Bart Kuijpers P4 Presentation Main mentor: Dr. G. Bracken1176420 2012-12-03 BT mentor; Ir Y. Cuperus
Updating Shanghai:Life from the ground up
1
SHANGHAI 1554-1842
2
SHANGHAI 1842-1943
3
SHANGHAI 2012
4
SHANGHAI CHINA FLOATING
1830
2
4
6
8
10
12
14
16
18
20
22
24
26
28
400
300
200
100
500
600
700
800
900
1,000
1,100
1,200
1,300
1,400
1840 1850 1860 1870 1880 1890 1900 1910 1920 1930 1940 1950 1960 1970 1980 1990 2000 2010
POPULATION CHINA VS SHANGHAIPO
PULA
TION
SH
ANGH
AI IN
MIL
LION
S
POPU
LATI
ON C
HIN
A IN
MIL
LION
S
5
1830
2
4
6
8
10
12
14
16
18
20
22
24
0.5
1
1.5
2
2.5
3
3.5
4
4.5
5
5.5
6
1840 1850 1860 1870 1880 1890 1900 1910 1920 1930 1940 1950 1960 1970 1980 1990 2000 2010
PEOP
LE IN
MIL
LION
S
FSI
POPULATION VS BUILDING FSI & CONSTRUCTION PERIOD
6
SHIKUMEN CHARACTERISTICS
DECORATED STONE DOORFRAME.
BLACK WOODEN DOOR
COURTYARDSKYWELL
DORMERWINDOWS
GREY & REDBRICKS
ROOFTERRACE
BALCONIES& BAY WINDOWS
7
ENGLISH (TUDOR) RENTAL HOUSING MARKETS
PUBLIC FACILITIESSMALL INDUSTRY
MAIN ALLEY
FRENCH (CITE) SHANGHAI VERNACULAR FENG SHUI CHINESE SOCIETY
SHIKUMEN= COLLABORATION
8
DISTANCE IN MAN
ON WHAT DISTANCE SOCIAL INTERACTION TAKES PLACE
0-0.15 m 0.45-0.75 m 1.2-2.1 m 3.6-7.2 m INTIMATE CLOSE PERSONAL CLOSE SOCIAL CLOSE PUBLIC CLOSE0.15-0.45 m 0.75-1.2 m 2.1-3.6 m 7.2 mINTIMATE FAR PERSONAL FAR SOCIAL FAR PUBLIC FAR
9
OUTSIDE MAIN ALLEY SIDE ALLEY HOUSE STAIRS ROOM
IN WHAT TYPE OF SPACE DOES THE SOCIAL INTERACTION TAKE PLACE?
10
OUTSIDE MAIN ALLEY SIDE ALLEY HOUSE STAIRS ROOM
IN WHAT TYPE OF SPACE DOES THE SOCIAL INTERACTION TAKE PLACE?
INTIMATE
PERSONAL
SOCIAL
PUBLIC
1 PERSON
10,000 PEOPLE
DIST
ANCE
OF
INER
ACTI
ON
AMOU
NT O
F PE
OPLE
11
OUTSIDE/COMPOUND
LOBBY/WAITING AREA
ELEVATOR HALLWAY APARTMENT/ROOM
IN WHAT TYPE OF SPACE DOES THE SOCIAL INTERACTION TAKE PLACE?
12
OUTSIDE/COMPOUND
LOBBY/WAITING AREA
ELEVATOR HALLWAY APARTMENT/ROOM
INTIMATE
PERSONAL
SOCIAL
PUBLIC
1 PERSON
10,000 PEOPLE
DIST
ANCE
OF
INER
ACTI
ON
AMOU
NT O
F PE
OPLE
IN WHAT TYPE OF SPACE DOES THE SOCIAL INTERACTION TAKE PLACE?
