Project :- OTIS_for Factory Expansion Subject : Pre Final Bill for Interior works Pre Final Bill Item No. Description of work Unit Quantity PREAMBLE Rate (Rs.) 1. The description of an item shall be deemed to include all preambles, headings, sub-headings and references to other documents. The detailed description of work and materials, given in the Specification are not necessarily repeated in the Bill of Quantities. 2. The Preamble to the Bills of Quantities must be read with the Drawings, Conditions of Contract and the Specification and the tenderer shall be deemed to have examined the Drawings, Specifications, Conditions of Contract and to have acquainted himself with the Works to be done and the way in which they are to be carried out. This preamble to the Bills of Quantities shall form part of the Contract. 3. Tenderers are instructed to quote "rate only" for all QRO items without fail and not to enter any amount in the amount column. The rates quoted under QRO items is negotiable during the evaluation of the tender and the rationalized rate only will be considered if there is a need to operate QRO items during execution. Any percentage of discount / rebate offered by the tenderer during negotiation is applicable on all the quoted rates of the tendered items including "QRO" Items. 4. Providing and maintaining Field Laboratory in a satisfactory manner till the completion of work to ensure site control on quality of materials and the works and shall strictly comply with provision of Indian/ International Standards at no extra cost. All other regular tests including requisite materials shall be carried out as directed either at approved laboratory or at site at no extra cost. 5. The Tenderers are requested to inspect the site and obtain for themselves at their own expense all necessary information and particulars to enable them to submit the tender. 6. The dimensions shown in the drawings shall have to be verified by the contractor at site before execution of the items and necessary allowance's) have to be made as per the actual dimensions available at site. 7. For the items of works having Basic rate of material, price adjustment will be made only on the actual quantity measured. Wastage shall be to Contractors account. Basic rate indicates landed cost at site including transportation charges, loading- unloading and all other levies/taxes as applicable. 8. The contractor should refer to the detailed drawings for details. All the rates so quoted should be inclusive of all hardware. In case of discrepancy between drawing and Bill of Quantity the drawing supersedes, unless specifically mentioned in the BOQ.

Otis Elevator Final Bill Tender Items

  • Upload
    yogesh

  • View
    71

  • Download
    0

Embed Size (px)

DESCRIPTION

otis

Citation preview

Page 1: Otis Elevator Final Bill Tender Items

Project :- OTIS_for Factory Expansion

Subject : Pre Final Bill for Interior works

Pre Final Bill

Item No. Description of work Unit Quantity Amount (Rs.)

PREAMBLE

Rate (Rs.)

1. The description of an item shall be deemed to include all preambles, headings, sub-headings and references to other documents. The detailed description of work and materials, given in the Specification are not necessarily repeated in the Bill of Quantities.

2. The Preamble to the Bills of Quantities must be read with the Drawings, Conditions of Contract and the Specification and the tenderer shall be deemed to have examined the Drawings, Specifications, Conditions of Contract and to have acquainted himself with the Works to be done and the way in which they are to be carried out. This preamble to the Bills of Quantities shall form part of the Contract.

3. Tenderers are instructed to quote "rate only" for all QRO items without fail and not to enter any amount in the amount column. The rates quoted under QRO items is negotiable during the evaluation of the tender and the rationalized rate only will be considered if there is a need to operate QRO items during execution. Any percentage of discount / rebate offered by the tenderer during negotiation is applicable on all the quoted rates of the tendered items including "QRO" Items.

4. Providing and maintaining Field Laboratory in a satisfactory manner till the completion of work to ensure site control on quality of materials and the works and shall strictly comply with provision of Indian/ International Standards at no extra cost. All other regular tests including requisite materials shall be carried out as directed either at approved laboratory or at site at no extra cost.

5. The Tenderers are requested to inspect the site and obtain for themselves at their own expense all necessary information and particulars to enable them to submit the tender.

6. The dimensions shown in the drawings shall have to be verified by the contractor at site before execution of the items and necessary allowance's) have to be made as per the actual dimensions available at site.

7. For the items of works having Basic rate of material, price adjustment will be made only on the actual quantity measured. Wastage shall be to Contractors account. Basic rate indicates landed cost at site including transportation charges, loading-unloading and all other levies/taxes as applicable.

8. The contractor should refer to the detailed drawings for details. All the rates so quoted should be inclusive of all hardware. In case of discrepancy between drawing and Bill of Quantity the drawing supersedes, unless specifically mentioned in the BOQ.

Page 2: Otis Elevator Final Bill Tender Items

Item No. Description of work Unit Quantity Amount (Rs.) Rate (Rs.)

9. All pre-fabrication works wherever possible shall be carried outside the client's premises, only assembling and finishing work will be allowed within the Site.

10. Items of work provided in this schedule but not covered in the specifications shall be executed strictly as per instructions of the engineer-in-charge/PMC.

11. Unless specifically mentioned otherwise in the contract, the tenderer shall quote for the finished items and shall provide for the complete cost towards labour, materials, plant and machinery, operational costs, levies, taxes, transport, repairs, rectification, maintenance till handing over, revenue expenses, contingencies, overheads, profits and all incidental items not specifically mentioned but reasonably implied and necessary to complete the works according to the contract.

12. The quantities of the various items mentioned in the schedule in the schedule of items are approximate and may vary up to any extent or be deleted altogether. The quoted rates of each item shall remain firm for all works. The contractor, in his own interest, should get an indication of the probable extent of the work to be executed under any particular item in this schedule, before undertaking any preliminary and enabling work or purchasing bought out components related to the work.

13. Rates shall be quoted both in figures and in words in clear legible writing. No overwriting is allowed. All scoring and cancellations should be countersigned by the tenderer. In case of illegibility, the interpretation of the engineer shall be final. All entries shall be in English language.

14. Engineer-in-charge's decision shall be final and binding on the contractor regarding clarifications of items in this schedule with respect to the other sections of the Contract.

15. It may be noted that the total work or any part / parts of the same may be awarded as mentioned in this schedule of items.16. The rates quoted shall be inclusive of all mock-ups, associated samples prior to any mass production or procurement as per complete satisfaction of the Client and Architect. Inclusive of dismantling, demolishing and carting the material and making good of the surface.

17. Any debris generated out of the said work may please be cleared on priority basis from the Site

18. Veneer unless or otherwise specified shall have a landed cost of Rs.120/- per sqft (incl. of all transportation, Octroi, taxes, duty etc)

19. Laminate unless or otherwise specified shall have a landed cost of Rs.45/- per sqft (incl. of all transportation, Octroi, taxes, duty etc).

19. The door size mentioned is the overall opening size.

Page 3: Otis Elevator Final Bill Tender Items

Item No. Description of work Unit Quantity Amount (Rs.) Rate (Rs.)

IS :- Indian Standard

A.S.T.M :- American Society for Testing and Materials

A.W.S :- American Welding Society

MM or mm :- Millimeter /s

CM & cm :- Centimeter /s

RM (rm) / RMT (Rmt) :- Running meter /s

KG (kg) :- Kilogram /s

Tone/t/MT :- Metric ton/s (1000 Kilogram's)

Dia. :- Diameter

Sqm :- Square meter

Cum:- Cubic meter

No.:- Number/s

Qty.:- Quantity

L.S :- Lump sum.

QRO:- Quote rate only.

B.R :- Basic Rate

Drg.No. :- Drawing number

Dwg. :- Drawing

1 WOODEN FLOORING

1.1

1.1.1 Ground Floor rmt1.1.2 First Floor rmt

1.2

rmt

20. The contractor should refer to the detailed drawings for details. All the rates so quoted should be inclusive of all hardware. In case of discrepancy between drawing and Bill of Quantity the drawing supersedes, unless specifically mentioned in the BOQ.

21. Rates for all exposed T.W. members and lipping shall include cost of melamine finish.

22. The rate of all units to be inclusive of matched locks for individual work space every drawer and shutter to be provided with locks of Godrej/Equivalent make

23. One master key shall be handed over for all storage locks.

24. The abbreviations used in the Specification and Bill of Quantities shall be read as follows :

Providing and fixing 75 / 80mm high Anodized aluminium skirting, length 3.05mts, guage 1.5mm, projection from installed surface 10mm, coating thickness - Anodized 20 micron / Powder coated 70 microns, corner guard - hard PVC and adhesive for installation with 12mm ply backing., as approved by Architect

Providing & fixing SS 304 grade 50mm wide & 2mm thick Transit Profile between Carpet / wooden & other flooring material. Sample to be submitted to Architect for approval.

Page 4: Otis Elevator Final Bill Tender Items

Item No. Description of work Unit Quantity Amount (Rs.) Rate (Rs.)

1.3

1.3.1

1.3.1.1 Ground Floor sqm 33.68 2850.00 95,988.00 1.3.1.2 First Floor sqm 135.73 2850.00 386,830.50 1.3.2 For Skirting - 100mm high

1.3.2.1 Ground Floor sqm1.3.2.2 First Floor sqm

Providing & fixing Armstrong Ambience Premium Laminate Wood Flooring,Specification:- Classification of use 32/23 with a  surface abrasion resistance of class AC4 (average 4500 cycles), impact resistance of IC2,resistance to cigarette burn with a rating of 5(EN 438-2:15), swelling after 24 hrs in water of 8.22%, Modulus of rupture of 53.3 newton/mm2, Internal bond 1.78 newton/mm2, surface soundness 2.62 newton/mm2(EN 13329:2000) with a 0.2 mm thick wear layer on top of a High Density Fiber  substrate core (density ~ 948.3 Kgs/M3) of plank size 1214 mm X 192 mm /1286 X 192mm having locking arrangement (lock strength > 1000 lbs/ft) with an underlayment made of natural colour foam , with accessories like End profile, Transition profile, reducer, Stair nosing etc. complete

Installation:- It is important to ensure the sub floor on which the planks are being laid is smooth, flat & hard & free from moisture, greases, etc. In case of uneven sub floor the same should be leveled by self leveling compound. The moisture level present in the sub floor should be less than 8% before installation of the floor. The Laminate wood flooring should be a completely floating floor (using recommended a water barrier of minimum of 250 microns & 2mm polyethylene foam). The tongue & groove joints shall be glued together using recommended adhesive. The installation shall be undertaken as per the manufacturer's installation instructions.

For Flooring, Grade - AC4Basic Rate of Laminate wooden floor Rs. 250/- per Sq.ft

Page 5: Otis Elevator Final Bill Tender Items

Item No. Description of work Unit Quantity Amount (Rs.) Rate (Rs.)

1.4

1.4.1

1.4.1.1 Ground Floor sqm

1.5

1.5.1 40mm thick with 20mm nominal size stone aggregate.

1.5.1.1 Ground Floor sqm1.5.1.2 First Floor sqm

1.6

1.6.1 18mm thick

1.6.1.1 Ground Floor rmt1.6.1.2 First Floor rmt

SUB TOTAL OF FLOORING 482,818.50

2.0 DRY PARTITIONS and PANELLING

Providing and laying 2 mm thick ANTSTATIC POLYVINYL SHEET manufactured by M/s. Premider Polyfilm Ltd. / Birla Corporation Ltd. or equivalent on a smooth & damp proof base using rubber based Adhesives (@ 0.2 kg/sqm) of approved quality and manufacturer like Dunlop S-758, Fevicol SR-998 or equivalent including cleaning, levelling, drying of the base, rolling with light wooden roller weighing about 5.00kg including providing copper strip of size 15mm x 2mm for earthing etc. all complete as per specification and the directions of the Engineer-in-Charge and having the following properties for the sheet: (1) Electrical Resistance - Anti-Statitic flooring range 5x10 ^4 - 10^8 Ohms, conductive flooring range upto 5 x 10^4 Ohms (2) Flexibility - Does not break, crack or any sign of failure (3) Heat Ageing & Exudation - No visible effects or exudation (4) Fire resistance - Does not support combustion or assist spread of flame (5) Water absorption - less than 0.1% (6) Sound reduction factor - 2mm - 3 db.

Basic Rate of Antistatic Polyvinly sheet floor Rs. 85/- per Sq.ft

Cement concrete flooring 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry, but excluding the cost of nosing of steps etc. complete.

Cement plaster skirting (up to 100mm height) with cement mortar 1:3 (1 cement : 3 coarse sand) finished with a floating coat of neat cement.

• Control joints to be incorporated wherever the length of the partitions is more than 10m.

• All GI steel to be marked with "GYPSTEEL" which is a standard hologram of India gypsum.

• The rate to be inclusive of additional frame work for white boards, panaboards, over head storages, counter fixing.

Page 6: Otis Elevator Final Bill Tender Items

Item No. Description of work Unit Quantity Amount (Rs.) Rate (Rs.)

2.1

2.1.1 Ground Floor

2.1.1.1 Partition Upto False Ceiling Lvl. sqm 109.03 2600.00 283,478.00

• Angle beads have to be used at the external angles to get straight line and finish and protection from impacts.

• Edge beads have to be used to protect the exposed edges of Gypboard. The edges can be at the opening for doors, windows, glazing, etc or any other exposed edges.

• The cost of laminate, veneer given below is the landed cost of the material, with all taxes, delivery, transport and all taxes thereon

• Cost of laminate/veneer mentioned is the maximum cost. It should be inclusive of all materials, taxes, transportation to site, storage, loading-unloading and all taxes, Octroi, duties as applicable.

• All internal wooden framework to be treated with 1 coat of anti-termite coat/paint of approved make as per manufacturer's specifications

• Above false ceiling double ply and gyp shall continue. Only finishing like paints/laminates shall be excluded in costing above false ceiling

Providing and fixing 98mm thick acoustic partition.Framework to be provided up-to true ceiling., frame to be made of 70mm Gyp steel® Ultra accousted or GYP Steel or GYB steel or Equivalent , having one flange of 41mm & another flange of 44mm placed at specified distance as per site requirement, in 72mm gyp steel Ultra® floor & ceiling, ceiling channel having equal flanges of 32mm of GI steel) ., A fixing channel of 99mm width (0.90mm thick having two flanges of 9.5mm each) to be used at the loading areas. The fixing channel should be fixed with self driving screws with flat head made up of Hilti.

Cladding on frame work : The framework to be clad on both sides with 13mm thick Gyproc duraline® boards (conforming to BS 5234, Part 2) up-to the true ceiling in line and level screw fixed with 25mm drywall screws @ 300mm & 150mm at floor & ceiling channel.The boards have to be fixed in a staggered manner. Finally square and tapered edges of the boards are to be jointed and finished so as to have a flush look which includes filling and finishing with jointing compound (IGL Make), 3 layers of jointing finishing with paper tape (as per recommended practices of Saint Gobain Gyproc) to achieve a smooth and seamless finish.

Acoustic material : As an acoustic requirement, 50mm thick glass wool slabs with 32kg /m3 density is to be wrapped in RP tissue and used as infill up to the soffit level.The periphery of the partition to be sealed with an acoustic sealant by India gypsum specs.

