Project: OTIS Factory Expansion Subject: Non-Tender Items for Interior works - Pre-final bill Non-Tender items Item No. Description of work Unit Quantity 1.0 Circular discussion cabin admin block sqm 15.73 8082.63 2.0 Ground Floor sqm 133.48 4997.82 First Floor sqm 35.95 4997.82 3.0 Ground Floor sqm 172.86 4518.18 First Floor sqm 56.14 4518.18 4 Ground Floor sqm 1.02 4417.84 First Floor sqm 9.36 4417.84 5.0 Ground Floor sqm 10.59 9146.06 6.0 Ground Floor sqm 20.46 5835.72 First Floor sqm 15.36 5835.72 7.0 Ground Floor sqm 47.42 6534.70 8.0 Ground Floor sqm 33.46 8426.92 8.1 Ground Floor sqm 18.22 7500.00 (Rs.) Providing and fixing circular discussion cabin with 50mm thick salwood frame cladded with 12mm flexible ply finished with approved veneer with necessary hardware,melamine and workmanship. Providing and fixing cladding for columns with 50mm thick salwood frame cladded with 12mm plywood finished with approved veneer with necessary hardware,melamine and workmanship. Providing and fixing circular cladding for columns with 50mm thick salwood frame cladded with 12mm flexible ply finished with satin finish paint with necessary hardware, and workmanship. Providing and fixing trapdoors made out with 50mm thick salwood frame cladded with 12mm ply finished with laminate on both sides with necessary hardware, and workmanship. Providing and fixing one feet deep framing made out of 50mm thick salwood frame cladded with 12mm ply finished with background paint and cladded with 6mm saint gobain lacquered glass on studs with necessary hardware, and workmanship. Providing and fixing one feet deep display unit boxing made out of ply wood cladded with approved veneer with necessary hardware, and workmanship. providing and fixing wooden ceiling made out of 50mm thick salwood frame cladded with 12mm ply finished with approved veneer with necessary melamine hardware, and workmanship. Providing and fixing partition with 50mm thick salwood frame cladded with 12mm ply on one sides finished with approved veneer with necessary hardware,melamine and workmanship. Providing and fixing partition with 50mm thick salwood frame cladded with 12mm ply on both sides finished with approved veneer with gypsum & necessary hardware,melamine and workmanship.

Otis Elevator Final Bill NT Items

  • Upload
    yogesh

  • View
    8

  • Download
    0

Embed Size (px)

DESCRIPTION

otti

Citation preview

Page 1: Otis Elevator Final Bill NT Items

Project: OTIS Factory Expansion

Subject: Non-Tender Items for Interior works - Pre-final bill

Non-Tender items

Item No. Description of work Unit Quantity Amount (Rs.)

1.0

Circular discussion cabin admin block sqm 15.73 8082.63 127,139.77

2.0

Ground Floor sqm 133.48 4997.82 667,109.01

First Floor sqm 35.95 4997.82 179,671.63

3.0

Ground Floor sqm 172.86 4518.18 781,012.59

First Floor sqm 56.14 4518.18 253,650.63

4

Ground Floor sqm 1.02 4417.84 4,506.20

First Floor sqm 9.36 4417.84 41,350.98

5.0

Ground Floor sqm 10.59 9146.06 96,856.78

6.0

Ground Floor sqm 20.46 5835.72 119,398.83

First Floor sqm 15.36 5835.72 89,636.66

7.0

Ground Floor sqm 47.42 6534.70 309,875.47

8.0

Ground Floor sqm 33.46 8426.92 281,964.74

8.1

Ground Floor sqm 18.22 7500.00 136,650.00

Rate (Rs.)

Providing and fixing circular discussion cabin with 50mm thick salwood frame cladded with 12mm flexible ply finished with approved veneer with necessary hardware,melamine and workmanship.

Providing and fixing cladding for columns with 50mm thick salwood frame cladded with 12mm plywood finished with approved veneer with necessary hardware,melamine and workmanship.

Providing and fixing circular cladding for columns with 50mm thick salwood frame cladded with 12mm flexible ply finished with satin finish paint with necessary hardware, and workmanship.

Providing and fixing trapdoors made out with 50mm thick salwood frame cladded with 12mm ply finished with laminate on both sides with necessary hardware, and workmanship.