13
STREET- LÙ - 路PUBLIC
14
MAIN ALLEY - LI - 里SEMI-PUBLIC
15
SIDE ALLEY - LÒNGTÁNG - 弄堂SEMI-PRIVATE
16
HOUSE - SHÍKÙMÉN - 石库门PRIVATE
17
TRANSITION AREAS
SOCIAL HOTSPOTS
18
FUNCTIONS WITHIN THE COMPOUND/NEIGHBORHOOD
RESIDENCES RESIDENCES SMALL SHOPS SHOP HOUSES FACILITIES FOR RESIDENTS SMALL INDUSTRY COMMUNAL FUNCTIONS
19
FUNCTIONS WITHIN THE COMPOUND/NEIGHBORHOOD
CLOSED OFF FROM THE URBAN FABRIC POROUS ENTITY ONLY ACCESSIBLE FOR RESIDENTS ACCESIBLE FOR EVERYBODY
20
拆那
CHINA
21
THE SHIKUMEN PARADOX
THEY CAN’T BE SAVED, THEY CAN’T BE KEPT
ARCHITECTURAL HERITAGE & SOCIAL HERITAGE
FOUR OPTIONS
22
1. DESTROY THE SHIKUMEN
LOSE THE BUILDINGS AS WELL AS THE SOCIAL STRUCTURE
MOST COMMON OPTION, AS IT IS HIGHLY PROFITABLE
23
2. DESTROY AND REBUILD
KEEP THE FAKE BUILDINGS, LOSE THE SOCIAL STRUCTURE
POPULAR HOTSPOT XINTIANDI USES THIS METHOD, AS WILL THE PROJECT LOCATION
24
3. RENOVATE
KEEP THE BUILDINGS, GENTRIFICATION WILL PUSH THE ORIGINAL RESIDENTS OUT
JIANYE LI, PORTMAN HOUSE, TRIED AND FAILED
25
4. DO NOTHING
IT WILL KEEP THE ORIGINAL RESIDENTS AND BUILDINGS, BUT WILL EVENTUALLY FALL APART AND LOSE EVERYTHING
26
Photo by Gropius Photographyhttp://www.flickr.com/photos/gropius/7987982563/
GOALS
MAINTAIN & RENOVATE SHIKUMENKEEP THE SOCIAL STRUCTURE & ORIGINAL RESIDENTS
27
SHANGHAI
HIGH RISE, SHIKUMEN & GREEN
28
Client: OCT
Goals; Create profit by redeveloping the cultural and historical valuable area on the bank of the Suzhou Creek
Requirements;Redesign the project location within the context of the existing masterplan500-600 Apartments40-60 sqm per apartment20% commercial functions
29
End User; Current Shikumen Residents
Description;Working class, low budget, aging populationValue their social interaction, long time residentsAverage household size; 3
Needs;Small, affordable housing (40-60 sqm)Social space for various activities such as playing cards and ex-ercising.Keeping the walking areas as level as possible
30
31
MASTERPLAN
32
POROUSITY
3 AREAS;RENOVATED SHIKUMENPUBLIC PARK & SHOPSRESIDENTIAL TOWER
3 INTERCONNECTING FLOWS
33
RELOCATION
RENOVATE & GENTRIFY THE SHIKUMEN
OFFER COMPENSATION TO THE ORIGINAL RESIDENTS IN THE NEW TOWER
ALLOW THE NEW SHIKUMEN RESIDENTS TO INVEST IN THE TOWER
34
MONEY
FRIENDS
35
MATERIAL PUBLIC AREA
WOODEN FACADE PANELS AND PLANTS
36
MATERIAL SHIKUMEN
RENOVATE WITH THE EXISTING TRADITIONAL GREY ANDORANGE BRICK
37
MATERIAL TOWER
WHITE CONCRETEGLASS
RENDER BY LUXIGON38
STANDARD HIGH RISE SLAB
39
SEPARATE SLABS AROUND CENTRAL CORE
40
DIVIDE HORIZONTALLY INTO 3 LAYERS
41
MAKE THE RELATIONSHIP HORIZONTAL INSTEAD OF VERTICAL
42
EARLY MODEL
3 SLABS
OPPOSITE OF EACH OTHERCENTRAL CORE
43
P3 MODEL
2 SLABS
HEXAGON AROUND THE CORE
EAST AND WEST FACADE OPEN
44
FORM STUDIES
TWO BUILDINGS BECOME ONE
SLABS GROWN TOGETHER
45
FORM STUDIES
IT SEEMS THE SUPERFORM IS CREATED BY CUTTING AWAY PARTS OF THE HEXAGON
IN THE PROCESS, IT WAS CREATED BY ADDITION TO THE SLABS
46
DESIGN APPROACH
CONSTRUCTED AROUND A SERIES OF SCALE MODELS BASED ON THE DIS-TANCES AND INTERACTION FOUND IN THE SHIKUMEN