The Rate Shall also to be include with two coats of Plastic Emulsion Paint of approved colour.

Page 7: Otis Elevator Final Bill Tender Items

Item No. Description of work Unit Quantity Amount (Rs.) Rate (Rs.)

2.1.1.2 Partition above false ceiling lvl. sqm 108.55 2200.00 238,810.00 2.1.2 First Floor

2.1.2.1 Partition Upto False Ceiling Lvl. sqm 7.53 2600.00 19,578.00 2.1.2.2 Partition above false ceiling lvl. sqm 13.38 2200.00 29,436.00

2.2

2.2.1 Ground Floor sqm2.2.2 First Floor sqm 17.88 4000.00 71,520.00

2.3

2.3.1 Ground Floor sqm2.3.2 First Floor sqm 9.55 2200.00 21,010.00

2.4

2.4.1 Ground Floor sqm2.4.2 First Floor sqm

2.5

2.5.1 Along Windows & Structural Glazing2.5.1.1 Ground Floor rmt 67.70 1200.00 81,240.00 2.5.1.2 First Floor rmt 24.09 1200.00 28,908.00

2.6

rmt

Providing and fixing 75mm thick Low height partition finished with Laminate consisting of 12mm thick commercial plywood of approved make fixed on sal wood frame work (50mm x 50mm) in proper line and level, sample on to partition walls by means of approved wooden screws/nails. The ply surface to be pasted with approved shade and sample, 1.5mm thick laminate, with grooves as directed. The edges should have matching Teak wood beading finished in approved melamine polish, all complete.

Providing and fixing Laminate paneling / Boxing consisting of Providing and fixing in proper line and level, 19mm thick commercial plywood of approved make Archwud / Century or equivalent and sample on to partition walls by means of approved wooden screws/nails. The ply surface to be pasted with approved shade and sample, 1.5mm thick laminate, with grooves as directed. The edges should have matching Teak wood beading finished in approved melamine polish, etc., all complete.

Providing and fixing ceramic writing board with. teak wood frame stained and melamine finished and fixed as per Architects instructions. P3 or approved equivalent.

Providing and fixing 19mm thick Ply Wood Pelmet of 150mmx300mm fixed to false ceiling /soffit for fixing Blinds , pelmet shall be laminate finished rate including all accessories complete as per detail design and drawing.

Providing & fixing SS 304 grade Corner Guard 40x40x3mm for wall / partition. Sample to be submitted to Architect for approval.

Page 8: Otis Elevator Final Bill Tender Items

Item No. Description of work Unit Quantity Amount (Rs.) Rate (Rs.)

2.7

2.7.1 Ground Floor sqm 7.11 3900.00 27,729.00 2.7.2 First Floor sqm 1.39 3900.00 5,421.00

2.8.1 Training room sqm

2.9

sqm

SUB TOTAL OF DRY PARTITIONS and PANELLING 807,130.00

3 FALSE CEILING

Note :

4. Paint Shade shall be approved by Client/Architect.

5. Type of Modular tiles shall be Approved by Client/Architect.

Gypsum False Ceiling

Providing and fixing Mirror panelling in 6mm thick mirror of Modifloat make on a backing of 12mm thick commercial plywood Make: Archwud / Century or equivalent stuck to the wall/partition. The mirror to be fixed by means of mirror head screw with necessary supports in the partition etc. all complete.

Providing and fixing sliding folding partition system with 25mm thick ply shutter finish in laminate hanged from ceiling on a single track. Partition to be manually moved. The finishing profiles to be hidden as per detail design & drawing, all complete.

Providing and covering/cladding the columns using 12.5mm thick gypsum fixed over framing work with corner joints chamfered properly to form to perfect line and finished to plumb and finishing the surface to receive paint etc., all complete.

1. Rate Shall Include all Necessary additional frame works / Extra Bracing to accommodate all height .

2. Rate shall include for all drops, design pattern, as shown in drawing.

3. Rates shall also include making all type of cutouts , trap doors for all services. 4.Seperation of Modular and Gypsum ceiling shall be with grove joint /Axiom as shown in detail and rate shall be included.

6. Rate Shall include all design features /groves / junction finishing between two separate materials.

7. GYPSUM False ceiling will be measured on horizontal plane only. Horizontal plane measurements are to be inclusive of all vertical drops, edge moldings, fascias, etc.

Page 9: Otis Elevator Final Bill Tender Items

Item No. Description of work Unit Quantity Amount (Rs.) Rate (Rs.)

3.1

3.1.1 Ground Floor sqm 2558.01 1000.00 2,558,010.00 3.1.2 First Floor sqm 942.49 1000.00 942,490.00

Mineral Fiber False ceiling

3.2

General requisites :

Tile Specification :

Tile Type : Lay - in ceiling type.

Edge Detail : VT - 15, Recessed Beveled Edge

Light Reflectance : upto 90%.

Humidity Resistance : 90%.

Colour : White Similar to RAL 9010.

Surface Burning Characteristics : Class1, BS 476:Part 7:1987.

Providing and fixing 12.5 mm thick gypsum board false ceiling in horizontal/vertical and curved surfaces, coffers etc. fixed with screws to underside of GI suspension system comprising of G.I. angle of size 0.55 mm thick having one flange of 20mm and another flange of 30mm and a web of 27mm flanges along with perimeter of ceiling, screws fixed to brick/RCC /partition wall with the help of nylon sleeves and screws at 610 mm centers both sides.

The suspending GI intermediate channels of size 45mmx 0.9mm thick with two flanges 15mm each from the soffit at 1220mm centres with ceiling angle of width 25mmx10mmx0.55mm thick fixed to soffit with G.I. cleat and steel expansion fastener. Ceiling section of 0.55 mm thickness having knurled web of 51.5 mm and two flanges of 26mm each with lips of 10.5mm are then fixed to intermediate channel with the help of connecting clip and in direction perpendicular to the intermediate channel at 457mm centre and Gyp Board fixed to the ceiling section with 25 mm dry wall screws at 230mm centres complete in all respect as per recommendations of India Gypsum Ltd. and approval including making and cutting for electrical / AC / fire fighting fixture and providing and fixing MS angle/tee/flat/ perforated edge bead for suspended ceiling and GI angle beads, edge beads wherever AC/Light fittings are to be installed, trap door in ceiling where directed, The Rate Shall also to be include with two coats of Plastic Emulsion Paint of approved colour.

Providing & Installating Commercial type suspended modular ceiling consisting of

Tiles : Rock Wool based Mineral Fiber ( Wet Felt bounded ) & Not Glass Wool.

Grids : FineLine ( Silhouette ) White / Black - 15 mm wide flat with BLACK groove grids finished in approved shade.

The main runners & cross Tees to have " Click " Installation system made of Corrosion - protected high tensile steel or approved equivalent.

600 * 600 * 15 mm thickness, Smooth Finish Rock Wool Mineral Fibre Tile.

Page 10: Otis Elevator Final Bill Tender Items

Item No. Description of work Unit Quantity Amount (Rs.) Rate (Rs.)

Class A2 as per DIN 4102 Part 1.

Smoke Developed = 0 & Flame Spread = 5.

Thermal Conductivity : 0.052 - .057 W/mK

Thickness/Weight : 2.4 Kg/m2

Metal Grid member sizes :

Fineline ( Silhouette ) White / Black 15MM

Main Runners ( 3000mm ) : 15 * 38 * 0.30

Long Cross Tee ( 1200mm ) : 15 * 32 * 0.30

Short Cross Tee ( 600mm ) : 15 * 32 * 0.30

Perimeter Section ( 3000mm ) : 19 * 22 * 0.40

Ceiling Suspension System ( Installation ) :

3.2.1

3.2.1.1 Ground Floor sqm 941.82 1650.00 1,554,003.00 3.2.1.2 First Floor sqm 431.72 1650.00 712,338.00

3.2.2

3.2.2.1 Ground Floor sqm3.2.2.2 First Floor sqm

GI SLATS - 150MM x 1200MM metal false ceiling

Tile Name : Thermatex THERMOFON / ECOPHON / ROCKPHON.

Proprietary supplied ceiling suspension system to consist of

4mm GI suspension rod/wire with adjustable Butterfly Clip of

4mm dia securely affixed to structural ceiling using 10mm dia

hook type anchor fastener . Ceiling Suspension System to be

fixed at interval ( grid ) of 600 mm in both direction .Proprietary supplied ceiling suspension system to consist of

Main Runners @ 1200mm and joined by Cross Tees @ 600mm

to form overall grid opening of 600mm * 600mm centre to

centre. Additional cross tees are to be placed where

appropriate for light fixtures, AC diffusers etc. The Grid

system shall be hot dipped galvanized steel sections, with

exposed surfaces chemically cleaned and capped prefinished

in high - gloss polyester enamel with two coat system on cold

rolled steel. False ceiling will be measured on horizontal plane

only. Horizontal plane measurements are to be inclusive of all

vertical drops, edge moldings, fascias, etc.All extra tiles occupied by lights and diffusers to be returned

to owner.Rate quoted to include all cut - outs required for light fixtures,

smoke detectors and other services cut - outs complete as

directed by Architect.

NRC ( Absorption ) : Not less than 0.90 (Conference room / Board room & Training room)

NRC ( Absorption ) : Not less than 0.50 (Workstation and other area)

Page 11: Otis Elevator Final Bill Tender Items

Item No. Description of work Unit Quantity Amount (Rs.) Rate (Rs.)

3.3

3.3.1 Ground Floor sqm3.3.2 First Floor sqm

GI PERFORATED TILES - 600MM x 600MM3.4

3.4.1 Ground Floor sqm3.4.2 First Floor sqm

3.5

3.5.1 Ground Floor sqm3.5.2 First Floor sqm

Supplying and installing acoustical & fire retardant tile ceiling system comprising of tiles 150mm x 1200 mm long fabricated from 0.90mm GI sheet. The tile shall be chemically treated and painted with electrostatic powder coating on outer surface. It shall be suspended with the frame work etc., complete from the slab, beams etc. by means of 4mm dia G.I. rods, G.I. snap bar at 1200 mm center to center . G.I. snap couplings, aluminium snap bar hanger, G.I. edge profile etc. (No deduction shall be given for light area, air duct opening area, return air slit area palmets & columns beams etc.,) Make:- Armstrong / USG / Hunter Douglas / Fameline / Daikin.

The suspension system shall consist of 4 mm dia G.I. rod, sprinG steel clip, snap bar hanger 1.15 mm thick G.I. sheet height 80 mm X 26 mm snap bar 0.35 mm thick Galvanized sheet 27 mm X 2440 mm . G.I snap coupling size 220 mm in length X height 27 mm and pressure clip 1.10 mm thick galvanized sheet 35 mm X 30 mm. The edge profile shall be 18 mm X 20 mm fabricated from 0.5 mm thick G.I. sheets.

Supplying and installing acoustical & fire retardant tile ceiling system comprising of tiles 600 mm x 600 mm long fabricated from 0.90mm GI sheet. The tile shall be chemically treated and painted with electrostatic powder coating on outer surface. It shall be suspended with the frame work etc., complete from the slab, beams etc. by means of 4mm dia G.I. rods, G.I. snap bar at 600 mm center to center . G.I. snap couplings, aluminium snap bar hanger, G.I. edge profile etc. (No deduction shall be given for light area, air duct opening area, return air slit area palmets & columns beams etc.,) Make:- Armstrong / USG / Hunter Douglas / Fameline / Daikin.

The suspension system shall consist of 4 mm dia G.I. rod, sprinG steel clip, snap bar hanger 1.15 mm thick G.I. sheet height 80 mm X 26 mm snap bar 0.35 mm thick Galvanized sheet 27 mm X 2440 mm . G.I snap coupling size 220 mm in length X height 27 mm and pressure clip 1.10 mm thick galvanized sheet 35 mm X 30 mm. The edge profile shall be 18 mm X 20 mm fabricated from 0.5 mm thick G.I. sheets.

Providing and fixing PVC sintex tiles for false ceiling as per manufacturer's specification, etc all complete in Toilets.

Page 12: Otis Elevator Final Bill Tender Items

Item No. Description of work Unit Quantity Amount (Rs.) Rate (Rs.)

3.6

No

SUB TOTAL OF FALSE CEILING 5,766,841.00

4 PAINTING

4.1

4.1.1 Ground Floor sqm 221.36 210.00 46,485.60 4.1.2 First Floor sqm 100.86 210.00 21,180.60

4.2

4.2.1 Ground Floor sqm 818.61 160.00 130,977.60 4.2.2 First Floor sqm 399.05 160.00 63,848.00

4.3

4.3.1 Ground Floor sqm4.3.2 First Floor sqm

SUB TOTAL OF PAINTING 262,491.80

5 GLAZING WORK

• Rate shall include all accessories as shown in drawing .

Providing and fixing 6mm thick commercial ply backing of size 600mm X 600mm on mineral fiber modular false ceiling tiles to support light fitting, speakers, CCTV cameras, diffuser of grid work size with necessary cut outs for the same, etc., all complete.

Punning with Minimum 6mm thick layer of super fine plaster of Paris (anhydrous gypsum) applied over selected surface (Both curved and plain surfaces) on walls and columns finished smooth. Surface to be to plumb and square. Surface prepared by hacking and applying a coat of slurry if required.

Painting internal plastered surfaces with two or more coats of super acrylic emulsion paint of approved brand and colour (Berger or Asian or equivalent) to give an even shade with required finish over a coat of water thinnable cement primer including cleaning the surfaces, filling the crevices with approved filler, scaffolding, etc.,complete all as per specifications.

Providing and applying Texture paint of approved colour and shade to GYPSUM partition walls after thoroughly sand papering surfaces to remove dust, dirt, etc., and repairing dents, holes with POP to achieve level surface and finishing with two coats of primer, putty and two coats of paint including cost of material, labour, scaffolding etc., all complete as directed by the Architect's, approval required after each coat.Basic Rate for Textrue Paint Rs. 40/- per Sq.ft.

• Rate shall include all supporting frames also for fixing main frames to partition

• Cost of laminate/veneer mentioned is the maximum cost. It should be inclusive of all materials, taxes, transportation to site, storage, loading-unloading and all taxes, Octroi, duties as applicable.

Page 13: Otis Elevator Final Bill Tender Items

Item No. Description of work Unit Quantity Amount (Rs.) Rate (Rs.)

5.1

5.1.1 Ground Floor sqm 189.71 4050.00 768,325.50 5.1.2 First Floor sqm 26.86 4050.00 108,783.00

5.2

5.2.1 Ground Floor sqm 51.73 13000.00 672,490.00 5.2.2 First Floor sqm 10.41 13000.00 135,330.00

5.3

5.3.1

5.3.1.1 Ground Floor set5.3.1.2 First Floor set

SUB TOTAL OF GLAZING WORK 1,684,928.50

• All internal wooden framework to be treated with 1 coat of anti-termite coat/paint of approved make as per manufacturer's specifications

• The rate for doors to include shutter, finishes all hardware like exposed door closer, locks, hinges, all as per drawings

• All the hardware for the doors to be as per the manufacturers recommendation for the size and application of the door. Patches and floor spring to be as per manufacturers specs. for the type, size and location of door.

