VALIDATION
of the EXTRACTIVE INDUSTRIES
TRANSPARENCY INITIATIVE IN ALBANIA
August 2011
APPENDICES to the REPORT
Prepared by Hart Nurse Ltd
INDEX OF APPENDICES
APPENDIX 1 List of Respondents
APPENDIX 2 Company self assessment questionnaires
APPENDIX 3 Draft Work Plan (revised June 2011)
APPENDIX 4 Order No 71 of the Prime Minister dated 21st July 2011
Index of nominated members
APPENDIX 5 Draft terms of reference and rules of procedure for ALBEITI Working Group
APPENDIX 6 Minutes and attendance list for the meeting of the Working Group on 4th May 2011, approving the 2009 Reconciliation report
Report to the Albania EITI Working Group Validation of the Implementation of EITI in Albania
HN/425 30th August 2011
Page 1 of 56
APPENDIX 1 – LIST OF RESPONDENTS
Person Interviewed Organisation Neritan Alibali* Deputy Minister, METE
Prof. Sokol Mati* METE
Bujar Rami* General Directorate of taxes
Prof. Edmond Goskolli* AKBN
Veronka Korkaj* Ministry of Finance
Denada Kociaj* Ministry of Justice
Oltion Kuke* General Directorate of Customs
Ylber Bezo Director of Accounting & Audit, Ministry of Finance
Shkelqim Hysaj Chairman of ALBEITI Secretariat
Agim Shehu Coordinator, ALBEITI Secretariat
Albert Brokaj Coordinator, ALBEITI Secretariat
Alexander Seneli AlbPetrol
Vjolca Selimag AlbPetrol
Perparim Alikaj* Foreign Investors Association of Albania
Jonathan Richards Tirex Resources Ltd
Dr Zeki Kaya Kurum Holding
Nazmi Kumanova Beralb SH.A.
Medat Zogu ACR
Suleiman Alia ACR
Arian Tartari Stream Oil and Gas Ltd
Ardit Kero Bankers Petroleum Ltd
Patrick Pascal Selenice Bitumi SH.A.
Ilr Aliaj* Centre for Development and Democritisation of Institutions
Anila Hajnaj Albanian Center for Development and Integration
Sami Nezaj Center for Transparency and Information
Altim Goxhaj Consumer Protection Office
Kliton Zguri Access Albania
Emin Saraçi Albanian Life Quality Union
Engell Çakçiri Albanian Centre for International Law
* Member of the ALBEITI Working Group at the time of the validation visit.
Report to the Albania EITI Working Group Validation of the Implementation of EITI in Albania
HN/425 30th August 2011
Page 2 of 56
APPENDIX 2 – COMPANY SELF ASSESSMENT QUESTIONNAIRES
Company self assessment questionnaires were returned by the companies listed below and are appended here in this order:
• Albania Chrome (ACR) • Alba-Co • Albanisa Krypi • Alba Canaj • Alfa Nikel • Ateani • Bankers Petroleum • Ber-Alb • Bledi • Geri-Trevi • Herbi • Heronjte Bater • IEC Visoka • Klosi • Koka • Mineral Tadri • Petromanas Albania • RAL • Shkembi • Tirex Explorations • Xhireton
Company self assessment questionnaires were sent to the following companies:-
ALBANIAN -CHROME shpk ALB -CANAJ shpk ALBA - CO shpk Albanisa Krypi shpk ALFA NIKEL shpk ATEANI shpk Balkan Resourses
BankersPetrolium Albania BERALBA shpk BESJANA shpk
Report to the Albania EITI Working Group Validation of the Implementation of EITI in Albania
HN/425 30th August 2011
Page 3 of 56
BLEDI shpk
Capricorn Albania Ltd Dollar Oil shpk Egi-K shpk Empire Mining (Albania) shpk Fab. Pas. Kromit Bulqize shpk Gentari shpk Geri's 2002 shpk GERI-TREVI shpk Global Interprise Group shpk HERBI shpk
IEC Visoka Isaku shpk
Island International Eksploratoin IVNO 1100 Shpk Jab Resources shpk K-12 shpk Klervibris shpk KLOSI shpk KOKA shpk L.B.M - LLC shpk
ManasAdriatic NELI shpk Prodhime Karbonike sha RAL shpk
Sherwood International SHKALLA shpk SHKEMBI shpk
SKY Petroleum Streampetroleum LTD TADRI shpk Tirex Resourses XHIRETON shpk YLBERI shpk YZO shpk ZGURI shpk
Report to the Albania EITI Working Group Validation of the Implementation of EITI in Albania
HN/425 30th August 2011
Page 4 of 56
€0F,?pAr{y: 4tn Atu rfl ru cuRaHf juo.ru*u*n A L sANr tn .
Mark indicators belowwhh a #
1, HastheHas the company made
ffv., [ *,public statements in support of the ElTl process in this country?
No
2' Hasthecompanyrommittedtosupportandcooperatewithimplementat ionoftheCountryElTlWorkplan(asagreedby the multi-stakeholder group), including abiding by government ElTl+elated directives (e.g.laws and Mous) and,where appropriate, meeting with stakeholders?
pJ v"' [ * o
3' Have all material payrnents been disclosed to the organisation contracted to reconcile figures and produce theElTl Report as per agreed ElTl reporting templates and pursuant to agreed timelines?
M t ' [ * o
the data that was submitted to the organisation contracted to reconcile figures and produce the ElTl Reportn from accounts independently audited to international standards?
Yes [_l ruo
5' Has the company responded to queries from the organisation contracted to reconcile figures and produce theElTl Report to assist in the reconciliation of country payments with government receipts in accordance w1h ElTlreporting templates?JlvJ Yes U ruo
FJarrative opinionslf any indicators above are marked ,,No,i please provide an explanation:
Wastake
V
4
Any othel comments:
Report to the Albania EITI Working Group Validation of the Implementation of EITI in Albania
HN/425 30th August 2011
Page 5 of 56
coMpANy: n pfu _c_.ocouNrRY: ,$r;P"^ 6", t-yt-g/
Mark indicators below with a y'
l ' Has the company made public statements in support of the ElTl process in this country?i--l-rr
[_V Yes l_] r'ro
2' HasthecompanycommittedtosupportandcooperatewithimplementationoftheCountryElTlWorkplan{asagreedby the multi-stakeholder group), including abiding by governmenr ElTl-related directives (e.g.laws and Mous) and,where appropriate, meeting with stakeholders?
P v", fl *o
3' Have all material payments been disclosed to the organisation contracted to reconcile figures and produce theElrl Report as per agreed Elrl reporting templates and pursuant to agreed timelines?
@ v.t D * o4' Was the data that was submitted to the organisation contracted to reconcile figures and produce the ElTl Report
taken from accounts independently audited to international standards?
[ * o
5' Has the company responded to queries from the organisation contracted to reconcile figures and produce theElrl Reportto assist in the reconciliation of country payments with government receipts in accordance with Elrlreporting templates?,=A[_YJ yes LJ No
Any other comments:
Report to the Albania EITI Working Group Validation of the Implementation of EITI in Albania
HN/425 30th August 2011
Page 6 of 56
t l - ^ ^coMpANV: ' \u?"r\ \\\ 5 F. KtL\ P I couurny: €.tfl i za
. \ - . * . r ' I I t v v f r r t r r r l :
\
Mark indicators below with a y'
I . Has the company made public statements in support of the ElTl process in this country?
ffi v"s f * o
2' Has the company committed to support and cooperate with implementation of the CountryElTl Work plan (as agreedby the multi-stakeholder group), including abiding by government ElTl-related directives (e.g.laws and MoUs) and,where appropriate, meeting with stakeholders?
ffi t", I * o
3' l-lave all material payments been disclosed to the organisation contracted to reconcile figures and produce theElrl Report as per agreed Elrl reporting templates and pursuant to agreed timelines?pf v.' f * o
4' Was the data that was submitted to the organisation contracted to reconcile figures and produce the ElTl Reporttaken from accounts independently audited to international standards?
Yes I *o
5' Has the cornpany responded to queries fiom the organisation contracted to reconcile figures and produce theElTl Reportto assist in the reconcillation of country payments with government receipts in accordance with Elrlreporting templates?
ffir., [ *o €,ru*e (uNarrative opinionslf any indicators above are marked,,Nol please provide an
Any other comments:
Report to the Albania EITI Working Group Validation of the Implementation of EITI in Albania
HN/425 30th August 2011
Page 7 of 56
COMPANY:
Mark indicators belowwith a y'
l . Hasthe
COUNTRY:
public statements in support of the ElTl process in this country?
No
Has the company committed to support and cooperate with implementation of the country ElT| Work plan (as agreedby the multi-stakeholder group), including abiding by government ElrFrelated directives (e.g.laws and Mous) and,where appropriate, meeting with stakeholders?
ly! Yes LJ no
Have all matelial payments been disclosed to the organisation contracted to reconcile figures and produce theElrl Report as per agreed Elrl reporting templates and pursuant to agreed timelines?
