Grinding operations reportIntroductory presentation
January 2014
From: 1/1/15To: YTD 2/28/15
Type Code Count Duration (Hr)RTK S1 RTK S2 SRMCC S3 SRMCC S4 EFF Overall Mill Efficiency (%) Process PRC
Month: December 200.00 12.00 150.00 100.00 UTL Overall Mill Utilization (%) Mechanical MECYear: 2014 PWR Overall Avg. Power Consumption (kw/ton) Electrical ELC
MTBF Mean Time Between Failures (MTBF) - Hours Automation AUTMTTR Mean Time to Repair (MTTR) - Hours Lack of Demand DMDAVL Mill Availability (%) High silo level HSL
Planned Shutdown PSDExternal EXT
KPI Equation GGBFS TYP I TYP V TYP II Shift change SHFTotal (Hours)
POZCMT GRND LMS GRND POZ WCMTKPI Trend
S1 S2 S3 S4 FLYASHCMTMAX. 207 T MAX. 203 T MAX. 269 T MAX. 270 T Product Volume (MT)
MIN. 0 T MIN. 0 T MIN. 16 T MIN. 0 T GGBFSGGBFS TYP I TYP V TYP II TYP I
TYP IIPOZCMT GRND LMS GRND POZ WCMT TYP V
GBFS TYP I Clk TYP V Clk TYP II Clk GGBFS TYP I TYP V TYP II FLYASHCMTFLYASHCMT POZCMT
LMS RM GYP RM WCMT Clk POZ RM POZCMT GRND LMS GRND POZ WCMT GRND LMSGRND POZ
FLYASH FLYASHCMT GGBFS TYP I TYP V TYP II WCMT
POZCMT GRND LMS GRND POZ WCMT GGBFSTYP I
FLYASHCMT TYP VTYP II
GGBFS TYP I TYP V TYP II GGBFS TYP I TYP V TYP II FLYASHCMTGGBFS TYP I TYP V TYP II POZCMT
POZCMT GRND LMS GRND POZ WCMT POZCMT GRND LMS GRND POZ WCMT GRND LMSPOZCMT GRND LMS GRND POZ WCMT GRND POZ
FLYASHCMT FLYASHCMT WCMTFLYASHCMT Total (SAR)
GGBFS TYP I TYP V TYP II GGBFS TYP I TYP V TYP II GGBFS TYP I TYP V TYP II
POZCMT GRND LMS GRND POZ WCMT POZCMT GRND LMS GRND POZ WCMT POZCMT GRND LMS GRND POZ WCMT
FLYASHCMT FLYASHCMT FLYASHCMT
5B. Total INVOICED sales revenue (SAR)
Customer
4. PnG1&2 stoppages analaysis from: 1-Jan-15 to 28-Feb-15
5. Sales performance from: 1-Jan-15 to 28-Feb-155A. Largest customer per product
Report FilterFree date selection
Periodical selections
2B. Accumulated Production / Dispatch Reporting from: 1-Jan-15 to 28-Feb-15
1A. Finished products silos balances at 28-Feb-15
Silo level Trend
In the period from 1-Jan-15 to 28-Feb-15 (Year-to-date)Grinding Operations Report - Grinding Plant 1
3. Key performance Indicators3A. PnG1&2 KPI's from: 1-Jan-15 to 28-Feb-15
Production Line Selection
Quick Selections
PnG1&2
3B.5 Mill productivity per Product (tons/hour)
1. Material Balances Reporting
2. Production / Dispatch Reporting
1B.1 Raw Materials - Balances as of 28-Feb-15 1B.2 Finished Products - Balances as of 28-Feb-15
2A. Daily Production / Dispatch Reporting as of Last Reported Day; 28-Feb-15
1B. Report of Balances per Material as of 02/28/2015
2A.1 Production - Daily (TON) for PnG1&2 2A.2 Dispatch - Daily (TON)
2B.1 Production - Accumulated (TON) for PnG1&2 2B.2 Dispatch - Accumulated (TON)
3B.4 Average Power Consumption per Product (kwh/ton)
3B.1 Mill Efficiency per product (%)
3B.2 Mill Utilization per Product (%)
3B.3 Average Blaine per Product (cm2/gm)
3B. PnG1&2 production KPI's from: 1-Jan-15 to 28-Feb-15Wk 1
Month-to-date
Current year-to-date
Wk 2 Wk 3 Wk 4
PnG1 PnG2
This one page operation report consists of the following 5 sections:
Material balances
Production/Dispatch information
Key Performance Indicators (KPIs)
Stoppages analysis
Sales performance
It is possible to use quick filtering options for a specific date, week, month or a year.