Providing and fixing one feet deep framing made out of 50mm thick salwood frame cladded with 12mm ply finished with background paint and cladded with 6mm saint gobain lacquered glass on studs with necessary hardware, and workmanship.

Providing and fixing one feet deep display unit boxing made out of ply wood cladded with approved veneer with necessary hardware, and workmanship.

providing and fixing wooden ceiling made out of 50mm thick salwood frame cladded with 12mm ply finished with approved veneer with necessary melamine hardware, and workmanship.

Providing and fixing partition with 50mm thick salwood frame cladded with 12mm ply on one sides finished with approved veneer with necessary hardware,melamine and workmanship.

Providing and fixing partition with 50mm thick salwood frame cladded with 12mm ply on both sides finished with approved veneer with gypsum & necessary hardware,melamine and workmanship.

Page 2: Otis Elevator Final Bill NT Items

Item No. Description of work Unit Quantity Amount (Rs.) Rate

(Rs.)

9.0

Ground Floor sqm 17.10 4508.00 77,086.80

10.0

Ground floor sqm 210.25 1609.22 338,338.08

11.0

Ground Floor sqm 136.88 6374.51 872,542.93

12.0

Ground Floor sqm 43.07 4867.50 209,643.23

12.1

Ground Floor sqm 52.25 1752.76 91,581.71

First Floor sqm 13.59 1752.76 23,820.01

12.2

Ground Floor sqm 48.34 3868.76 187,015.86

13.0

Ground Floor sqm 115.35 24984.20 2,881,927.47

Frist Floor sqm 26.95 24984.20 673,324.19

14.0

First Floor sqm 16.08 28220.23 453,781.30

15.0

Providing in position approved make of false raised flooring system with tiles made in high yield MS powder coated moulded sheets with cementious in-fill as per the manufacturers specifications. The raised flooring shall be installed as per the manufacturers specifications with Architects approval. The height of the jacks shall be of adjustable type for finished floor levels upto an height of + or - 150mm lvl and for the following finished floor levels adhering to the detail drawings. The raised flooring system, inclusive of under structure provided shall be designed for the loading of 1.00 Ton per sqm. The tile top shall shall be finished with Anti-static vinyl tiles of approved make and shade. The PVC edge beading of the tiles shall also have the anti-static properties as per the manufacturers specifications. This includes providing necessary copper earthing and end termination as per the manufacturers specifications.

painting of duco paint after scrapping the surface with necessary spray and workmanship

Providing and fixing 18"deep boxing unit made out of 50mm thick salwood frame cladded with 12mm plywood partly finished with veneer for soft board and writing board with necessary hardware, and workmanship.

Providing and fixing of 8mm thick toughen glass finished with 1 mm frosted film writing board with plywood backing and necessary hardware and workmanship

Providing and fixing of 12mm soft board with plywood backing and approved fabric with necessary hardware and workmanship

Providing & fixing of 12 thick magnetic writing board with ply wood backing & with necessary hardware & workmanship

Providing and fixing 2' depth partition cum storage on one side with 12mm toughened glass made out of 50mm thick salwood frame cladded with 12mm ply on both sides for soft board and writing board finished with approved veneer with necessary hardware,melamine and workmanship.

Providing and fixing 3' depth partition cum storage on both sides with 12mm toughened glass made out of 50mm thick salwood frame cladded with 12mm ply on both sides finished with approved veneer with necessary hardware,melamine and workmanship.

Providing and fixing storage of depth 2' made out of 19mm plywood cladded with approved veneer and 20mm granite top with necessary hardware,melamine and workmanship

Page 3: Otis Elevator Final Bill NT Items

Item No. Description of work Unit Quantity Amount (Rs.) Rate

(Rs.)

First Floor sqm 4.65 21365.15 99,347.95

16.0

Ground Floor sqm 23.80 18938.21 450,729.40

First Floor 4.65 18938.21 88,062.68

17.0

Ground Floor sqm 43.63 3615.37 157,738.59

First Floor sqm 3.07 3615.37 11,099.19

18.0

First floor sqm 13.24 8341.83 110,445.83

19.0

Ground floor sqm 129.81 2000.00 259,620.00

First Floor sqm 69.63 2000.00 139,260.00

20.0 Mineral Fiber grid False ceiling 4' x1'

Ground floor sqm 252.60 2000.00 505,200.00

First floor sqm 11.90 2000.00 23,800.00

21.0

22.0

23.0

Ground Floor sqm 8.36 399.21 3,337.40

24.0LS 50000.00 50,000.00

providing and fixing storage of depth 2' made out of 19mm plywood cladded with approved veneer & laminate with necessary hardware,melamine and workmanship

Providing and fixing of 50mm thick salwood frame cladded with 12mm ply on gypsum with paint finish necessary hardware and workmanship.

