30
P A U L S E N A R C H I T E C T S Structural Engineer P A U L S E N A R C H I T E C T S A vision for the future. Experience that equals success. Bold designs to bring interest to our pa JIM PANKO, PE MARSHALL HOTEL INVESTIGATION

P A U L S E N A R C H I T E C T S Structural Engineer P A U L S E N A R C H I T E C T S A vision for the future. Experience that equals success. Bold designs

Embed Size (px)

Citation preview

Page 1: P A U L S E N A R C H I T E C T S Structural Engineer P A U L S E N A R C H I T E C T S A vision for the future. Experience that equals success. Bold designs

P A U L S E N A R C H I T E C T S

Structural Engineer

P A U L S E N A R C H I T E C T S

A vision for the future.

Experience that equals success.

Bold designs to bring interest to our paths.

JIM PANKO, PE

MARSHALL HOTEL INVESTIGATION

Page 2: P A U L S E N A R C H I T E C T S Structural Engineer P A U L S E N A R C H I T E C T S A vision for the future. Experience that equals success. Bold designs

P A U L S E N A R C H I T E C T S

OVERVIEW

• 3 Story brick structure

• Wood framed floors and roof

MARSHALL HOTEL INVESTIGATION

CITY HALL

WEST M

AIN

ALLEY

DAILY GRIND

MARSH

ALL

HOTEL

FOUNDATION 2ND-ROOF

Page 3: P A U L S E N A R C H I T E C T S Structural Engineer P A U L S E N A R C H I T E C T S A vision for the future. Experience that equals success. Bold designs

P A U L S E N A R C H I T E C T S

ROOF STRUCTURE

• 1 ½”x9 ¼” Hem-fir joist at 16” O.C.

• Snow load capacity of 35 psf

• Moisture damage at north end of structure from insufficient roofing membrane

MARSHALL HOTEL INVESTIGATION

Page 4: P A U L S E N A R C H I T E C T S Structural Engineer P A U L S E N A R C H I T E C T S A vision for the future. Experience that equals success. Bold designs

P A U L S E N A R C H I T E C T S

ROOF STRUCTURE• Failed roof membrane

MARSHALL HOTEL INVESTIGATION

Page 5: P A U L S E N A R C H I T E C T S Structural Engineer P A U L S E N A R C H I T E C T S A vision for the future. Experience that equals success. Bold designs

P A U L S E N A R C H I T E C T S

ROOF STRUCTURE• Failed roof membrane

MARSHALL HOTEL INVESTIGATION

Page 6: P A U L S E N A R C H I T E C T S Structural Engineer P A U L S E N A R C H I T E C T S A vision for the future. Experience that equals success. Bold designs

P A U L S E N A R C H I T E C T S

ROOF STRUCTURE• Failed roof membrane

MARSHALL HOTEL INVESTIGATION

Page 7: P A U L S E N A R C H I T E C T S Structural Engineer P A U L S E N A R C H I T E C T S A vision for the future. Experience that equals success. Bold designs

P A U L S E N A R C H I T E C T S

ROOF STRUCTURE• Damaged roof structure on North end

MARSHALL HOTEL INVESTIGATION

Page 8: P A U L S E N A R C H I T E C T S Structural Engineer P A U L S E N A R C H I T E C T S A vision for the future. Experience that equals success. Bold designs

P A U L S E N A R C H I T E C T S

ROOF STRUCTURE• Damaged roof structure on North end

MARSHALL HOTEL INVESTIGATION

Page 9: P A U L S E N A R C H I T E C T S Structural Engineer P A U L S E N A R C H I T E C T S A vision for the future. Experience that equals success. Bold designs

P A U L S E N A R C H I T E C T S

ROOF STRUCTURE• Water intrusion at light well

MARSHALL HOTEL INVESTIGATION

Page 10: P A U L S E N A R C H I T E C T S Structural Engineer P A U L S E N A R C H I T E C T S A vision for the future. Experience that equals success. Bold designs

P A U L S E N A R C H I T E C T S

ROOF STRUCTURE• Damaged roof structure at light well

MARSHALL HOTEL INVESTIGATION

Page 11: P A U L S E N A R C H I T E C T S Structural Engineer P A U L S E N A R C H I T E C T S A vision for the future. Experience that equals success. Bold designs

P A U L S E N A R C H I T E C T S

THIRD FLOOR

• 1 ½”x13 ¼” Hem-fir joist at 16” O.C.

