NHAI – PIU-RJY SOWiL Limited
Consulting Services as Independent Engineer during Operation & Maintenance of 4-lanedivided carriageway facility of the section from Rajahmundry- Dharmavaram –TuniKm 200 to Km 300 (New Chainage Km 901.753 to Km 799.998) Constructed on BOT
(Annuity) on NH-5 (NH-16) in the State of Andhra Pradesh.
OPERATION & MAINTENANCE REPORTFOR THE MONTH OF JULY - 2016
EMPLOYER:NATIONAL HIGHWAYS AUTHORITY OF INDIA
G-5 & 6, Sector – 10, Dwaraka, New Delhi.
NATIONAL HIGHWAYS AUTHORITY OF INDIAD.NO.78-14-21, Syamala Nagar,PIU – Rajahmundry – 533 103.
CONCESSIONAIRE :M/S. Andhra Expressway Limited,
H.No.74-7-4 AMC Bhavan, Prakash NagarRAJAHMUNDRY – 533 103.
INDEPENDENT ENGINEER :SOWiL LIMITED
Site Office : Head Office :H.No.78-13-7/3, S.B.I.Colony D-157, Sector 7,Road No.1, Syamala Nagar, NOIDA – 201301,E.G.Dt., A.P.Rajahmundry-533 103. Ph: 0120-4232757-59,e-mail: [email protected] Fascimile:0120 4232760,Telephone and Fax. 0883 2436615 e-mail:[email protected]
NH-16, Rajahmundry to DharmavaramAP – 15 Package
___________________________________________________________________________________
OPERATION AND MAINTENANCE JULY - 2016
Contents PREAMBLE ............. ……………………………………………………………............ 1
1. CHAPTER …………………………………………………….............………............ 31.1 Executive Summary1.2 Project Background
1.2.1 Introduction1.2.2 Project Fact Sheet1.2.3 NH-Map (Chennai-Kolkata)1.2.4 Layout Map
2. CHAPTER …………………………………………………………………................. 92.1 Project facilities
3. CHAPTER ………………………………………………………………………......... 11Maintenance activates3. a) Routine Maintenance
b) Emergency Maintenance c) Other Maintenance d) Safety and Traffic Maintenance e) Corridor Maintenance f) Miscellaneous
4. CHAPTER .......................................................................................................................... 16 4.1. Details of Maintenance Staff Deployed
5. OBJECTIVE AND FREQUENCY OF INSPECTION ................................................... 18 5.1 Operation and Maintenance Report 5.2 Inspection / Observation Report6. MONTHLY INSPECTION REPORT .............................................................................. 20
7. APPENDIX –A
Inspections under taken &Notices / Instructions Issued to the Concessionaire 548. APPENDIX – B
Public Facilities 56
9. APPENDIX – C – ACCIDENT REPORT / INCIDENT REPORT………..…..……... 58
10. APPENDIX – D – OPERATION AND MAINTENANCE REPORT.……………..… 6210.1 Restoration of Illumination Report10.2 Daily Visual Encroachment / Encumbrance Report10.3 Emergency Response Protocol10.4 Weather Report10.5 Bleeding Area Report10.6 Plant & Equipment Report10.7 Statement of Manpower Available at Site work10.8 Maintenance Activities carried out during the Month10.9 Compliance Report10.10 O&M Constraints10.11 Lane Non-Availability Report10.12 Report on Abnormal Indivisible Load Routing10.13 Progress of 10th Year Periodic Maintenance10.14 Status of plantation in PPP projects
11. APPENDIX – E Control of National Highways (Land & Traffic) Act 2002 (13 of 2003) – Implementation 80
12. PHOTOGRAPHS……………………………………………………..……………..… 90
`NH-16, Rajahmundry to Dharmavaram AP – 15 Package
OPERATION AND MAINTENANCE REPORT JULY - 2016
PREAMBLE
NHAI amidst national competitive bidding appointed M/s.Sowil Limited vide
NHAI/ROHYD/11014/1/13-RJY/5587 Dated 28th June 2013 as an independent Engineer during the
Operations and Maintenance for AP – 15 packages (Km.200 to Km.253) i.e. (901.753 to 848.746)
being executed by M/s. Rajahmundry Expressway Limited respectively.
Prior to our mobilization, M/s.Louis Berger Group Inc., and M/s.Artefact Projects – Zaidun
Leeng.sdn.bhd (JV) have conducted as Independent Engineer to this project since the
implementation period.
The O&M activities have commenced from, 24th Sept. 2004 as discussed in Minutes of Meeting
with NHAI, IE & Concessionaire, (refer letter no.AP:ZL/Proj-Rajah/Site/2004/C/1538,
dt.24.09.04), during September 2004. During that meeting, Organization Chart regarding
deployment of Staff and Technicians was discussed and finalized during the same meeting and
accordingly manpower and resources were deployed by Concessionaire.
The Concessionaire has submitted O&M Manual (Operations) vide letter
no.REL/RDRP/CE/1(C)/2993/2004, dt.12th April 2004. The official unveiling of O & M Manual
and inauguration of Maintenance Yard Building took place by the Member Tech, NHAI on 10-10-
2004 at Maintenance Yard.
The other milestone events of the project are as below;
Provisional Completion Certificate as on 20th September 2004 was issued by IndependentEngineer vide letter no.AP: ZL/ Proj-Rajah/Site/2005/C/1794, dated 6th May 2005.
`NH-16, Rajahmundry to Dharmavaram AP – 15 Package
OPERATION AND MAINTENANCE REPORT JULY - 2016
Completion Certificate was issued to the Concessionaire vide letter no. no.AP:ZL/Proj-Rajah/2007-08/2511, dated 25th April 2007 as per the approval of Competent Authority of NHAIvide their letter no. NHAI/20/Vol.9/PIU-RJY/2007-08/9637 dated 19.04.2007.
Pushkara Lift Irrigation Scheme has been undertaken as per the 2nd supplementary Agreement dated15th March 2007.
Completion certificate for Irrigation Bridges has been issued as of 31st July 2007.
As a part of concession Agreement, 5th & 10th year periodic maintenance works are completed.The Project MPR has been submitted in six chapters covering various facts of the projects.
Chapter 1 : The Executive summary
Chapter 2 : The Project facilities
Chapter 3 : The Maintenance activitiesA) Routine MaintenanceB) Emergency MaintenanceC) Other MaintenanceD) Safety and Traffic MaintenanceE) Corridor MaintenanceF) Miscellaneous
Chapter 4 : Emergency response protocola) NHAIb) Independent Engineerc) Concessionaired) Local emergency services
Chapter 5 : Objective and Frequency of Inspection
Chapter 6 : Monthly Inspection Report
`NH-16, Rajahmundry to Dharmavaram AP – 15 Package
OPERATION AND MAINTENANCE REPORT JULY - 2016
1. CHAPTER
1.1 EXECUTIVE SUMMARY
1. Mobilization of O & M crew:
a) The O & M activities are in progress in accordance with Minutes of Meetingwith NHAI, IE & Concessionaire, dt.24th Sept.2004 (refer letter no.AP-ZL/Proj- Rajah / Site / 2004 / C/1538, dt.24.09.04), during Sept.2004.
b) The Quality Assurance / Quality Control Laboratory located at 859.203(Ch.242+540) near village Chinnempeta has been established and operationalsince COD.
c) This Package is having a Maintenance Yard at Chinnimpeta (Ch.242.540)with the facilities for relief in emergency situations such as Hydra toe awayCrane, Escorts JCB 3D excavator cum loader, Ambulance with first aid kit,Highway Patrolling Vehicle, daily inspection crew vehicle. Also since thenthe quality control lab with all highway material testing equipments is inoperations. Stores is well equipped with Highway Safety material, first aidkit required by the Emergency Response Protocol Team as well as trafficfurniture like metal crash barrier, delineators for guard posts, trafficsignages, and other essential material set is available.
d) The Concessionaire has submitted all different statutory O & Mrequirements as per Schedule – I of the Concession Agreement to theIndependent Engineer. The Safety Plan, Emergency Response Protocol,Environmental Plan, Traffic Management Plan and Method Statement forwork and O&M manual have all been submitted and accepted in principleby the Independent Engineer in consultations with NHAI.
`NH-16, Rajahmundry to Dharmavaram AP – 15 Package
OPERATION AND MAINTENANCE REPORT JULY - 2016
1.2 PROJECT BACKGROUND
1.2.1 Introduction
The Government of India through the Ministry of Road Transport and Highways have proposed tocarryout a major exercise to improve (strengthening and widening to 4 lane) the highwaysconnecting various cities. One of the gigantic proposals is a Golden Quadrilateral connecting fourmetropolitan cities viz.
a) Delhi to Kolkatab) Kolkata to Chennaic) Chennai to Mumbai via Bangalore andd) Mumbai to Delhi
Amidst International Competitive bidding, the National Highways Authority of India awarded the53 km from Rajahmundry to Dharmavaram Road upgradation to M/s. GAMMON INDIALIMITED on Build, Operate and Transfer (BOT) Annuity basis. The Project was executed througha SPV M/s. Rajahmundry Expressway Limited.
M/s.Zaidun Leeng Sdn. Bhd. In joint venture with Artefact Projects were the Independent Engineerstill 20th July 2009. Subsequently M/s.The Louis Berger Group, Inc. have commenced the servicesas an Independent Engineer for the project vide letter No.NHAI/12014/2009/RD/GM(CK-I)/Tech/1005 dated 13th July 2009 and completed the service on 30th June 2013 vide letter No.NHAI/66/LBG/PIU-RJY/2013-14/16089 dated 28th June 2013.
Further M/s Sowil Limited have commenced the services as an Independent Engineer from 1 st July2013 for the project vide letter No.NHAI/RO-HYD/11014/1/13-RJY-5587 dated 28 th June2013
The milestone events of the project are as under :
a) Provisional Completion Certificate as on 20th September 2004 was issued vide I.E letterno.AP:ZL/Proj-Rajah/Site/2005/C/1794, dt.06.05.05.
b) Completion Certificate was issued to the Concessionaire vide letter no.AP:ZL/Proj-Rajah/2007-08/2511, dated 25th April 2007 as per the approval of Competent Authority of NHAIvide their letter no.NHAI/20/Vol.9/PIU-RJY/2007-08/9637 dated 19.04.2007 no.AP:ZL/Proj-Rajah/Site/2005/C/1981 w.e.f. 30th December, 2005.
c) IRRIGATION CANAL Under Pushkara Lift Irrigation Scheme is crossing the corridor atkm.879+083 & km.889+310 (Mallepalli village & Murari village). At these two crossings twoBridges were constructed as Deposit Works under 2nd Supplementary Agreement dated15.03.2007.These Two Bridges were completed and Completion Certificate of these IrrigationCanal Bridges was issued Technical Consultants vide letter No.AP:ZL/Proj-Rajah/Site/2007/IRRI/2703 dt.31.12.2007.
`NH-16, Rajahmundry to Dharmavaram AP – 15 Package
OPERATION AND MAINTENANCE REPORT JULY - 2016
1.2.2 Project Fact Sheet
Chainage Km. 901+753 to 848+746 (New Chainage)Km. 200+000 to 253+000 (Old Chainage)
Location Rajahmundry-Dharmavaram
Owner National Highways Authority of India
Independent Engineer The Sowil Limited
Name of the EPC Contractor Gammon India Limited
Name of the Concessionaire Rajahmundry Expressway Limited
Construction Contract Period 30 Months
Dt. Of LOA 05-09-2001 (Ref: - NHAI/15020/2000/GM/E-III)/Tech dt.5-9-2001
Dt. of Signing of Concession agreement 30.10.2001
Commencement Date 30-5-2002 (7 months from the date of CA)
Scheduled Completion Date 29-11-2004
Actual completion date (C.O.D) 20-09-2004
Concession Period 17 ½ Years ( 2 ½ years for construction, 15 years foroperations)
Completion Certificate Issued on on 25.04.2007 with effect from 30.12.2005.
Annuity Amount (Rs.)Rs.296.19 MillionBi-annual annuities for 15 years
No of Annuity Certificates Recommended 23rd Annuity – (May - 2016 )
`NH-16, Rajahmundry to Dharmavaram AP – 15 Package
OPERATION AND MAINTENANCE REPORT JULY - 2016
1.2.3 Independent Engineer Consultancy Contract Details.
Name of the Independent Engineer : M/s. Sowil Limited.,
Contract Signed : 28-06-2013
Commencement Date : 01-07-2013
Original Completion Date : 30-06-2016
Extended Date : 31-12-2016
Original Contract Period : 36 Months
Extended Period : 6 Months
Original Contract Amount : Rs. 3, 38, 28,000/-
`NH-16, Rajahmundry to Dharmavaram AP – 15 Package
OPERATION AND MAINTENANCE REPORT JULY - 2016
`NH-16, Rajahmundry to Dharmavaram AP – 15 Package
OPERATION AND MAINTENANCE REPORT JULY - 2016
`NH-16, Rajahmundry to Dharmavaram AP – 15 Package
OPERATION AND MAINTENANCE REPORT JULY - 2016
2. CHAPTER
2.1 PROJECT FACILITIES
Sl. No. Description Scope Unit1. 4/6 Laning 53 Km2. Realignment section 7.885 Km3. Service Roads 4.400 Km4. Major Junction 8 Nos.5. Minor Junctions 4 Nos.6. Major Bridge 1 Nos.7. Minor Bridges 3+2 Nos.8. Minor Irrigation Bridges 2 Nos.9. Vehicular Underpass 1 Nos.
10. Pedestrian /Cattle Underpass 5 Nos.11. Slab/Box Culverts 13+33 = 46 Nos.12. Pipe Culverts 109+2 Nos.13. Covered drains 15.200 Km14. Toe drains 90.800 Km15. Signages 419 No.16. Road Furniture (K.M) 53 Km17. Safety barriers (MBCB) 31.148 Km.18. Guard Posts 4917 Nos19. Delineators 400 Nos20. Toll Plaza 1 Nos.21. Illumination in the
corridorPosts 507
Lamps 854Nos.
22. Bus Bays 2 Nos.23. Bus Shelters 5 Nos.24 Bus Bays + Bus Shelters 9 Nos.25 Maintenance yard 2000 m²
`NH-16, Rajahmundry to Dharmavaram AP – 15 Package
OPERATION AND MAINTENANCE REPORT JULY - 2016
2.2 PROJECT STATUS
2.2.1 Provisional Completion Certificate: -
Provisional Completion Certificate as on 20th September 2004 was issued byIndependent Engineer – M/s. Zaidun-Leeng Sdn. Bhd. & Artefact Projects (JV) videletter no.AP:ZL/Proj-Rajah/Site/2005/C/1794, dated 6th May 2005.
2.2.2 Completion Certificate:-
a) Completion Certificate was issued to the Concessionaire vide letterno.AP:ZL/Proj-Rajah/2007-08/2511, dated 25th April 2007 as per the approval ofCompetent Authority of NHAI vide their letter no.NHAI/20/Vol.9/PIU-RJY/2007-08/9637 dated 19.04.2007, subject to admissible exclusion of the following:
i. Protection work to the 2 Nos. Pipe Culverts (Stone Pitching, Filter Media andApron on RHS) at Ch.229+160 km and Ch.229+356 km.
ii. Construction of Toe Drains 570m.
iii. Footpath (755 m) and Covered drains (65m).
The estimated cost of these omitted items amounting Rs.3, 15,085/- (Rupees ThreeLakhs Fifteen Thousand and Eighty Five only) shall be recovered from the paymentdue to the concessionaire against Change of Scope Order issued time to time.
The above amount has been recovered from the Concessionaire payments.
b) Completion Certificate for the construction of 2 Nos. Irrigation Canal crossingsunder Pushkara Lift Irrigation Scheme has been issued to the Concessionairevide letter No. No.AP:ZL/Proj-Rajah/Site/2007/IRRI/2703 dt.31.12.2007 by theTechnical Consultants (M/s. Zaidun-Leeng Sdn. Bhd. & Artefact Projects).Presently the
c) bridges are under maintenance with the Concessionaire as per the 2nd
Supplementary Agreement.
`NH-16, Rajahmundry to Dharmavaram AP – 15 Package
OPERATION AND MAINTENANCE REPORT JULY - 2016
3. CHAPTER
MAINTENANCE ACTIVITES
(A) ROUTINE MAINTENANCE
Description of Activities Status of Activities
Cleaning of pavement, removal of debris orany unwanted material from Project highway.
Cleaning of pavement, removal of dead animal & debrisetc. is being done on regular basis.
Repair/Replacement of road furnitureincluding crash barrier, road marking, signage,guard post, railing, kerb etc.
Fixing of broken/spoiled/removed Guard Posts, MetalBeam Crash Barriers and reflective stickers is beingreplaced. Fixing of damaged PG Rails Work in Progress.
Repair of damaged earthen shoulder,embankment slopes, drain, removal oflandslide etc.
a) Repair of damaged earthen shoulders to be rectified
b) Maintenance of Cross drainage work is in progress
Maintenance of plants & shrubs to ensureproper growth.
The Trimming, manuaring & watering is being doneregularly. Replacement of dead plants / missing plantshas been replaced.
Removal of weeds & other vegetation frommedian, earthen shoulders & slopes.
Though it is being carried up on daily basis. Removal ofRank Vegetation and vegetation on slopes up to ROW isin progress.
`NH-16, Rajahmundry to Dharmavaram AP – 15 Package
OPERATION AND MAINTENANCE REPORT JULY - 2016
(B)EMERGENCY MAINTENANCE
Description of Activities Status of Activites
Development of Emergency ResponseProtocol (ERP) in consultation with thelocal police, hospital, fire department &other authorities
Emergency Response Protocol is being maintainedwith the cooperation of local police, fire stationsand hospitals with their mobile numbers.
Highway Patrolling
Round the clock Highway patrolling is being doneby Patrolling vehicles for security and safety of theproject and to prevent the unauthorizedencroachment/ Obstruction in the entire projectlength.
`NH-16, Rajahmundry to Dharmavaram AP – 15 Package
OPERATION AND MAINTENANCE REPORT JULY - 2016
(C) OTHER MAINTENANCE
Description of Activities Status of Activites
Maintenance of all Illumination Work
Cleaning of luminaries, replacement of damagedluminaries is being done as and when required. Thedamaged electrical poles and burnt cables are work inprogress.
Maintenance of highway landscape The trimming, manuaring & watering is being doneregularly some more attence is suggested.
Maintenance & cleaning of public placessuch as bus bays and bus shelters.
Cleaning, removal of debris at Bus bay & Bus shelterlocations has done on daily basis.
Maintenance of median drains andlongitudinal drains
Cleaning of median drains which are deposited with silt,sand and waste. Disposal of debris from longitudinaldrain from time to time. Covered drains silt to beRemoved in built up areas.
Maintenance of Highway Signs and RoadMarking. Any damage to traffic signswhich reduces or threatens to reduce fulland clear visibility shall be rectified withintwenty four (24) hours of its occurrence.
All Traffic Signs has been kept in clean and correctalignment and position. The fixing of missing Signboards work in progress.