Filters Include:Year-to-date, Month-to-date, etc.
In addition to option to select a specific production line or all lines combined.
From: 1/1/15To: YTD 2/28/15
Type Code Count Duration (Hr)RTK S1 RTK S2 SRMCC S3 SRMCC S4 EFF Overall Mill Efficiency (%) Process PRC
Month: December 200.00 12.00 150.00 100.00 UTL Overall Mill Utilization (%) Mechanical MECYear: 2014 PWR Overall Avg. Power Consumption (kw/ton) Electrical ELC
MTBF Automation AUTMTTR Mean Time to Repair (MTTR) - Hours Lack of Demand DMDAVL Mill Availability (%) High silo level HSL
Planned Shutdown PSDExternal EXT
KPI Equation GGBFS TYP I TYP V TYP II Shift change SHFTotal (Hours)
POZCMT GRND LMS GRND POZ WCMTKPI Trend
S1 S2 S3 S4 FLYASHCMTMAX. 207 T MAX. 203 T MAX. 269 T MAX. 270 T Product Volume (MT)
MIN. 0 T MIN. 0 T MIN. 16 T MIN. 0 T GGBFSGGBFS TYP I TYP V TYP II TYP I
TYP IIPOZCMT GRND LMS GRND POZ WCMT TYP V
GBFS TYP I Clk TYP V Clk TYP II Clk GGBFS TYP I TYP V TYP II FLYASHCMTFLYASHCMT POZCMT
LMS RM GYP RM WCMT Clk POZ RM POZCMT GRND LMS GRND POZ WCMT GRND LMSGRND POZ
FLYASH FLYASHCMT GGBFS TYP I TYP V TYP II WCMT
POZCMT GRND LMS GRND POZ WCMT GGBFSTYP I
FLYASHCMT TYP VTYP II
GGBFS TYP I TYP V TYP II GGBFS TYP I TYP V TYP II FLYASHCMTGGBFS TYP I TYP V TYP II POZCMT
POZCMT GRND LMS GRND POZ WCMT POZCMT GRND LMS GRND POZ WCMT GRND LMSPOZCMT GRND LMS GRND POZ WCMT GRND POZ
FLYASHCMT FLYASHCMT WCMTFLYASHCMT Total (SAR)
GGBFS TYP I TYP V TYP II GGBFS TYP I TYP V TYP II GGBFS TYP I TYP V TYP II
POZCMT GRND LMS GRND POZ WCMT POZCMT GRND LMS GRND POZ WCMT POZCMT GRND LMS GRND POZ WCMT
FLYASHCMT FLYASHCMT FLYASHCMT
Report FilterFree date selection
Periodical selections
Production Line Selection
Quick Selections
PnG1&2
Wk 1
Month-to-date
Current year-to-date
Wk 2 Wk 3 Wk 4
PnG1 PnG2
From: 1/1/15To: 2/28/15
Type Code Count Duration (Hr)RTK S1 RTK S2 SRMCC S3 SRMCC S4 EFF Overall Mill Efficiency (%) Process PRC
Month: December 200.00 12.00 150.00 100.00 UTL Overall Mill Utilization (%) Mechanical MECYear: 2014 PWR Overall Avg. Power Consumption (kw/ton) Electrical ELC
MTBF Automation AUTMTTR Mean Time to Repair (MTTR) - Hours Lack of Demand DMDAVL Mill Availability (%) High silo level HSL
Planned Shutdown PSDExternal EXT
KPI Equation GGBFS TYP I TYP V TYP II Shift change SHFTotal (Hours)
POZCMT GRND LMS GRND POZ WCMTKPI Trend
