OVERDICK
2
About us
OVERDICK has been founded 10 years ago to provide high quality engineering solutions to the maritime and offshore energy industries.
OVERDICK
3
About us
OVERDICK focus is to apply modern engineering methodsto create practical and economical solutions to the complexchallenges of our clients. This is possible with Engineers who combine years of experience in design, fabrication and operations.
OVERDICK
5
About us
COMPETENCY
• Structures, Finite element Analysis, Fatigue Analysis• Numerical motion analysis, Hydrostatics, Computational fluid dynamics• Fabrication, welding, materials• Corrosion analysis• Mooring, Towing, Seafastening, Loadouts, Liftouts, Upending, Rigging• Heavy lift engineering and management• Surveying, inspection, testing• Operational procedures, Supervision and management of T&I Operations
OVERDICK
6
About us
THE TEAM
• Naval Architects 14• Structural Engineers 10• Geotechnical Engineers 2• Drafting 5• Welding Engineers 1• Mechanical Engineers 1• Administration/Coordination/Controlling: 8
• Total 41
OVERDICK
8
About us
• Offshore Structural Analysis: SACS, Engineering Dynamics, IncStaadPro, Research Engineers Intl.
• Hydromechanics: MOSES, Ultramarine, IncAutoHYDRO, Autoship Corp.
• CFD: EFD.LAB, Nika GmbH• Solid FEA: COSMOS Pro, Dassault• General FEA: STRAND7, Strand7 Pty Ltd
StaadPro, Research Engineers Intl.• Lattice Structures: RSTAB, Dlubal GmbH• Structural 3D Drafting: XSTEEL, Tekla GmbH
ADVANCE, Graitec Group• 3D CAD: CATIA v5, SOLIDWORKS, Dassault• 2D CAD: AUTOCAD, Autodesk• Ship Design: CATIA v5 Shipdesign, Dassault
Main Software Tools
OVERDICK
11
Wind Installer
Overdick designed Installer is a North SeaJack-Up Barge specified to all year operations up to 50m water depth with facilities to servethe oil&gas industry and the upcomingoffshore wind energy sector.
Characteristics
L 130mB 40mD 11mLegs 90mPayload 7000 tCrane 1600 tJacking capacity 40,000 tPOB 90Speed 12 KnotDynamic Positioning DP2
Engineering Services
• Concept• Detail Engineering
ClientBELUGA HOCHTIEF OFFSHORE
in service 2012
OVERDICK
12
MOAB DC SUBSTATION North Sea – A
The MOAB SUBSTATION is designed as substation for a German North Sea wind farm.
Characteristics
Payload 2700 tJ Tubes 14LAT 40mLocation GermanyPOB 37
Engineering Services
• Concept• Basic Engineering• Detail Engineering• Fabrication follow up• Transport & Installation Engineering• Installation management
Clientnn
In service 2011
OVERDICK
13
MOAB DC SUBSTATION North Sea - B
The MOAB SUBSTATION is designed as substation for a German North Sea wind farm.
Characteristics
Payload 2200 tJ Tubes 14LAT 40mLocation Germany
Engineering Services
• Concept• Basic Engineering• Detail Engineering• Fabrication follow up• Transport & Installation Engineering• Installation management
Clientnn
In service 2011
OVERDICK
14
EMERAUDE MOAB
The EMERAUDE MOAB is the firstMOAB designed as an integrated well head, drilling and processing platform.
Characteristics
Payload 2000 tConductors 14LAT 70mLocation Rep. of Congo
Engineering Services
• Concept• Basic Engineering• Detail Engineering• Fabrication follow up• Transport & Installation Engineering• Installation management
ClientPERENCO
Load out mid of December 2008
OVERDICK
16
Akcakoca Gas Well Head Platform
Overdick has been awarded contract for Structural and and T&I engineering as well as engineering assistance for fabrication.
Characteristics
• Location: Black Sea, Turkey• 14 km Offshore• Water depth: 95m• Jacket Weight: 1550 MT• Topsides Weight: 850 MT• 4 Main Piles and 4 Skirt Piles with a penetration up to 122m (400 ft)• 6 Conductors
Engineering Services
• Concept• Detail Engineering
ClientTPAO
2009 Ongoing
OVERDICK
17
Jack Up Barge Thor
Overdick designed Thor is a North Sea Jack-Up Barge specified to all year operations up to 50m water depth with facilities to serve theoil&gas industry and the upcoming offshore wind energy sector.