Maintenance of Safety Barriers Replacement of damaged safety barriers like MBCB,PG rails etc completed.
Maintenance of road furniture Repair / replacement of road furniture is being done.
Maintenance yard, Fee plaza &Administrative building.
The hygienic conditions at Maintenance Yard & Trucklay –bye - maintained regularly.
`NH-16, Rajahmundry to Dharmavaram AP – 15 Package
OPERATION AND MAINTENANCE REPORT JULY - 2016
(D) SAFETY AND TRAFFIC MAINTENANCE
(E) CORRIDOR MAINTENANCE
Description of Activities Status of Activities
New Encroachments within ROW
Encroachments wherever occurred are being removedand unauthorised access are observed in some locations.The Concessionaire is instructed to be more vigilantthrough Route Patrole vehicle to curb encrochments /unauthorised access.
Safety o Safety Project FacilitiesClose monitoring by the Patrolling team is required toavoid any damages to the Project Facilities.
Description of Activities Status of Activites
Safety during the maintenance of road
Safety precautions during the road maintenance worksare being taken by the Concessionaire like Flag menwith necessary jacket, Warned sign Boards, diversionboards, cones etc.
Safety during the Road accidentsThis is being maintained with the cooperation of localpolice, fire stations and hospitals with their mobilenumbers.
`NH-16, Rajahmundry to Dharmavaram AP – 15 Package
OPERATION AND MAINTENANCE REPORT JULY - 2016
(F) MISCELLANEOUS
Description Status
O & M Activities :The O&M activities done by the Concessionaire asper 12th Year O&M Plan.
Whenever accidents / incidents are occurred, thepatrolling team is attending properly
Whenever accidents / incidents are occurred, theAmbulance team is attending properly.
`NH-16, Rajahmundry to Dharmavaram AP – 15 Package
OPERATION AND MAINTENANCE REPORT JULY - 2016
4. CHAPTER4.1. Details of Maintenance Staff Deployed
EMMERGENCY RESPONSE PROTOCOL-List of Important Phone Numbers in case of Emergency
A ) NHAI – STAFF - PIU- Rajahmundry
SlNo. Name Designation Location Telephone Mobile
1 Mr.J.Ch.V.Ratnam Project Director Rajahmundry 0883-2431170Fax 2437832 9959826395
BB)) INDEPENDENT ENGINEER STAFFSlNo Name Designation Location Telephone Mobile
1 Mr. D.Satyanarayana Team Leader Rajahmundry 0883-2436615 9440536285
2 Highway-cum-Maintenance Engineer
3 Mr.G.Papa Rao Highway-cum-Maintenance Engineer Rajahmundry 0883-2436615 9177333826
4 Mr.Y.Prasad Technical Supervisor Rajahmundry 0883-2436615 9491912860
5 Mr.Uma Shankar prasad Technical Supervisor Rajahmundry 0883-2436615 8986365326
6 Mr.K.Malleswara Rao Lab Assistant Rajahmundry 0883-2436615 8341474163
CC)) CONCESSIONAIRE O & M STAFF
SlNo Name Designation Location Telephone Mobile
1 Mr. S.Ramesh Project -In- Charge Rajahmundry 0883-2460533 9963959141
2 Mr. R.V.Appa Rao Highway Engineer Prathipadu 08868-200163 9912199109
3 Mr. J. Venu Gopal Traffic Safety Officer Chinnampeta 08868-200162 9948296328
4 Mr. Goutam Duty Officer Chinnampeta 08868 - 200162 9912199107
`NH-16, Rajahmundry to Dharmavaram AP – 15 Package
OPERATION AND MAINTENANCE REPORT JULY - 2016
DD)) LLOOCCAALL EEMMEERRGGEENNCCYY SSEERRVVIICCEESS
SlNo.
Name Location Telephone Mobile
1. General Hospital Rajahmundry 0883-2484999 -
2. District Hospital Rajahmundry 0883-2442555 -
3. Fire station
Rajahmundry/Jaggampeta /Gandepalli /Rajanagaram/Prathipadu
0883-2444101,101
9440138292(Mr.D.R.B.
Raju)
4. Police stationBommuru,RajanagaraGadepalli JaggempetaKirlampudi, Pathipadu
100 -
5. Highway Patrol Mobile Van Chinnam peta 9912199110
6. O&M Ambulance Chinnam peta 08868-200162 9912722117
7. Tow Away Crane Chinnampeta 08868-200162 99482 98968
`NH-16, Rajahmundry to Dharmavaram AP – 15 Package
OPERATION AND MAINTENANCE REPORT JULY - 2016
5. CHAPTER5.1 Objective and Frequency of Inspection
Item Daily Monthly QuarterlyBefore andafter rainy
seasonRiding Surface Pavement ¨ 7 l
Expansion Joints ¨ 7 l
Median Kerb ¨ 7 l
Side SlopesShape ¨ 7 l
Turfing ¨ l
Pitching & masonry ¨ l
Retaining wall 7 l
DrainageSide/Toe drain vGullies and catchPits
v 7
Bridges
Superstructure 7 l
Substructure 7 lHead wing wallsand aprons
7 l
Painting l
Hand rail 7 lCulverts/Underpasses
l
Safety Barrier ¨ 7 l
Traffic operationfacilities
Sings l 7Marking ¨ 7 l
Delineator ¨ 7 l
Lighting ¨ 7Other facilities Vegetation /
Landscaping¨ 7 l
Trafficconditions
¨ l 7
Encroachments ¨ l
LEGEND¨ Visual Inspection7 Close inspectionl Thorough inspectionv Visual inspection during rainy season only
`NH-16, Rajahmundry to Dharmavaram AP – 15 Package
OPERATION AND MAINTENANCE REPORT JULY - 2016
5.2 Operation and Maintenance Report
On verification of Concessionaire’s O & M records, the Independent Engineerfound that the Concessionaire has performed prescribed inspections in the followingformats.
i. Accident Report
ii. Road Maintenance
iii. Maintenance of Structures / Underpass etc.,
iv. Maintenance of Highway Road marking and Signages, Lighting.
5.3. Inspection / Observation Report
Inspection / observation report has been forwarded to Project Director NHAI,Rajahmundry during the month and copy of the report is in Appendix – ‘A’.
`NH-16, Rajahmundry to Dharmavaram AP – 15 Package
OPERATION AND MAINTENANCE REPORT JULY - 2016
CHAPTER. 6
6.0 MONTHLY INSPECTION REPORT
6.1 Visual Inspection Report:
6.1.1 Side slopes: The Concessionaire is replacing damaged pitching on side slopes maintenanceregularly.
6.2 Close Inspection Report:
6.2.1 Pavement Riding Surface:
· The Concessionaire is maintaining the pavement for good riding surface.
6.2.2 Expansion Joints.
· The Concessionaire is maintaining the “Silt up Expansion Joints” regularly.
6.2.3 Median Kerb:
· Damaged kerb is being rectifying as a part of routine maintenance.
6.2.4 Other facilities-Vegetation and Landscaping:
· Landscaping at PIU is being maintained satisfactorily.
· Maintenance of Median Plantation has been carried out, Pruning has also been carriedout.
· Maintenance standards of Avenue Plantation have to be improved. Periodical manure,watering to be carried out regularly.
· Missing/ Dead plants are being replaced during rainy season. Concessionaire has beenreplaced.
6.2.5 Other facilities –
· Illumination is being maintained regularly at Built up areas, Service Roads andjunctions needs to be improved desired required percentage as per ConcessionAgreement.
`NH-16, Rajahmundry to Dharmavaram AP – 15 Package
OPERATION AND MAINTENANCE REPORT JULY - 2016
6.2.6 Other facilities – Way side Amenities:
· Bus bays are being maintained regularly.
· Maintenance yard is being maintained regularly.
6.2.7 Drainage – Side / Toe drain:
· Re sectioning of the toe drain, cleaning of lined drain, etc. is being maintained.
6.2.8 Bridge - Hand rail:
· Damaged hand rails replace & painted.
6.2.9 Traffic operation Facilities - Marking:
· Faded thermoplastic pavement marking is to be maintained properly.
6.2.10 Traffic operation facilities – delineator (Guard Posts)
· Road Delineators (Guard Posts) are functioning satisfactorily.
6.3 Thorough Inspection Report:
6.3.1Traffic operation Facilities signs:
· All sign boards are being maintained satisfactorily..
6.3.2 Traffic conditions:
· Overall condition of traffic management is satisfactory.
· Smooth traffic flow has been ensured during the month. Accident vehicles have beencleared after obtaining necessary clearance from local police.
6.3.3 Encroachments:· 24 hour patrolling is being carried out to monitor encroachments.· Encroachments wherever occur are being removed as a part of maintenance.
`NH-16, Rajahmundry to Dharmavaram AP – 15 Package
OPERATION AND MAINTENANCE REPORT JULY - 2016
Inspection Report of the Independent Engineerfor the month of July, 2016:
In pursuance of Schedule-I, after receipt of Concessionaire's O&M StatusReport for the month of July, 2016, a Site Inspection was carried out by theTeam Leader of Independent Engineer on 02-08-2016. The following are theobservations:
O&M Activities :
· The Concessionaire have been attending the maintenancerequirements and safety requirements communicated by theIndependent Engineer. Most of the existing Highway is observed withpot holes. The Concessionaire has attended the work and it is inprogress.
· Drainage spouts on bridges are cleaned and it is observed thatthe work is in progress.
· Roughness Index test was conducted in presence of IndependentEngineer and report submitted.
· BBD Test also conducted by the Concessionaire in presence of theIndependent Engineer and report submitted
· Removal of Rank Vegetation up to ROW is in progress.
· Replaced the Metal Beam Crash Barriers wherever damaged withnew one.
· Median Plantation & median grass work is maintained by theConcessionaire, satisfactorily.
· Safety requirements are not complied as informed by theIndependent Engineer. Even the instructions given during the lastinspection are not attended.
· Foot Paths, cover drains in built-up locations & service roads arenot being cleared.
· Illumination in the corridor has to be improved and desirable limitnot yet reached.
· Cat-eyes / pavement makers are to be fixed.
· Side berms / gravel shoulder are badly damaged at manylocations. Need to be rectified immediately.
`NH-16, Rajahmundry to Dharmavaram AP – 15 Package
OPERATION AND MAINTENANCE REPORT JULY - 2016
Incidence Management:
The Independent Engineer has inspected for AP-15 & AP-16 Packages on 18th
& 19th July, 2016 and the following observations are made:
a) Ambulance :
The following items of basic life support system are verified:
i. Automatic loading stretcher;
ii. Spine board full, Vacuum splint kit;
iii. C-Collars;
iv. Oxygen Cylinder with pressure indicators;
v. BP Instruments;
vi. Stethoscope;
vii. Resuscitation bag;
viii. Manual foot operated suction pump;
ix. I.V. Fluid and I.V. Sets;
x. Tourniquet;
xi. First-Aid Box;(Dressing materials / Antiseptic lotion/Analgesicetc.)
xii. Blanket;
xiii. Fire extinguisher;
xiv. Laryngeal mask;
xv. Torch lights;
xvi. Drinking water;
xvii. Registers of incident / accidents;
xviii. List of Medicine Register etc.
xix. List of Hospitals;
xx. Mobile phones for communication.
`NH-16, Rajahmundry to Dharmavaram AP – 15 Package
OPERATION AND MAINTENANCE REPORT JULY - 2016
The following paramedical staff with proper uniform and name of theperson written on the uniform:
1. Trained Paramedical Staff with knowledge of first aid : 3 Nos.
2. Driver for ambulance: 3 Nos.
b) Route Patrol, Hydra Crane & JCB Vehicles :
Round the clock Highway Patrolling is being done by Patrolling Vehiclesfor security and safety of the project and to prevent the unauthorizedencroachment / obstruction in the entire project length.
The following items are verified in the above Vehicles:
i. Fire extinguisher;
ii. Gas cutter with protective glass;
iii. Water container with fresh water;
iv. Rubber Gloves;
v. Brooms one hard bristle, other soft;
vi. Rain coat; Blanket;
vii. Torch lights with spare batteries;
viii. Flashing light;
ix. Hydraulic jack, towing chain, rope;
x. Toll set (with standard set);
xi. Digital Camera, measuring tape;
xii. Paper pad, pen / pencils;
xiii. First aid kit;
xiv. List of Hospitals;
xv. List of ROW details.
`NH-16, Rajahmundry to Dharmavaram AP – 15 Package
OPERATION AND MAINTENANCE REPORT JULY - 2016
Each vehicle should also carry Traffic Management Equipment, such as
a) Sign boards – “Accident ahead”; “Lane merging”; “Direction
Arrows”; “Speed Limit”; “Keep Left / Right”;
b) Flags, whistle, reflective hand signal;
c) Traffic cones;
d) Barricades, tape;
e) Reflective jackets
f) Mobile phones.
The following manpower deployed with patrol vehicle:
1. Route Patrol In-Charge;
2. Route Patrol Assistant;
3. Driver, with knowledge of vehicle repairs.
`NH-16, Rajahmundry to Dharmavaram AP – 15 Package
OPERATION AND MAINTENANCE REPORT JULY - 2016
Daily Inspection Report&
Monthly Inspection Report
Date: 26.06.2016
General Accident/Damaged/Missing Remarks
Pavement ¨Cleaning ¨
Expansion Joints ¨
2 Median Kerb ¨
Shape ¨Turfing
Pitching & masonry
Retaining wall
Side/Toe drain v
Gullies and catch Pits v
Superstructure
Substructure
Head wing walls and approns
Painting
Hand rail
6 Culverts/ Underpasses
7 Safety Barrier Metal Beam Crash Barrier & Guard Posts ¨
Signs
Marking ¨Delineator ¨
Toll Plaza /Truck lay bye ¨Way side amenities ¨
9 Other Facilities Vegetation / Landscaping ¨
10 Illumination ¨11 Traffic conditions ¨12 Encroachments ¨
Note: No work has been done due to non-availability of Labour on "SUNDAY"
LEGEND
¨ Visual Inspection * Close inspection l Thorough inspection
DAILY INSPECTION REPORT FOR AP-15 PACKAGE (From Km.901.753 to Km.848.746)
Month : 26th JUNE’ 2016 to 25th JULY’ 2016Weather Condition : Clear
S.No Objective Item Type of Inspection ChainageObservation
1 Riding Surface
3 Slide Slopes
4 Drainage
v Visual inspection during rainy season only
HME (Sowil Limited)_________________________________
SowiL,Rajahmundry -Dharmavaram
5 Bridges
8 Traffic operation facilities
Date:27.06.2016
General Accident/Damaged/Missing RemarksPavement ¨ In Fair conditionCleaning 890.000 to 900.000 Rplacement of damged dead plants(New Plants)
856.000 to 857.000 Median plants trimming Work in progress850.000 to 851.000 Median grass cutting with grass cutter Work in progress860.000 to 861.000 Jungle cutting up to ROW with EX-60(LHS) Work in progress
2 Median Kerb ¨ In Fair conditionPlantation
Shape ¨Turfing In Fair condition
Pitching & masonry In Fair conditionRetaining wall In Fair condition
Side/Toe drain v 860.000 to 861.000 Toe drain preparation Work in progressGullies and catch Pits v In Fair condition
Superstructure In Fair conditionSubstructure In Fair condition
Head wing walls and approns In Fair conditionPainting 880.500 to 881.500 P.G.Rails painting Work in progressHand rail
6 Culverts/ Underpasses In Fair conditionMetal Beam Crash Barrier ¨ 855.800 to 855.000 Metal Beam crash Barriers End beams restoration Work in progressMetal Beam Crash Barrier ¨
Boundary Stones ¨ 858.000 to 862.000 ROW Stones fixing Work in progressDelineator ¨
Bus shelters In Fair conditionPedestrian Guard Rails ¨ In Fair condition
Guard Posts ¨Signs ¨
Marking ¨ In Fair conditionDelineator ¨
Toll Plaza /Truck lay bye ¨ Generator operators Work in progressToll Plaza ¨
9 Other Facilities Way side amenities ¨ In Fair conditionVegetation / Landscaping ¨ In Fair condition
10 Illumination KM STONES & 5th KM STONES ¨ 899.200 Electrical poles pits preparation Work in progress
11 Traffic conditions ¨ In Fair condition
12 Encroachments ¨ In Fair condition
LEGEND
¨ Visual Inspection * Close inspection l Thorough inspection
HME (Sowil Limited)
v Visual inspection during rainy season only
_________________________________SowiL,Rajahmundry -Dharmavaram
5 Bridges
7 Safety Barrier
8 Traffic operation facilities
1 Riding Surface
3 Slide Slopes
4 Drainage
DAILY INSPECTION REPORT FOR AP-15 PACKAGE (From Km.901.753 to Km.848.746)Month : 26th JUNE’ 2016 to 25th JULY’ 2016
Weather Condition : Clear
S.No Objective Item Type of Inspection ChainageObservation
Date:28.06.2016
General Accident/Damaged/Missing RemarksPavement ¨ In Fair conditionCleaning
2 Median Kerb ¨ In Fair conditionPlantation
Shape ¨Turfing In Fair condition
Pitching & masonry In Fair conditionRetaining wall In Fair condition
Side/Toe drain vGullies and catch Pits v In Fair condition
Superstructure In Fair conditionSubstructure In Fair condition
Head wing walls and approns In Fair conditionPaintingHand rail
6 Culverts/ Underpasses In Fair conditionMetal Beam Crash Barrier ¨Metal Beam Crash Barrier ¨
Boundary Stones ¨Delineator ¨
Bus shelters In Fair conditionPedestrian Guard Rails ¨ In Fair condition
Guard Posts ¨Signs ¨
Marking ¨ In Fair conditionDelineator ¨
Toll Plaza /Truck lay bye ¨ Generator operators Work in progressToll Plaza ¨
9 Other Facilities Way side amenities ¨ In Fair conditionVegetation / Landscaping ¨ In Fair condition
10 Illumination KM STONES & 5th KM STONES ¨ 899.200 Electrical poles Errection work Work in progress
11 Traffic conditions ¨ In Fair condition
12 Encroachments ¨ In Fair condition
LEGEND
¨ Visual Inspection * Close inspection l Thorough inspection
DAILY INSPECTION REPORT FOR AP-15 PACKAGE (From Km.901.753 to Km.848.746)Month : 26th JUNE’ 2016 to 25th JULY’ 2016
Weather Condition : Clear
S.No Objective Item Type of Inspection ChainageObservation
1 Riding Surface
3 Slide Slopes
4 Drainage
5 Bridges
7 Safety Barrier
8 Traffic operation facilities
HME (Sowil Limited)_________________________________
SowiL,Rajahmundry -Dharmavaram
v Visual inspection during rainy season only
Date:29.06.2016
General Accident/Damaged/Missing RemarksPavement ¨ In Fair conditionCleaning
2 Median Kerb ¨ In Fair conditionPlantation
Shape ¨Turfing In Fair condition
Pitching & masonry In Fair conditionRetaining wall In Fair condition
Side/Toe drain vGullies and catch Pits v In Fair condition
Superstructure In Fair conditionSubstructure In Fair condition
Head wing walls and approns In Fair conditionPaintingHand rail
6 Culverts/ Underpasses In Fair conditionMetal Beam Crash Barrier ¨Metal Beam Crash Barrier ¨
