AmerGenMAmeTGen Energy Company
Oyster CreekUS Route 9 South, P.O. Box 388Forked River, NJ 08731
www.exeloncorp.com An Exelon Company
October 22, 2008
RA-08-099
The Honorable David MostMayor, Lacey Township818 West Lacey RoadForked River, NJ 08731
Subject: Oyster Creek Generating StationIndependent SpentFuel Storage Installation Annual Report
Reference: Building Permit; Appeal 93-40 (after remand)
The above referenced Building Permit requires the Oyster Creek Generating Station to submitroutine monitoring reports to Lacey Township on an annual basis. Enclosed is the TemperatureMonitoring and Radiation Survey data as required by Condition 10 of the Building Permit, and thenumber of spent fuel assemblies in dry storage as required by Condition 11 of the-Building Permit.The status of Federal Govemmentrs plans to site a permanent spent fuel repository is alsoprovided, as required by Condition 17 of the Building-Permit. This fulfills the reportingrequirements for the year 2008.
If any further information or assistance is needed, please contact Richard Milos at 609-971-4973.
Sincerely,
C otyS. Ru~schVice President Oyster Creek Generating Station
Enclosure
cc: USNRC Document Control Desk; Docket 72-15Administrator, USNRC Region IUSNRC Senior Project Manager, Oyster CreekUSNRC Senior Resident Inspector, Oyster CreekFile No. 08006
Enclosure
Independent Spent Fuel Storage Installation (ISFSI) Buildina Permit Condition Ten:
"The applicant shall provide to the township on a yearly basis, written records revealing alltemperature and radiation measurements. The applicant shall further advise of any and all repairsmade to the concrete modules."
Oyster Creek Generating Station Reply to Condition Ten:
The temperatures of the loaded, concrete, Horizontal Storage Modules (HSMs) are monitored dailyand are part of the station's surveillance records. The temperatures of the loaded HSMs can be upto 30 degrees higher than the unloaded HSMs depending on the heat load of the spent fuel loaded.During the summer months, the highest concrete HSM temperatures were less than 120 degrees.This is well within the design limits of the HSMs and represents an actual heat loading of about 7.5KW.
The following graphs represent average monthly temperature data for the period from October2007 to September 2008, for the HSMs we loaded in 2002 (# 1-4), the HSMs we loaded in 2003(# 5-8), the HSMs we loaded in 2004 (# 9-11), and the HSMs we loaded in 2005 (# 12-16). HSMs#17-18 remain empty and are at ambient temperatures.
The highest radiation measurements on the vertical face of the HSMs were 2 mr/hr gamma and<0.1 mr/hr neutron. The highest gamma dose rate at the opening between the HSMs (birdscreens) was 6.1 mrem/hr. These readings are well within the design limits of the HSMs. The roofof the HSMs is a posted radiation area and is not readily accessible. The highest radiation levelsat the ISFSI security fence facing Route 9 was <0.2 mr/hr gamma and <0.1 mr/hr neutron.Radiation survey data sheets are included following the temperature graphs.
We are currently installing the remaining two HSMs (#19-20), with a planned loading of four spentfuel canisters into HSMs #17-20 during 2010. This will complete the existing Independent SpentFuel Storage Installation reviewed under the Building Permit, Appeal 93-40 (after remand).
There were no repairs to the concrete modules since the last report.
Independent SDent Fuel Storaae Installation Buildina Permit Condition Eleven:
"The applicant shall provide to the township on a yearly basis, the specific number of spent fuel rod
assemblies which have been moved into the dry storage facility."
Oyster Creek Generatina Station Reply to Condition Eleven:
There were no fuel assemblies loaded into the ISFSI prior to 2002. During 2002, 244 fuelassemblies were transferred to the ISFSI. During 2003, 244 additional fuel assemblies weretransferred to the ISFSI. During 2004, 183 additional fuel assemblies were transferred to theISFSI. During 2005, 305 additional assemblies were transferred to the ISFSI. No fuel assemblieshave been loaded into the ISFSI since 2005. The Oyster Creek ISFSI currently contains 976 fuelassemblies.
Independent Spent Fuel Storage Installation Buildina Permit Condition Seventeen:
"The applicant shall submit a report to the Township of Lacey no less than annually as to the statusof the efforts of the Federal Government to site a permanent spent fuel repository."
Oyster Creek Generating Station Reply to Condition Seventeen:
The Department of Energy has submitted a license application for the Yucca Mountain Repositoryto the Nuclear Regulatory Commission on June 3, 2008. The best achievable schedule foroperation is 2017.
