Optimal Design of Qualitative Risk Matrices to Classify
Quantitative Risks
Bill HuberQuantitative Decisions
Rosemont, PA
Tony CoxCox Associates
Denver, CO
Quantitative Decisions/Cox Associates2
Outline Setting the Scene
• Examples: risk matrices are widely used.• Definitions and terminology: our model applies to most risk
matrices.• Pros and cons of risk matrices: they have their uses, but problems
lurk.• The Risk Matrix Design problem: if you must create a risk matrix,
how well can you do and is it worth the effort to do a good job? Optimal Risk Matrix Design Theory and Results (Binary
Case)• Result 1: Make your matrices as square as possible.• Result 2: Create the best matrix with the Zig-Zag construction.
Further Research• Beyond binary: What about risk matrices with more than two
decisions?• What you can do.
Quantitative Decisions/Cox Associates3
Risk Matrices
U.S. FHA
Australian Government
Swedish Rescue Service
Canadian Navy
Supply
Chain Digest
Quantitative Decisions/Cox Associates4
Definitions A risk matrix assigns a unique decision to any
prospect:• Accounts that could go bad;• Facilities that might be attacked;• Research, development, or exploration projects that might
not come to fruition; etc. It presents a two-dimensional table of decisions.
• Rows correspond to classes (or “bins”) of a prospect attribute u (typically consequence, severity, impact, or disutility) and columns to bins of another attribute p (typically probability).
• u and p might be computed from other prospect attributes. Decisions could be
• Act now, take risk mitigation countermeasures, perform a follow-on study: typically colored red.
• Do nothing, act later, assume no risk: typically colored green.
Quantitative Decisions/Cox Associates5
Uncovering the Detail
Pêches et Océans Canada
Harvard Business Review (From a consultant’s white paper)
Quantitative Decisions/Cox Associates6
Risk Matrices Are DiscreteApproximations Their creators clearly conceive of risk matrices as
discrete representations of functional relationships. Thus,
• Columns bin the values of p at breakpoints x0 (the smallest possible value of p), x1, x2, …, xn (the largest possible value).
• Rows bin the values of u at breakpoints ym < ym-1 < ym-2 < … < y0.
• Risk is determined by a function v(p,u): the valuation function. (Often p and u can be expressed so that v(p,u) = pu: “risk is probability times consequence.” However, p does not need to be probability, nor does u have to be consequence, and our theory handles a large class of valuation functions besides pu.)
• Decisions are intervals of risk (z0,z1], (z1,z2], …, (zL-1,zL].
Quantitative Decisions/Cox Associates7
Notation
... xj -1 xj ...
...
yi
yi -1
...
a ij
u axis
p axis
prospect (p,u)
Bin (yi, yi-1] for u:yi < u yi-1.
Bin (xj-1, xj] for p:xj-1 < p xj.
row i
colu
mn j
The decision for prospect (p,u) is shown here as aij. We talk about it generically as a color ranging from green through red.
Quantitative Decisions/Cox Associates8
Why Use Risk Matrices? The risk attributes p and u or the valuation
function v(p,u) might not be accurately known or precisely measurable.
Computing v(p,u) and comparing it to the breakpoints z1, z2, …, zL-1 may be burdensome, time consuming error prone, or could reveal sensitive information.• When p or u change frequently, a risk matrix expedites
the response. A risk matrix can present, simplify, and
document the information used to make a decision.
Quantitative Decisions/Cox Associates9
Problems with Risk Matrices Binning (classifying into categories) the variables p
and u almost always loses some information that may be needed for correct decision making.
This causes the risks of some pairs of prospects to be ranked incorrectly.• It is possible for decisions made with them to be worse than
random! (LA Cox Jr, What’s Wrong with Risk Matrices, Risk Analysis 28(2), 2008).
An error will occur when a prospect with attributes (p,u) falls into a cell whose color is not the correct one for the “true” risk v(p,u). We call these the “bad” prospects for the risk matrix.• “Gray” cells by definition contain both good and bad
prospects. How bad can the errors get in actual use?
Quantitative Decisions/Cox Associates10
The Risk Matrix Design Problem Given a valuation function v(p,u) and constraints
(upper bounds) on the numbers of rows and columns you want to use, determine breakpoints x1, x2, …, xn-
1; y1, y2, …, ym-1; and z1, z2, …, zL-1 that minimize the “overall” error made by users of the risk matrix.• In most cases, the set of decisions is predetermined,
thereby fixing the breakpoints z1, z2, …, zL-1.
• “Overall” error can be measured in several ways, including maximum possible error, expected error under a probability distribution of prospects, or expected error rate.
How well can an optimal matrix perform compared to an “intuitive” or “generic” solution?
Theory and Results
The Case of Binary Risk Matrices
Quantitative Decisions/Cox Associates12
Preliminaries Re-express p and u so they both lie in the interval [0, 1].
