9
OVERVIEW OF INDONESIA GAS DEMAND Jakarta, August 1 st 2018

OVERVIEW OF INDONESIA GAS DEMAND · BISON-IGUANA- ANDE ANDE LUMUT GAJAH PUTERI JAMBU AYE UTARA FEED Prod (Q4 2020): 70 WASAMBO *) Addition to Jangkrik Muara Bakau 600 MMscfd **) Addition

  • Upload
    vukhanh

  • View
    221

  • Download
    0

Embed Size (px)

Citation preview

Page 1: OVERVIEW OF INDONESIA GAS DEMAND · BISON-IGUANA- ANDE ANDE LUMUT GAJAH PUTERI JAMBU AYE UTARA FEED Prod (Q4 2020): 70 WASAMBO *) Addition to Jangkrik Muara Bakau 600 MMscfd **) Addition

OVERVIEW OF INDONESIA

GAS DEMAND

Jakarta, August 1st 2018

Page 2: OVERVIEW OF INDONESIA GAS DEMAND · BISON-IGUANA- ANDE ANDE LUMUT GAJAH PUTERI JAMBU AYE UTARA FEED Prod (Q4 2020): 70 WASAMBO *) Addition to Jangkrik Muara Bakau 600 MMscfd **) Addition

20

18

© S

KK

Mig

as –

All

righ

ts r

eser

ved

Catatan:*) Data realisasi rata-rata bulan Mei tahun 2018

4,397 4,416

4,202 4,008

3,820 3,775 3,681

4,336

4,078

3,631

3,402 3,237

3,090 2,860

2,736 2,670

1,480 1,466 1,513

2,341 2,527

2,913

3,323 3,379 3,267

3,550

3,774 3,632

3,882 3,997 3,875

3,987

-

500

1,000

1,500

2,000

2,500

3,000

3,500

4,000

4,500

5,000

2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018

BB

TUD

Ekspor Domestik

INDONESIA DOMESTIC GAS DEMAND IS GROWING

• Since 2013 Domestic Gas Supply is higher than Export• 60% of gas is supplied to Domestic in 2018

Page 3: OVERVIEW OF INDONESIA GAS DEMAND · BISON-IGUANA- ANDE ANDE LUMUT GAJAH PUTERI JAMBU AYE UTARA FEED Prod (Q4 2020): 70 WASAMBO *) Addition to Jangkrik Muara Bakau 600 MMscfd **) Addition

20

18

© S

KK

Mig

as –

All

righ

ts r

eser

ved

Major Upstream ProjectDominated by Gas and LNG Project

SULAWESI SELATAN

SUMATERA UTARA

JAWA TIMUR

MALUKU

PAPUA BARAT

ACEH

SULAWESI TENGAH

KALIMANTAN TIMUR

SUMATERA SELATAN

LAMPUNG

JAWA BARAT

KEP. RIAU

POD APPROVEDPeak Prod : 391 MMScfd*)

BANGKA : 80 MMscfd, 2200 bcpd

GENDALO-GEHEM: Pre FEED POD 1 Revision finished. POD 1 Revision being discussed.

Gendalo Hub: (Q4-2022)

Gehem Hub : (Q2-2023)

Pre FEEDPOD 1 Revision to be submitted in Nov 2018

Pre FEEDOn going POD II 155 MMscfd

CONSTRUCTIONProd (Q2-2020):3,8 MTPA (700 MMscfd), 3200 bopd ***)

EPC TENDERProd (Q1-2021) : 25000 bopd

CONSTRUCTIONProd (2020)190 MMscfd (Netto Gas)

CONSTRUCTIONProd (Q2-2019): 175 MMscfd**)