HORIZONTAL STORAGE MODULE #1,TEMPERATURE
120.0-
100.0
u~a. 80.0-
40 . -
20.0-
0.0-Oct Nov- Dec,- Jan- Feb- Mar- Apr- May- Jun- Jul- Aug- Sep-07 07 07/ :;08 08 08 08 08 08 08 08 08
Month
HORIZONTAL STORAGE MODULE #2TEMPERATURE
120.0
100.0
u.. 80.0
S60.0
o• 40.0
20.0
0.0Oct Nov- Dec- Jan- Feb- Mar- Apr- May- Jun- Jul- Aug- Sep-07 07 07 08 08 08 .08 08 08 08 08 08
Month
HORIZONTAL STORAGE MODULE #3TEMPERATURE
120.0-
100.0-
u. 80.0-
.= 60.0-0o40.0
20.0
0 .0 .. , , • • • , ,,Oct Nov- Dec- Jan- Feb- Mar- Apr- May- Jun- Jul- Aug- Sep-07 07 i07 • i08 08 08 08 08 08 08 08 08
Month
HORIZONTAL STORAGE MODULE #4TEMPERATURE
120.0
100.0
u. 80.0
.. 60.0
o 40.0
20.0
0.0Oct Nov- Dec- Jan- Feb- Mar- Apr- May- Jun- Jul- Aug- Sep-07 07 07 08 08 08 08 08 08 08 08 08
Month
HORIZONTAL STORAGE MODULE #5TEMPERATURE
U.U)4)4)I-0)4,
120.0
100.0
80.0
60.0
40.0
20.0
0.0Oct07
Nov-07
Dec- Jan- Feb- Mar- Apr- May- Jun-07 08 08 08 08 08 08
Jul- Aug- Sep-08 08 08
Month
HORIZONTAL STORAGE MODULE #6TEMPERATURE
120.0-
100.0
,,-. 80.0-
,•60.0-
Ogel
S40.0
20.0
0 .0 -,...,..Oct Nov- Dec- Jan- Feb- Mar- Apr- May- Jun- Jul- Aug- Sep-07 07 07 08 08 08 08 08 08 08 08 08
Month
HORIZONTAL STORAGE MODULE #7TEM PERATU RE
140.0-
120.0-
100.0-U-
d 80.0Q60.0
4O.
20.0
0.0Oct Nov- Dec- Jan- Feb- Mar- Apr- May- Jun- Jul- Aug- Sep-07 07 07 08 08 08 08 08 08 081 08 08
Month
HORIZONTAL STORAGE MODULE #8TEMPERATURE
140.0
120.0-
100.0-
== 80.0a)Om 60.0-
40.0-
20.0-
0.0-Oct Nov- Dec- Jan- Feb- Mar- Apr- May- Jun- Jut- Aug- Sep-07 07 07 08 08 08 08 08 08 08 08 08
Month
HORIZONTAL STORAGE MODULE #9TEMPERATURE
120.0
100.0
u. 80.0U)
L 60.0
o 40.0
20.0
0.0Oct Nov- Dec- Jan- Feb- Mar- Apr- May- Jun- Jul- Aug- Sep-07 07 07 08 08 08 08 08 08 08 08 08
Month
HORIZONTAL STORAGE MODULE #10TEMPERATURE
120.0
100.0
U..U)4)
I-
80.0
60.0
40.0
20.0
0.0Oct Nov- Dec- Jan- Feb- Mar- Apr- May- Jun-07 07 07 08 08 08 08 08 08
Jul- Aug- Sep-08 08 08
Month
HORIZONTAL STORAGE MODULE #11TEMPERATURE
120.0
100.0
u.. 80.0
0 60.01.
40 ,-
20.0-
0.0 -..
Oct Nov- Dec- Jan- Feb- Mar- Apr- May- Jun- Jul- Aug- Sep-
07 07 07 08 08 08 08 08 08 08 08 08
Month
HORIZONTAL STORAGE MODULE #12TEMPERATURE
120.0
100.0
u. 80.0-00 60.0-a)
S40.0-
20.0.-
0.0Oct Nov- Dec- Jan- Feb- Mar- Apr- May- Jun- Jut- Aug- Sep-07 07 07 •08 08 08 08 08 08 08 08 08
Month
HORIZONTAL STORAGE MODULE #13TEMPERATURE
120.0-"
100.0-
u. 80.0-
I. 60.0 -
o40.0-
20.0 -
0.0Oct Nov- Dec- Jan-EFeb- Mar- Apr- May- Jun- Jul- Aug- Sep-07 07 07 08 08 08 08 08 08 08 08 08
Month
HORIZONTAL STORAGE MODULE #14TEMPERATU RE
120.0-
100.0-
U. 80.0
01
0)S40.0-
20.0
Oct Nov- Dec- Jan- Feb- Mar- Apr- May- Jun- Jul- Aug- Sep-07 07 :07 08 08 08 08 08 08 08 08 08
Month
HORIZONTAL STORAGE MODULE #15TEMPERATURE
120.0-
100.0-
u. 80.0-
060.0-
o40.0-
20.0-
0.0-Oct Nov- Dec- Jan- Feb- Mar- Apr- May- Jun- Jul- Aug- Sep-07 07 07 08 08 08 08 08 08 08 08 08
Month
HORIZONTAL STORAGE MODULE #16TEMPERATURE
120.0
100.0
U. 80.0U)
060.0
o40.0
20.0
0.0Oct Nov- Dec- Jan- Feb- Mar- Apr- May- Jun- Jul- Aug- Sep-07 07 07 08 08 08 08 08 08 08 08 08
Month
CGS Radlologlcal Survey IN. yr-5 -,o-7 - .602. IDMS/o0~" ilrmI /s ILneation INDEPENDENT SPENT FUEL STORAGE FACILITYI
0 _- o
Ii o n .... .. . . . . ... .. . . ..