Providing and Fixing toughened glass partitions of 10mm thick with aluminum "U" channel to hold glass at ceiling and floor. The rate to be inclusive of salwood frame above false ceiling to hold glass and gypsum board cladding on sal wood frame work on either side wherever air-tightness is required. Glass divisions to be as per specified in drawings and .all as per architects instructions & drawing.

Supplying and fixing Fully openable Patch fitting frame less glass door of 'DORMA' 'PT' rage fittings or equivalent to get a clear height upto 2500mm with top & side fixed panels. In general, the door cum fixed panel consists of corner fittings SM1090/91, Top pivot PT 24, Top patch PT 20, Bottom patch PT 10, with BTS 75 EN 1-4 Floor spring with SS cover plate, Standard spindle, corner lock at top & bottom, Euro profile cylinder with 3 keys, lock strike plate US 10 and 12mm thick clear toughened glass with etching as per design and all confirming to manufactures specification. SS fixtures shall confirm Grade SS 304 to BS 7352. (Rate shall include for providing glass fin to support the patch fitting door, transport charges, handling, loading, unloading, installation, and all necessary hard wares, structural supports if any, etc,) complete and all as per manufactures specification and direction of Engineer-in-charge.

Providing and fixing set of Stainless steel (SS 304 or 316 grade) from the makes of "KITCH / SEVAX / EPCO / DORMA" or equivalent with necessary stainless steel screws etc. complete:Pull handle set (set of two handles) one on each side of door 'D' shape of size 22mm dia x 300mm long.

Page 14: Otis Elevator Final Bill Tender Items

Item No. Description of work Unit Quantity Amount (Rs.) Rate (Rs.)

6 FIXED FURNITURES and STORAGES

Note:

• All locks within individual work spaces to be matched

• Tower bolts will be fitted on shutters without locks

6.1

sqm

6.2

6.2.1 Record room Storage (1000mm deep and 2400mm high) sqm 5.58 10000.00 55,800.00 6.2.2 Storage (400mm deep and 2100mm high) sqm 5.05 8000.00 40,400.00 6.2.3 Pantry Storage Unit( above counter) sqm 5.44 9000.00 48,960.00 6.2.4 Pantry Storage Unit( below counter) sqm 3.84 8500.00 32,640.00

6.3

rmt

6.4

sqm

Board room Table (Shaped table)

• Cost of laminate/veneer mentioned is the maximum cost. It should be inclusive of all materials, taxes, transportation to site, storage, loading-unloading and all taxes, Octroi, duties as applicable.

• All internal wooden framework to be treated with 1 coat of anti-termite coat/paint of approved make as per manufacturer's specifications

• All lockable shutters to be provided with magnetic ball catches

Providing and finishing tiered steps in 19mm plywood and 50mm x 50mm sal wood frame in training areas. Maximum height from FFL of last step shall be 1'-0". Finished surface shall be condusive for carpet laying with appropriate levels. Measurement for payment shall be for plan area only, etc., all complete.

Providing and fixing storage unit made of 19mm thick ply with approved laminate finish, equal openable shutters, Drawers, Shelf With necessary accessories like hooks. locks, handle, hardware etc., & separate Keys complete as per detail design and drawing.

Providing and fixing Running Counter 600mm wide made of 19mm thk. Ply Make: Archwud / Century or equivalent finished with laminate and supported over 19mm thk. Ply laminate finished all edges fixed with Teak wood beading of 25mm x 19mm complete as per design and drawing.

Providing and doing Niche made 12mm thk. Ply Make: Archwud / Century or equivalent boxing and with frame work fixed to the partition wall and entire niche finished with laminate complete as per design and drawing.

Page 15: Otis Elevator Final Bill Tender Items

Item No. Description of work Unit Quantity Amount (Rs.) Rate (Rs.)

6.5

each 1.00 75000.00 75,000.00

Reprographic Table / Storage6.6

sqm 13.70 10000.00 137,000.00

Receptionist's Table6.7

each 1.00 60000.00 60,000.00

6.8

sqm 2.42 9000.00 21,780.00

471,580.00

7 BLINDS

Vertical Blinds

Providing and fixing Board table 6750mm x 2450mm x 750mm shape as shown in drawing of size with table top made of 19mm double ply tapered design, table edge with Teak wood beading, top finished with approved 2 shade veneer supported over ply boxing and placed over tapered wider base entire outer surface of table support shall be finished with veneer with PU coat.

including provision for power and AV requirements, and Power sockets as per the details shown in the drawing. All edges to be covered with teak wood beading and will have spray applied matt finish melamine polish of approved shade. The rate shall include making grooves, beveling the edges and making necessary cut outs for data, AV and power outlets etc., all complete.

Providing and fixing Reprographic table cum storage 600mm wide and 750mm ht with equal shutters and adjustable shelf inside, made with 19mm block board. The top surfaces covered with 1mm laminate with post formed edges and vertical surfaces with 1mm laminate of approved shade and all edges to be covered with PVC lipping. The insides finished with laminate with necessary accessories like locks, powder coated metal handles, hardware, etc. as per drawing.

Providing and fixing Receptionist's table made of 20mm thick corian table top and front side of table with frosted glass and SS studs shall be used as per design , table supported over the Ply boxing corian finished as per detail design and drawing

Providing making and fixing credenza made of 19mm thk. Ply and finished with laminate ,Shutters shall be of louvered shutters and laminate finished complete as per detail design and drawing in Board room.

SUB TOTAL OF FIXED / LOOSE - FURNITURES & STORAGES

Page 16: Otis Elevator Final Bill Tender Items

Item No. Description of work Unit Quantity Amount (Rs.) Rate (Rs.)

7.1

7.1.1 Ground Floor sqm 38.20 950.00 36,290.00 7.1.2 First Floor sqm

Motorized Blinds

7.2 Supply & installation of roller Blinds

Shade

Solar transmittance of maximum 30%

Solar reflectance of a minimum of 35%

Solar absorption : 50% maximum

UV transmittance : 15% maximum

Openness factor of 5% maximum

Visibility light transmission : 12% maximum

Fire resistance : confirming to NFPA 701 ( USA ) / NF P92-503

Thickness of Fabric : minimum 0.5mm thk

Mass of Fabric : 375 g/sqm minimum

Roller Tube

Aluminium - thickness minimum 0.5mm with 25mm dia.

Bottom Rail

Aluminium - thickness minimum 0.5mm with 20mm dia.

Ball Chain

Chain drive unit & Idler end

Supply & installation of vertical blind which includes Head Channel of 33mm wide & 30mm deep with a nominal wall thickness of 1.2mm to 1.4mm made of aluminium alloy finished in clear anodizing to a thickness of 10 microns or a powder coated to a thickness of 30 to 40 microns, Tilt control by means of 2mm dia imported braided Nylon Cord with 4.5mm dia acetyl balls moulded co-axially to it on 11.8mm centres by pulling on a ball chain connected to a pulley, Traversing cord of 2mm dia constructed with braided polyester jacket over a polyester core. The cord shall be held in tension by cord weight, Fabric slat shall be slit from woven fabric in width of 75mm with bottom pockets housing weight slot, coupled together by means of endless bead chains, Bottom weight does not rust nor cut the fabric.Basic Rate for Vertical Blinds Rs. 80/- per sft.Make: - Hunter Douglas / Louverline / Drapes / Vista or equivalent.

Composition of Yan : Glass fiber ( 30% minimum ) & Bulk dyed Polymer compound

Durability : water proof, anti-microbial, corrosion resistant washable, flame retardant, fade resistant & satin guarded.

Aluminium as per manufacturer without connecting cap. Chain to be continuous & fixed while installing chain drive unit.

Manufactured of moulded plastic with support pin. It shall be driven by ball chain pulley. The shade shall be automatically locked in any position. Unit to have spring loaded mechanism to assist user to operate blinds.

Page 17: Otis Elevator Final Bill Tender Items

Item No. Description of work Unit Quantity Amount (Rs.) Rate (Rs.)

7.2.1

7.2.1.1 Display area in Ground Floor sqm7.2.1.2 Motors Nos.7.2.1.3 Remote Nos.

SUB TOTAL OF BLINDS 36,290.00

8 GRAPHICS

8.1

8.1.1

8.1.1.1 Ground Floor sqm8.1.1.2 First Floor sqm

8.2

8.2.1

8.2.1.1 Ground Floor sqm

8.3

sqm

SUB TOTAL OF GRAPHICS -

Total Rs. ###Vat @ 14.5% on 70% 965,476.10

Service Tax @ 12.36% on 30% 352,707.92

Grand-Total Rs. ###

Basic Rate for Roller Blinds Rs.120/- per sft.Note:- The minimum width of blinds should be 1200mm. Make: - Hunter Douglas / Louverline / Drapes / Vista or equivalent.

Motorized blinds to be switch & remote control operated.

Supplying GRAPHIC VINYL WITH APPROVED GRAPHICS. Surface preparation - thoroughly sand papering surfaces to remove dust, dirt, etc., and repairing dents, holes with POP to achieve level surface and finishing including cost of material, labour, scaffolding etc., all complete as directed by the Architect's, approval required after each coat and over laminated.Warranty 5 years. Make: Avery / 3M.

Note:- The cost shall include design & printing as per Architect specification.

Supplying HIGH END GRAPHIC VINYL WITH APPROVED GRAPHICS. Surface preparation - thoroughly sand papering surfaces to remove dust, dirt, etc., and repairing dents, holes with POP to achieve level surface and finishing including cost of material, labour, scaffolding etc., all complete as directed by the Architect's, approval required after each coat and over laminated.Warranty 5 years. Make: Avery / 3M.

Note:- The cost shall include design & printing as per Architect specification.

Supplying and fixing of frosted film of 3M or approved equivalent Make on Glass Partition in pattern as per drawings as per manufacturer's specifications with 10 years warranty etc. complete.

Page 18: Otis Elevator Final Bill Tender Items

9,502,779.80

Page 19: Otis Elevator Final Bill Tender Items

Project :- OTIS_for Factory Expansion

Subject : Pre Final Bill Measurements for Interior works

MEASURMENT SHEET for Pre Final Bill

Item No. Description of work Nos Length H/W Total Sft Deduction Sqmtr

PREAMBLE

Actual BOQ qty

1. The description of an item shall be deemed to include all preambles, headings, sub-headings and references to other documents. The detailed description of work and materials, given in the Specification are not necessarily repeated in the Bill of Quantities.

2. The Preamble to the Bills of Quantities must be read with the Drawings, Conditions of Contract and the Specification and the tenderer shall be deemed to have examined the Drawings, Specifications, Conditions of Contract and to have acquainted himself with the Works to be done and the way in which they are to be carried out. This preamble to the Bills of Quantities shall form part of the Contract.

3. Tenderers are instructed to quote "rate only" for all QRO items without fail and not to enter any amount in the amount column. The rates quoted under QRO items is negotiable during the evaluation of the tender and the rationalized rate only will be considered if there is a need to operate QRO items during execution. Any percentage of discount / rebate offered by the tenderer during negotiation is applicable on all the quoted rates of the tendered items including "QRO" Items.

4. Providing and maintaining Field Laboratory in a satisfactory manner till the completion of work to ensure site control on quality of materials and the works and shall strictly comply with provision of Indian/ International Standards at no extra cost. All other regular tests including requisite materials shall be carried out as directed either at approved laboratory or at site at no extra cost.

5. The Tenderers are requested to inspect the site and obtain for themselves at their own expense all necessary information and particulars to enable them to submit the tender.

6. The dimensions shown in the drawings shall have to be verified by the contractor at site before execution of the items and necessary allowance's) have to be made as per the actual dimensions available at site.7. For the items of works having Basic rate of material, price adjustment will be made only on the actual quantity measured. Wastage shall be to Contractors account. Basic rate indicates landed cost at site including transportation charges, loading-unloading and all other levies/taxes as applicable.

8. The contractor should refer to the detailed drawings for details. All the rates so quoted should be inclusive of all hardware. In case of discrepancy between drawing and Bill of Quantity the drawing supersedes, unless specifically mentioned in the BOQ.

9. All pre-fabrication works wherever possible shall be carried outside the client's premises, only assembling and finishing work will be allowed within the Site.

Page 20: Otis Elevator Final Bill Tender Items

Item No. Description of work Nos Length H/W Total Sft Deduction SqmtrActual BOQ qty

10. Items of work provided in this schedule but not covered in the specifications shall be executed strictly as per instructions of the engineer-in-charge/PMC.

11. Unless specifically mentioned otherwise in the contract, the tenderer shall quote for the finished items and shall provide for the complete cost towards labour, materials, plant and machinery, operational costs, levies, taxes, transport, repairs, rectification, maintenance till handing over, revenue expenses, contingencies, overheads, profits and all incidental items not specifically mentioned but reasonably implied and necessary to complete the works according to the contract.

12. The quantities of the various items mentioned in the schedule in the schedule of items are approximate and may vary up to any extent or be deleted altogether. The quoted rates of each item shall remain firm for all works. The contractor, in his own interest, should get an indication of the probable extent of the work to be executed under any particular item in this schedule, before undertaking any preliminary and enabling work or purchasing bought out components related to the work.

13. Rates shall be quoted both in figures and in words in clear legible writing. No overwriting is allowed. All scoring and cancellations should be countersigned by the tenderer. In case of illegibility, the interpretation of the engineer shall be final. All entries shall be in English language.

14. Engineer-in-charge's decision shall be final and binding on the contractor regarding clarifications of items in this schedule with respect to the other sections of the Contract.15. It may be noted that the total work or any part / parts of the same may be awarded as mentioned in this schedule of items.

16. The rates quoted shall be inclusive of all mock-ups, associated samples prior to any mass production or procurement as per complete satisfaction of the Client and Architect. Inclusive of dismantling, demolishing and carting the material and making good of the surface.

17. Any debris generated out of the said work may please be cleared on priority basis from the Site

18. Veneer unless or otherwise specified shall have a landed cost of Rs.120/- per sqft (incl. of all transportation, Octroi, taxes, duty etc)

19. Laminate unless or otherwise specified shall have a landed cost of Rs.45/- per sqft (incl. of all transportation, Octroi, taxes, duty etc).

19. The door size mentioned is the overall opening size.20. The contractor should refer to the detailed drawings for details. All the rates so quoted should be inclusive of all hardware. In case of discrepancy between drawing and Bill of Quantity the drawing supersedes, unless specifically mentioned in the BOQ.

