Montana Law Enforcement Academy Master Plan

Prepared by:

Department of Administration Architecture & Engineering Division

1520 East Sixth Avenue, Rm. 33 Metcalf Building P. O. Box 200103

Helena MT 59620-0103 (406) 444-3104

Fax (406) 444-3399

February 26, 2016

Page 2: Montana Law Enforcement Academy Master Plan · 209 stor. 212 dorm room 5 3 1 dorm room 7 dorm room 8 jan. 218 dorm room 9 dorm room 10 dorm room 11 corridor 222 down up dn dn dn dn

Introduction In 1997, the Montana Law Enforcement Academy (MLEA) relocated to its current location (the former Mountain View School for Girls

campus) northeast of Helena. The campus covers approximately 22 acres and consists of 10 occupied structures originally constructed from 1920 to 1960. When MLEA took over the campus the buildings were in very poor and deteriorating condition due to vacancy and lack of maintenance. The Department of Justice (DOJ) and past and current administration of MLEA have been diligent in their continuing efforts to improve and upgrade not only the educational programs at MLEA, but also the buildings and campus in order to provide a more conducive learning environment for law enforcement cadets.

To date over $8.2 million in infrastructure improvements have been made on campus. Work includes a new waste water treatment system,

a new water system, a new classroom building (Ohs Education Center) as well as stabilizing existing buildings and foundations, improving existing building exterior envelopes, upgrading campus fire alarm systems, mitigating seismic building hazards, and retrofitting heating, ventilating and air conditioning as systems fail.

The campus location and existing facilities have worked well for the MLEA program, and the DOJ has made significant investments but, until

now, no plan or assessment of future goals and requirements has been prepared for the MLEA. In anticipation of the future, growth and continued success of the academy, the campus and its facilities, the Department of Administration Architecture & Engineering Division teamed with MLEA staff and administration to prepare this Masterplan report.

This report reflects the findings of on-site building and facility assessments and educational and programming surveys of the requirements of

the Montana Law Enforcement Academy. This campus development plan provides planning principles, priorities, ideas and estimates to help guide and shape the direction and future of the MLEA. The information is preliminary in nature and intended to be used as a baseline scope and estimating tool to work with in presenting future goals and visions for the MLEA.

1

Page 3: Montana Law Enforcement Academy Master Plan · 209 stor. 212 dorm room 5 3 1 dorm room 7 dorm room 8 jan. 218 dorm room 9 dorm room 10 dorm room 11 corridor 222 down up dn dn dn dn

SIERRA ROAD EAST

LAW

EN

FOR

CEM

ENT

ACAD

EMY

RD

1

2

3

4

5

6

7

8

9 10

12

11

1314

15

16

17

SITE PLANMONTANA LAW ENFORCEMENT ACADEMY

1 Spruce Dorm2 Aspen Dorm3 Water Storage Tower4 Pump House5 Gymnasium6 Kitchen / Dining7 Administration8 Sewage Lift Station9 Shop10 Garage11 Training Structure12 Treatment Building13 Clinic14 Storage15 Maple Dorm16 Education Center17 Cottonwood Dorm

CAMPUS LEGEND

2

Page 4: Montana Law Enforcement Academy Master Plan · 209 stor. 212 dorm room 5 3 1 dorm room 7 dorm room 8 jan. 218 dorm room 9 dorm room 10 dorm room 11 corridor 222 down up dn dn dn dn

1

1

12

4

7

8

5

36

1

PHASE 1: Dormitory Renovations

PHASE 2: Cafeteria Expansion / Renovation

PHASE 4: Administration Offices / Addition to Ohs Bldg.

PHASE 5: Renovate Administration Bldg Into Classrooms

PHASE 3: New Scenario Bldg.