FEED TENDER PREPProd (Q2-2022):108 MMscfd, 3300 bopd

FEEDProd (Q2-2021)60 MMscfd

FEED TENDERProd (Q3-2020):60 MMscfd, 3000 bopdCONSTRUCTION

Prod (Q3-2019):BISON: 45 MMscfd,IGUANA: 45 MMscfdGAJAH PUTERI: 73 MMscfd

POD I APPROVEDPlateau Prod : 170 MMScfd, 737 bcpd

IDD

BADIK & WEST BADIKMERAKES

SENORO

TANGGUH TRAIN-3

ASAP MERAH KIDO

ABADIMDA & MBHJAMBARAN TIUNG BIRU

POFD L-PARIGI

ANDE ANDE LUMUTBISON-IGUANA-GAJAH PUTERI

JAMBU AYE UTARA

FEEDProd (Q4-2020):70 MMscfd

WASAMBO

*) Addition to Jangkrik MuaraBakau 600 MMscfd

**) Addition to MBD 100 MMscfd***) Addition to 7.6 MTPA Tangguh 1 & 2

Page 4: OVERVIEW OF INDONESIA GAS DEMAND · BISON-IGUANA- ANDE ANDE LUMUT GAJAH PUTERI JAMBU AYE UTARA FEED Prod (Q4 2020): 70 WASAMBO *) Addition to Jangkrik Muara Bakau 600 MMscfd **) Addition

20

18

© S

KK

Mig

as –

All

righ

ts r

eser

ved

SOUTH SULAWESI

NORTH SUMATERA

EAST JAWA

MALUKU

WEST PAPUA

ACEH

CENTRAL SULAWESI

EAST KALIMANTAN

CENTRAL SUMATERA

SOUTH SUMATERA

LAMPUNG

WEST JAWA

RIAU ISLANDS

Challenges in Meeting Gas Demand

431*149**

1.2691.886

2.4551.001 1.295

863

9081.940 870

+/-1.900

1.190

Demand - Supply

New Major Project

450

Infrastructures is the Key in meeting Indonesia gas DemandOption:- Bring the gas or LNG to gas demand- Build Demand near gas supply

* Demand (MMSCFD)** Suppy (MMSCFD)***2018 Demand & Supply based on Necara Gas Bumi Indonesia 2016-2035**** Supply is incremental from new project only

137425

2531.131

597530

TRAIN-3 + AMK

ABADI

MERAKES + BADIK

IDD + Wasambo

Page 5: OVERVIEW OF INDONESIA GAS DEMAND · BISON-IGUANA- ANDE ANDE LUMUT GAJAH PUTERI JAMBU AYE UTARA FEED Prod (Q4 2020): 70 WASAMBO *) Addition to Jangkrik Muara Bakau 600 MMscfd **) Addition

Infrastructure

Gas Price

Energy MixDemand

Supply

Transporter (Pipeline Gas, CNG

truck, LNG ship, LNG truck, etc)

Presidential or Ministerial Decree

etc

Crude Oil and Natural Gas,

Coal, Renewables, etc

Crude Oil Lifting, Fertilizer & Petrochem,

Industry, Electricity, Gas Network, BBG,

etc

Gas Producer, Seller,

Agregator, Integrator, etc

Upstream to Downstream Integration to Meet Gas Supply and Demand

Page 6: OVERVIEW OF INDONESIA GAS DEMAND · BISON-IGUANA- ANDE ANDE LUMUT GAJAH PUTERI JAMBU AYE UTARA FEED Prod (Q4 2020): 70 WASAMBO *) Addition to Jangkrik Muara Bakau 600 MMscfd **) Addition

INDONESIA: Liquefaction and regasification facilities

Regasification terminalsLiquefaction plants

Existing Under construction Proposed Decommissioned

INDONESIA(SUMATRA)

INDONESIA(JAVA)

INDONESIA(KALIMANTAN) INDONESIA

(SULAWESI)INDONESIA

(PAPUA)

MALAYSIA

MALAYSIA

CAMBODIA

VIETNAM

MYANMAR

PHILIPPINES

MALAYSIABRUNEI

THAILAND

PAPUA NEW GUINEA

AUSTRALIA

1

23

5

6

7

8

9

10

11

12*

1314

16

15

17

4

18

1 - Arun2 - Lampung (FSRU)3 - Nusantara (FSRU)4 - Tanjung Benoa LNG (FRU/FSU)5 - Makassar LNG6 - Cilacap (FSRU)7 - Jawa 1 (FSRU)8 - Bojonegara (Banten)9 - Bontang10 - Donggi Senoro

