Proprietary and Confidential Challenges Hitting a small window with a big solution Must be live and ready before the holiday shutdown (< 3 months) Integration with existing Teradata/ARM systems Maximize real-time data to drive customer interactions Results Live and running in time for holiday rush 36 IP addresses warmed up 12 users (technical & marketing) trained Volume exceeding 275M per month & growing 10M messages per hour “burst” capability 99% delivery rate OVERSTOCK.COM: STRONGSTART IMPLEMENTATION “Very impressed and pleased…concerned that there may not be any bandwidth left for the actual website.” Project Manager—Overstock.com D e a l S i g n e d I n s t a l l a t i o n I n t e g r a t i o n & M i g r a t i o n T r a i n i n g L i v e July August September October Project launched Migration plan Integration plan Install/Config hardware Install/Config software Teradata integration Content migration End user training Admin training IP warm-up Test Full production

Overstock.com : StrongStart Implementation

  • Upload
    aldis

  • View
    55

  • Download
    1

Embed Size (px)

DESCRIPTION

Overstock.com : StrongStart Implementation. July. Project launched Migration plan Integration plan. Deal Signed. August. Challenges Hitting a small window with a big solution Must be live and ready before the holiday shutdown (< 3 months) - PowerPoint PPT Presentation

Citation preview

Page 1: Overstock.com :  StrongStart Implementation

Proprietary and Confidential

Challenges• Hitting a small window with a big solution• Must be live and ready before the holiday

shutdown (< 3 months)• Integration with existing Teradata/ARM

systems• Maximize real-time data to drive

customer interactions

Results• Live and running in time for holiday rush• 36 IP addresses warmed up• 12 users (technical & marketing) trained• Volume exceeding 275M per month &

growing• 10M messages per hour “burst”

capability• 99% delivery rate

OVERSTOCK.COM: STRONGSTART IMPLEMENTATION

“Very impressed and pleased…concerned that there may not be any bandwidth left for the actual website.” Project Manager—Overstock.com

Deal Signed

Installation

Integration & M

igrationTrainin

gLive

July

August

September

October

Project launchedMigration planIntegration plan

Install/Config hardwareInstall/Config software

Teradata integrationContent migration

End user trainingAdmin training

IP warm-upTestFull production