Boundary Stones ¨Delineator ¨
Bus shelters In Fair conditionPedestrian Guard Rails ¨ In Fair condition
Guard Posts ¨Signs ¨
Marking ¨ In Fair conditionDelineator ¨
Toll Plaza /Truck lay bye ¨ Generator operators Work in progressToll Plaza ¨
9 Other Facilities Way side amenities ¨ In Fair conditionVegetation / Landscaping ¨ In Fair condition
10 Illumination KM STONES & 5th KM STONES ¨
11 Traffic conditions ¨ In Fair condition
12 Encroachments ¨ In Fair condition
LEGEND
¨ Visual Inspection * Close inspection l Thorough inspection
DAILY INSPECTION REPORT FOR AP-15 PACKAGE (From Km.901.753 to Km.848.746)Month : 26th JUNE’ 2016 to 25th JULY’ 2016
Weather Condition : Clear
S.No Objective Item Type of Inspection ChainageObservation
1 Riding Surface
3 Slide Slopes
4 Drainage
5 Bridges
7 Safety Barrier
8 Traffic operation facilities
HME (Sowil Limited)_________________________________
SowiL,Rajahmundry -Dharmavaram
v Visual inspection during rainy season only
Date:30.06.2016
General Accident/Damaged/Missing RemarksPavement ¨ In Fair conditionCleaning
870.000 to 871.000 Median plants trimming Work in progress
2 Median Kerb ¨ In Fair conditionPlantation
Shape ¨Turfing In Fair condition
Pitching & masonry In Fair conditionRetaining wall In Fair condition
Side/Toe drain vGullies and catch Pits v In Fair condition
Superstructure In Fair conditionSubstructure In Fair condition
Head wing walls and approns In Fair conditionPaintingHand rail
6 Culverts/ Underpasses In Fair conditionMetal Beam Crash Barrier ¨Metal Beam Crash Barrier ¨
Boundary Stones ¨Delineator ¨
Bus shelters In Fair conditionPedestrian Guard Rails ¨ In Fair condition
Guard Posts ¨Signs ¨
Marking ¨ In Fair conditionDelineator ¨
Toll Plaza /Truck lay bye ¨ Generator operators Work in progressToll Plaza ¨
9 Other Facilities Way side amenities ¨ In Fair conditionVegetation / Landscaping ¨ In Fair condition
10 Illumination KM STONES & 5th KM STONES ¨ Pits Excavation for electrical poles Work in progress
11 Traffic conditions ¨ In Fair condition
12 Encroachments ¨ In Fair condition
LEGEND
¨ Visual Inspection * Close inspection l Thorough inspection
DAILY INSPECTION REPORT FOR AP-15 PACKAGE (From Km.901.753 to Km.848.746)Month : 26th JUNE’ 2016 to 25th JULY’ 2016
Weather Condition : Clear
S.No Objective Item Type of Inspection ChainageObservation
1 Riding Surface
3 Slide Slopes
4 Drainage
5 Bridges
7 Safety Barrier
8 Traffic operation facilities
HME (Sowil Limited)_________________________________
SowiL,Rajahmundry -Dharmavaram
v Visual inspection during rainy season only
Date:01.07.2016
General Accident/Damaged/Missing RemarksPavement ¨ In Fair condition
Cleaning 863.000 to 859.000 Rplacement of damaged /deadMedian plants(New Plants) Work in progress
870.000 to 871.000 Median plants trimming Work in progress
901.000 to 903.000 Rplacement of damaged /dead Avenue plants(New Plants) Work in progress
2 Median Kerb ¨ In Fair conditionPlantation
Shape ¨Turfing In Fair condition
Pitching & masonry In Fair conditionRetaining wall In Fair condition
Side/Toe drain vGullies and catch Pits v In Fair condition
Superstructure In Fair conditionSubstructure In Fair condition
Head wing walls and approns In Fair conditionPaintingHand rail
6 Culverts/ Underpasses In Fair conditionMetal Beam Crash Barrier ¨Metal Beam Crash Barrier ¨
Boundary Stones ¨Delineator ¨
Bus shelters In Fair conditionPedestrian Guard Rails ¨ In Fair condition
Guard Posts ¨Signs ¨
Marking ¨ In Fair conditionDelineator ¨
Toll Plaza /Truck lay bye ¨ Generator operators Work in progressToll Plaza ¨
9 Other Facilities Way side amenities ¨ In Fair conditionVegetation / Landscaping ¨ In Fair condition
10 Illumination KM STONES & 5th KM STONES ¨ 888.600 Pits Excavation for electrical poles Work in progress
11 Traffic conditions ¨ In Fair condition
12 Encroachments ¨ In Fair condition
LEGEND
¨ Visual Inspection * Close inspection l Thorough inspection
DAILY INSPECTION REPORT FOR AP-15 PACKAGE (From Km.901.753 to Km.848.746)Month : 26th JUNE’ 2016 to 25th JULY’ 2016
Weather Condition : Clear
S.No Objective Item Type of Inspection ChainageObservation
1 Riding Surface
3 Slide Slopes
4 Drainage
5 Bridges
7 Safety Barrier
8 Traffic operation facilities
HME (Sowil Limited)_________________________________
SowiL,Rajahmundry -Dharmavaram
v Visual inspection during rainy season only
Date:02.07.2016
General Accident/Damaged/Missing RemarksPavement ¨ In Fair conditionCleaning
859.000 to 858.000 Median plants trimming Work in progress
2 Median Kerb ¨ In Fair condition
Plantation 849.000 to 848.750 Rplacement of damaged /deadMedian plants(New Plants) Work in progress
Shape ¨Turfing In Fair condition
Pitching & masonry In Fair conditionRetaining wall In Fair condition
Side/Toe drain v 858.300 to 858.000 Rectification of damaged Longitudinal median Drains Under progressGullies and catch Pits v In Fair condition
Superstructure In Fair conditionSubstructure In Fair condition
Head wing walls and approns In Fair conditionPaintingHand rail
6 Culverts/ Underpasses In Fair conditionMetal Beam Crash Barrier ¨Metal Beam Crash Barrier ¨ 863.000 Damaged End Beams restoration Under progress
Boundary Stones ¨Delineator ¨
Bus shelters In Fair conditionPedestrian Guard Rails ¨ In Fair condition
Guard Posts ¨Signs ¨
Marking ¨ In Fair conditionDelineator ¨
Toll Plaza /Truck lay bye ¨ Generator operators Work in progressToll Plaza ¨
9 Other Facilities Way side amenities ¨ In Fair conditionVegetation / Landscaping ¨ In Fair condition
10 Illumination KM STONES & 5th KM STONES ¨ 880.500 Pits Excavation for electrical poles Work in progress
11 Traffic conditions ¨ In Fair condition
12 Encroachments ¨ In Fair condition
LEGEND
¨ Visual Inspection * Close inspection l Thorough inspection
DAILY INSPECTION REPORT FOR AP-15 PACKAGE (From Km.901.753 to Km.848.746)Month : 26th JUNE’ 2016 to 25th JULY’ 2016
Weather Condition : Clear
S.No Objective Item Type of Inspection ChainageObservation
1 Riding Surface
3 Slide Slopes
4 Drainage
5 Bridges
7 Safety Barrier
8 Traffic operation facilities
HME (Sowil Limited)_________________________________
SowiL,Rajahmundry -Dharmavaram
v Visual inspection during rainy season only
Date: 03.07.2016
General Accident/Damaged/Missing Remarks
Pavement ¨Cleaning ¨
Expansion Joints ¨
2 Median Kerb ¨
Shape ¨Turfing
Pitching & masonry
Retaining wall
Side/Toe drain v
Gullies and catch Pits v
Superstructure
Substructure
Head wing walls and approns
Painting
Hand rail
6 Culverts/ Underpasses
7 Safety Barrier Metal Beam Crash Barrier & Guard Posts ¨
Signs
Marking ¨Delineator ¨
Toll Plaza /Truck lay bye ¨Way side amenities ¨
9 Other Facilities Vegetation / Landscaping ¨
10 Illumination ¨11 Traffic conditions ¨12 Encroachments ¨
Note: No work has been done due to non-availability of Labour on "SUNDAY"
LEGEND
¨ Visual Inspection * Close inspection l Thorough inspection
DAILY INSPECTION REPORT FOR AP-15 PACKAGE (From Km.901.753 to Km.848.746)
Month : 26th JUNE’ 2016 to 25th JULY’ 2016Weather Condition : Clear
S.No Objective Item Type of Inspection ChainageObservation
1 Riding Surface
3 Slide Slopes
4 Drainage
v Visual inspection during rainy season only
HME (Sowil Limited)_________________________________
SowiL,Rajahmundry -Dharmavaram
5 Bridges
8 Traffic operation facilities
Date:04.07.2016
General Accident/Damaged/Missing RemarksPavement ¨ In Fair conditionCleaning
862.800 to 860.000 Median plants trimming Work in progress901.750 to 901.000 Corridor cleaning Work in progress901.750 to 901.000 Weeds removing on median concrete Work in progress
2 Median Kerb ¨ In Fair conditionPlantation
Shape ¨Turfing In Fair condition
Pitching & masonry In Fair conditionRetaining wall In Fair condition
Side/Toe drain v 857.200 to 856.000 Rectification of damaged Longitudinal median Drains Under progressGullies and catch Pits v In Fair condition
Superstructure In Fair conditionSubstructure In Fair condition
Head wing walls and approns In Fair conditionPainting 880.500 to 881.500 P.G.Rails painting Work in progressHand rail
6 Culverts/ Underpasses In Fair conditionMetal Beam Crash Barrier ¨ 895.000 Damaged End Beams restoration Under progressMetal Beam Crash Barrier ¨
Boundary Stones ¨Delineator ¨
Bus shelters In Fair conditionPedestrian Guard Rails ¨ In Fair condition
Guard Posts ¨ 890.800 to 895.800 Painting on guard stones Work in progressSigns ¨ 890.800 to 895.800 Paintin on Sign Boards Work in progress
Marking ¨Delineator ¨ 890.800 to 895.800 Painting on delineators Work in progress
Toll Plaza /Truck lay bye ¨ Generator operators Work in progressToll Plaza ¨
9 Other Facilities Way side amenities ¨ In Fair conditionVegetation / Landscaping ¨ In Fair condition
10 Illumination KM STONES & 5th KM STONES ¨ 880.000 Electrical poles errection Work in progress
11 Traffic conditions ¨ In Fair condition
12 Encroachments ¨ In Fair condition
LEGEND
¨ Visual Inspection * Close inspection l Thorough inspection
DAILY INSPECTION REPORT FOR AP-15 PACKAGE (From Km.901.753 to Km.848.746)Month : 26th JUNE’ 2016 to 25th JULY’ 2016
Weather Condition : Clear
S.No Objective Item Type of Inspection ChainageObservation
1 Riding Surface
3 Slide Slopes
4 Drainage
5 Bridges
7 Safety Barrier
8 Traffic operation facilities
HME (Sowil Limited)_________________________________
SowiL,Rajahmundry -Dharmavaram
v Visual inspection during rainy season only
Date:05.07.2016
General Accident/Damaged/Missing RemarksPavement ¨ In Fair conditionCleaning 863.600 to 862.000 Median plants trimming Work in progress
900.400 to 801.000 Corridor cleaning Work in progress901.750 to 901.000 Weeds removing on median concrete Work in progress850.000 to 848.500 Side jungle cutting near roa furniture Work in progress863.000 to 864.500 Jungle cutting up to ROW with EX-60(LHS) Work in progress
2 Median Kerb ¨ In Fair conditionPlantation
Shape ¨Turfing In Fair condition
Pitching & masonry In Fair conditionRetaining wall In Fair condition
863.000 to 864.500 Toe drain preparation Work in progressSide/Toe drain v 850.000 to 849.000 Rectification of damaged Longitudinal median Drains Work in progress
Gullies and catch Pits v In Fair conditionSuperstructure In Fair conditionSubstructure In Fair condition
Head wing walls and approns In Fair conditionPaintingHand rail
6 Culverts/ Underpasses In Fair conditionMetal Beam Crash Barrier ¨Metal Beam Crash Barrier ¨
Boundary Stones ¨Delineator ¨
Bus shelters 860.000 to 858.000 Replacement of damaged delineators Work in progressPedestrian Guard Rails ¨ In Fair condition
Guard Posts ¨ 860.000 to 858.000 Replacement of damaged guard stones Work in progressSigns ¨
Marking ¨ In Fair conditionDelineator ¨
Toll Plaza /Truck lay bye ¨ Generator operators Work in progressToll Plaza ¨
9 Other Facilities Way side amenities ¨ In Fair conditionVegetation / Landscaping ¨ In Fair condition
10 Illumination KM STONES & 5th KM STONES ¨ 886.000 Replacement of damaged bus shelters sheets Work in progress
11 Traffic conditions ¨ In Fair condition
12 Encroachments ¨ In Fair condition
LEGEND
¨ Visual Inspection * Close inspection l Thorough inspection
HME (Sowil Limited)_________________________________
SowiL,Rajahmundry -Dharmavaram
v Visual inspection during rainy season only
5 Bridges
7 Safety Barrier
8 Traffic operation facilities
1 Riding Surface
3 Slide Slopes
4 Drainage
DAILY INSPECTION REPORT FOR AP-15 PACKAGE (From Km.901.753 to Km.848.746)Month : 26th JUNE’ 2016 to 25th JULY’ 2016
Weather Condition : Clear
S.No Objective Item Type of Inspection ChainageObservation
Date:06.07.2016
General Accident/Damaged/Missing RemarksPavement ¨ In Fair conditionCleaning 848.750 to 849.000 Corridor cleaning Work in progress
2 Median Kerb ¨ In Fair condition
Plantation 848.750 to 849.000Relacement of Avenue Plantations at dead/deseagedplaces
Work in progress
Shape ¨Turfing In Fair condition
Pitching & masonry In Fair conditionRetaining wall In Fair condition
Side/Toe drain vGullies and catch Pits v In Fair condition
Superstructure In Fair conditionSubstructure In Fair condition
Head wing walls and approns In Fair conditionPaintingHand rail
6 Culverts/ Underpasses In Fair conditionMetal Beam Crash Barrier ¨Metal Beam Crash Barrier ¨
Boundary Stones ¨Delineator ¨
Bus shelters 870.800 Replacement of damaged bus shelters sheets Work in progressPedestrian Guard Rails ¨ In Fair condition
Guard Posts ¨Signs ¨
Marking ¨ In Fair conditionDelineator ¨
Toll Plaza /Truck lay bye ¨ Generator operators Work in progressToll Plaza ¨
9 Other Facilities Way side amenities ¨ In Fair conditionVegetation / Landscaping ¨ In Fair condition
10 Illumination KM STONES & 5th KM STONES ¨
11 Traffic conditions ¨ In Fair condition
12 Encroachments ¨ In Fair condition
LEGEND
¨ Visual Inspection * Close inspection l Thorough inspection
HME (Sowil Limited)_________________________________
SowiL,Rajahmundry -Dharmavaram
v Visual inspection during rainy season only
5 Bridges
7 Safety Barrier
8 Traffic operation facilities
1 Riding Surface
3 Slide Slopes
4 Drainage
DAILY INSPECTION REPORT FOR AP-15 PACKAGE (From Km.901.753 to Km.848.746)Month : 26th JUNE’ 2016 to 25th JULY’ 2016
Weather Condition : Clear
S.No Objective Item Type of Inspection ChainageObservation
Date:07.07.2016
General Accident/Damaged/Missing RemarksPavement ¨ In Fair conditionCleaning 899.000 to 898.000 Median grass cutting with grass cutter Work in progress
899.000 to 898.000 Corridor Cleaning Work in progress850.000 to 851.000 Corridor Cleaning Work in progress861.000 to 862.000 Jungle cutting up to ROW with EX-60(RHS)
2 Median Kerb ¨ In Fair condition
Plantation 851.000 to 861.000Relacement of Avenue Plantations at dead/deseagedplaces
Work in progress
901.750 to 899.000 Watering on median plants Work in progressShape ¨Turfing In Fair condition
Pitching & masonry In Fair conditionRetaining wall In Fair condition
Side/Toe drain v 861.000 to 862.000 Toe drain preparation Work in progressGullies and catch Pits v In Fair condition
Superstructure In Fair conditionSubstructure In Fair condition
Head wing walls and approns In Fair conditionPaintingHand rail
6 Culverts/ Underpasses In Fair conditionMetal Beam Crash Barrier ¨Metal Beam Crash Barrier ¨
Boundary Stones ¨Delineator ¨ 860.000 to 859.000 Painting on Delineators Work in progress
Bus shelters In Fair conditionPedestrian Guard Rails ¨ In Fair condition
Guard Posts ¨ 860.000 to 859.000 Painting on Guard Posts Work in progressSigns ¨ 860.000 to 859.000 Painting on Sign Boards Work in progress
Marking ¨ In Fair conditionDelineator ¨
Toll Plaza /Truck lay bye ¨ Generator operators Work in progressToll Plaza ¨
9 Other Facilities Way side amenities ¨ In Fair conditionVegetation / Landscaping ¨ In Fair condition
10 Illumination KM STONES & 5th KM STONES ¨ 895.000 Replacement of damaged electrical poles Work in progress
11 Traffic conditions ¨ In Fair condition
12 Encroachments ¨ In Fair condition
LEGEND
¨ Visual Inspection * Close inspection l Thorough inspection
HME (Sowil Limited)_________________________________
SowiL,Rajahmundry -Dharmavaram
v Visual inspection during rainy season only
5 Bridges
7 Safety Barrier
8 Traffic operation facilities
1 Riding Surface
3 Slide Slopes
4 Drainage
DAILY INSPECTION REPORT FOR AP-15 PACKAGE (From Km.901.753 to Km.848.746)Month : 26th JUNE’ 2016 to 25th JULY’ 2016
Weather Condition : Clear
S.No Objective Item Type of Inspection ChainageObservation
Date:08.07.2016
General Accident/Damaged/Missing RemarksPavement ¨ In Fair conditionCleaning
898.000 to 897.000 Median grass cutting with grass cutter Work in progress898.000 to 897.000 Corridor Cleaning Work in progress851.000 to 850.000 Corridor Cleaning Work in progress860.000 to 859.000 Jungle cutting up to ROW with EX-60(RHS)
2 Median Kerb ¨ In Fair condition
Plantation 851.000 to 861.000Relacement of Avenue Plantation at dead/deseagedplaces
Work in progress
888.000 to 886.000 Watering on median plants Work in progressShape ¨Turfing In Fair condition
Pitching & masonry In Fair conditionRetaining wall In Fair condition
Side/Toe drain v 860.000 to 859.000 Toe drain preparation Work in progressGullies and catch Pits v In Fair condition
Superstructure In Fair conditionSubstructure In Fair condition
Head wing walls and approns In Fair conditionPaintingHand rail
6 Culverts/ Underpasses In Fair conditionMetal Beam Crash Barrier ¨Metal Beam Crash Barrier ¨
Boundary Stones ¨Delineator ¨
Bus shelters In Fair conditionPedestrian Guard Rails ¨ In Fair condition
Guard Posts ¨Signs ¨
Marking ¨ In Fair conditionDelineator ¨
Toll Plaza /Truck lay bye ¨ Generator operators Work in progressToll Plaza ¨
9 Other Facilities Way side amenities ¨ In Fair conditionVegetation / Landscaping ¨ In Fair condition
10 Illumination KM STONES & 5th KM STONES ¨ 876.000 Replacement of damaged electrical poles Work in progress
11 Traffic conditions ¨ In Fair condition
12 Encroachments ¨ In Fair condition
LEGEND
¨ Visual Inspection * Close inspection l Thorough inspection
HME (Sowil Limited)_________________________________