• Live load capacity of 60 psf

• Moisture damage at light well and North end of structure

MARSHALL HOTEL INVESTIGATION

Page 12: P A U L S E N A R C H I T E C T S Structural Engineer P A U L S E N A R C H I T E C T S A vision for the future. Experience that equals success. Bold designs

P A U L S E N A R C H I T E C T S

THIRD FLOOR• Moisture damage in light well bearing

wall and adjacent floor joist.

MARSHALL HOTEL INVESTIGATION

Page 13: P A U L S E N A R C H I T E C T S Structural Engineer P A U L S E N A R C H I T E C T S A vision for the future. Experience that equals success. Bold designs

P A U L S E N A R C H I T E C T S

THIRD FLOOR• Moisture damage at north end of

structure from leaking roof

MARSHALL HOTEL INVESTIGATION

Page 14: P A U L S E N A R C H I T E C T S Structural Engineer P A U L S E N A R C H I T E C T S A vision for the future. Experience that equals success. Bold designs

P A U L S E N A R C H I T E C T S

SECOND FLOOR

• 1 ½”x13 ¼” Hem-fir joist at 16” O.C.

• Live load capacity of 60 psf

• Moisture damage at various locations

MARSHALL HOTEL INVESTIGATION

Page 15: P A U L S E N A R C H I T E C T S Structural Engineer P A U L S E N A R C H I T E C T S A vision for the future. Experience that equals success. Bold designs

P A U L S E N A R C H I T E C T S

SECOND FLOOR• Inadequate drainage on

light well roof

• Load bearing light well wall transfers load to second floor joist

MARSHALL HOTEL INVESTIGATION

ROOF DRAIN

Page 16: P A U L S E N A R C H I T E C T S Structural Engineer P A U L S E N A R C H I T E C T S A vision for the future. Experience that equals success. Bold designs

P A U L S E N A R C H I T E C T S

SECOND FLOOR• Water damage at various

plumbing lines

• Water damage from leaking roof

MARSHALL HOTEL INVESTIGATION

Page 17: P A U L S E N A R C H I T E C T S Structural Engineer P A U L S E N A R C H I T E C T S A vision for the future. Experience that equals success. Bold designs

P A U L S E N A R C H I T E C T S

MAIN FLOOR• 1 ½”x 9 Hem fir joist @ 16” O.C.

• Live load capacity of 80 to 85 psf

• Shear failure on part of floor structure

MARSHALL HOTEL INVESTIGATION

Page 18: P A U L S E N A R C H I T E C T S Structural Engineer P A U L S E N A R C H I T E C T S A vision for the future. Experience that equals success. Bold designs

P A U L S E N A R C H I T E C T S

FOUNDATION

• Stone and cast in place concrete foundation walls

• Foundation is connected to adjacent Structures

MARSHALL HOTEL INVESTIGATION

Page 19: P A U L S E N A R C H I T E C T S Structural Engineer P A U L S E N A R C H I T E C T S A vision for the future. Experience that equals success. Bold designs

P A U L S E N A R C H I T E C T S

FOUNDATIONMARSHALL HOTEL INVESTIGATION

Inside Daily Grind looking at east foundation wall of Marshall Hotel

Inside City Hall looking at west foundation wall of Marshall Hotel

Page 20: P A U L S E N A R C H I T E C T S Structural Engineer P A U L S E N A R C H I T E C T S A vision for the future. Experience that equals success. Bold designs

P A U L S E N A R C H I T E C T S

PARTY WALLS

• Marshall Hotel west bearing wall is independent from adjacent structure.