PHASE 6: Maintenance Shop Addition

PHASE 7: Cottonwood Dormitory Demolition

PHASE 8: New 30 Room Dormitory

Cost Estimate: $5,023,470

Cost Estimate: $1,431,730

Cost Estimate: $594,063

Cost Estimate: $1,619,408

Cost Estimate: $3,241,709

Cost Estimate: $370,673

Cost Estimate: $314,004

Cost Estimate: TBD

MASTER PLAN PHASINGMONTANA LAW ENFORCEMENT ACADEMY

PHASING LEGEND

3

Page 5: Montana Law Enforcement Academy Master Plan · 209 stor. 212 dorm room 5 3 1 dorm room 7 dorm room 8 jan. 218 dorm room 9 dorm room 10 dorm room 11 corridor 222 down up dn dn dn dn

PHASE 1 - DORMITORY RENOVATIONSMONTANA LAW ENFORCEMENT ACADEMY

SPRUCE DORM• Upgrade Heating & Ventilation Systems• Upgrade Lighting• Remodel existing building to add 10 private rooms• Add laundry facilities in basement• Add student lounge in basement• New paint & flooring

ASPEN DORM• Upgrade Heating & Ventilation Systems• Upgrade Lighting• Remodel existing building to add 6 private

rooms• Add laundry facilities in basement• Add student lounge in basement• New paint & flooring

MAPLE DORM• Upgrade Heating & Ventilation Systems• Upgrade Lighting• Remodel existing building to add 20 private

rooms• Add laundry facilities in basement• Add student lounge in basement• New paint & flooring• Renovate basement scenario training area

CLINIC BUILDING• Upgrade Heating & Ventilation Systems• Upgrade Lighting• Remodel existing unused building into 7

dorm suites• Add laundry facility

4

Page 6: Montana Law Enforcement Academy Master Plan · 209 stor. 212 dorm room 5 3 1 dorm room 7 dorm room 8 jan. 218 dorm room 9 dorm room 10 dorm room 11 corridor 222 down up dn dn dn dn

BOILERROOM

001

ENTRY002

ENTRY003

STAIRS004

STORAGE007

STORAGE006

STORAGE008HALL

009

TVLOUNGE

010

STORAGE011

STORAGE012

WATERENTRY

013

HALL014

HALL015

LAUNDRY005U

P

UP

UP

UP

DORMROOM

15CLO102

CLO103

DORMROOM

16 TOILET105

KITCHEN107

STAIRS DN108

STAIRS UP109

DORM110 PORCH

113

STUDY117OFFICE

118

ENTRY120

BATH122

DORMROOM

17 DORM ROOM

18

PORCH126

CORRIDOR126

CORRIDOR127

FOYER119

DORM ROOM

19

DN UP

UP

DN

UP

UPDN

UP

CLO.201

DORMROOM

12

EXIT203 TOILETS &

SHOWER204

STAIRS205

DORMROOM

6

DORMROOM

4

DORMROOM

2

EXIT209

STOR.212

DORMROOM

1

DORMROOM

3

DORMROOM

5

DORMROOM

7

DORMROOM

8

JAN.218

DORMROOM

9

DORMROOM

10

DORMROOM

11

CORRIDOR222

DOW

N

UP

DN

DN

DN

DN

REMODEL CONSTRUCTION

NEW FINISHES

LEGEND

PHASE 1 - SPRUCE DORMITORYMONTANA LAW ENFORCEMENT ACADEMY

BASEMENT

FIRST FLOOR

SECOND FLOOR

5

Page 7: Montana Law Enforcement Academy Master Plan · 209 stor. 212 dorm room 5 3 1 dorm room 7 dorm room 8 jan. 218 dorm room 9 dorm room 10 dorm room 11 corridor 222 down up dn dn dn dn