SowiL,Rajahmundry -Dharmavaram
v Visual inspection during rainy season only
5 Bridges
7 Safety Barrier
8 Traffic operation facilities
1 Riding Surface
3 Slide Slopes
4 Drainage
DAILY INSPECTION REPORT FOR AP-15 PACKAGE (From Km.901.753 to Km.848.746)Month : 26th JUNE’ 2016 to 25th JULY’ 2016
Weather Condition : Clear
S.No Objective Item Type of Inspection ChainageObservation
Date:09.07.2016
General Accident/Damaged/Missing RemarksPavement ¨ In Fair condition
Cleaning 853.000 to 854.000 Median grass and weeds removal on Concrete median Work in progress
896.800 to 895.800 Corridor Cleaning Work in progress896.600 to 895.000 Grass cutting with grass cutter on median Work in progress
858.500 Longitudinal drain dressing work856.000 to 855.000 Jungle cutting up to ROW with EX-60(RHS)
2 Median Kerb ¨ In Fair condition
Plantation 856.000 to 866.000Relacement of Avenue Plantation at dead/deseagedplaces
Work in progress
901.750 to 891.000 Watering on median plants Work in progress848.750 to 847.750 Watering on median plants Work in progress
Shape ¨Turfing In Fair condition
Pitching & masonry In Fair conditionRetaining wall In Fair condition
Side/Toe drain v 856.000 to 855.000 Toe drain preparation Work in progressGullies and catch Pits v In Fair condition
Superstructure In Fair conditionSubstructure In Fair condition
Head wing walls and approns In Fair conditionPaintingHand rail
6 Culverts/ Underpasses In Fair conditionMetal Beam Crash Barrier ¨Metal Beam Crash Barrier ¨
Boundary Stones ¨Delineator ¨
Bus shelters In Fair conditionPedestrian Guard Rails ¨ In Fair condition
Guard Posts ¨Signs ¨
Marking ¨ In Fair conditionDelineator ¨
Toll Plaza /Truck lay bye ¨ Generator operators Work in progressToll Plaza ¨ 865.500 Canopy sheets fixing Work in progress
9 Other Facilities Way side amenities ¨ In Fair conditionVegetation / Landscaping ¨ In Fair condition
10 Illumination KM STONES & 5th KM STONES ¨ 896.800 Replacement of damaged electrical poles Work in progress
11 Traffic conditions ¨ In Fair condition
12 Encroachments ¨ In Fair condition
LEGEND
¨ Visual Inspection * Close inspection l Thorough inspection
HME (Sowil Limited)_________________________________
SowiL,Rajahmundry -Dharmavaram
v Visual inspection during rainy season only
5 Bridges
7 Safety Barrier
8 Traffic operation facilities
1 Riding Surface
3 Slide Slopes
4 Drainage
DAILY INSPECTION REPORT FOR AP-15 PACKAGE (From Km.901.753 to Km.848.746)Month : 26th JUNE’ 2016 to 25th JULY’ 2016
Weather Condition : Clear
S.No Objective Item Type of Inspection ChainageObservation
Date: 10.07.2016
General Accident/Damaged/Missing Remarks
Pavement ¨Cleaning ¨
Expansion Joints ¨
2 Median Kerb ¨
Shape ¨Turfing
Pitching & masonry
Retaining wall
Side/Toe drain v
Gullies and catch Pits v
Superstructure
Substructure
Head wing walls and approns
Painting
Hand rail
6 Culverts/ Underpasses
7 Safety Barrier Metal Beam Crash Barrier & Guard Posts ¨
Signs
Marking ¨Delineator ¨
Toll Plaza /Truck lay bye ¨Way side amenities ¨
9 Other Facilities Vegetation / Landscaping ¨
10 Illumination ¨11 Traffic conditions ¨12 Encroachments ¨
Note: No work has been done due to non-availability of Labour on "SUNDAY"
LEGEND
¨ Visual Inspection * Close inspection l Thorough inspection v Visual inspection during rainy season only
HME (Sowil Limited)_________________________________
SowiL,Rajahmundry -Dharmavaram
5 Bridges
8 Traffic operation facilities
1 Riding Surface
3 Slide Slopes
4 Drainage
DAILY INSPECTION REPORT FOR AP-15 PACKAGE (From Km.901.753 to Km.848.746)
Month : 26th JUNE’ 2016 to 25th JULY’ 2016Weather Condition : Clear
S.No Objective Item Type of Inspection ChainageObservation
Date:11.07.2016
General Accident/Damaged/Missing RemarksPavement ¨ In Fair conditionPot holes 901.750 to 880.000 Rectification of Pot Holes Work in progressCleaning 853.000 to 852.000 Shoulder side Corridor Cleaning (RHS) Work in progress
896.400 to 895.800 Corridor Cleaning (RHS) Work in progress891.000 to 889.000 Grass cutting with grass cutter on median Work in progress860.000 to 862.000 Side jungle cutting near road furniture Work in progress853.000 to 850.000 Jungle cutting up to ROW with EX-60(RHS) Work in progress
2 Median Kerb ¨ In Fair condition
Plantation 855.000 to 860.000Relacement of Avenue Plantation at dead/deseagedplaces
Work in progress
901.750 to 891.000 Watering on median plants Work in progress853.000 to 855.000 Watering on median plants Work in progress
Shape ¨Turfing In Fair condition
Pitching & masonry In Fair conditionRetaining wall In Fair condition
Side/Toe drain v 853.000 to 850.000 Toe drain preparation Work in progressGullies and catch Pits v In Fair condition
Superstructure In Fair conditionSubstructure In Fair condition
Head wing walls and approns In Fair conditionPainting 876.000 Painting on Pedestrian guard railsHand rail
6 Culverts/ Underpasses In Fair conditionMetal Beam Crash Barrier ¨Metal Beam Crash Barrier ¨
Boundary Stones ¨Delineator ¨
Bus shelters In Fair conditionPedestrian Guard Rails ¨ In Fair condition
Guard Posts ¨Signs ¨
Marking ¨ In Fair conditionDelineator ¨
Toll Plaza /Truck lay bye ¨ Generator operators Work in progressToll Plaza ¨
9 Other Facilities Way side amenities ¨ In Fair conditionVegetation / Landscaping ¨ In Fair condition
10 Illumination KM STONES & 5th KM STONES ¨ 880.500 Replacement of damaged electrical poles Work in progress
11 Traffic conditions ¨ In Fair condition
12 Encroachments ¨ In Fair condition
LEGEND
¨ Visual Inspection * Close inspection l Thorough inspection
HME (Sowil Limited)_________________________________
SowiL,Rajahmundry -Dharmavaram
v Visual inspection during rainy season only
5 Bridges
7 Safety Barrier
8 Traffic operation facilities
1 Riding Surface
3 Slide Slopes
4 Drainage
DAILY INSPECTION REPORT FOR AP-15 PACKAGE (From Km.901.753 to Km.848.746)Month : 26th JUNE’ 2016 to 25th JULY’ 2016
Weather Condition : Clear
S.No Objective Item Type of Inspection ChainageObservation
Date:12.07.2016
General Accident/Damaged/Missing RemarksPavement ¨ In Fair conditionPot holes 901.750 to 880.000 Rectification of Pot Holes Work in progressCleaning 855.000 to 854.000 Corridor Cleaning (RHS) Work in progress
895.200 to 894.800 Corridor Cleaning (RHS) Work in progress890.600 to 889.000 Grass cutting with grass cutter on median Work in progress858.000 to 856.000 Side jungle cutting near road furniture Work in progress852.000 to 851.000 Jungle cutting up to ROW with EX-60(RHS) Work in progress
2 Median Kerb ¨ In Fair condition
Plantation 901.750 to 891.000Relacement of Avenue Plantation at dead/deseagedplaces
Work in progress
891.000 to 889.000 Watering on median plants Work in progress855.000 to 857.000 Watering on median plants Work in progress
Shape ¨Turfing In Fair condition
Pitching & masonry In Fair conditionRetaining wall In Fair condition
Side/Toe drain v 852.000 to 851.000 Toe drain preparation Work in progressGullies and catch Pits v 876.600 Pits preperation for P G Rails Work in progress
Superstructure In Fair conditionSubstructure In Fair condition
Head wing walls and approns In Fair conditionPaintingHand rail
6 Culverts/ Underpasses In Fair conditionMetal Beam Crash Barrier ¨Metal Beam Crash Barrier ¨
Boundary Stones ¨Delineator ¨
Bus shelters In Fair conditionPedestrian Guard Rails ¨ 881.000 Painting on Pedestrian guard rails Work in progress
Guard Posts ¨Signs ¨ 880.000 Sign Boards Painting Work in progress
Marking ¨ In Fair conditionDelineator ¨
Toll Plaza /Truck lay bye ¨ Generator operators Work in progressToll Plaza ¨
9 Other Facilities Way side amenities ¨ In Fair conditionVegetation / Landscaping ¨ In Fair condition
10 Illumination KM STONES & 5th KM STONES ¨ 889.500 Replacement of damaged electrical poles Work in progress
11 Traffic conditions ¨ In Fair condition
12 Encroachments ¨ In Fair condition
LEGEND
¨ Visual Inspection * Close inspection l Thorough inspection
HME (Sowil Limited)_________________________________
SowiL,Rajahmundry -Dharmavaram
v Visual inspection during rainy season only
5 Bridges
7 Safety Barrier
8 Traffic operation facilities
1 Riding Surface
3 Slide Slopes
4 Drainage
DAILY INSPECTION REPORT FOR AP-15 PACKAGE (From Km.901.753 to Km.848.746)Month : 26th JUNE’ 2016 to 25th JULY’ 2016
Weather Condition : Clear
S.No Objective Item Type of Inspection ChainageObservation
Date:13.07.2016
General Accident/Damaged/Missing RemarksPavement ¨ In Fair conditionPot holes 901.750 to 880.000 Rectification of Pot Holes Work in progressCleaning 894.000 to 895.000 Corridor Cleaning Work in progress
856.000 to 855.000 Corridor Cleaning Work in progress887.800 to 887.000 Grass cutting with grass cutter on median Work in progress865.600 to 864.600 Side jungle cutting near road furniture Work in progress850.000 to 849.000 Jungle cutting up to ROW with EX-60(RHS) Work in progress
2 Median Kerb ¨ In Fair condition
Plantation 901.750 to 891.000Relacement of Avenue Plantation at dead/deseagedplaces
Work in progress
Shape ¨Turfing In Fair condition
Pitching & masonry In Fair conditionRetaining wall In Fair condition
Side/Toe drain v 850.000 to 849.000 Toe drain preparation Work in progressGullies and catch Pits v 876.600 Pits preperation for P G Rails Work in progress
Superstructure In Fair conditionSubstructure In Fair condition
Head wing walls and approns In Fair conditionPaintingHand rail
6 Culverts/ Underpasses In Fair conditionMetal Beam Crash Barrier ¨Metal Beam Crash Barrier ¨
Boundary Stones ¨Delineator ¨
Bus shelters In Fair conditionPedestrian Guard Rails ¨ 881.000 Painting on Pedestrian guard rails Work in progress
Guard Posts ¨Signs ¨
Marking ¨ In Fair conditionDelineator ¨
Toll Plaza /Truck lay bye ¨ Generator operators Work in progressToll Plaza ¨
9 Other Facilities Way side amenities ¨ In Fair conditionVegetation / Landscaping ¨ In Fair condition
10 Illumination KM STONES & 5th KM STONES ¨ 899.200Replacement of damaged Junction Boxes on Electricalpoles
Work in progress
11 Traffic conditions ¨ 870.000 Ptis excavation for Electrical Poles Work in progress
12 Encroachments ¨ In Fair condition
LEGEND
¨ Visual Inspection * Close inspection l Thorough inspection
HME (Sowil Limited)
v Visual inspection during rainy season only_________________________________SowiL,Rajahmundry -Dharmavaram
5 Bridges
7 Safety Barrier
8 Traffic operation facilities
1 Riding Surface
3 Slide Slopes
4 Drainage
DAILY INSPECTION REPORT FOR AP-15 PACKAGE (From Km.901.753 to Km.848.746)Month : 26th JUNE’ 2016 to 25th JULY’ 2016
Weather Condition : Clear
S.No Objective Item Type of Inspection ChainageObservation
Date:14.07.2016
General Accident/Damaged/Missing RemarksPavement ¨ In Fair conditionPot holes 880.000 to 870.000 Rectification of Pot Holes Work in progressCleaning 893.500 to 894.000 Corridor Cleaning Work in progress
856.500 to 857.000 Side jungle cutting near road furniture Work in progress887.400 to 886.000 Grass cutting with grass cutter on median Work in progress854.000 to 853.000 Side jungle cutting near road furniture Work in progress850.500 to 849.000 Jungle cutting up to ROW with EX-60(RHS) Work in progress
2 Median Kerb ¨ In Fair condition
Plantation 892.000 to 890.000Relacement of Avenue Plantation at dead/deseagedplaces
Work in progress
901.750 to 899.000 Watering on median plants
Shape ¨Turfing In Fair condition
Pitching & masonry In Fair conditionRetaining wall In Fair condition
Side/Toe drain v 850.500 to 849.000 Toe drain preparation Work in progressGullies and catch Pits v 876.500 Pits preperation for P G Rails Work in progress
Superstructure In Fair conditionSubstructure In Fair condition
Head wing walls and approns In Fair conditionPaintingHand rail
6 Culverts/ Underpasses In Fair conditionMetal Beam Crash Barrier ¨Metal Beam Crash Barrier ¨
Boundary Stones ¨Delineator ¨
Bus shelters In Fair conditionPedestrian Guard Rails ¨
Guard Posts ¨Signs ¨
Marking ¨ In Fair conditionDelineator ¨
Toll Plaza /Truck lay bye ¨ Generator operators Work in progressToll Plaza ¨
9 Other Facilities Way side amenities ¨ In Fair conditionVegetation / Landscaping ¨ In Fair condition
10 Illumination KM STONES & 5th KM STONES ¨ 899.200Replacement of damaged Junction Boxes on Electricalpoles
Work in progress
870.000 Ptis excavation for Electrical Poles Work in progress
11 Traffic conditions ¨ In Fair condition
12 Encroachments ¨ In Fair condition
LEGEND
¨ Visual Inspection * Close inspection l Thorough inspectionv Visual inspection during rainy season only_________________________________
SowiL,Rajahmundry -DharmavaramHME (Sowil Limited)
5 Bridges
7 Safety Barrier
8 Traffic operation facilities
1 Riding Surface
3 Slide Slopes
4 Drainage
DAILY INSPECTION REPORT FOR AP-15 PACKAGE (From Km.901.753 to Km.848.746)Month : 26th JUNE’ 2016 to 25th JULY’ 2016
Weather Condition : Clear
S.No Objective Item Type of Inspection ChainageObservation
Date:15.07.2016
General Accident/Damaged/Missing RemarksPavement ¨ In Fair conditionPot holes 880.000 to 870.000 Rectification of Pot Holes Work in progressCleaning 894.000 to 894.500 Corridor Cleaning Work in progress
857.000 to 857.500 Side jungle cutting near road furniture Work in progress886.000 to 886.500 Grass cutting with grass cutter on median Work in progress853.000 to 852.000 Side jungle cutting near road furniture Work in progress849.500 to 849.000 Jungle cutting up to ROW with EX-60(RHS) Work in progress
2 Median Kerb ¨ In Fair condition
Plantation 890.000 to 888.000Relacement of Avenue Plantation at dead/deseagedplaces
Work in progress
899.000 to 897.000 Watering to median plants
Shape ¨Turfing In Fair condition
Pitching & masonry In Fair conditionRetaining wall In Fair condition
Side/Toe drain v 849.500 to 849.000 Toe drain preparation Work in progressGullies and catch Pits v 876.500 Pits preperation for P G Rails Work in progress
Superstructure In Fair conditionSubstructure In Fair condition
Head wing walls and approns In Fair conditionPaintingHand rail
6 Culverts/ Underpasses In Fair conditionMetal Beam Crash Barrier ¨Metal Beam Crash Barrier ¨
Boundary Stones ¨Delineator ¨
Bus shelters In Fair conditionPedestrian Guard Rails ¨
Guard Posts ¨Signs ¨
Marking ¨ In Fair conditionDelineator ¨
Toll Plaza /Truck lay bye ¨ Generator operators Work in progressToll Plaza ¨
9 Other Facilities Way side amenities ¨ In Fair conditionVegetation / Landscaping ¨ In Fair condition
10 Illumination KM STONES & 5th KM STONES ¨ 899.200Replacement of damaged Junction Boxes on Electricalpoles
Work in progress
11 Traffic conditions ¨ 870.000 Ptis excavation for Electrical Poles Work in progress
12 Encroachments ¨ In Fair condition
LEGEND
¨ Visual Inspection * Close inspection l Thorough inspection
HME (Sowil Limited)_________________________________
SowiL,Rajahmundry -Dharmavaram
v Visual inspection during rainy season only
5 Bridges
7 Safety Barrier
8 Traffic operation facilities
1 Riding Surface
3 Slide Slopes
4 Drainage
DAILY INSPECTION REPORT FOR AP-15 PACKAGE (From Km.901.753 to Km.848.746)Month : 26th JUNE’ 2016 to 25th JULY’ 2016
Weather Condition : Clear
S.No Objective Item Type of Inspection ChainageObservation
Date:16.07.2016
General Accident/Damaged/Missing RemarksPavement ¨ In Fair conditionPot holes 880.000 to 870.000 Rectification of Pot Holes Work in progressCleaning 891.400 to 892.000 Corridor Cleaning Work in progress
857.800 to 856.300 Corridor Cleaning Work in progress884.800 to 883.500 Grass cutting with grass cutter on median Work in progress889.500 to 890.000 Grass cutting with grass cutter on median Work in progress849.500 to 849.000 Jungle cutting up to ROW with EX-60(RHS)
2 Median Kerb ¨ In Fair conditionPlantation 897.000 to 895.000 Watering to median plants Work in progress
850.000 to 848.000 Watering to median plants Work in progressShape ¨Turfing In Fair condition
Pitching & masonry In Fair conditionRetaining wall In Fair condition
Side/Toe drain v 849.500 to 849.000 Toe drain preparation Work in progressGullies and catch Pits v 876.500 Pits preperation for P G Rails Work in progress
Superstructure In Fair conditionSubstructure In Fair condition
Head wing walls and approns In Fair conditionPaintingHand rail
6 Culverts/ Underpasses In Fair conditionMetal Beam Crash Barrier ¨Metal Beam Crash Barrier ¨
Boundary Stones ¨Delineator ¨
Bus shelters In Fair conditionPedestrian Guard Rails ¨ 876.000 Pedestrian Guard rails fixing Work in progress
Guard Posts ¨Signs ¨
Marking ¨ In Fair conditionDelineator ¨
Toll Plaza /Truck lay bye ¨ Generator operatorsToll Plaza ¨
9 Other Facilities Way side amenities ¨ In Fair conditionVegetation / Landscaping ¨ In Fair condition
KM STONES & 5th KM STONES ¨10 Illumination ¨ 875.000 Replacement of Dooms on Electrical poles Work in progress
11 Traffic conditions ¨ In Fair condition
12 Encroachments ¨ In Fair condition
LEGEND
¨ Visual Inspection * Close inspection l Thorough inspection
HME (Sowil Limited)_________________________________
SowiL,Rajahmundry -Dharmavaram
v Visual inspection during rainy season only
5 Bridges
7 Safety Barrier
8 Traffic operation facilities
