71
Consultancy Services – M/s Unihorn India Pvt Ltd Monthly Report on Audit of Traffic/ December 2014 NATIONAL HIGHWAYS AUTHORITY OF INDIA (MINISTRY OF SHIPPING, ROAD TRANSPORT & HIGHWAYS) DEPARTMENT OF ROAD TRANSPORT & HIGHWAYS (G – 5 & 6, Sect – 10, Dwarka, New Delhi – 110075) (CONSULTANCY SERVICES – M/S UNIHORN INDIA PRIVATE LIMITED) Consulting Services as Independent Engineer during Operation & Maintenance and Fee Collection of 4-lane dual Carriageway from km. 407.100 to km. 456.100 of NH – 3 (Old NH – 1) {Jalandhar-Amritsar Section} in the State of Punjab on Build, Operate and Transfer (BOT) basis through a Concessionaire. REPORTS ON AUDIT OF THE TRAFFIC (December 2014) CONCESSIONAIRE: M/s HEAD OFFICE JALANDHAR AMRITSAR TOLLWAYS LTD, P–2, 1 st Floor, Green Park Extension, New Delhi – 110 016 SITE OFFICE Project: 4-Laning of Jalandhar-Amritsar BOT Project of NH – 3 (Old NH-1) in the State of Punjab Page - 1

Organization Chart of Independent Consultantnhai.org.in/spw/IEReport/Monthly Report on Audit of... · Web viewConsultancy Services – M/s Unihorn India Pvt Ltd Monthly Report on

  • Upload
    vanthu

  • View
    217

  • Download
    1

Embed Size (px)

Citation preview

Page 1: Organization Chart of Independent Consultantnhai.org.in/spw/IEReport/Monthly Report on Audit of... · Web viewConsultancy Services – M/s Unihorn India Pvt Ltd Monthly Report on

Consultancy Services – M/s Unihorn India Pvt LtdMonthly Report on Audit of Traffic/ December 2014

NATIONAL HIGHWAYS AUTHORITY OF INDIA(MINISTRY OF SHIPPING, ROAD TRANSPORT & HIGHWAYS)

DEPARTMENT OF ROAD TRANSPORT & HIGHWAYS(G – 5 & 6, Sect – 10, Dwarka, New Delhi – 110075)

(CONSULTANCY SERVICES – M/S UNIHORN INDIA PRIVATE LIMITED)

Consulting Services as Independent Engineer during Operation & Maintenance and Fee Collection of 4-lane dual Carriageway from km. 407.100 to km. 456.100 of NH – 3 (Old NH – 1)

{Jalandhar-Amritsar Section} in the State of Punjab on Build, Operate and Transfer (BOT) basis through a Concessionaire.

REPORTS ON AUDIT OF THE TRAFFIC(December 2014)

CONCESSIONAIRE:

M/sHEAD OFFICEJALANDHAR AMRITSAR TOLLWAYS LTD, P–2, 1st Floor, Green Park Extension, New Delhi – 110 016 SITE OFFICE JALANDHAR AMRITSAR TOLLWAYS LTD, Toll Plaza – 1 at Km. 410 NH – 1, G. T. Road, Dhilwan - 144804

INDEPENDENT CONSULTANT:

HEAD OFFICEM/S UNIHORN INDIA PRIVATE LIMITED,Unit No. 404, 4th Floor, IRIS Tech Park, Sector – 48, Sohna Road, Gurgaon (Haryana) – 122 002SITE OFFICE # 584 (D II), Housefed Complex, G T Road, New Amritsar, Amritsar–143 010 (Punjab)

CONTENTS

Sr. No. Descriptions Page No. Project: 4-Laning of Jalandhar-Amritsar BOT Project of NH – 3 (Old NH-1) in the State of Punjab Page - 1

Page 2: Organization Chart of Independent Consultantnhai.org.in/spw/IEReport/Monthly Report on Audit of... · Web viewConsultancy Services – M/s Unihorn India Pvt Ltd Monthly Report on

Consultancy Services – M/s Unihorn India Pvt LtdMonthly Report on Audit of Traffic/ December 2014

1 Project Details 03

1.1 Executive Summary 03

1.2 Contract Details 03 – 04

1.3 Scope of Works 05

1.4 General Specifications 05

1.5 Service Roads 06

1.6 Junction (At Grade) 06

1.7 Bridges 07

1.8 Road Over Bridge (ROB) 08

1.9 Underpasses 08

1.10 Culverts 09 – 10

2. Organization Chart of Independent Consultant 11

3. Independent Consultant's Review during O&M Period 11

3.1. Traffic Sampling 11

3.2 Traffic Operation and Safety Requirement 12

3.3 Toll Plaza and Fees Collection System12

Annexure – A(13 – 34)

3.4 Traffic Report / Data at Toll Plazas12

Annexure – B(35 – 37)

3.5 Highway Accident Report12

Annexure – C(38 – 41)

3.6 Incident Management Data12

Annexure – D(42 – 43)

1. PROJECT DETAILS 1.%2% Executive Summary

Project: 4-Laning of Jalandhar-Amritsar BOT Project of NH – 3 (Old NH-1) in the State of Punjab Page - 2

Page 3: Organization Chart of Independent Consultantnhai.org.in/spw/IEReport/Monthly Report on Audit of... · Web viewConsultancy Services – M/s Unihorn India Pvt Ltd Monthly Report on

Consultancy Services – M/s Unihorn India Pvt LtdMonthly Report on Audit of Traffic/ December 2014 National Highway NH -3 (Old NH-1) from Delhi to Pakistan border at Wagha is an important link passing through states of

Haryana and Punjab. This link also serves some major industrial areas of Panipat, Ambala, Ludhiana, Jalandhar and holy city of

Amritsar. Some of the sections between Delhi and Jalandhar have already been converted into four lane configurations.

In order to provide a safe and better service to both Commercial and Defense related vehicular traffic, the National Highways

Authority of India (NHAI) decided to wide four lane configurations from exiting two lane from Km 407.100 to Km 456.100 under

NHDP in the districts of Kapurthala and Amritsar in the state of Punjab which includes Major & Minor Bridges, ROBs,

Underpasses, Service Roads and improving junctions etc on Build, Operate and Transfer (BOT) basis. This section of road

passes through urban areas like Dhilwan, Beas, Rayya and Jandiala etc. Index map of the Project Road is as below:

The Project Highway traverses through plain terrain from Chainage km 407.100 on Jalandhar side to km 456.100 at Verka

Chowk, Amritsar and generally lies between latitudes 31.19 N – 31.38 N and longitudes 74.53 E – 75.78 E respectively. The

climatic features highlight the variation of temperature from – 20C in winter to a maximum of 460C during peak summer and

recorded normal rainfall is 813 mm.

The Detailed Engineering Report was prepared by M/s ICT, New Delhi.

The work awarded to M/s Jalandhar Amritsar Tollways Limited (JATL), New Delhi on 30th November 2005.

JATL appointed M/s NICE, Delhi as their Structural Consultants and M/s IVRCL Infrastructure Projects Ltd., Hyderabad as

EPC-Contractor. The Structural consultants M//s NICE, Delhi as appointed by JATL worked in the project initially three months

and then got demobilized.

NHAI has appointed M/s Consulting Engineering Services (India) Private Limited, New Delhi (CES) to act as Independent

Consultants for this project vide Agreement No. IC/PhIIIA/NH1/Pb/009 dated 13th April 2006.

NHAI again awarded this project for O&M Phase to M/s Unihorn India Private Limited, Gurgaon to act as Independent

Consultant for this project vide NHAI/BOT/11023/11/2006/23318 dated 23.11.2011

1.2 Contract Details

Project name : 4-Laning of Jalandhar-Amritsar BOT Project of NH-1 (Km 407.100 to Km 456.100)

Concessionaire : Jalandhar Amritsar Tollways Limited

State : Punjab

Component : National Highway No. 1

Location : Dhilwan (Km 407.100) to Verka Chowk (Km 456.100)

Estimated Project Cost :Rs 263 Crores(In Financial Document Rs. 237.75 Crores Original + 105.8 Crores Additional total Rs. 343.55 Crores as per the Concessionaire MPR )

Estimated Completion Date : November 2008

Civil Contract

EPC Contractor : M/s IVCRL Limited

Contract Limit : Km 407.100 to Km 456.100

Project: 4-Laning of Jalandhar-Amritsar BOT Project of NH – 3 (Old NH-1) in the State of Punjab Page - 3

Page 4: Organization Chart of Independent Consultantnhai.org.in/spw/IEReport/Monthly Report on Audit of... · Web viewConsultancy Services – M/s Unihorn India Pvt Ltd Monthly Report on

Consultancy Services – M/s Unihorn India Pvt LtdMonthly Report on Audit of Traffic/ December 2014

Contract Length : 49.000 Km

Contract Location : Dhilwan to Verka Chowk

State : Punjab

District : Kapurthala / Amritsar

Concessionaire Agreement Signed : 30.11.2005

Completion of Pre-Construction Activity : 30.05.2006

Commencement Dated : 29.05.2006

Original Completion Date : 30.11.2008

Provisional Completion Date : 29.04.2010

Original Construction Period : 30 months

Revised Construction Period : 43 months

Original Concession Period : 20 Years (Including Construction Period)

Initial Operation & Maintenance Period : 17.5 Years

Revised Operation & Maintenance Period : 16.4 Years

Performance Security : 3% of Contract Price

Independent Consultant : M/s Unihorn India Private Limited

Contract Limit : Operation & Maintenance - 36 months

Contract Signed : 22.11.2011

Commencement Date : 07.12.2011

Original Contract Period : 36 months for O&M Period

Original Contract Amount : Rs. 2,76,98,000/-

Performance Security (BG No. ININ1DL11G320474 for Rs. 692,450/- : (BG No. ININ1DL11G320474 for Rs. 692,450/- being 2.5% of

Contract Value valid till 31 January 2015

1.3 Scope of Works

Length of Road Sector - 49 Km Completed

(Km 407+100 to Km 456+100)

Service Road - 14 Km Completed

Project: 4-Laning of Jalandhar-Amritsar BOT Project of NH – 3 (Old NH-1) in the State of Punjab Page - 4

Page 5: Organization Chart of Independent Consultantnhai.org.in/spw/IEReport/Monthly Report on Audit of... · Web viewConsultancy Services – M/s Unihorn India Pvt Ltd Monthly Report on

Consultancy Services – M/s Unihorn India Pvt LtdMonthly Report on Audit of Traffic/ December 2014 Culverts - 51 Nos. Completed

Minor Bridge - 10 Nos. Completed

Major Bridge (Including Beas Bridge) - 4 Nos. Completed

Under Passes (One Double Cell) - 8 Nos. Completed

ROB - 3 Nos (2 Carriageway) Completed

1 Nos (4 Carriageway) Completed

Major Road Junctions - 7 Nos. Completed

Toll Plazas - 2 Nos. Completed

1.4 General Specifications

Main Road - Four Lane Divided Carriageway

2 x (7.0m + 1.5m + 2.0m shoulder)

wide separated by 4.5m wide median

Design Speed - 100 kmph

Cross slope - 2.5%

Maximum Super Elevation - 5%

Service Road (Carriageway) - 5.5 / 7.0 m

1.5 Service Roads

Service roads provided at the followings stretches.

SL NO

Location Length (m)

Width (m)

SideRemark

From (Km+m)

To (Km+m)

1 408+900 409+320 420 7.00 LHS Dhilwan (New )

2 409+050 409+320 270 7.00 RHS Dhilwan (New )

Project: 4-Laning of Jalandhar-Amritsar BOT Project of NH – 3 (Old NH-1) in the State of Punjab Page - 5

Page 6: Organization Chart of Independent Consultantnhai.org.in/spw/IEReport/Monthly Report on Audit of... · Web viewConsultancy Services – M/s Unihorn India Pvt Ltd Monthly Report on

Consultancy Services – M/s Unihorn India Pvt LtdMonthly Report on Audit of Traffic/ December 2014

3 413+380 414+565 1185 7.00 LHS Beas (Urban)

4 413+650 414+400 750 7.00 RHS Beas (Urban)

5 417+250 418+680 2860 5.50 LHS&RHS Umranangal (Semi Urban)

6 419+400 420+260 1720 7.00 LHS&RHS Rayya (Urban)

7 425+500 426+350 1700 7.00 LHS&RHS Khalchian (Urban)

8 430+500 431+100 600 7.00 RHS Tangra (Urban)

9 438+600 439+650 1050 7.00 LHS Jandiyalaguru (Urban)

10 438+750 439+650 900 7.00 RHS Jandiyalaguru (Urban)

11 448+300 449+050 1500 5.50 LHS&RHS Daburji ( Semi Urban)

12 452+320 453+000 680 7.00 RHS Walla ( New )

13 452+400 453+000 600 7.00 LHS Walla ( New )

Total 0 (5.5m Width – 4360m & 7.0m Width – 9710m)

1.6 Major Junction (at grade)–

Major Junctions (at grade) provided at following locations:

Sl. No. Location (New Chainage) Name of Junction

1. Km. 413.630 Beas

2. Km. 416.775 Batala

3. Km. 440.875 Taran Taran

4. Km. 449.530 Bypass

5. Km. 452.200 Mehata Chowk

6. Km. 452.400 Vallah Chowk

7. Km. 455.800 Verka Chowk

Project: 4-Laning of Jalandhar-Amritsar BOT Project of NH – 3 (Old NH-1) in the State of Punjab Page - 6

Page 7: Organization Chart of Independent Consultantnhai.org.in/spw/IEReport/Monthly Report on Audit of... · Web viewConsultancy Services – M/s Unihorn India Pvt Ltd Monthly Report on

Consultancy Services – M/s Unihorn India Pvt LtdMonthly Report on Audit of Traffic/ December 2014

1.7 Bridges Details of Major and Minor Bridges

Sr. No. Structure Chainage

Existing New Constructed

Rem

arks

Type of Structure Span ArrangementsLength of Structure (in mtr)

Type of Structure Span Arrangements

Length of Structure (in mtr)

I. Major Bridges

1413/1(Beas)

412+294 RCC Slab over PSC Girder 2x6.8+15x37.81 580.75RCC Slab over

PSC Girder1x10.04.14x37.81.1x3

1.953.1x10.40581.73 2-lane

2

415/4(Dera Baba Jaimal

Singh bridge)414+644 RCC T-Beam and Slab 5x19.87 99.35

RCCT-Beam and Slab

5x20.00 100.00 2-lane

3434/1

(Patti nallah bridge433+523 RCC T-Beam and Slab

4x15.72(Skew 38)

62.88RCC

T-Beam and Slab2x16.532.2x15.746 64.556 2-lane

4 447/1 (Kasur nallah bridge)

446+049 RCC T-Beam and Slab 6x13.5 81 PSC Voided Slab 3x27.00 81.00 2-lane

II. Minor Bridges

1 409/1 408+081 RCC T – Beam and Slab 2x20 40.00RCC T – Beam

and Slab2x20 40.00 4-lane

2 421/4 420+476 RCC T – Beam and Slab 1x28.397 28.397RCC Slab over PSC Girders

1x28x397 28.397 4-lane

3 421/6 420+618 RCC Solid Slab 1x11.216 (Skew) 8.45 Box Bridge 1x11.216 (Skew) 11.216 4-lance

4 428/1 427+072RCC Solid Slab

(Khalchian drain)4x7.00 28.00 RCC Solid Slab 4x7.00 28.00 2-lane

5 428/2 427+123 Arch Bridge 1x10.70 10.0 Box Bridge 1x10.70 10.70 4-lane

6437/1

(Kasurcanal bridge)436+609 Arch Bridge 1x36.50 (Skew) 9.75

RCC Slab Over PSC Girders

1x36.50 (Skew) 36.50 4-lane

7 443/2 442+067 RCC Solid Slab 1x27.00 28.32 PSC Voided Slab 1x27.00 27.00 4-lane8 447/2 446+466 RCC Solid Slab 1x7.02 7.00 Box Bridge 1x7.02 7.02 2-lane9 453/1 452+258 RCC, T – Beam & Slab 1x10.02 10.02 Box Bridge 1x10.02 10.02 6-lane