BOILER RM001

STOR.002

STAIRS003

HALL004

STORAGE005

STAIRS006

LAUNDRY007

TVROOM

008

STORAGE009

STORAGE010

STORAGE011

STORAGE RM012

HALL013

UP

UP

UP

UP UP

KITCHEN110

ENTRY111

ENTRY109

STAIRS108

SITTINGROOM

101

STUDYROOM

102

DORM103

DORM104

DORM107

DORM106

DORM112

DORM113

DORM114

DORM115

BATH105

UP

DO

WN

UPUP

DORMROOM

2

DORMROOM

4

DORMROOM

6

DORMROOM

8

DORMROOM

10

STAIRS206

TOILETS &SHOWERS

207

DORMROOM

14

DORMROOM

13

DORMROOM

12

DORMROOM

11

DORMROOM

9

DORMROOM

7

DORMROOM

5

DORMROOM

3

DORMROOM

1

CORRIDOR217

DO

WNDN DN

REMODEL CONSTRUCTION

NEW FINISHES

LEGEND

PHASE 1 - ASPEN DORMITORYMONTANA LAW ENFORCEMENT ACADEMY

BASEMENT

FIRST FLOOR

SECOND FLOOR

6

Page 8: Montana Law Enforcement Academy Master Plan · 209 stor. 212 dorm room 5 3 1 dorm room 7 dorm room 8 jan. 218 dorm room 9 dorm room 10 dorm room 11 corridor 222 down up dn dn dn dn

LAUNDRY017

STAIRS016

STORAGE015

STORAGE014

STORAGE013

STORAGE012

STORAGE009

TV LOUNGE008

STORAGE005

BARSCENARIO

001

APARTMENTSCENARIO

010

UP

CONFERENCE105

STUDY106

STUDY107

DORM114

DORM116

DORM117

PORCH119

DORM120

DORM121

CORR.122

CORRIDOR113

STAIRS126

ENTRY101

JAN.123

DORM128

CORRIDOR127

FOYER125

KITCHEN106

UPDN

UP

UP

UPU

P

UP

UP

DN

UP

DORMROOM

201

DORMROOM

202

DORMROOM

203

DORMROOM

204

TOILET &SHOWER

205 DORMROOM

206

DORMROOM

207

DORMROOM

208

DORMROOM

211

DORMROOM

212

DORMROOM

213

DORMROOM

214

DORMROOM

215

DORMROOM

216

DORMROOM

217

DORMROOM

218

DORMROOM

220

DORMROOM

221SHOWERS

222

DORMROOM

223

DORMROOM

224

DORMROOM

225

DORMROOM

226

DORMROOM

227

DORMROOM

228

EXIT229

DORMROOM

230

DORMROOM

231

DORMROOM

232

CORR.233

CORRIDOR236

STAIRS237

DORMROOM

238

CORR.239

CORRIDOR219

TOILETS234 LAVS

235

DO

WN

DN

DN

DN

DN

DN

DN

DN

DN

REMODEL CONSTRUCTION

NEW FINISHES

LEGEND

PHASE 1 - MAPLE DORMITORYMONTANA LAW ENFORCEMENT ACADEMY

BASEMENT

FIRST FLOOR

SECOND FLOOR

7

Page 9: Montana Law Enforcement Academy Master Plan · 209 stor. 212 dorm room 5 3 1 dorm room 7 dorm room 8 jan. 218 dorm room 9 dorm room 10 dorm room 11 corridor 222 down up dn dn dn dn

DORMSUITE

105DORMSUITE

106

DORMSUITE

107

DORMSUITE

101

DORMSUITE

102

DORMSUITE

103

DORMSUITE

104

LAUNDRY

REMODEL CONSTRUCTION

NEW FINISHES

LEGEND

PHASE 1 - CLINIC BUILDING DORMITORYMONTANA LAW ENFORCEMENT ACADEMY

CLINIC BUILDING FLOOR PLAN

8

Page 10: Montana Law Enforcement Academy Master Plan · 209 stor. 212 dorm room 5 3 1 dorm room 7 dorm room 8 jan. 218 dorm room 9 dorm room 10 dorm room 11 corridor 222 down up dn dn dn dn

Phase 1 Estimate of Cost: Dormitory Renovation

Description:

A. Renovation/Remodel Work1. Building Renovation 33726402. Permits, Fees, Testing, Survey, Mobilization 67452.8

Subtotal Renovation Costs 3,440,093$ B. Architect Engineer Fees & Expenses

1. New Construction - Building 344,009$ 2. Expenses 17,200$

Subtotal A/E Fees & Expenses 361,210$

C. Equipment & Furnishings1. Furnishings & Equipment 137,604$

Subtotal Equip. & Furnishings 137,604$

Subtotal Project Cost 3,938,906$

D. Contingency 15% 590,836$

TOTAL DESIGN AND CONSTRUCTION COST 4,529,742$

E. Escalation to Mid Point Const - 3.5 years @ 3.0% per year 493,727$ (Bid Jan 2018, Move in Sept 2019)

F. TOTAL DESIGN & CONSTRUCTION COST 5,023,470$

Complete interior renovation/remodel of existing dormitories on campus . Work to each building includes but is not limited to:  Upgraded interior finishes; Upgraded heating, ventilation, air conditioning, lighting and power; On‐ site laundry facilities, Multiple study areas, Kitchenette