Yes [ *o
was the data that was submitted to the organisation contracted to reconcile figures and produce the ElTl Reporttaken from accounts independently audited to international standards?
fl *o
5' Has the company responded to queries from the organisation contracted to reconcile figures and produce theElTl Report to assist in the reconcillation of country payments with government receipts in accordance with Elrlreporting templates?
Has the company made
HJ Y"s U tt,
Narative
Any other comments:
Report to the Albania EITI Working Group Validation of the Implementation of EITI in Albania
HN/425 30th August 2011
Page 8 of 56
Report to the Albania EITI Working Group Validation of the Implementation of EITI in Albania
HN/425 30th August 2011
Page 9 of 56
coMPANy: #4**^' ffi, | ,1,
COUI{TRY!
s0{v{3
l . Hasthe public statements in support of the ElTl process in this country?
Has the company committed to support and cooperate with implementation of the Country ElTl Work plan (as igreedby the multi-stakeholder group), including abiding by government ElTl-related directives (e.g.laws and Mous) and,where appropriate, meeting with stakeholders?
pl vu' I t o
3' Have all material payments been disclosed to the organisation contracted to reconcile figures and produce theElrl Report as per agreed ElTl reporting templates and pursuant to agreed timelines?p v.t f * o
4' Was the data that was submitted to the organisation contracted to reconcile figures and produce the ElTl Reporttaken from accounts independently audited to international standards?pl ves fJ *o
5' Has the company responded to queries from the organisation contracted to reconcile figures and produce theElTl Reponto assist in the reconciliation of country payments with government receipts in accordance with ElTlreporting templates?
@ v . , [ * o
provide an explanation:
6*td &u(yik/
Mark indicators below with a y'
t'las the company made--
[2[ Yes LJ nro
;;9
Any other comments:
Report to the Albania EITI Working Group Validation of the Implementation of EITI in Albania
HN/425 30th August 2011
Page 10 of 56
Report to the Albania EITI Working Group Validation of the Implementation of EITI in Albania
HN/425 30th August 2011
Page 11 of 56
l'. Has the company made
[ f , f y e s l l r v o
coifPA*y;'A *TZA-LD s4 A cou*r*y!M,t tt 'oao .ll,;;iLr1 e Fqbn r q p/r4,.4.-et
Mark indlcators belowwith a y'
public statements in support of the ElTt process in this country?
a
2' Has the company committed to support and cooperate with implementation of the country Eln work plan (as agreedby the multi-stakeholder group), including abiding by government EfTl-related directives {e.g.laws and Mous) and,where appropriate, rneeting with stakeholders?
fl *o3' Have all material payments been disclosed to the organisation contracted to reconcile figures and produce theElrt Report as per agreed ErTr reporting temprates arid orrrr."ii" riiuua ri,'n*t,nuriri-n
1}J yes LJ wo
4' Was the data that was submitted to the organisation contracted to reconcile figures and produce the ElTl Reporttaken from accounts independently auUitea to international standards?
I v " , N * o5. Has the company responded to queries from the organisation contracted to reconcile figures and produce theElrl Repon to assist in the rconciliation of country;;il;; ffin*ln*.n, receipts in accordance w*h ErTrreporting templates?
[X Y.' LJ ruo
l{aratin* opinionslf any indicators above are marked,Noi please provide an explanation:
*-",1,1,,+1 rq *tb* wi a Wtr \rol--lvr\gl&tq-P-D ^€(p g{"ar-rcf a {f
q ccor{ r^F +o\
R AUTSHA
E* ALg
Report to the Albania EITI Working Group Validation of the Implementation of EITI in Albania
HN/425 30th August 2011
Page 12 of 56
COMPANY: COUNTRY:
Mark indicators below with a y'
1 . Has the company made public statements in support of the ElTl process in this country?
Q vut I * o
2' Has the company committed to support and cooperate with implementation of the Country ElTlWork plan (as agreedby the multi-stakeholder group), including abiding by government E|I-related directives {e.g.laws and Mous) and,where appropriate, meeting with stakeholders?
@ v"' fl *o
3' Have all material payments been disclosed to the organisation contracted to reconcile figures and produce theElrl Report as per agreed Elrl reporting templates and pursuant to agreed timelines?
@ v.' [ * o
4' Was the data that was submitted to the organisation contracted to reconcile figures and produce the ElTl Reporttaken from accounts independently audited to international standards?
@ v"t [ * o
5' Has the company responded to queries from the organisation contracted to reconcile figures and produce theElTl Reponto assist in the reconciliation of country payments with government receipts in accordance with ElTlreporting templates?
@! ves [ * o
n' 8L € Azu JH?-t
.E gpaa
Narrative opinionslf any indicators above are marked"Nol please provide an
Any other comments:
-E$PqFr
Report to the Albania EITI Working Group Validation of the Implementation of EITI in Albania
HN/425 30th August 2011
Page 13 of 56
COMPANY;
Mark indicators belowwith a y'
COUNTRY!
l . company made public statements in support of the EITI process in this country?
[ * o
2' Has the company committed to support and cooperate with implementation of the Country ElTtWork plan (as agreedby the multi-stakeholder group), including abiding by government E|T-related directives (e.g.laws and Mous) and,where appropriate, meeting with stakeholders?
pf v.' [ * o
3' Have all material payments been disclosed to the organisation contracted to reconcile figures and produce theElrl Report as per agreed Elrl reporting templates and pursuant to agreed timelines?,_J[ . 1 2 ] Y e s L l r u o
4' Was the data that was submitted to the organisation contracted to reconcile figures and produce the ElTl Reporttaken from accounts independently audited to international standards?
5' Has the company responded to queries from the organisation contracted to reconcile figures and produce theElTl Reportto assist in the reconciliation of country payments with government receipts in accordance w1h ElTlreporting templates? t1 n €al -rr€ e \/l " 3 t'/37a
No L7@ v", D
4 a,n 8 i 1 4 1 9 u q 4
Narrative opinionslf any indicators above are marked"Nol prease provide fn expranation:
Any other comments:
Has the r
d ,o
NoYes
Report to the Albania EITI Working Group Validation of the Implementation of EITI in Albania
HN/425 30th August 2011
Page 14 of 56
COMPAMf:
Mark indicators below with a y'
COUNTRY:
1 Has
ffithe company made public statements in support of the ElTl process in this country?
Has the company committed to support and cooperate with implementation of the country ElTl work Plan (as agreed
by the multi-stakeholder group), including abiding by government ElTl-related directives (e'g'laws and Mous) and'
whTre appropriate, meeting with stakeholders?
f , v u ' I * o
Have all material payments been disclosed to the organisation contracted to reconcile figures and produce the
ElTl Report as per agreed ElTl reporting templates and pursuant to agreed timelines?
r-l--{
[!] Yes LJ No
Was the data that was submitted to the organisation contracted to reconcile figures and produce the ElTl Report
taken from accounts independently audited to international standards?
li/ ves LJ no
Has the company responded to queries from the organisation contracted to reconcile figures and produce the
ElTl Report to assist in the reconcillatlon of country payments with government receipts in accordance wlth ElTl
reporting templates?
f f i v . ' I *o
No
Narrative opinions
lf any indicators above are marked'No", please provide an explanation:
tuho fr,uM-ffis*t {.JrElEtr t*
alr6D
Report to the Albania EITI Working Group Validation of the Implementation of EITI in Albania
HN/425 30th August 2011
Page 15 of 56
COMPANY:
Mark indicators below with a y'
COUNTRY:
2' Has the company committed to support and cooperate with implementation of the Country ElTlWork plan (as agreedby the multi-stakeholder group), including abiding by government ElTl-related directives (e.g.laws and Mous) and,where appropriate, meeting with stakeholders?
f v", I * o
3' Have all rnaterial payments been disclosed to the organisation contracted to reconcile figures and produce theElrl Report as per agreed Elrl reporting templates and pursuant to agreed timelines?
Yes f t o
Was the data that was submitted to the organisation contracted to reconcile figures and produce the ElTl Reporttaken from accounts independently audited to international standards?Il.1ZJ Yes LJ Ho
Has the company responded to queries from the organisation contracted to reconcile figures and produce theElTl Report to assist in the reconciliation of country payments with government receipts in accordance w1h ElTl
1' Has the company made public statements in suppon of the ElTl process in this country?---'F1
ffi ves LJ wo
reporting templates?
ffiv", II{arrative #lf any indicators
K,^,WAny other comments:
Report to the Albania EITI Working Group Validation of the Implementation of EITI in Albania
HN/425 30th August 2011
Page 16 of 56
{ffiStr.s"4.N'f: {*}"FST|t}"r
k*rlr irdir*tnrs brl*,r+ r.vkh a M
L i"l*r tilr:,:*r?irFa*-r*?risi:i*pi;*iir st*tsi*sntx it-r suppol-l af fhs tll'l pr$(*:s in tiris r*r.:lrir:,,1r - -1 : ; :j i Ypi : i . / i r ' . . ie( --i rY-j ' '
2. lh : th tCCrnp: r1 i i . : r rm i l f t ; J t * i t rn1 ' t r1 an< i { * '3per " t i r , " : r ' i t i r y l : re , , t :n i r l ionc i t i t ( . { { ; , r i r l r l i l l i } ln / * rk l r iA l {A iagr*e*
l-ry tht lrrr lr i stairthclt : 'sr {}r$ripj, i r i ( iud;*g ahiding i ly Etveri , f fre*r I t ' f i -r* lalrd tJir*; t i .r i ; (e"l l iarn,s *rrC MrUsi arrd,
rrrl ier* apprc pii atc, rleetii', g r.- i tn :la keho ide i r ?