10 453/2 452+300 RCC T-Beam and Slab 3x15.14 45.42RCC T-Beam

and Slab3x15.50 45.50 3-lane

1.8 Road Over Bridge (ROB)

Project: 4-Laning of Jalandhar-Amritsar BOT Project of NH – 3 (Old NH-1) in the State of Punjab Page - 7

Page 8: Organization Chart of Independent Consultantnhai.org.in/spw/IEReport/Monthly Report on Audit of... · Web viewConsultancy Services – M/s Unihorn India Pvt Ltd Monthly Report on

Consultancy Services – M/s Unihorn India Pvt LtdMonthly Report on Audit of Traffic/ December 2014

Details of ROBs

Sr. No. Structure Chainage

Existing New Constructed

Rem

arks

Type of Structure Span ArrangementsLength of

Structure (in mtr)

Type of Structure Span ArrangementsLength of Structure (in mtr)

1 409/2 408.500 RCC Slab over steel girders1x36.423.1x45.77

(Skew)68.97 RCC Slab over PSC girders

1x36.423.1x45.77 (Skew)

82.193 4-lane

2 416/1 415.208 RCC Solid Slab 1x10.90 (Skew) 10.90 RCC Slab over PSC girders 1x37.05 (Skew) 37.05 2-lane

3 452/1 451.273 RCC Slab over steel girders 1x12.90 (Skew) 12.90 RCC Slab over PSC girders 1x27.79 (Skew) 27.79 2-lane

4 456/2 455.686 RCC Slab over steel girders 1x6.75 6.75 RCC Slab over PSC girders 1x23.10 23.10 2-lane

1.9 Underpasses-Details of Underpasses

Sr No Structure Chainage

Existing New Constructed

Rem

arks

Type of Structure

Span Arrangements

Length of Structure (in mtr)

Type of Structure

Span Arrangements

Length of Structure (in mtr)

1 410/1 (Dhilwan) 409+050 - - - Box 1x7.00x3.80 7.00

2 415/1 (Beas) 414+120 - - - Box 1x10.00x3.80 10.00

3 415/2 (Beas – Dera) 414+565 - - - Box 2x10.00x3.80 20.00

4 420/1 (Rayya) 419+765 - - - Box 1x7.00x3.80 7.00

5 426/3 (Khalchian) 425+950 - - - Box 1x7.00x3.80 7.00

6 440/1 (Jandiala village) 439+100 - - - Box 1x7.00x3.80 7.00

7 448.675 (Daburje) 448+675 - - - Box 1x7.00x3.80 7.00

8 453/7 (Vallah) 452+710 - - - Box 1x7.00x3.80 7.00

Project: 4-Laning of Jalandhar-Amritsar BOT Project of NH – 3 (Old NH-1) in the State of Punjab Page - 8

Page 9: Organization Chart of Independent Consultantnhai.org.in/spw/IEReport/Monthly Report on Audit of... · Web viewConsultancy Services – M/s Unihorn India Pvt Ltd Monthly Report on

Consultancy Services – M/s Unihorn India Pvt LtdMonthly Report on Audit of Traffic/ December 2014 1.10 Culverts –

Details of Culverts

Sl No Structure No. Chainage Type Size (m) Type of Construction Remarks

1 410/2 409+275 B 1.2x1.2 RE Construction

2 410/3 409+463 1x1.0 New Construction

3 411/1 410+207 B 1.2x1.2 RE Construction

4 413/2 412+900 2x0.9 New Construction

5 414/1 413+100 B 2.0x2.0 RE Construction

6 414/2 413+632 B 1.5x1.5 New Construction

7 418/1 417+483 S 5.25 New Construction

8 419/1 418+190 1x1 New Construction

9 420/1 419+000 S 1.5 New Construction

10 421/1 420+322 1.5x1.2 RE Construction

11 421/2 420+425 B 4.0 RE Construction

12 421/3 420+443 B 4.0 RE Construction

13 421/5 420+520 B 2.0x1.2 RE Construction

14 421/7 420+900 1x1 New Construction

15 422/1 421+900 1x1 New Construction

16 423/1 422+400 B 1.2x1.2 New Construction

17 424/1 423+400 1x1 New Construction

18 425/1 424+277 B 1.5x1.2 New Construction

19 426/1 425+075 B 1.5X1.2 RE Construction

20 426/2 425+510 1x1 New Construction

21 427/1 426+490 B 1.5X1.2 New Construction

22 428/3 427+700 1x1 New Construction

23 429/1 428+500 1x1 New Construction

24 430/1 429+000 1x1 New Construction

25 430/2 429+600 1x1 New Construction

26 433/1 432+800 B 1.2x1.2 New Construction

Sl No Structure No. Chainage Type Size (m) Type of Construction Remarks

27 435/1 434+494 S 3 RE Construction

Project: 4-Laning of Jalandhar-Amritsar BOT Project of NH – 3 (Old NH-1) in the State of Punjab Page - 9

Page 10: Organization Chart of Independent Consultantnhai.org.in/spw/IEReport/Monthly Report on Audit of... · Web viewConsultancy Services – M/s Unihorn India Pvt Ltd Monthly Report on

Consultancy Services – M/s Unihorn India Pvt LtdMonthly Report on Audit of Traffic/ December 2014

28 438/1 437+400 B 2x(1.5x1.5) New Construction

29 440/2 439+230 1x1 New Construction

30 442/1 441+100 1x1 New Construction

31 442/2 441+363 B 2x(2x1.2) RE Construction

32 443/2 442+780 B 1.2x1.2 New Construction

33 444/1 443+845 B 3x1.2 RE Construction

34 445/1 444+700 B 2x (2x1.2) RE Construction

35 448/1 447+177 B 2x(1.5x1.2) New Construction

36 449/1 448+210 S 5 RE Construction

37 449/2 448+625 B 2x (2x1.2) RE Construction

38 450/1 449+070 B 2x(1.5x1.5) RE Construction

39 450/2 449+693 1x1 RE Construction

40 451/1 450+602 1x1 RE Construction

41 451/2 450+920 1x0.6 RE Construction

42 452/2 451+906 1x1 New Construction

43 453/3 452+370 B 3x1.2 RE Construction

44 453/4 452+435 1x1 RE Construction

45 453/5 452+484 B 2x1.2 RE Construction

46 453/6 452+696 B 1.2x1.2 RE Construction

47 453/8 452+765 B 1.5x1.2 RE Construction

48 453/9 452+965 B 1.2x1.2 RE Construction

49 454/1 453+254 S 2 RE Construction

50 456/1 455+140 1.2x1.2 RE Construction

51 457/1 456+037 S 6 Widening

Legend: - S - SlabB - Box

-Pipe

Project: 4-Laning of Jalandhar-Amritsar BOT Project of NH – 3 (Old NH-1) in the State of Punjab Page - 10

Page 11: Organization Chart of Independent Consultantnhai.org.in/spw/IEReport/Monthly Report on Audit of... · Web viewConsultancy Services – M/s Unihorn India Pvt Ltd Monthly Report on

Consultancy Services – M/s Unihorn India Pvt LtdMonthly Report on Audit of Traffic/ December 2014 2 ORGANIZATION CHART OF INDEPENDENT CONSULTANT

3 INDEPENDENT CONSULTANT'S REVIEW DURING O&M PERIOD: IC’s responsibility during O&M Phase has been clearly mentioned vide Clause 3.3 along with sub causes 3.3.1 to 3.3.8. Reporting criteria has been en-framed in Clause 5 © , Page O 16 of CA VOL II during O&M Phase. Monthly reporting requirement is envisaged covering all aspects of O&M, Toll Booths, Bridges or other structures, Traffic Management and Safety, Telephone and Ambulance etc.

3.1 Traffic Sampling (Vide Schedule P of Page P1 Concession Agreement VOL II):

As Independent Consultant is authorized / obligated vide Clauses referred above to undertake traffic sampling for the purpose of determination and / or verification of the actual traffic plying on project highways, Automatic Traffic Count cum Classifier is to be procured by Concessionaire earlier i. e. as ensured by Concessionaire vide letter no 3198 dated 02.02.2011by 25.02.2011.In compliance to the Schedule – P of Concession Agreement, Concessionaire mobilized IRD (CANADA) make Automatic Traffic Count – cum – Classifier and had put up the same on trial for two days in June 2011 but subsequently it was found that the equipment is lacking from proper functioning and needs repair / replacement. The replacement of Calibrated Equipment is being placed at site from 1st week of July 2011.

Traffic Sampling / Recording System (TRS) conducted by Concessionaire in presence of IC at Km. 416.500 from date 22.12.2011 to 25.12.2011 as per Schedule – P of Concession Agreement Vol II and recent test has been conducted in the month of June 2012.

3.2 Traffic Operation and Safety Requirement (Independent Consultant’s Involvement is validated vide Clause 3.3.8, Page O –

14 Under Head of IC’s TOR of Concession Agreement Vol – II):

Project: 4-Laning of Jalandhar-Amritsar BOT Project of NH – 3 (Old NH-1) in the State of Punjab Page - 11

MR G. S. GillTEAM LEADER CUM SR. HIGHWAY ENGINEER

Mr. Harbans Singh

Asstt Highway Engineer

Mr. Anil KumarOffice Manager cum Accountant

Mr. Kartar Chand

Secretary cum Computer Operator

Mr. Mangat SinghOffice Boy

Mr. Bhupinder Singh

Asstt Bridge Engineer

Mr. N Dharamrajan

Senior Pavement Specialist

Mr. Ajay Singh

Financial Expert

Col (Retd) Dharampal

Legal Expert

Mr. Aniruddha Swami

Bridge Engineer

Mr. Praveen Kr. Jain

Quality / Material Engineer

TBN

Traffic & Transport Engineer

Mr. Satish Kr Verma(Additional Staff under COS for Grade Separator)

Quantity Surveyor

Mr. C. S. Thakur (Additional Staff under COS for Grade Separator)

Survey Engineer

Page 12: Organization Chart of Independent Consultantnhai.org.in/spw/IEReport/Monthly Report on Audit of... · Web viewConsultancy Services – M/s Unihorn India Pvt Ltd Monthly Report on

Consultancy Services – M/s Unihorn India Pvt LtdMonthly Report on Audit of Traffic/ December 2014 Independent Consultant is effective by minimizing disruption to traffic in the event of accidents or other incidents affecting the safety

and use of the Project Highway by providing a rapid and effective response and maintaining liaison procedures with emergency

services.

The Concessionaire's adherence to the safety standards set out in Schedule ‘S’ are strictly complied with in the event of any lane

closure or diversion of traffic. Compliance with Schedule ‘S’ gets monitored by the Independent Consultant and a breach by the

Concessionaire of its obligations in respect of this Schedule identified by the Independent Consultant gets notified immediately and

is required to be cured within 24 hours of its notification notwithstanding inspection, reporting procedures outlined elsewhere in this

Agreement. In addition, each notified breach shall lead to the award of a penalty point to the Concessionaire. A total of five penalty

points in any continuous period of 365 days shall constitute a Material Breach of this Agreement.

3.3 Toll Plaza and Fees Collection System (Independent Consultant’s Involvement is validated vide Clause 3.3.3,

Page O – 14 Under Head of IC’s TOR of Concession Agreement Vol – II):

Concessionaire is charging / collecting and retaining the Fees in accordance with the Agreement by refurbishment of tolling system

and hardware and other equipment. The revised rate of Toll Collection Fee commencing w.e.f 01st Sept 2014 at Toll Plaza 1&2

along with substance of Gazette Notification no. S.O. 1592(E) dated 30.06.2009 was got published for the information in two local

Newspapers i. e. "The Tribune" in English and "Daily Jagbani" in Punjabi language both as follows:

User Fee to be Applicable to each Toll Plaza i.e. at Km. 410.140 and 442.890 w.e.f. 01st September 2014 from Km. 407.100 to Km. 456.100 (Total Length 49 Km. i.e. 24.50 Km. for each Plaza)

Sr. No. Particulars Car LCV Truck

/ BusMulti Axle Vehicle

(>2 Axles)EME / HCM

1 Fee for the Traffic Crossing any one Plaza 25 43 87 140 186

2 Fee for the Local Personal Traffic (25% of the applicable fees for the specific category of Vehicle) 6 - - - -

3 Fee for the Local Commercial Traffic (50% of the applicable fees for the specific category of Vehicle) 12 22 43 70 93

4 Fee for Multiple Journey within a day for each Plaza(One & half time of notified rate) 37 65 130 209 279

5 Fee for Monthly Passes for Frequent Journey for each Plaza (payment of charges equal to 30time notified rate) 744 1303 2606 4187 5583

IC presents the monthly tollable traffic statement for both the toll plazas as submitted by the Concessionaire as Annexure – A

3.4 Traffic Data at Toll Plazas : Annexure B

3.5 Highway Accident Report : Annexure C

3.6 Incident Management : Annexure D

Project: 4-Laning of Jalandhar-Amritsar BOT Project of NH – 3 (Old NH-1) in the State of Punjab Page - 12

Page 13: Organization Chart of Independent Consultantnhai.org.in/spw/IEReport/Monthly Report on Audit of... · Web viewConsultancy Services – M/s Unihorn India Pvt Ltd Monthly Report on

Consultancy Services – M/s Unihorn India Pvt LtdMonthly Report on Audit of Traffic/ December 2014

Annexure – A

Monthly Tollable Traffic Statement for both the toll plazas

Project: 4-Laning of Jalandhar-Amritsar BOT Project of NH – 3 (Old NH-1) in the State of Punjab Page - 13

Page 14: Organization Chart of Independent Consultantnhai.org.in/spw/IEReport/Monthly Report on Audit of... · Web viewConsultancy Services – M/s Unihorn India Pvt Ltd Monthly Report on

Consultancy Services – M/s Unihorn India Pvt LtdMonthly Report on Audit of Traffic/ December 2014

MONTHLY FEE COLLECTION STATEMENT OF LOCAL TOLLED TRAFFIC FOR TOLL PLAZA-IName of Work: JALANDHAR AMRITSAR TOLLWAYS LIMITEDDate of commencement of fee collection : 30.04.2010 Report for month ending : December 2014Fee rates ( in Rs.)

Vehicle TypeFee rates on

commencement

Rates during YR 10-11

w.e.f.01.09.2010 to 31.08.2011

Rates during YR 11 -12 applied w.e.f

01.09.2011 to 31.08.2012

Rates during YR 12 -13 applied w.e.f.