9

Page 11: Montana Law Enforcement Academy Master Plan · 209 stor. 212 dorm room 5 3 1 dorm room 7 dorm room 8 jan. 218 dorm room 9 dorm room 10 dorm room 11 corridor 222 down up dn dn dn dn

PHASE 2 - CAFETERIA EXPANSION & RENOVATIONMONTANA LAW ENFORCEMENT ACADEMY

CAFETERIA EXPANSION• Upgrade heating & ventilation systems• Upgrade lighting• Construct addition to increase seating capacity to 120• Add conference room• Construct entry vestibule addition• Expand existing bathrooms to meet current codes• Construct covered patio for additional seating• Construct dry storage addition• Upgrade kitchen equipment• Upgrade food service serving line

10

Page 12: Montana Law Enforcement Academy Master Plan · 209 stor. 212 dorm room 5 3 1 dorm room 7 dorm room 8 jan. 218 dorm room 9 dorm room 10 dorm room 11 corridor 222 down up dn dn dn dn

DISH WASHING103

KITCHEN104 DRY STORAGE

105

WALK-INCOOLER

106

JANITOR107

ENTRY108

SERVING115

OFFICE116

HALL117

TOILET109

VESTIBULE ADDITION

COVERED PATIOADDITION

CONFERENCE ROOM

STORAGEADDITION

WOMEN

MEN

NEW CONSTRUCTION

NEW FINISHES

LEGEND

PHASE 2 - CAFETERIA EXPANSION & RENOVATIONMONTANA LAW ENFORCEMENT ACADEMY

CAFETERIA FLOOR PLAN

11

Page 13: Montana Law Enforcement Academy Master Plan · 209 stor. 212 dorm room 5 3 1 dorm room 7 dorm room 8 jan. 218 dorm room 9 dorm room 10 dorm room 11 corridor 222 down up dn dn dn dn

Phase 2 Estimate of Cost: Cafeteria Expansion & Renovation

Description:

A. Renovation/Remodel Work1. Building Renovation 9612302. Permits, Fees, Testing, Survey, Mobilization 19224.6

Subtotal Renovation Costs 980,455$ B. Architect Engineer Fees & Expenses

1. New Construction - Building 98,045$ 2. Expenses 4,902$

Subtotal A/E Fees & Expenses 102,948$

C. Equipment & Furnishings1. Furnishings & Equipment 147,068$

Subtotal Equip. & Furnishings 147,068$

Subtotal Project Cost 1,230,471$

D. Contingency 15% 184,571$

TOTAL DESIGN AND CONSTRUCTION COST 1,415,041$

E. Escalation to Mid Point Const - 3 years @ 3.0% per year 131,213$ (Bid Jan 2018, Jan 2019)

F. TOTAL DESIGN & CONSTRUCTION COST 1,546,254$

Complete interior renovation & addition to cafeteria . Work includes but is not limited to: Dining addition to increase dining capacity to 120; Covered exterior eating area; Enclosed entry vestibule addition; Upgraded/ toilet rooms; Dry storage addition; Upgraded interior finishes; Upgraded heating, ventilation, air conditioning, and 

12

Page 14: Montana Law Enforcement Academy Master Plan · 209 stor. 212 dorm room 5 3 1 dorm room 7 dorm room 8 jan. 218 dorm room 9 dorm room 10 dorm room 11 corridor 222 down up dn dn dn dn

PHASE 3 - SCENARIO TRAINING BUILDINGMONTANA LAW ENFORCEMENT ACADEMY

SCENARIO BUILDINGThe scenario building can house a full-sizedcity street, with curbs and sidewalks. Thestreet is flanked by building facades thatrepresent businesses and residences found inany police agency's jurisdiction. Thesefacades are set up with furniture thatrealistically replicates business and residentialsettings and gives students a chance torespond to calls at a bank, a bar, an apartmentor any other configuration that training staffmembers create. The scenario building alsohas a correctional facility facade andequipment that allows for practice of safesuspect/inmate transportation and booking, aswell as more tactical maneuvers like safe cellextraction.