Providing and fixing of 50mm thick salwood frame cladded with 12mm ply on both side finished with lacquered glass, veneer , toughened glass necessary hardware and workmanship.

Supply & installation of block out roller blinds which includes Head Channel of 33mm wide & 30mm deep with a nominal wall thickness of 1.2mm to 1.4mm made of aluminium alloy finished in clear anodizing to a thickness of 10 microns or a powder coated to a thickness of 30 to 40 microns, Tilt control by means of 2mm dia imported braided Nylon Cord with 4.5mm dia acetyl balls moulded co-axially to it on 11.8mm centres by pulling on a ball chain connected to a pulley, Traversing cord of 2mm dia constructed with braided polyester jacket over a polyester core. The cord shall be held in tension by cord weight, Fabric slat shall be slit from woven fabric in width of 75mm with bottom pockets housing weight slot, coupled together by means of endless bead chains, Bottom weight does not rust nor cut the fabric.

Providing & Installing Commercial type suspended modular ceiling of nrc .90

Providing and fixing 12mm ply and paint on existing partition cladded with 12mm toughened glass with vinyl backing on studs with necessary hardware and workmanship

Providing and fixing 50mm salwood frame work with 12mm ply on one side with background paint with necessary hardware and workmanship

Providing & fixing of 6mm clear glass with necessary hardware & workmanship

MS supports with ISMB in various locations:Supporting document to be submitted

Page 4: Otis Elevator Final Bill NT Items

Item No. Description of work Unit Quantity Amount (Rs.) Rate

(Rs.)

25.0

Ground Floor sqm 1.98 18938.00 37,497.24

26.0

LS 1.00 ### 75,000.00

27.0

LS 1.00 ### 150,925.00

28.0

Nos 1.00 56086.00 56,086.00

29.0Sqm 182.37 455.00 82,978.35

30.0Sqm 26.97 385.00 10,383.45

31.0Sqm 151.30 315.00 47,659.50

32.0Sqm 9.36 665.00 6,224.40

33.00 Plonter Box inside enamel paint outside polish Nos 20.00 1200.00 24,000.00

34.00 Board Room Screeding chipping and granite laying Sqm 19.11 2848.00 54,425.28

35.00 Board Room concret screeding Sqm 94.08 750.00 70,560.00

36.00 Supplying of Reception Back Lackred Glass Sqm 3.35 6500.00 21,775.00

37.00 Nos 5.00 8500.00 42,500.00

38.00 Test tower soft closing ply with top finished calsiucilicate board Nos 3.00 3000.00 9,000.00

39.00 2ft x 2ft 6mm thick ply finished with emulsion paint trap doors Nos 14.00 300.00 4,200.00

40.0 Supply of Miscellaneous Items 375,000.00

41.00 SS guard railling RMT 14.23 1500.00 21,345.00

42.00 SS Railling RMT 0.00 6000.00 -

43.00 MS Colum enamel paint Sqm 23.16 180.00 4,168.80

Providing & fixing storage unit made out of 19 mm thick ply with approved laminate granite top finish equal openable shutters drawers in necessary hardware.

Providing & fixing of discussion room table 19ft x 5ft x 2.50 shape as shown in drawing size with table top made of 19mm double ply table edge with veneer finish beading top finish with approved veneer melamine & workmanship

Providing & fixing of board room table 33ft x 6 ft x2.50 shape shown in drawing of size with table top made of 19 mm double ply tapered design, table edge with veneer beading, top finished with approved shade veneer supported over ply boxing and placed over tapered wider base entire outer surface of table support shall be finished with veneer & melamine

Providing and fixing of Meeting room table 2400mm x 1200mm x 750 mm shape as shown in drawing of size table top made out of 19mm double ply, table top finished with veneer base entire outer surface of table finished with veneer and melamine polish

Replacement of gypsum board finished with premium emulsion paint (water leakage area)

After finishing of paint gypsum board cutting (for Services AC Electrical Fire) Refixing area

After finishing of GI frame work (changes in drawing and height problem for AC)

Providing and fixing of 8mm thick calcium ciliate board finished with necessary hardware and paint

Beach wood Center table top finished with 6mm thick glass and nessacery workman ship

Page 5: Otis Elevator Final Bill NT Items

Item No. Description of work Unit Quantity Amount (Rs.) Rate

(Rs.)