1 Riding Surface
3 Slide Slopes
4 Drainage
DAILY INSPECTION REPORT FOR AP-15 PACKAGE (From Km.901.753 to Km.848.746)Month : 26th JUNE’ 2016 to 25th JULY’ 2016
Weather Condition : Clear
S.No Objective Item Type of Inspection ChainageObservation
Date: 17.07.2016
General Accident/Damaged/Missing Remarks
Pavement ¨Cleaning ¨
Expansion Joints ¨
2 Median Kerb ¨
Shape ¨Turfing
Pitching & masonry
Retaining wall
Side/Toe drain v
Gullies and catch Pits v
Superstructure
Substructure
Head wing walls and approns
Painting
Hand rail
6 Culverts/ Underpasses
7 Safety Barrier Metal Beam Crash Barrier & Guard Posts ¨
Signs
Marking ¨Delineator ¨
Toll Plaza /Truck lay bye ¨Way side amenities ¨
9 Other Facilities Vegetation / Landscaping ¨10 Illumination ¨11 Traffic conditions ¨12 Encroachments ¨
Note: No work has been done due to non-availability of Labour on "SUNDAY"
LEGEND
¨ Visual Inspection * Close inspection l Thorough inspection v Visual inspection during rainy season only
HME (Sowil Limited)_________________________________
SowiL,Rajahmundry -Dharmavaram
5 Bridges
8 Traffic operation facilities
1 Riding Surface
3 Slide Slopes
4 Drainage
DAILY INSPECTION REPORT FOR AP-15 PACKAGE (From Km.901.753 to Km.848.746)
Month : 26th JUNE’ 2016 to 25th JULY’ 2016Weather Condition : Clear
S.No Objective Item Type of Inspection ChainageObservation
Date:18.07.2016
General Accident/Damaged/Missing RemarksPavement ¨ In Fair conditionPot holesCleaning 885.500 to 884.500 Corridor Cleaning Work in progress
885.800 to 884.500 Vegitation and weeds removal near road furniture Work in progress884.800 to 883.500 Grass cutting with grass cutter on median Work in progress858.000 to 859.000 Corridor Cleaning Work in progress
2 Median Kerb ¨ In Fair conditionPlantation 888.970 tp 886.970 Watering to median plants Work in progress
848.000 to 850.000 Watering to median plants Work in progressShape ¨Turfing In Fair condition
Pitching & masonry In Fair conditionRetaining wall In Fair condition
Side/Toe drain vGullies and catch Pits v 876.500 Pits preperation for P G Rails Work in progress
Superstructure In Fair conditionSubstructure In Fair condition
Head wing walls and approns In Fair conditionPaintingHand rail
6 Culverts/ Underpasses In Fair conditionMetal Beam Crash Barrier ¨Metal Beam Crash Barrier ¨
Boundary Stones ¨Delineator ¨
Bus shelters In Fair conditionPedestrian Guard Rails ¨ 876.000 Pedestrian Guard rails fixing Work in progress
Guard Posts ¨Signs ¨
Marking ¨ In Fair conditionDelineator ¨
Toll Plaza /Truck lay bye ¨ Generator operators Work in progressToll Plaza ¨
9 Other Facilities Way side amenities ¨ In Fair conditionVegetation / Landscaping ¨ In Fair condition
KM STONES & 5th KM STONES ¨ In Fair condition10 Illumination ¨
11 Traffic conditions ¨ In Fair condition
12 Encroachments ¨ In Fair condition
LEGEND
¨ Visual Inspection * Close inspection l Thorough inspection
5 Bridges
7 Safety Barrier
8 Traffic operation facilities
v Visual inspection during rainy season only
HME (Sowil Limited)_________________________________
SowiL,Rajahmundry -Dharmavaram
1 Riding Surface
3 Slide Slopes
4 Drainage
DAILY INSPECTION REPORT FOR AP-15 PACKAGE (From Km.901.753 to Km.848.746)Month : 26th JUNE’ 2016 to 25th JULY’ 2016
Weather Condition : Clear
S.No Objective Item Type of Inspection ChainageObservation
Date:19.07.2016
General Accident/Damaged/Missing RemarksPavement ¨ In Fair conditionPot holesCleaning 881.400 to 880.000 Vegitation and weeds removal near road furniture Work in progress
888.200 to 887.200 Corridor Cleaning Work in progress877.600 to 879.600 Grass cutting with grass cutter on median Work in progress873.750 to 872.750 Corridor Cleaning Work in progress879.000 to 878.000 Side Jungle cutting
2 Median Kerb ¨ In Fair conditionPlantation 886.970 tp 884.970 Watering to median plants Work in progress
Shape ¨Turfing In Fair condition
Pitching & masonry In Fair conditionRetaining wall In Fair condition
Side/Toe drain vGullies and catch Pits v 876.500 Pits preperation for P G Rails Work in progress
Superstructure In Fair conditionSubstructure In Fair condition
Head wing walls and approns In Fair conditionPaintingHand rail
6 Culverts/ Underpasses In Fair conditionMetal Beam Crash Barrier ¨Metal Beam Crash Barrier ¨
Boundary Stones ¨Delineator ¨
Bus shelters In Fair conditionPedestrian Guard Rails ¨ 876.000 Pedestrian Guard rails fixing Work in progress
Guard Posts ¨Signs ¨
Marking ¨ In Fair conditionDelineator ¨
Toll Plaza /Truck lay bye ¨ Generator operators Work in progressToll Plaza ¨
9 Other Facilities Way side amenities ¨ In Fair conditionVegetation / Landscaping ¨ In Fair condition
KM STONES & 5th KM STONES ¨10 Illumination
11 Traffic conditions ¨ In Fair condition
12 Encroachments ¨ In Fair condition
LEGEND
¨ Visual Inspection * Close inspection l Thorough inspection
5 Bridges
7 Safety Barrier
8 Traffic operation facilities
v Visual inspection during rainy season only
HME (Sowil Limited)_________________________________
SowiL,Rajahmundry -Dharmavaram
1 Riding Surface
3 Slide Slopes
4 Drainage
DAILY INSPECTION REPORT FOR AP-15 PACKAGE (From Km.901.753 to Km.848.746)Month : 26th JUNE’ 2016 to 25th JULY’ 2016
Weather Condition : Clear
S.No Objective Item Type of Inspection ChainageObservation
Date:20.07.2016
General Accident/Damaged/Missing RemarksPavement ¨ In Fair conditionPot holesCleaning 880.000 to 880.600 Vegitation and weeds removal near road furniture Work in progress
887.200 to 886.200 Corridor Cleaning Work in progress879.600 to 880.600 Grass cutting with grass cutter on median Work in progress872.750 to 871.750 Corridor Cleaning Work in progress878.000 to 877.000 Side Jungle cutting Work in progress
2 Median Kerb ¨ In Fair conditionPlantation 884.970 tp 882.970 Watering to median plants Work in progress
Shape ¨Turfing In Fair condition
Pitching & masonry In Fair conditionRetaining wall In Fair condition
Side/Toe drain vGullies and catch Pits v 876.500 Pits preperation for P G Rails Work in progress
Superstructure In Fair conditionSubstructure In Fair condition
Head wing walls and approns In Fair conditionPaintingHand rail
6 Culverts/ Underpasses In Fair conditionMetal Beam Crash Barrier ¨Metal Beam Crash Barrier ¨
Boundary Stones ¨Delineator ¨
Bus shelters In Fair conditionPedestrian Guard Rails ¨ 876.000 Pedestrian Guard rails fixing Work in progress
Guard Posts ¨Signs ¨
Marking ¨ In Fair conditionDelineator ¨
Toll Plaza /Truck lay bye ¨ Generator operatorsToll Plaza ¨
9 Other Facilities Way side amenities ¨ In Fair conditionVegetation / Landscaping ¨ In Fair condition
KM STONES & 5th KM STONES ¨10 Illumination
11 Traffic conditions ¨ In Fair condition
12 Encroachments ¨ In Fair condition
LEGEND
¨ Visual Inspection * Close inspection l Thorough inspection
5 Bridges
7 Safety Barrier
8 Traffic operation facilities
v Visual inspection during rainy season only
HME (Sowil Limited)_________________________________
SowiL,Rajahmundry -Dharmavaram
1 Riding Surface
3 Slide Slopes
4 Drainage
DAILY INSPECTION REPORT FOR AP-15 PACKAGE (From Km.901.753 to Km.848.746)Month : 26th JUNE’ 2016 to 25th JULY’ 2016
Weather Condition : Clear
S.No Objective Item Type of Inspection ChainageObservation
Date:21.07.2016
General Accident/Damaged/Missing
RemarksPavement ¨ In Fair conditionPot holesCleaning 901.750 to 901.750 Corridor cleaning Work in progress
887.800 to 886.800 Corridor cleaning Work in progress886.100 to 885.100 Corridor cleaning884.400 to 883.000 Corridor cleaning872.500 to 871.000 Corridor cleaning870.100 to 869.400 Corridor cleaning863.700 to 862.300 Corridor cleaning Work in progress860.200 to 859.000 Corridor cleaning Work in progress884.800 to 884.000 Side Jungle cutting with grass cutter Work in progress860.000 to 861.000 Grass cutting with grass cutter on median Work in progress
2 Median Kerb ¨Plantation 901.750 to 890.750 Watering to median plants Work in progress
Shape ¨Turfing In Fair condition
Pitching & masonry In Fair conditionRetaining wall In Fair condition
Side/Toe drain vGullies and catch Pits v 876.500 Pits preperation for P G Rails Work in progress
Superstructure In Fair conditionSubstructure In Fair condition
Head wing walls and approns In Fair conditionPaintingHand rail
6 Culverts/ Underpasses In Fair conditionMetal Beam Crash Barrier ¨Metal Beam Crash Barrier ¨
Boundary Stones ¨Delineator ¨
Bus shelters In Fair conditionPedestrian Guard Rails ¨
Guard Posts ¨ 876.000 Pedestrian Guard rails fixing Work in progressSigns ¨
Marking ¨ In Fair conditionDelineator ¨
Toll Plaza /Truck lay bye ¨ Generator operators Work in progressToll Plaza ¨
9 Other Facilities Way side amenities ¨ In Fair conditionVegetation / Landscaping ¨ In Fair condition
KM STONES & 5th KM STONES10 Illumination ¨ 896.000 Erreection of Electrical poles
11 Traffic conditions ¨
12 Encroachments ¨ In Fair condition
LEGEND
¨ Visual Inspection * Close inspection l Thorough inspection
5 Bridges
7 Safety Barrier
8 Traffic operation facilities
v Visual inspection during rainy season only
HME (Sowil Limited)_________________________________
SowiL,Rajahmundry -Dharmavaram
1 Riding Surface
3 Slide Slopes
4 Drainage
DAILY INSPECTION REPORT FOR AP-15 PACKAGE (From Km.901.753 to Km.848.746)Month : 26th JUNE’ 2016 to 25th JULY’ 2016
Weather Condition : Clear
S.No Objective Item Type of Inspection ChainageObservation
Date:22.07.2016
General Accident/Damaged/Missing
RemarksPavement ¨ In Fair conditionPot holesCleaning 901.750 to 901.750 Corridor cleaning Work in progress
887.800 to 886.800 Corridor cleaning Work in progress886.100 to 885.100 Corridor cleaning884.400 to 883.000 Corridor cleaning872.500 to 871.000 Corridor cleaning870.100 to 869.400 Corridor cleaning863.700 to 862.300 Corridor cleaning Work in progress860.200 to 859.000 Corridor cleaning Work in progress884.800 to 884.000 Side Jungle cutting with grass cutter Work in progress860.000 to 861.000 Grass cutting with grass cutter on median Work in progress
2 Median Kerb ¨Plantation 901.750 to 890.750 Watering to median plants Work in progress
Shape ¨Turfing In Fair condition
Pitching & masonry In Fair conditionRetaining wall In Fair condition
Side/Toe drain vGullies and catch Pits v 876.500 Pits preperation for P G Rails Work in progress
Superstructure In Fair conditionSubstructure In Fair condition
Head wing walls and approns In Fair conditionPaintingHand rail
6 Culverts/ Underpasses In Fair conditionMetal Beam Crash Barrier ¨Metal Beam Crash Barrier ¨
Boundary Stones ¨Delineator ¨
Bus shelters In Fair conditionPedestrian Guard Rails ¨
Guard Posts ¨ 876.000 Pedestrian Guard rails fixing Work in progressSigns ¨
Marking ¨ In Fair conditionDelineator ¨
Toll Plaza /Truck lay bye ¨ Generator operators Work in progressToll Plaza ¨
9 Other Facilities Way side amenities ¨ In Fair conditionVegetation / Landscaping ¨ In Fair condition
KM STONES & 5th KM STONES10 Illumination ¨
11 Traffic conditions ¨ 896.000 Erreection of Electrical poles
12 Encroachments ¨ In Fair condition
LEGEND
¨ Visual Inspection * Close inspection l Thorough inspection
5 Bridges
7 Safety Barrier
8 Traffic operation facilities
v Visual inspection during rainy season only
HME (Sowil Limited)_________________________________
SowiL,Rajahmundry -Dharmavaram
1 Riding Surface
3 Slide Slopes
4 Drainage
DAILY INSPECTION REPORT FOR AP-15 PACKAGE (From Km.901.753 to Km.848.746)Month : 26th JUNE’ 2016 to 25th JULY’ 2016
Weather Condition : Clear
S.No Objective Item Type of Inspection ChainageObservation
Date:23.07.2016
General Accident/Damaged/Missing
RemarksPavement ¨ In Fair conditionPot holesCleaning 900.750 to 899.750 Side Jungle cutting with grass cutter Work in progress
886.800 to 886.000 Corridor cleaning Work in progress885.100 to 884.100 Corridor cleaning Work in progress863.400 to 864.000 Corridor cleaning Work in progress871.000 to 871.500 Corridor cleaning Work in progress850.400 to 849.400 Side Jungle cutting with grass cutter Work in progress862.300 to 868.300 Grass cutting with grass cutter on median Work in progress
2 Median Kerb ¨ In Fair conditionPlantation
Shape ¨Turfing In Fair condition
Pitching & masonry In Fair conditionRetaining wall In Fair condition
Side/Toe drain vGullies and catch Pits v 876.500 Pits preperation for P G Rails Work in progress
Superstructure In Fair conditionSubstructure In Fair condition
Head wing walls and approns In Fair conditionPaintingHand rail
6 Culverts/ Underpasses In Fair conditionMetal Beam Crash Barrier ¨Metal Beam Crash Barrier ¨
Boundary Stones ¨Delineator ¨
Bus shelters In Fair conditionPedestrian Guard Rails ¨
Guard Posts ¨ 876.000 Pedestrian Guard rails fixing Work in progressSigns ¨
Marking ¨ In Fair conditionDelineator ¨
Toll Plaza /Truck lay bye ¨ Generator operators Work in progressToll Plaza ¨
9 Other Facilities Way side amenities ¨ In Fair conditionVegetation / Landscaping ¨ In Fair condition
KM STONES & 5th KM STONES ¨10 Illumination ¨ 896.000 Erreection of Electrical poles
11 Traffic conditions ¨
12 Encroachments ¨ In Fair condition
LEGEND
¨ Visual Inspection * Close inspection l Thorough inspection
5 Bridges
7 Safety Barrier
8 Traffic operation facilities
v Visual inspection during rainy season only
HME (Sowil Limited)_________________________________
SowiL,Rajahmundry -Dharmavaram
1 Riding Surface
3 Slide Slopes
4 Drainage
DAILY INSPECTION REPORT FOR AP-15 PACKAGE (From Km.901.753 to Km.848.746)Month : 26th JUNE’ 2016 to 25th JULY’ 2016
Weather Condition : Clear
S.No Objective Item Type of Inspection ChainageObservation
Date: 24.07.2016
General Accident/Damaged/Missing Remarks
Pavement ¨Cleaning ¨
Expansion Joints ¨
2 Median Kerb ¨
Shape ¨Turfing
Pitching & masonry
Retaining wall
Side/Toe drain v
Gullies and catch Pits v
Superstructure
Substructure
Head wing walls and approns
Painting
Hand rail
6 Culverts/ Underpasses
7 Safety Barrier Metal Beam Crash Barrier & Guard Posts ¨
Signs
Marking ¨Delineator ¨
Toll Plaza /Truck lay bye ¨Way side amenities ¨
9 Other Facilities Vegetation / Landscaping ¨
10 Illumination ¨11 Traffic conditions ¨12 Encroachments ¨
Note: No work has been done due to non-availability of Labour on "SUNDAY"
LEGEND
¨ Visual Inspection * Close inspection l Thorough inspection v Visual inspection during rainy season only
HME (Sowil Limited)_________________________________
SowiL,Rajahmundry -Dharmavaram
5 Bridges
8 Traffic operation facilities
1 Riding Surface
3 Slide Slopes
4 Drainage
DAILY INSPECTION REPORT FOR AP-15 PACKAGE (From Km.901.753 to Km.848.746)
Month : 26th JUNE’ 2016 to 25th JULY’ 2016Weather Condition : Clear
S.No Objective Item Type of Inspection ChainageObservation
Date:25.07.2016
General Accident/Damaged/Missing
RemarksPavement ¨ In Fair conditionPot holesCleaning 871.900 to 872.500 Corridor cleaning Work in progress
889.600 to 890.000 Side Jungle cutting with grass cutter Work in progress889.300 to 890.000 Corridor cleaning Work in progress860.100 to 859.100 Corridor cleaning Work in progress
2 Median Kerb ¨ In Fair conditionPlantation
Shape ¨ In Fair conditionTurfing In Fair condition
Pitching & masonry In Fair conditionRetaining wall In Fair condition
Side/Toe drain vGullies and catch Pits v
Superstructure In Fair conditionSubstructure In Fair condition
Head wing walls and approns In Fair conditionPaintingHand rail
6 Culverts/ UnderpassesMetal Beam Crash Barrier ¨ In Fair conditionMetal Beam Crash Barrier ¨ In Fair condition
Boundary Stones ¨ In Fair conditionDelineator ¨
Bus shelters In Fair conditionPedestrian Guard Rails ¨ In Fair condition
Guard Posts ¨ In Fair conditionSigns ¨ In Fair condition
Marking ¨ In Fair conditionDelineator ¨ In Fair condition
Toll Plaza /Truck lay bye ¨ Generator operators Work in progressToll Plaza ¨ In Fair condition
9 Other Facilities Way side amenities ¨ In Fair conditionVegetation / Landscaping In Fair condition
KM STONES & 5th KM STONES ¨
10 Illumination ¨ 896.000 Electrical connection rectification on Feeder Piller Side Work in progress
11 Traffic conditions ¨ In Fair condition
12 Encroachments ¨ In Fair condition
LEGEND
¨ Visual Inspection * Close inspection l Thorough inspection
5 Bridges
7 Safety Barrier
8 Traffic operation facilities
v Visual inspection during rainy season only
HME (Sowil Limited)_________________________________
SowiL,Rajahmundry -Dharmavaram
1 Riding Surface
3 Slide Slopes
4 Drainage
DAILY INSPECTION REPORT FOR AP-15 PACKAGE (From Km.901.753 to Km.848.746)Month : 26th JUNE’ 2016 to 25th JULY’ 2016
Weather Condition : Clear
S.No Objective Item Type of Inspection ChainageObservation
NH-16, Rajahmundry to DharmavaramAP – 15 Package
OPERATION AND MAINTENANCE REPORT JULY- 2016
7. APPENDIX – “A”
INSPECTIONS UNDER TAKEN
&
NOTICES / INSTRUCTIONS
ISSUED TO THE CONCESSIONAIRE
NH-16, Rajahmundry to DharmavaramAP – 15 Package
OPERATION AND MAINTENANCE REPORT JULY- 2016
SOWiL Limited
Consultancy Services as Independent Engineer during Operation & Maintenance period ofRajahmundry-Dharmavaram (Km. 200 to Km. 253) of NH-5in Andhra Pradesh,
AP-15 BOT (Annuity) Projects.
