Oswego Riverbank Stabilization. C&S ENGINEERS, INC. Oswego Riverbank Stabilization. Pre-construction condition. Oswego Riverbank Stabilization. Soil/Rock interface at river’s edge. Oswego Riverbank Stabilization. Pre-construction condition: concrete fill. Oswego Riverbank Stabilization. - PowerPoint PPT Presentation
Citation preview
Oswego Riverbank Stabilization
C&S ENGINEERS, INC
Oswego Riverbank Stabilization
Pre-construction condition
Oswego Riverbank Stabilization
Soil/Rock interface at river’s edge
Oswego Riverbank Stabilization
Pre-construction condition: concrete fill
Oswego Riverbank Stabilization
Pre-construction: Salmon anglers
Oswego Riverbank Stabilization
Hayward Baker 2’ Diameter Auger
Oswego Riverbank Stabilization
Hayward Bayer auger and casing for rock sockets
Oswego Riverbank Stabilization
Augered rock socket for soldier pile
Oswego Riverbank Stabilization
Cores from rock sockets
Oswego Riverbank Stabilization
Concrete placement to anchor soldier piles
Oswego Riverbank Stabilization
Installation of lagging panels
Oswego Riverbank Stabilization
Soldier piles and lagging panels
Oswego Riverbank Stabilization
Hayward Baker drilling for rock anchor tiebacks
Oswego Riverbank Stabilization
Tieback Anchor Drilling
Oswego Riverbank Stabilization
1.25” diameter rock anchors
Oswego Riverbank Stabilization
Completed wall
Oswego Riverbank Stabilization
Completed wall
Oswego Riverbank Stabilization
Looking northwest over Varick Dam
Oswego Riverbank Stabilization
Sidewalk, capbeam, railing, and protective screening
Oswego Riverbank Stabilization
Oswego Riverbank Stabilization
Oswego Riverbank Stabilization
Oswego Riverbank Stabilization