Total Rs. ###Vat @ 14.5% on 70% 1,206,860.77

Service tax @ 12.36% on 30% 440,890.62

Grand-Total Rs. ###

Page 6: Otis Elevator Final Bill NT Items

P: 6/17

Project :- OTIS Factory Expansion

Subject : Non Tender Item measurements for Interior works - Prefinal Bill

Pre-Final Bill for Non tender items

Item No.Description of work Nos Length H / W Total Sft Deduction Net Total in Sqm

1.0

Circular discussion cabin admin block 2.00 21.16 4.00 169.28 15.73

2.0

Ground Floor

Admin block MS Coolum cladding 6.00 6.34 9.00 342.36

VIP cabin Colum cladding 2.00 5.00 10.25 102.50

2.00 3.00 10.25 61.50

Discussion room Colum 2.00 10.16 10.00 203.20

Reception MS Colum cladding 4.00 8.16 10.00 326.40

Lift front Colum cladding 1.00 12.33 10.00 123.30

1.00 9.16 10.00 91.60

Board room 1.00 2.58 11.50 29.67

1.00 1.00 9.16 9.16

ISMB cladding above glass partition 1.00 4.00 29.00 116.00

1.00 2.66 11.50 30.59

Total ### 133.48

First Floor

Board room sitting area Coolum cladding 2.00 9.50 2.50 47.50

Coolum cladding 4.00 6.00 9.50 228.00

Horizontal 1.00 4.00 8.16 32.64

1.00 4.00 4.66 18.64

1.00 15.00 4.00 60.00

Total 386.78 35.95

3.0

Ground Floor

Admin block 20.00 7.50 10.25 ###

Double height 2.00 7.50 21.50 322.50

Total ### 172.86

First Floor

Canteen area 5.00 7.50 9.34 350.25

Board room 2.00 7.50 9.34 140.10

2.00 7.50 7.58 113.70

Total 604.05 56.14

Providing and fixing circular discussion cabin with 50mm thick salwood frame cladded with 12mm flexible ply finished with approved veneer with necessary hardware,melamine and workmanship.

Providing and fixing cladding for columns with 50mm thick salwood frame cladded with 12mm plywood finished with approved veneer with necessary hardware,melamine and workmanship.

Providing and fixing circular cladding for columns with 50mm thick salwood frame cladded with 12mm flexible ply finished with satin finish paint with necessary hardware, and workmanship.

Page 7: Otis Elevator Final Bill NT Items

P: 7/17

Item No.Description of work Nos Length H / W Total Sft Deduction Net Total in Sqm

4

Ground Floor

Full height area 1.00 2.00 3.00 6.00

1.00 2.00 2.50 5.00

Total 11.00 1.02

First Floor

Canteen 1.00 6.50 15.50 100.75

Total 100.75 9.36

5.0

Ground floor

Reception table back wall 1.00 6.33 18.00 113.94

Total 113.94 10.59

6.0

Ground floor

Reception lacquered glass above paneling 1.00 49.00 2.00 98.00

FED office 1.00 26.00 2.25 58.50

Hub room side wall 2.00 8.16 2.50 40.80

1.00 19.66 1.16 22.81

Total 220.11 20.46

First Floor

Board room sitting area 1.00 20.66 8.00 165.28

Total 165.28 15.36

7.0

Ground floor

Reception area 2.00 11.00 13.00 286.00

1.00 11.50 19.50 224.25

Total 510.25 47.42

Providing and fixing trapdoors made out with 50mm thick salwood frame cladded with 12mm ply finished with laminate on both sides with necessary hardware, and workmanship.

Providing and fixing one feet deep framing made out of 50mm thick salwood frame cladded with 12mm ply finished with background paint and cladded with 6mm saint gobin lacquered glass on studs with necessary hardware, and workmanship.

Providing and fixing one feet deep display unit boxing made out of ply wood cladded with approved veneer with necessary hardware, and workmanship.

providing and fixing wooden ceiling made out of 50mm thick salwood frame cladded with 12mm ply finished with approved veneer with necessary melamine hardware, and workmanship.