21. Rates for all exposed T.W. members and lipping shall include cost of melamine finish.

22. The rate of all units to be inclusive of matched locks for individual work space every drawer and shutter to be provided with locks of Godrej/Equivalent make

Page 21: Otis Elevator Final Bill Tender Items

Item No. Description of work Nos Length H/W Total Sft Deduction SqmtrActual BOQ qty

IS :- Indian Standard

A.S.T.M :- American Society for Testing and Materials

A.W.S :- American Welding Society

MM or mm :- Millimeter /s

CM & cm :- Centimeter /s

RM (rm) / RMT (Rmt) :- Running meter /s

KG (kg) :- Kilogram /s

Tone/t/MT :- Metric ton/s (1000 Kilogram's)

Dia. :- Diameter

Sqm :- Square meter

Cum:- Cubic meter

No.:- Number/s

Qty.:- Quantity

L.S :- Lump sum.

QRO:- Quote rate only.

B.R :- Basic Rate

Drg.No. :- Drawing number

Dwg. :- Drawing

1 WOODEN FLOORING

1.1

1.1.1 Ground Floor1.1.2 Frist Floor

1.2

1.3

23. One master key shall be handed over for all storage locks.

24. The abbreviations used in the Specification and Bill of Quantities shall be read as follows :

Providing and fixing 75 / 80mm high Anodized aluminium skirting, length 3.05mts, gauge 1.5mm, projection from installed surface 10mm, coating thickness - Anodized 20 micron / Powder coated 70 microns, corner guard - hard PVC and adhesive for installation with 12mm ply backing., as approved by Architect

Providing & fixing SS 304 grade 50mm wide & 2mm thick Transit Profile between Carpet / wooden & other flooring material. Sample to be submitted to Architect for approval.

Providing & fixing Armstrong Ambience Premium Laminate Wood Flooring,Specification:- Classification of use 32/23 with a  surface abrasion resistance of class AC4 (average 4500 cycles), impact resistance of IC2,resistance to cigarette burn with a rating of 5(EN 438-2:15), swelling after 24 hrs in water of 8.22%, Modulus of rupture of 53.3 newton/mm2, Internal bond 1.78 newton/mm2, surface soundness 2.62 newton/mm2(EN 13329:2000) with a 0.2 mm thick wear layer on top of a High Density Fiber  substrate core (density ~ 948.3 Kgs/M3) of plank size 1214 mm X 192 mm /1286 X 192mm having locking arrangement (lock strength > 1000 lbs/ft) with an underlayment made of natural colour foam , with accessories like End profile, Transition profile, reducer, Stair nosing etc. complete

Page 22: Otis Elevator Final Bill Tender Items

Item No. Description of work Nos Length H/W Total Sft Deduction SqmtrActual BOQ qty

1.3.1

1.3.1.1 Ground Floor 250.68

reception 2.00 10.00 10.50 210.00

1.00 13.25 11.50 152.38Total 362.38 33.68

1.3.1.2 First Floor 213.49

Board Room 1.00 49.00 29.50 1445.50

1.00 3.00 5.00 15.00Total 1460.50 135.73

1.3.2 For Skirting - 100mm high

1.3.2.1 Ground Floor

1.3.2.2 First Floor

1.4

1.4.1

1.4.1.1 Ground Floor

Installation:- It is important to ensure the sub floor on which the planks are being laid is smooth, flat & hard & free from moisture, greases, etc. In case of uneven sub floor the same should be leveled by self leveling compound. The moisture level present in the sub floor should be less than 8% before installation of the floor. The Laminate wood flooring should be a completely floating floor (using recommended a water barrier of minimum of 250 microns & 2mm polyethylene foam). The tongue & groove joints shall be glued together using recommended adhesive. The installation shall be undertaken as per the manufacturer's installation instructions.

For Flooring, Grade - AC4Basic Rate of Laminate wooden floor Rs. 250/- per Sq.ft

Providing and laying 2 mm thick ANTSTATIC POLYVINYL SHEET manufactured by M/s. Premider Polyfilm Ltd. / Birla Corporation Ltd. or equivalent on a smooth & damp proof base using rubber based Adhesives (@ 0.2 kg/sqm) of approved quality and manufacturer like Dunlop S-758, Fevicol SR-998 or equivalent including cleaning, levelling, drying of the base, rolling with light wooden roller weighing about 5.00kg including providing copper strip of size 15mm x 2mm for earthing etc. all complete as per specification and the directions of the Engineer-in-Charge and having the following properties for the sheet: (1) Electrical Resistance - Anti-Static flooring range 5x10 ^4 - 10^8 Ohms, conductive flooring range upto 5 x 10^4 Ohms (2) Flexibility - Does not break, crack or any sign of failure (3) Heat Ageing & Exudation - No visible effects or exudation (4) Fire resistance - Does not support combustion or assist spread of flame (5) Water absorption - less than 0.1% (6) Sound reduction factor - 2mm - 3 db.

Basic Rate of Antistatic Polyvinyl sheet floor Rs. 85/- per Sq.ft

Page 23: Otis Elevator Final Bill Tender Items

Item No. Description of work Nos Length H/W Total Sft Deduction SqmtrActual BOQ qty

1.5

1.5.1

1.5.1.1 Ground Floor

1.5.1.2 First Floor

1.6

1.6.1 18mm thick

1.6.1.1 Ground Floor

1.6.1.2 First Floor

SUB TOTAL OF FLOORING

2.0 DRY PARTITIONS and PANELLING

2.1

Cement concrete flooring 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry, but excluding the cost of nosing of steps etc. complete.40mm thick with 20mm nominal size stone aggregate.

Cement plaster skirting (up to 100mm height) with cement mortar 1:3 (1 cement : 3 coarse sand) finished with a floating coat of neat cement.

• Control joints to be incorporated wherever the length of the partitions is more than 10m.

• All GI steel to be marked with "GYPSTEEL" which is a standard hologram of India gypsum.• The rate to be inclusive of additional frame work for white boards, panel boards, over head storages, counter fixing. • Angle beads have to be used at the external angles to get straight line and finish and protection from impacts.• Edge beads have to be used to protect the exposed edges of Gypboard. The edges can be at the opening for doors, windows, glazing, etc or any other exposed edges.

• The cost of laminate, veneer given below is the landed cost of the material, with all taxes, delivery, transport and all taxes thereon

• Cost of laminate/veneer mentioned is the maximum cost. It should be inclusive of all materials, taxes, transportation to site, storage, loading-unloading and all taxes, Octroi, duties as applicable.

• All internal wooden framework to be treated with 1 coat of anti-termite coat/paint of approved make as per manufacturer's specifications

• Above false ceiling double ply and gyp shall continue. Only finishing like paints/laminates shall be excluded in costing above false ceiling

Providing and fixing 98mm thick acoustic partition.Framework to be provided up-to true ceiling., frame to be made of 70mm Gyp steel® Ultra accousted or GYP Steel or GYB steel or Equivalent , having one flange of 41mm & another flange of 44mm placed at specified distance as per site requirement, in 72mm gyp steel Ultra® floor & ceiling, ceiling channel having equal flanges of 32mm of GI steel) ., A fixing channel of 99mm width (0.90mm thick having two flanges of 9.5mm each) to be used at the loading areas. The fixing channel should be fixed with self driving screws with flat head made up of Hilti.

Page 24: Otis Elevator Final Bill Tender Items

Item No. Description of work Nos Length H/W Total Sft Deduction SqmtrActual BOQ qty

2.1.1 Ground Floor

2.1.1.1 Partition Upto False Ceiling Lvl. 116.13

G M Cabin Partition 8.00 11.00 10.00 880.00Deduction Glass Partition 5.00 1.50 10.00 75.00Sky light area partition 1.00 12.00 11.00 132.00Pantry Utility 1.00 9.00 6.00 54.00

1.00 5.25 10.50 55.13

1.00 11.00 10.00 110.00

1.00 4.00 4.25 17.00

1248.13 75.00Less Deductions -75.00Total 1173.13 109.03

2.1.1.2 Partition above false ceiling lvl. 53.23Meeting room factory side above lass partition 1.00 15.00 3.00 45.00

1.00 119.50 3.50 418.25Above glass partition cabin 1.00 5.75 3.50 20.13Discussion room above glass partition 1.00 27.00 4.50 121.50VIP cabin above partition 1.00 41.25 3.50 144.38Side partition 3.00 16.50 3.50 173.25Factory entry glass partition above 1.00 15.50 5.00 77.50Gents toilet wall above partition 1.00 36.00 4.00 144.00Board room & gents toilet wall above partition 1.00 4.00 6.00 24.00Total 1168.00 108.55

2.1.2 First Floor

2.1.2.1 Partition Upto False Ceiling Lvl. 9.22

Sky light area 1.00 9.00 8.00 72.00

2.00 9.00 0.50 9.00Total 81.00 7.53

2.1.2.2 Partition above false ceiling lvl. 4.22

Glass partition above 1.00 32.00 4.50 144.00Total 144.00 13.38

Cladding on frame work : The framework to be clad on both sides with 13mm thick Gyproc duraline® boards (conforming to BS 5234, Part 2) up-to the true ceiling in line and level screw fixed with 25mm drywall screws @ 300mm & 150mm at floor & ceiling channel.The boards have to be fixed in a staggered manner. Finally square and tapered edges of the boards are to be jointed and finished so as to have a flush look which includes filling and finishing with jointing compound (IGL Make), 3 layers of jointing finishing with paper tape (as per recommended practices of Saint Gobain Gyproc) to achieve a smooth and seamless finish.

Acoustic material : As an acoustic requirement, 50mm thick glass wool slabs with 32kg /m3 density is to be wrapped in RP tissue and used as infill up to the soffit level.The periphery of the partition to be sealed with an acoustic sealant by India gypsum specs.

The Rate Shall also to be include with two coats of Plastic Emulsion Paint of approved colour.

Page 25: Otis Elevator Final Bill Tender Items

Item No. Description of work Nos Length H/W Total Sft Deduction SqmtrActual BOQ qty

2.2

2.2.1 Ground Floor

2.2.2 First Floor 12.60

Trap door above partition 1.00 6.75 28.50 192.38 17.88

2.3

2.3.1 Ground Floor

2.3.2 First Floor

Dummy boxing both the side of trap door 75.00 2.00 3.00 6.16 36.96Colum finish wit laminate 1.00 6.75 9.75 65.81Total 102.77 9.55

2.4

2.4.1 Ground Floor

2.4.2 First Floor

2.5

2.5.1 Along Windows & Structural Glazing2.5.1.1 Ground Floor 184.66

Discussion room 1.00 81.00 (RFT)G M cabin 6.00 9.34 56.04 (RFT)

2.00 11.00 22.00 (RFT)VIP cabin 1.00 33.00 (RFT)Board room 1.00 30.00 (RFT)Total 222.04 67.70

2.5.1.2 First Floor 246.44

Board room 1.00 69.00 (RFT)Pull-down screen pelmet (Rework) 1.00 10.00(RFT)Total 79.00 24.09

Providing and fixing 75mm thick Low height partition finished with Laminate consisting of 12mm thick commercial plywood of approved make fixed on sal wood frame work (50mm x 50mm) in proper line and level, sample on to partition walls by means of approved wooden screws/nails. The ply surface to be pasted with approved shade and sample, 1.5mm thick laminate, with grooves as directed. The edges should have matching Teak wood beading finished in approved melamine polish, all complete.

Providing and fixing Laminate paneling / Boxing consisting of Providing and fixing in proper line and level, 19mm thick commercial plywood of approved make Archwud / Century or equivalent and sample on to partition walls by means of approved wooden screws/nails. The ply surface to be pasted with approved shade and sample, 1.5mm thick laminate, with grooves as directed. The edges should have matching Teak wood beading finished in approved melamine polish, etc., all complete.

Providing and fixing ceramic writing board with. teak wood frame stained and melamine finished and fixed as per Architects instructions. P3 or approved equivalent.

Providing and fixing 19mm thick Ply Wood Pelmet of 150mmx300mm fixed to false ceiling /soffit for fixing Blinds , pelmet shall be laminate finished rate including all accessories complete as per detail design and drawing.

Page 26: Otis Elevator Final Bill Tender Items

Item No. Description of work Nos Length H/W Total Sft Deduction SqmtrActual BOQ qty

2.6

2.7

2.7.1 Ground Floor 14.73

Gents toilet 1.00 5.00 3.00 15.00Ladies toilet 1.00 5.00 3.00 15.00Wash room 2.00 3.25 7.16 46.54Total 76.54 7.11

2.7.2 First Floor 17.34

Providing & fixing SS 304 grade Corner Guard 40x40x3mm for wall / partition. Sample to be submitted to Architect for approval.

Providing and fixing Mirror panelling in 6mm thick mirror of Modifloat make on a backing of 12mm thick commercial plywood Make: Archwud / Century or equivalent stuck to the wall/partition. The mirror to be fixed by means of mirror head screw with necessary supports in the partition etc. all complete.

Page 27: Otis Elevator Final Bill Tender Items

Item No. Description of work Nos Length H/W Total Sft Deduction SqmtrActual BOQ qty

VIP canteen wash room 1.00 5.00 3.00 15.00 1.39

2.8.1 Training room

2.9

3 FALSE CEILING

Note :

4. Paint Shade shall be approved by Client/Architect.

Gypsum False Ceiling 3.1

Providing and fixing sliding folding partition system with 25mm thick ply shutter finish in laminate hanged from ceiling on a single track. Partition to be manually moved. The finishing profiles to be hidden as per detail design & drawing, all complete.

Providing and covering/cladding the columns using 12.5mm thick gypsum fixed over framing work with corner joints chamfered properly to form to perfect line and finished to plumb and finishing the surface to receive paint etc., all complete.

SUB TOTAL OF DRY PARTITIONS and PANELLING

1. Rate Shall Include all Necessary additional frame works / Extra Bracing to accommodate all height .

2. Rate shall include for all drops, design pattern, as shown in drawing.

3. Rates shall also include making all type of cutouts , trap doors for all services.

4.Seperation of Modular and Gypsum ceiling shall be with grove joint /Axiom as shown in detail and rate shall be included.

5. Type of Modular tiles shall be Approved by Client/Architect.

6. Rate Shall include all design features /groves / junction finishing between two separate materials. 7. GYPSUM False ceiling will be measured on horizontal plane only. Horizontal plane measurements are to be inclusive of all vertical drops, edge moldings, fascia's, etc.

Providing and fixing 12.5 mm thick gypsum board false ceiling in horizontal/vertical and curved surfaces, coffers etc. fixed with screws to underside of GI suspension system comprising of G.I. angle of size 0.55 mm thick having one flange of 20mm and another flange of 30mm and a web of 27mm flanges along with perimeter of ceiling, screws fixed to brick/RCC /partition wall with the help of nylon sleeves and screws at 610 mm centers both sides.