S1 S2 S3 S4 FLYASHCMTMAX. 207 T MAX. 203 T MAX. 269 T MAX. 270 T Product Volume (MT)
MIN. 0 T MIN. 0 T MIN. 16 T MIN. 0 T GGBFSGGBFS TYP I TYP V TYP II TYP I
TYP IIPOZCMT GRND LMS GRND POZ WCMT TYP V
GBFS TYP I Clk TYP V Clk TYP II Clk GGBFS TYP I TYP V TYP II FLYASHCMTFLYASHCMT POZCMT
LMS RM GYP RM WCMT Clk POZ RM POZCMT GRND LMS GRND POZ WCMT GRND LMSGRND POZ
FLYASH FLYASHCMT GGBFS TYP I TYP V TYP II WCMT
POZCMT GRND LMS GRND POZ WCMT GGBFSTYP I
FLYASHCMT TYP VTYP II
GGBFS TYP I TYP V TYP II GGBFS TYP I TYP V TYP II FLYASHCMTGGBFS TYP I TYP V TYP II POZCMT
POZCMT GRND LMS GRND POZ WCMT POZCMT GRND LMS GRND POZ WCMT GRND LMSPOZCMT GRND LMS GRND POZ WCMT GRND POZ
FLYASHCMT FLYASHCMT WCMTFLYASHCMT Total (SAR)
GGBFS TYP I TYP V TYP II GGBFS TYP I TYP V TYP II GGBFS TYP I TYP V TYP II
POZCMT GRND LMS GRND POZ WCMT POZCMT GRND LMS GRND POZ WCMT POZCMT GRND LMS GRND POZ WCMT
FLYASHCMT FLYASHCMT FLYASHCMT
1A. Finished products silos balances at 28-Feb-15
Silo level Trend
1. Material Balances Reporting
Under section no. 1, one can track trend of material level per each silo to analyze and plan future capacities.
There is also a button to show trend of material level in a single silo or in all silos levels over preceding 90 days.
A graphic indicator is visible to show the filling degree per each silo.
From: 1/1/15To: 2/28/15
Type Code Count Duration (Hr)RTK S1 RTK S2 SRMCC S3 SRMCC S4 EFF Overall Mill Efficiency (%) Process PRC
Month: December 200.00 12.00 150.00 100.00 UTL Overall Mill Utilization (%) Mechanical MECYear: 2014 PWR Overall Avg. Power Consumption (kw/ton) Electrical ELC
MTBF Automation AUTMTTR Mean Time to Repair (MTTR) - Hours Lack of Demand DMDAVL Mill Availability (%) High silo level HSL
Planned Shutdown PSDExternal EXT
KPI Equation GGBFS TYP I TYP V TYP II Shift change SHFTotal (Hours)
POZCMT GRND LMS GRND POZ WCMT
S1 S2 S3 S4 FLYASHCMTMAX. 207 T MAX. 203 T MAX. 269 T MAX. 270 T Product Volume (MT)
MIN. 0 T MIN. 0 T MIN. 16 T MIN. 0 T GGBFSGGBFS TYP I TYP V TYP II TYP I
TYP IIPOZCMT GRND LMS GRND POZ WCMT TYP V
GBFS TYP I Clk TYP V Clk TYP II Clk GGBFS TYP I TYP V TYP II FLYASHCMTFLYASHCMT POZCMT
LMS RM GYP RM WCMT Clk POZ RM POZCMT GRND LMS GRND POZ WCMT GRND LMSGRND POZ
FLYASH FLYASHCMT GGBFS TYP I TYP V TYP II WCMT
POZCMT GRND LMS GRND POZ WCMT GGBFSTYP I
FLYASHCMT TYP VTYP II