[j v*o i:il run
3. fl*v* xll mfrtsridl tlaF**t1$ h*s* dllsl*ssd i* the r:rgrarris*li*ri rcnlr.*rierJ t+ r*;*ncil* t1,*llir*r and ,:r*el,"i{f lirr[1ft il*psrl ;u per*1;ete.cl f-ii ! repq*iftg ferpl;1e.5 s$1{ }:1r]f$r:rfrrrt t* *,j}r*cd yinr*lin*lJa - :
I iYes l. ' ,r ; r,r*
\\r.*l {h'": d,it,i lhst '"{c5 submltt*d fs th{ or$&nisati$ri t*r..trxird afi ycir:n{ils f:lg*r*s *r:* ;:r*eiur* the f;iT} ficparitaken frcn arisufits ir:CccerJerrtly aurjit*d t* i l ' l trrnati*nsl standards ja I i - . ' f
I J Y * r l i , / J r a
$' l ; ts rhs trrf l f ,*ary re spitnicd tc qt: lr i*s i :sor {hr *rg*nisa;i . :n rwlracfei j {s fecoitr i lc f ;guinr ani i pr$, jr j{r t i l rt tTi f ; ;pln t* a:si: t in lh* rEr*l 'c i l iel i0n,:f t0i- ini ty t jAyr]] f nis rvi i l r $C:,, ,ernrt:ert i |*celt t5 i i i f iC(srCit i lcewith l i i jni)0rt ii].' tenrpi*lesl
{ - * _ i i _ _ - }
i j * ' i { J r u
S*rre*ive xpi*i**sll;xy indir*t*rs *b*v* ;tru nark{d"fda-, ple*r* pr*vidr an rx*i**ati*n:
4,
5 "
i tx,';*, '?J,"*-;* *__ F* .r -
;,;T-- #il;t; ';:;-* ;;;;;-; b- *- :
IJu-* , .* . f , / ru { ,* r , " : ,pt ' ) " , { rg ' l ** ' ' *
** :#r lg" iI l " - ' / ' - - i
Any cther esnff i*nfs:
IIIl
I:
Report to the Albania EITI Working Group Validation of the Implementation of EITI in Albania
HN/425 30th August 2011
Page 17 of 56
COUiITRY;COMPANY:
Mark indicators below with a y'
1 Hasthe company made public statements in support of the ElTl process in this country?
fJ ves l_J No
Has the company committed to support and cooperate with implementation of the Country ElTlWork Plan {as agreed
by the multi-stakeholder group), including abiding by government ElTl-related directives (e'g'laws and MoUs) and'
where appropriate, meeting with stakeholders?
I v . ' [ * o
Have all material payments been disclosed to the organisation contncted to reconcile figures and produce the
ElTl Report as per agreed ElTl reporting templates and pursuant to agreed timelines?
[ * o
Was the data that was submitted to the organisation contracted 1o reconcile figures and produce the ElTl Report
taken from accounts independently audited to international standatds?
Has the company responded to queries from the organisation contracted to reconcile figures and produce the
ElTl Report to assist in the reconcillation of country payments with government receipts in accordance with ElTl
reportlng templates?
pJ v.' E *o
Narrative opinions
lf any indicators above are marked'No', please provide an explanationl
Yes [ *o
II
!
i
7,1." ".i\7- . t -1n1r5- " . . \
t i l r 0 l r ' i 'fiq z;[ kt$r-,'
Report to the Albania EITI Working Group Validation of the Implementation of EITI in Albania
HN/425 30th August 2011
Page 18 of 56
COMPANY:
Mark indicators below with a y'
L HastheHas the company made_J
[gJ ves LJ ruo
COUNTRY:
public statements in support of the ElTl process in this country?
2' Has the company committed to support and cooperate with implementation of the Country ElTlWork plan (as agreedby the multi-stakeholder group), including abiding by government E|T-related directives (e.g.laws and Mous) and,where appropriate, meeting with stakeholders?
fl tu, I t o
Have all material payments been disclosed to the organisation contracted to reconcile figures and produce theElrl Report as per agreed ElTl reporting templates and pursuant to agreed timelines?pJ v.' [ * o
Was the data that wa5 submitted to the organisation contracted to reconcile figures and produce the ElTl Reporttaken from accounts independently audited to international standards?
Yes [ *o
Has the company responded to queries from the organisation contracted to reconcile figures and produce theElrl Repon to assist in the reconciliation of country payments with government receipts in accordance with EI11reporting templates? , / 7 € a 1 < A " s t a . f . t <
o <r'4
Sl| P I( IMP ETPx l(01(A ',
Any other comments:
r-llyJ Yes L_J No
u€A rc i'P V
Narrative opinionslf any indicators above are rnarked"Noi please provide an explanation:
Report to the Albania EITI Working Group Validation of the Implementation of EITI in Albania
HN/425 30th August 2011
Page 19 of 56
COMPANY:
Mark indicators belowwith a y'
COUNTRV!
l . HastheHas the company made
ffiv", [ *,public statements in support of the ElTl process in this countryZ
No
2' Has the company committed to support and cooperate with implementation of the Country ElTl Work plan (as agreedby the multi-stakeholder group), including abiding by government ElTl-related directives (e.g.laws and Mous) and,where appropriate, meeting with stakeholders?.--/It/l ves LJ wo
3. Have all material payments been disclosed to the organisation contracted to reconcile figures and produce theElrl Report as per agreed Elrl reporting templates and pursuant to agreed timelines?,-1f u l y e s l l N o
4' Was the data that was submitted to the organisation contracted to reconcile figures and produce the ElTl Reporttaken from accounts independently audited to international standards?
Yes [ *o
5' Has the company responded to queries from the organisation contracted to reconcile figures and produce theElTl Reportto assist in the reconciliation of country payments with government receipts in accordance w1h ElTlreporting templates?
, t T A O p t , l@ v", [ * o
"T4Ht
Narrative opinionslf any indicators above are marked,,Nol please provide an
Any other comments:
Report to the Albania EITI Working Group Validation of the Implementation of EITI in Albania
HN/425 30th August 2011
Page 20 of 56
Pero" /v/.t PO/ fl zt!4fr/tE dft{ly' r
(OMPANY: COUNTRY:
Mark indicators belowwith a y'
1. Has the company made public statements in support of the ElTl process in this country?
F.v"' L-J No
2. Has the company committed to support and cooperate with implementation of the Country ElTlWork Plan (as agreed
by the multi-stakeholder group), including abiding by government ElTl-related directives (e.g'laws and MoUs) and,
where appropriate, meeting with stakeholders?
[J'v.t I t o
3. Have all material payments been disclosed to the organisation contracted to reconcile figures and produce the
ElTl Report as per agreed ElTl reporting templates and pursuant to agreed timelines?
S t ' D * o
4. Was the data that was submitted to the organisation contracted to reconcile figures and produce the ElTl Report
taken from accounts independently audited to international standards?
Yes I * o
5. Has the company responded to queries from the organisation contracted to reconcile figures and produce the
ElTl Report to assist in the reconciliation of country payments with government receipts in accordance wlth ElTl
reporting templates?
Pv., I * o
Narrative opinionslf any indicators above are marked'No", please provide an explanation:
Report to the Albania EITI Working Group Validation of the Implementation of EITI in Albania
HN/425 30th August 2011
Page 21 of 56
coMpANV: i ,a, / t, &/ ,*
Mark indicators below with a y'
l. Has the company made
pf yes [__j rvo
public statements in support of the ElTl process in this country?
2' Has the company committed to support and cooperate with implementation of the Country ElTl Work plan (as agreedby the multi-stakeholder group), including abiding by government ElTl-related directives (e.g.laws and Mous) and,where appropriate, meeting with stakeholders?
p v"t [ * o
3' Have all material payments been disclosed to the organisation contracted to reconcile figures and produce theElrl Report as per agreed Elrl reporting templates and pursuant to agreed timelines?p v.t [ * o
4' Was the data that was submitted to the organisation contracted to reconcile figures and produce the ElTl Reporttaken from accounts independently audited to international standards?
f, v"t [ * o
Any other comments:
Report to the Albania EITI Working Group Validation of the Implementation of EITI in Albania
HN/425 30th August 2011
Page 22 of 56
COMPANY:
Mark indicators below with a y'
COUNTRY:
l. Has the company made public statements in support of the ElTl process in this countryl"1l{J yes U ruo
Has the company committed to support and cooperate with implementation of the country ElTlWork plan {as agreedby the multi-stakeholder group), including abiding by government ElTl-related directives (e.g.laws and Mous) and,where appropriate, meeting with sta keholders?t'-'-11
l_!J Yes L_J r,ro
Have all material payments been disclosed to the organisation contracted to reconcile figures and produce theElrl Report as per agreed ElTl reporting templates and pursuant to agreed timelines?t--vl.z[ Yes LJ No
Was the data that was submitted to the organisation contracted to reconcile figures and produce the ElTl Reporttaken from accounts independently audited to international standards?-J
llf ves [ *o
Has the company responded to queries from the organisation contracted to reconcile figures and produce theElrl Reportto assist in the reconciliation of country payments with government receipts in accordance with Elrlreporting templates?