Page 28: Otis Elevator Final Bill Tender Items

Item No. Description of work Nos Length H/W Total Sft Deduction SqmtrActual BOQ qty

3.1.1 Ground Floor 339.59

Ground floor test tower

Electrical room vestible 1.00 6.75 8.00 54.00Deduction for Grid 1.00 4.00 4.00 16.00Vertical 4.00 4.00 0.50 8.00Skylight AreaTest Tower 1.00 10.00 13.00 130.00

1.00 5.50 23.50 129.25Vertical 2.00 23.50 4.00 188.00

1.00 10.00 3.50 35.00

1.00 36.50 4.00 146.00

1.00 6.50 4.00 26.00

1.00 12.00 4.00 48.00

1.00 12.00 5.50 66.00west side gypsum ceiling 1.00 38.00 4.75 180.50Vertical 1.00 38.00 1.83 69.54

1.00 1.25 8.00 10.00Vertical 1.00 8.00 0.75 6.00

1.00 8.00 0.25 2.00Corridor 1.00 45.75 3.16 144.57Vertical 1.00 45.75 0.75 34.31

1.00 45.75 0.25 11.44Sunlight side ceiling 1.00 38.00 6.25 237.50Deduction column 2.00 2.00 2.00 8.00Inside vertical 1.00 26.00 0.75 19.50

1.00 26.00 0.25 6.50Sunlight out side vertical 1.00 38.00 3.42 129.96Entry corridor 1.00 46.25 10.00 462.50Vertical inside 1.00 16.00 0.75 12.00

1.00 16.00 0.25 4.00Glazing side vertical 1.00 55.50 2.00 111.00Vertical 1.00 8.00 0.75 6.00

1.00 8.00 0.25 2.00Deduction for wall 2.00 11.42 2.75 62.81Vestibule 1.00 6.58 8.00 52.64FED Office 1.00 18.00 14.50 261.00Vertical filling above lintel 1.00 18.50 0.75 13.88

The suspending GI intermediate channels of size 45mmx 0.9mm thick with two flanges 15mm each from the soffit at 1220mm centres with ceiling angle of width 25mmx10mmx0.55mm thick fixed to soffit with G.I. cleat and steel expansion fastener. Ceiling section of 0.55 mm thickness having knurled web of 51.5 mm and two flanges of 26mm each with lips of 10.5mm are then fixed to intermediate channel with the help of connecting clip and in direction perpendicular to the intermediate channel at 457mm centre and Gyp Board fixed to the ceiling section with 25 mm dry wall screws at 230mm centres complete in all respect as per recommendations of India Gypsum Ltd. and approval including making and cutting for electrical / AC / fire fighting fixture and providing and fixing MS angle/tee/flat/ perforated edge bead for suspended ceiling and GI angle beads, edge beads wherever AC/Light fittings are to be installed, trap door in ceiling where directed, The Rate Shall also to be include with two coats of Plastic Emulsion Paint of approved colour.

Page 29: Otis Elevator Final Bill Tender Items

Item No. Description of work Nos Length H/W Total Sft Deduction SqmtrActual BOQ qty

Vertical 2.00 8.00 0.25 4.00

2.00 12.00 0.25 6.00FED big room 1.00 41.00 2.50 102.50

1.00 5.00 22.75 113.75

1.00 22.75 3.50 79.63

1.00 3.83 41.00 157.03Vertical 2.00 34.00 1.00 68.00

2.00 20.00 1.00 40.00

2.00 34.00 0.34 23.12

2.00 20.00 0.34 13.60Deduction for wall 1.00 2.75 5.50 15.13

Ground Floor Admin Block Canteen Side Ceiling 1.00 78.00 6.58 513.24Vertical 1.00 73.00 1.00 73.00Glazing side 1.00 29.00 5.00 145.00Vertical 1.00 31.00 1.00 31.00

1.00 2.50 73.00 182.50Inside vertical 8.00 12.00 0.75 72.00External vertical 8.00 12.00 0.25 24.00Ceiling 1.00 2.75 8.50 23.38

1.00 4.16 30.00 124.80Vertical 4.00 30.00 0.75 90.00External vertical 4.00 30.00 0.25 30.00

1.00 4.58 30.00 137.40

1.00 32.50 4.16 135.20Gypsum Boxing 1.00 2.16 19.66 42.47Ceiling 1.00 7.50 32.00 240.00Vertical 4.00 30.00 0.75 90.00External vertical 4.00 32.00 0.25 32.00Ceiling 1.00 4.50 32.00 144.00

1.00 5.25 32.00 168.00VIP cabin front 1.00 34.50 4.00 138.00Vertical 2.00 24.00 0.75 36.00External vertical 2.00 24.00 0.25 12.00Ceiling 1.00 4.33 24.00 103.92

1.00 4.16 24.00 99.84Vertical 2.00 12.00 0.75 18.00External vertical 2.00 12.00 0.25 6.00Vertical 2.00 8.00 0.75 12.00

2.00 8.00 0.25 4.00VIP cabin side 1.00 43.25 5.66 244.80Vertical 2.00 22.00 0.75 33.00

2.00 22.00 0.25 11.00Ceiling 1.00 20.00 5.00 100.00Vertical 4.00 20.00 0.75 60.00

4.00 20.00 0.25 20.00Ceiling 1.00 12.00 4.00 48.00

1.00 13.25 5.00 66.25Ceiling 1.00 31.25 5.50 171.88Vertical 2.00 30.00 0.75 45.00

2.00 30.00 0.25 15.00Ceiling 1.00 12.00 3.50 42.00

1.00 12.00 4.16 49.92Vertical 2.00 12.00 0.75 18.00

2.00 12.00 0.25 6.00

1.00 28.00 4.58 128.24

Page 30: Otis Elevator Final Bill Tender Items

Item No. Description of work Nos Length H/W Total Sft Deduction SqmtrActual BOQ qty

Discussion cabin 1.00 28.00 2.50 70.00Vertical 2.00 28.00 0.75 42.00

2.00 28.00 0.25 14.00

2.00 11.00 0.75 16.50

2.00 11.00 0.25 5.50Ceiling 1.00 20.00 5.50 110.00Vertical 4.00 16.00 0.75 48.00

4.00 16.00 0.25 16.00Vertical 4.00 12.00 0.75 36.00

4.00 12.00 0.25 12.00Ceiling 2.00 12.00 4.16 99.84

1.00 20.16 5.00 100.80

1.00 6.50 18.00 117.00

1.00 31.25 5.00 156.25Vertical 4.00 30.00 0.75 90.00

4.00 30.00 0.25 30.00

4.00 12.00 0.75 36.00

4.00 12.00 0.25 12.00Ceiling 1.00 12.00 4.16 49.92

2.00 12.00 3.50 84.00

1.00 37.00 2.50 92.50

1.00 10.00 1.00 10.00

1.00 12.25 13.00 159.25Vertical 2.00 10.00 0.50 10.00

2.00 4.00 0.50 4.00

2.00 13.00 2.16 56.16Deduction for grid 1.00 4.00 10.00 40.00Reception to admin entry 1.00 12.25 2.16 26.46

1.00 12.25 5.66 69.34VIP & GM cabin centre cabin 1.00 15.25 10.25 156.31Electrical panel front ceiling 1.00 14.58 9.66 140.84Vertical 1.00 22.50 1.00 22.50Discussion room gypsum ceiling 1.00 26.75 6.00 160.50

1.00 26.75 1.50 40.13Deduction Colum 2.00 2.50 2.50 12.50

1.00 9.00 26.00 234.00Vertical 4.00 20.00 1.50 120.00

4.00 20.00 0.50 40.00

4.00 10.00 1.50 60.00

4.00 10.00 0.50 20.00Ceiling 2.00 4.25 10.00 85.00

2.00 4.00 10.00 80.00Paneling side 1.00 1.75 13.50 23.63VIP cabin 1 1.00 14.00 20.42 285.88Vertical 2.00 10.00 0.50 10.00

2.00 6.00 0.50 6.00

1.00 21.00 1.00 21.00

1.00 5.50 0.58 3.19

1.00 9.58 0.58 5.56

1.00 9.00 0.58 5.22Deduction for grid 1.00 10.00 6.00 60.00Deduction column 1.00 2.66 2.00 5.32

1.00 2.00 2.00 4.00VIP cabin 2 1.00 14.00 20.42 285.88Vertical 2.00 10.00 0.50 10.00

2.00 6.00 0.50 6.00

Admin block reception entry double door above ceiling

Page 31: Otis Elevator Final Bill Tender Items

Item No. Description of work Nos Length H/W Total Sft Deduction SqmtrActual BOQ qty

1.00 21.00 1.00 21.00

1.00 5.50 0.58 3.19

1.00 9.58 0.58 5.56Deduction for grid 1.00 10.00 6.00 60.00

1.00 9.00 0.58 5.22Deduction column 1.00 2.66 2.00 5.32

1.00 2.00 2.00 4.00GM cabin 1.00 10.75 11.25 120.94Vertical 2.00 6.00 0.50 6.00

2.00 8.00 0.50 8.00Deduction for grid 1.00 6.00 8.00 48.00GM cabin 2 1.00 11.00 11.58 127.38Vertical 1.00 6.00 0.50 3.00

2.00 8.00 0.50 8.00Deduction column 1.00 1.50 2.00 3.00Deduction for Grid 1.00 6.00 8.00 48.00Cabin 3 6.00 11.00 11.75 775.50Vertical 12.00 8.00 0.50 48.00

12.00 6.00 0.50 36.00Deduction for Grid 1.00 6.00 8.00 48.00Meeting room 1.00 15.16 11.58 175.55Vertical 2.00 10.00 0.50 10.00

2.00 6.00 0.50 6.00

1.00 15.16 0.66 10.01

1.00 119.50 0.75 89.63Deduction for grid 1.00 10.00 6.00 60.00Pantry utility 1.00 9.00 16.66 149.94Vertical 2.00 6.00 0.50 6.00

2.00 2.00 0.50 2.00

1.00 11.00 4.00 44.00Liphro Graphic room 1.00 13.75 8.00 110.00

Vertical 1.00 6.00 0.50 3.00

1.00 2.00 0.50 1.00Record room 1.00 18.50 14.00 259.00Vertical 4.00 6.00 0.50 12.00

4.00 2.00 0.50 4.00Pantry 1.00 16.00 8.72 139.52Vertical 2.00 6.00 0.50 6.00

2.00 2.00 0.50 2.00Door above vertical 1.00 3.00 1.25 3.75Reception to admin block workstation area 1.00 73.00 6.58 480.34

1.00 4.00 2.00 8.00Vertical 1.00 71.00 0.50 35.50

1.00 6.00 1.00 6.00

1.00 64.66 2.50 161.65

1.00 64.66 4.00 258.64

1.00 30.00 2.00 60.00

2.00 30.00 6.00 360.00

1.00 30.00 4.82 144.60

1.00 14.00 1.50 21.00Vertical 6.00 30.00 0.75 135.00

6.00 30.00 0.25 45.00

2.00 12.00 0.75 18.00

2.00 12.00 0.25 6.00

2.00 8.00 0.75 12.00

2.00 8.00 0.25 4.00

Page 32: Otis Elevator Final Bill Tender Items

Item No. Description of work Nos Length H/W Total Sft Deduction SqmtrActual BOQ qty

2.00 28.00 0.75 42.00

2.00 28.00 0.25 14.00

1.00 35.00 0.50 17.50Ceiling 1.00 38.00 4.50 171.00Double height area (Sky Light area) 1.00 62.00 3.00 186.00Vertical 1.00 62.00 0.50 31.00

1.00 63.00 3.50 220.50Slope Ceiling 1.00 63.00 8.00 504.00

1.00 63.00 5.00 315.00Vertical 1.00 63.00 0.50 31.50

1.00 63.00 1.00 63.00Ceiling 1.00 2.25 63.00 141.75Deduction for Colum 3.00 2.25 2.25 15.19Vertical 1.00 63.00 3.83 241.29

1.00 47.00 3.83 180.01

1.00 47.00 1.16 54.52

1.00 39.00 2.50 97.50

1.00 2.25 11.00 24.75

1.00 63.00 1.34 84.42Double high area Ceiling 1.00 61.00 60.50 3690.50Glazing side Vertical 1.00 42.00 2.50 105.00

1.00 39.00 1.00 39.00Deduction of grid 2.00 28.00 22.00 1232.00Vertical 4.00 28.00 0.75 84.00

4.00 28.00 0.25 28.00

4.00 22.00 0.75 66.00

4.00 22.00 0.25 22.00External vertical 4.00 28.00 0.50 56.00

4.00 22.00 0.50 44.00

1.00 38.00 2.50 95.00Vertical 1.00 4.00 2.50 10.00

1.00 11.00 2.50 27.50Gents toilet ceiling 1.00 28.00 22.00 616.00Vertical 1.00 22.00 2.50 55.00

4.00 16.00 0.50 32.00Deduction for grid 1.00 16.00 16.00 256.00Deduction for wall 1.00 6.66 12.25 81.59Ladies toilet entrance ceiling 1.00 12.33 8.50 104.81Vertical 4.00 6.00 0.50 12.00

4.00 2.00 0.50 4.00Deduction for grid 2.00 6.00 2.00 24.00Handicapped toilet 1.00 8.75 8.25 72.19Vertical 1.00 6.00 3.00 18.00

2.00 6.00 0.50 6.00

2.00 4.00 0.50 4.00Deduction for Grid 1.00 6.00 4.00 24.00Ladies toilet 1.00 21.50 10.75 231.13Vertical 2.00 8.00 0.50 8.00

2.00 16.00 0.50 16.00Deduction for grid 1.00 16.00 8.00 128.00Vertical 1.00 10.75 3.00 32.25VIP toilet change room 1.00 11.16 5.00 55.80Vertical 2.00 8.00 0.50 8.00

2.00 2.00 0.50 2.00Deduction for grid 1.00 8.00 2.00 16.00

Double height area AC grill cutting and refixing of gypsum board

Page 33: Otis Elevator Final Bill Tender Items

Item No. Description of work Nos Length H/W Total Sft Deduction SqmtrActual BOQ qty

Wash room 1.00 10.25 9.00 92.25

1.00 2.25 3.25 7.31

1.00 6.33 4.16 26.33Vertical 1.00 4.00 0.50 2.00

1.00 8.00 0.50 4.00Ladies Wash Room 1.00 6.50 4.00 26.00

1.00 11.00 5.00 55.00Deduction 1.00 2.00 4.25 8.50Deduction for Grid 1.00 2.00 2.00 4.00VIP toilet utility ceiling 1.00 9.66 4.08 39.41Deduction for wall 1.00 4.25 0.75 3.19Deduction for Grid 1.00 2.00 2.00 4.00Reception to admin entry corridor 1.00 11.25 9.00 101.25Slope Ceiling 1.00 5.50 7.00 38.50

