P09451 Final P09451 Final Project ReviewProject Review
Bryan McCormick (ME) Project ManagerBryan McCormick (ME) Project ManagerAndy Freedman (ME) Heat Transfer/Fluids Analysis & Andy Freedman (ME) Heat Transfer/Fluids Analysis &
DesignDesignJohn Kreuder (ME) Thermal ModelerJohn Kreuder (ME) Thermal Modeler
Ken McLoud (ME) Structural DesignerKen McLoud (ME) Structural DesignerJon Holdsworth (EE) Electrical System DesignerJon Holdsworth (EE) Electrical System Designer
Gabriela Santa Cruz (IE) Engineering EconomicsGabriela Santa Cruz (IE) Engineering Economics
Sponsored by:Sponsored by:
Project DescriptionProject Description Improved test stand for studying thermo-Improved test stand for studying thermo-
electric moduleselectric modules
High Level Customer Needs:High Level Customer Needs: Implement air-cooling on cold side of thermo-electric Implement air-cooling on cold side of thermo-electric
array in addition to the water-cooling system.array in addition to the water-cooling system. Be able to experimentally validate thermoelectric Be able to experimentally validate thermoelectric
system models and enable more parameters to be system models and enable more parameters to be explored.explored.
Improve user interface and data acquisition to allow Improve user interface and data acquisition to allow greater ease of use of the test stand.greater ease of use of the test stand.
Improve set-up and shut-down procedures to reduce Improve set-up and shut-down procedures to reduce assembly times assembly times
Current StatusCurrent Status
Assembly completeAssembly complete Labview completeLabview complete System test incompleteSystem test incomplete
Current StatusCurrent Status
On target to meet budgetOn target to meet budget Melcor thermoelectric modules still Melcor thermoelectric modules still
outstandingoutstanding Wire to arrive todayWire to arrive today
Schedule: Schedule: Design completed on scheduleDesign completed on schedule Machining/Assembly took much longer than Machining/Assembly took much longer than
anticipatedanticipated Testing not yet completeTesting not yet complete
Test ResultsTest Results
System is operationalSystem is operational More testing is required to prove More testing is required to prove
functionalityfunctionality
Successes/FailuresSuccesses/FailuresSuccessesSuccesses
User Interface ImprovementsUser Interface Improvements Cross-flow air coolingCross-flow air cooling Ability to interchange air cooling Ability to interchange air cooling
and water coolingand water cooling Addition of 4th zoneAddition of 4th zone Additional temperature Additional temperature
measurementsmeasurements Temperature measurements at Temperature measurements at
inlet and outlet of each zoneinlet and outlet of each zone Additional pressure Additional pressure
measurementsmeasurements Elimination of manual Elimination of manual
measurementsmeasurements Consistent positive positioning of Consistent positive positioning of
thermocouplesthermocouples Additional tool clearance on Additional tool clearance on
components of power modulecomponents of power module Safety shutoff sensor for heaterSafety shutoff sensor for heater Multiple heat sinksMultiple heat sinks
FailuresFailures MOSFET power-tracking MOSFET power-tracking
systemsystem Inability to use control system Inability to use control system
for peak power (due to for peak power (due to MOSFETs)MOSFETs)
Machining time Machining time underestimationunderestimation
Insufficient time for testingInsufficient time for testing