@ v * [ * o
')rq rc",r-, d /''' "u/a/g
Narative opinions
7<'<ya 4s , L e.7 /
=#tlf any indicators above are marked oNol please provide an explanation:
Any other comments:
Report to the Albania EITI Working Group Validation of the Implementation of EITI in Albania
HN/425 30th August 2011
Page 23 of 56
r!-
c o M p A N y : ' | r R E K E K P L 0 R A r , 0 f u s c o u N r R Y ! A t 6 4 A f l 4
Mark indicators belowwith a y'
I . Has the company made public statements in support of the ElTl process in this country?
ffi v"' l l N o
2. Has the company committed to support and cooperate with implementation of the Country ElTlWork Plan (as agreed
by the multi-stakeholder group), including abiding by government ElTl-related directives (e.g.laws and MoUs) and,
where appropriate, meeting with stakeholders?
ffi vut I t o
3. Have all material payments been disclosed to the organisation contracted to reconcile figures and produce the
ElTl Report as per agreed ElTl reporting templates and pursuant to agreed timelines?
ffi v.t fl ro
4. Was the data that was submined to the organisation contracted to reconcile figures and produce the ElTl Report
taken frorir accounts independently audited to international standards?
ffi v"t [ * o
5. Has the company responded to queries from the organisation contracted to reconcile figures and produce the
ElTl Report to assist In the reconciliation of country payments with government receipts in accordance wlth ElTl
reporting templates?
S v . ' I * o
Narrative opinionslf any indicators above are marked"Noi please provide an explanation:
Report to the Albania EITI Working Group Validation of the Implementation of EITI in Albania
HN/425 30th August 2011
Page 24 of 56
1. Hasthecompanymade
llll Yes L.| N,
coMpANy: fffrnffcU CoUNrRy: -/ / Z./]y <: ( ;i OT€ P- )
Mark indicators below with a y'
public statements in support of the ElTl process in this country?
2. Has the company committed to support and cooperate with implementation of the Country ElTl Work Plan (as agreed
by the multi-stakeholder group), including abiding by government ElTl+elated directives (e'g'laws and MoUs) and'
where appropriate, meeting with stakeholders?
E t o [ * o
3. Have all material payments been disclosed to the organisation contracted to reconcile figures and produce the
ElTl Report as per agreed ElTl reporting templates and pursuantto agreed timelines?
ffi v.t I * o
4. Was the data that was submitted to the organisation contracted to reconcile figures and produce the ElTl Report
taken from accounts independently audited to international standards?
M t o D * o
5. Has the company responded to queries from the organisation contracted to reconcile figures and produce the
ElTl Report to assist in the reconcillatlon of country payments with government receipts in accordance with ElTl
reporting templates?
ffS , rtf, v.t D * o
Narrative opinionsl n P n R t E x o R i
No
I
t
? fr;t.*t r
lf any indicators above are marked'No", please provide an explanation:
i i i i n t r E B n t $
Report to the Albania EITI Working Group Validation of the Implementation of EITI in Albania
HN/425 30th August 2011
Page 25 of 56
APPENDIX 3 – ALBEITI WORK PLAN FOR 2011-2013 (REVISED JUNE 2011)
Report to the Albania EITI Working Group Validation of the Implementation of EITI in Albania
HN/425 30th August 2011
Page 26 of 56
1
ALBEITI - WORK PLAN FOR THE YEAR 2011-2013
Aktivity Action(s) Needed Timetable Responsibility
Estimated Cost & Source of Funding
Expected Output/Outcome
OBJECTIVE ONE: COMMITMENT TO PARTICIPATE IN THE EITI STABILIZING WORKING GROUP AND IMPLEMENTED OBLIGATIONS RELATED APPLICATION
1a. Participation in the EITI Global Conference (Initiative for Transparency in Extracting Industries)
1. MSG and the Secretariat ALBEITI confirm implementation of the steps and obligations of the Albanian Government to be members of the EITI 2. Participation of a delegation of international EITI conference in Paris, France in March 2011 3. Participation of a delegation of international EITI conference in 2013
Participation in the Conference 5-of EITI International in Paris, France 1-2 March 2011 Participation in the International EITI Conference in 2013
Deputy Minister of Economy, Trade and Energy, Head of Secretariat ALBEITI
not / applicable EITI and support from local donors 3 000 $ budget and / or donor funds EITI
Obligations and procedures for implementation purpose of membership in the initiative for transparency in extracting (EITI) Participation in international activities Discussion, understanding, exchange of experiences and contacts with leaders and members of the EITI
1b. Completion of Secretariat staff following of establishing the central points of the Albanian government (the Chairman of the Working Group ( MSG ) and manager of the Secretariat)
Secretariat ALBEITI meet staff by decision of KM and orders of KM, METE
January - February 2011 Based on Decision of KM Nr.540, dated 07.07.2010 and Order of KM Nr.201 dated 03.12.2010 and Order of the Minister of Economy, Trade and Energy Nr. 896, date21.12. 2010 for the organizational structure of the Secretariat ALBEITI
Minister of Economy, Trade and Energy MSG Chairman Head of Secretariat ALBEITI
not / applicable
Application of VKM Nr.540, date 07.07.2010 and Order Nr.201, dated 03.12.2010 was appointed director of the Secretariat ALBEITI Application of the duties of the Minister of Economy, Trade and Energy to Order Nr.896 dated 21.12.2010 has approved the organizational structure of the Secretariat ALBEITI at METE Minister for the purposes of ongoing EITI process led by GP and Deputy along the METE Filling Secretariat ALBEITI staff and increase the level and work on EITI procedures
1c. Knowing the commitment of the Government, which undertakes to work with all stakeholders (such as civil society, companies, etc.) on EITI
1. Contact and coordination with civil society and other companies for preparation of the first EITI report; 2. The operation Interagency working group (Working Group) to the right of participation and other external members also demonstrates the commitment of government and examines the work of the EITI process continuously. 3. Expanding the participation of
January - March 2011 Interest groups most important for participation in the WG of ALBEITI will be invited to meetings of the WG of ALBEITI. Interest groups will be informed continuously
WG Chairman Head of Secretariat ALBEITI
not / applicable
Participation and involvement of interest groups that will be participating in the actions of WG and ALBEITI Secretariat as part of the work on the validation report of the situation and concrete work to be submitted to the Central Board of EITI in Oslo, Norway. Extending of Interest Groups in the WG.
Report to the Albania EITI Working Group Validation of the Implementation of EITI in Albania
HN/425 30th August 2011
Page 27 of 56
2
stakeholders in WG setting min. 50% participation of their WG. 4. Participation of stakeholders who will be participating in the WG for ALBEITI action (acceptance, participation and cooperation by them) at the validation of the situation in Albania and the EITI report follows.
March - May 2011 Letter and Invitation to expand the participation of stakeholders in WG. July - August 2011 Decision KM on WG and participation of stakeholders in WG.
Acceptance and commitment, participation and continuous collaboration with stakeholders on the objectives, scope and concrete work towards the EITI process.
1d. Recognition the MSG of EITI and interest groups participants in the WG with the work done for the tendering arrangements for foreign consultants for first EITI report and validation EITI report.
Preparation and approval of ToR, procedures for appointment of consultants for assessment ALBEITI in WG (such as government agencies, oil companies, mining companies, civil society, etc.) Presentation, discussion and approval of draft reports by an independent administrator and validator EITI Report, discussion of work done to achieve the fittest concrete special reports required for Albania's participation in EITI
The first meeting of WG of ALBEITI with members and guests will be held on 04 January 2011; January - May 2011 WG meetings will be every month and constantly throughout the period of assessment to examine the concrete work of the consultants and the Secretariat
WG and Secretariat ALBEITI
not / applicable Discussion and approval of TOR, deadlines of consultants and tendering procedures. Discussion and approval of draft reports and final reports for the membership and participation in the EITI from the WG on quality and deadlines. Regular monthly meetings of the WG will discuss and will lead the implementation of the obligations of the inclusion of Albania in EITI
Aktivity Action(s) Needed Timetable Responsibility
Estimated Cost & Source of Funding
Expected Output/Outcome
OBJECTIVE TWO: ESTABLISH, DEVELOP AND PUBLISH AN EITI WORK PLAN
2a. Establish, Develop and Publish an EITI work plan and implementation schedule
Develop a Work Plan to be valid published which defines the main lines of work within the ALBEITI implementation of obligations arising from the process and the application of EITI (initially through an validation report that will be judged by the EITI Board ).