01.09.2012 to 31.08.2014

Rates during YR 13-14 applied w.e.f. 01.09.2013 to

31.08.2014

Rates during YR 14-15 Present applied w.e.f. 01.09.2014 till

31.08.2015

LP LC LP LC LP LC LP LC LP LC LP LC

Car, Passenger van or jeep 4 9 5 9 5 10 5 11 6 12 6 12

Light Commercial Vehicle (LCV) including Mini Bus 8 16 8 16 0 18 0 19 0 20 0 22

Truck/Bus 15 31 16 32 0 35 0 38 0 41 0 43

Multi Axle vehicle (>2 Axle) 25 51 25 51 0 56 0 61 0 66 0 70

Earth moving equipments and heavy construction machinery 33 65 34 68 0 75 0 82 0 88 0 93

Collection during month under report (Amount in Rs. Lacs)

Vehicle TypePrevious Month Corresponding Month

during Previous Year Current Month

Nos.Amount

in Rs.Lacs

Nos. AmountNos. Amount in Rs.Lacs

Nos. Amount in Rs. LacsLP LC LP LC

Car, Passenger van or jeep 1,308 0.08 1,816 0.11 1,632 2 0.10 0.00 1,634 0.10

Light Commercial Vehicle (LCV) including Mini Bus 114 0.03 256 0.04 0 110 0.00 0.02 110 0.02

Truck/Bus 40 0.02 84 0.03 0 36 0.00 0.02 36 0.02

Multi Axle vehicle (>2 Axle) 0 0.00 0 0.00 0 0 0.00 0.00 0 0.00

Earth moving equipments and heavy construction machinery 0 0.00 0 0.00 0 0 0.00 0.00 0 0.00

Gross Total 1,462 0.12 2,156 0.18 1632 148 0.10 0.04 1,780 0.14

MONTHLY FEE COLLECTION STATEMENT OF LOCAL TOLLED TRAFFIC FOR TOLL PLAZA-II Project: 4-Laning of Jalandhar-Amritsar BOT Project of NH – 3 (Old NH-1) in the State of Punjab Page - 14

Page 15: Organization Chart of Independent Consultantnhai.org.in/spw/IEReport/Monthly Report on Audit of... · Web viewConsultancy Services – M/s Unihorn India Pvt Ltd Monthly Report on

Consultancy Services – M/s Unihorn India Pvt LtdMonthly Report on Audit of Traffic/ December 2014

Name of Work: JALANDHAR AMRITSAR TOLLWAYS LIMITEDDate of commencement of fee collection : 30.04.2010 Report for month ending : December 2014Fee rates ( in Rs.)

Vehicle TypeFee rates on

commencement

Rates during YR 10-11

w.e.f.01.09.2010 to 31.08.2011

Rates during YR 11 -12 applied w.e.f

01.09.2011 to 31.08.2012

Rates during YR 12 -13 applied w.e.f.

01.09.2012 to 31.08.2014

Rates during YR 13-14 applied w.e.f. 01.09.2013 to

31.08.2014

Rates during YR 14-15 Present applied w.e.f. 01.09.2014 till

31.08.2015

LP LC LP LC LP LC LP LC LP LC LP LC

Car, Passenger van or jeep 4 9 5 9 5 10 5 11 6 12 6 12

Light Commercial Vehicle (LCV) including Mini Bus 8 16 8 16 0 18 0 19 0 20 0 22

Truck/Bus 15 31 16 32 0 35 0 38 0 41 0 43

Multi Axle vehicle (>2 Axle) 25 51 25 51 0 56 0 61 0 66 0 70

Earth moving equipments and heavy construction machinery 33 65 34 68 0 75 0 82 0 88 0 93

Collection during month under report (Amount in Rs. Lacs)

Vehicle TypePrevious Month Corresponding Month

during Previous Year Current Month

Nos.Amount

in Rs.Lacs

Nos. AmountNos. Amount in Rs.Lacs

Nos. Amount in Rs. LacsLP LC LP LC

Car, Passenger van or jeep 7,868 0.48 10,009 0.60 7,647 194 0.46 0.02 7,841 0.48

Light Commercial Vehicle (LCV) including Mini Bus 18 0.00 127 0.03 1 17 0.00 0.00 18 0.00

Truck/Bus 56 0.02 185 0.08 0 71 0.00 0.03 71 0.03

Multi Axle vehicle (>2 Axle) 0 0.00 0 0.00 0 0 0.00 0.00 0 0.00

Earth moving equipments and heavy construction machinery 0 0.00 0 0.00 0 0 0.00 0.00 0 0.00

Gross Total 7,942 0.51 10,321 0.71 7648 282 0.46 0.06 7,930 0.52

MONTHLY FEE COLLECTION STATEMENT OF LOCAL TOLLED TRAFFIC FOR TOLL PLAZA-I & IIName of Work: JALANDHAR AMRITSAR TOLLWAYS LIMITED

Project: 4-Laning of Jalandhar-Amritsar BOT Project of NH – 3 (Old NH-1) in the State of Punjab Page - 15

Page 16: Organization Chart of Independent Consultantnhai.org.in/spw/IEReport/Monthly Report on Audit of... · Web viewConsultancy Services – M/s Unihorn India Pvt Ltd Monthly Report on

Consultancy Services – M/s Unihorn India Pvt LtdMonthly Report on Audit of Traffic/ December 2014

Date of commencement of fee collection : 30.04.2010 Report for month ending : December 2014Fee rates ( in Rs.)

Vehicle TypeFee rates on

commencement

Rates during YR 10-11

w.e.f.01.09.2010 to 31.08.2011

Rates during YR 11 -12 applied w.e.f

01.09.2011 to 31.08.2012

Rates during YR 12 -13 applied w.e.f.

01.09.2012 to 31.08.2014

Rates during YR 13-14 applied w.e.f. 01.09.2013 to

31.08.2014

Rates during YR 14-15 Present applied w.e.f. 01.09.2014 till

31.08.2015

LP LC LP LC LP LC LP LC LP LC LP LC

Car, Passenger van or jeep 4 9 5 9 5 10 5 11 6 12 6 12

Light Commercial Vehicle (LCV) including Mini Bus 8 16 8 16 0 18 0 19 0 20 0 22

Truck/Bus 15 31 16 32 0 35 0 38 0 41 0 43

Multi Axle vehicle (>2 Axle) 25 51 25 51 0 56 0 61 0 66 0 70

Earth moving equipments and heavy construction machinery 33 65 34 68 0 75 0 82 0 88 0 93

Collection during month under report (Amount in Rs. Lacs)

Vehicle TypePrevious Month Corresponding Month

during Previous Year Current Month

Nos.Amount

in Rs.Lacs

Nos. AmountNos. Amount in Rs.Lacs

Nos. Amount in Rs. LacsLP LC LP LC

Car, Passenger van or jeep 9,176 0.56 11,825 0.71 9279 196 0.56 0.02 9,475 0.58

Light Commercial Vehicle (LCV) including Mini Bus 132 0.03 383 0.06 1 127 0.00 0.03 128 0.03

Truck/Bus 96 0.04 269 0.11 0 107 0.00 0.05 107 0.05

Multi Axle vehicle (>2 Axle) 0 0.00 0 0.00 0 0 0.00 0.00 0 0.00

Earth moving equipments and heavy construction machinery 0 0.00 0 0.00 0 0 0.00 0.00 0 0.00

Gross Total 9,404 0.63 12,477 0.89 9280 430 0.56 0.10 9,710 0.65

MONTHLY FEE COLLECTION STATEMENT OF THROUGH TOLLED TRAFFIC FOR PLAZA-IName of Work: JALANDHAR AMRITSAR TOLLWAYS LIMITEDDate of commencement of fee collection : 30.04.2010 Report for month ending : December -2014

Project: 4-Laning of Jalandhar-Amritsar BOT Project of NH – 3 (Old NH-1) in the State of Punjab Page - 16

Page 17: Organization Chart of Independent Consultantnhai.org.in/spw/IEReport/Monthly Report on Audit of... · Web viewConsultancy Services – M/s Unihorn India Pvt Ltd Monthly Report on

Consultancy Services – M/s Unihorn India Pvt LtdMonthly Report on Audit of Traffic/ December 2014

Fee rates ( in Rs.)

Vehicle TypeFee rates on

commencement

Rates during YR 10-11

w.e.f.01.09.2010 to 31.08.2011

Rates during YR 11 -12 applied w.e.f 01.09.2011 to

31.08.2012

Rates during YR 12 -13 applied w.e.f. 01.09.2012

to 31.08.2014

Rates during YR 13-14 applied w.e.f. 01.09.2013

to 31.08.2014

Rates during YR 14-15 Present applied w.e.f.

01.09.2014 till 31.08.2015

SJ DP MP SJ DP MP SJ DP MP SJ DP MP SJ DP MP SJ DP MP

Car, Passenger van or jeep 17 26 523 18 27 543 20 30 601 22 33 654 23 35 702 25 37 744

Light Commercial Vehicle (LCV) including Mini Bus 31 46 916 32 48 951 35 53 1051 38 57 1145 41 61 1229 43 65 1303

Truck/Bus 61 92 1832 63 95 1902 70 105 2102 76 114 2290 82 123 2459 87 130 2606

Multi Axle vehicle (>2 Axle) 98 147 2944 102 153 3057 113 169 3379 123 184 3680 132 198 3951 140 209 4187

Earth moving equipments and heavy construction machinery 131 196 3925 204 204 4076 150 225 4505 164 245 4907 176 263 5268 186 279 5583

Collection during month under report (Amount in Rs. Lacs)

Vehicle Type Previous Month Corresponding Month during Previous Year Current Month

Nos. Amount in Rs.Lacs Nos. Amount Nos. Amount in Rs.Lacs Nos. Amount in

Rs.LacsSJ DP MP SJ DP MPCar, Passenger van or jeep 213,759 69.32 207,520 62.47 95,122 137,307 6 23.78 50.80 0.04 232,435 74.63

Light Commercial Vehicle (LCV) including Mini Bus 47,675 26.96 49,183 25.90 22,823 29,215 22 9.81 18.99 0.29 52,060 29.09

Truck/Bus 30,019 34.02 30,789 32.68 14,089 15,880 63 12.26 20.64 1.64 30,032 34.54

Multi Axle vehicle (>2 Axle) 21,434 31.95 18,893 26.77 17,774 2,987 10 24.88 6.24 0.42 20,771 31.55Earth moving equipments and heavy

construction machinery 156 0.30 59 0.11 50 3 0 0.09 0.01 0.00 53 0.10

Gross Total 313,043 162.55 306,444 147.92 149,858 185,392 101 70.83 96.69 2.39 335351 169.91

MONTHLY FEE COLLECTION STATEMENT OF THROUGH TOLLED TRAFFIC FOR PLAZA-IIName of Work: JALANDHAR AMRITSAR TOLLWAYS LIMITEDDate of commencement of fee collection : 30.04.2010 Report for month ending : December -2014

Fee rates ( in Rs.)

Project: 4-Laning of Jalandhar-Amritsar BOT Project of NH – 3 (Old NH-1) in the State of Punjab Page - 17

Page 18: Organization Chart of Independent Consultantnhai.org.in/spw/IEReport/Monthly Report on Audit of... · Web viewConsultancy Services – M/s Unihorn India Pvt Ltd Monthly Report on

Consultancy Services – M/s Unihorn India Pvt LtdMonthly Report on Audit of Traffic/ December 2014

Vehicle TypeFee rates on

commencement

Rates during YR 10-11

w.e.f.01.09.2010 to 31.08.2011

Rates during YR 11 -12 applied w.e.f 01.09.2011 to

31.08.2012

Rates during YR 12 -13 applied w.e.f. 01.09.2012

to 31.08.2014

Rates during YR 13-14 applied w.e.f. 01.09.2013

to 31.08.2014

Rates during YR 14-15 Present applied w.e.f.

01.09.2014 till 31.08.2015

SJ DP MP SJ DP MP SJ DP MP SJ DP MP SJ DP MP SJ DP MP

Car, Passenger van or jeep 17 26 523 18 27 543 20 30 601 22 33 654 23 35 702 25 37 744

Light Commercial Vehicle (LCV) including Mini Bus 31 46 916 32 48 951 35 53 1051 38 57 1145 41 61 1229 43 65 1303

Truck/Bus 61 92 1832 63 95 1902 70 105 2102 76 114 2290 82 123 2459 87 130 2606

Multi Axle vehicle (>2 Axle) 98 147 2944 102 153 3057 113 169 3379 123 184 3680 132 198 3951 140 209 4187

Earth moving equipments and heavy construction machinery 131 196 3925 204 204 4076 150 225 4505 164 245 4907 176 263 5268 186 279 5583

Collection during month under report (Amount in Rs. Lacs)

Vehicle Type Previous Month Corresponding Month during Previous Year Current Month

Nos. Amount in Rs.Lacs Nos. Amount

Nos. Amount in Rs.LacsNos. Amount in

Rs.LacsSJ DP MP SJ DP MPCar, Passenger van or jeep 215,941 70.74 215,757 65.75 83,495 141,472 9 20.87 52.34 0.07 224,976 73.29

Light Commercial Vehicle (LCV) including Mini Bus 38,852 21.83 37,689 19.91 17,166 22,209 21 7.38 14.44 0.27 39,396 22.09

Truck/Bus 22,948 26.11 23,365 24.77 10,880 11,290 43 9.47 14.68 1.12 22,213 25.26

Multi Axle vehicle (>2 Axle) 24,948 37.04 19,085 27.47 21,906 3,182 8 30.67 6.65 0.33 25,096 37.65Earth moving equipments and heavy

construction machinery 140 0.28 79 0.15 68 17 0 0.13 0.05 0.00 85 0.17

Gross Total 302,829 156.00 295,975 138.05 133,515 178,170 81 68.52 88.16 1.80 311766 158.47

MONTHLY FEE COLLECTION STATEMENT OF THROUGH TOLLED TRAFFIC FOR PLAZA-I & IIName of Work: JALANDHAR AMRITSAR TOLLWAYS LIMITEDDate of commencement of fee collection : 30.04.2010 Report for month ending : December -2014

Fee rates ( in Rs.)

Project: 4-Laning of Jalandhar-Amritsar BOT Project of NH – 3 (Old NH-1) in the State of Punjab Page - 18

Page 19: Organization Chart of Independent Consultantnhai.org.in/spw/IEReport/Monthly Report on Audit of... · Web viewConsultancy Services – M/s Unihorn India Pvt Ltd Monthly Report on

Consultancy Services – M/s Unihorn India Pvt LtdMonthly Report on Audit of Traffic/ December 2014

Vehicle TypeFee rates on

commencement

Rates during YR 10-11

w.e.f.01.09.2010 to 31.08.2011

Rates during YR 11 -12 applied w.e.f 01.09.2011 to

31.08.2012

Rates during YR 12 -13 applied w.e.f. 01.09.2012

to 31.08.2014

Rates during YR 13-14 applied w.e.f. 01.09.2013

to 31.08.2014

Rates during YR 14-15 Present applied w.e.f.

01.09.2014 till 31.08.2015

SJ DP MP SJ DP MP SJ DP MP SJ DP MP SJ DP MP SJ DP MP

Car, Passenger van or jeep 17 26 523 18 27 543 20 30 601 22 33 654 23 35 702 25 37 744

Light Commercial Vehicle (LCV) including Mini Bus 31 46 916 32 48 951 35 53 1051 38 57 1145 41 61 1229 43 65 1303

Truck/Bus 61 92 1832 63 95 1902 70 105 2102 76 114 2290 82 123 2459 87 130 2606

Multi Axle vehicle (>2 Axle) 98 147 2944 102 153 3057 113 169 3379 123 184 3680 132 198 3951 140 209 4187

Earth moving equipments and heavy construction machinery 131 196 3925 204 204 4076 150 225 4505 164 245 4907 176 263 5268 186 279 5583

Collection during month under report (Amount in Rs. Lacs)

Vehicle Type Previous Month Corresponding Month during Previous Year Current Month

Nos. Amount in Rs.Lacs Nos. Amount

Nos. Amount in Rs.LacsNos. Amount in

Rs.LacsSJ DP MP SJ DP MPCar, Passenger van or jeep 429,700 140.06 423,277 128.22 178617 278779 15 41.08 97.57 0.11 457,411 147.91

Light Commercial Vehicle (LCV) including Mini Bus 86,527 48.79 86,872 45.81 39989 51424 43 16.40 31.37 0.53 91,456 51.18

Truck/Bus 52,967 60.13 54,154 57.45 24969 27170 106 20.22 33.42 2.61 52,245 59.81

Multi Axle vehicle (>2 Axle) 46,382 68.99 37,978 54.24 39680 6169 18 52.38 12.21 0.71 45,867 69.20Earth moving equipments and heavy

construction machinery 296 0.58 138 0.26 118 20 0 0.21 0.05 0.00 138 0.28

Gross Total 615,872 318.55 602,419 285.98 283373 363562 182 130.29 174.63 3.95 647,117 328.38

MONTHLY FEE COLLECTION STATEMENT OF TOTAL TOLLED TRAFFIC FOR PLAZA-IName of Work: JALANDHAR AMRITSAR TOLLWAYS LIMITEDDate of commencement of fee collection : 30.04.2010 Report for month ending : December- 2014Fee rates ( in Rs.)