• There is no loss of generality: ultimately both variables will be binned anyway. Assume v(p,u) is strictly increasing in both arguments in the interior of its
domain (i.e., (0,1) (0,1)).• This is natural: anything else probably doesn’t qualify as a valuation function.
A binary (two-decision) problem divides prospects into “green” ones where v(p,u) k and “red” ones where v(p,u) > k. (k is known as “acceptable risk.”)
• The threshold k is fixed. It determines the decision curve {(p,u) : v(p,u) = k}. Adopt a cost function C(p,u,d). The cost is that of making decision d for
prospect (p,u). Often, C will indicate error or the size of the error.• When the decision is the correct one, the cost is zero.• E.g., relative risk is C(p,u,d) = |v(p,u) – k|. Indicator risk is C(p,u,d) = 1.
Optionally specify a probability (or frequency) distribution for the prospects.
• E.g., the uniform distribution d = dpdu.
0.0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1.0
0.0 0.2 0.4 0.6 0.8 1.0
Quantitative Decisions/Cox Associates13
Two Kinds of Problems The minimax problem is to optimize the worst cost
that can be incurred in using the risk matrix. The expected cost (or expected loss) problem is to
optimize the average cost incurred in using the risk matrix.• This requires one to specify the frequencies (or probabilities)
with which the prospects will occur. For either problem,
• Use indicator risk C(p,u,d) = 1 to measure error rates.• We use relative risk C(p,u,d) = |v(p,u) – k| to account for the
degree of error as well as its occurrence.• Generally, the cost should increase or at least stay the same
as the difference between the risk matrix’s prescription and the true decision increases. We solve the problem in this most general setting.
Quantitative Decisions/Cox Associates14
Binary Risk Matrices Binary risk matrices have two colors only: red and
green. Understanding them is a key step towards a
general theory of optimal risk matrix design.
Műnchener Rűck Munich Re Group
Quantitative Decisions/Cox Associates15
Choosing the Right Decisions After binning the variables, you can
go cell by cell through the matrix to pick the decision that minimizes the cell’s cost.• When all prospects in the cell have the
same color, give the cell that color (obviously).
• Otherwise In the minimax problem, consider the worst
prospect for each possible cell color. Choose the color that minimizes this worst case.
In the expected cost problem, choose the color that minimizes the expected cost over the cell.
Thus, the problems of choosing breakpoints and coloring the cells are decoupled.
0.0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1.0
0.0 0.2 0.4 0.6 0.8 1.0
However we color this gray cell, the worst costs will be incurred at the two corner cells marked.
In solving the expected cost problem, we have to integrate the cost over the upper half of the cell (if it’s colored green) or over the lower half (if it’s colored red).
Quantitative Decisions/Cox Associates16
Sweeping through a Strip Focus on one column as you vary one y-breakpoint.
config33a new.ggb
The cost of this cell goes up …
while the cost of this cell goes
down.
We prove there is a unique point
in the sweep where the sum of the two costs is
smallest.
The colored dots mark curvilinear triangles containing bad prospects. E.g., the cell for the green dot (at the left) will necessarily be colored red, but this prospect—lying below the decision curve—is green.
Quantitative Decisions/Cox Associates17
The Key Idea At any critical point, the infinitesimal increase
in cost contributed by the green (left) line segment balances the infinitesimal decrease in cost contributed by the red (right) line segment.
Quantitative Decisions/Cox Associates18
Result 1: Use Square Matrices Make the matrix as square as possible (that is,
m and n should be equal or differ by one).• If not, there will be neighboring rows (or columns)
that can be combined without any increase in overall cost.
No matter how we vary y2 between y1 and y3, the row of cells between y1 and y2 must always be colored the same as the row of cells between y2 and y3. Thus, y2 is unnecessary.
This situation always happens when there are more rows than columns+1.
Quantitative Decisions/Cox Associates19
Result 2: The Zig-Zag Procedure The “zig-zag” procedure always
produces a best set of breakpoints.
• This works for any reasonable cost function C and valuation v.
• It applies to expected cost and minimax cost.
The procedure:• Start at top (or left).• Move down (or right), cross the
decision curve, and move an “equivalent” distance beyond it.
• Make a right turn.• Repeat until you move beyond the
square.• If your last step lands exactly on
the boundary, you have a good design.
• This produces a set of simultaneous equations we can solve explicitly.
x 4x 3x 2x 1
y 1
y 2
y 3
y 4
Quantitative Decisions/Cox Associates20
How Good Is Best? The graphic shows how
overall costs for relative risk vary with breakpoints in a binary 2 2 risk matrix.• The problem’s symmetry
(correctly) suggests the y breakpoint should equal the x breakpoint.
