPF

(COMPLETE)– CONOPS Engineering Annex (COMPLETE)– CONOPS Medical Annex (IN PROGRESS)– CONOPS Veterinarian Annex (IN PROGRESS)– TBD: Post CONOPS to APAN (pending approval)

• ADVON Composition / Notification– Composition approved by CPF– Notification in progress by OIC/AOIC

• Collecting following information: contact info, passport, GOVCC, ATFP requirements, visas

• Voyage Planning– CPF major sked change request approved (expect msg later this week)– MERCY transit plan 291731Z FEB 12

• CSFTP endorsement 011817Z MAR 12• Endorsements remaining: C3F, CTF76, C7F

Page 38: PACIFIC PARTNERSHIP 2012

38

UNCLASSIFIED

UNCLASSIFIED

Mission Commander Priorities (continued)

• MRX Planning– 08MAR: MRX planning TELCON (#3)

• Participants: MTF MERCY, USNS MERCY, HSC 21, ENG, EST, CDS7: OPS, FP, Comms, & PAO reps

– MRX Participant list finalized– All participants must be on MERCY messdecks on Monday, 12MAR at

0730-1200 for MRX pre-sail conference/briefs

• Pre-deployment Briefings– 27MAR 1400 PST (272200ZMARR12) – C3F– 02APR 1630 PST (030030ZAPR12) – CTF76 (VTC)– 09APR 1630 PST (100030ZAPR12) – C7F (VTC)– TBD – CPF (13APR – proposed)

• Concerns– Manning

• Unfilled billets• 16x USA CA billets (351st)

– JCSE funding– Timeline for dissemination of CONOPS on APAN to NGOs, PNs, HNs,

etc for planning

Page 39: PACIFIC PARTNERSHIP 2012

39

UNCLASSIFIED

UNCLASSIFIED

Closing Questions/Comments

• CPF Staff• State Dept – Mr. Weinz• AUS HQ JOC• HQ JFNZ• JSDF• FLC-Yokosuka• C7F• C3F• CTF 76

• 351st Civil Affairs Command• DLA Troop Support - Pacific• 30th NCR• ETG• HSC-21 DET 2• MCAST• USNS MERCY• CDS-7