The list of letters/notices issued to the Concessionaire during the month of JULY- 2016
S.No Letter No. Date Subject Remarks
1 SOWIL/O&M/RJY/ REL/AEL/643 27.07.2016 Review of various records andregisters - Reg
To beverified
2 SOWIL/O&M/RJY/REL /645 27.07.2016
Providing Optical Fibre Media-Permission to laying Optical FibeCable along Km.838/035 to Km.839/495 and across at Km.839/110of NH-16-Permission for trenchingand cable laying for a length of 1507Meters-Detailed Report
Received
3 SOWIL/O&M/RJY/REL /PIPLMC 646 27.07.2016
Water Resources Dept-PIP LMC-Construction of bridges for 10 Nosof Canal crossings across NH-5-Reg.
Awaited
NH-16, Rajahmundry to DharmavaramAP – 15 Package
OPERATION AND MAINTENANCE REPORT JULY - 2016
8. APPENDIX – “B”
PUBLIC FACILITIES
Client : NATIONAL HIGHWAYS AUTHORITY OF INDIA
Concessionaire : RAJAHMUNDRY EXPRESSWAY LTD.
Job : Rajahmundry - Dharmavaram Road Project on NH-16
1 27.11.2014 865.500Toll Plaza
(Krishnavaram)
Construction of Public Facilities i.e., Traffic Aid Post, MedicalAid Post and Wash Room at Toll Plazas along NHs and
maintenance thereof under OMT, BOT (TOLL) & BOT (Annuity)contracts.
NHAICM-II/Public-Facilities/2014 &NHAI/RO-HYD/17011/TOLL/14-15/3341
Package: AP-15
Independent Engineer :Sowil Limited
S.No Chainage
For the Month of : JULY - 2016
The estimate submited to the NHAI videLetter No.301
The facilities i.e. Traffic Aid Post,Medical Aid Post and wash room etc at
Toll Plaza are not provided inConcession Agreement
Location Public Facilities Remarks by the I.EDate
OPERATION AND MAINTENANCE REPORT JULY - 2016
NH-16, Rajahmundry -DharmavaramAP – 15 Package
OPERATION AND MAINTENANCE REPORT JULY- 2016
9.APPENDIX – “C”
Accident / Incident Report
Fatal Injured Ambulance Patrol Vehicle
OPERATIONS AND MAINTENANCE OF THE ROAD CORRIDORCONTRACT PACKAGES : AP - 15
DETAILS OF THE ACCIDENT VICTIMS FOR THE MONTH OF JULY - 2016
SL. NO Contract Package - AP - 15No of
AmbulancesNo ofPatrol
Accident Victims Helps /Assistance ProvidedRemarks
2 71Rajahmundry -Dharmavaram Road
Project ( Km.901+753 to 848.+746) BOTAnnuity (Contract Package - AP 15)
1 1 4 3
JULY- 2016
Proforma-1
Name of PIU's/CMU's……………………………………..Rajamundary1) Stretch: Rajahmundry - Dharmavaram Road Project2) Stretch Chainage: km 848+746 to 901+7533) State: Andra Pradesh4) District: East Godavari5) Police Station:
National Highway No:16
A B C D E F G H
Accidentlocation
Nature ofAccident
Classificationof Accident Causes Road
FeaturesRoad
Condition
Intersection type &Control
VehicleResponsible Fatal Graviou
s Minor NonInjured
1 02.07.16 10.30PM 863.200 LHS Urban 3 2 2 4 2 - 1 - 1 - - - Patrol vehicle/Ambulance
2 03.07.16 04.00AM 876.600 LHS Rural 2 4 4 4 1 - 3 - - - - - Patrol vehicle
3 08.07.16 11.00AM 874.000 Median Urban 4 4 2 4 1 - 1 - - - - - Patrol vehicle
4 11.07.16 09.00PM 870.300 RHS Rural 2 1 2 4 2 - 4 1 1 - - - Patrol vehicle/Ambulance
5 14.07.16 06.00PM 876.500 RHS Urban 2 3 2 4 2 - 3 - - 1 - - Patrol vehicle
6 16.07.1605.30AM(Early hrs of
17.07.16)872.200 RHS Urban 2 1 2 4 2 - 3 3 - - - - Patrol vehicle
7 24.07.1605.00M(Early hrs of
25.07.16)849.500 RHS Rural 4 4 4 4 1 - 3 - - - - - Patrol vehicle
4 2 1 0 0
Name & Signature of Project DirectorB: 1- Overturning, 2- Head on collision, 3- Rear end collision, 4- Collision brush/Side wipe, 5- Left turn collision, 6- Skidding, 7- Right turn collision, 8- Others(PI.Specific)C: 1- Fatal, 2- Grievious Injury, 3- Minor Injury, 4- Non Injury
E: 1- Single lane, 2- Two lanes, 3- Three lanes or More with out central divider(median), 4- Four lanes or more with central divderF: 1- Straight road, 2- Slight curve, 3- Sharp curve, 4- Flat road, 5-Gentle incline, 6- Steep incline, 7- Hump, 8- DipG: 1- T-Junction, 2- Y- Junction, 3- Four arm Junction, 4- Staggered Junction, 5- Junction with more than four arms, 6- Round about junction, 7- Manned rail crossing, 8- Unmanned rail crossingH: 1- Fine, 2- Mist/Fog, 3- Cloudy, 4- Light rain, 5- heavy rain, 6- Hail/Sleet, 7- Snow, 8- Strong wind, 9- Dust storm, 10- Very hot, 11- Very cold, 12- Other extraordinary condition
D: 1- Drunken, 2- Over speeding, 3- Vehicle out of control, 4- Fault of driver of Motor vehicle/Driver of other vehicle/Cyclist/Pedestrian/Passenger, 5- Deffect in mechanical condition of motor vehicle/Road condition
National Highways Authority of India
Accident DataMonth: JULY - 2016
Sl.No Date SideChainage
TOTAL
Time of Acc.(am/pm)
No of affected personsNo.of
animalskilled if any
Help provided Ambulance/Patrol vehicle Remarks
JULY - 2016
Sl.No.
Date Time New Ch. Side Type of accident / incident Details of vehicleName ofInformer
Contactphone no.
Details of complaint Remarks
1 2.07.2016 863.200 10.30PM LHSSpeedy uncontrolled van hit Autowhile over taking.
AP05W5235 O&M 9912199110 Informed to Yeleswaram Police station.One person injured.Injuredperson shifted toPrathipadu GGH
2 3.07.2016 876.600 04.00AM LHSUncontrolled lorry hit medianMetal Beam Crash Barrier due todriver slept
AP16TD0468 O&M 9912199110 Informed to Gandepalli Police station .No one injured. 16MtsMBCB Damaged.
3 8.07.2016 874.000 11.00AM Median Unknown vehicle hit Electricalpole. Unknown O&M 9912199110 Informed to Gandepalli Police station Damaged one electrical
pole with accessories.
4 11.07.2016 870.300 09.00PM RHSSpeedy motor cyclist hit Cyclistwhile over taking.
AP16BC0987 O&M 9912199110 Informed to Jeggampeta Police stationOne person died on thespot,another one majorinjured.
5 14.07.2016 876.500 06.00PM RHSSpeedy Tata Ace van hitpedestrian guard rail while overtaking.
AP05TA0365 O&M 9912199110 Informed to Gandepalli Police station One person minor injured.
6 16.07.2016 872.205.30AM(Earlyhrs of 17.07.16)
RHSUncontrolled byke hit shoulderside parked Tractor rear end.
AP37AZ2106 O&M 9912199110 Informed to Gandepalli Police station. Three persons died on thespot.
7 24.07.2016 849.50005.00M(Early
hrs of 25.07.16)RHS
Uncontrolled trialor lorry hitGuard post and drop down in Toedrain .
RJ06GT1280 O&M 9912199110 Informed to Prathipadu police station 09Nos Guard postsdamaged.
Client:NATIONAL HIGHWAY AUTHORITY OF INDIA.
Concessionaire:RAJAHMUNDRY EXPRESSWAY LTD.
Job: Rajahmundry - Dharmavaram Road Project on NH-16
Package:AP-15 ( From 26.06.2016 to 25.07.2016 )
Independent Engineer: Sowil Limited
Ref.No. JULY - 2016ACCIDENT / INCIDENTINFORMATION BOOK
Month : JULY - 2016
OPERATION AND MAINTENANCE REPORT JULY - 2016
No. Of Affected Persons Fatal: 4 Grievous: 2 Minor: 1 Non
Injured:0
AP- 15 Incident Analysis for the Month July-2016
Fatal29%
Grevious14%
Minor14%
Non Injured43%
Total Classification of Accidents
849.500 863.200 870.300 872.200 874.000 876.500 876.600Accidents in Chainage 1 1 1 1 1 1 1Fatal 1 3Grievous 1 1Minor 1Non Injured 1 1
1 1 1 1 1 1 11
3
1 1 11 1
0
1
2
3
4
5
6
7Accidents Vs Affected Persons as per chainage
Total
Accid
ents
Fatal - 2
Gravious -1Minor - 1
Non Injured - 1
Non Injured - 201234567
Drunke
n
Over sp
eeding
Vehicle
out of
control
Fault o
f driver
of Mo
tor veh
icle/Dr
iver of
other v
ehicle/
Cyclist/
Pedestr
ian/Pa
ssenge
r
Deffect
in mech
anical
Causes of Accidents To
tal Ac
ciden
ts
Fatal & Grievous Injuries
Reasons for the Accident : Control Measures : CH 863.200 –Grievous injuries Speedy uncontrolled van hit auto while overtaking
Road Safety Awareness program will be conducted at identified locations of crossings CH 870.300 – Fatal & Grievous injuries Speedy motor cyclist hit cyclist while overtaking Close monitoring by route patrolling team to control the movement of cyclist on NH particularly during nights Awareness program for both Cyclist and Motor cyclist users to
utilize the paved shoulder CH 872.200 - Fatal Uncontrolled bike hit t shoulder side parked tractor
Instructions were given to the route patrolling team to clear the unauthorized parking on the shoulders which obstructs to road users
Road Safety Awareness program will be conducted at identified locations of crossing
NH-16, Rajahmundry- DharmavaramAP – 15 Package
OPERATION AND MAINTENANCE REPORT JULY- 2016
10.APPENDIX – “D”
Monthly Operation&
Maintenance Reports
From To
1 08.07.16 899.223 GIET Damaged Electrical pole with accessories Restoration of New pole with accessories Work in progress
2 08.07.16 899.253 GIET Damaged Electrical pole with accessories Restoration of New pole with accessories Work in progress
3 08.07.16 899.283 GIET Damaged Electrical pole with accessories Restoration of New pole with accessories Work in progress
4 09.07.16 896.393 Rajanagaram Damaged Electrical pole with accessories Restoration of New pole with accessories Work in progress
5 09.07.16 896.423 Rajanagaram Damaged Electrical pole with accessories Restoration of New pole with accessories Work in progress
6 09.07.16 896.603 Rajanagaram Damaged Electrical pole with accessories Restoration of New pole with accessories Work in progress
7 09.07.16 S.RJN Rajanagaram Damaged Electrical pole with accessories Restoration of New pole with accessories Work in progress
8 09.07.19 894.988 Rajanagaram Damaged Electrical pole with accessories Restoration of New pole with accessories Work in progress
9 09.07.16 895.108 Rajanagaram Damaged Electrical pole with accessories Restoration of New pole with accessories Work in progress
10 09.07.16 895.138 Rajanagaram Damaged Electrical pole with accessories Restoration of New pole with accessories Work in progress
11 09.07.16 895.199 Rajanagaram Damaged Electrical pole with accessories Restoration of New pole with accessories Work in progress
12 11.07.16 888.153 Murari Damaged Electrical pole with accessories Restoration of New pole with accessories Work in progress
13 12.07.16 888.183 Murari Damaged Electrical pole with accessories Restoration of New pole with accessories Work in progress
14 12.07.16 888.213 Murari Damaged Electrical pole with accessories Restoration of New pole with accessories Work in progress
15 12.07.16 888.243 Murari Damaged Electrical pole with accessories Restoration of New pole with accessories Work in progress
16 12.07.16 888.513 Murari Damaged Electrical pole with accessories Restoration of New pole with accessories Work in progress
17 12.07.16 888.603 Murari Damaged Electrical pole with accessories Restoration of New pole with accessories Work in progress
18 12.07.16 888.633 Murari Damaged Electrical pole with accessories Restoration of New pole with accessories Work in progress
19 12.07.16 888.723 Murari Damaged Electrical pole with accessories Restoration of New pole with accessories Work in progress
20 12.07.16 889.053 Murari Damaged Electrical pole with accessories Restoration of New pole with accessories Work in progress
21 12.07.16 885.663 Gandepalli Damaged Electrical pole with accessories Restoration of New pole with accessories Work in progress
22 12.07.16 885.696 Gandepalli Damaged Electrical pole with accessories Restoration of New pole with accessories Work in progress
23 12.07.16 879.943 Mallepalli Damaged Electrical pole with accessories Restoration of New pole with accessories Work in progress
24 12.07.16 880.303 Mallepalli Damaged Electrical pole with accessories Restoration of New pole with accessories Work in progress
25 12.07.16 880.483 Mallepalli Damaged Electrical pole with accessories Restoration of New pole with accessories Work in progress
26 12.07.16 880.873 Mallepalli Damaged Electrical pole with accessories Restoration of New pole with accessories Work in progress
27 12.07.16 880.993 Mallepalli Damaged Electrical pole with accessories Restoration of New pole with accessories Work in progress
28 12.07.16 875.983 Talluru Damaged Electrical pole with accessories Restoration of New pole with accessories Work in progress
29 12.07.16 876.043 Talluru Damaged Electrical pole with accessories Restoration of New pole with accessories Work in progress
30 12.07.16 876.253 Talluru Damaged Electrical pole with accessories Restoration of New pole with accessories Work in progress
31 12.07.16 874.133 Z R Peta Damaged Electrical pole with accessories Restoration of New pole with accessories Work in progress
32 12.07.16 874.793 Z R Peta Damaged Electrical pole with accessories Restoration of New pole with accessories Work in progress
33 12.07.16 874.913 Z R Peta Damaged Electrical pole with accessories Restoration of New pole with accessories Work in progress
34 12.07.16 873.413 Z R Peta Damaged Electrical pole with accessories Restoration of New pole with accessories Work in progress
35 12.07.16 873.443 Z R Peta Damaged Electrical pole with accessories Restoration of New pole with accessories Work in progress
36 18.07.16 869.553 Ramavaram Damaged Electrical pole with accessories Restoration of New pole with accessories Work in progress
37 18.07.16 869.823 Ramavaram Damaged Electrical pole with accessories Restoration of New pole with accessories Work in progress
38 18.07.16 869.883 Ramavaram Damaged Electrical pole with accessories Restoration of New pole with accessories Work in progress
39 18.07.16 869.913 Ramavaram Damaged Electrical pole with accessories Restoration of New pole with accessories Work in progress
40 18.07.16 869.973 Ramavaram Damaged Electrical pole with accessories Restoration of New pole with accessories Work in progress
41 18.07.16 875.123 Neeladriraopeta Damaged Electrical pole with accessories Restoration of New pole with accessories Work in progress
42 18.07.16 874.943 Neeladriraopeta Damaged Electrical pole with accessories Restoration of New pole with accessories Work in progress
Client : NATIONAL HIGHWAYS AUTHORITY OF INDIA
10.1 RESTORATION OFILLUMINATION REPORT
Independent Engineer : Sowil Limited
Concessionaire : RAJAHMUNDRY EXPRESSWAY LTD.
Ref. No. JULY - 2016Job : Rajahmundry - Dharmavaram Road Project on NH-16
Package : AP-15 (From 26.06.16 to 25.07.16)
S.No.
New Chainage
Observation on the Site Action taken by the Concessionaire Remarks by I.EDate
OPERATION AND MAINTENANCE REPORT JULY - 2016
From To
901.75(RHS) RHSTemporary Tached hut for fruit
shopRemoved Removed
1 901.700(RHS) RHSTemporary Tached hut for fruit
shopRemoved Removed
2 901.670(RHS) RHSTemporary Tached hut for fruit
shopRemoved Removed
3 901.500(RHS) RHSTemporary Tached hut for fruit
shopRemoved Removed
4 901.650(LHS) LHSTemporary Tached hut for fruit
shopRemoved Removed
5 901.730(LHS) LHSTemporary Tached hut for fruit
shopRemoved Removed
6 863.160(LHS) LHS Temporary Pan shop Removed Removed
7 863.200(RHS) RHS Temporary fruit shop Removed Removed
Sl.No.