Photos provided courtesy of theOregon Public Safety Academy

13

Page 15: Montana Law Enforcement Academy Master Plan · 209 stor. 212 dorm room 5 3 1 dorm room 7 dorm room 8 jan. 218 dorm room 9 dorm room 10 dorm room 11 corridor 222 down up dn dn dn dn

SCENARIO #13SALLY PORT

SCENARIO #12CORRECTIONS

SCENARIO #10BAR

DRESSING RM

WOMEN

MEN

SCENARIO #9DRIVE THRU

SCENARIO #2KITCHEN

SCENARIO #1LIVING ROOM

SCENARIO #3BEDROOM SCENARIO #4BATH

SCENARIO #5CANNABIS STORE STORAGE

SCENARIO #6CONVENIENCE STORE

STORAGE

SCENARIO #7ALLEY

SCENARIO #8BANK

SCENARIO #11PAWN SHOP

88'116'

26'

25'

PHASE 3 - SCENARIO TRAINING BUILDINGMONTANA LAW ENFORCEMENT ACADEMY

SCENARIO BUILDING FLOOR PLAN10,200 SQ FT

Floor plan provided courtesy of theOregon Public Safety Academy

14

Page 16: Montana Law Enforcement Academy Master Plan · 209 stor. 212 dorm room 5 3 1 dorm room 7 dorm room 8 jan. 218 dorm room 9 dorm room 10 dorm room 11 corridor 222 down up dn dn dn dn

Phase 3 Estimate of Cost: New Scenario Building

Description:

A. Renovation/Remodel Work1. Building Renovation 19380002. Permits, Fees, Testing, Survey, Mobilization 38760

Subtotal Renovation Costs 1,976,760$ B. Architect Engineer Fees & Expenses

1. New Construction - Building 197,676$ 2. Expenses 9,884$

Subtotal A/E Fees & Expenses 207,560$

C. Equipment & Furnishings1. Furnishings & Equipment 395,352$

Subtotal Equip. & Furnishings 395,352$

Subtotal Project Cost 2,579,672$

D. Contingency 15% 386,951$

TOTAL DESIGN AND CONSTRUCTION COST 2,966,623$

E. Escalation to Mid Point Const - 3 years @ 3.0% per year 275,086$ (Bid Jan 2018, Move in Jan 2019)

F. TOTAL DESIGN & CONSTRUCTION COST 3,241,709$

Construct scenario training building to provide full‐sized city street with curbs and sidewalks flanked by building facades which represent typical businesses and residences found in any police agency's jurisdiction. The building also contains a correctional facility facade and equipment that allows for practice of safe suspect/inmate 

15

Page 17: Montana Law Enforcement Academy Master Plan · 209 stor. 212 dorm room 5 3 1 dorm room 7 dorm room 8 jan. 218 dorm room 9 dorm room 10 dorm room 11 corridor 222 down up dn dn dn dn

PHASE 4 - ADMINISTRATION OFFICES - ADDITION TO OHS BUILDINGMONTANA LAW ENFORCEMENT ACADEMY

ADMINISTRATION OFFICES ADDITION• Construct 12-office addition to accommodate all administrative functions

• Relocate offices currently located in the Administration Building• Relocate Public Safety Officer Standards and Training (POST)

Council from Maple Dormitory• Provide offices for adjunct teachers

16

Page 18: Montana Law Enforcement Academy Master Plan · 209 stor. 212 dorm room 5 3 1 dorm room 7 dorm room 8 jan. 218 dorm room 9 dorm room 10 dorm room 11 corridor 222 down up dn dn dn dn