RLPower- /00 %I a-
lmm!w OOTmS hIMRTmIiTATIm nDaTAII .. . .. . . . . .
LOCA-M P"rw. a mi UIA I RADIAIOU SIWMVUY
111 irc ioe- e.~I,*91 ~- .- 11 1. hi __ .
I
c..rqk W q-- Iii- I -e5p MM4~ P AVIt P L ESM ^-yQA1e M-- -
I0
M'$ .46 .WS V0L2fI f4 _e'ýr;A
.eZ.
.4L
_dr*
AS
.4
•'r,
I
.tI5
Jt
N-Nuto C .In _ _l
'4 k3__ 1 IA
S , _ _ _" m_t_ I.
*1 _ _ _ 11 AI
S - "--,• x~=
12 -
17
Hdauin d, uD -ai *i#.PM FriskN ~ ~ ~ ~ ~ ~ ~ ~ ~~~m ora -~ -i =u~~w~ RedmI. no. __________
,-'.f ad- .. or .. "r ,
L
_0 OPL00 0 -Io__A z__L 1. I.3 I' 3 3 3 - i.;. ~
P&'m. Rft A.Adb. Tk.ElN 11 Cmmoe Unu Odmim Ncft
-,JmUyuLI S - Ssr~
oArvow• iI-t - •dfu - Oba"•'TWuifsWbabof boded AM ulw c~mm*MMbf BOMMM
s4m• Iahid Do c
daBlC coffimiiwm Ii.
CGS RadiologicalSurvey INo. r$-os- 091 1Date -3- 3aoar - TInm 7 1 Location INDEPENDENT SPENT FUEL STORAGE FACILITY
.,Q C -w.e in -000140RI. Powe'r qz. % I
p w*MARUA=fI a Efnl•truiMAl7M IN*ThtUEN•TAT'ItVN fATA
I -------. .-.--- ___ ______ DATA
LOCATONP70[ CWU ROM
o MAAMIR0 DPI AREA
RADIATION SURVEY
INST "En7-L
r
3 -W
42 1 am o S)I
a COUTfAUSmiO SURVEY
10 10% 31(0C 0 CPU
C4 91(0O -ý CPtA
15______ AIR AUPI.E DATA-PC NT u
.L7_______ L 1L.sg AmaBm
isMNC at1Caunted
19 ~a Not1 Dw~p!!Cd20______ HT a MM Talmn
1-3I ~? *2Gaamm G-A. -Srnear
Data S-Bet DF- Direct Frisk
A00" -4 A~jWC-A #N =Neutsron- X-X or -- =Red BounclU/eu~~~~~ CnatOc _ slContac
Rd= "a" dCh nCt;4 Kn aKASS, W'= Walst B IC. i BfiIy Ses TScmMU dose frat In nm An unleos ailtmlee nme I ____________
'*>Osr. -?ýkTQJ. C.-05 Splec-:cmý
3LTý,-"%; K$b OIX,-6
r- No R.M n..Oný. T.&-
1. Nah", 0atachng a lmoadd caMh CONFIEP.1NT BOUNDARYa hicabd by to NUackV risn 10 0.. ftUU01. OR
2. A~cddvamtcUIo aft"nir a sk CON4FINEMENT BOUNDARYm hifaimd byi an cm4W miadas 0 SUB nEwm@. an
I Arty cowrdiam tihe dp~ im. Emergsey ammia ionOf WMde Wus StoMg ca.*i 00NPINBWENT4
U
---- SpWWmft.1 40a*AWft at'l IM ham the HSM
1100 mrqftvW r an cerftr fine
of Dsc
20 mrwvhr 8W stmW tva 6I.,
'I mb sisveys an corUdaW Ift kwided HSM&Garm"W ama hag asneceemy to veWy Gramv" conbnwmdm ýey,
M-09 40.,31-01
:)CGS Radilological Survey INo. Y S- -Z8,5 7 lost. 15 5" 08 (The 1400 ILocation INDEPENDENT SPENT FUEL STORAGE FACILrTyL.Wo lRompo n ALL-4 4?~jir.I W ri~A
- ---- i T I I II ,
RL Power- % II w
@l nAD*lI! E l•lw IMAIem U IIfl'rIUMKMIAIflM IBAThI -.--.- -.-.---- _________________DATA
I z
LOCA1l0N13 CEPM COPH
ia 1POASr, MRADMR I
MARZI I
RWA1IXA SURVEY
79_______ . 2~-.TiU~
~i-~I• I I I I i
4!f/
I I L I I I
N
I.