Publication of the work plan 2011 for ALBEITI in January 2011. Publication of the work plan for 2011-2013 ALBEITI in July 2011. Publication of the plan
MSG and Secretariat ALBEITI
State Budget and World Bank project. Main cost is time and effort of the WG and the Secretariat of ALBEITI
A work plan for the Secretariat of ALBEITI published on the basis of which reported, analyzed and updated the work carried out in accordance with the implementation of EITI procedures and deadlines.
Report to the Albania EITI Working Group Validation of the Implementation of EITI in Albania
HN/425 30th August 2011
Page 28 of 56
3
Work plan is dynamic and will be updated whenever it will be necessary. It will be a press conference to publish this ALBEITI work plan in February 2011 and for Work plan 2011 - 2013 in June 2011.
improving for 2011 - 2013, welcoming all comments and recommendations made, which will be constantly under implementation periods. June 2011
2b. Identify sustainable sources of financing for EITI implementation
Ensuring the state budget and / or local funds and foreign donors for ALBEITI and seeking other funding sources to support implementation of the EITI. Preparation of the budget required and argumentation. Preparation and applications for projects, agreements etc.. order making grants, funds from various local and foreign donors.
January 2011 Revised September 2011 Overview p / budget v.2012, 2013 Overview of projects and applications within the time mainly in the first 6 month period 2011-2013.
MSG and Secretariat ALBEITI
State budget , local and foreign donor Guarantee fund 6 million ALL / year for EITI activities financed from state budget 2011 -2013. Project in Albania to support EITI by World Bank, providing funding of $ 275 thousand for 2011. Support for 2011 of $ 91,000 from local donors. Main cost is time and effort of the WG and the Secretariat of ALBEITI
Steady income to support the implementation of EITI Support ALBEITI state budget and other donors. Application and submission of proposals at the various donors in supporting funds to ALBEITI
2c. The determination of the Statute and the EITI Secretariat duties and MSG
Improve the legal framework. Acceptance of the Statute, procedures and regulations for MSG Acceptance of the Statute, the Terms of Reference (TOR) , the regulation for the MSG , Secretariat staff and staff employed / engaged for the realization of the tasks left by the MSG and in support of his work.
June 2011 February 2012 Review and Improvement
Secretariat ALBEITI in Ministry of Economy, Trade and Energy
not / applicable 33 million lek in 2011 - State Budget 60 million lek in 2012 - State Budget
Work with high level and the implementation deadlines set. Coordination of Secretariat work for the program support tasks that ALBEITI MSGs work and duties to the EITI Central
Aktivity Action(s) Needed Timetable Responsibility
Estimated Cost & Source of Funding
Expected Output/Outcome
OBJECTIVE THREE: REMOVE OBSTACLES TO OBLIGATIONS UNDER EITI / CAPACITY BUILDING AND PERFORMANCE
3a.Review of legal framework to identify potential obstacles to
Review of legislation to identify possible obstacles in implementing the EITI obligations.
March - July 2011
Secretariat ALBEITI
not / applicable
Improving the legal basis / regulatory / contractual and free of obstacles to EITI implementation
Report to the Albania EITI Working Group Validation of the Implementation of EITI in Albania
HN/425 30th August 2011
Page 29 of 56
4
EITI implementation Define procedures for compliance with the requirements of the legal basis of the EITI. Improvement of law for reporting of data from private and state companies.
March 2012 MSG of ALBEITI
Application of a memorandum of understanding with the oil and gas companies for the implementation of EITI procedures up to legal improvements
3b. Capacity building/training for government specialists on EITI and petroleum sector issues
Training for employees of state Training for MSG members, Workshops and seminars for MSG and public employees, institutions, etc. related activities of EITI. Study tour for experience in other countries. Self-assessment workshop
March - December 2011 By detailing the work program during the v. 2012, 2013
Secretariat ALBEITI MSG of ALBEITI
26. 000 USD in 2011 - the WB project Budget, donors Year 2012 - 2013 (Implementing Agency for Training and Consulting, workshop and study tour)
Understanding and better implementation of the EITI and the problems associated with and the relationships between sectors of the extractive industry and government. Cooperation with civil society, interest groups, regional development, community etc. Training for implementation of EITI obligations.
3c. Capacity building/training for civil society (including media) on EITI and petroleum sector issues.
Training for civil society in general, Information and discussions with civil society regarding the EITI Training for civil society, members of the MSG, Workshops and seminars / training sessions and information on issues specific to different groups according to interests, Self-assessment workshop
April - December 2011 By detailing the work program during the v. 2012, 2013
Civil society and media Secretariat ALBEITI MSG of ALBEITI
15. 000 USD in 2011 - the WB project Budget, donors Year 2012 - 2013 (Implementing Agency for Training and Consulting, workshop and study tour)
Understanding and better implementation of the EITI and the problems associated with and the relationships between sectors of the extractive industry and government in Albania assessed by civil society. Cooperation with civil society, regional development, community etc. Suggestions / recommendations and support of civil society through a better understanding on the part of its extractive industry issues.
3d. Capacity building / training of stakeholders (industry) on EITI and extractive industry sector issues
Training for stakeholders in general, Information and discussions with these groups to the mining and hydrocarbon sector in relation to EITI Training for stakeholders, members of the MSG, Workshops and seminars / training sessions and information on issues specific to different groups according to interests, Self-assessment workshop
April - December 2011 By detailing the work program during the v. 2012, 2013
Participants in the GP of interest groups (extractive industries) Secretariat ALBEITI MSG of ALBEITI
10. 000 USD in 2011 - the WB project Budget, donors Year 2012 - 2013 (Implementing Agency for Training and Consulting, workshop and study tour)
Understanding and better implementation of the EITI and the problems associated with and the relationships between sectors of the extractive industry and government in Albania assessed by stakeholders. Cooperation with stakeholders, regional development, community etc. Suggestions / recommendations and support of stakeholders through a better understanding on the part of its extractive industry issues.
3e. Outreach informational activities
Preliminary Communication Strategy 2011 Communication and Information Strategy 2011-2012
January 2011 June 2011 April - December 2011
Secretariat ALBEITI MSG of ALBEITI
10,000 USD in 2011 - the WB project for strategy
Continuous information and forms diversified mining and hydrocarbon sector in Albania in the largest size, with accurate, reliable and readable by a wider public.
Report to the Albania EITI Working Group Validation of the Implementation of EITI in Albania
HN/425 30th August 2011
Page 30 of 56
5
Seminars, radio and TV talk show, news articles, newsletters, websites, lists of addresses, e-mail, etc.. Manufacturing information brochures, articles, etc..
By detailing the work program during the v. 2012, 2013 Ongoing
23. 000 USD in 2011 - the WB project Budget, donors Year 2012 - 2013 (Implementing Agency and Consultant for publicity, TV, radio, publications, workshops, etc.).
Increased opportunities for information to a wider public, civil society, community, etc. and. encouragement of interest for their problems in extracting industry, regional development, community areas, etc..
3f. Capacity building and monitoring sustainable income (MSI)
Improve the legal reporting of data. Define the procedures and timelines of data collection for evaluation Based on the production plans of each year, MSG and Secretariat ALBEITI may decide each year on what data should be added in order to have a more detailed reporting statements to achieve a sustainable monitoring of revenues derived by all companies. Self-assessment workshop
March 2011 April - December 2011 By detailing the work program during the v. 2012, 2013 Ongoing
Secretariat ALBEITI MSG of ALBEITI
5.500 USD in 2011 - the WB project Budget, donors Year 2012 - 2013
Increased capacity to various stakeholders about EITI to realize a sustainable monitoring of revenue for the government and stakeholders.
Aktivity Action(s) Needed Timetable Responsibility
Estimated Cost & Source of Funding
Expected Output/Outcome
OBJECTIVE FOUR: COMPLETE AND DISTRIBUTION OF THE REPORT OF EITI
4a. Develop a reporting template for the EITI report
MSG ALBEITI base of discussions agree to the form of reporting results in ALBEITI report ensuring that the report be simple, understandable, comparable to the form of reports that are used for EITI and contain all the data necessary. Working Group (MSG ) estimates and determines data to be collected, their method of reporting by companies and government and ensure the receipt of this information. (Data received from the government and companies should be based on the audit of financial activity by international standards)
March 2011 METE Secretariat ALBEITI MSG of ALBEITI
2.500 USD in 2011 - the WB project Budget, donors Year 2012 - 2013 Main cost is time and effort of the MSG and the Secretariat of ALBEITI
Format of reporting standards used by the EITI reports. Support to legal for companies mining and hydrocarbon companies initially for basic memorandum of understanding. Applications for the consultants' recommendations EITI, WB and international auditing standards.