Client : NATIONAL HIGHWAYS AUTHORITY OF INDIA
10.2 VISUAL ENCROACHMENT/ENCUMBRANCE REPORTConcessionaire : RAJAHMUNDRY EXPRESSWAY LTD.
ChainageAction Taken by the
Concessionare
Jul-16
26.06.15 to 25.07.2016
Remarks by I.E
Package : AP-15
Side Details of encroachment /encumbrance
Job : Rajahmundry~Dharmavaram Road Project on NH-16
Independent Engineer:Sowil Limited
OPERATION AND MAINTENANCE REPORT JULY - 2016
S.No
Section /NH No Side
Total No.ofHoardings and
otherUnauthorised
Boards up to lastmonths
New Hoardingsand other
UnauthorisedBoards emerged
during themonth
TotalHoardingsand other
UnauthorisedBoards
Hoardings andother
UnauthorisedBoards removed
during themonth
BalanceHoardings and
otherUnauthorisedBoards left till
this month
Remarks about future planning etc.
1 NH-16 LHS 0 4 4 4 0
2 NH-16 RHS 0 8 8 8 0
3 NH-16 Median 0 4 4 4 0
Format for recording Hoardings and other Unauthorised Boards
A. Information of Hoardings and other Unauthorised Boards AP-15 package
Jul-16
OPERATION AND MAINTENANCE REPORT JULY- 2016
Length(mt)
Width(mt) Temporary Permanent
1 NH-16 880.200 RHS - 1.00 4.00 Temporary - Publicity Flexy,Mallepalli removed 4nos
2 NH-16 880.200 LHS - 2.00 2.00 Temporary - Medical camp Flexy,Mallepalli removed 4nos
3 NH-16 860.000 Median - 3.00 2.00 Temporary - Publicity Flexy,Yerravaram removed 4nos
4 NH-16 865.000 RHS - 2.00 2.00 Temporary - Publicity Flexy,Neeladrirao Peta removed 4nos
Address of Encroacher RemarksNewChainage Side
Format for recording Hoardings and other Unauthorised Boards
B. The detailed information chainage wise for AP-15 package
S.No
Section /NH No
ActionTaken forRemoval
Jul-16
ROW( in metre )
Hoardings and otherUnauthorised Boards.
Nature of Hoardings andother Unauthorised Boards.
OPERATION AND MAINTENANCE REPORT JULY - 2016
Jul-16
S.No
Section /NH No Side
Total No.ofEncroachment
up to lastmonths
NewEncroachment
emerged during themonth
TotalEncroachment
Encroachmentremoved during
the month
BalanceEncroachment left
till this month
Remarks about futureplanning etc.
1 NH-16 LHS 0 3 3 3 0
2 NH-16 RHS 0 5 5 5 0
Format for recording Encroachment
A. Information of Encroachment AP-15 package
OPERATION AND MAINTENANCE REPORT JULY - 2016
Length Width Temporary Permanent
1 NH-16 901.750 RHS 5 5 Temporary - Tached hut for fruit shop,Diwanchervu Removed
2 NH-16 901.700 RHS 7 5 Temporary - Tached hut for fruit shop,Diwanchervu Removed
3 NH-16 901.670 RHS 7 4 Temporary - Tached hut for fruit shop,Diwanchervu Removed
4 NH-16 901.500 RHS 5 2 Temporary - Tached hut for fruit shop,Diwanchervu Removed
5 NH-16 901.650 LHS 5 5 Temporary - Tached hut for fruit shop,Diwanchervu Removed
6 NH-16 901.730 LHS 4 5 Temporary - Tached hut for fruit shop,Diwanchervu Removed
7 NH-16 863.160 LHS 3 5 Temporary - Pan shop,Yerravaram Removed
8 NH-16 863.200 RHS 6 5 Temporary - fruit shop,Yerravaram Removed
Nature of Encroachment.S.No
Section /NH No New Ch
Format for recording Encroachment
B. The detailed information chainage wise for AP-15 packageJul-16
Address of Encroacher Action Taken forRemoval RemarksSide ROW (in
mt)Encroachment
OPERATION AND MAINTENANCE REPORT JULY - 2016
Client : NATIONAL HIGHWAYS AUTHORITY OF INDIA
Concessionaire : RAJAHMUNDRY EXPRESSWAY LTD.
Job : Rajahmundry - Dharmavaram Road Project on NH-16
Sl.No. Date Chainage Time Side Action taken by the Concessionaire
1 02.07.16 10.30PM 863.200 LHSDeployed O&M crew to the spot & injured shifted to govthospital by O&M ambulance and cleared the traffic
2 03.07.16 04.00AM 876.600 LHS Deployed O&M crew to the spot & cleared the traffic
3 08.07.16 11.00AM 874.000 Median Deployed O&M crew to the spot & cleared the traffic
4 11.07.16 09.00PM 870.300 RHSDeployed O&M crew to the spot & injured shifted to govthospital by O&M ambulance and cleared the traffic
5 14.07.16 06.00PM 876.500 RHS Deployed O&M crew to the spot & cleared the traffic
10.3 EMERGENCY RESPONSE PROTOCOL
Package : AP-15 26.06.15 to 25.07.2016
5 14.07.16 06.00PM 876.500 RHS Deployed O&M crew to the spot & cleared the traffic
6 16.07.1605.30AM(Earl
y hrs of17.07.16)
872.200 RHS Deployed O&M crew to the spot & cleared the traffic
7 24.07.1605.00M(Early
hrs of25.07.16)
849.500 RHS Deployed O&M crew to the spot & cleared the traffic
OPERATION AND MAINTENANCE REPORT JULY - 2016
Package : AP-15
Maximum Minimum Today This Month
1 26-Jun-16 32ºC 27ºC 6.0mm 6.0mm
2 27-Jun-16 30ºC 26ºC 20.0mm 26.0mm
3 28-Jun-16 28ºC 25ºC 25.0mm 51.0mm
4 29-Jun-16 27ºC 26ºC 18.0mm 69.0mm
5 30-Jun-16 26ºC 25ºC 12.0mm 81.0mm
6 1-Jul-16 28ºC 24ºC 8.0mm 89.0mm
7 2-Jul-16 28ºC 25ºC 10.0mm 99.0mm
8 3-Jul-16 29ºC 25ºC 24.0mm 123.0mm
9 4-Jul-16 32ºC 24ºC 36.0mm 159.0mm
10 5-Jul-16 35ºC 23ºC 16.0mm 175.0mm
11 6-Jul-16 37ºC 24ºC 8.0mm 183.0mm
12 7-Jul-16 38ºC 26ºC 7.0mm 190.0mm
13 8-Jul-16 35ºC 25ºC 0.0mm 190.0mm
14 9-Jul-16 32ºC 28ºC 10.0mm 200.0mm
15 10-Jul-16 32ºC 27ºC 0.0mm 200.0mm
16 11-Jul-16 32ºC 25ºC 0.0mm 200.0mm
17 12-Jul-16 34ºC 25ºC 0.0mm 200.0mm
18 13-Jul-16 35ºC 26ºC 22.0mm 222.0mm
19 14-Jul-16 35ºC 25ºC 0.0mm 222.0mm
20 15-Jul-16 38ºC 27ºC 0.0mm 222.0mm
21 16-Jul-16 39ºC 27ºC 0.0mm 222.0mm
22 17-Jul-16 39ºC 27ºC 0.0mm 222.0mm
23 18-Jul-16 33ºC 28ºC 0.0mm 222.0mm
24 19-Jul-16 35ºC 25ºC 100.0mm 322.0mm
25 20-Jul-16 31ºC 24ºC 0.0mm 322.0mm
26 21-Jul-16 33ºC 24ºC 4.0mm 326.0mm
27 22-Jul-16 36ºC 26ºC 9.0mm 335.0mm
28 23-Jul-16 34ºC 25ºC 15.0mm 350.0mm
29 24-Jul-16 36ºC 25ºC 32.0mm 382.0mm
30 25-Jul-16 35ºC 25ºC 0.0mm 382.0mm
RemarksSl.No DateTemperature in C Rainfall (in mm)
26.06.15 to 25.07.2016
Client : NATIONAL HIGHWAYS AUTHORITY OF INDIA
10.4 WEATHER REPORT
Independent Engineer :Sowil Limited
Concessionaire : RAJAHMUNDRY EXPRESSWAY LTD.
Ref. No. JULY - 2016Job :Rajahmundry~Dharmavaram Road Project on NH-16
OPERATION AND MAINTENANCE REPORT JULY- 2016
Job : Rajahmundry - Dharmavaram Road Project on NH-16
From To
Package : AP-15 (from 26.06.16 to 25.07.16) Month: JULY - 2016
S.No. DateChainage
Side Area Remarks by the I.E
NO BLEEDING REPORT FOUND DURING THIS MONTH
Client : NATIONAL HIGHWAYS AUTHORITY OF INDIA
10.5 Bleeding ReportIndependent Engineer : Sowil Limited
Concessionaire : RAJAHMUNDRY EXPRESSWAY LTD.
Ref. No. JULY - 2016
OPERATION AND MAINTENANCE REPORT JULY - 2016
Client : NATIONAL HIGHWAYS AUTHORITY OF INDIA
Concessionaire : RAJAHMUNDRY EXPRESSWAY LTD.
Job : Rajahmundry- Dharmavaram Road Project on NH-16
S.No. Equipment Description Remarks
I PLANT & EQUIPMENT FOR ROUTINE MAINTENANCE
A) UTILITY VEHICLES
1 MAHENDRA CAMPER - AP05W 5573
2 TATA 407 VAN - AP05V - 8209 -
3 SCOPIO - AP05TV - 4245 -
B) BREAKDOWN CLEARENCE VEHICLE
1 HYDRA CRANE - MH0B-8937
2ESCORTS JCB - AP05 BA - 8773
3 AMBULANCE - AP05W 2111 The required Medical Staffengaged as per NHAI guidelines
C) Plant & Machinery for periodic Maintenance
1
2
3
4
5
6
7
8
9
10
11
12
Bituminous Plate Compactor - 1 No.
Tractor mounted Bituminous Sprayer - 1 No.
Bituminous Sprayer - 2 Nos.
Road Marking Laying equipment - 1 set
Water Tanker - 2 Nos.
Mobile Hot Mix Eqipment - 1 No
RTR - 2 Nos.
10.6 PLANT & EQUIPMENTREPORT
Vibratory Roller - 1 No.
Package : AP-15
-
Emergency Lamp
Tandem Roller - 4 Nos.
JCB - 1 No.
Air Compressors - 2 Nos.
Independent Engineer :Sowil Limited
Tractor with Trailer - 1 No.
Ref. No. JULY - 2016
List of items available in Vehicles
Mobile Phone, First Aid Box,Accidental Report Form with Pen,
Camera, Emergency Torches etc.,
Reflective cones, Barricade, signboards, flags, Relective jockets, All
types of fire extinguishers, MechanicalTool box, Shovel & Emergency lamp.
First aid kit, Artificial respiratory kit,Emergency torches, etc.,
Rope Sling, D-Shackle Nylon Ropes,Wooden logs, Emergency Lamp etc.,
OPERATION AND MAINTENANCE REPORT JULY- 2016
S.No. Remarks by I.E
1 Present
2 Present
3 Present
4 Present
5
6
7
Mr. J. Venugopal
TBN Duty Officer/ Traffic SafetySupervisor( One in each Shift) 24 Hours duty
Mr. Goutam Duty Officer Day duty
Designation Man Hour
Mr.R.V.Appa Rao Dy, Manager ( Highways Day duty
Project In -charge Day duty
Independent Engineer : Sowil LimitedConcessionaire : RAJAHMUNDRY EXPRESSWAY LTD.
Job : Rajahmundry- Dharmavaram Road Project on NH-16
Mr.Ramesh Sreerangam
Supervisors ( 1 No.) Day duty
Dy, Manager ( Structures)
Client : NATIONAL HIGHWAYS AUTHORITY OF INDIA
10.7 STATEMENT OF MANPOWERAVAILABLE AT WORKSITE
TBN Engineer( QC/ Highways) Day duty
Day dutyTBN
Package : AP-15 Ref. No. JULY- 2016
Name / Category
OPERATION AND MAINTENANCE REPORT JULY - 2016
Client : NATIONAL HIGHWAYS AUTHORITY OF INDIA
Concessionaire : RAJAHMUNDRY EXPRESSWAY LTD.
Ref. No. JULY - 2016
Jul-16
Maintenance activities carried out during this Month : Action taken by theConcessionaire Remarks by IE
1 Carried out Carried out
2 Work in Progress Work in Progress
3 done Completed
4 Work in Progress Work in Progress
5 Work in Progress Work in Progress
6 Work in Progress Work in Progress
7 Work in Progress Work in Progress
8 Completed Completed
9 Work in Progress Work in Progress
10 Work in Progress Work in Progress
11 done Completed
12 done Completed
13 done Completed
14 Work in Progress Work in Progress
15 Completed Completed
16 Completed Completed
17 Work in Progress Work in Progress
Replacement of diffused bulbs,damaged domes,chowks,ignators and fuse carriers is in progress
Replacement of damaged Electrical poles is in progress
Replacement of damaged bus Sheltor sheets has been completed
Replacement of damaged Pedestrain Guard Rails is in progress
Replacement of damaged Metal beam crash barrier is in progress
Median grass cutting with grass cutters has been done from 848.746 to 901.753
Kerb side silt cleaning & Corridor cleaning - in progress from Ch 848.746 to 901.753
Shoulder side jungle clearance is in progress from Ch 848.746 to 901.753
10.8 Maintenance activity carried out in this monthIndependent Engineer :Sowil Limited
Job : Rajahmundry - Dharmavaram Road Project on NH-16
Package : AP-15 ( From 26.06.2016 to 25.07.2016)
Daily cleaning of Carriageways,Service roads & Foot Paths has been carried out.
Regular watering of Median plantation-in progress
Replacement of damaged/accident Guard posts has been done
Toe drain construction is in progress at Krishnavaram tollplaza
Restoration of ROW Stones has been done from 848.746 to 901.753
Longitudinal median drains rectification has been done
Encroachments & Hoardings removing in progress from ch 848.746 to 901.753
Replacement of dead/deceased Avenue plants has been completed from 848.746 to 901.753
Replacement of dead/deceased median plants has been completed from 848.746 to 901.753
OPERATION AND MAINTENANCE REPORT JULY - 2016
Month: JULY - 2016
From To
1 04.07.16 to22.07.2016 901.750 850.000 RHS & LHS Work in Progress
2 27.06.16 to27.07.2016 901.450 849.800 Median Work in Progress
3 27.06.2016 to15.07.2016 862.000 848.746 RHS & LHS Work in Progress
4 27.06.2016 to23.07.2016 848.000 898.000 LHS & RHS Work in Progress
5 09.07.2016 to20.07.2016 849.800 856.200 Median COMPLETED
6 26.06.16 to25.07.16 848.745 901.753 3600 COMPLETED
7 26.06.16 to25.07.16 901.450 901.753 36 COMPLETED
8 03.07.16 890.500 889.500 LHS & RHS Work in Progress
9 03.07.16 890.500 899.500 LHS & RHS COMPLETED
10 06.07.16 848.800 859.150 LHS & RHS Work in Progress
11 06.07.16 848.800 859.150 LHS & RHS Work in Progress
12 26.06.16 to25.07.16 889.000 889.300 B/S COMPLETED
13 26.06.16 to25.07.16 876.000 877.000 B/S Work in Progress
14 03.07.16 889.300 LHS COMPLETED
15 08.07.16 854.900 LHS COMPLETED
16 08.07.16 855.900 RHS COMPLETED
17 08.07.16 856.400 RHS COMPLETED
18 08.07.16 856.600 RHS COMPLETED
19 08.07.16 859.950 RHS COMPLETED
Restoration of Guard Posts work has been done
Restoration of Guard Posts work has been done
Restoration of Guard Posts work has been done
Restoration of Guard Posts work has been done
Restoration of Guard Posts work has been done
Restoration of Guard Posts work has been done
Replacement of Dead/Deaseased median plants work done
Guard post paint work has been done
Guard post paint work has been done
Sign Boards Paint work has been done
Sign Boards Paint work has been done
Corridor cleaning & Kerb side silt removed
Median Cleaning and median jungle cutting
Kacha/Toe drain cleaning
Rank vegetation removed
Rectification of Longitudinal Drains work has been done
Replacement of Dead/Deaseased median plants work done
Restoration of Pedestrian Guard rail fixing work has been done
Side Action Taken by Concessionaire
Package : AP-15 (from 26.06.16 to 25.07.16)
Remarks by I.ESl.No. Date
Chainage
Restoration of Pedestrian Guard rail fixing work has been done
10.9 Compliance ReportConcessionaire : RAJAHMUNDRY EXPRESSWAY LTD.
IndependentEngineer :
Sowil Limited
Ref. No. JULY - 2016Job : Rajahmundry - Dharmavaram Road Project on NH-16
Client : NATIONAL HIGHWAYS AUTHORITY OF INDIA
OPERATION AND MAINTENANCE REPORT JULY - 2016
From ToSide Action Taken by Concessionaire Remarks by I.ESl.
