RE: Long Distance P/C-MRD link installed under MSAG project Nouman Hussaini/SE OFC TNR Karachi/PTCL

Dear Abbas, The Fibers b/w MRD & PakCapital were tested again (at 12:00PM toda) and found suitable for commissioning. The details of Fiber pairs are below: NEC ODF (MRD->P/C) Fiber5 (at PakCapital) -------------> Fiber7 (at MRD) ............... 8.1 dB Loss Fiber6 (at PakCapital) -------------> Fiber8 (at MRD) .............. 8.5 dB Loss LTE ODF (MRD->P/C) Fiber13 (at PakCapital) -------------> Fiber13 (at MRD) ............ 4.2 dB Loss Fiber14 (at PakCapital) -------------> Fiber14 (at MRD) ............ 5.1 dB Loss Mr. Muzaffar from OFNS was also present at PakCapital while testing. Regards, (Nouman Mahmood Hussaini) Senior Engineer Optical Fiber Cables, Ops Transmission (South), PTCL Karachi Cell: 0321-2911803 Email: [email protected]

From: Mohammad Abbas/SE OFNS J&CC-I Karachi/PTCL Sent: Tuesday, October 12, 2010 4:47 PM To: Abdul Haleem/SE OFS Karachi/PTCL; Nouman Hussaini/SE OFC TNR Karachi/PTCL Cc: Muhammad Aslam Khan/SM Network TX Karachi-II/PTCL; Abdul Ghani/GM Dev Optical Fiber South/PTCL; Muhammad Samiullah Tunio/Assistant Manager OFNS J&CC-I KHI/PTCL Subject: FW: Long Distance P/C-MRD link installed under MSAG project AOA, Dear Sir, Our new P/C -MRD 10 G Link is utilizing OLIX Fibre pair 5,6 and 13,14. Both Links are currently 0+0. Please verify , as these pairs were Ok at the time of commissioning of link, but we are getting Rlos on them now. Mr Engineer Mr Sami (0333-2142869) is currently at MRD OFS Hall and needs OFC team's support.

Sent: Wednesday, October 13, 2010 1:46 PM

To: Mohammad Abbas/SE OFNS J&CC-I Karachi/PTCL; Abdul Haleem/SE OFS Karachi/PTCL

Cc: Muhammad Aslam Khan/SM Network TX Karachi-II/PTCL; Muhammad Samiullah Tunio/Assistant Manager OFNS J&CC-I KHI/PTCL

Page 1 of 2RE: Long Distance P/C-MRD link installed under MSAG project

1/6/2011https://webmail.ptcl.net.pk/owa/?ae=Item&t=IPM.Note&id=RgAAAAA1no9w7Z70TIzjzb...

Page 2: OSN3500 New

S.E J&CC-1 OFNS(S), PTCL. Karachi. 0300-2482109

From: Nadeem Ahmed [[email protected]] Sent: Tuesday, October 12, 2010 4:31 PM To: Mohammad Abbas/SE OFNS J&CC-I Karachi/PTCL Cc: AHSAN SATTAR KHAN; Abdul Ghani/GM Dev Optical Fiber South/PTCL; Muhammad Samiullah Tunio/Assistant Manager OFNS J&CC-I KHI/PTCL Subject: Re: Long Distance P/C-MRD link installed under MSAG project Dear Ahsan, Please help to resolve the issue. Regards, Nadeem Ahmed Mallick 03028550996 On 12-Oct-2010, at 4:04 PM, Mohammad Abbas/SE OFNS J&CC-I Karachi/PTCL <[email protected]> wrote:

AOA, Dear Sir, The P/C -MRD link installed under MSAG project, is having some issues regarding monitoring at NMS, the cross connect boards for the new nodes are not visible on NMS and version requires upgradation. Please provide expert support , so that the link can be handed over. S.E J&CC-1 OFNS(S), PTCL. Karachi. 0300-2482109

Page 2 of 2RE: Long Distance P/C-MRD link installed under MSAG project