Project: 4-Laning of Jalandhar-Amritsar BOT Project of NH – 3 (Old NH-1) in the State of Punjab Page - 19

Page 20: Organization Chart of Independent Consultantnhai.org.in/spw/IEReport/Monthly Report on Audit of... · Web viewConsultancy Services – M/s Unihorn India Pvt Ltd Monthly Report on

Consultancy Services – M/s Unihorn India Pvt LtdMonthly Report on Audit of Traffic/ December 2014

Vehicle TypeFee rates on

commencement

Rates during YR 10-11

w.e.f.01.09.2010 to 31.08.2011

Rates during YR 11 -12 applied w.e.f

01.09.2011 to 31.08.2012

Rates during YR 12 -13 applied w.e.f. 01.09.2012 to

31.08.2014

Rates during YR 13-14 applied w.e.f. 01.09.2013

to 31.08.2014

Rates during YR 14-15 Present applied w.e.f.

01.09.2014 till 31.08.2015

SJ DP MP SJ DP MP SJ DP MP SJ DP MP SJ DP MP SJ DP MP

Car, Passenger van or jeep 17 26 523 18 27 543 20 30 601 22 33 654 23 35 702 25 37 744

Light Commercial Vehicle (LCV) including Mini Bus 31 46 916 32 48 951 35 53 1051 38 57 1145 41 61 1229 43 65 1303

Truck/Bus 61 92 1832 63 95 1902 70 105 2102 76 114 2290 82 123 2459 87 130 2606

Multi Axle vehicle (>2 Axle) 98 147 2944 102 153 3057 113 169 3379 123 184 3680 132 198 3951 140 209 4187

Earth moving equipments and heavy construction machinery 131 196 3925 204 204 4076 150 225 4505 164 245 4907 176 263 5268 186 279 5583

Collection during month under report (Amount in Rs. Lacs)

Vehicle TypePrevious Month

Corresponding Month during Previous Year

Current Month

Nos. Amount in Rs.Lacs Nos. Amount

Nos. Amount in Rs.LacsNos. Amount in

Rs.LacsSJ DP LP LC MP SJ DP LP LC MP

Car, Passenger van or jeep 215,067 69.40 209,336 62.58 95122 137307 1632 2 6 23.78 50.80 0.10 0.00 0.04 234,069 74.73

Light Commercial Vehicle (LCV) including Mini Bus 47,789 26.99 49,439 25.94 22823 29215 0 110 22 9.81 18.99 0.00 0.02 0.29 52,170 29.11

Truck/Bus 30,059 34.04 30,873 32.71 14089 15880 0 36 63 12.26 20.64 0.00 0.01 1.64 30,068 34.56

Multi Axle vehicle (>2 Axle) 21,434 31.95 18,893 26.77 17774 2987 0 0 10 24.88 6.24 0.00 0.00 0.42 20,771 31.55Earth moving equipments and heavy construction

machinery156 0.30 59 0.11 50 3 0 0 0 0.09 0.01 0.00 0.00 0.00 53 0.10

Gross Total 314,505 162.68 308,600 148.10 149858 185392 1632 148 101 70.83 96.69 0.10 0.04 2.39 337131 170.04

MONTHLY FEE COLLECTION STATEMENT OF TOTAL TOLLED TRAFFIC FOR PLAZA-IIName of Work: JALANDHAR AMRITSAR TOLLWAYS LIMITEDDate of commencement of fee collection : 30.04.2010 Report for month ending : December - 2014Fee rates ( in Rs.)

Project: 4-Laning of Jalandhar-Amritsar BOT Project of NH – 3 (Old NH-1) in the State of Punjab Page - 20

Page 21: Organization Chart of Independent Consultantnhai.org.in/spw/IEReport/Monthly Report on Audit of... · Web viewConsultancy Services – M/s Unihorn India Pvt Ltd Monthly Report on

Consultancy Services – M/s Unihorn India Pvt LtdMonthly Report on Audit of Traffic/ December 2014

Vehicle TypeFee rates on

commencement

Rates during YR 10-11

w.e.f.01.09.2010 to 31.08.2011

Rates during YR 11 -12 applied w.e.f

01.09.2011 to 31.08.2012

Rates during YR 12 -13 applied w.e.f. 01.09.2012 to

31.08.2014

Rates during YR 13-14 applied w.e.f. 01.09.2013

to 31.08.2014

Rates during YR 14-15 Present applied w.e.f.

01.09.2014 till 31.08.2015

SJ DP MP SJ DP MP SJ DP MP SJ DP MP SJ DP MP SJ DP MP

Car, Passenger van or jeep 17 26 523 18 27 543 20 30 601 22 33 654 23 35 702 25 37 744

Light Commercial Vehicle (LCV) including Mini Bus 31 46 916 32 48 951 35 53 1051 38 57 1145 41 61 1229 43 65 1303

Truck/Bus 61 92 1832 63 95 1902 70 105 2102 76 114 2290 82 123 2459 87 130 2606

Multi Axle vehicle (>2 Axle) 98 147 2944 102 153 3057 113 169 3379 123 184 3680 132 198 3951 140 209 4187

Earth moving equipments and heavy construction machinery 131 196 3925 204 204 4076 150 225 4505 164 245 4907 176 263 5268 186 279 5583

Collection during month under report (Amount in Rs. Lacs)

Vehicle TypePrevious Month Corresponding Month

during Previous Year Current Month

Nos. Amount in Rs.Lacs Nos. Amount

Nos. Amount in Rs.LacsNos. Amount in

Rs.LacsSJ DP LP LC MP SJ DP LP LC MP

Car, Passenger van or jeep 223,809 71.22 225,766 66.35 83495 141472 7647 194 9 20.87 49.52 0.46 0.02 0.07 232,817 70.94

Light Commercial Vehicle (LCV) including Mini Bus 38,870 21.83 37,816 19.93 17166 22209 1 17 21 7.38 14.44 0.00 0.00 0.27 39,414 22.09

Truck/Bus 23,004 26.13 23,550 24.85 10880 11290 0 71 43 9.47 14.68 0.00 0.03 1.12 22,284 25.29

Multi Axle vehicle (>2 Axle) 24,948 37.04 19,085 27.47 21906 3182 0 0 8 30.67 6.65 0.00 0.00 0.33 25,096 37.65Earth moving equipments and heavy construction

machinery140 0.28 79 0.15 68 17 0 0 0 0.13 0.05 0.00 0.00 0.00 85 0.17

Gross Total 310,771 156.50 306,296 138.7598 133515 178170 7648 282 81 68.52 85.33 0.46 0.06 1.80 319,696 156.15

MONTHLY FEE COLLECTION STATEMENT OF TOTAL TOLLED TRAFFIC FOR PLAZA- I & IIName of Work: JALANDHAR AMRITSAR TOLLWAYS LIMITEDDate of commencement of fee collection : 30.04.2010 Report for month ending : December- 2014Fee rates ( in Rs.)

Project: 4-Laning of Jalandhar-Amritsar BOT Project of NH – 3 (Old NH-1) in the State of Punjab Page - 21

Page 22: Organization Chart of Independent Consultantnhai.org.in/spw/IEReport/Monthly Report on Audit of... · Web viewConsultancy Services – M/s Unihorn India Pvt Ltd Monthly Report on

Consultancy Services – M/s Unihorn India Pvt LtdMonthly Report on Audit of Traffic/ December 2014

Vehicle TypeFee rates on

commencement

Rates during YR 10-11

w.e.f.01.09.2010 to 31.08.2011

Rates during YR 11 -12 applied w.e.f

01.09.2011 to 31.08.2012

Rates during YR 12 -13 applied w.e.f. 01.09.2012 to

31.08.2014

Rates during YR 13-14 applied w.e.f. 01.09.2013

to 31.08.2014

Rates during YR 14-15 Present applied w.e.f.

01.09.2014 till 31.08.2015

SJ DP MP SJ DP MP SJ DP MP SJ DP MP SJ DP MP SJ DP MP

Car, Passenger van or jeep 17 26 523 18 27 543 20 30 601 22 33 654 23 35 702 25 37 744

Light Commercial Vehicle (LCV) including Mini Bus 31 46 916 32 48 951 35 53 1051 38 57 1145 41 61 1229 43 65 1303

Truck/Bus 61 92 1832 63 95 1902 70 105 2102 76 114 2290 82 123 2459 87 130 2606

Multi Axle vehicle (>2 Axle) 98 147 2944 102 153 3057 113 169 3379 123 184 3680 132 198 3951 140 209 4187

Earth moving equipments and heavy construction machinery 131 196 3925 204 204 4076 150 225 4505 164 245 4907 176 263 5268 186 279 5583

Collection during month under report (Amount in Rs. Lacs)

Vehicle TypePrevious Month Corresponding Month

during Previous Year Current Month

Nos. Amount in Rs.Lacs Nos. Amount

Nos. Amount in Rs.LacsNos. Amount in

Rs.LacsSJ DP LP LC MP SJ DP LP LC MP

Car, Passenger van or jeep 438,876 140.62 435,102 128.93 178617 278779 9,279 196 15 44.65 103.15 0.56 0.02 0.11 466,886 148.49

Light Commercial Vehicle (LCV) including Mini Bus 86,659 48.82 87255 45.8696 39989 51424 1 127 43 17.20 33.43 0.00 0.03 0.53 91,584 51.17

Truck/Bus 53,063 60.17 54423 57.5636 24969 27170 0 107 106 21.72 35.32 0.00 0.05 2.61 52,352 59.70

Multi Axle vehicle (>2 Axle) 46,382 68.99 37978 54.239 39680 6169 0 0 18 55.55 12.89 0.00 0.00 0.71 45,867 69.16Earth moving equipments and heavy construction

machinery296 0.58 138 0.26202 118 20 0 0 0 0.22 0.06 0.00 0.00 0.00 138 0.28

Gross Total 625,276 319.18 614,896 286.864 283373 363562 9,280 430 182 139.34 184.84 0.56 0.09 3.95 656,827 328.79

STATEMENT OF DAILY TRAFFIC & COLLECTION (Toll Plaza 1)(A) Tolled Traffic & Collection (Cash)

Date Car, Passenger Van or Jeep

Light Commercial Vehicle Truck/Bus Multi Axle Vehicle Earth moving equipments and

heavy construction machinery Total

Project: 4-Laning of Jalandhar-Amritsar BOT Project of NH – 3 (Old NH-1) in the State of Punjab Page - 22

Page 23: Organization Chart of Independent Consultantnhai.org.in/spw/IEReport/Monthly Report on Audit of... · Web viewConsultancy Services – M/s Unihorn India Pvt Ltd Monthly Report on

Consultancy Services – M/s Unihorn India Pvt LtdMonthly Report on Audit of Traffic/ December 2014

Nos. Amount Nos. Amount Nos. Amount Nos. Amount Nos. Amount (Rs.) Nos. Amount (Rs.)1- Dec-14 6703 215923 1704 95646 1035 113523 671 99805 4 837 10117 525734

2- Dec-14 7011 228291 1729 95181 1023 113855 690 104121 2 372 10455 541820

3- Dec -14 8054 262418 1767 98245 1034 115199 728 109855 1 186 11584 585903

4- Dec -14 7070 225398 1722 94550 1009 111347 742 110987 1 186 10544 542468

5- Dec -14 8569 271225 2090 116270 999 110692 742 111194 3 558 12403 609939

6- Dec -14 10577 343529 1881 104599 1032 114638 722 107980 2 372 14214 671118

7- Dec -14 12041 388325 1950 107324 909 100841 645 95958 2 372 15547 692820

8- Dec -14 6942 220134 1741 97963 1042 114949 747 111687 0 0 10472 544733

9- Dec -14 6066 196542 1723 94659 969 105717 705 104910 3 558 9466 502386

10- Dec -14 6323 207611 1788 100248 958 105491 736 111044 4 837 9809 525231

11- Dec -14 5953 191761 1638 89486 965 106917 692 105160 1 186 9249 493510

12- Dec -14 7544 238628 1795 98239 1037 113654 795 119649 6 1209 11177 571379

13- Dec -14 9772 317440 1817 101627 966 106746 730 108548 2 372 13287 634733

14- Dec-14 10327 332575 1710 94782 855 94208 572 84565 0 0 13464 606130

15- Dec -14 6337 202777 1520 84104 991 108061 721 107564 4 744 9573 503250

16- Dec -14 5884 192436 1819 102373 990 110253 687 102942 0 0 9380 508004

17- Dec -14 5637 184173 1560 85846 906 99806 631 95102 0 0 8734 464927

18- Dec -14 5488 177004 1675 91781 1066 117467 810 119886 1 186 9040 506324

19- Dec -14 6811 212839 1851 101527 1011 109543 684 103350 0 0 10357 527259

20- Dec -14 8832 288552 1686 94278 1155 121469 677 102922 1 186 12351 607407

21- Dec -14 11299 367711 1819 101515 844 89983 566 83104 0 0 14528 642313

22- Dec -14 6346 202366 1573 87725 993 109697 581 89413 0 0 9493 489201

23- Dec -14 5921 189833 1339 74275 896 101430 521 78391 4 744 8681 444673

24- Dec -14 6639 212691 1517 82919 945 103930 691 104951 3 558 9795 505049

25- Dec -14 6387 201639 1749 96547 893 94805 709 105056 3 558 9741 498605

26- Dec -14 6751 212779 1474 81026 976 107100 578 86509 1 186 9780 487600

27- Dec -14 7502 233870 1609 89229 922 100166 632 95518 0 0 10665 518783

28- Dec -14 8105 257441 1198 64802 787 86271 530 78616 2 372 10622 487502

29- Dec -14 7062 222306 1301 71233 869 96071 467 70003 1 186 9700 459799

30- Dec -14 6478 204454 1586 88482 926 101159 605 91807 2 372 9597 486274

31-Dec-14 7995 255663 1706 93840 966 105155 753 111906 0 0 11420 566564

Total 232426 7458334 52037 2880321 29969 3290143 20760 3112503 53 10137 335245 16751438(B) Local Tolled Traffic & Collection (Through Smart Cards)

Project: 4-Laning of Jalandhar-Amritsar BOT Project of NH – 3 (Old NH-1) in the State of Punjab Page - 23

Page 24: Organization Chart of Independent Consultantnhai.org.in/spw/IEReport/Monthly Report on Audit of... · Web viewConsultancy Services – M/s Unihorn India Pvt Ltd Monthly Report on

Consultancy Services – M/s Unihorn India Pvt LtdMonthly Report on Audit of Traffic/ December 2014

Date Car, Passenger Van or Jeep Light Commercial Vehicle Truck/Bus Multi Axle Vehicle (>2 axle) Earth moving equipments and

heavy construction machinery Total

Nos. Amount Nos. Amount Nos. Amount Nos. Amount Nos. Amount (Rs.) Nos. Amount (Rs.)1- Dec-14 54 324 6 132 1 43 0 0 0 0 61 499

2- Dec-14 54 324 5 110 2 86 0 0 0 0 61 520

3- Dec -14 35 210 7 154 2 86 0 0 0 0 44 450

4- Dec -14 62 372 4 88 2 86 0 0 0 0 68 546

5- Dec -14 54 324 4 88 2 86 0 0 0 0 60 498

6- Dec -14 48 288 3 66 1 43 0 0 0 0 52 397

7- Dec -14 31 186 1 22 0 0 0 0 0 0 32 208

8- Dec -14 45 270 4 88 0 0 0 0 0 0 49 358

9- Dec -14 53 318 4 88 2 86 0 0 0 0 59 492

10- Dec -14 53 318 4 88 2 86 0 0 0 0 59 492

11- Dec -14 39 234 5 110 2 86 0 0 0 0 46 430

12- Dec -14 45 270 5 110 2 86 0 0 0 0 52 466

13- Dec -14 39 234 3 66 0 0 0 0 0 0 42 300

14- Dec-14 29 174 1 22 1 43 0 0 0 0 31 239

15- Dec -14 43 258 4 88 2 86 0 0 0 0 49 432

16- Dec -14 62 384 5 110 2 86 0 0 0 0 69 580

17- Dec -14 51 306 5 110 3 129 0 0 0 0 59 545

18- Dec -14 65 390 4 88 1 43 0 0 0 0 70 521

19- Dec -14 49 294 4 88 1 43 0 0 0 0 54 425

20- Dec -14 58 348 3 66 0 0 0 0 0 0 61 414

21- Dec -14 41 246 1 22 0 0 0 0 0 0 42 268

22- Dec -14 60 360 4 88 2 86 0 0 0 0 66 534

23- Dec -14 53 318 3 66 1 43 0 0 0 0 57 427

24- Dec -14 79 474 6 132 0 0 0 0 0 0 85 606

25- Dec -14 38 228 4 88 3 129 0 0 0 0 45 445

26- Dec -14 72 432 1 22 1 43 0 0 0 0 74 497

27- Dec -14 56 336 3 66 1 43 0 0 0 0 60 445

28- Dec -14 63 378 2 44 0 0 0 0 0 0 65 422

29- Dec -14 64 384 3 66 0 0 0 0 0 0 67 450

30- Dec -14 58 348 1 22 0 0 0 0 0 0 59 370

31-Dec-14 81 486 1 22 0 0 0 0 0 0 82 508

Project: 4-Laning of Jalandhar-Amritsar BOT Project of NH – 3 (Old NH-1) in the State of Punjab Page - 24

Page 25: Organization Chart of Independent Consultantnhai.org.in/spw/IEReport/Monthly Report on Audit of... · Web viewConsultancy Services – M/s Unihorn India Pvt Ltd Monthly Report on

Consultancy Services – M/s Unihorn India Pvt LtdMonthly Report on Audit of Traffic/ December 2014

Total 1634 9816 110 2420 36 1548 0 0 0 0 1780 13784

Total Tolled Traffic & Collection (A+B)

Date Car, Passenger Van or Jeep Light Commercial Vehicle Truck/Bus Multi Axle Vehicle (>2 axle) Earth moving equipments and heavy construction machinery Total

Nos. Amount Nos. Amount Nos. Amount Nos. Amount Nos. Amount (Rs.) Nos. Amount (Rs.)

