2
CITY OF GEORGE PERMIT APPLICATION 102 Richmond Avenue - PO Box5277 George, WA 98848 509-785-5081 cityofgeorge.org Fax:509-785-4880 FOR STAFF USE ONIY Permit Number Site Address ParcellD Lot Subdivision Proiect Descriotion: Proiect Address: Commercial: l--l Residential: l-l LeEal Owner: Phone: Cell: Mailine Address: Email Address: Primarv Contractor: License #: Address: Phone: Enpineer of Record: Phone: Address: Fax: Sub-Contractor: License #: Address: Phone: LIST ADDITIONAT CONTRACTORS ON 2ND PAGE NOTE: INSPECTION OF CONNECTIONS lS REQUIRED BEFORE BACKFlttllNG Square Footage : Proposed Use: Tvoe of Heat: lmprovement Type: Main Floor Residential Gas New Buildine 2"" Floor Sinele Familv Electric Addition 3'" Floor Multi (# Units) Solar Remodel/Repair Additional Floors Hotel, Dorm Wood Re-Roof Basement Garage Fence Covered Porch Carport Sewer Construction Tvpe Decks Patio Public Wood Garage Commercial Private Steel Other New Buildins Masonrv Decks ShellOnlv Water Demolition Tenant lmorovements Public Site Plan Remodel/Addition Private State Permit Asbestos Permit Project Valuation: Occupancy Group: Construction Type: NOTICE: Before a permit will be issued and construction allowed to proceed, the person filling out the application must submit THREE (3) sets of plans to the City Building Department for plan check. All plans for commercial buildings and multiple housing units MUST be stamped by a professional architect and/or engineer. I hereby certify that the above information is correct. I also certify that all contractors performing work on this project will be licensed and registered as required by law: Owner/ Owner Rep: Contact Name: Contact Phone: Email:

OF GEORGE Number USEcityofgeorge.org/forms/Bldg Permit application.pdf · 3'" Floor Multi (# Units) Solar Remodel/Repair Additional Floors Hotel, Dorm Wood Re-Roof Basement Garage

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: OF GEORGE Number USEcityofgeorge.org/forms/Bldg Permit application.pdf · 3'" Floor Multi (# Units) Solar Remodel/Repair Additional Floors Hotel, Dorm Wood Re-Roof Basement Garage

CITY OF GEORGEPERMIT APPLICATION

102 Richmond Avenue - PO Box5277

George, WA 98848

509-785-5081 cityofgeorge.org Fax:509-785-4880

FOR STAFF USE ONIYPermit NumberSite Address

ParcellDLot

Subdivision

Proiect Descriotion:

Proiect Address: Commercial: l--l Residential: l-l

LeEal Owner: Phone: Cell:

Mailine Address: Email Address:

Primarv Contractor: License #:

Address: Phone:

Enpineer of Record: Phone:

Address: Fax:

Sub-Contractor: License #:

Address: Phone:

LIST ADDITIONAT CONTRACTORS ON 2ND PAGE

NOTE: INSPECTION OF CONNECTIONS lS REQUIRED BEFORE BACKFlttllNG

Square Footage : Proposed Use: Tvoe of Heat: lmprovement Type:

Main Floor Residential Gas New Buildine

2"" Floor Sinele Familv Electric Addition

3'" Floor Multi (# Units) Solar Remodel/Repair

Additional Floors Hotel, Dorm Wood Re-Roof

Basement Garage Fence

Covered Porch Carport Sewer Construction Tvpe

Decks Patio Public Wood

Garage Commercial Private Steel

Other New Buildins Masonrv

Decks ShellOnlv Water DemolitionTenant lmorovements Public Site Plan

Remodel/Addition Private State Permit

Asbestos Permit

Project Valuation: Occupancy Group: Construction Type:

NOTICE: Before a permit will be issued and construction allowed to proceed, the person filling out the application must

submit THREE (3) sets of plans to the City Building Department for plan check. All plans for commercial buildings and

multiple housing units MUST be stamped by a professional architect and/or engineer.

I hereby certify that the above information is correct. I also certify that all contractors performing work on thisproject will be licensed and registered as required by law:

Owner/ Owner Rep:

Contact Name: Contact Phone: Email:

Page 2: OF GEORGE Number USEcityofgeorge.org/forms/Bldg Permit application.pdf · 3'" Floor Multi (# Units) Solar Remodel/Repair Additional Floors Hotel, Dorm Wood Re-Roof Basement Garage

-2-

Please Note: Contractors and Subcontractors need itinerant vendor licenses as per the municipal code. A STOP

WORK ORDER may be issued if required licenses and permits are not obtained. The City of George audits all

building permit applications for taxes paid. The City of George's tax identification number is 1304.

*NAMES OF ADDITIONAL CONTRACTORS: License #: Contact Number:

1.

2.

3.

4.

5.*Please verify that your contractors have a current City of George Business License

The applicant, his agents, and employees shall comply with all the rules, restrictions, and requirements of the Municipality and

Building codes governing location, construction, and erection of the above proposed work for which the permit is granted.

The Municipality or its agents are authorized to order the immediate cessation of construction at any time that a violation of

the codes or regulations appears to have occurred. Violation of any of the applicable codes or regulations may result in the

revocation of this permit.

Buildings MUST conform with plans as submitted to the Municipality. Any changes of plans or layout must be approved prior

to the changes being made. Any change in the use or occupancy of the building or structure must be approved prior to

proceeding with construction.

The applicant is required to call for inspections at various stages of the construction, and the applicant shall give the building

inspector not less than one day's prior notice to perform such activities.

The permit is automatically void in the event construction is not commenced within L80 days of issuance of this permit.

Cessation of work for a period of 180 continuous days shall also cause this permit to be void. Permits are not transferable.

I@

APPLICATION SENT TO DEPARTMENTS FOR REVIEW:

Itl@@MSUBMITTED: SUBMITTED:- SUBMITTED:

APPROVED: APPROVED: APPROVED:+

COMPLETE APPLICATION SUBMITTED:

CITY VERIFIES COMPLETE APPLICATION :

SUBMITTED:

APPROVED:

ISSUE DATE:

CITY OF GEORGE

PERMIT APPLICATION PROCESS

Date:

Date:

t@

SUBMITTED:

APPROVED:

CITY OF GEORGE BUILDING PERMIT PROCESS