•,1"p
*OAO
F"1( I"is, t'l I*4.
-B 3 - I .o'
2 A L9 T •. ( -oa
BB
_--____ 10% 31K0 r CPU4 - 1(0 7C6P-
__________ AIR SAPL DATA____________ C NT uii ,. , i CC
W i. 3 0S 02
NT= Nol Orllnd
_________ cNT.* Nt T7a"km
- Gamma O.A Arm Smear
: I I I I " '-" "
LH±WLHýW .isle
4~.-AsI -*.Z5.1
'-I0ml t B,, Bea OF- Dirert Frisk
,e e .A // I N., Neutron K-X ou. - = Red BamudaONT o= contactI•0cm = BlCont
I -15= Kra*, Wl wht' . ,y j Deft y ,.3O0
\~a &ei NA~L~JG A.4 .Z
4 d. '
11. how i n a Ioafsd cabo C!OINIRNEMENT BOIJNOARY-mdidmi b an CImb~tredlam lStnI iI 0 Sitw ,niad. OR
2 AahduW cnfau ki 1 m* CONM~EMENT BOL4OARY-- ,nXMDM by an comaS mdn .10 avm nor". On
of -1ded ful Stma. cask CONRItEm •2 T owUNDA RY.
Micb Uctms Odw#m NbdeDOWl MO-. ll Toc~h 8m Urmt'm
s4 4 3 AMfer ftr N1 SM
. om N e NN*'i' 2D mnmvwf * sh" v vabd
No !J9BelaPu~mTaLken
swvwW daf adsaimin b lit lode liSWt
Goo.,m %nee e b~asub~
necessa~tovaif~*ki ~woscnuArdo
ot imdw tw 78twage ca*.k NEMEW IMRY.
iOCGS Radiological Survey INo. 0 0q21 IDate920 IThm /-Y,74 ILocation INDEPENDENT SPENT FUEL STORAGE FACILIT,RWP 16-ason 0 1
I QjQ 1m . .
4 10
o".
To 0--0-6(601.0-0
qIRx.power. IeI7 % Iw
asmqAD*U a icflMTANNIPAflM III •1 IMENY rAWl*'J flAY,RE___________ _______
: FIWP /,•'•' FtmumnLOCAIION
p y 0CCPM A Deu O l3~ URAMU APRA
NADL1ON SLOWVmII- -. 1 - _________________
I
pill,
.1 JJ~ -I / I
mm•mmmm•mmm
1
I
A)
4%
'ax
"'4 ,s ~, A
iv,.,. 17i ji 1 #3 1f # j * *
I4p-A
)i-A
,4-/i.
"A,-
2 / ~coo 2 c3 eWA Mrir
10 P 10% SKQiX0V CPU
14 ________ SKG CPMAM SAMPLE DATA
.18 NT17 Lsarge A Sm..'is ___11C____ NC Not Counted
Daf O B Bel DP - Direcit Frisk
I7-,-29-019 ternCordact:/S3or M _ Beta Iy CndiNd alN d Ch.CstK Kn aKneeW aWaist *B/#=P/y pm Sells/ y3001
All domes roesn In merm- ndwwlaoties w snoted_____________
APA4ftAll
m=I
a-Dr
d ~ a -
FI abmjm ldbyuc" rua rsr O0ws1
2L Accadeflcond- los~i4k~adeda ca"k CONFINEWn vicalad by 25 .an nriýim10 m ha1 mss
3. Anry moidraniftre atho~n aWeEmerpMDenc Octor that Iode fhul mala cm*k FINE~MET 304,
o NO eado Desected Unissa O1tehvsnu Noted
ENT BUNDARY k3
nonvu OR ci0j1
INDARY.
;KN ne Resi~ng Taken-
ech e.n,=, Llerfhlatfow if= .ON sm
! d or on canter lir
:bled vel esheror
7rf r s5"eays on corrtactwnd Mlt from fth loaded HShi.Generai ms aM fernce lire ascssy to verdy po•hng. Gross
apt confammaion swvy..
Oyster Creek Generating StationRoute 9 SouthP. 0. Box 388Forked River, NJ o8731
E~s PQ8.
02 1A0004395034MAILED FROM ZIP
U. S. Nuclear Regulatory Commission &. C-.V-Attention: Document Control DeskWashington, D.C. 20555