Page 8: Otis Elevator Final Bill NT Items

P: 8/17

Item No.Description of work Nos Length H / W Total Sft Deduction Net Total in Sqm

8.0

Ground floor

Ply wood ceiling vertical partition 3.00 4.00 30.00 360.00

Total 360.00 33.46

8.1

Ground floor

Reception back side 1.00 49.00 4.00 196.00

Total 196.00 18.22

9.0

Ground Floor

Hub room 1.00 16.00 11.50 184.00

Total 184.00 17.10

10.0

Ground floor Reception back side double height 1.00 48.00 23.00 ###

6.00 23.00 4.50 621.00

Vertical factory side 1.00 23.00 3.00 69.00

Reception side vertical 1.00 23.00 2.00 46.00

Deduction for ceiling niche 12.00 4.00 3.16 151.68

Providing and fixing partition with 50mm thick salwood frame cladded with 12mm ply on one sides finished with approved veneer with necessary hardware,melamine and workmanship.

Providing and fixing partition with 50mm thick salwood frame cladded with 12mm ply on both sides finished with approved veneer with gypsum & necessary hardware,melamine and workmanship.

Providing in position approved make of false raised flooring system with tiles made in high yield MS powder coated moulded sheets with cementious in-fill as per the manufacturers specifications. The raised flooring shall be installed as per the manufacturers specifications with Architects approval. The height of the jacks shall be of adjustable type for finished floor levels upto an height of + or - 150mm lvl and for the following finished floor levels adhering to the detail drawings. The raised flooring system, inclusive of under structure provided shall be designed for the loading of 1.00 Ton per sqm. The tile top shall shall be finished with Anti-static vinyl tiles of approved make and shade. The PVC edge beading of the tiles shall also have the anti-static properties as per the manufacturers specifications. This includes providing necessary copper earthing and end termination as per the manufacturers specifications.

painting of duco paint after scrapping the surface with necessary spray and workmanship

Page 9: Otis Elevator Final Bill NT Items

P: 9/17

Item No.Description of work Nos Length H / W Total Sft Deduction Net Total in Sqm

Niche inside vertical 24.00 4.00 3.34 320.64

24.00 3.16 3.34 253.31

### 151.68

Less Deduction ###

Total ### 210.25

11.0

Ground floor

Reception to factory entry 1.00 43.25 8.25 356.81

1.00 6.50 8.25 53.63

1.00 10.00 8.25 82.50

Deduction glass door 1.00 6.84 3.16 21.61

Glass partition side 1.00 11.25 9.16 103.05

Deduction aluminium door 1.00 3.75 6.75 25.31

1.00 6.75 9.75 65.81

Board room 1.00 14.56 8.42 122.60

Board room pull down screen side paneling 1.00 7.25 16.00 116.00

1.00 25.00 8.42 210.50

Display side (Reception)

Reception fire unit side paneling (Display) 1.00 6.08 6.50 39.52

1.00 8.75 6.75 59.06

FED office 1.00 24.75 9.25 228.94

1.00 3.25 2.25 7.31

Meeting room 1.00 10.58 7.00 74.06

1522.07 ### 46.93

Less Deductions -46.93

Total ### 136.88

12.0

Ground floor

Discussion room 1.00 8.25 6.25 51.56

2.00 2.50 5.25 26.25

FED office 1.00 5.00 3.25 16.25

1.00 8.16 5.75 46.92

1.00 6.58 5.00 32.90

VIP cabin 2.00 6.08 5.00 60.80

GM cabin 7.00 4.58 4.00 128.24

Meeting room 1.00 9.42 4.00 37.68

GM Corner Glass cabin 1.00 4.66 4.00 18.64

First Floor board Room 2.00 5.00 4.42 44.20

Total 463.44 43.07

Providing and fixing 18"deep boxing unit made out of 50mm thick salwood frame cladded with 12mm plywood partly finished with veneer for soft board and writing board with necessary hardware, and workmanship.