GGBFS TYP I TYP V TYP II GGBFS TYP I TYP V TYP II FLYASHCMTGGBFS TYP I TYP V TYP II POZCMT
POZCMT GRND LMS GRND POZ WCMT POZCMT GRND LMS GRND POZ WCMT GRND LMSPOZCMT GRND LMS GRND POZ WCMT GRND POZ
FLYASHCMT FLYASHCMT WCMTFLYASHCMT Total (SAR)
GGBFS TYP I TYP V TYP II GGBFS TYP I TYP V TYP II GGBFS TYP I TYP V TYP II
POZCMT GRND LMS GRND POZ WCMT POZCMT GRND LMS GRND POZ WCMT POZCMT GRND LMS GRND POZ WCMT
FLYASHCMT FLYASHCMT FLYASHCMT
1B.1 Raw Materials - Balances as of 28-Feb-15 1B.2 Finished Products - Balances as of 28-Feb-151B. Report of Balances per Material as of 02/28/2015
The second section displays Production / Dispatch where information about the actual volumes produced & dispatched per day or at any other pre-prespecified period in the report filters.
Also, it clearly shows the accumulated quantity produced of each product as well as its quantity dispatched during the selected period.
From: 1/1/15To: 2/28/15
Type Code Count Duration (Hr)RTK S1 RTK S2 SRMCC S3 SRMCC S4 EFF Overall Mill Efficiency (%) Process PRC
Month: December 200.00 12.00 150.00 100.00 UTL Overall Mill Utilization (%) Mechanical MECYear: 2014 PWR Overall Avg. Power Consumption (kw/ton) Electrical ELC
MTBF Automation AUTMTTR Mean Time to Repair (MTTR) - Hours Lack of Demand DMDAVL Mill Availability (%) High silo level HSL
Planned Shutdown PSDExternal EXT
KPI Equation GGBFS TYP I TYP V TYP II Shift change SHFTotal (Hours)
POZCMT GRND LMS GRND POZ WCMT
S1 S2 S3 S4 FLYASHCMTMAX. 207 T MAX. 203 T MAX. 269 T MAX. 270 T Product Volume (MT)
MIN. 0 T MIN. 0 T MIN. 16 T MIN. 0 T GGBFSGGBFS TYP I TYP V TYP II TYP I
TYP IIPOZCMT GRND LMS GRND POZ WCMT TYP V
GBFS TYP I Clk TYP V Clk TYP II Clk GGBFS TYP I TYP V TYP II FLYASHCMTFLYASHCMT POZCMT
LMS RM GYP RM WCMT Clk POZ RM POZCMT GRND LMS GRND POZ WCMT GRND LMSGRND POZ
FLYASH FLYASHCMT GGBFS TYP I TYP V TYP II WCMT
POZCMT GRND LMS GRND POZ WCMT GGBFSTYP I
FLYASHCMT TYP VTYP II
GGBFS TYP I TYP V TYP II GGBFS TYP I TYP V TYP II FLYASHCMTGGBFS TYP I TYP V TYP II POZCMT
POZCMT GRND LMS GRND POZ WCMT POZCMT GRND LMS GRND POZ WCMT GRND LMSPOZCMT GRND LMS GRND POZ WCMT GRND POZ
FLYASHCMT FLYASHCMT WCMTFLYASHCMT Total (SAR)
GGBFS TYP I TYP V TYP II GGBFS TYP I TYP V TYP II GGBFS TYP I TYP V TYP II
POZCMT GRND LMS GRND POZ WCMT POZCMT GRND LMS GRND POZ WCMT POZCMT GRND LMS GRND POZ WCMT