No. Date Chainage
20 08.07.16 889.750 LHS COMPLETED
21 05.07.16 874.280 Median COMPLETED
22 05.07.16 874.270 Median COMPLETED
23 05.07.16 873.450 Median COMPLETED
24 05.07.16 853.790 RHS COMPLETED
25 05.07.16 855.550 LHS COMPLETED
26 05.07.16 855.580 RHS COMPLETED
27 05.07.16 855.600 LHS COMPLETED
28 05.07.16 873.120 LHS COMPLETED
29 05.07.16 873.160 RHS COMPLETED
30 05.07.16 873.400 RHS COMPLETED
31 05.07.16 873.450 RHS COMPLETED
32 05.07.16 873.550 RHS COMPLETED
33 05.07.16 889.910 RHS COMPLETED
34 08.07.16 Engineering College 899.303(w) RHS COMPLETED
35 08.07.16 Engineering College 899.303 (E) LHS COMPLETED
36 08.07.16 NR Puram 895.003 (W) RHS COMPLETED
37 08.07.16 NR Puram 895.223 (E) LHS COMPLETED
38 08.07.16 Gandepalli 885.403(W) LHS COMPLETED
39 08.07.16 Gandepalli 885.403 (E) RHS COMPLETED
40 08.07.16 Ramavaram 870.333(E) LHS COMPLETED
41 08.07.16 Ramavaram 870.343 (W) RHS COMPLETED
42 08.07.16 Somavaram 864.093 (E) RHS COMPLETED
43 08.07.16 Somavaram 864.543 (W) LHS COMPLETED
44 08.07.16 Yerravaram 863.196 (W) LHS COMPLETED
45 08.07.16 Yerranvaram 863.196 (E) RHS COMPLETED
46 08.07.16 Burugupudi 867.943 (W) LHS COMPLETED
47 08.07.16 Burugupudi 867.943 (E) RHS COMPLETED
48 08.07.16 899.223 RHS Work in Progress
Restoration of Guard Posts work has been done
Restoration of Double sided Metal Beam Crash Barriers has been done
Restoration of Double sided Metal Beam Crash Barriers has been done
Restoration of Double sided Metal Beam Crash Barriers has been done
Restoration of Double sided Metal Beam Crash Barriers has been done
Restoration of Single sided Metal Beam Crash Barriers has been done
Restoration of Single sided Metal Beam Crash Barriers has been done
Restoration of Single sided Metal Beam Crash Barriers has been done
Restoration of Single sided Metal Beam Crash Barriers has been done
Restoration of Single sided Metal Beam Crash Barriers has been done
Restoration of Single sided Metal Beam Crash Barriers has been done
Restoration of Single sided Metal Beam Crash Barriers has been done
Restoration of Single sided Metal Beam Crash Barriers has been done
Restoration of Single sided Metal Beam Crash Barriers has been done
Replacement of damaged bus shelter sheets
Replacement of damaged bus shelter sheets
Replacement of damaged bus shelter sheets
Replacement of damaged bus shelter sheets
Replacement of damaged bus shelter sheets
Replacement of damaged bus shelter sheets
Replacement of damaged bus shelter sheets
Replacement of damaged bus shelter sheets
Replacement of damaged bus shelter sheets
Replacement of damaged bus shelter sheets
Replacement of damaged bus shelter sheets
Replacement of damaged bus shelter sheets
Replacement of damaged bus shelter sheets
Replacement of damaged bus shelter sheets
Replacement of Bulbs,Chowks,Ignitors & Dumes work has been done
OPERATION AND MAINTENANCE REPORT JULY - 2016
Independent Engineer :Sowil Limited
S.No. Constraints
1) CONSTRAINTS OF THE CONCESSIONAIRE
a) MATERIALS
b) STAFFING
c) EQUIPMENT
d) WEATHER
e) PLANNING
f) CASH FLOW
g) OTHERS
2 CONSTRAINTS OF THE ENGINEER /EMPLOYER (NHAI) NIL
Client : NATIONAL HIGHWAYS AUTHORITY OF INDIA10.10
O&M CONSTRAINTSConcessionaire : RAJAHMUNDRY EXPRESSWAY LTD.
NIL
Package : AP-15
Ref. No. JULY - 2016Job : Rajahmundry - Dharmavaram Road Project on NH-16
OPERATION AND MAINTENANCE REPORT JULY - 2016
Package: AP-15
From To From To
03.07.16 876.600 876.650 LHS 04.00AM 06.00AM 1Uncontrolled lorry hitmedian Metal Beam CrashBarrier due to driver slept.
05.50AM 10 Min Nil
Non-available chainage
SideNon-availabilityduration after
Police clearance
Effectivenon-
availabilityRemarks
Non-available timeNo.of non-available
lanesReason of non-availability
Police / Insuranceclearance time
(if any)
For the Month of :JULY - 2016
Client : National Highway Authority of IndiaConcessionaire : Rajahmundry Expressway Limited.Job : Rajahmundry - Dharmavaram Road Project NH 16
10.11 LANE NON-AVAILABILITY REPORT Independent Engineer : Sowil Limited
26.06.16 to 25.07.2016
Date
OPERATION AND MAINTENANCE REPORT JULY - 2016
Client : NATIONAL HIGHWAYS AUTHORITY OF INDIA
Concessionaire : RAJAHMUNDRY EXPRESSWAY LTD.
Job : Rajahmundry - Dharmavaram Road Project on NH-16
Vehicle Regn. No Wight ( MT) From To Tyres
26.06.16 to 25.07.2016
Package: AP-15
Independent Engineer :Sowil Limited
Details of oversize /overweight vehicle (Registration number Vehicle Owner Details, Size /Weight. Origin& Destination)
S.No
10.12 REPORT ON ABNORMAL INDIVISIBLE LOAD ROUTING(Overweight )
Time
For the Month of : JULY - 2016
Permissionavailability Action takenDate
NIL
OPERTATION AND MAINTENANCE REPORT JULY - 2016
FROM ToS.NO Date
ChainageSide Length mts
10TH YEAR PERIODIC MAINTENANCE WORKS COMPLETED
Remarks
Client : NATIONAL HIGHWAYS AUTHORITY OF INDIA
10.13 Cumulative Progress of10th Year Periodic Maintenance Independent Engineer : SOWiL LIMITEDConcessionaire : RAJAHMUNDRY EXPRESSWAY LTD.
Job : Rajahmundry - Dharmavaram Road Project on NH-16
Package: AP-15 Rajahmundry - Dharmavaram Road Project for AP-15 Package (Km.901.753 to 848.746 )
JULY-2016
Client : NATIONAL HIGHWAYS AUTHORITY OF INDIA
Concessionaire : RAJAHMUNDRY EXPRESSWAY LTD.
Job : Dharmavaram - Tuni Road Project on NH-16 For the Month of : JULY - 2016
Name of the PIU Name of the project,with chainage
Date ofcompletion
Agency forplantations, if notthe Concessionaie
Total no. of plantsto be planted on
the project stretch
No. of plantsplanted so far Survival percentage (%)
If not completed,tentative date of
completion
Action takenagainst any
default as perthe CA
Remarks
1 2 3 4 5 6 7 8 9 10
Rajahmundry
Rajahmundry -Dharmavaram RoadProject on NH -16
(From KM. 901.753TO.KM.848.746 )
20.09.2004 BOT(Annuity) NA 6850 6850
93 TheConcessionaire started toreplace dead plants from
01.07.2016 and replaced 206plants out of 685 dead /
missing.
31.07.2016 NILPlants
indicated areavenue plants.
Independent Engineer :Sowil Limited
Package: AP-15
10.14 Status of plantation in PPP projects
26.06.16 to 25.07.2016
OPERTATION AND MAINTENANCE REPORT JULY - 2016
Client : NATIONAL HIGHWAYS AUTHORITY OF INDIA
S.NO TYPE Package Missing Nos Start Pate End Date Remarks
1 AvenueRajahrmmdry Expressway Limited
Rajahmundry - Dharamavaram fromKm.901.753 to 848.746)
1761 25.06.16 31.07.16
2 MedianRajahnundry Expressway Limited
(Rajahmundry - Dharamavaram fromKm.901.753 to 848.746)
796 25.06.16 15.07.16
10.15 Status of Avenue& Median PlantationConcessionaire : RAJAHMUNDRY EXPRESSWAY LTD.
Job : Rajahmundry - Dharmavaram Road Project on NH-16
Package: AP-15
26.06.16 to 25.07.2016
Independent Engineer :Sowil Limited
OPERTATION AND MAINTENANCE REPORT JULY - 2016
NH-16, Rajahmundry- DharmavaramAP – 15 Package
OPERATION AND MAINTENANCE REPORT JULY- 2016
11.APPENDIX – “E”
Control of National Highways(Land & Traffic) Act 2002 (13 of 2003) -
Implementation
Annexure -1
S.No.Location
(Chainage) km tokm (LHS/RHS)
Area underUnauthorised
Occupation
Nature ofUnauthorised
Occupation
Name of UnauthorisedOccupants
Tentative Date ofUnauthorised
Occupation
Date of Detectionof Unauthorised
occupationDetected by whom Action taken
1 2 3 4 5 6 7 8 9
1 901.750(RHS) 25 (Sqm)Temporary Tachedhut for fruit shop
Cultivation land 03.07.16 04.07.16 Route patrolling team Removed
2 901.700(RHS) 35 (Sqm)Temporary Tachedhut for fruit shop
Cultivation land 03.07.16 04.07.16 Route patrolling team Removed
3 901.670(RHS) 28 (Sqm)Temporary Tachedhut for fruit shop
Cultivation land 08.07.16 09.07.16 Route patrolling team Removed
4 901.500(RHS) 10 (Sqm)Temporary Tachedhut for fruit shop
Cultivation land 10.07.16 11.07.16 Route patrolling team Removed
5 901.650(LHS) 25 (Sqm)Temporary Tachedhut for fruit shop
Cultivation land 10.07.16 11.07.16 Route patrolling team Removed
6 901.730(LHS) 20 (Sqm)Temporary Tachedhut for fruit shop
Cultivation land 15.07.16 16.07.16 Route patrolling team Removed
7 863.160(LHS) 15 (Sqm) Temporary Pan shop Cultivation land 18.07.16 19.07.16 Route patrolling team Removed
8 863.200(RHS) 30 (Sqm) Temporary fruit shop Cultivation land 18.07.16 19.07.16 Route patrolling team Removed
MONTHLY REPORT OF IE/SC/ AE ON UNAUTHORISED OCCUPATION ON NH LAND
Report for the month of: July'16
NH No.16 (Project Name) : Rajahmundry Expressway Ltd
STATE / UT : Andhra Pradesh
PIU : Rajahmundry
Name of IE/SC/AE: Sowil Limited
OPERATION AND MAINTENANCE
S. No.Location
(Chainage) km tokm (LHS/RHS)
Area underUnauthorised
OccupationName of Unauthorised Occupants
Date of first timedetection of
unauthorisedoccupation
Detectedby whom
Dates of noticeissued u/s 26(2)
of the Act
Dates ofhearings
Date of orderfor removal of
theunauthorised
occupation
Date of removal ofunauthorised
occupationRemarks
1 2 3 4 5 6 7 8 9 10 11
1 901.750(RHS) 25 (Sqm) Tached hut for fruit shop,Diwanchervu Removed
2 901.700(RHS) 35 (Sqm) Tached hut for fruit shop,Diwanchervu Removed
3 901.670(RHS) 28 (Sqm) Tached hut for fruit shop,Diwanchervu Removed
4 901.500(RHS) 10 (Sqm) Tached hut for fruit shop,Diwanchervu Removed
5 901.650(LHS) 25 (Sqm) Tached hut for fruit shop,Diwanchervu Removed
6 901.730(LHS) 20 (Sqm) Tached hut for fruit shop,Diwanchervu Removed
7 863.160(LHS) 15 (Sqm) Pan shop,Yerravaram Removed
8 863.200(RHS) 30 (Sqm) fruit shop,Yerravaram Removed
Annexure - II
PIU : Rajahmundry
REGISTER FOR RECORD OF REMOVAL OF UNAUTHORISED OCCUPATION
Name of IE / SC /AE : Sowil Limited Report for the month of : July'16
NH No.16 (Project Name) : Rajahmundry Expressway Ltd
STATE / UT : Andhra Pradesh
OPERATION AND MAINTENANCE
Regularised Removed Total
1 2 3 4 5 6 7 8 9 10 11 12 13 14
1Rajahmundry
Expressway Ltd
Annexure - IIIMONTHLY REPORT TO BE SUBMITTED BY PD IN REGARD TO UNAUTHORISED OCCUPATION
Name of IE / SC /AE : Sowil Limited Report for the month of : July'16
NH No.16 (Project Name) : Rajahmundry Expressway Ltd
STATE / UT : Andhra Pradesh
PIU : Rajahmundry
RemarksPending upto the
previousmonth
Detectedduring the
month
Total cases of un-authorised
occupation up tothe current
month
Pending atthe end of
month(Total)
Pending forless than 6
months
Pendingfrom 6 to 12
months
Pendingfrom 1 to 2
years
Pending formore than 2
years
S.NO Project Name
Cases of unauthorised occupationCases of unauthorised occupationand disposed off during the month
Cases pending
OPERATION AND MAINTENANCE
Annexure - IV
S.NOLocation
(Chainage) km tokm (LHS/RHS)
Area underUnauthorised Access
Nature of Unauthorised AccessName of person
whose occupationis Unauthorised
Tentative Date ofUnauthorised
Access
Date ofDetection of
UnauthorisedAccess
Detected bywhom
Action taken
1 2 3 4 5 6 7 8 9
1 851.300(RHS) 10 (Sqm) Temporary road connection to NH Cultivation land 28.06.16 29.06.16Route patrolling
teamRemoved
2 882.600(LHS) 20 (Sqm) Temporary road connection to NH Cultivation land 05.07.16 06.07.16Route patrolling
teamRemoved
3 884.850(RHS) 10 (Sqm) Temporary road connection to NH Cultivation land 11.07.16 12.07.16Route patrolling
teamRemoved
4 890.400(LHS) 15 (Sqm) Temporary road connection to NH Cultivation land 13.07.16 14.07.16Route patrolling
teamRemoved
5 894.750(RHS) 18 (Sqm) Temporary road connection to NH Cultivation land 16.07.16 17.07.16Route patrolling
teamRemoved
6 897.400(RHS) 23 (Sqm) Temporary road connection to NH Cultivation land 18.07.16 19.07.16Route patrolling
teamRemoved
MONTHLY REPORT OF IE/SC/ AE ON UNAUTHORISED ACCESS ON NH LAND
NH No.16 (Project Name) : Rajahmundry Expressway Ltd
STATE / UT : Andhra Pradesh
PIU : Rajahmundry
Name of IE/SC/AE: Sowil Limited Report for the month of: July'16
OPERATION AND MAINTENANCE
S.NOLocation
(Chainage) km tokm (LHS/RHS)
Area underUnauthorised
Access
Name ofUnauthorised
Occupants
Date of firsttime detection
of UnauthorisedAccess
Detected bywhom
Date of Noticeissued u/s
29(4) of theAct
Date ofhearings
Date of order forremoval of theUnauthorised
Access
Date of removalUnauthorised
AccessRemarks
1 2 3 4 5 6 7 8 9 10 11
1 851.300(RHS) 10(Sqm) Cultivation land Removed
2 882.600(LHS) 20(Sqm) Cultivation land Removed
3 884.850(RHS) 10 (Sqm) Cultivation land Removed
4 890.400(LHS) 15 (Sqm) Cultivation land Removed
5 894.750(RHS) 18 (Sqm) Cultivation land Removed
6 897.400(RHS) 23 (Sqm) Cultivation land Removed
PIU : Rajahmundry
Annexure - VREGISTER FOR RECORD OF REMOVAL OF UNAUTHORISED ACCESS
Name of IE / SC /AE : Sowil Limited Report for the month of : July'16
NH No. 16 (Project Name) : Rajahmundry Expressway Ltd
STATE / UT : Andhra Pradesh
OPERATION AND MAINTENANCE
Regularised Removed Total
1 2 3 4 5 6 7 8 9 10 ii 12 13 14
1Rajahmundry
Expressway Ltd
PIU : Rajahmundry
Annexure - VIMONTHLY REPORT TO BE SUBMITTED BY PD IN REGARD TO UNAUTHORISED ACCESS
Name of IE / SC /AE : Sowil Limited Report for the month of : July'16
NH No. 16 (Project Name) : Rajahmundry Expressway Ltd
STATE / UT : Andhra Pradesh
RemarksPending up
to thepreviousmonth
Detectedduring the
month
Total cases of Un-authorised Access upto the current month
Pending atthe end of
month(Total)
Pending forless than 6
months
Pendingfrom 6 to
12 months
Pendingfrom 1 to 2
years
Pending formore than
2 years
Project NameS.NO
Cases of Unauthorised AccessCases of Un-authorised Access and
disposed off during the month
Cases pending
OPERATION AND MAINTENANCE
S. No.Location (Chainage)km to km (LHS/RHS)
Area underunauthorisedOccupation /
Access
Name of unauthorisedoccupants / person
whose access isunauthorised
Date of Removal ofUnauthorised Occupation/
Access
Date of Re-occupation reportedby IE/SC/AE
1 2 3 4 5 6
1 851.300(RHS) 100(Sqm) Dharmavaram Month of July 2016
2 882.600(LHS) 80 (Sqm) Mallepalli Month of July 2016
3 884.850(RHS) 130 (Sqm) Gandepalli Month of July 2016
4 890.400(LHS) 40 (Sqm) Murari Month of July 2016
5 894.750(RHS) 150 (Sqm) Rajanagaram Month of July 2016
6 897.400(RHS) 100 (Sqm) Rajanagaram Month of July 2016
No REOCCUPATION / ACCESS
PIU : Rajahmundry
Annexure - VII
MONTHLY REPORT OF IE/SC/ AE IN REGARD TO REOCCUPATION / ACCESS OF NATIONAL HIGHWAYS
Name of IE/SC/AE: Sowil Limited Report for the month of: July'16
NH No. 16 (Project Name) : Rajahmundry Expressway Ltd
STATE / UT : Andhra Pradesh
OPERATION AND MAINTENANCE
S.NODate of judicial complaint
submitted by PD to HighwayAdministration u/s 39
Date of approval ofjudicial complaint by
Highway Administration
Date of submission ofjudicial complaint in the
Court
Court where the judicialcomplaint has been
lodgedName of Advocate
Details ofsubmission of
hearingsFinal Outcome
1 2 3 4 5 6 7 8
PIU : Rajahmundry
Annexure - VIII
REGISTER FOR RECORD OF REOCCUPATION OF NATIONAL HIGHWAYS LANDName of IE/SC/AE: Sowil Limited Report for the month of: July'16
NH No.16 (Project Name) : Rajahmundry Expressway Ltd
STATE / UT : Andhra Pradesh
OPERATION AND MAINTENANCE
S.No Project NameJudicial complaintspending up to theprevious MONTH
Judicialcomplaints
lodged duringcurrent month
Judicial complaintsavailable for
disposal up to thecurrent month
Judicialcomplaints
disposed offduring the
current month
Judicialcomplaints
pending at theend of currentmonth (Total)
Pending formore than 6
months
Pending from 6to 12 months
Pending morethan for 1 year
Pending formore than 2
years
1 2 3 4 5 6 7 8 9 10 11
1Rajahmundry
Expressway Ltd
STATE / UT : Andhra Pradesh
PIU : Rajahmundry
Annexure - IX
REGISTER FOR RECORD OF REOCCUPATION OF NATIONAL HIGHWAY LANDName of IE/SC/AE: Sowil Limited Report for the month of: July'16
NH No.16 (Project Name) : Rajahmundry Expressway Ltd
OPERATION AND MAINTENANCE
NH-16,Rajahmundry to DharmavaramAP-15 Package
OPERATION AND MAINTENANCE REPORT JULY - 2016
12. PHOTOGRAPHS
RAJAHMUNDRY-DHARMAVARAM ROAD PROJECT FOR AP-15 PACKAGE
OPERATION AND MAINTENANCE REPORT JULY- 2016
DEAD/DECEASED PLANTS REPLACEMENT
RANK VEGETATION CUTTING-IN PROGRESS
HOARDINGS REMOVING ON THE CORRIDOR
RAJAHMUNDRY-DHARMAVARAM ROAD PROJECT FOR AP-15 PACKAGE
OPERATION AND MAINTENANCE REPORT JULY- 2016
REPLACEMENT OF DAMAGED METAL BEAM CRASH BARRIERS-IN PROGRESS
REPLACEMENT OF DAMAGED ELECTRICAL POLES AT 881
INJURED PERSON SHIFTED TO HOSPITAL BY AMBULANCE