Providing and fixing of 8mm thick toughen glass finished with 1 mm frosted film writing board with plywood backing and necessary hardware and workmanship

Page 10: Otis Elevator Final Bill NT Items

P: 10/17

Item No.Description of work Nos Length H / W Total Sft Deduction Net Total in Sqm

12.1

Ground floor

FED office 1.00 5.50 3.75 20.63

VIP cabin 2.00 5.00 4.16 41.60

2.00 6.16 5.00 61.60

Reception to admin block entry 1.00 4.83 4.50 21.74

2.00 4.66 4.50 41.94

1.00 2.66 4.50 11.97

1.00 6.00 4.50 27.00

2.00 4.58 4.50 41.22

1.00 6.00 4.50 27.00

1.00 2.66 4.50 11.97

Reception 1.00 4.66 5.75 26.80

1.00 5.75 5.75 33.06

1.00 2.66 5.75 15.30

Board room 1.00 7.08 7.66 54.23

1.00 8.83 7.66 67.64

FED office 1.00 26.00 2.25 58.50

Total 562.18 52.25

First floor

Board room 1.00 13.25 5.00 66.25

2.00 8.00 5.00 80.00

Total 146.25 13.59

12.2

Ground floor

reception area to admin area entry 1.00 14.33 4.50 64.49

1.00 9.25 4.50 41.63

Reception to factory entry 3.00 7.42 5.75 128.00

1.00 5.25 5.75 30.19

1.00 2.66 5.75 15.30

Board room 1.00 16.00 6.75 108.00

1.00 16.00 5.33 85.28

1.00 7.00 6.75 47.25

Total 520.12 48.34

13.0

Providing and fixing of 12mm soft board with plywood backing and approved fabric with necessary hardware and workmanship

Providing & fixing of 12 thick magnetic writing board with ply wood backing & with necessary hardware & workmanship

Providing and fixing 2' depth partition cum storage on one side with 12mm toughened glass made out of 50mm thick salwood frame cladded with 12mm ply on both sides for soft board and writing board finished with approved veneer with necessary hardware,melamine and workmanship.

Page 11: Otis Elevator Final Bill NT Items

P: 11/17

Item No.Description of work Nos Length H / W Total Sft Deduction Net Total in Sqm

Ground floor

1.00 49.75 10.25 509.94

VIP cabin Partition 1.00 41.25 10.25 422.81

Side partition 2.00 6.58 10.33 135.94

Center partition 1.00 12.50 10.33 129.13

Deduction for glass door 2.00 3.00 7.00 42.00

Discussion cabin wall paneling 1.00 12.50 6.83 85.38

### 42.00

Less Deduction -42.00

Total ### 115.35

First floor

Board room center partition 2.00 7.25 20.00 290.00

Sitting area wall paneling

Total 290.00 26.95

14.0

First floor

Board room corridor side partition 1.00 35.75 9.75 348.56

Deduction for glass door

2.00 9.00 9.75 175.50

348.56 175.50

Less Deductions ###

Total 173.06 16.08

15.0

First floor

Board room 1.00 20.00 2.50 50.00

Total 50.00 4.65

16.0

Ground floor

Discussion room 1.00 13.08 2.50 32.70

1.00 11.50 2.50 28.75

VIP canteen 2.00 6.08 2.66 32.35

Reception to admin block entry corridor partition

Providing and fixing 3' depth partition cum storage on both sides with 12mm toughened glass made out of 50mm thick salwood frame cladded with 12mm ply on both sides finished with approved veneer with necessary hardware,melamine and workmanship.

Providing and fixing storage of depth 2' made out of 19mm plywood cladded with approved veneer and 20mm granite top with necessary hardware,melamine and workmanship

providing and fixing storage of depth 2' made out of 19mm plywood cladded with approved veneer & laminate with necessary hardware,melamine and workmanship

Page 12: Otis Elevator Final Bill NT Items

P: 12/17

Item No.Description of work Nos Length H / W Total Sft Deduction Net Total in Sqm

1.00 9.58 2.50 23.95

1.00 4.50 2.50 11.25

1.00 8.08 2.50 20.20

Meeting room 1.00 6.00 2.50 15.00

Board room 1.00 16.00 2.50 40.00

1.00 6.00 2.50 15.00

FED office 1.00 14.75 2.50 36.88

Total 256.07 23.80

First floor

Board room 1.00 20.00 2.50 50.00

Total 50.00 4.65

17.0

Grand floor

Hub room wall 1.00 16.00 10.00 160.00

Double height AC duct covering 1.00 4.50 13.00 58.50

Skylight area 1.00 3.00 13.00 39.00

1.00 4.00 5.00 20.00

Hub room glass partition above 1.00 16.00 7.50 120.00

Board room 2.00 1.25 10.00 25.00

1.00 2.00 16.00 32.00

Steps side 1.00 5.00 3.00 15.00

Total 469.50 43.63

First floor

skylight 1.00 11.00 3.00 33.00 3.07

18.0

First floor

VIP canteen 1.00 15.00 9.50 142.50 13.24

Providing and fixing of 50mm thick salwood frame cladded with 12mm ply on gypsum with paint finish necessary hardware and workmanship.