FLYASHCMT FLYASHCMT FLYASHCMT
2B. Accumulated Production / Dispatch Reporting from: 1-Jan-15 to 28-Feb-15
2. Production / Dispatch Reporting2A. Daily Production / Dispatch Reporting as of Last Reported Day; 28-Feb-15
2A.1 Production - Daily (TON) for PnG1&2 2A.2 Dispatch - Daily (TON)
2B.1 Production - Accumulated (TON) for PnG1&2 2B.2 Dispatch - Accumulated (TON)
From: 1/1/15To: 2/28/15
Type Code Count Duration (Hr)RTK S1 RTK S2 SRMCC S3 SRMCC S4 EFF Overall Mill Efficiency (%) Process PRC
Month: December 200.00 12.00 150.00 100.00 UTL Overall Mill Utilization (%) Mechanical MECYear: 2014 PWR Overall Avg. Power Consumption (kw/ton) Electrical ELC
MTBF Mean Time Between Failures (MTBF) - Hours Automation AUTMTTR Mean Time to Repair (MTTR) - Hours Lack of Demand DMDAVL Mill Availability (%) High silo level HSL
Planned Shutdown PSDExternal EXT
KPI Equation GGBFS TYP I TYP V TYP II Shift change SHFTotal (Hours)
POZCMT GRND LMS GRND POZ WCMTKPI Trend
S1 S2 S3 S4 FLYASHCMTMAX. 207 T MAX. 203 T MAX. 269 T MAX. 270 T Product Volume (MT)
MIN. 0 T MIN. 0 T MIN. 16 T MIN. 0 T GGBFSGGBFS TYP I TYP V TYP II TYP I
TYP IIPOZCMT GRND LMS GRND POZ WCMT TYP V
GBFS TYP I Clk TYP V Clk TYP II Clk GGBFS TYP I TYP V TYP II FLYASHCMTFLYASHCMT POZCMT
LMS RM GYP RM WCMT Clk POZ RM POZCMT GRND LMS GRND POZ WCMT GRND LMSGRND POZ
FLYASH FLYASHCMT GGBFS TYP I TYP V TYP II WCMT
POZCMT GRND LMS GRND POZ WCMT GGBFSTYP I
FLYASHCMT TYP VTYP II
GGBFS TYP I TYP V TYP II GGBFS TYP I TYP V TYP II FLYASHCMTGGBFS TYP I TYP V TYP II POZCMT
POZCMT GRND LMS GRND POZ WCMT POZCMT GRND LMS GRND POZ WCMT GRND LMSPOZCMT GRND LMS GRND POZ WCMT GRND POZ
FLYASHCMT FLYASHCMT WCMTFLYASHCMT Total (SAR)
GGBFS TYP I TYP V TYP II GGBFS TYP I TYP V TYP II GGBFS TYP I TYP V TYP II
POZCMT GRND LMS GRND POZ WCMT POZCMT GRND LMS GRND POZ WCMT POZCMT GRND LMS GRND POZ WCMT
FLYASHCMT FLYASHCMT FLYASHCMT
3. Key performance Indicators3A. PnG1&2 KPI's from: 1-Jan-15 to 28-Feb-15
3B.1 Mill Efficiency per product (%)3B. PnG1&2 production KPI's from: 1-Jan-15 to 28-Feb-15
Performance indicators section displays the calculated value per each indicator as well as its trend over a selected period through clicking a button.
For each indicator, the method of calculating the indicator is visible to the user by clicking on another button.