Report to the Albania EITI Working Group Validation of the Implementation of EITI in Albania
HN/425 30th August 2011
Page 31 of 56
6
4b. Determination and Agreeing on levels of confidentiality ( level of aggregation /disaggregation)
MSG ALBEITI will discuss and agree on the level of confidentiality that will be used in reports on EITI maintaining information related commercial activity and influence with the companies but by creating a balance and the right to public information concerning the activity extractive industry in terms of payments to companies and those obtained by the state.
March – April 2011 METE Secretariat ALBEITI MSG of ALBEITI
Main cost is time and effort of the MSG and the Secretariat of ALBEITI
Determination of levels of data confidentiality, detailed, full, etc..
4c. Define the procedures and deadlines for recruiting consultant who will prepare the Annual Report and final report EITI based requirements and reporting EITI forms for extracting industries (Regarding this activity and 4a)
MSG ALBEITI should determine procedures, tasks and time requirements for administrators, validators and independent consultants who will prepare reports in accordance with EITI requirements and forms, which must be reliable, efficient professional, listed by the EITI, at a cost appropriate and accurate.
January – March 2011 September 2011 January 2012 January 2013
Secretariat ALBEITI MSG of ALBEITI
Main cost is time and effort of the MSG and the Secretariat of ALBEITI
Binding contracts and compliance deadlines to / from independent consultants for the design and delivery of the EITI report, evaluation report EITI binding
4d. EITI report completed by an independent consultant who submitted the EITI Working Group which formally approves (or rejected)
Consultant collects, analyzes and processes the data related to the extracting industry in Albania, including minerals and hydrocarbon sector under the action areas and terms of reference that has designated and approved by the Working Group (MSG). Independent Consultant represent the first EITI report for formal approval at the ALBEITI Secretariat and the Working Group (MSG). . Initially, the ALBEITI Secretariat and the following ALBEITI MSG analyzes report, discusses and asks the consultant for explanations, where necessary to make updates to the report with new data and examine whether the present format of the report complies with the terms of reference defined by EITI requirements. ALBEITI Secretariat and further ALBEITI MSG formally evaluates and
The first EITI report (Reconciliation Report ) year 2009 in summary be submitted until 30 March 2011
Secretariat ALBEITI MSG of ALBEITI Independent Consultant selected for reconciliation report
85. 000 USD for the first EITI report in 2009 - funded by the WB project 85. 000 USD for EITI reconciliation report for 2010 - funding from local donors Budget and donor funds to v.2011 - 2012
Report in accordance with the requirements of EITI is presented by independent manager consultant and formally approved (or rejected) by MSG ALBEITI.
Report to the Albania EITI Working Group Validation of the Implementation of EITI in Albania
HN/425 30th August 2011
Page 32 of 56
7
approves (or rejects) summary report. In case of failure can make their objections to the report.
4e. Publication and distribution of the Report prepared in compliance with the EITI and approved by the Government
EITI Report published by the government, ALBEITI Secretariat and other websites.; EITI Report published and recorded / reported on its basic points in the media (a summary of the report published in newspapers, etc.) ALBEITI Secretariat designs and ALBEITI MSG approves a strategy with regard to information and publication of this report (by organizing information sessions, explaining the data and findings, etc.) for all stakeholders while you give them the opportunity to discuss this report so that they make their evaluations and interpretations of results.
May – July 2011 Secretariat ALBEITI MSG of ALBEITI
Funds for information, communication and publicity in mass media, print media etc.. provided for y.2011 by the project WB See note 3e Funds for the year 2012 -2013 - from the state budget and donors
EITI Reports for Albania published in two languages (Albanian and English) on various websites, ALBEITI and METE website and made possible their knowledge to all parties concerned.
Aktivity Action(s) Needed Timetable Responsibility
Estimated Cost & Source of Funding
Expected Output/Outcome
OBJECTIVE FIVE: VALIDATION OF THE IMPLEMENTATION OF EITI
5a. Validation EITI ALBEITI Secretariat informs ALBEITI MSG basic procedures for the selection of an validator from a list approved by the International EITI Secretariat in Oslo, Norway. Validator follow all procedures of validation of Albania as a country of EITI implementation in accordance with the requirements provided in the book for EITI assessment and submit report for approval at the ALBEITI Secretariat and ALBEITI MSG, the Albanian government and the EITI Board (who approve or rejected).
Validation Report (Draft Validation Report) summary of submitted in MSG until 10 May 2011 and until 14 May 2011 in EITI International Secretariat. Review final report submitted max. 01 September 2011 Approval or rejected in the Central Board of EITI with min. May 15, 2011 max. October 2011 January 2012 January 2013
Secretariat ALBEITI Validator working with major companies, civil society, government and all stakeholders and the members of the ALBEITI MSG
65. 000 Euro for Validation report for the year 2011 - State Budget
Recognition of results of implementation of EITI work and procedures. Submission for approval of validation report to the ALBEITI Secretariat, ALBEITI MSG , the government and the EITI Board, who approve or rejected.
5b. Publication and distribution of
EITI validation report published by the government, the ALBEITI website or
May / October 2011
Secretariat ALBEITI
23. 000 USD. - WB project
EITI Reports for Albania published in two languages (Albanian and English) on various
Report to the Albania EITI Working Group Validation of the Implementation of EITI in Albania
HN/425 30th August 2011
Page 33 of 56
8
validation report EITI
other website, a summary of his main points of his published in the mass media (a summary of the report published in newspapers, TV, etc.) ALBEITI Secretariat designs and ALBEITI MSG approves a strategy on information, communication and publicity of the validation report (by organizing information sessions, workshops, media to explain the data and results of the evaluation report, etc..) to all parties concerned.
March 2012 March 2013
MSG of ALBEITI
See note 3e websites, ALBEITI and METE website and made possible their knowledge to all parties concerned.
TOTAL COST
Cost per year with funding sources
2011 - 2013 Total 426.000 usd for year 2011 a. 60.000 usd – State
Budget b. 275.000 usd –
project WB, MDF, OSCE
c. 91.000 usd –other donors
Totali 220.000 usd for year 2012 d. 100.000 usd –
State Budget a. 120.000 usd – WB,
MDF,OSCE, other donors
Totali 235 000 for year 2013 e. 105.000 usd –
State Budget a. 130.000 usd – WB,
MDF, OSCE, other donors
Values of the EITI initiative spending in years divided by source of financing
Report to the Albania EITI Working Group Validation of the Implementation of EITI in Albania
HN/425 30th August 2011
Page 34 of 56
9
Cost per year to be financed from state budget
2011 - 2013 60 000 usd – for year 2011 – State Budget 100.000 usd – for year 2012 – State Budget 105 000 usd – for year 2013 –State Budget Total for three years 265.000 usd
Values of the EITI initiative spending in years divided by source of financing
Cost per year to be financed by the Multi Donor Fund (MDF), World Bank (WB), OSCE and other donors
2011 - 2013 275. 000 – for year 2011 – project with WB 91.000 usd –for year 2011 from local donors 120 000 usd – for year 2012 – MDF, BB, OSCE other donors 130. 000 usd – for year 2013 – MDF, BB, OSCE, other donors Total for three years 616. 000 usd
Values of the EITI initiative spending in years divided by source of financing
Note: The following schedule of activities 2011 - 2013 under the above
Report to the Albania EITI Working Group Validation of the Implementation of EITI in Albania
HN/425 30th August 2011
Page 35 of 56
10
Timetable Aktivity 2
00
9 -
20
10
Jan
-2
01
1
Feb
. -2
01
1
Mar
-2
01
1
Ap
ril-
20
11
May
-20
11
Jun
e-2
01
1
July
-2
01
1
Au
g.-2
01
1
Sep
t.-2
01
1
Oct
.-2
01
1
No
v-2
01
1
Dic
.-2
01
1
Jan
-20
12
Feb
.-2
01
2
Mar
-20
12
Ap
ril -
20
12
May
-20
12
Jun
e -2
01
2
July
-20
12
Au
g.-2
01
2
Sep
.-2
01
2
Oct
.-2
01
2
No
v.-2
01
2
Dic
.-2
01
2
Jan
-20
13
Feb
.-2
01
3
Mar
-20
13
Ap
ril-
20
13
May
20
13
Jun
e-2
01
3
PARTICIPATION IN EITI BY APPLICATION MEET OBLIGATIONS
1a.Unequivocal public statement of intention to implement EITI
1a. Participation in the EITI Global Conference (Initiative for Transparency in Extracting Industries)
1b. Setting the central points of the Albanian Government to the Working Group ( MSG ) Chairman / Secretariat ALBEITI
1b. Completion of Secretariat staff following of establishing the central points of the Albanian government (the Chairman of the Working Group ( MSG ) and manager of the Secretariat)
Report to the Albania EITI Working Group Validation of the Implementation of EITI in Albania
HN/425 30th August 2011
Page 36 of 56
11
1c Government commits to working with all stakeholders (such as civil society, companies, etc.) on EITI
1c. Knowing the commitment of the Government, which undertakes to work with all stakeholders (such as civil society, companies, etc.) on EITI
1d. Determination of ALBEITI MSG -interest groups participating in the MSG
1d. Recognition the MSG of EITI and interest groups participants in the WG with the work done for the tendering arrangements for foreign consultants for first EITI report and validation EITI report.