Providing and fixing of 50mm thick salwood frame cladded with 12mm ply on both side finished with lacquered glass, veneer , toughened glass necessary hardware and workmanship.

Page 13: Otis Elevator Final Bill NT Items

P: 13/17

Item No.Description of work Nos Length H / W Total Sft Deduction Net Total in Sqm

19.0

Ground floor

Board room 6.00 13.00 5.00 390.00

VIP cabin 1.00 12.56 9.25 116.18

1.00 4.50 9.25 41.63

1.00 18.00 9.25 166.50

Discussion cabin 1.00 14.25 10.00 142.50

1.00 22.00 10.00 220.00

1.00 32.00 10.00 320.00

Total ### 129.81

First Floor Board Room 1.00 51.00 9.25 471.75

1.00 30.00 9.25 277.50

Total 749.25 69.63

20.0 Mineral Fiber grid False ceiling 4' x1'

Ground floor

Lift front 1.00 20.00 28.00 560.00

Reception area 1.00 45.00 8.00 360.00

1.00 11.00 46.00 506.00

1.00 3.00 8.00 24.00

2.00 7.00 8.00 112.00

1.00 3.00 8.00 24.00

1.00 44.00 10.00 440.00

Admin block 1.00 28.00 11.00 308.00

2.00 8.00 24.00 384.00

Total ### 252.60

First floor

Board room 2.00 8.00 8.00 128.00

Supply & installation of block out roller blinds which includes Head Channel of 33mm wide & 30mm deep with a nominal wall thickness of 1.2mm to 1.4mm made of aluminium alloy finished in clear anodizing to a thickness of 10 microns or a powder coated to a thickness of 30 to 40 microns, Tilt control by means of 2mm dia imported braided Nylon Cord with 4.5mm dia acetyl balls moulded co-axially to it on 11.8mm centres by pulling on a ball chain connected to a pulley, Traversing cord of 2mm dia constructed with braided polyester jacket over a polyester core. The cord shall be held in tension by cord weight, Fabric slat shall be slit from woven fabric in width of 75mm with bottom pockets housing weight slot, coupled together by means of endless bead chains, Bottom weight does not rust nor cut the fabric.

Providing & Installing Commercial type suspended modular ceiling of nark .90

Page 14: Otis Elevator Final Bill NT Items

P: 14/17

Item No.Description of work Nos Length H / W Total Sft Deduction Net Total in Sqm

Total 128.00 11.90

21.0

22.0

23.0

Ground floor board room 2.00 15.00 3.00 90.00 8.36

24.0 MS supports with ISMB in various locations

Ground floor

Board room LS

Reception ceiling LS

First floor

Truss work area for ceiling support LS

25.0

Ground floor pantry 1.00 8.00 2.66 21.28 1.98

26.0

1 Nos LS

27.00

1 Nos LS

Providing and fixing 12mm ply and paint on existing partition cladded with 12mm toughened glass with vinyl backing on studs with necessary hardware and workmanship

Providing and fixing 50mm salwood frame work with 12mm ply on one side with background paint with necessary hardware and workmanship

Providing & fixing of 6mm clear glass with necessary hardware & workmanship

Providing & fixing storage unit made out of 19 mm thick ply with approved laminate granite top finish equal openable shutters drawers in necessary hardware.