From: 1/1/15To: 2/28/15
Type Code Count Duration (Hr)RTK S1 RTK S2 SRMCC S3 SRMCC S4 EFF Overall Mill Efficiency (%) Process PRC
Month: December 200.00 12.00 150.00 100.00 UTL Overall Mill Utilization (%) Mechanical MECYear: 2014 PWR Overall Avg. Power Consumption (kw/ton) Electrical ELC
MTBF Automation AUTMTTR Mean Time to Repair (MTTR) - Hours Lack of Demand DMDAVL Mill Availability (%) High silo level HSL
Planned Shutdown PSDExternal EXT
KPI Equation GGBFS TYP I TYP V TYP II Shift change SHFTotal (Hours)
POZCMT GRND LMS GRND POZ WCMT
S1 S2 S3 S4 FLYASHCMTMAX. 207 T MAX. 203 T MAX. 269 T MAX. 270 T Product Volume (MT)
MIN. 0 T MIN. 0 T MIN. 16 T MIN. 0 T GGBFSGGBFS TYP I TYP V TYP II TYP I
TYP IIPOZCMT GRND LMS GRND POZ WCMT TYP V
GBFS TYP I Clk TYP V Clk TYP II Clk GGBFS TYP I TYP V TYP II FLYASHCMTFLYASHCMT POZCMT
LMS RM GYP RM WCMT Clk POZ RM POZCMT GRND LMS GRND POZ WCMT GRND LMSGRND POZ
FLYASH FLYASHCMT GGBFS TYP I TYP V TYP II WCMT
POZCMT GRND LMS GRND POZ WCMT GGBFSTYP I
FLYASHCMT TYP VTYP II
GGBFS TYP I TYP V TYP II GGBFS TYP I TYP V TYP II FLYASHCMTGGBFS TYP I TYP V TYP II POZCMT
POZCMT GRND LMS GRND POZ WCMT POZCMT GRND LMS GRND POZ WCMT GRND LMSPOZCMT GRND LMS GRND POZ WCMT GRND POZ
FLYASHCMT FLYASHCMT WCMTFLYASHCMT Total (SAR)
GGBFS TYP I TYP V TYP II GGBFS TYP I TYP V TYP II GGBFS TYP I TYP V TYP II
POZCMT GRND LMS GRND POZ WCMT POZCMT GRND LMS GRND POZ WCMT POZCMT GRND LMS GRND POZ WCMT
FLYASHCMT FLYASHCMT FLYASHCMT
3B.5 Mill productivity per Product (tons/hour)
3B.4 Average Power Consumption per Product (kwh/ton)
3B.2 Mill Utilization per Product (%)
3B.3 Average Blaine per Product (cm2/gm)
From: 1/1/15To: 2/28/15
Type Code Count Duration (Hr)RTK S1 RTK S2 SRMCC S3 SRMCC S4 EFF Overall Mill Efficiency (%) Process PRC
Month: December 200.00 12.00 150.00 100.00 UTL Overall Mill Utilization (%) Mechanical MECYear: 2014 PWR Overall Avg. Power Consumption (kw/ton) Electrical ELC
MTBF Automation AUTMTTR Mean Time to Repair (MTTR) - Hours Lack of Demand DMDAVL Mill Availability (%) High silo level HSL
Planned Shutdown PSDExternal EXT
KPI Equation GGBFS TYP I TYP V TYP II Shift change SHFTotal (Hours)
POZCMT GRND LMS GRND POZ WCMT
S1 S2 S3 S4 FLYASHCMTMAX. 207 T MAX. 203 T MAX. 269 T MAX. 270 T Product Volume (MT)
MIN. 0 T MIN. 0 T MIN. 16 T MIN. 0 T GGBFSGGBFS TYP I TYP V TYP II TYP I
TYP IIPOZCMT GRND LMS GRND POZ WCMT TYP V
GBFS TYP I Clk TYP V Clk TYP II Clk GGBFS TYP I TYP V TYP II FLYASHCMTFLYASHCMT POZCMT
LMS RM GYP RM WCMT Clk POZ RM POZCMT GRND LMS GRND POZ WCMT GRND LMSGRND POZ
FLYASH FLYASHCMT GGBFS TYP I TYP V TYP II WCMT
POZCMT GRND LMS GRND POZ WCMT GGBFSTYP I
FLYASHCMT TYP VTYP II
GGBFS TYP I TYP V TYP II GGBFS TYP I TYP V TYP II FLYASHCMTGGBFS TYP I TYP V TYP II POZCMT
POZCMT GRND LMS GRND POZ WCMT POZCMT GRND LMS GRND POZ WCMT GRND LMSPOZCMT GRND LMS GRND POZ WCMT GRND POZ
FLYASHCMT FLYASHCMT WCMTFLYASHCMT Total (SAR)
GGBFS TYP I TYP V TYP II GGBFS TYP I TYP V TYP II GGBFS TYP I TYP V TYP II
POZCMT GRND LMS GRND POZ WCMT POZCMT GRND LMS GRND POZ WCMT POZCMT GRND LMS GRND POZ WCMT
FLYASHCMT FLYASHCMT FLYASHCMT
4. PnG1&2 stoppages analaysis from: 1-Jan-15 to 28-Feb-15
Section no. 4 is concerned with equipment stoppages that have happened in a selected period, it will display them categorized by specialty, duration and frequency/count.