1- Dec-14 6757 216247 1710 95778 1036 113566 671 99805 4 837 10178 526233

2- Dec-14 7065 228615 1734 95291 1025 113941 690 104121 2 372 10516 542340

3- Dec -14 8089 262628 1774 98399 1036 115285 728 109855 1 186 11628 586353

4- Dec -14 7132 225770 1726 94638 1011 111433 742 110987 1 186 10612 543014

5- Dec -14 8623 271549 2094 116358 1001 110778 742 111194 3 558 12463 610437

6- Dec -14 10625 343817 1884 104665 1033 114681 722 107980 2 372 14266 671515

7- Dec -14 12072 388511 1951 107346 909 100841 645 95958 2 372 15579 693028

8- Dec -14 6987 220404 1745 98051 1042 114949 747 111687 0 0 10521 545091

9- Dec -14 6119 196860 1727 94747 971 105803 705 104910 3 558 9525 502878

10- Dec -14 6376 207929 1792 100336 960 105577 736 111044 4 837 9868 525723

11- Dec -14 5992 191995 1643 89596 967 107003 692 105160 1 186 9295 493940

12- Dec -14 7589 238898 1800 98349 1039 113740 795 119649 6 1209 11229 571845

13- Dec -14 9811 317674 1820 101693 966 106746 730 108548 2 372 13329 635033

14- Dec-14 10356 332749 1711 94804 856 94251 572 84565 0 0 13495 606369

15- Dec -14 6380 203035 1524 84192 993 108147 721 107564 4 744 9622 503682

16- Dec -14 5946 192820 1824 102483 992 110339 687 102942 0 0 9449 508584

17- Dec -14 5688 184479 1565 85956 909 99935 631 95102 0 0 8793 465472

18- Dec -14 5553 177394 1679 91869 1067 117510 810 119886 1 186 9110 506845

19- Dec -14 6860 213133 1855 101615 1012 109586 684 103350 0 0 10411 527684

20- Dec -14 8890 288900 1689 94344 1155 121469 677 102922 1 186 12412 607821

21- Dec -14 11340 367957 1820 101537 844 89983 566 83104 0 0 14570 642581

22- Dec -14 6406 202726 1577 87813 995 109783 581 89413 0 0 9559 489735

23- Dec -14 5974 190151 1342 74341 897 101473 521 78391 4 744 8738 445100

24- Dec -14 6718 213165 1523 83051 945 103930 691 104951 3 558 9880 505655

25- Dec -14 6425 201867 1753 96635 896 94934 709 105056 3 558 9786 499050

26- Dec -14 6823 213211 1475 81048 977 107143 578 86509 1 186 9854 488097

27- Dec -14 7558 234206 1612 89295 923 100209 632 95518 0 0 10725 519228

28- Dec -14 8168 257819 1200 64846 787 86271 530 78616 2 372 10687 487924

Project: 4-Laning of Jalandhar-Amritsar BOT Project of NH – 3 (Old NH-1) in the State of Punjab Page - 25

Page 26: Organization Chart of Independent Consultantnhai.org.in/spw/IEReport/Monthly Report on Audit of... · Web viewConsultancy Services – M/s Unihorn India Pvt Ltd Monthly Report on

Consultancy Services – M/s Unihorn India Pvt LtdMonthly Report on Audit of Traffic/ December 2014

29- Dec -14 7126 222690 1304 71299 869 96071 467 70003 1 186 9767 460249

30- Dec -14 6536 204802 1587 88504 926 101159 605 91807 2 372 9656 486644

31-Dec-14 8076 256149 1707 93862 966 105155 753 111906 0 0 11502 567072

Total 234060 7468150 52147 2882741 30005 3291691 20760 3112503 53 10137 337025 16765222(C) Exempted Traffic

Date Car, Passenger Van or Jeep Light Commercial Vehicle Truck/Bus Multi Axle Vehicle (>2 axle)

Earth moving equipments and heavy construction machinery Total

Nos. Amount Nos. Amount Nos. Amount Nos. Amount Nos. Amount (Rs.) Nos. Amount (Rs.)

1- Dec-14 268 6700 18 774 12 1044 2 280 0 0 300 8798

2- Dec-14 281 7025 25 1075 11 957 3 420 0 0 320 9477

3- Dec -14 293 7325 21 903 17 1479 3 420 0 0 334 10127

4- Dec -14 284 7100 23 989 18 1566 2 280 0 0 327 9935

5- Dec -14 293 7325 21 903 21 1827 1 140 0 0 336 10195

6- Dec -14 325 8125 26 1118 17 1479 2 280 1 186 371 11188

7- Dec -14 298 7450 24 1032 9 783 3 420 0 0 334 9685

8- Dec -14 275 6875 23 989 21 1827 1 140 0 0 320 9831

9- Dec -14 236 5900 28 1204 23 2001 1 140 0 0 288 9245

10- Dec -14 263 6575 31 1333 22 1914 3 420 0 0 319 10242

11- Dec -14 216 5400 16 688 28 2436 4 560 0 0 264 9084

12- Dec -14 262 6550 36 1548 21 1827 1 140 0 0 320 10065

13- Dec -14 330 8250 40 1720 18 1566 2 280 0 0 390 11816

14- Dec-14 294 7350 24 1032 4 348 4 560 0 0 326 9290

15- Dec -14 236 5900 33 1419 14 1218 4 560 0 0 287 9097

16- Dec -14 215 5375 28 1204 26 2262 3 420 0 0 272 9261

17- Dec -14 249 6225 33 1419 24 2088 1 140 0 0 307 9872

18- Dec -14 206 5150 13 559 34 2958 1 140 0 0 254 8807

19- Dec -14 253 6325 35 1505 19 1653 1 140 0 0 308 9623

20- Dec -14 253 6325 21 903 15 1305 0 0 0 0 289 8533

21- Dec -14 308 7700 28 1204 7 609 2 280 0 0 345 9793

22- Dec -14 327 8175 50 2150 21 1827 0 0 0 0 398 12152

23- Dec -14 292 7300 40 1720 28 2436 3 420 0 0 363 11876

24- Dec -14 290 7250 27 1161 27 2349 0 0 0 0 344 10760

25- Dec -14 285 7125 13 559 20 1740 2 280 0 0 320 9704

Project: 4-Laning of Jalandhar-Amritsar BOT Project of NH – 3 (Old NH-1) in the State of Punjab Page - 26

Page 27: Organization Chart of Independent Consultantnhai.org.in/spw/IEReport/Monthly Report on Audit of... · Web viewConsultancy Services – M/s Unihorn India Pvt Ltd Monthly Report on

Consultancy Services – M/s Unihorn India Pvt LtdMonthly Report on Audit of Traffic/ December 2014

26- Dec -14 296 7400 19 817 11 957 0 0 1 186 327 9360

27- Dec -14 226 5650 16 688 36 3132 0 0 0 0 278 9470

28- Dec -14 293 7325 28 1204 4 348 1 140 0 0 326 9017

29- Dec -14 277 6925 21 903 9 783 0 0 0 0 307 8611

30- Dec -14 264 6600 33 1419 16 1392 3 420 0 0 316 9831

31-Dec-14 265 6625 26 1118 9 783 1 140 0 0 301 8666

Total 8453 211325 820 35260 562 48894 54 7560 0 372 9891 303411

(D) Bar Code Traffic

Date Car, Passenger Van or Jeep

Light Commercial Vehicle Truck/Bus Multi Axle Vehicle

(>2 axle)Earth moving equipments and heavy construction machinery Total

Nos. Amount Nos. Amount Nos. Amount Nos. Amount Nos. Amount (Rs.) Nos. Amount (Rs.)1- Dec-14 4195 104875 1125 48375 693 60291 133 18620 0 0 6146 232161

2- Dec-14 4375 109375 1076 46268 757 65859 142 19880 1 186 6351 241568

3- Dec -14 5152 128800 1139 48977 766 66642 193 27020 0 0 7250 271439

4- Dec -14 4289 107225 1075 46225 753 65511 183 25620 0 0 6300 244581

5- Dec -14 4229 105725 1353 58179 680 59160 165 23100 0 0 6427 246164

6- Dec -14 5274 131850 1111 47773 577 50199 160 22400 0 0 7122 252222

7- Dec -14 5364 134100 886 38098 445 38715 143 20020 0 0 6838 230933

8- Dec -14 4045 101125 1170 50310 734 63858 189 26460 0 0 6138 241753

9- Dec -14 3908 97700 1113 47859 738 64206 212 29680 0 0 5971 239445

10- Dec -14 4193 104825 1213 52159 671 58377 202 28280 1 186 6280 243827

11- Dec -14 3710 92750 1028 44204 725 63075 246 34440 0 0 5709 234469

12- Dec -14 3942 98550 1091 46913 676 58812 210 29400 0 0 5919 233675

13- Dec -14 4676 116900 1052 45236 585 50895 162 22680 0 0 6475 235711

14- Dec-14 4790 119750 816 35088 376 32712 73 10220 0 0 6055 197770

15- Dec -14 3648 91200 933 40119 622 54114 99 13860 0 0 5302 199293

16- Dec -14 3823 95575 1239 53277 721 62727 119 16660 0 0 5902 228239

17- Dec -14 3574 89350 960 41280 672 58464 123 17220 0 0 5329 206314

18- Dec -14 3430 85750 1017 43731 676 58812 182 25480 0 0 5305 213773

19- Dec -14 3372 84300 1142 49106 649 56463 198 27720 0 0 5361 217589

20- Dec -14 4390 109750 1001 43043 520 45240 178 24920 0 0 6089 222953

21- Dec -14 4799 119975 767 32981 270 23490 145 20300 0 0 5981 196746

Project: 4-Laning of Jalandhar-Amritsar BOT Project of NH – 3 (Old NH-1) in the State of Punjab Page - 27

Page 28: Organization Chart of Independent Consultantnhai.org.in/spw/IEReport/Monthly Report on Audit of... · Web viewConsultancy Services – M/s Unihorn India Pvt Ltd Monthly Report on

Consultancy Services – M/s Unihorn India Pvt LtdMonthly Report on Audit of Traffic/ December 2014

22- Dec -14 3728 93200 1014 43602 618 53766 190 26600 0 0 5550 217168

23- Dec -14 3488 87200 939 40377 695 60465 192 26880 0 0 5314 214922

24- Dec -14 3679 91975 903 38829 604 52548 192 26880 0 0 5378 210232

25- Dec -14 3246 81150 974 41882 410 35670 133 18620 0 0 4763 177322

26- Dec -14 3579 89475 887 38141 547 47589 166 23240 1 186 5180 198631

27- Dec -14 3392 84800 970 41710 532 46284 126 17640 0 0 5020 190434

28- Dec -14 4298 107450 668 28724 462 40194 153 21420 0 0 5581 197788

29- Dec -14 3494 87350 689 29627 437 38019 107 14980 0 0 4727 169976

30- Dec -14 3247 81175 914 39302 506 44022 97 13580 0 0 4764 178079

31-Dec-14 3723 93075 916 39388 453 39411 90 12600 0 0 5182 184474

Total 125052 3126300 31181 1340783 18570 1615590 4903 686420 3 558 179709 6769651

Grand Total of Traffic & Collection (A+B+C+D)

Date Car, Passenger Van or Jeep Light Commercial Vehicle Truck/Bus Multi Axle Vehicle

(>2 axle)Earth moving equipments and heavy construction machinery Grand Total

Nos. Amount Nos. Amount Nos. Amount Nos. Amount Nos. Amount (Rs.) Nos. Amount (Rs.)