1.00 14.50 5.50 79.75Vertical 1.00 14.50 3.25 47.13

1.00 7.00 1.50 10.50

1.00 3.50 1.00 3.50

1.00 7.75 2.75 21.31

1.00 5.00 1.00 5.00Ceiling 1.00 9.00 11.83 106.47

1.00 13.50 1.50 20.25Vertical 1.00 6.00 0.75 4.50

1.00 7.50 1.00 7.50

1.00 11.83 0.50 5.92lift front ceiling 1.00 25.25 6.75 170.44

2.00 31.00 3.00 186.00

1.00 20.00 3.00 60.00Vertical 2.00 20.00 0.75 30.00

2.00 28.00 0.75 42.00

2.00 20.00 0.25 10.00

2.00 28.00 0.25 14.00Deduction 1.00 1.50 2.50 3.75Deduction for grid 1.00 20.00 28.00 560.00Vertical 1.00 23.00 2.50 57.50Ladies toilet entry ceiling 1.00 12.66 13.75 174.08Vertical 1.00 13.75 1.00 13.75Display above vertical 1.00 1.34 14.00 18.76

1.00 1.08 12.00 12.96Reception front ceiling 1.00 45.00 3.82 171.90Vertical 2.00 45.00 1.00 90.00

1.00 11.25 3.00 33.75

1.00 1.50 11.25 16.88

1.00 3.00 1.50 4.50

1.00 11.25 0.25 2.81

1.00 3.00 0.25 0.75Ceiling 1.00 12.00 3.00 36.00Vertical 1.00 12.00 2.00 24.00

1.00 12.00 0.25 3.00

1.00 26.00 0.50 13.00

1.00 46.00 6.66 306.36Vertical 2.00 46.00 2.00 184.00

1.00 46.00 0.34 15.64

1.00 7.00 1.00 7.00

1.00 3.00 1.00 3.00

1.00 3.00 0.34 1.02

Page 34: Otis Elevator Final Bill Tender Items

Item No. Description of work Nos Length H/W Total Sft Deduction SqmtrActual BOQ qty

1.00 20.00 2.00 40.00Reception to factory entry 1.00 12.00 8.00 96.00Vertical 1.00 12.00 2.00 24.00

1.00 8.00 2.00 16.00

1.00 11.00 0.34 3.74

1.00 8.00 0.34 2.72Ceiling 1.00 18.00 6.58 118.44

1.00 4.16 3.58 14.89

2.00 44.00 4.00 352.00

2.00 44.00 2.00 176.00

2.00 44.00 0.34 29.92

2.00 10.00 2.00 40.00

2.00 10.00 0.34 6.80Glass Partition near ceiling 1.00 15.50 6.16 95.48Vertical 1.00 15.50 1.00 15.50Factory entry side 1.00 16.50 16.50 272.25

4.00 8.00 0.34 10.88Vertical 1.00 3.00 16.00 48.00

1.00 5.00 0.75 3.75

1.00 3.00 2.00 6.00Deduction for grid 1.00 8.00 8.00 64.00Reception back side vertical 1.00 22.00 3.66 80.52Reception area deduction for grid (1x4) 1.00 45.00 8.00 360.00

1.00 11.50 4.00 46.00

1.00 3.00 8.00 24.00

2.00 7.00 8.00 112.00

1.00 3.00 8.00 24.00

1.00 44.00 4.00 176.00Board room 1.00 21.58 38.00 820.04Slope Vertical 2.00 3.75 32.00 240.00

2.00 2.50 32.00 160.00Vertical 2.00 32.00 1.16 74.24

2.00 10.00 1.16 23.20

2.00 31.00 0.34 21.08

2.00 9.00 0.34 6.12

2.00 3.00 2.00 12.00Deduction for grid 1.00 32.00 10.00 320.00Board room inside room 1.00 12.00 6.00 72.00Sky light area board replacement 2.00 40.00 6.50 520.00

2.00 18.00 3.50 126.00Vertical 2.00 18.00 3.50 126.00

1.00 38.00 4.00 152.00

1.00 27.00 4.00 108.00

1.00 14.00 2.00 28.00

1.00 4.00 12.00 48.00Ceiling 1.00 5.00 12.00 60.00Reception display entry area door up 1.00 5.00 4.00 20.00Board room and training room entry area 1.00 23.00 9.00 207.00Deduction or grid 1.00 8.00 8.00 64.00Vertical 4.00 8.00 0.75 24.00

1.00 1.10 23.00 25.30Ceiling 1.00 2.60 3.00 7.80Board room up area ceiling 1.00 4.00 28.00 112.00Vertical 1.00 8.00 7.00 56.00

1.00 6.00 7.00 42.00

1.00 11.00 6.00 66.00

Page 35: Otis Elevator Final Bill Tender Items

Item No. Description of work Nos Length H/W Total Sft Deduction SqmtrActual BOQ qty

1.00 11.00 2.50 27.50

1.00 4.00 0.60 2.40Board AC tight above ceiling 1.00 51.00 4.00 204.00

1.00 30.00 4.00 120.00Pelmet area glossing above pelmet side vertical 1.00 64.00 0.60 38.40Ladies toilet front 1.00 4.00 3.00 12.00

1.00 4.00 2.50 10.00Admin entry area 1.00 12.00 4.50 54.00GM and VIP cabin center ceiling area 2.00 10.00 14.00 280.00

30828.44 3304.30Less Deductions -3304.30Total 27524.14 2558.01

3.1.2 First Floor 296.41

First floor test tower

Fixed Glazed Above 1.00 12.00 1.00 12.00

1.00 5.00 2.00 10.00

1.00 21.00 6.00 126.00

1.00 21.00 3.50 73.50

1.00 5.00 3.50 17.50

1.00 13.00 3.50 45.50Vertical 1.00 4.00 4.00 16.00Display Area 1.00 4.00 3.50 14.00west side 1.00 30.67 4.83 148.14

1.00 1.25 8.00 10.00Vertical 1.00 8.00 0.75 6.00

1.00 8.00 0.25 2.00Corridor 1.00 46.00 3.16 145.36

Vertical 1.00 46.00 0.75 34.50

1.00 46.00 0.25 11.50

1.00 8.00 2.16 17.28Vertical 1.00 8.00 0.75 6.00

1.00 8.00 0.25 2.00Sunlight side 1.00 16.00 2.16 34.56

1.00 16.00 0.75 12.00

1.00 16.00 0.25 4.00

1.00 30.50 5.42 165.31Vertical 1.00 34.00 3.16 107.44

1.00 10.00 1.83 18.30

1.00 26.00 0.75 19.50

1.00 26.00 0.25 6.50

1.00 16.00 0.75 12.00

1.00 16.00 0.25 4.00First Board Room Staircase Area, Vertical 1.00 8.00 7.00 56.00

1.00 6.00 7.00 42.00

1.00 6.00 10.00 60.00

1.00 7.00 2.50 17.50

1.00 22.00 4.00 88.00Board Room t Training room sitting area 1.00 22.50 20.00 450.00Vertical 1.00 1.75 22.50 39.38

4.00 8.00 0.66 21.12

1.00 0.33 6.00 1.98Board Room wooden partition above gypsum closing 1.00 49.00 4.00 196.00

1.00 30.00 4.00 120.00Board room sitting area ceiling 1.00 30.00 16.50 495.00Vertical 2.00 28.00 0.50 28.00

Page 36: Otis Elevator Final Bill Tender Items

Item No. Description of work Nos Length H/W Total Sft Deduction SqmtrActual BOQ qty

2.00 28.00 0.25 14.00

2.00 9.00 0.50 9.00

2.00 9.00 0.25 4.50Project ceiling 2.00 24.00 0.50 24.00

2.00 9.00 0.50 9.00Deduction for Grid 1.00 24.00 6.00 144.00Staircase area 1.00 21.25 13.50 286.88Vertical 1.00 7.00 13.50 94.50Corridor 1.00 8.25 67.75 558.94Board room ceiling 1.00 52.25 28.50 1489.13Project ceiling 2.00 34.00 0.50 34.00

2.00 14.00 0.50 14.00Vertical 2.00 34.00 0.50 34.00

2.00 14.00 0.50 14.00

2.00 34.00 0.25 17.00

2.00 14.00 0.25 7.00Deduction for grid 1.00 34.00 14.00 476.00Glazing side vertical 1.00 28.25 1.83 51.70

1.00 28.25 0.50 14.13VIP Canteen 1.00 6.50 2.00 13.00

1.00 6.50 1.50 9.75

1.00 3.00 4.00 12.00Vertical 2.00 6.50 0.33 4.29VIP Canteen Gypsum cove 1.00 28.00 1.50 42.00Cove inside vertical 1.00 28.00 0.25 7.00North Side Ceiling 1.00 68.58 3.92 268.83Vertical 4.00 10.00 1.50 60.00

4.00 10.00 0.34 13.60

2.00 28.00 1.60 89.60

2.00 28.00 0.34 19.04Cove 1.00 21.75 1.50 32.63Inside vertical Cove 1.00 21.75 0.34 7.40Pump room glazing side 1.00 28.00 7.08 198.24Vertical 2.00 22.00 1.50 66.00

2.00 22.00 0.34 14.96Wash basin entry above 1.00 6.50 3.00 19.50Glass Partition ceiling 1.00 8.16 30.50 248.88Wash Basing wall side 1.00 3.00 6.50 19.50

1.00 7.34 30.00 220.20

1.00 3.00 2.00 6.00Vertical 4.00 30.00 1.50 180.00

4.00 30.00 0.34 40.80

1.00 42.25 3.75 158.44

1.00 42.25 2.50 105.63Trapdoor side ceiling 1.00 2.00 30.00 60.00Vertical 1.00 1.50 30.00 45.00

1.00 0.50 30.00 15.00VIP canteen toilet & wash area 1.00 5.92 7.00 41.44Deduction for grid 1.00 2.00 2.00 4.00Vertical 4.00 2.00 0.25 2.00

1.00 5.58 7.16 39.95Deduction for grid 1.00 2.00 2.00 4.00Vertical 4.00 2.00 0.25 2.00Sunlight area Glazing side cove 1.00 3.00 44.00 132.00Ceiling 1.00 43.00 5.00 215.00Slop ceiling 1.00 38.00 5.00 190.00

Page 37: Otis Elevator Final Bill Tender Items

Item No. Description of work Nos Length H/W Total Sft Deduction SqmtrActual BOQ qty

Vertical 1.00 35.00 4.00 140.00Glazing side 1.00 60.75 3.50 212.63

1.00 55.75 5.00 278.75Slop ceiling 1.00 52.00 5.00 260.00Vertical 1.00 52.00 5.00 260.00Colum 7.00 2.50 1.75 30.63Wash basin areas ceiling 1.00 14.67 11.92 174.87Deduction column 1.00 8.00 12.00 96.00Deduction column 1.00 2.50 1.50 3.75Add 1.00 40.00 0.75 30.00Tress work area sunlight side ceiling 1.00 4.50 43.00 193.50Vertical 1.00 52.00 0.34 17.68

1.00 40.00 0.34 13.60

1.00 40.00 1.25 50.00

1.00 8.34 35.34 294.74Vertical 1.00 35.34 0.34 12.02

2.00 42.00 0.34 28.56

2.00 42.00 1.25 105.00Glazing side 1.00 18.00 3.00 54.00Vertical 1.00 18.00 1.00 18.00

1.00 18.00 0.34 6.12

1.00 6.00 46.00 276.00Vertical 1.00 40.00 1.25 50.00

1.00 40.00 0.34 13.60Factory side ceiling 1.00 4.42 42.00 185.64Vertical 1.00 38.00 1.25 47.50

1.00 38.00 0.34 12.92Glazing side ceiling 1.00 18.00 1.75 31.50

1.00 18.00 1.58 28.44

1.00 18.00 0.50 9.00

1.00 2.00 14.00 28.00

1.00 14.00 0.50 7.00

1.00 6.00 1.25 7.50

1.00 6.00 1.58 9.48

1.00 6.00 0.50 3.00

10864.95 723.75Less Deductions -723.75Total 10141.20 942.49

Mineral Fiber False ceiling

3.2

General requisites :

Tile Specification :

Tile Type : Lay - in ceiling type.

Providing & Installing Commercial type suspended modular ceiling consisting of

Tiles : Rock Wool based Mineral Fiber ( Wet Felt bounded ) & Not Glass Wool.

Grids : FineLine ( Silhouette ) White / Black - 15 mm wide flat with BLACK groove grids finished in approved shade.

The main runners & cross Tees to have " Click " Installation system made of Corrosion - protected high tensile steel or approved equivalent.

Page 38: Otis Elevator Final Bill Tender Items

Item No. Description of work Nos Length H/W Total Sft Deduction SqmtrActual BOQ qty

Edge Detail : VT - 15, Recessed Beveled Edge

Light Reflectance : upto 90%.

Humidity Resistance : 90%.

Colour : White Similar to RAL 9010.

Class A2 as per DIN 4102 Part 1.

Smoke Developed = 0 & Flame Spread = 5.

Thermal Conductivity : 0.052 - .057 W/mK

Thickness/Weight : 2.4 Kg/m2

Metal Grid member sizes :

Fineline ( Silhouette ) White / Black 15MM

Main Runners ( 3000mm ) : 15 * 38 * 0.30

Long Cross Tee ( 1200mm ) : 15 * 32 * 0.30

Short Cross Tee ( 600mm ) : 15 * 32 * 0.30

Perimeter Section ( 3000mm ) : 19 * 22 * 0.40

Ceiling Suspension System ( Installation ) :

3.2.1

3.2.1.1 Ground Floor QRO

Admin block 2.00 32.00 12.00 768.00

2.00 30.00 12.00 720.00VIP cabin front 1.00 6.00 24.00 144.00

1.00 20.00 12.00 240.00

1.00 8.00 20.00 160.00

1.00 30.00 12.00 360.00

2.00 16.00 12.00 384.00

2.00 30.00 12.00 720.00

1.00 12.00 30.00 360.00

600 * 600 * 15 mm thickness, Smooth Finish Rock Wool Mineral Fibre Tile.

Surface Burning Characteristics : Class1, BS 476:Part 7:1987.

Tile Name : Thermatex THERMOFON / ECOPHON / ROCKPHON.