There is an option to view a pie chart for the distribution per specialty of stoppages based on the duration of stoppages and the count of stoppages in the selected period.
From: 1/1/15To: 2/28/15
Type Code Count Duration (Hr)RTK S1 RTK S2 SRMCC S3 SRMCC S4 EFF Overall Mill Efficiency (%) Process PRC
Month: December 200.00 12.00 150.00 100.00 UTL Overall Mill Utilization (%) Mechanical MECYear: 2014 PWR Overall Avg. Power Consumption (kw/ton) Electrical ELC
MTBF Automation AUTMTTR Mean Time to Repair (MTTR) - Hours Lack of Demand DMDAVL Mill Availability (%) High silo level HSL
Planned Shutdown PSDExternal EXT
KPI Equation GGBFS TYP I TYP V TYP II Shift change SHFTotal (Hours)
POZCMT GRND LMS GRND POZ WCMT
S1 S2 S3 S4 FLYASHCMTMAX. 207 T MAX. 203 T MAX. 269 T MAX. 270 T Product Volume (MT)
MIN. 0 T MIN. 0 T MIN. 16 T MIN. 0 T GGBFSGGBFS TYP I TYP V TYP II TYP I
TYP IIPOZCMT GRND LMS GRND POZ WCMT TYP V
GBFS TYP I Clk TYP V Clk TYP II Clk GGBFS TYP I TYP V TYP II FLYASHCMTFLYASHCMT POZCMT
LMS RM GYP RM WCMT Clk POZ RM POZCMT GRND LMS GRND POZ WCMT GRND LMSGRND POZ
FLYASH FLYASHCMT GGBFS TYP I TYP V TYP II WCMT
POZCMT GRND LMS GRND POZ WCMT GGBFSTYP I
FLYASHCMT TYP VTYP II
GGBFS TYP I TYP V TYP II GGBFS TYP I TYP V TYP II FLYASHCMTGGBFS TYP I TYP V TYP II POZCMT
POZCMT GRND LMS GRND POZ WCMT POZCMT GRND LMS GRND POZ WCMT GRND LMSPOZCMT GRND LMS GRND POZ WCMT GRND POZ
FLYASHCMT FLYASHCMT WCMTFLYASHCMT Total (SAR)
GGBFS TYP I TYP V TYP II GGBFS TYP I TYP V TYP II GGBFS TYP I TYP V TYP II
POZCMT GRND LMS GRND POZ WCMT POZCMT GRND LMS GRND POZ WCMT POZCMT GRND LMS GRND POZ WCMT
FLYASHCMT FLYASHCMT FLYASHCMT
5B. Total INVOICED sales revenue (SAR)
This last section shows the sales performance per product, per customer and per region.
There is an option which displays the proportion of each customer’s purchases to total sales and viewed in a pie chart having a dedicated color assigned to each region.
Product Volume (MT)GGBFSTYP ITYP II RM05 Saihat 493.5TYP VFLYASHCMT Other external customers 215.4POZCMTGRND LMSGRND POZWCMT
Customer
5. Sales performance from: 1-Jan-15 to 28-Feb-155A. Largest customer per product