WORKING FROM OUTSIDE IN; THE ROUTE FROM PUBLIC TO PRIVATE
47
TRANSITION SPACE 1
GROUNDFLOOR CONNECTING THE TOWER, SHIKUMEN AND PUBLIC AREA
MATERIALIZATION WHICH PATH BELONGS TO WHICH AREA
“ELEVATOR LOBBY” IS OPEN AND SURROUND BY SEMI PUBLIC SOCIAL SPACES
GROUND FLOOR SPACE IS PUBLIC DISTANCE, WHILE THE SOCIAL SPACES ARE ADJUSTED FOR SOCIAL DISTANCE
48
TRANSITION SPACE 2
WALKWAYS CONNECTION THE CENTRAL CORE TO THE GALLERY
ONE FOR EACH FLOOR
FLOORS ARE CONNECTED BY STAIRS AT THE BACK OF THE SPACE
VISUAL CONNECTION AT THE FRONT OF THE SPACE
SPACE ADJUSTED FOR SOCIAL DISTANCE
49
TRANSITION SPACE 3
COURTYARDS CONNECTING THE GALLERY TO THE APARTMENTS
EVERY HOUSE IT CONNECTED TO A COURTYARD, SOMETIMES SHARED
COURTYARD IS PART OF THE APARTMENT
NO VISUAL OR PHYSICAL OBSTRUCTION BETWEEN THE GALLERY AND FRONT DOOR ALLOWED
SPACE IS ADJUSTED TO PERSONAL DISTANCE
50
DESIGN
YÙJING GONGYÙJADE WELL APARTMENTS
51
APARTMENTS
625 APARTMENTS IN TOTAL
BOTTOM ALLEY 261 APARTMENTS
MIDDLE ALLEY 220 APARTMENTS
BOTTOM ALLEY 144 APARTMENTS
THE CONFIGURATION CHANGES AS THE SHAPECHANGES
BOTTOM ALLEY HAS MORE FAMILY APARTMENTS
TOP LAYER HAS MORE SINGLE BEDROOM APARTMENTS
52
PHYSICAL VERTICAL CONNECTION
3 VERTICAL ALLEYS CONNECTED BY STAIRS
2 PLATFORMS CONNECTING THE VERTICAL ALLEYS
53
ELEVATOR SYSTEM
EACH OF THE THREE LAYERS HAS A SEPARATE ELEVATOR CORE
REDUCING THE AMOUNT OF DIFFERENT PEOPLE YOU CAN ENCOUNTER DURING THE AWKWARD ELEVATOR MOMENT
54
FLOW OF PEOPLE
ROUTE TIME SPEND IN ZONE
55
WHAT KIND OF ACTIVITIES TAKE PLACE?
FROM THE STREET TO THE APARTMENT
文学你好
OUTSIDE LOBBY ELEVATOR BRIDGE COURTYARD LIVING ROOM BED ROOM
56
FUNCTIONS
GROUND FLOOR HAS SHOPS
THE DECKS ARE CONNECTING ELEMENTS BETWEEN THE VERTICAL ALLEYS
EAST DECK IS FOR BREAKFAST AND EXERCISE
WEST DECK IS EVENING SNACKS AND MAHJONG/CARDS
FOOD STALLS ON THE DECKS ARE SAFE FROM CHENGGUAN
57
GROUND FLOOR
3 LEVELS; PATHS, GREEN, SOCIAL SPACE
-1 SOCIAL SPACE0 PATHS+1 GREEN AREAS
58
OPENESS
THE TOWERS OPENS UP TOWARDS THE SHIKUMENWHILE THE CENTER IS MORE CLOSED TOWARDS THE OTHER SIDES
59
BRIDGES
THREE SETS OF BRIDGES CONSISTING OF 9 EACH MAKETHREE VERTICAL ALLEYS IN THE TOWER
OUTSIDE STRAIGHT, INSIDE ORGANIC
60
FENG SHUI
GEOMANCY, AN EARLY FORM OF ENVIROMENTALISM
WORK WITH THE ENVIRONMENT, NOT AGAINST IT
DUE TO FENG SHUI GUIDELINES, ALMOST EVERY BUILDING IN CHINA IS SOUTH FACING
61
FENG SHUI, BA GUA
62
PRIVACY ZONING OF THE APARTMENTS
SEMI PUBLIC
PRIVATE
63
PRIVACY ROUTE
THE FURTHER THE ROUTE GOES IN TO THEBUILDING, THE MORE PRIVATE IT GETS
AT THE END, THE BEDROOMS, THE MOSTPRIVATE MEETS THE MOST PUBLIC
THE OUTER FACADE WILL BE STRAIGHT ANDANGULAR
THE INSIDE FACADE IS MORE ORGANIC
64
N
3RD FLOOR
BOTTOM ALLEY
65
N
13TH FLOOR
MIDDLE ALLEY
66
N
19TH FLOOR
CONNECTING FLOOR FOR THE MIDDLE AND TOP ALLEY
EAST DECK
MORNING AREA; EXERCISE & BREAKFAST
67
N
24TH FLOOR
TOP ALLEY
68
APARTMENTS
54 M2TWO BEDROOMSOUTH FACINGPRIVATE COURTYARD
38 M2SINGLE BEDROOMNORTH FACINGSHARED COURTYARD
69
BRIDGES
THE SOCIAL SPACES ON THE BRIDGES ARECONNECTED VISUALLY...