Proprietary supplied ceiling suspension system to

consist of 4mm GI suspension rod/wire with

adjustable Butterfly Clip of 4mm dia securely affixed

to structural ceiling using 10mm dia hook type anchor

fastener . Ceiling Suspension System to be fixed at

interval ( grid ) of 600 mm in both direction .Proprietary supplied ceiling suspension system to consist of Main Runners @ 1200mm and joined by Cross Tees @ 600mm to form overall grid opening of 600mm * 600mm centre to centre. Additional cross tees are to be placed where appropriate for light fixtures, AC diffusers etc. The Grid system shall be hot dipped galvanized steel sections, with exposed surfaces chemically cleaned and capped prefinished in high - gloss polyester enamel with two coat system on cold rolled steel. False ceiling will be measured on horizontal plane only. Horizontal plane measurements are to be inclusive of all vertical drops, edge moldings, fascia's, etc.All extra tiles occupied by lights and diffusers to be

returned to owner.Rate quoted to include all cut - outs required for light

fixtures, smoke detectors and other services cut - outs

complete as directed by Architect.NRC ( Absorption ) : Not less than 0.90 (Conference room / Board room & Training room)

Page 39: Otis Elevator Final Bill Tender Items

Item No. Description of work Nos Length H/W Total Sft Deduction SqmtrActual BOQ qty

1.00 28.00 30.00 840.00

1.00 8.00 30.00 240.00

Page 40: Otis Elevator Final Bill Tender Items

Item No. Description of work Nos Length H/W Total Sft Deduction SqmtrActual BOQ qty

Discussion room front 2.00 20.00 10.00 400.00VIP cabin 2.00 10.00 6.00 120.00GM cabin 8.00 6.00 8.00 384.00Meeting room 1.00 10.00 6.00 60.00UPS room 1.00 10.33 15.33 158.36Electrical room 1.00 10.33 11.00 113.63Server room 1.00 16.00 11.00 176.00Utility 1.00 6.00 2.00 12.00Record room 2.00 6.00 2.00 24.00Reprographic room 1.00 6.00 2.00 12.00Pantry 1.00 6.00 2.00 12.00Double Height area 2.00 24.00 22.00 1056.00Add offset portion 2.00 4.00 10.00 80.00Gents toilet 1.00 16.00 16.00 256.00Ladies toilet entry 2.00 6.00 2.00 24.00

Handicap toilet 1.00 6.00 4.00 24.00Ladies toilet 1.00 16.00 8.00 128.00VIP toilet 1.00 8.00 2.00 16.00

1.00 4.00 8.00 32.00

2.00 2.00 2.00 8.00Factory entry side 1.00 8.00 8.00 64.00Board room 1.00 32.00 10.00 320.00Test tower ground floor 1.00 46.00 8.00 368.00

1.00 8.00 18.00 144.00

1.00 18.00 16.00 288.00

1.00 12.00 8.00 96.00Electrical room 1.00 18.00 7.00 126.00Utility 1.00 4.00 4.00 16.00FED office 1.00 34.00 20.00 680.00Total 10133.99 941.82

3.2.1.2 First Floor 175.46

Test tower 1.00 46.00 8.00 368.00

1.00 8.00 18.00 144.00

1.00 16.00 18.00 288.00Board room 1.00 34.00 14.00 476.00Sitting area 1.00 24.00 6.00 144.00VIP canteen 1.00 22.00 10.00 220.00

1.00 30.00 10.00 300.00

1.00 28.00 30.00 840.00Wash Basin Area 1.00 12.00 8.00 96.00UPS Electrical room corridor 1.00 10.33 4.00 41.32Admin Entry 1.00 10.00 4.00 40.00VIP toilet 2.00 2.00 2.00 8.00Tress work area 1.00 42.00 40.00 1680.00Total 4645.32 431.72

3.2.2

3.2.2.1 Ground Floor3.2.2.2 First Floor

NRC ( Absorption ) : Not less than 0.50 (Workstation and other area)

GI SLATS - 150MM x 1200MM metal false ceiling

Page 41: Otis Elevator Final Bill Tender Items

Item No. Description of work Nos Length H/W Total Sft Deduction SqmtrActual BOQ qty

3.3

3.3.1 Ground Floor3.3.2 First Floor

GI PERFORATED TILES - 600MM x 600MM

Supplying and installing acoustical & fire retardant tile ceiling system comprising of tiles 150mm x 1200 mm long fabricated from 0.90mm GI sheet. The tile shall be chemically treated and painted with electrostatic powder coating on outer surface. It shall be suspended with the frame work etc., complete from the slab, beams etc. by means of 4mm dia G.I. rods, G.I. snap bar at 1200 mm center to center . G.I. snap couplings, aluminium snap bar hanger, G.I. edge profile etc. (No deduction shall be given for light area, air duct opening area, return air slit area pelmets & columns beams etc.,) Make:- Armstrong / USG / Hunter Douglas / Fameline / Daikin.

The suspension system shall consist of 4 mm dia G.I. rod, spring steel clip, snap bar hanger 1.15 mm thick G.I. sheet height 80 mm X 26 mm snap bar 0.35 mm thick Galvanized sheet 27 mm X 2440 mm . G.I snap coupling size 220 mm in length X height 27 mm and pressure clip 1.10 mm thick galvanized sheet 35 mm X 30 mm. The edge profile shall be 18 mm X 20 mm fabricated from 0.5 mm thick G.I. sheets.

Page 42: Otis Elevator Final Bill Tender Items

Item No. Description of work Nos Length H/W Total Sft Deduction SqmtrActual BOQ qty

3.4

3.4.1 Ground Floor3.4.2 First Floor

3.5

3.5.1 Ground Floor3.5.2 First Floor

3.6

SUB TOTAL OF FALSE CEILING

4 PAINTING

4.1

4.1.1 Ground Floor 906.00

Admin Block 1.00 9.00 12.25 110.25Colum 17.00 1.25 9.34 198.48Double height entry 1.00 4.66 9.00 41.94

1.00 1.00 6.16 6.16

1.00 1.50 65.75 98.63

1.00 4.50 9.00 40.50Discussion room 1.00 1.00 24.00 24.00Sky light area 1.00 63.00 5.00 315.00Gents toilet 1.00 33.00 2.50 82.50

3.00 22.00 2.50 165.00

Supplying and installing acoustical & fire retardant tile ceiling system comprising of tiles 600 mm x 600 mm long fabricated from 0.90mm GI sheet. The tile shall be chemically treated and painted with electrostatic powder coating on outer surface. It shall be suspended with the frame work etc., complete from the slab, beams etc. by means of 4mm dia G.I. rods, G.I. snap bar at 600 mm center to center . G.I. snap couplings, aluminium snap bar hanger, G.I. edge profile etc. (No deduction shall be given for light area, air duct opening area, return air slit area pelmets & columns beams etc.,) Make:- Armstrong / USG / Hunter Douglas / Fameline / Daikin.

The suspension system shall consist of 4 mm dia G.I. rod, spring steel clip, snap bar hanger 1.15 mm thick G.I. sheet height 80 mm X 26 mm snap bar 0.35 mm thick Galvanized sheet 27 mm X 2440 mm . G.I snap coupling size 220 mm in length X height 27 mm and pressure clip 1.10 mm thick galvanized sheet 35 mm X 30 mm. The edge profile shall be 18 mm X 20 mm fabricated from 0.5 mm thick G.I. sheets.

Providing and fixing PVC sintex tiles for false ceiling as per manufacturer's specification, etc all complete in Toilets.

Providing and fixing 6mm thick commercial ply backing of size 600mm X 600mm on mineral fiber modular false ceiling tiles to support light fitting, speakers, CCTV cameras, diffuser of grid work size with necessary cut outs for the same, etc., all complete.

Punning with Minimum 6mm thick layer of super fine plaster of Paris (anhydrous gypsum) applied over selected surface (Both curved and plain surfaces) on walls and columns finished smooth. Surface to be to plumb and square. Surface prepared by hacking and applying a coat of slurry if required.

Page 43: Otis Elevator Final Bill Tender Items

Item No. Description of work Nos Length H/W Total Sft Deduction SqmtrActual BOQ qty

Ladies toilet entrance 1.00 42.75 9.00 384.75Deductions 1.00 4.00 7.00 28.00

1.00 7.00 3.00 21.00

1.00 2.50 7.00 17.50

1.00 2.50 6.00 15.00

1.00 3.75 7.00 26.25Handicap toilet 1.00 34.25 2.50 85.63Ladies toilet 2.00 21.50 2.50 107.50

2.00 10.75 2.50 53.75VIP toilet 1.00 32.33 3.00 96.99Wash room 1.00 47.00 2.50 117.50Ladies wash room 1.00 18.00 2.50 45.00

1.00 29.00 2.00 58.00Reception 2.00 10.00 1.00 20.00

1.00 1.50 8.00 12.00Board room 1.00 2.00 8.00 16.00

1.00 2.50 10.00 25.00

1.00 2.75 10.00 27.50

1.00 2.50 9.00 22.50Glass door side 2.00 2.00 8.00 32.00Board room inside room 2.00 6.00 9.00 108.00

2.00 12.00 9.00 216.00Deduction for door 1.00 3.00 7.00 21.00

2510.57 128.75Less Deductions -128.75Total 2381.82 221.36

4.1.2 First Floor 657.00

VIP canteen sky light area 1.00 60.00 7.00 420.00

1.00 44.00 7.00 308.00

7.00 3.00 2.50 52.50

1.00 4.50 9.00 40.50

1.00 3.50 9.00 31.50Toilet 1.00 25.00 2.50 62.50

1.00 24.00 2.50 60.00Training Room Side 1.00 12.25 9.00 110.25Total 1085.25 100.86

4.2

4.2.1 Ground Floor 906.00

admin Block workstation area 1.00 25.00 10.00 250.00

1.00 23.00 2.50 57.50Coolum 17.00 1.25 9.34 198.48Discussion room wall 1.00 23.50 9.00 211.50GM cabin 1.00 119.50 9.25 1105.38Deduction for window 7.00 6.42 4.83 217.06Electrical pane side 7.00 16.00 10.00 1120.00Deduction for door 1.00 4.00 7.00 28.00UPS room entry corridor 2.00 11.25 11.00 247.50

Painting internal plastered surfaces with two or more coats of super acrylic emulsion paint of approved brand and colour (Berger or Asian or equivalent) to give an even shade with required finish over a coat of water thinnable cement primer including cleaning the surfaces, filling the crevices with approved filler, scaffolding, etc.,complete all as per specifications.

Page 44: Otis Elevator Final Bill Tender Items

Item No. Description of work Nos Length H/W Total Sft Deduction SqmtrActual BOQ qty

Deduction for door 2.00 4.00 7.25 58.00Deduction for door 1.00 4.83 4.00 19.32Deduction for door 1.00 4.00 2.00 8.00Hub room side wall 1.00 16.00 4.00 64.00Utility 1.00 26.42 10.00 264.20Deduction for door 3.00 3.33 7.00 69.93

1.00 4.00 6.00 24.00

1.00 6.00 5.00 30.00

1.00 2.16 10.00 21.60

1.00 2.75 10.00 27.50

1.00 4.00 5.00 20.00Reprographic rom 2.00 13.75 9.25 254.38

2.00 8.00 9.25 148.00Deduction for door 1.00 3.25 7.00 22.75Deduction 1.00 1.16 3.25 3.77Record room 2.00 18.50 9.25 342.25

2.00 13.75 9.25 254.38Deduction for door 1.00 3.25 7.00 22.75

1.00 1.16 3.25 3.77Pantry 2.00 16.00 9.25 296.00

2.00 8.75 9.25 161.88

1.00 1.16 3.25 3.77Deduction for door 2.00 3.25 7.00 45.50Deduction for tile 1.00 2.50 20.00 50.00Admin Block reception back wall 1.00 32.00 10.00 320.00Double height area (AC duct) 1.00 8.50 22.00 187.00

1.00 2.50 12.00 30.00

1.00 2.83 9.00 25.47Entrance 2.00 5.25 16.00 168.00

1.00 4.66 24.00 111.84AC duct 1.00 7.00 22.00 154.00

1.00 5.00 12.00 60.00Double height Wall 1.00 11.00 40.00 440.00

1.00 1.50 65.75 98.63

1.00 1.00 24.00 24.00Skylight area 1.00 63.00 5.00 315.00

1.00 13.00 14.00 182.00Gents toilet 1.00 33.00 2.50 82.50

1.00 22.00 2.50 55.00Ladies toilet entrance 1.00 42.75 9.00 384.75Deductions 1.00 4.00 7.00 28.00Deductions 1.00 7.00 3.00 21.00Deductions 1.00 2.50 7.00 17.50Deductions 1.00 2.50 6.00 15.00Deductions 1.00 3.75 7.00 26.25Toilet front wall electrical panel side 1.00 13.66 8.50 116.11

1.00 11.75 8.50 99.88Deduction 1.00 6.66 7.00 46.62Deduction for door 1.00 3.25 7.00 22.75

1.00 40.00 8.50 340.00Deduction for door 23.00 4.00 7.00 644.00Handicapped toilet 1.00 34.25 2.50 85.63Ladies toilet 2.00 10.75 2.50 53.75VIP toilet 1.00 32.33 3.00 96.99Wash room 1.00 47.00 2.50 117.50Ladies wash room 1.00 18.00 2.50 45.00

Page 45: Otis Elevator Final Bill Tender Items

Item No. Description of work Nos Length H/W Total Sft Deduction SqmtrActual BOQ qty

1.00 29.00 2.00 58.00Reception 2.00 10.00 1.00 20.00Board room out side 1.00 1.50 8.00 12.00

1.00 2.00 8.00 16.00

1.00 2.50 10.00 25.00

1.00 2.75 10.00 27.50Reception glass door side 1.00 2.50 9.00 22.50Board room inside room 2.00 6.00 9.00 108.00

2.00 12.00 9.00 216.00Deduction for door 1.00 2.50 7.00 17.50Board room 1.00 38.00 10.50 399.00

2.00 21.00 10.00 420.00Deduction for door 1.00 2.50 7.00 17.50

1.00 5.00 10.00 50.00Reception to factory entry wall 1.00 17.00 9.00 153.00

1.00 5.25 9.00 47.25

1.00 3.00 10.00 30.00Staircase below 1.00 21.00 4.00 84.00

1.00 14.00 4.00 56.00

1.00 8.00 3.00 24.00

1.00 13.00 3.00 39.00Future locker room wall 1.00 5.33 8.33 44.40Reception to admin entry area stair case side 1.00 7.33 7.33 53.73

1.00 4.00 7.00 28.00

10420.98 1612.70Less deductions -1612.70Total 8808.28 818.61

4.2.2 First Floor 657.00

Board room Steps side 1.00 4.00 14.00 56.00

1.00 9.50 9.00 85.50

1.00 12.50 31.00 387.50

1.00 4.00 22.00 88.00Ceiling 1.00 4.00 30.00 120.00Landing area 1.00 12.25 9.50 116.38

1.00 4.00 12.00 48.00

1.00 9.50 12.50 118.75

1.00 5.00 25.00 125.00Board room 1.00 4.00 9.00 36.00

1.00 2.00 25.00 50.00VIP canteen 1.00 30.00 9.50 285.00

1.00 17.66 8.00 141.28Toilet front wall 1.00 21.00 9.00 189.00Toilet inside 1.00 25.00 2.50 62.50

1.00 24.00 2.50 60.00Deduction for door 1.00 3.66 7.00 25.62Wash area side 1.00 16.25 9.00 146.25Ceiling 1.00 7.00 13.25 92.75

1.00 25.00 7.50 187.50

1.00 1.00 7.00 7.00Wall 1.00 16.00 9.00 144.00Deduction for window 1.00 6.83 5.00 34.15Wash room entry 1.00 3.00 9.00 27.00

1.00 1.66 14.75 24.49

2.00 12.00 1.66 39.84

2.00 2.50 1.66 8.30

Page 46: Otis Elevator Final Bill Tender Items

Item No. Description of work Nos Length H/W Total Sft Deduction SqmtrActual BOQ qty

Skylight area 1.00 60.00 7.00 420.00

1.00 44.00 7.00 308.00

7.00 3.00 2.50 52.50

1.00 4.50 9.00 40.50

1.00 3.50 9.00 31.50Truss work area 1.00 52.00 9.00 468.00

1.00 43.00 9.00 387.00

4353.53 59.77Less Deductions -59.77Total 4293.76 399.05

4.3

4.3.1 Ground Floor

4.3.2 First Floor

SUB TOTAL OF PAINTING

5 GLAZING WORK

Providing and applying Texture paint of approved colour and shade to GYPSUM partition walls after thoroughly sand papering surfaces to remove dust, dirt, etc., and repairing dents, holes with POP to achieve level surface and finishing with two coats of primer, putty and two coats of paint including cost of material, labour, scaffolding etc., all complete as directed by the Architect's, approval required after each coat.Basic Rate for Texture Paint Rs. 40/- per Sq.ft.