Here, poor choice of breakpoints can increase losses over 100% (minimax) or almost 400% (expected loss, uniform distribution) relative to the best choice.
m = n = 2; k = 1/4v(p ,u ) = pu ; c(v ,k ) = |v - k |
0.01
0.10
1.00
0.0 0.2 0.4 0.6 0.8 1.0
x 1, y 1
Lo
ss
Minimax loss
Minimax optimum
Expected loss
Expected optimum
Note the logarithmic scale for loss (overall cost).
Quantitative Decisions/Cox Associates21
How Good Is Best? (2) The “naïve” design
divides p and u each into n equally spaced bins (which is often done).
These values of k are the worst case for v = pu: for them, the minimax cost is largest.
Nevertheless, the “Ratio” column shows the best design is typically 2.5 to 3 times better than the naïve one.
Similar results hold for the expected-cost problem.
Maximum Relative Risk
n k Naïve Optimal Ratio2 0.3750 0.1250 0.1250 1.003 0.3704 0.1481 0.0741 2.004 0.3691 0.1309 0.0527 2.485 0.3686 0.1114 0.0410 2.726 0.3684 0.0906 0.0335 2.717 0.3682 0.0621 0.0283 2.198 0.3682 0.0693 0.0245 2.839 0.3681 0.0718 0.0217 3.3210 0.3680 0.0520 0.0194 2.6811 0.3680 0.0452 0.0175 2.5812 0.3680 0.0487 0.0160 3.0413 0.3680 0.0462 0.0147 3.1414 0.3680 0.0414 0.0136 3.0415 0.3680 0.0365 0.0127 2.88
n = #rows, #columns. k = decision threshold.“Naïve” and “Optimal” are maximum relative risk errors caused by using a risk matrix.
Further Research
Beyond Binary Risk Matrices
Quantitative Decisions/Cox Associates23
What Next? What can we say about more than two decisions?
• The strip sweep analysis still works.• The Zig-Zag procedure does not easily extend to more than
two decisions because of interactions between strips.• It is unlikely we will find any simple, clear characterization of
all optimal risk matrices. What can we say about arbitrary probability
distributions of prospects?• Not much, unless we make strong assumptions.
Nevertheless, our results for the binary case suggest significant improvements over intuitive or naïve designs are possible.• The Zig-Zag procedure applied independently to the L-1
cutoffs for an L-decision matrix might be a good heuristic guide in many cases.
Quantitative Decisions/Cox Associates24
What You Can Do Consider using the Zig-Zag procedure to help
determine cutoffs for p and u in your risk matrices.
More generally, evaluate the potential effects of a risk matrix in terms of the maximum error or expected error incurred by its users.
If your analysis suggests the error rates are unacceptable, you can• Increase the numbers of rows and columns or• Provide quantitative decision procedures
(formulas) or software in place of a risk matrix.
0.0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1.0
0.0 0.2 0.4 0.6 0.8 1.0
Supporting you and solving your problems with maps, numbers, and analyses.
www.quantdec.com
QD and CA
Superior business decisions through better data analysis.
www.cox-associates.com
Quantitative Decisions/Cox Associates26
Finding the Best Breakpoints The overall cost of the design, given that we have
selected the best color for each cell, is a function of n+m–2 variables subject to the constraints 0<x1<x2 …<xn-
1<1>y1>y2>…>ym-1>0. For the minimax problem the cost is not differentiable
(vide the red curve) so we have to be careful about using Calculus.
Nevertheless, we can use the fundamental idea of looking for the best design at critical points where independent small changes in any variable no longer improve the cost.
Changing any variable causes changes in the strips of cells through which it passes. Therefore, we study how the cost changes as a breakpoint sweeps across one strip.
0.01
0.10
1.00
0.0 0.2 0.4 0.6 0.8 1.0
Lo
ss
Quantitative Decisions/Cox Associates27
Example:Minimax relative risk for v = pu
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1.0
0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1.0
x 1 x 2 x 3 x 4
y 1
y 2
y 3
y 4
v (p ,u )=0.289
v (p ,u )=0.211
For an n by n risk matrix with decision threshold k, valuation function v(p,u) = pu, and relative risk cost c(p,u,d) = |v(p,u) – k| (when d is the wrong decision for (p,u)), maximum loss is minimized uniquely by choosing breakpoints in the zig-zag construction beginning at x1 = k + e where e is the only positive root of
(k + e)n = (k – e)n –1.
The x-breakpoints lie in geometric progression with common ratio r = (k+e)/(k–e), so that
xi = (k + e)r i‑1 = (k + e)i / (k – e)i‑1,
i = 1, 2, …, n.
The y-breakpoints are the same as the x-breakpoints. The maximum loss is e.
For k = 0.25 and m = n = 4, e 0.039.
Note that 0.289 = 0.25 + 0.039 and 0.211 = 0.25 – 0.039.