Characteristics
L 70mB 40mD 7mPayload 2,500 tCrane 650 tJacking capacity 12,000 tPOB 25 / 80
Engineering Services
• Concept• Basic Engineering• Operating Manuals• Fabrication follow up
ClientHOCHTIEF CONSTRUCTION
in service June 2010
OVERDICK
18
MOAB – Tunisia
This MOAB is currently under detail design. The platform is conceived as wellhead, drilling, production and accommodation platform. Installation foreseen 2011
Characteristics
Payload 3000 tConductors 5 doubleLAT 77mLoaction Tunisia
Engineering Services
• Concept• Basic Engineering• Detail Engineering• Project Management• Installation
ClientNn
In Service 2012
OVERDICK
19
NAVTUG 18
The NAVTUG 18 is a special multipurposevessel with low draft, low air draft, raisable wheelhouse which can be usedas tug push and supply boat.
Characteristics
LOA 18mB 6mT 1.9mD 100t
Engineering Services
• Concept• Basic Engineering• Detail Engineering• Project Management• Yard Supervision• Operation Manuals
ClientHHS2008
OVERDICK
20
TRIJACK – North Sea
The TRIJACK is Overdick‘s concept forinstallation and environmental friendlyWTG foundation.
Characteristics
Payload up to 6MWLAT up to 60mLoaction North Sea
Engineering Services
• Concept• Basic Engineering• Detail Engineering• Project Management• Installation
Client
2008
OVERDICK
21
BAL HAF – Jemen
For the Bal Haf project, OV was involvedpurely in the design of the Transport & Installation Activities.12 Jackets and Topsides were built in Malaysia, transported to Jemen and installed
Engineering Services
• Strucural Verification for T&I• Metocean Criteria• Tow route definition• Upending and Loadout• Grillage and Seafastening• Marine Analysis for Tow and Installation• Heavy Lift Analysis and Design• T&I detailed procedures
ClientMUHIBBAH / YEMGAS
2007 / 2008
OVERDICK
22
PESCARUS FIELD - Romania
BROWNFIELD SERVICES:
Fatigue Life Extension• design review for fatigue life of existing platforms: PFS-6, PGSU-6, PFS-7, PGSU-7
•underwater inspections and non destructive testing of most critical joints. • on site diving supervision during the inspections and evaluation of the results.Refurbishment and replacement of
helicopter landing platforms•inspection and reanalysis of the condition of six existing steel helidecks in use. The review targeted all aspects of the helidecks including structure, equipment and safety concerns.•Upgrade procedures to new aluminium helidecks and equipment to meet international offshore standards.•designed of steel substructure interfacing the aluminium helidecks with the existing platform structure.
ClientPETROM
2006 ongoing
OVERDICK
23
TRENT Compression Annex MOAB
The Trent Compression Platform is the third Mobile Offshore Application Barge, MOAB to be realized. This platform is designed for the southern UK North Sea sectorThe platform will be bridge linked to the TRENT gas production platform.
Engineering Services
•Platform concept•Budgetary cost estimate•Detail engineering of the platform and link bridge•Installation Engineering
LAT: 50 mTopsides Payload 1.000 t
ClientPERENCO UK, 2004-05
OVERDICK
24
DSV BIBBY SAPPHIRE
The Bibby Sapphire is a conversion project from a Offshore ROV Support Vessl to a Diving Support Vessel.
•Characteristics
•LOA 45m•B 15m•T 5m•Diving System 18 divers in 3 hyperbaric
chambers, twin bell deployment system, HRV
•Engineering Services
• Concept• Basic Engineering• Detail Engineering• Project Management• Yard Supervision• Operation Manuals
•ClientBibby Offshore
2005
OVERDICK
25
Bunga Raja - E Gas treatment Platform
Overdick designed Bunga Raja E Gas treatment platform has been loaded out from Sime Darby Engineering yard at Pasir Gudang, Malaysia the 24th January. And successfully installed at the BR field in the night of the 16th February.The With 12000 t transport weight oneof the largest platforms in Malaysia’swaters .
Engineering Services
• Structural optimization study• Detail design AFC of topsides• Detail analysis of 8 leg jacket• Detail design of LSF• Load out and float-over engineering
LAT: 56 mTopsides Payload 12.000 t
Client
TALISMAN ENERGY Malaysia2003-2006
OVERDICK
26
BUNGA RAYA COMPLEX
The Bunga Raya Field is composed by a complex of platforms comprising:
BR-A Central Processing PlatformBR-B Wellhead PlatformBR-C Wellhead PlatformBR-D Processing extensionBR-E Gas TreatmentBR-F Vent and Flare Tower
The BR-D, BR-E, BR-F and the two interconnectingbridges have been conceived and designed by OVERDICK
OVERDICK
28
LINKING BRIGDES
Engineering Services
• Conceptual design• Detail design AFC • Transport and Installation• Project Management Services
Client TALISMAN ENERGY Malaysia 2003-2005
Two in-field bridges connecting BR-E CO2 removal platform (L=75m) with the BR-D compression platform (L=100m) and with the vent tower. The Vent bridge services as support for vent, flare and platform for pigging facilities.