• Rate shall include all accessories as shown in drawing .• Rate shall include all supporting frames also for fixing main frames to partition

• Cost of laminate/veneer mentioned is the maximum cost. It should be inclusive of all materials, taxes, transportation to site, storage, loading-unloading and all taxes, Octroi, duties as applicable.

• All internal wooden framework to be treated with 1 coat of anti-termite coat/paint of approved make as per manufacturer's specifications• The rate for doors to include shutter, finishes all hardware like exposed door closer, locks, hinges, all as per drawings

• All the hardware for the doors to be as per the manufacturers recommendation for the size and application of the door. Patches and floor spring to be as per manufacturers specs. for the type, size and location of door.

Page 47: Otis Elevator Final Bill Tender Items

Item No. Description of work Nos Length H/W Total Sft Deduction SqmtrActual BOQ qty

5.1

5.1.1 Ground Floor 293.65

Discussion room 1.00 5.33 9.50 50.64

1.00 2.00 9.50 19.00Storage above partition 1.00 6.83 11.91 81.35

1.00 5.25 9.50 49.88Deduction for door 1.00 3.25 7.00 22.75 22.75VIP cabin

Corner partition 2.00 4.58 10.33 94.62

2.00 2.58 10.33 53.30

1.00 1.75 9.25 16.19Meeting room factory side 1.00 15.16 10.00 151.60Deduction for door 1.00 3.00 7.00 21.00GM Cabin long partition 1.00 119.50 10.00 1195.00Deduction for door 9.00 3.00 7.00 189.00

5.00 1.75 10.25 89.69Hub room partition 1.00 10.25 7.00 71.75Deduction for double door 1.00 6.00 7.00 42.00Reception area glass partition 1.00 15.50 8.33 129.12Deduction for door 2.00 3.25 7.00 45.50Board room 2.00 15.00 8.25 247.50FED office 1.00 12.16 9.25 112.48Deduction for door 1.00 3.33 7.00 23.31

2384.85 343.56Less Deductions -343.56Total 2041.29 189.71

5.1.2 First Floor 354.70

Board room 1.00 5.50 9.75 53.63

1.00 9.00 9.75 87.75Deduction for double door 1.00 6.00 7.00 42.00

1.00 5.00 10.00 50.00Deduction for door 2.00 3.00 7.00 42.00VIP Canteen 1.00 8.50 9.42 80.07

1.00 7.25 9.42 68.30

1.00 6.50 9.42 61.23Deduction for door 1.00 4.00 7.00 28.00

400.97 112.00

Less Deductions -112.00Total 288.97 26.86

Providing and Fixing toughened glass partitions of 10mm thick with aluminum "U" channel to hold glass at ceiling and floor. The rate to be inclusive of salwood frame above false ceiling to hold glass and gypsum board cladding on sal wood frame work on either side wherever air-tightness is required. Glass divisions to be as per specified in drawings and .all as per architects instructions & drawing.

Page 48: Otis Elevator Final Bill Tender Items

Item No. Description of work Nos Length H/W Total Sft Deduction SqmtrActual BOQ qty

5.2

5.2.1 Ground Floor 45.64

Discussion room 1.00 3.25 7.00 22.75Meeting room 2.00 3.00 7.00 42.00GM cabin 9.00 3.00 7.00 189.00Hub room 1.00 6.00 7.00 42.00VIP cabin 2.00 3.00 7.00 42.00Admin block entry double door 1.00 7.34 7.00 51.38Reception area double door 2.00 3.25 7.00 45.50Future locket room 1.00 7.00 4.00 28.00Display area entry door 1.00 4.00 7.00 28.00

1.00 5.33 8.00 42.64FED office 1.00 3.33 7.00 23.31Total 556.58 51.73

5.2.2 First Floor 25.80

Board door 1.00 6.00 7.00 42.00

2.00 3.00 7.00 42.00VIP canteen 1.00 4.00 7.00 28.00Total 112.00 10.41

5.3

5.3.1

5.3.1.1 Ground Floor

5.3.1.2 First Floor

SUB TOTAL OF GLAZING WORK

6 FIXED FURNITURES and STORAGES

Note:

Supplying and fixing Fully openable Patch fitting frame less glass door of 'DORMA' 'PT' rage fittings or equivalent to get a clear height upto 2500mm with top & side fixed panels. In general, the door cum fixed panel consists of corner fittings SM1090/91, Top pivot PT 24, Top patch PT 20, Bottom patch PT 10, with BTS 75 EN 1-4 Floor spring with SS cover plate, Standard spindle, corner lock at top & bottom, Euro profile cylinder with 3 keys, lock strike plate US 10 and 12mm thick clear toughened glass with etching as per design and all confirming to manufactures specification. SS fixtures shall confirm Grade SS 304 to BS 7352. (Rate shall include for providing glass fin to support the patch fitting door, transport charges, handling, loading, unloading, installation, and all necessary hard wares, structural supports if any, etc,) complete and all as per manufactures specification and direction of Engineer-in-charge.

Providing and fixing set of Stainless steel (SS 304 or 316 grade) from the makes of "KITCH / SEVAX / EPCO / DORMA" or equivalent with necessary stainless steel screws etc. complete:

Pull handle set (set of two handles) one on each side of door 'D' shape of size 22mm dia x 300mm long.

• Cost of laminate/veneer mentioned is the maximum cost. It should be inclusive of all materials, taxes, transportation to site, storage, loading-unloading and all taxes, Octroi, duties as applicable.

Page 49: Otis Elevator Final Bill Tender Items

Item No. Description of work Nos Length H/W Total Sft Deduction SqmtrActual BOQ qty

• Tower bolts will be fitted on shutters without locks

6.1

6.2

6.2.1 24.00

VIP toilet 1.00 7.34 3.00 22.02Gents toilet 1.00 4.00 7.00 28.00Vip Cafeteria 1.00 2.50 4.00 10.00Total 60.02 5.58

6.2.2 Storage (400mm deep and 2100mm high) 42.00

1.00 4.08 8.16 33.29

1.00 4.00 5.25 21.00Total 54.29 5.05

6.2.3 Pantry Storage Unit( above counter) 6.00

1.00 16.00 2.66 42.56

1.00 8.00 2.00 16.00Total 58.56 5.44

6.2.4 Pantry Storage Unit( below counter) 4.80

1.00 16.00 2.58 41.28Total 41.28 3.84

6.3

6.4

Board room Table (Shaped table)

• All internal wooden framework to be treated with 1 coat of anti-termite coat/paint of approved make as per manufacturer's specifications• All locks within individual work spaces to be matched

• All lockable shutters to be provided with magnetic ball catches

Providing and finishing tiered steps in 19mm plywood and 50mm x 50mm sal wood frame in training areas. Maximum height from FFL of last step shall be 1'-0". Finished surface shall be condusive for carpet laying with appropriate levels. Measurement for payment shall be for plan area only, etc., all complete.

Providing and fixing storage unit made of 19mm thick ply with approved laminate finish, equal openable shutters, Drawers, Shelf With necessary accessories like hooks. locks, handle, hardware etc., & separate Keys complete as per detail design and drawing.Record room Storage (1000mm deep and 2400mm high)

Providing and fixing Running Counter 600mm wide made of 19mm thk. Ply Make: Archwud / Century or equivalent finished with laminate and supported over 19mm thk. Ply laminate finished all edges fixed with Teak wood beading of 25mm x 19mm complete as per design and drawing.

Providing and doing Niche made 12mm thk. Ply Make: Archwud / Century or equivalent boxing and with frame work fixed to the partition wall and entire niche finished with laminate complete as per design and drawing.

Page 50: Otis Elevator Final Bill Tender Items

Item No. Description of work Nos Length H/W Total Sft Deduction SqmtrActual BOQ qty

6.5

1 Nos 1 Nos

Reprographic Table / Storage6.6

11.25

1.00 13.66 2.50 34.15

2.00 13.66 2.50 68.30

3.00 6.00 2.50 45.00

Total 147.45 13.70

Receptionist's Table6.7

1Nos

1 Nos

6.8 3.90

Reception table side credenza 1.00 8.00 3.25 26.00 2.42

7 BLINDS

Vertical Blinds

Providing and fixing Board table 6750mm x 2450mm x 750mm shape as shown in drawing of size with table top made of 19mm double ply tapered design, table edge with Teak wood beading, top finished with approved 2 shade veneer supported over ply boxing and placed over tapered wider base entire outer surface of table support shall be finished with veneer with PU coat.

including provision for power and AV requirements, and Power sockets as per the details shown in the drawing. All edges to be covered with teak wood beading and will have spray applied matt finish melamine polish of approved shade. The rate shall include making grooves, beveling the edges and making necessary cut outs for data, AV and power outlets etc., all complete.

Providing and fixing Reprographic table cum storage 600mm wide and 750mm ht with equal shutters and adjustable shelf inside, made with 19mm block board. The top surfaces covered with 1mm laminate with post formed edges and vertical surfaces with 1mm laminate of approved shade and all edges to be covered with PVC lipping. The insides finished with laminate with necessary accessories like locks, powder coated metal handles, hardware, etc. as per drawing.

Providing and fixing Receptionist's table made of 20mm thick corian table top and front side of table with frosted glass and SS studs shall be used as per design , table supported over the Ply boxing corian finished as per detail design and drawing

Providing making and fixing credenza made of 19mm thk. Ply and finished with laminate ,Shutters shall be of louvered shutters and laminate finished complete as per detail design and drawing in Board room.

SUB TOTAL OF FIXED / LOOSE - FURNITURES & STORAGES

Page 51: Otis Elevator Final Bill Tender Items

Item No. Description of work Nos Length H/W Total Sft Deduction SqmtrActual BOQ qty

7.1

7.1.1 Ground Floor

GM Cabin 7.00 6.58 5.58 257.01

Meeting Room 1.00 15.16 10.16 154.03

Deduction for Door 1.00 3.00 7.00 21.00 21.00

432.04 21.00

Less Deductions 21.00

Total 411.04 38.20

7.1.2 First Floor

Motorized Blinds

7.2 Supply & installation of roller Blinds

Shade

Solar transmittance of maximum 30%

Solar reflectance of a minimum of 35%

Solar absorption : 50% maximum

UV transmittance : 15% maximum

Openness factor of 5% maximum

Visibility light transmission : 12% maximum

Thickness of Fabric : minimum 0.5mm thk

Mass of Fabric : 375 g/sqm minimum

Roller Tube

Bottom Rail

Ball Chain

Chain drive unit & Idler end

Supply & installation of vertical blind which includes Head Channel of 33mm wide & 30mm deep with a nominal wall thickness of 1.2mm to 1.4mm made of aluminium alloy finished in clear anodizing to a thickness of 10 microns or a powder coated to a thickness of 30 to 40 microns, Tilt control by means of 2mm dia imported braided Nylon Cord with 4.5mm dia acetyl balls moulded co-axially to it on 11.8mm centres by pulling on a ball chain connected to a pulley, Traversing cord of 2mm dia constructed with braided polyester jacket over a polyester core. The cord shall be held in tension by cord weight, Fabric slat shall be slit from woven fabric in width of 75mm with bottom pockets housing weight slot, coupled together by means of endless bead chains, Bottom weight does not rust nor cut the fabric.Basic Rate for Vertical Blinds Rs. 80/- per sft.Make: - Hunter Douglas / Louverline / Drapes / Vista or equivalent.

Composition of Yan : Glass fiber ( 30% minimum ) & Bulk dyed Polymer compound

Fire resistance : confirming to NFPA 701 ( USA ) / NF

P92-503

Durability : water proof, anti-microbial, corrosion resistant washable, flame retardant, fade resistant & satin guarded.

Aluminium - thickness minimum 0.5mm with 25mm dia.

Aluminium - thickness minimum 0.5mm with 20mm dia.

Aluminium as per manufacturer without connecting cap. Chain to be continuous & fixed while installing chain drive unit.

Page 52: Otis Elevator Final Bill Tender Items

Item No. Description of work Nos Length H/W Total Sft Deduction SqmtrActual BOQ qty

7.2.1

7.2.1.1 Display area in Ground Floor

7.2.1.2 Motors

7.2.1.3 Remote

SUB TOTAL OF BLINDS

8 GRAPHICS

8.1

8.1.1

8.1.1.1 Ground Floor8.1.1.2 First Floor

Manufactured of moulded plastic with support pin. It shall be driven by ball chain pulley. The shade shall be automatically locked in any position. Unit to have spring loaded mechanism to assist user to operate blinds.Basic Rate for Roller Blinds Rs.120/- per sft.Note:- The minimum width of blinds should be 1200mm. Make: - Hunter Douglas / Louverline / Drapes / Vista or equivalent.

Motorized blinds to be switch & remote control operated.

Supplying GRAPHIC VINYL WITH APPROVED GRAPHICS. Surface preparation - thoroughly sand papering surfaces to remove dust, dirt, etc., and repairing dents, holes with POP to achieve level surface and finishing including cost of material, labour, scaffolding etc., all complete as directed by the Architect's, approval required after each coat and over laminated.Warranty 5 years. Make: Avery / 3M.

Note:- The cost shall include design & printing as per Architect specification.

Page 53: Otis Elevator Final Bill Tender Items

Item No. Description of work Nos Length H/W Total Sft Deduction SqmtrActual BOQ qty

8.2

8.2.1

8.2.1.1 Ground Floor8.3

Supplying HIGH END GRAPHIC VINYL WITH APPROVED GRAPHICS. Surface preparation - thoroughly sand papering surfaces to remove dust, dirt, etc., and repairing dents, holes with POP to achieve level surface and finishing including cost of material, labour, scaffolding etc., all complete as directed by the Architect's, approval required after each coat and over laminated.Warranty 5 years. Make: Avery / 3M.

Note:- The cost shall include design & printing as per Architect specification.

Supplying and fixing of frosted film of 3M or approved equivalent Make on Glass Partition in pattern as per drawings as per manufacturer's specifications with 10 years warranty etc. complete.