MARSHALL HOTEL INVESTIGATION

Page 21: P A U L S E N A R C H I T E C T S Structural Engineer P A U L S E N A R C H I T E C T S A vision for the future. Experience that equals success. Bold designs

P A U L S E N A R C H I T E C T S

PARTY WALLS

• Marshall Hotel east bearing wall is independent from adjacent structure.

MARSHALL HOTEL INVESTIGATION

Page 22: P A U L S E N A R C H I T E C T S Structural Engineer P A U L S E N A R C H I T E C T S A vision for the future. Experience that equals success. Bold designs

P A U L S E N A R C H I T E C T S

ROOFTOP SIGN• Corroded sign structure

• Six guy cables failed

MARSHALL HOTEL INVESTIGATION

Page 23: P A U L S E N A R C H I T E C T S Structural Engineer P A U L S E N A R C H I T E C T S A vision for the future. Experience that equals success. Bold designs

P A U L S E N A R C H I T E C T S

ROOFTOP SIGN• Corroded sign structure & failed guy wire

MARSHALL HOTEL INVESTIGATION

Page 24: P A U L S E N A R C H I T E C T S Structural Engineer P A U L S E N A R C H I T E C T S A vision for the future. Experience that equals success. Bold designs

P A U L S E N A R C H I T E C T S

FRONT SIGN• Remove remaining glass tubing

MARSHALL HOTEL INVESTIGATION

Page 25: P A U L S E N A R C H I T E C T S Structural Engineer P A U L S E N A R C H I T E C T S A vision for the future. Experience that equals success. Bold designs

P A U L S E N A R C H I T E C T S

FRONT CANOPY• Can support a balanced snow load 35 psf

• Structurally inadequate to support the snow loads from the effects of drifting per ASCE 7-05

MARSHALL HOTEL INVESTIGATION

Page 26: P A U L S E N A R C H I T E C T S Structural Engineer P A U L S E N A R C H I T E C T S A vision for the future. Experience that equals success. Bold designs

P A U L S E N A R C H I T E C T S

FRONT CANOPY• Bolt insufficient to support drift loads

MARSHALL HOTEL INVESTIGATION

Page 27: P A U L S E N A R C H I T E C T S Structural Engineer P A U L S E N A R C H I T E C T S A vision for the future. Experience that equals success. Bold designs

P A U L S E N A R C H I T E C T S

FIRE ESCAPE

• Structurally adequate to support snow load and self weight as an un-occupied structure.

• Depending on future occupancy, may not be adequate to serve as an exit.

• Fire escape appears to impede on Right of way for alley.

MARSHALL HOTEL INVESTIGATION

Page 28: P A U L S E N A R C H I T E C T S Structural Engineer P A U L S E N A R C H I T E C T S A vision for the future. Experience that equals success. Bold designs

P A U L S E N A R C H I T E C T S

CONCLUSIONSMARSHALL HOTEL INVESTIGATION

REQUIRED REPAIRS AS UN-OCCUPIED STRUCTURE

ACTION

Removal of rooftop sign

Removal or repair of canopy

Removal of loose roofing material

Removal of remaining glass on front sign

Replacement of roofing membrane

Repair of all damaged roof structure

TIME FRAME

60 Days

60 Days

60 Days

60 Days

60 DaysAt the time of replacing roofing membrane

Page 29: P A U L S E N A R C H I T E C T S Structural Engineer P A U L S E N A R C H I T E C T S A vision for the future. Experience that equals success. Bold designs

P A U L S E N A R C H I T E C T S

ESTIMATE OF REPAIRS

• Cost estimate for repairs required to protect the general public from harm as an un-occupied structure.

• Additional repairs and upgrades will be required before the structure can be occupied.

MARSHALL HOTEL INVESTIGATION

Page 30: P A U L S E N A R C H I T E C T S Structural Engineer P A U L S E N A R C H I T E C T S A vision for the future. Experience that equals success. Bold designs

P A U L S E N A R C H I T E C T S

P A U L S E N A R C H I T E C T S

A vision for the future.

Experience that equals success.

Bold designs to bring interest to our paths.