OVERDICK
29
BR-E VENT TOWER
The BR-E Vent tower is installed in 54m of water to sustain the Vent bridge (L=90m). Its main function is to support the vent and flare stacks of the CO2 plant. It is also used as tower for pipeline risers.
Engineering Services
• Conceptual design• Detail design AFC
• Transport and Installation• Project Management Services
Client TALISMAN ENERGY Malaysia 2003-2005
OVERDICK
30
RWE Dea Mittelplate A to shore drilled pipeline link
Engineering Services
• General pipeline installation concept• Design of the contruction pits• Design of barges‘ outfitting• Design of the pipe transportation road• Overall logistic.• On-site supervision.
Client
RWE Dea Hamburg2004 - 2005
OVERDICK
31
South Angsi Field Development - MOAB
Engineering Services •Conceptual design•Detail design•Transportation and Installation•Project Management Services
LAT: 70 mTopsides Payload 4.000 t
ClientTALISMAN ENERGY Malaysia2003-2005
OVERDICK
33
BRA Annexe MOAB
Engineering Services
•Conceptual design•Detail design•Foundation Design•Transportation and Installation concept•Site support for completion, Load-outand Sail-away activities
LAT: 56 mTopsides Payload 2.500 t
ClientLUNDIN PETROLEUM /TALISMAN ENERGY Malaysia2001-2003
OVERDICK
34
RWE Dea Mittelplate A – Transport and Installation Services
Engineering Services
• Engineering Procurement and Management of varioustransport and installation projects for the Mittelplateartificial island: Drilling Rig removal and reinstallation, new island crane, process modules, Accommodation removal and new installation, etc.
ClientRWE Dea Hamburg2003 - Ongoing
OVERDICK
35
RWE Dea Mittelplate A – New Living Quarters
Engineering Services
• Planning of removal of old livingquarters
• Transportation and Installation engineering of two new livingquarters
ClientRWE Dea Hamburg2002-2003
OVERDICK
36
Baltic Sea Gravity Platfoms „Schwedeneck See"
Engineering Services
• Abandonment and Removal enginering
• EPIC Contract Engineering
Client RWE Dea AG Aufschluß + Gewinnung ,
Hamburg 1999 / 2000
OVERDICK
37
F2a HANZE Field Development (Dutch Sector)
Tanker Mooring and Loading System
• Screening and Conceptual Design studies
• Tendering Management• Bid evaluation• Survey and supervision• Project management services
Client VEBA Oil and Gas Netherland1999
OVERDICK
38
F2a HANZE Subsea Oil Storage
Engineering Services
• Screening phase• Conceptual Design • Cost estimates• Installation Engineering• Project management services• Surveying and Auditing
Client
RWE Dea AG Aufschluß + Gewinnung , Hamburg
VEBA Oil and Gas Netherland1996 -> 2000
OVERDICK
40
Naval Architectural services
Naval Architecture is also part of the origins of Overdick and the company has been always keen to be up to date in the engineering level of this discipline. Although the origins were based in ship production activities, soon the tools and the capabilities shifted to the support of offshore activities.
Services•Hydrostatic Analysis•Motion Analysis, frequency domain, time domain, multi-body•Mooring analysis•Lifting analysis•Procedures and Manuals•Offshore Supervision•MOB, DEMOB supervision •Resistance and Propulsion•Vessel inspections, Off-Hire surveys•Damage expert reviews •Ship structures design•Yard site support
OVERDICK
42
Galapagos Explorer – Panama Channel
Engineering Services
• Removal concept• Foundation design• Structural design
ClientTITAN MARITIME, LLC
OVERDICK
43
Antai - Port Klang Malaysia
Engineering Services
• Structural Analysis of Barge• Chain Pullers Re-Design• Detail Structural Analysis
ClientTITAN MARITIME, LLC
OVERDICK
45
Engineering Services
• Planning of Bridge installations• Installation procedures• Structural analysis• Hydromechanical analysis
Bridges Installations – Engineering services
OVERDICK
46
This document is the property of Overdick GmbH & Co.KGany unauthorized use of the same will be prosecuted.
46
GmbH & Co. KG
consulting engineers
Kontakt: Office: Cremon 32, 20457 Hamburg
Email: [email protected]: +49 40 325 756 0Fax: +49 40 325 756 26www.overdick.com