    ASPROFOS ENGINEERING S.A.

    OFFSHORE SECTION OF STEFANIALIVERI

    PIPELINE

    Construction Supervision Overview

  • 8/11/2019 Offshore Presentation for BJ1

    2/22

    Project Overview

    Installation of a N.G.H.P Offshore Pipeline

    with the purpose to supply natural gas to

    Evia island and a Power Plant in Aliveri.

    Size of the pipeline :20

    Total length of the Pipeline approximately

    14.2 km

    Maximum water depth along the pipeline

    route: 70m.

    Offshore pipeline was consist of two offshore

    sections, joined together offshore by Above

    Water Tie In method.

    2

  • 8/11/2019 Offshore Presentation for BJ1

    3/22

    3

    Pipeline Route Layout

    Varnavas

    Landfall

    KaravosLandfall

    AWTI

  • 8/11/2019 Offshore Presentation for BJ1

    4/22

  • 8/11/2019 Offshore Presentation for BJ1

    5/22

  • 8/11/2019 Offshore Presentation for BJ1

    6/22

    The Team

    The Team was divided into two (2) sub teams.

    The Supervising Engineering Team (Field):

    Site Construction Supervision Head

    Site Offshore Pipeline Supervising Engineer

    Site Shore Approach Supervising Engineer

    Site Engineer

    Management/Review /Support Team (Head Offices):

    Project Management

    Pipeline Specialists

    6

  • 8/11/2019 Offshore Presentation for BJ1

    7/22

    Main Documents Review

    Project Management Documents: Project Overview Manual, Quality Manuals, Project Control Docs, Projects HSE Docs etc

    Design Engineering Documents:

    PIPELINE ON BOTTOM STABILITY ANALYSIS

    PIPELINE FREE SPAN ANALYSIS

    CATHODIC PROTECTION PHILOSOPHY AND DETAILED DESIGN REPORT

    PIPELINE PROTECTION DESIGN

    TECHNICAL SPECIFICATION FOR SACRIFITIAL ANODES

    GEOTECHNICAL CROSS SECTIONS

    VESSEL POSITIONING PROCEDURE

    SURVEY REPORT & CHARTS (PRE LAYAS LAID)

    FLOODING, CLEANING, GAUGING AND HYDROTESTING PROCEDURE

    PIPELINE ABOVE WATER TIE IN MANUAL

    7

  • 8/11/2019 Offshore Presentation for BJ1

    8/22

    Main Documents Review

    Design Engineering Documents: SHORE APPROACH METHOD

    START-UP MOORING ARRANGEMENT

    SHORE PULL SEQUENCE

    PIPELINE AWTI SEQUENCE

    PIPES TRANSPORTATION (METHODS)

    PRE-LAY SURVEY CHARTS FOR ANCHOR CORRIDOR

    GEOTECHNICAL STUDY FOR THE TRENCH DREDGING AND BACKFILL

    PRE-LAY SURVEY AT LANDFALLS

    TRENCHING AND BACKFILLING MANUAL

    WAVE PREDICTION STUDY

    WAVE PREDICTION STUDY AT LANDFALL POINTS

    WELDING COATING PROCEDURE

    8

  • 8/11/2019 Offshore Presentation for BJ1

    9/22

    9

    Main Field Activities Sequence

    Pipe/Material/Equipment Deliverance.

    Installation of Anchors and Concrete Blocks.

    Dredging Activities Mooring Activities

    Welding/Sandblasting/Coating Activities

    Shore Pull Activities

    Normal Pipe Laying

    AWTI

    Backfilling/Wave Protection/ Reinstatement

  • 8/11/2019 Offshore Presentation for BJ1

    10/22

    10

    Main Field Activities

    1. Pipe/Material/Equipment Deliverance.

  • 8/11/2019 Offshore Presentation for BJ1

    11/22

    11

    Main Field Activities

    2. Anchoring - Mooring.

  • 8/11/2019 Offshore Presentation for BJ1

    12/22

    12

    Main Field Activities

    3. Dredging Activities

  • 8/11/2019 Offshore Presentation for BJ1

    13/22

    13

    Main Field ActivitiesTrench Long. Profile

  • 8/11/2019 Offshore Presentation for BJ1

    14/22

    4. Welding/Sandblasting/Coating Activities

    14

    Main Field Activities

  • 8/11/2019 Offshore Presentation for BJ1

    15/22

  • 8/11/2019 Offshore Presentation for BJ1

    16/22

  • 8/11/2019 Offshore Presentation for BJ1

    17/22

    17

    Main Field Activities

    6. Normal Pipe Laying

  • 8/11/2019 Offshore Presentation for BJ1

    18/22

    18

    Main Field Activities

    7. AWTI

  • 8/11/2019 Offshore Presentation for BJ1

    19/22

  • 8/11/2019 Offshore Presentation for BJ1

    20/22

    20

    Main Field Activities

    8. Backfilling/Wave Protection/ Reinstatement

  • 8/11/2019 Offshore Presentation for BJ1

    21/22

    21

    Wave Protection Design

  • 8/11/2019 Offshore Presentation for BJ1

    22/22

    22

    284, EL. VENIZELOU str. GR-176 75 KALLITHEAATHENS, GREECE

    Tel.: +302109491600

    Fax: +302109491610

    http://www.asprofos.gr

    THANK YOU FOR YOUR ATTENTION!

    22