STORAGE206

CLASSROOM205

CLASSROOM204

STORAGE203

CONFERENCEROOM

207

STORAGE215

ELEV.201

LOBBY202

CLASSROOM214

CLASSROOM213

STAIR'B'208

STAIR'A'200

JAN.210

MENSRESTROOM

211

WOMENSRESTROOM

212

CORR.209

STORAGE216

MECH.217

CORR.218

ELECT.219

STORAGE220

OFFICE OFFICE

OFFICEOFFICEOFFICEOFFICE

EDITING111

STUDIO112

OFFICE110

OFFICE109

OFFICE108

OFFICE107

HALL106

RECEPTION105

STAIR'A'102

VEST.100

VEST.115

STAIR'B'116

LOUNGE114

STUDY113

LOBBY101

CLASSROOM121

VEST.122

ELECT.129

ELEV. EQUIP.125

PRACTICALTRAINING

124

STORAGE.123

MENSRESTROOM

120

JAN.118

WOMENSRESTOOM

119

STOR.104

ELEV.103

COMM.128

MECH.127

CORR.117

FIRESPRINKLER

130

VAULT126

OFFICE OFFICE

OFFICEOFFICEOFFICEOFFICE

NEW CONSTRUCTION

NEW FINISHES

LEGEND

PHASE 4 - ADMINISTRATION OFFICES - ADDITION TO OHS BUILDINGMONTANA LAW ENFORCEMENT ACADEMY

SECOND FLOOR

FIRST FLOOR

17

Page 19: Montana Law Enforcement Academy Master Plan · 209 stor. 212 dorm room 5 3 1 dorm room 7 dorm room 8 jan. 218 dorm room 9 dorm room 10 dorm room 11 corridor 222 down up dn dn dn dn

Phase 4 Estimate of Cost: Administration Offices Addition

Description:

A. Renovation/Remodel Work1. Building Renovation 3693002. Permits, Fees, Testing, Survey, Mobilization 7386

Subtotal Renovation Costs 376,686$ B. Architect Engineer Fees & Expenses

1. New Construction - Building 37,669$ 2. Expenses 1,883$

Subtotal A/E Fees & Expenses 39,552$

C. Equipment & Furnishings1. Furnishings & Equipment 56,503$

Subtotal Equip. & Furnishings 56,503$

Subtotal Project Cost 472,741$

D. Contingency 15% 70,911$

TOTAL DESIGN AND CONSTRUCTION COST 543,652$

E. Escalation to Mid Point Const - 3 years @ 3.0% per year 50,411$ (Bid Jan 2018, Move in Sept 2019)

F. TOTAL DESIGN & CONSTRUCTION COST 594,063$

Construct 12‐office addition to the Ohs Building to acommodate all administrative functions

18

Page 20: Montana Law Enforcement Academy Master Plan · 209 stor. 212 dorm room 5 3 1 dorm room 7 dorm room 8 jan. 218 dorm room 9 dorm room 10 dorm room 11 corridor 222 down up dn dn dn dn

PHASE 5 - RENOVATE ADMINISTRATION BUILDING INTO CLASSROOMSMONTANA LAW ENFORCEMENT ACADEMY

ADMIN BUILDING RENOVATION• Return entire building function to educational space• Upgrade Heating & Ventilation Systems• Upgrade Lighting• Remodel main floor into classrooms• Add bathrooms to meet current codes

19

Page 21: Montana Law Enforcement Academy Master Plan · 209 stor. 212 dorm room 5 3 1 dorm room 7 dorm room 8 jan. 218 dorm room 9 dorm room 10 dorm room 11 corridor 222 down up dn dn dn dn