1- Dec-14 11220 327822 2853 144927 1741 174901 806 118705 4 837 16624 767192

2- Dec-14 11721 345015 2835 142634 1793 180757 835 124421 3 558 17187 793385

3- Dec -14 13534 398753 2934 148279 1819 183406 924 137295 1 186 19212 867919

4- Dec -14 11705 340095 2824 141852 1782 178510 927 136887 1 186 17239 797530

5- Dec -14 13145 384599 3468 175440 1702 171765 908 134434 3 558 19226 866796

6- Dec -14 16224 483792 3021 153556 1627 166359 884 130660 3 558 21759 934925

7- Dec -14 17734 530061 2861 146476 1363 140339 791 116398 2 372 22751 933646

8- Dec -14 11307 328404 2938 149350 1797 180634 937 138287 0 0 16979 796675

9- Dec -14 10263 300460 2868 143810 1732 172010 918 134730 3 558 15784 751568

10- Dec -14 10832 319329 3036 153828 1653 165868 941 139744 5 1023 16467 779792

11- Dec -14 9918 290145 2687 134488 1720 172514 942 140160 1 186 15268 737493

12- Dec -14 11793 343998 2927 146810 1736 174379 1006 149189 6 1209 17468 815585

13- Dec -14 14817 442824 2912 148649 1569 159207 894 131508 2 372 20194 882560

14- Dec-14 15440 459849 2551 130924 1236 127311 649 95345 0 0 19876 813429

15- Dec -14 10264 300135 2490 125730 1629 163479 824 121984 4 744 15211 712072

16- Dec -14 9984 293770 3091 156964 1739 175328 809 120022 0 0 15623 746084

17- Dec -14 9511 280054 2558 128655 1605 160487 755 112462 0 0 14429 681658

Project: 4-Laning of Jalandhar-Amritsar BOT Project of NH – 3 (Old NH-1) in the State of Punjab Page - 28

Page 29: Organization Chart of Independent Consultantnhai.org.in/spw/IEReport/Monthly Report on Audit of... · Web viewConsultancy Services – M/s Unihorn India Pvt Ltd Monthly Report on

Consultancy Services – M/s Unihorn India Pvt LtdMonthly Report on Audit of Traffic/ December 2014

18- Dec -14 9189 268294 2709 136159 1777 179280 993 145506 1 186 14669 729425

19- Dec -14 10485 303758 3032 152226 1680 167702 883 131210 0 0 16080 754896

20- Dec -14 13533 404975 2711 138290 1690 168014 855 127842 1 186 18790 839307

21- Dec -14 16447 495632 2615 135722 1121 114082 713 103684 0 0 20896 849120

22- Dec -14 10461 304101 2641 133565 1634 165376 771 116013 0 0 15507 719055

23- Dec -14 9754 284651 2321 116438 1620 164374 716 105691 4 744 14415 671898

24- Dec -14 10687 312390 2453 123041 1576 158827 883 131831 3 558 15602 726647

25- Dec -14 9956 290142 2740 139076 1326 132344 844 123956 3 558 14869 686076

26- Dec -14 10698 310086 2381 120006 1535 155689 744 109749 3 558 15361 696088

27- Dec -14 11176 324656 2598 131693 1491 149625 758 113158 0 0 16023 719132

28- Dec -14 12759 372594 1896 94774 1253 126813 684 100176 2 372 16594 694729

29- Dec -14 10897 316965 2014 101829 1315 134873 574 84983 1 186 14801 638836

30- Dec -14 10047 292577 2534 129225 1448 146573 705 105807 2 372 14736 674554

31-Dec-14 12064 355849 2649 134368 1428 145349 844 124646 0 0 16985 760212

Total 367565 10805775 84148 4258784 49137 4956175 25717 3806483 58 11067 526625 23838284

STATEMENT OF DAILY TRAFFIC & COLLECTION(Toll Plaza 2) (A) Tolled Traffic & Collection (Cash)

Date Car, Passenger Van or Jeep Light Commercial Vehicle Truck/Bus Multi Axle Vehicle (> 2 axle)

Earth moving equipments and heavy construction

machineryTotal

Nos. Amount Nos. Amount Nos. Amount Nos. Amount Nos. Amount (Rs.) Nos. Amount1- Dec-14 7156 233416 1313 73377 776 84325 881 129964 2 372 10128 521454

2- Dec-14 7393 242917 1389 76579 785 87387 880 129548 2 372 10449 536803

3- Dec -14 7977 261909 1416 78686 796 87398 911 134647 1 186 11101 562826

4- Dec -14 7214 232730 1420 78506 754 82153 890 130327 2 372 10280 524088

5- Dec -14 8363 270971 1514 83450 753 83141 898 132068 2 372 11530 570002

6- Dec -14 9631 312367 1429 78739 763 84183 976 147818 3 558 12802 623665

7- Dec -14 9434 302990 1193 65027 616 67094 766 116486 2 465 12011 552062

8- Dec -14 7216 233308 1321 73633 780 84888 813 121962 2 372 10132 514163

9- Dec -14 6581 216281 1378 76304 750 81633 898 137795 2 372 9609 512385

10- Dec -14 6814 226390 1355 74699 758 82114 833 123727 3 558 9763 507488

11- Dec -14 6097 199705 1302 71936 755 83315 809 122437 2 465 8965 477858

12- Dec -14 7136 233276 1383 76365 753 81980 818 120868 10 2046 10100 514535

13- Dec -14 8480 275468 1377 76305 727 79718 818 120799 2 465 11404 552755 Project: 4-Laning of Jalandhar-Amritsar BOT Project of NH – 3 (Old NH-1) in the State of Punjab Page - 29

Page 30: Organization Chart of Independent Consultantnhai.org.in/spw/IEReport/Monthly Report on Audit of... · Web viewConsultancy Services – M/s Unihorn India Pvt Ltd Monthly Report on

Consultancy Services – M/s Unihorn India Pvt LtdMonthly Report on Audit of Traffic/ December 2014

14- Dec-14 8348 272756 1045 57783 615 66792 688 104738 2 372 10698 502441

15- Dec -14 6763 220471 1167 66021 731 79421 795 117648 2 465 9458 484026

16- Dec -14 6217 204589 1322 74864 731 80023 817 121487 3 744 9090 481707

17- Dec -14 6098 202010 1221 68189 691 75296 751 110729 1 186 8762 456410

18- Dec -14 5709 188073 1229 68489 763 83237 874 128501 4 1023 8579 469323

19- Dec -14 6309 206505 1285 71513 739 80375 765 114345 2 372 9100 473110

20- Dec -14 7270 237406 1224 68516 813 85652 867 129798 2 465 10176 521837

21- Dec -14 7596 249144 1096 60218 524 55134 660 96264 1 186 9877 460946

22- Dec -14 6877 224773 1177 65395 700 76896 744 111267 3 558 9501 478889

23- Dec -14 6284 204884 1102 61158 666 73637 694 102680 4 744 8750 443103

24- Dec -14 6799 220999 1206 67522 685 75591 818 121282 3 651 9511 486045

25- Dec -14 6400 205876 1308 71666 687 73013 728 106543 4 744 9127 457842

26- Dec -14 7072 227512 1225 67393 705 76557 765 114414 7 1488 9774 487364

27- Dec -14 7585 241333 1268 70166 682 73352 837 122355 5 1023 10377 508229

28- Dec -14 7881 254181 946 51920 607 65795 697 103652 0 0 10131 475548

29- Dec -14 7162 230662 1063 58381 617 67525 576 88161 2 372 9420 445101

30- Dec -14 6870 220770 1333 74061 739 79730 926 136747 3 651 9871 511959

31-Dec-14 8235 268167 1368 74862 709 76905 895 132821 2 372 11209 553127

Total 224967 7321839 39375 2181723 22170 2414260 25088 3731878 85 17391 311685 15667091

(B) Local Tolled Traffic & Collection (Through Smart cards)

Date Car, Passenger Van or Jeep Light Commercial Vehicle Truck/Bus Multi Axle Vehicle

(> 2 axle)Earth moving equipments and heavy construction machinery Total

Nos. Amount Nos. Amount Nos. Amount Nos. Amount Nos. Amount Nos. Amount

1- Dec-14 292 1800 0 0 0 0 0 0 0 0 292 1800

2- Dec-14 348 2124 1 22 3 129 0 0 0 0 352 2275

3- Dec -14 357 2190 2 30 1 43 0 0 0 0 360 2263

4- Dec -14 269 1644 1 22 3 129 0 0 0 0 273 1795

5- Dec -14 289 1818 0 0 1 43 0 0 0 0 290 1861

6- Dec -14 203 1260 1 22 1 43 0 0 0 0 205 1325

7- Dec -14 164 1002 0 0 3 129 0 0 0 0 167 1131

8- Dec -14 217 1302 0 0 1 43 0 0 0 0 218 1345

9- Dec -14 227 1398 2 44 0 0 0 0 0 0 229 1442

10- Dec -14 298 1836 1 22 5 215 0 0 0 0 304 2073

Project: 4-Laning of Jalandhar-Amritsar BOT Project of NH – 3 (Old NH-1) in the State of Punjab Page - 30

Page 31: Organization Chart of Independent Consultantnhai.org.in/spw/IEReport/Monthly Report on Audit of... · Web viewConsultancy Services – M/s Unihorn India Pvt Ltd Monthly Report on

Consultancy Services – M/s Unihorn India Pvt LtdMonthly Report on Audit of Traffic/ December 2014

11- Dec -14 283 1710 2 44 3 129 0 0 0 0 288 1883

12- Dec -14 316 1962 1 22 1 43 0 0 0 0 318 2027

13- Dec -14 270 1650 1 22 5 215 0 0 0 0 276 1887

14- Dec-14 202 1224 0 0 0 0 0 0 0 0 202 1224

15- Dec -14 243 1488 1 22 2 86 0 0 0 0 246 1596

16- Dec -14 222 1392 0 0 7 301 0 0 0 0 229 1693

17- Dec -14 301 1842 0 0 3 129 0 0 0 0 304 1971

18- Dec -14 296 1824 0 0 1 43 0 0 0 0 297 1867

19- Dec -14 314 1914 1 22 1 43 0 0 0 0 316 1979

20- Dec -14 324 1974 0 0 4 172 0 0 0 0 328 2146

21- Dec -14 240 1458 0 0 4 172 0 0 0 0 244 1630

22- Dec -14 200 1218 1 22 3 129 0 0 0 0 204 1369

23- Dec -14 191 1200 0 0 1 43 0 0 0 0 192 1243

24- Dec -14 267 1662 1 22 0 0 0 0 0 0 268 1684

25- Dec -14 156 984 0 0 3 129 0 0 0 0 159 1113

26- Dec -14 270 1656 0 0 2 86 2 50 0 0 274 1792

27- Dec -14 265 1650 0 0 2 86 0 0 0 267 1736

28- Dec -14 216 1320 0 0 1 43 0 0 0 0 217 1363

29- Dec -14 193 1182 1 22 3 129 0 0 0 0 197 1333

30- Dec -14 195 1206 1 22 1 43 0 0 0 0 197 1271

31-Dec-14 213 1320 0 0 6 258 0 0 0 0 219 1578

Total 7841 48210 18 382 71 3053 2 50 0 0 7932 51695Total Tolled Traffic & Collection (A+B)

Date Car, Passenger Van or Jeep Light Commercial Vehicle Truck/Bus Multi Axle Vehicle (> 2 axle) Earth moving equipments and

heavy construction machinery Total

Nos. Amount Nos. Amount Nos. Amount Nos. Amount Nos. Amount Nos. Amount

1- Dec-14 7448 235216 1313 73377 776 84325 881 129964 2 372 10420 523254

2- Dec-14 7741 245041 1390 76601 788 87516 880 129548 2 372 10801 539078

3- Dec -14 8334 264099 1418 78716 797 87441 911 134647 1 186 11461 565089

4- Dec -14 7483 234374 1421 78528 757 82282 890 130327 2 372 10553 525883

5- Dec -14 8652 272789 1514 83450 754 83184 898 132068 2 372 11820 571863

6- Dec -14 9834 313627 1430 78761 764 84226 976 147818 3 558 13007 624990

7- Dec -14 9598 303992 1193 65027 619 67223 766 116486 2 465 12178 553193

8- Dec -14 7433 234610 1321 73633 781 84931 813 121962 2 372 10350 515508

Project: 4-Laning of Jalandhar-Amritsar BOT Project of NH – 3 (Old NH-1) in the State of Punjab Page - 31

Page 32: Organization Chart of Independent Consultantnhai.org.in/spw/IEReport/Monthly Report on Audit of... · Web viewConsultancy Services – M/s Unihorn India Pvt Ltd Monthly Report on

Consultancy Services – M/s Unihorn India Pvt LtdMonthly Report on Audit of Traffic/ December 2014

9- Dec -14 6808 217679 1380 76348 750 81633 898 137795 2 372 9838 513827

10- Dec -14 7112 228226 1356 74721 763 82329 833 123727 3 558 10067 509561

11- Dec -14 6380 201415 1304 71980 758 83444 809 122437 2 465 9253 479741

12- Dec -14 7452 235238 1384 76387 754 82023 818 120868 10 2046 10418 516562

13- Dec -14 8750 277118 1378 76327 732 79933 818 120799 2 465 11680 554642

14- Dec-14 8550 273980 1045 57783 615 66792 688 104738 2 372 10900 503665

15- Dec -14 7006 221959 1168 66043 733 79507 795 117648 2 465 9704 485622

16- Dec -14 6439 205981 1322 74864 738 80324 817 121487 3 744 9319 483400

17- Dec -14 6399 203852 1221 68189 694 75425 751 110729 1 186 9066 458381

18- Dec -14 6005 189897 1229 68489 764 83280 874 128501 4 1023 8876 471190

19- Dec -14 6623 208419 1286 71535 740 80418 765 114345 2 372 9416 475089

20- Dec -14 7594 239380 1224 68516 817 85824 867 129798 2 465 10504 523983

21- Dec -14 7836 250602 1096 60218 528 55306 660 96264 1 186 10121 462576

22- Dec -14 7077 225991 1178 65417 703 77025 744 111267 3 558 9705 480258

23- Dec -14 6475 206084 1102 61158 667 73680 694 102680 4 744 8942 444346

24- Dec -14 7066 222661 1207 67544 685 75591 818 121282 3 651 9779 487729

25- Dec -14 6556 206860 1308 71666 690 73142 728 106543 4 744 9286 458955

26- Dec -14 7342 229168 1225 67393 707 76643 767 114464 7 1488 10048 489156

27- Dec -14 7850 242983 1268 70166 684 73438 837 122355 5 1023 10644 509965

28- Dec -14 8097 255501 946 51920 608 65838 697 103652 0 0 10348 476911

29- Dec -14 7355 231844 1064 58403 620 67654 576 88161 2 372 9617 446434

30- Dec -14 7065 221976 1334 74083 740 79773 926 136747 3 651 10068 513230

31-Dec-14 8448 269487 1368 74862 715 77163 895 132821 2 372 11428 554705

Total 232808 7370049 39393 2182105 22241 2417313 25090 3731928 85 17391 319617 15718786(C) Exempted Traffic

Date Car, Passenger Van or Jeep Light Commercial Vehicle Truck/Bus Multi Axle Vehicle

(> 2 axle)Earth moving equipments and heavy construction machinery Total

Nos. Amount Nos. Amount Nos. Amount Nos. Amount Nos. Amount Nos. Amount

1- Dec-14 332 8300 26 1118 11 957 3 420 0 0 372 10795

2- Dec-14 328 8200 24 1032 7 609 1 140 0 0 360 9981

3- Dec -14 270 6750 17 731 12 1044 3 420 0 0 302 8945

4- Dec -14 355 8875 36 1548 16 1392 3 420 0 0 410 12235

5- Dec -14 359 8975 36 1548 18 1566 2 280 0 0 415 12369

Project: 4-Laning of Jalandhar-Amritsar BOT Project of NH – 3 (Old NH-1) in the State of Punjab Page - 32

Page 33: Organization Chart of Independent Consultantnhai.org.in/spw/IEReport/Monthly Report on Audit of... · Web viewConsultancy Services – M/s Unihorn India Pvt Ltd Monthly Report on

Consultancy Services – M/s Unihorn India Pvt LtdMonthly Report on Audit of Traffic/ December 2014

6- Dec -14 442 11050 24 1032 19 1653 6 840 0 0 491 14575

7- Dec -14 435 10875 23 989 12 1044 6 840 0 0 476 13748

8- Dec -14 342 8550 24 1032 14 1218 2 280 0 0 382 11080

9- Dec -14 277 6925 41 1763 20 1740 2 280 0 0 340 10708

10- Dec -14 254 6350 33 1419 22 1914 7 980 0 0 316 10663

11- Dec -14 278 6950 19 817 27 2349 2 280 0 0 326 10396

12- Dec -14 311 7775 31 1333 13 1131 2 280 0 0 357 10519

13- Dec -14 334 8350 31 1333 15 1305 0 0 0 0 380 10988

14- Dec-14 432 10800 22 946 9 783 1 140 1 186 465 12855

15- Dec -14 301 7525 37 1591 15 1305 3 420 1 186 357 11027

16- Dec -14 296 7400 27 1161 21 1827 1 140 0 0 345 10528

17- Dec -14 282 7050 31 1333 19 1653 4 560 0 0 336 10596

18- Dec -14 216 5400 12 516 23 2001 0 0 0 0 251 7917

19- Dec -14 270 6750 25 1075 14 1218 0 0 0 0 309 9043

20- Dec -14 329 8225 27 1161 14 1218 1 140 1 186 372 10930

21- Dec -14 306 7650 20 860 7 609 1 140 1 186 335 9445

22- Dec -14 269 6725 23 989 17 1479 1 140 0 0 310 9333

23- Dec -14 305 7625 29 1247 18 1566 1 140 0 0 353 10578

24- Dec -14 287 7175 22 946 26 2262 3 420 0 0 338 10803

25- Dec -14 309 7725 14 602 17 1479 1 140 0 0 341 9946

26- Dec -14 342 8550 34 1462 12 1044 4 560 0 0 392 11616

27- Dec -14 213 5325 14 602 14 1218 0 0 2 372 243 7517

28- Dec -14 299 7475 20 860 7 609 0 0 0 0 326 8944

29- Dec -14 262 6550 18 774 15 1305 1 140 0 0 296 8769

30- Dec -14 262 6550 20 860 9 783 1 140 0 0 292 8333

31-Dec-14 278 6950 30 1290 11 957 2 280 0 0 321 9477

Total 9575 239375 790 33970 474 41238 64 8960 6 1116 10909 324659

Barcode Traffic (From Nijjarpura Toll Plaza)(D)