70
BRIDGES
...AND PHYSICALLY
71
LOAD BEARING CONSTRUCTION
WHILE A RIGID FRAME POSSIBLY COULD BE STABLE ENOUGHK-BRACING HAS BEEN ADDED TO COUNTER TORSION AND HORIZONTALDEFORMATION
72
LOAD BEARING CONSTRUCTION
RIGID CONCRETE FRAME WITH K-BRACING4000x9100 GRID
6000x9100 GRID
6000x9100 GRID6000x9100 GRID
6400x9100 GRID
5000x9100 GRID
73
3D RIGID FRAME
CROSS FLOORS
GRID ADAPTS TO THE APARTMENTS
74
CONSTRUCTION BRIDGES
IF LENGTH INCREASES, THE RAILING GETS HIGHER
SUPPORTED ON THE RIGID CONCRETE FRAME ANDCENTRAL CORE
75
INSTALLATIONS - SHAFTS
EACH APARTMENT HAS 2 SHAFTS
BETWEEN EACH OF THE 3 LAYERS A HORIZONTAL DISTRIBUTION SPACE
76
DAYLIGHT
SHANGHAI’S LATITUDE IS 31 DEGREES
IN SUMMER, THE HIGHEST POINT OF THE SUN IS 82 DEGREES
77
DAYLIGHT
... AND 32 DEGREES IN THE WINTER
78
HEATING/COOLING SUMMER
COOLING, USING THE SUZHOU CREEK1.5M BELOW THE SURFACE CONSTANT ~14C
WARMTH STORED IN AQUIFER
79
HEATING/COOLING WINTER
HEATING, USING THE HEAT FROM THE SUMMER IN THE AQUIFER
HEATING IS NOT MANDATORY IN SHANGHAI, BUT IT IS NECESSARY
80
INDOOR CLIMATEINDOOR CLIMATE
OUTSIDE SOLAR SHADINGOUTSIDE SOLAR SHADINGNATURAL CROSS VENTILATIONNATURAL CROSS VENTILATIONFLOOR HEATING/COOLINGFLOOR HEATING/COOLINGPOSSIBILITY FOR AIRCO UNIT IN FACADEPOSSIBILITY FOR AIRCO UNIT IN FACADECONCRETE FLOORS PROVIDE THERMAL MASSCONCRETE FLOORS PROVIDE THERMAL MASS
81
AIRCONDITIONING
AIRCO IS NOT NECESSARY DUE TO FLOOR HEATING/COOLING
IN THE HIGHLY LIKELY EVENT PEOPLE WANTAIRCO, IT WILL NOT DISRUPT THE FACADE
82
DETAILS
OUTER FACADE THE GLASS AND PREFAB ELEMENTARE IN ONE LINE, A STRICT DIVISION BETWEEN THEPUBLIC OUTSIDE AND PRIVATE INSIDE
83
DETAILS
OUTSIDE SOLAR SHADING IS CONNECTED BY AN ISOKORFINSULATION ELEMENT
THE PREFAB ELEMENT WILL BE ENGRAVED WITH SMALL LINES,DIFFERENT FOR EACH ALLEY LAYER, CHANGING THEAPPEARANCE OVER TIME AS IT GETS DIRTIER
84
DETAILS
ON THE INSIDE THE APART-MENTS HAVE BAY WINDOWSMAKING A BETTER CONNECTIONBETWEEN THE GALLERY ANDLIVING ROOM
85
THANK YOU
QUESTIONS?
86