ESTABLISH, DEVELOP AND PUBLISH AN EITI WORK PLAN
Report to the Albania EITI Working Group Validation of the Implementation of EITI in Albania
HN/425 30th August 2011
Page 37 of 56
12
2a. Establish, Develop and Publish an EITI work plan and implementation schedule
2b. Identify sustainable sources of financing for EITI implementation
2c. Establishment of the Secretariat of ALBEITI
2c. The determination of the Statute and the EITI Secretariat duties and MSG
REMOVE OBSTACLES TO OBLIGATIONS UNDER EITI / CAPACITY BUILDING AND PERFORMANCE
3a. Review of legal framework to identify potential obstacles to EITI implementation
3b. . Capacity building/training for government specialists on EITI and petroleum sector issues
Report to the Albania EITI Working Group Validation of the Implementation of EITI in Albania
HN/425 30th August 2011
Page 38 of 56
13
3c. Capacity building/training for civil society (including media) on EITI and petroleum sector issues.
3d. Capacity building / training of stakeholders (industry) on EITI and extractive industry sector issues
3e. Outreach informational activities
3f. Capacity building and monitoring sustainable income (MSI)
COMPLETE AND DISTRIBUTION OF THE REPORT OF EITI
4a. Develop a reporting template for the EITI report
4b. Determination and Agreeing on levels of confidentiality ( level of aggregation /disaggregation)
Report to the Albania EITI Working Group Validation of the Implementation of EITI in Albania
HN/425 30th August 2011
Page 39 of 56
14
4c. Define the procedures and deadlines for recruiting consultant who will prepare the Annual Report and final report EITI based requirements and reporting EITI forms for extracting industries (Regarding this activity and 4a)
4d. EITI report completed by an independent consultant who submitted the EITI Working Group which formally approves (or rejected)
4e. Publication and distribution of the Report prepared in compliance with the EITI and approved by the Government
VALIDATION OF THE
IMPLEMENTATION OF EITI
Report to the Albania EITI Working Group Validation of the Implementation of EITI in Albania
HN/425 30th August 2011
Page 40 of 56
15
5a. Validation EITI
5b. Publication and distribution of validation report EITI
Report to the Albania EITI Working Group Validation of the Implementation of EITI in Albania
HN/425 30th August 2011
Page 41 of 56
APPENDIX 4 –
• ORDER NO. 71 OF THE PRIME MINISTER DATED 21ST JULY 2011
• MEMBERS OF THE ALBEITI WORKING GROUP NOMINATED UNDER THE PROVISIONS OF ORDER 71 OF THE PRIME MINISTER DATED 21ST JULY 2011
Report to the Albania EITI Working Group Validation of the Implementation of EITI in Albania
HN/425 30th August 2011
Page 42 of 56
REPUBLIC OF ALBANIA
PRIME MINISTER
O R D E R
No. 71, dated July 21, 2011
FOR
THE ESTABLISHMENT AND FUNCTIONING
OF THE MULTI-STAKEHOLDER WORKING GROUP
FOR THE SUPERVISION OF ALBANIA’S MEMBERSHIP
PROCEDURES IN THE EXTRACTIVE INDUSTRIES
TRANSPARENCY INITIATIVE (EITI)
Based on Point 3 of the Article 102 of the Constitution and on Point 1 of Article 12 of the Law No. 9000, dated January 30, 2003 “On the organization and functioning of the Council of Ministers”,
I ORDER:
1. The establishment and set to functioning of the multi stakeholder working group for supervising Albania’s membership procedures, as implementing country of the Extractive Industries Transparency Initiative, as well as ongoing fulfillment of duties deriving from being part of this initiative.
2. The Working Group is headed by the Deputy Minister of Economy, Trade and Energy and is composed by the following members:
a) One representative from the Ministry of Economy, Trade and Energy; b) One representative from the Ministry of Finances; c) One representative from the Ministry of Justice;
Report to the Albania EITI Working Group Validation of the Implementation of EITI in Albania
HN/425 30th August 2011
Page 43 of 56
d) One representative from the General Tax Department; e) One representative from the National Agency of Natural Resources; f) One representative from the Albanian Geological Service; g) Five representatives from the business, selected by the National Network of Extractive
Industries; h) Five representatives from the civil society, selected by the National Network for the Civil
Society for EITI.
The representative level in this Group for State institutions will be not lower than that of a director of directorate in a ministry.
3. On invitation from the chairman of the Group, representatives from other institutions may take part in Group meetings.
4. The institutions mentioned in the point 2 of this Order shall send to the chairman of the group, within 15 (fifteen) days from the day of entrance into force of this Order, the names of their representatives.
5. The Secretariat of the Extractive Industries Transparency Initiative (EITI) shall prepare the draft Regulatory Act for the functioning of the Working Group of the Extractive Industries Transparency Initiative (EITI), which is approved by the Minister of Economy, Trade and Energy.
6. The Order No. 156 dated December 27, 2008 of the Prime Minister “For the establishment and set to functioning of the multi stakeholder working group for supervising Albania’s candidacy procedures in the Extractive Industries Transparency Initiative (EITI)” is abrogated.
This Order enters into force immediately.
PRIME MINISTER
SALI BERISHA
Report to the Albania EITI Working Group Validation of the Implementation of EITI in Albania
HN/425 30th August 2011
Page 44 of 56
Members of the ALBEITI Working Group nominated under the provisions of Order 71 of the Prime Minister dated 21st July 2011
1. Neritan Alibali Working Group Chairman, Deputy Minister of METE 2. Sokol Mati METE, director of directorate 3. Arjana Dyrmishi Advisor to the Minister of Finance and director of directorate, Ministry of Finance 4. Tetis Lubonja Director of directorate, Ministry of Justice 5. Shilda Kamberi Chief of sector, General Tax Department 6. Edmond Goskolli Director of directorate, AKBN 7. Gjovalin Leka Director of directorate, Albanian Geological Service 8. George Bedineishvili CEO, Company Albanian Chrome 9. Adrian Bylyku CEO, Company Antea Cement (Titan) 10. Leonidha Cobo CEO, Company Bankers Petroleum Albania 11. Fatos Ademi CEO, Company Stream Oil and Gas Albania 12. Perparim Alikaj FIAA representative and CEO of the Company Tirex Resources 13. Fatbardh Zeneli Civil Society ( Albanian Centre for International Right ) 14. Erald Kapri Civil Society ( Centre for Albanian Youth and Media ) 15. Ilir Aliaj Civil Society ( Centre for Development and Democratization of Institutions) 16. Anila Hajnaj Civil Society (Albanian Centre for Institutional Development) 17. Sami Nezaj Civil Society (Albanian Centre for Transparency and Free Information)
We have not seen the letters of nomination specified by the Order of the Prime Minister.
Report to the Albania EITI Working Group Validation of the Implementation of EITI in Albania
HN/425 30th August 2011
Page 45 of 56
APPENDIX 5 – DRAFT TERMS OF REFERENCE AND RULES OF PROCEDURE FOR ALBEITI WORKING GROUP
Report to the Albania EITI Working Group Validation of the Implementation of EITI in Albania
HN/425 30th August 2011
Page 46 of 56
1
REPUBLIC OF ALBANIA MINISTRY OF ECONOMY, TRADE AND ENERGY
Extractive Industries Transparency Initiative Secretariat
BILL OF RULES OF THE MULTI STAKEHOLDER GROUP FOR SUPERVISING
ALBANIA’S MEMBERSHIP PROCEDURES IN THE EXTRACTIVE INDUSTRIES TRANSPARENCY INITIATIVE (EITI)
GENERAL PROVISIONS
In implementing the Council of Ministers Decree No. 540 dated July 07, 2010 “For the establishment and set to functioning of the Secretariat to supervise Albania’s membership procedures in the Extractive Industries Transparency Initiative (EITI)”, later changed and the Prime Minister Order No. 71 dated July 21, 2011 “On the establishment and set to functioning of the multi stakeholder working group for supervising Albania’s membership procedures, as implementing country of the Extractive Industries Transparency Initiative”, the following Bill of Rules is prepared:
Article 1
Juridical Status
The establishment and set to functioning of the multi stakeholder working group for supervising Albania’s membership procedures, as implementing country of the Extractive Industries
Transparency Initiative (EITI), hereinafter called MSG is based on the Prime Minister Order No. 71 dated July 21, 2011.
Article 2
Object of the Bill.
The Bill of Rules determines the way of MSG organizing and functioning.
Report to the Albania EITI Working Group Validation of the Implementation of EITI in Albania
HN/425 30th August 2011
Page 47 of 56
2
Article 3
Mission of the Multi Stakeholder Group (MSG)
1. MSG supervises Albania’s membership procedures, as implementing country of the Extractive Industries Transparency Initiative (EITI), for the ongoing completion and implementation of EITI procedures (Reference: Point 1 of the Prime Minister Order No. 71 dated July 21, 2011).