Date Car, Passenger Van or Jeep Light Commercial Vehicle Truck/Bus Multi Axle Vehicle

(> 2 axle)Earth moving equipments and heavy construction machinery Total

Nos. Amount Nos. Amount Nos. Amount Nos. Amount Nos. Amount Nos. Amount1- Dec-14 4542 113550 823 35389 470 40890 106 14840 0 0 5941 204669

2- Dec-14 4978 124450 890 38270 526 45762 107 14980 0 0 6501 223462 Project: 4-Laning of Jalandhar-Amritsar BOT Project of NH – 3 (Old NH-1) in the State of Punjab Page - 33

Page 34: Organization Chart of Independent Consultantnhai.org.in/spw/IEReport/Monthly Report on Audit of... · Web viewConsultancy Services – M/s Unihorn India Pvt Ltd Monthly Report on

Consultancy Services – M/s Unihorn India Pvt LtdMonthly Report on Audit of Traffic/ December 2014

3- Dec -14 4749 118725 926 39818 480 41760 110 15400 0 0 6265 215703

4- Dec -14 4652 116300 873 37539 481 41847 116 16240 0 0 6122 211926

5- Dec -14 5006 125150 1020 43860 483 42021 93 13020 0 0 6602 224051

6- Dec -14 5475 136875 910 39130 444 38628 145 20300 1 186 6975 235119

7- Dec -14 5710 142750 711 30573 409 35583 178 24920 0 0 7008 233826

8- Dec -14 4665 116625 879 37797 483 42021 185 25900 0 0 6212 222343

9- Dec -14 4672 116800 951 40893 517 44979 157 21980 0 0 6297 224652

10- Dec -14 4519 112975 865 37195 460 40020 176 24640 0 0 6020 214830

11- Dec -14 4031 100775 828 35604 451 39237 128 17920 0 0 5438 193536

12- Dec -14 4443 111075 877 37711 482 41934 119 16660 1 186 5922 207566

13- Dec -14 4343 108575 833 35819 421 36627 114 15960 1 186 5712 197167

14- Dec-14 4866 121650 641 27563 309 26883 90 12600 0 0 5906 188696

15- Dec -14 4193 104825 767 32981 403 35061 126 17640 1 186 5490 190693

16- Dec -14 4020 100500 943 40549 462 40194 107 14980 2 372 5534 196595

17- Dec -14 3779 94475 793 34099 436 37932 109 15260 0 0 5117 181766

18- Dec -14 3301 82525 789 33927 414 36018 105 14700 1 186 4610 167356

19- Dec -14 3961 99025 880 37840 440 38280 113 15820 0 0 5394 190965

20- Dec -14 3921 98025 814 35002 401 34887 119 16660 2 372 5257 184946

21- Dec -14 4356 108900 629 27047 222 19314 104 14560 1 186 5312 170007

22- Dec -14 3912 97800 697 29971 338 29406 77 10780 0 0 5024 167957

23- Dec -14 3984 99600 773 33239 444 38628 94 13160 0 0 5295 184627

24- Dec -14 3192 79800 676 29068 369 32103 95 13300 0 0 4332 154271

25- Dec -14 3289 82225 720 30960 277 24099 98 13720 0 0 4384 151004

26- Dec -14 3967 99175 757 32551 370 32190 107 14980 3 558 5204 179454

27- Dec -14 3436 85900 760 32680 336 29232 108 15120 0 0 4640 162932

28- Dec -14 3731 93275 503 21629 251 21837 75 10500 0 0 4560 147241

29- Dec -14 3314 82850 579 24897 294 25578 80 11200 0 0 4267 144525

30- Dec -14 3440 86000 773 33239 349 30363 97 13580 1 186 4660 163368

31-Dec-14 4193 104825 745 32035 364 31668 113 15820 0 0 5415 184348

Total 130640 3266000 24625 1058875 12586 1094982 3551 497140 14 2604 171416 5919601Grand Total of Traffic & Collection (A+B+C+D)

Date Car, Passenger Van or Jeep Light Commercial Vehicle Truck/Bus Multi Axle Vehicle (> 2 axle) Earth moving equipments and

heavy construction machinery Grand Total

Project: 4-Laning of Jalandhar-Amritsar BOT Project of NH – 3 (Old NH-1) in the State of Punjab Page - 34

Page 35: Organization Chart of Independent Consultantnhai.org.in/spw/IEReport/Monthly Report on Audit of... · Web viewConsultancy Services – M/s Unihorn India Pvt Ltd Monthly Report on

Consultancy Services – M/s Unihorn India Pvt LtdMonthly Report on Audit of Traffic/ December 2014

Nos. Amount Nos. Amount Nos. Amount Nos. Amount Nos. Amount Nos. Amount

1- Dec-14 12322 357066 2162 109884 1257 126172 990 145224 2 372 16733 738718

2- Dec-14 13047 377691 2304 115903 1321 133887 988 144668 2 372 17662 772521

3- Dec -14 13353 389574 2361 119265 1289 130245 1024 150467 1 186 18028 789737

4- Dec -14 12490 359549 2330 117615 1254 125521 1009 146987 2 372 17085 750044

5- Dec -14 14017 406914 2570 128858 1255 126771 993 145368 2 372 18837 808283

6- Dec -14 15751 461552 2364 118923 1227 124507 1127 168958 4 744 20473 874684

7- Dec -14 15743 457617 1927 96589 1040 103850 950 142246 2 465 19662 800767

8- Dec -14 12440 359785 2224 112462 1278 128170 1000 148142 2 372 16944 748931

9- Dec -14 11757 341404 2372 119004 1287 128352 1057 160055 2 372 16475 749187

10- Dec -14 11885 347551 2254 113335 1245 124263 1016 149347 3 558 16403 735054

11- Dec -14 10689 309140 2151 108401 1236 125030 939 140637 2 465 15017 683673

12- Dec -14 12206 354088 2292 115431 1249 125088 939 137808 11 2232 16697 734647

13- Dec -14 13427 394043 2242 113479 1168 117865 932 136759 3 651 17772 762797

14- Dec-14 13848 406430 1708 86292 933 94458 779 117478 3 558 17271 705216

15- Dec -14 11500 334309 1972 100615 1151 115873 924 135708 4 837 15551 687342

16- Dec -14 10755 313881 2292 116574 1221 122345 925 136607 5 1116 15198 690523

17- Dec -14 10460 305377 2045 103621 1149 115010 864 126549 1 186 14519 650743

18- Dec -14 9522 277822 2030 102932 1201 121299 979 143201 5 1209 13737 646463

19- Dec -14 10854 314194 2191 110450 1194 119916 878 130165 2 372 15119 675097

20- Dec -14 11844 345630 2065 104679 1232 121929 987 146598 5 1023 16133 719859

21- Dec -14 12498 367152 1745 88125 757 75229 765 110964 3 558 15768 642028

22- Dec -14 11258 330516 1898 96377 1058 107910 822 122187 3 558 15039 657548

23- Dec -14 10764 313309 1904 95644 1129 113874 789 115980 4 744 14590 639551

24- Dec -14 10545 309636 1905 97558 1080 109956 916 135002 3 651 14449 652803

25- Dec -14 10154 296810 2042 103228 984 98720 827 120403 4 744 14011 619905

26- Dec -14 11651 336893 2016 101406 1089 109877 878 130004 10 2046 15644 680226

27- Dec -14 11499 334208 2042 103448 1034 103888 945 137475 7 1395 15527 680414

28- Dec -14 12127 356251 1469 74409 866 88284 772 114152 0 0 15234 633096

29- Dec -14 10931 321244 1661 84074 929 94537 657 99501 2 372 14180 599728

30- Dec -14 10767 314526 2127 108182 1098 110919 1024 150467 4 837 15020 684931

31-Dec-14 12919 381262 2143 108187 1090 109788 1010 148921 2 372 17164 748530

Total 373023 10875424 64808 3274950 35301 3553533 28705 4238028 105 21111 501942 21963046

Project: 4-Laning of Jalandhar-Amritsar BOT Project of NH – 3 (Old NH-1) in the State of Punjab Page - 35

Page 36: Organization Chart of Independent Consultantnhai.org.in/spw/IEReport/Monthly Report on Audit of... · Web viewConsultancy Services – M/s Unihorn India Pvt Ltd Monthly Report on

Consultancy Services – M/s Unihorn India Pvt LtdMonthly Report on Audit of Traffic/ December 2014

Project: 4-Laning of Jalandhar-Amritsar BOT Project of NH – 3 (Old NH-1) in the State of Punjab Page - 36

Page 37: Organization Chart of Independent Consultantnhai.org.in/spw/IEReport/Monthly Report on Audit of... · Web viewConsultancy Services – M/s Unihorn India Pvt Ltd Monthly Report on

Consultancy Services – M/s Unihorn India Pvt LtdMonthly Report on Audit of Traffic/ December 2014

Annexure B

Traffic Data at Toll Plazas

Project: 4-Laning of Jalandhar-Amritsar BOT Project of NH – 3 (Old NH-1) in the State of Punjab Page - 37

Page 38: Organization Chart of Independent Consultantnhai.org.in/spw/IEReport/Monthly Report on Audit of... · Web viewConsultancy Services – M/s Unihorn India Pvt Ltd Monthly Report on

Consultancy Services – M/s Unihorn India Pvt LtdMonthly Report on Audit of Traffic/ December 2014

Grand Total of Traffic at Toll Plaza – 1

DateCar, Passenger

Van or Jeep

Light Commercial

VehicleTruck/Bus

Multi Axle Vehicle (>2 axle)

Earth moving equipments and

heavy construction machinery

Grand Total

1- Dec-14 11220 2853 1741 806 4 16624

2- Dec-14 11721 2835 1793 835 3 17187

3- Dec -14 13534 2934 1819 924 1 19212

4- Dec -14 11705 2824 1782 927 1 17239

5- Dec -14 13145 3468 1702 908 3 19226

6- Dec -14 16224 3021 1627 884 3 21759

7- Dec -14 17734 2861 1363 791 2 22751

8- Dec -14 11307 2938 1797 937 0 16979

9- Dec -14 10263 2868 1732 918 3 15784

10- Dec -14 10832 3036 1653 941 5 16467

11- Dec -14 9918 2687 1720 942 1 15268

12- Dec -14 11793 2927 1736 1006 6 17468

13- Dec -14 14817 2912 1569 894 2 20194

14- Dec-14 15440 2551 1236 649 0 19876

15- Dec -14 10264 2490 1629 824 4 15211

16- Dec -14 9984 3091 1739 809 0 15623

17- Dec -14 9511 2558 1605 755 0 14429

18- Dec -14 9189 2709 1777 993 1 14669

19- Dec -14 10485 3032 1680 883 0 16080

20- Dec -14 13533 2711 1690 855 1 18790

21- Dec -14 16447 2615 1121 713 0 20896

22- Dec -14 10461 2641 1634 771 0 15507

23- Dec -14 9754 2321 1620 716 4 14415

24- Dec -14 10687 2453 1576 883 3 15602

25- Dec -14 9956 2740 1326 844 3 14869

26- Dec -14 10698 2381 1535 744 3 15361

27- Dec -14 11176 2598 1491 758 0 16023

28- Dec -14 12759 1896 1253 684 2 16594

29- Dec -14 10897 2014 1315 574 1 14801

30- Dec -14 10047 2534 1448 705 2 14736

31-Dec-14 12064 2649 1428 844 0 16985

Total 367565 84148 49137 25717 58 526625

Grand Total of Traffic at Toll Plaza – 2 Project: 4-Laning of Jalandhar-Amritsar BOT Project of NH – 3 (Old NH-1) in the State of Punjab Page - 38

Page 39: Organization Chart of Independent Consultantnhai.org.in/spw/IEReport/Monthly Report on Audit of... · Web viewConsultancy Services – M/s Unihorn India Pvt Ltd Monthly Report on

Consultancy Services – M/s Unihorn India Pvt LtdMonthly Report on Audit of Traffic/ December 2014

DateCar,

Passenger Van or Jeep

Light Commercial

VehicleTruck/Bus

Multi Axle Vehicle

(> 2 axle)

Earth moving equipments and

heavy construction machinery

Grand Total

1- Dec-14 12322 2162 1257 990 2 16733

2- Dec-14 13047 2304 1321 988 2 17662

3- Dec -14 13353 2361 1289 1024 1 18028

4- Dec -14 12490 2330 1254 1009 2 17085

5- Dec -14 14017 2570 1255 993 2 18837

6- Dec -14 15751 2364 1227 1127 4 20473

7- Dec -14 15743 1927 1040 950 2 19662

8- Dec -14 12440 2224 1278 1000 2 16944

9- Dec -14 11757 2372 1287 1057 2 16475

10- Dec -14 11885 2254 1245 1016 3 16403

11- Dec -14 10689 2151 1236 939 2 15017

12- Dec -14 12206 2292 1249 939 11 16697

13- Dec -14 13427 2242 1168 932 3 17772

14- Dec-14 13848 1708 933 779 3 17271

15- Dec -14 11500 1972 1151 924 4 15551

16- Dec -14 10755 2292 1221 925 5 15198

17- Dec -14 10460 2045 1149 864 1 14519

18- Dec -14 9522 2030 1201 979 5 13737

19- Dec -14 10854 2191 1194 878 2 15119

20- Dec -14 11844 2065 1232 987 5 16133

21- Dec -14 12498 1745 757 765 3 15768

22- Dec -14 11258 1898 1058 822 3 15039

23- Dec -14 10764 1904 1129 789 4 14590

24- Dec -14 10545 1905 1080 916 3 14449

25- Dec -14 10154 2042 984 827 4 14011

26- Dec -14 11651 2016 1089 878 10 15644

27- Dec -14 11499 2042 1034 945 7 15527

28- Dec -14 12127 1469 866 772 0 15234

29- Dec -14 10931 1661 929 657 2 14180

30- Dec -14 10767 2127 1098 1024 4 15020

31-Dec-14 12919 2143 1090 1010 2 17164

Total 373023 64808 35301 28705 105 501942

Project: 4-Laning of Jalandhar-Amritsar BOT Project of NH – 3 (Old NH-1) in the State of Punjab Page - 39

Page 40: Organization Chart of Independent Consultantnhai.org.in/spw/IEReport/Monthly Report on Audit of... · Web viewConsultancy Services – M/s Unihorn India Pvt Ltd Monthly Report on

Consultancy Services – M/s Unihorn India Pvt LtdMonthly Report on Audit of Traffic/ December 2014

Annexure C

Highway Accident Report

Project: 4-Laning of Jalandhar-Amritsar BOT Project of NH – 3 (Old NH-1) in the State of Punjab Page - 40

Page 41: Organization Chart of Independent Consultantnhai.org.in/spw/IEReport/Monthly Report on Audit of... · Web viewConsultancy Services – M/s Unihorn India Pvt Ltd Monthly Report on

Consultancy Services – M/s Unihorn India Pvt LtdMonthly Report on Audit of Traffic/ December 2014

National Highway No.: NH - 3 Month: December- 2014

Sr. N

o.