11 - Sengkang12 - Abadi LNG*13 - Tangguh T314 - Tangguh T1-215 - Porong LNG (FSRU)16 - Nunukan LNG17 - East Dara FLNG18 - Probolinggo LNG19 - Batam20 - Gorontalo LNG21 – Bantaeng

Source: IHS Markit, 2018

Note: * Location of Abadi LNG has not been confirmed. Small-scale (<0.3 MMtpa) are not included.

19

20

21

Page 7: OVERVIEW OF INDONESIA GAS DEMAND · BISON-IGUANA- ANDE ANDE LUMUT GAJAH PUTERI JAMBU AYE UTARA FEED Prod (Q4 2020): 70 WASAMBO *) Addition to Jangkrik Muara Bakau 600 MMscfd **) Addition

20

18

© S

KK

Mig

as –

All

righ

ts r

eser

ved

PLTMG Saumlaki 10 MWPLTMG Merauke 20 MW

PLTMG Dobo 10 MW

PLTMG Langgur 20 MW

MPP Papua (Jayapura) 50 MWPLTMG Jayapura Peaker 40 MW

PLTMG Timika Peaker 10 MW

PLTMG Fak-Fak 10 MW

MPP Papua Barat (Manokwari) 20 MW

PLTMG Biak 15 MW

PLTMG Serui 10 MWPLTMG Bintuni 10 MW

PLTMG Nabire 20 MW

PLTMG Seram Peaker 20 MW

PLTMG Ambon Peaker 30 MW

MPP Maluku (Ambon) 70 MW

PLTMG Namlea 10 MW

Gas Salawati

Gas Bintuni

144.4 MMSCFD

78.6 MMSCFD

15 MMSCFD

HUB

7Source: Ministry of Energy and Mineral Resources, 2017

Scattered

Demand,

Small

Scale,

Mini LNG is

an option

Virtual Pipeline For Gas Power Plant in Eastern Part of Indonesia

Page 8: OVERVIEW OF INDONESIA GAS DEMAND · BISON-IGUANA- ANDE ANDE LUMUT GAJAH PUTERI JAMBU AYE UTARA FEED Prod (Q4 2020): 70 WASAMBO *) Addition to Jangkrik Muara Bakau 600 MMscfd **) Addition

TERIMA KASIH

Page 9: OVERVIEW OF INDONESIA GAS DEMAND · BISON-IGUANA- ANDE ANDE LUMUT GAJAH PUTERI JAMBU AYE UTARA FEED Prod (Q4 2020): 70 WASAMBO *) Addition to Jangkrik Muara Bakau 600 MMscfd **) Addition

www.pln.co.id |DIVSIS

Gas To Power in Papua

Source LNG :Tangguh

LNG Carrier Route:Tangguh SorongManokwariNabire Jayapura Biak Tangguh

: LNG Carrier (27.500-30.000) m3 (JV Perusda Papua Barat)

: Onshore / floating LNG storage 4.000-15.000 m3 &Regasification unit 3-39 mmscfd (PLN)

PLTG Sorong 30 MW (2018)PLTG Sorong 20 MW (2019)PLTMG Sorong 50 MW (2025)

MPP Manokwari 20 MW (2018)PLTMG Manokwari 20 MW (2019)PLTMG Manokwari 20 MW (2024))

MPP Nabire 20 MW (2017)PLTG/MG 10 MW (2018)PLTMG 10 MW (2019)

PLTMG Biak 35 MW (2018)

MPP Jayapura 50 MW (2017)PLTMG Jayapura Peaker 40 MW (2018)PLTMG Jayapura 50 MW (2019)

30k

Demand : 46,7 BBTUD

Source : PLN, 2018