Article 4
MSG Competences
1. MSG approves short and long term plans of the activities needed to ensure Albania’s membership in EITI and on periodical bases analizes the implementation of due programs.
2. MSG supervises and assesses the work of ALBEITI Secretariat in a periodical way and reports to the Prime Minister and the respective Minister.
3. MSG informs on ALBEITI Secretariat performance during the period between its two meetings.
4. MSG approves all necessary acts to complete Albania’s membeship procedures in EITI, on proposal from ALBEITI Secretariat and in respect of EITI International Secretariat procedures.
Article 5
MSG Chairman and Members
1. The Working Group is headed by the Deputy Minister of Economy, Trade and Energy and is composed by the following members:
a) One representative from the Ministry of Economy, Trade and Energy; b) One representative from the Ministry of Finances; c) One representative from the Ministry of Justice; d) One representative from the General Tax Department; e) One representative from the National Agency of Natural Resources; f) One representative from the Albanian Geological Service; g) Five representatives from the business, selected by the National Network of Extractive
Industries; h) Five representatives from the civil society, selected by the National Network for the Civil
Society for EITI.
Report to the Albania EITI Working Group Validation of the Implementation of EITI in Albania
HN/425 30th August 2011
Page 48 of 56
3
2. The representative level in this Group for State institutions will be not lower than that of a director of directorate in a Ministry.
3. MSG members that represent Government are appointed and released from duty by the director of the respective Government institution.
4. On invitation from MSG Chairman Group, representatives from other institutions and from the National Network of Extractive Industries and the National Network for the Civil Society for EITI may take part in Group meetings.
Article 6
MSG functioning
1. MSG holds its meetings, as a rule, in the headquarters of the Ministry of Economy, Trade and Energy, or in another location determined by MSG.
2. MSG develops its activity through the meetings of its Members and the decisions it takes. MSG meetings are considered valid when more than half of its Members participate.
3. MSG meetings are held not less than once in two months, or when they are required by its Chairman, by 1/3 of its Members, or by the Director of ALBEITI Secretariat. The Minister of Economy, Trade and Energy has the right to call an MSG meeting whenever he judges it opportune.
4. All MSG Members shall be informed in a written form and not less than 2(two) days ahead of the meeting, on the agenda of the meeting and shall be made available in an electronic way the preliminary materials for discussion.
5. MSG meetings are directed by MSG Chairman and in his absence, by an MSG Member authorized by him.
6. Every MSG Members present in an MSG meeting has the right of one vote. MSG decisions are considered as approved, when more than half of present MSG Members have voted for them. One the number of votes is equal, Chairman’s vote is decisive.
7. MSG meetings are documented by a Validation Note, prepared by a person assigned by MSG. The Note is signed by him/her and by all present MSG Members.
8. MSG decision are signed by MSG Chairman. 9. On invitation from MSG Chairman Group, representatives from other Government
institutions and/or from the National Network of Extractive Industries and the National Network for the Civil Society for EITI may take part in MSG meetings.
Article 7
Report to the Albania EITI Working Group Validation of the Implementation of EITI in Albania
HN/425 30th August 2011
Page 49 of 56
4
Rules of Ethics
MSG shall implement the Rules of Ethics approved in the Law “On Ethics in the Public Administration”.
Article 8
Information Administration
Classification of documentation and its safeguard ia made according the legislation in power, the methodology of documentation elaboration and its safeguard.
Article 9
Approval of the Bill
This Bill of Rules enters immediately into power and becomes obbligatory for implementation, immediately after its signing from the Minister of Economy, Trade and Energy.
M I N I S T E R
N A S I P N A Ç O
Report to the Albania EITI Working Group Validation of the Implementation of EITI in Albania
HN/425 30th August 2011
Page 50 of 56
APPENDIX 6 –
MINUTES AND ATTENDANCE LIST FOR THE MEETING OF THE WORKING GROUP ON 4TH MAY 2011, APPROVING THE 2009 RECONCILIATION REPORT
Report to the Albania EITI Working Group Validation of the Implementation of EITI in Albania
HN/425 30th August 2011
Page 51 of 56
./Vvi 0_
1 oMcbn^\j^k\iAcZouJtL h. puwta oibe
7
E\A<^0lL QnkqAJi^ (She^, CC/VL&. ) I C/(/u/fc
Awn ) -^-gl/Wv.
Report to the Albania EITI Working Group Validation of the Implementation of EITI in Albania
HN/425 30th August 2011
Page 52 of 56
0 1
UC £/TI fax. /
— JL
i \€ ?CUaaruAjx- F.)T\ FnZc ZLUAA h } pr<g/uc-eV
1 Tf / \ I A }fS> A
Report to the Albania EITI Working Group Validation of the Implementation of EITI in Albania
HN/425 30th August 2011
Page 53 of 56
4
REPUBLIKA E SHQIPERISE MINISTRIA E EKONOMISE, TREGTISE DHE ENERGJETIKES
Sekretariati Nismes per Transparence ne Industrite Nxjerrese
VENDIM
Nr. 51 date 04.05.2011
Grupi Nderinstitucional i Punes i ngarkuar me zbatimin EITI ne Shqiperi, pasi shqyrtoi dhe diskutoi Raportin Final te Rakordimit te paraqitur nga Administratori i Pavarur "Fair Links",France si dhe vleresimin e bere nga Sekretariati EITI, vleresoi se :
1. Raporti i Pare i Rakordimit EITI (Variant Perfundimtar) eshte hartuar duke u bazuar ne Termat e References te miratuara, ne rregullat dhe praktiken nderkombetare EITI.
2. Fazat dhe procedurat e ndjekura kane pasqyruar nje pune reale dhe vleresuese per gjendjen e industrise nxjerrese ne Shqiperi. Te dhenat e komunikuara nga ana e Agjencive te Shtetit jane te sakta dhe perfaqesojne te ardhurat e mbledhura nga Shteti.
3. Verjetjet e Grupit te Punes jane marre parasysh ne raportin perfundimtar. 4. Komentet dhe sugjerimet e bera nga Administratori I Pavarur "Fair Links", France
ne Draft Raportin Final EITI 2009 jane pranuar nga Grupi i Punes dhe do te ndiqen per te permiresuar punen e metejshme.
Ngarkohet Sekretariati Shqiptar EITI ( ALBEITI) per ndjekjen , zbatimin dhe raportimin.
Sokol Mati Znj.Elsa Dhuli
enada Kociaj Znj.Najada Rama
Z. Engjell Cakciri
Z. Sami Nezaj
Znj.Veronika Korkaj
Z. Mir Ibrahimi
Z. Mustafa Nezih Kubaq
Kj. Violeta Z a i m ^ ^ '
Z. Petrit Duva \
Z. Perparim Alikaj
Znj. Anila Hajnaj Z. Leonidha Cobo
Z. Erald Kapri
Z.Neritan Alibali (Kryetari Grupit te Punes)
Report to the Albania EITI Working Group Validation of the Implementation of EITI in Albania
HN/425 30th August 2011
Page 54 of 56
Mbledhje Grupit Nderinstitucional te Punes EITI
per Diskutimin e raportit final te kompanise "Fair Links" DATA : 04.05.2011
PJESEMARRJA
Nr. Emer Mbiemer Institucioni
Anetare te Grupit te Punes
Z. NERITAN ALIBALI METE
Z. SOKOL MATI METE
Znj.VERONIKA KORKAJ M.FINANCAVE
Znj. DENADA KOCIAJ M.DREJTESISE
Z. ILIR IBRAHIMI MPSCSHB
Znj. VIOLET A ZAIMI DPT
Z. OLTION KUKE DPD
Min. Jashteme
Znj.ELSA DHULI INSTAT
10 Z.EDMOND GOSKOLLI AKBN
11 Znj.NAJADA RAMA ATRAKO
12 Z.ADIL NEZIRAJ SHGJSH
13 Z. ILIR ALIAJ QZHDI
14 Znj. ANILA HAJNAJ QSHZHI
15 Z. SAMI NEZAJ OJIL
16 Z. ERALD KAPRI SHOQ.CIVILE
17 Z. ENGJELL CAKCIRI SHOQ.CIVILE
18 Z. MUSTAFA NEZIH KUBAQ BERALBA
19 Z. LEOJJIDIIA COBO BANKERS
20 Z. PETRIT DUVA ACR
21 Z. PERPARIM ALIKAJ FIAA
22 Z. YLLI GJONI- ALBPETROL
22 Z.FERDINAND MURATI ALBPETROL
Pjesemarres te tjere 23
24
25
C— IN ST AT
26
27
28
29
30 v i - . v f ^ , , -J. /•;•,'?
31
Report to the Albania EITI Working Group Validation of the Implementation of EITI in Albania
HN/425 30th August 2011
Page 55 of 56
Report to the Albania EITI Working Group Validation of the Implementation of EITI in Albania
HN/425 30th August 2011
Page 56 of 56