Date

Tim

e of

Acc

iden

t

Acci

dent

Loc

atio

ns

Natu

re o

f Acc

iden

t

Clas

sific

atio

n of

Ac

cide

nt

Caus

es

Road

Fai

lure

Road

con

ditio

n

Inte

rsec

tion

Type

and

Co

ntro

l

Wea

ther

Con

ditio

n

Vehi

cle

resp

onsi

ble

No. of Affected Person

No. o

f Ani

mal

s ki

lled

if an

y

Help Provided by Ambulance/t

rauma Vehicle / Patrolling

Rem

arks

Fata

l

Grie

vous

Min

or

Non

Inju

red

A B C D E F G H

1

1-De

c-14

10:2

5 PM

Km-4

37.2

80

RHS

8- O

ther

s

2 - G

rievo

us

Inju

ry,

1- D

runk

en

4- F

our l

ane

or m

ore

with

di

vider

1 - S

traig

ht

Road Nil 1-Fine LCV 0 1 1 0 0 Ambulance /

Recovery Van

LCV coming from Amritsar side in full speed the driver of the LCV is in Drunken position and lost there control over the vehicle and LCV was Toppled down.

2

5-De

c-14

8:45

PM

Km-4

39.8

55

LHS

8- O

ther

s

2 - G

rievo

us

Inju

ry,

2 - O

ver

spee

ding

4- F

our l

ane

or m

ore

with

di

vider

1 - S

traig

ht

Road Nil 1 -

Fine, Car 0 1 0 0 0 Ambulance / Recovery Van

Car Coming from Jalandhar side in full speed the driver of the car lost there control over Car and hit into the median kerb and toppled down. The driver got cut mark on Head and Hand. Shifted to Jandiala for first Aid.

3

6-De

c-14

11:5

0 AM

Km-4

16.5

00 R

HS

4 - C

ollis

ion

Brus

h / S

ide

Wip

e

1, F

atal

,

2

- Grie

vous

Inju

ry,

4 - F

ault

of D

river

of

Mot

or V

ehicl

e /

drive

r of o

ther

ve

hicle

/ cy

clist

/ pe

dest

rian

/

4- F

our l

ane

or

mor

e wi

th d

ivide

r

1 - S

traig

ht R

oad

Nil 1 - Fine, Car 1 1 0 0 0

Ambulance / Recovery

Van/ Highway Patrol

Car coming from Amritsar Side in full speed, and tried to overtook to the Scotter and hit into the scotter rider the scotter rider fallen down along with co-passenger. Shifted to Amandeep Hospital Amritsar.

4

7-De

c-14

9:00

AM

Km-4

17.8

00

RHS

4 - C

ollis

ion

Brus

h / S

ide

Wip

e

2 - G

rievo

us

Inju

ry,

2 - O

ver

spee

ding

4- F

our l

ane

or m

ore

with

di

vider

1 - S

traig

ht

Road Nil 1 -

Fine, Car 0 1 0 0 0

Ambulance / Recovery

Van/ Highway Patrol

Car coming from Amritsar side in the mean time another car which is also coming from Amritsar side and tried to took overtake, during overtaking the car driver hit into the another car. The car driver got serious Injury shifted to Bababakala Civil Hospital.

5

10-D

ec-1

4

3:30

PM

Km-4

30.7

50

LHS

8- O

ther

s

2 - G

rievo

us

Inju

ry,

2 - O

ver

spee

ding

4- F

our

lane

or

mor

e wi

th

divid

er

1 - S

traig

ht

Road Nil 1 -

Fine, Bike 0 2 0 0 0 Ambulance / Recovery Van

Bus coming from Amritsar side, in the mean time Bike rider coming behind the bus and tried to overtook to Bus, the Bike rider hit into the Bus from back side. The bike rider fallen down and shited to Amritsar Guru nanak Dev Hospital.

Project: 4-Laning of Jalandhar-Amritsar BOT Project of NH – 3 (Old NH-1) in the State of Punjab Page - 41

Page 42: Organization Chart of Independent Consultantnhai.org.in/spw/IEReport/Monthly Report on Audit of... · Web viewConsultancy Services – M/s Unihorn India Pvt Ltd Monthly Report on

Consultancy Services – M/s Unihorn India Pvt LtdMonthly Report on Audit of Traffic/ December 2014

6

13-D

ec-1

4

7:05

PM

Km-4

13.6

65

LHS

6 - S

kiddi

ng

3 - M

inor

In

jure

d

2 - O

ver

spee

ding

4- F

our l

ane

or m

ore

with

di

vider

1 - S

traig

ht

Road Nil 1 -

Fine, Truck 0 0 1 0 0

Ambulance / Recovery

Van/ Highway Patrol

Truck coming from Jalandhar side in full speed the driver of the truck lost there controll over the truck and truck skidding from the main carriageway to Service Road Driver of the Truck got minor injury. First Aid given at site.

7

14-D

ec-1

4

12:4

0 PM

Km-4

07.1

00

RHS

4 - C

ollis

ion

Brus

h / S

ide

Wip

e

3 - M

inor

In

jure

d

2 - O

ver

spee

ding

4- F

our

lane

or

mor

e wi

th

divid

er

1 - S

traig

ht

Road Nil 1 -

Fine, Car 0 0 2 0 0 Ambulance / Recovery Van

Car coming from Beas side in full speed in the mean time another two car also coming behind of the car and tried to overtook, in the mean time the three cars struck with each other while taking overtaking. One car driver got minor head injury. Firat Aid given at side.

8

14-D

ec-1

4

11:3

0 PM

Km-4

05.3

00

4 - C

ollis

ion

Brus

h / S

ide

Wip

e

4 - N

on

Inju

ry

2 - O

ver

spee

ding

2 - T

wo

Lane

1 - S

traig

ht

Road Nil

2 - Mist / Fog

Bus 0 0 0 0 0 Ambulance / Recovery Van

Bus Coming from Jalandhar side in full speed and Car coming from Amritsar side during overtaking by the Car the car struck side wise with the bus. Bus driver flew away.

9

17-D

ec-1

4

2:30

PM

Km-4

28.3

70

RHS

3- R

ear E

nd

Collis

ion

3 - M

inor

In

jure

d

2 - O

ver

spee

ding

4- F

our

lane

or

mor

e wi

th

divid

er

1 - S

traig

ht

Road Nil 1 -

Fine, LCV 0 0 1 0 0 Ambulance / Recovery Van

Car Coming from Amritsar side and LCV also coming behind the Car during overtaking by the LCV hit into the Car side wise and flew away, the car driver got minor cut mark on hand. First Aid given at site.

10

24-D

ec-1

4

7:10

AM

Km-

413.

700R

HS

4 - C

ollis

ion

Brus

h / S

ide

Wip

e

2 - G

rievo

us

Inju

ry /

3 -

Min

or In

jure

d

2 - O

ver

spee

ding

4- F

our l

ane

or m

ore

with

di

vider

1 - S

traig

ht

Road Nil

2 - Mist / Fog

Car 0 2 2 0 0

Ambulance / Recovery

Van/Highway Patrol

Car coming from Amritsar in full speed the car of the Driver didn,t control his vehicle and hit into the kerb and after that Diversion boards, another two nos car which is also coming behind the car hit into the car from Back side. Two nos serious injury shifted to Dera Accident and Two nos minor injury.

11

25-D

ec-1

4

6:30

AM

Km-4

20.2

00

RHS

8- O

ther

s

2 - G

rievo

us

Inju

ry /

3 -

Min

or

2 - O

ver

spee

ding

4- F

our

lane

or

mor

e wi

th

divid

er

1 - S

traig

ht

Road Nil

2 - Mist / Fog

Truck 0 1 1 0 0 Ambulance / Recovery Van

Truck coming from Amritsar side and hit into the median Kerb and toppled down due to dense fog and Zero visibility, another Truck which is also coming behind the truck hit into the toppled down kerb.

12

26-D

ec-1

4

11:0

0 PM

Km-4

42.9

00

RHS

8- O

ther

s

2 - G

rievo

us

Inju

ry,

2 - O

ver

spee

ding

4- F

our

lane

or

mor

e wi

th

divid

er

1 - S

traig

ht

Road Nil

2 - Mist / Fog

Car 0 1 0 0 0 Ambulance / Recovery Van

Car coming from Amritsar side in full speed the driver of the car didn't see the Kerb due to dense fog and hit into the kerb and toppled down. Driver of the car sent to Manawala civil Hospital for treatment.

13

29-D

ec-1

4

10:3

0 PM

Km-4

33.5

00

LHS

8- O

ther

s

2 - G

rievo

us

Inju

ry,

2 - O

ver

spee

ding

4- F

our

lane

or

mor

e wi

th

divid

er

1 - S

traig

ht

Road Nil

2 - Mist / Fog

LCV 0 1 0 0 0 Ambulance / Recovery Van

LCV coming from Amritsar side in full speed the driver of the LCV didn't control his vehicle and struck into carsh barrier and LCV toppled down. The driver of the LCV got leg fracture shifted to Amandeep Hospital Amritsar.

Project: 4-Laning of Jalandhar-Amritsar BOT Project of NH – 3 (Old NH-1) in the State of Punjab Page - 42

Page 43: Organization Chart of Independent Consultantnhai.org.in/spw/IEReport/Monthly Report on Audit of... · Web viewConsultancy Services – M/s Unihorn India Pvt Ltd Monthly Report on

Consultancy Services – M/s Unihorn India Pvt LtdMonthly Report on Audit of Traffic/ December 2014

14

30-D

ec-1

4

1:30

PM

Km-4

39.8

58 R

HS

3- R

ear E

nd C

ollis

ion

2 - G

rievo

us In

jury

,

4 - F

ault

of D

river

of

Mot

or V

ehicl

e / d

river

of

oth

er v

ehicl

e / c

yclis

t / p

edes

trian

/ pa

ssen

ger

4- F

our l

ane

or m

ore

with

divi

der

1 - S

traig

ht R

oad

Nil2 -

Mist / Fog

Bike 0 2 0 0 0

Ambulance / Recovery Van / Route Patrol

Vehicle

Bike rider coming from Jalandhar Side and tried to take RHS at the Median opening in the mean time LCV (PB-02-AH-9731) coming from Amritsar side tried to save the Bike and hit into the Truck (PB-06H-9937) which is also coming from Amritsar side. The driver and helper of the LCV is got hand and leg fracture. Shifted to Guru Ram dass Hospital Amritsar.

15

31-D

ec-1

4

7:15

AM

Km-4

12.9

00

LHS

2- H

ead

in

Collis

ion

2 - G

rievo

us

Inju

ry,

2 - O

ver

spee

ding

2 - T

wo L

ane,

1 - S

traig

ht

Road Nil

2 - Mist / Fog

Truck 0 1 0 0 0

Ambulance / Recovery Van / Route Patrol

Vehicle

Truck struck with Bus due to Overspeed. Truck coming from Jalandhar Side in full speed the driver of the Bus coming from Amritsar side and indicate the Truck driver for slow down but the driver of the Truck didn't control his vehicle and hit into the Bus. The conductor of the Bus gor leg fracture shifted to Dera Hospital.

16

31-D

ec-1

4

8:35

AM

Km-

413.

700R

HS

4 - C

ollis

ion

Brus

h / S

ide

Wip

e

2 - G

rievo

us

Inju

ry /

3 -

Min

or In

jure

d

2 - O

ver

spee

ding

4- F

our l

ane

or

mor

e wi

th

divid

er

1 - S

traig

ht

Road Nil

2 - Mist / Fog

Car 0 2 0 0 0

Ambulance / Recovery Van / Route Patrol

Vehicle

Total 1 16 8 0 0A. Urban / Rural and Details of Surrounding Landuse.B 1- Overturning, 2- Head in Collision, 3- Rear End Collision, 4 - Collision Brush / Side Wipe, 5 - Right Turn Collision, 6 - Skidding, 8- OthersC 1- Fatal, 2 - GreviousInjury, 3 - Minor Injured, 4 - Non InjuryD 1- Drunken, 2 - Overspeeding, 3 - Vehicle out of Control, 4 - Fault of Driver of Motor Vehicle / driver of other vehicle / cyclist / pedestrian / passenger, 5 - Defect in Mechanical Condition of motor Vehicle / road condition.

E 1- Single lane, 2 - Two Lane, 3- Three lane or more without central divider (Median) 4- Four lane or more without divider

F 1 - Straight Road, 2 - Slight Curve, 3 - Sharp Curve, 4 - Flat Road, 5 - Gentle Incline, 6 - Steep Incline, 7 - Hump, 8 - DipG 1 - T - Junction, 2- Y - Junction, 3 - Four Arm Junction, 4 - Staggered Junction, 5 - Junction with more than 4 arms, 6 - Roundabout Junction, 7 - Manned rails Crossing, 8 - Unmanned Rail CrossingH 1 - Fine, 2 - Mist / Fog, 3- Cloudy, 4 - Light Rain, 5 - Heavy Rain, 6 - Hail / Sleet, 7 - Snow, 8 - String Wind, 9 - Dust Strom, 10 - Very Cold, 11 - Very Cold, 12 - Other extraodinary Weather condition.4* Traffic has been put both way in same carirageway due to temporary blockage of other carriageway for construction purpose.

Project: 4-Laning of Jalandhar-Amritsar BOT Project of NH – 3 (Old NH-1) in the State of Punjab Page - 43

Page 44: Organization Chart of Independent Consultantnhai.org.in/spw/IEReport/Monthly Report on Audit of... · Web viewConsultancy Services – M/s Unihorn India Pvt Ltd Monthly Report on

Consultancy Services – M/s Unihorn India Pvt LtdMonthly Report on Audit of Traffic/ December 2014

Annexure D

Incident Management

Project: 4-Laning of Jalandhar-Amritsar BOT Project of NH – 3 (Old NH-1) in the State of Punjab Page - 44

Page 45: Organization Chart of Independent Consultantnhai.org.in/spw/IEReport/Monthly Report on Audit of... · Web viewConsultancy Services – M/s Unihorn India Pvt Ltd Monthly Report on

Consultancy Services – M/s Unihorn India Pvt LtdMonthly Report on Audit of Traffic/ December 2014

INCIDENT MANAGEMENT DATA (Reference is made to NHAI HQ letter No. NHAI/CM/Inc Man/2011 Dated 24.05.2011)Date From 01/12/2014 to 31/122014 Sl.No General Information Route Patrol Vehicle Ambulance-1

TP-IAmbulance-2

TP-IITow Away

Crane Total Remarks

1 PIU Jalandhar 2 NH Nos. New NH-3 (OLD NH-1)

3 Stretch 407+100 to 456+100 Total-49 Km

4 Location of Incident ManagementVehicle Km-410+200-Toll Plaza-I &

Km-442+800 Toll Plaza-II

5 Registration No. PB-02-AX-0859 PB-02-AX-0842 PB-02-BF-9911 PB-09-H-9561 6 Total No. of Accidents Reported 16 16 7 Number of accident cases Attedend 16 16 8 Numbers of injured Shifted to Hospitals 10 6 16

0 Number of other help provided by the Route Patrol( other than accidents ) 7 7 7

10 Number of other help provided by the Tow Away Vehicle ( other than accidents ) 16 16

11 No. of vehicles painted in stripes as per approved Colour Scheme 1 1 0 1 3

12 No. of vehicles with Requisite T&P and accessories as per contact 1 1 1 1 4

13 No. of vehicles as per approved illuminated boards on too 1 1 0 1 3

14 No. of Vehicles man power as per contact 1 1 1 1 4

15 No. of vehicles lifted with GPS/VTS 1 1 0 0 2

16 No. of reflective signages showing emergency contact no. 20 20

17 No. of plazas where emergency No. are installed 2 2

18 No. of plazas where emergency contact detail is being printed on back of toll tickets 2 2

Printed on the Front of The

Ticket

19 Date of last inspection by PD/RO 31.12.2014

Project: 4-Laning of Jalandhar-Amritsar BOT Project of NH – 3 (Old NH-1) in the State of Punjab Page - 45