Providing & fixing of discussion room table 19ft x 5ft x 2.50 shape as shown in drawing size with table top made of 19mm double ply table edge with veneer finish beading top finish with approved veneer melamine & workmanship

Providing & fixing of board room table 33ft x 6 ft x2.50 shape shown in drawing of size with table top made of 19 mm double ply tapered design, table edge with veneer beading, top finished with approved shade veneer supported over ply boxing and placed over tapered wider base entire outer surface of table support shall be finished with veneer & melamine

Page 15: Otis Elevator Final Bill NT Items

P: 15/17

Item No.Description of work Nos Length H / W Total Sft Deduction Net Total in Sqm

28.0

1 Nos LS

29.0

Admin Block Discussion cabin front (2 times) 2.00 12.00 4.00 96.00

GM cabin Ceiling (2 times) 2.00 10.00 2.00 40.00

GM cabin Partitions (2 times) 2.00 8.00 8.00 128.00

VIP cabin front vertical replacement 1.00 16.00 0.75 12.00

Test Tower 1.00 5.50 38.00 209.00

Vertical 1.00 3.50 18.00 63.00

First Floor test tower 1.00 6.50 38.00 247.00

1.00 6.00 3.50 21.00

Skylight area 1.00 4.00 4.00 16.00

Reception area 1.00 49.00 6.58 322.42

Vertical 1.00 45.00 0.33 14.85

1.00 25.00 3.00 75.00

1.00 25.00 2.50 62.50

1.00 1.00 4.00 4.00

1.00 4.00 4.00 16.00

Lacquered glass above ceiling 1.00 12.00 3.00 36.00

Vertical 1.00 12.00 0.33 3.96

Lift Front 1.00 27.00 7.00 189.00

Vertical 1.00 20.00 0.33 6.60

Toilet front 1.00 10.00 4.00 40.00

VIP Canteen Tress Work area (3 Times) 3.00 15.00 4.00 180.00

Vertical 3.00 15.00 4.00 180.00

Total ### 182.37

30

Ground Floor

Test tower 29.00 1.50 1.50 65.25

Admin Block 36.00 1.50 1.50 81.00

Double height Area 16.00 1.50 1.50 36.00

First Floor board room 26.00 1.50 1.50 58.50

Canteen area 22.00 1.50 1.50 49.50

Total 290.25 26.97

31

Ground Floor

Board Room 2.00 7.00 40.00 560.00

2.00 10.00 4.00 80.00

Admin Block 1.00 62.00 4.00 248.00

Providing and fixing of Meeting room table 2400mm x 1200mm x 750 mm shape as shown in drawing of size table top made out of 19mm double ply, table top finished with veneer base entire outer surface of table finished with veneer and melamine polish

Replacement of gypsum board finished with premium emulsion paint (water leakage area)

After finishing of paint gypsum board cutting (for Services AC Electrical Fire) Refixing area

After finishing of GI frame work (changes in drawing and height problem for AC)

Page 16: Otis Elevator Final Bill NT Items

P: 16/17

Item No.Description of work Nos Length H / W Total Sft Deduction Net Total in Sqm

1.00 62.00 2.50 155.00

1.00 30.00 6.50 195.00

1.00 30.00 2.00 60.00

1.00 30.00 6.00 180.00

1.00 30.00 5.00 150.00

Total ### 151.30

32

FED office entrance 1.00 20.00 4.16 83.26

1.00 8.75 2.00 17.50

Total 100.76 9.36

33 Plonter Box inside enamel paint outside polish 20.00 Nos

34 Board Room Screeding chipping and granite layin1.00 52.50 3.92 205.59 19.11

35 Board Room concret screeding 1.00 20.66 49.00 ### 94.08

36 Supplying of Reception Back Lackred Glass 3.00 2.00 6.00 36.00 3.35

37 5.00 Nos

38 3.00 Nos

39 14.00 Nos

40 Supply of Miscellaneous Items

41 SS guard railling

Reception 1.00 19.00 RFT 19.00

VIP cafeteria 1.00 27.66 RFT 27.66

Total 46.66 RMT 14.23

42 SS Railling 1mtr height

Total 0.00 RMT 0.00

43 MS Colum enamel paint

Cafeteria 4.00 2.50 9.00 90.00

Glazing side 3.00 2.50 9.00 67.50

Admin block 4.00 1.75 4.00 28.00

Reception 3.00 2.50 8.50 63.75

Providing and fixing of 8mm thick calcium cilicate board finished with nessacery hardware and paint

Beach wood center table top finished with 6mm thick glass and nessacery workman ship

Test tower soft closing ply with top finished calsiucilicate board

2ft x 2ft 6mm thick ply finished with emulsion paint trap doors

Page 17: Otis Elevator Final Bill NT Items

P: 17/17

Item No.Description of work Nos Length H / W Total Sft Deduction Net Total in Sqm

Total 249.25 23.16