CLASSROOM001

CLEANUP002

MEN003

WOMEN004

STAIRS005

ENTRY006

BOILER007

STORAGE008

TOILET009

PHONES010

CLO.011

CLO.012

STORAGE013

OFFICE014

STORAGE017

STORAGE &EQUIPMENT

018

HALL019

UP

UP

UP UP

STAIRS104

STAIRS105

ENTRY100

CLASSROOM101

CLASSROOM102

CLASSROOM108

WOMEN106

MEN107

UP D

N

DN

UP

CLASSROOM201

CLASSROOM203

CLASSROOM204

STOR.205

STOR.207

STAIR208

CORRIDOR209

CLASSROOM202

DN

11R

DN

11R

DN

9R

DN

9R

UP

REMODEL CONSTRUCTION

NEW FINISHES

LEGEND

PHASE 5 - RENOVATE ADMINISTRATION BUILDING INTO CLASSROOMSMONTANA LAW ENFORCEMENT ACADEMY

BASEMENT

FIRST FLOOR

SECOND FLOOR

20

Page 22: Montana Law Enforcement Academy Master Plan · 209 stor. 212 dorm room 5 3 1 dorm room 7 dorm room 8 jan. 218 dorm room 9 dorm room 10 dorm room 11 corridor 222 down up dn dn dn dn

Phase 5 Estimate of Cost: Renovate Admin Building back to Classrooms

Description:

A. Renovation/Remodel Work1. Building Renovation 11034202. Permits, Fees, Testing, Survey, Mobilization 22068.4

Subtotal Renovation Costs 1,125,488$ B. Architect Engineer Fees & Expenses

1. New Construction - Building 112,549$ 2. Expenses 5,627$

Subtotal A/E Fees & Expenses 118,176$

C. Equipment & Furnishings1. Furnishings & Equipment 45,020$

Subtotal Equip. & Furnishings 45,020$

Subtotal Project Cost 1,288,684$

D. Contingency 15% 193,303$

TOTAL DESIGN AND CONSTRUCTION COST 1,481,987$

E. Escalation to Mid Point Const - 3 years @ 3.0% per year 137,420$ (Bid Jan 2018, Move in Jan 2019)

F. TOTAL DESIGN & CONSTRUCTION COST 1,619,407$

Return/renovate existing admin building back to classrooms.  Work includes but is not limited to:  Upgrade heating, ventilation, air conditioning and lighting; Add toilet facilities to comply with interior finishes throughout.

21

Page 23: Montana Law Enforcement Academy Master Plan · 209 stor. 212 dorm room 5 3 1 dorm room 7 dorm room 8 jan. 218 dorm room 9 dorm room 10 dorm room 11 corridor 222 down up dn dn dn dn

PHASE 6 - MAINTENANCE SHOP ADDITIONMONTANA LAW ENFORCEMENT ACADEMY

MAINTENANCE SHOP ADDITION• Construct 2-Bay addition• Construct storage / laundry addition

22

Page 24: Montana Law Enforcement Academy Master Plan · 209 stor. 212 dorm room 5 3 1 dorm room 7 dorm room 8 jan. 218 dorm room 9 dorm room 10 dorm room 11 corridor 222 down up dn dn dn dn

STORAGE

2 BAY ADDITION

LAUNDRY

NEW CONSTRUCTION

NEW FINISHES

LEGEND

PHASE 6 - MAINTENANCE SHOP ADDITIONMONTANA LAW ENFORCEMENT ACADEMY

MAINTENANCE SHOP FLOOR PLAN

23

Page 25: Montana Law Enforcement Academy Master Plan · 209 stor. 212 dorm room 5 3 1 dorm room 7 dorm room 8 jan. 218 dorm room 9 dorm room 10 dorm room 11 corridor 222 down up dn dn dn dn

Phase 6 Estimate of Cost: Maintenance Shop Addition

Description:

A. Renovation/Remodel Work1. Building Renovation 2249002. Permits, Fees, Testing, Survey, Mobilization 4498

Subtotal Renovation Costs 229,398$ B. Architect Engineer Fees & Expenses

1. New Construction - Building 22,940$ 2. Expenses 1,147$

Subtotal A/E Fees & Expenses 24,087$

C. Equipment & Furnishings1. Furnishings & Equipment 45,880$

Subtotal Equip. & Furnishings 45,880$

Subtotal Project Cost 299,364$

D. Contingency 15% 44,905$

TOTAL DESIGN AND CONSTRUCTION COST 344,269$

E. Escalation to Mid Point Const - 2.5 years @ 3.0% per year 26,404$ (Bid Jan 2018, Move in Sept 2018)

F. TOTAL DESIGN & CONSTRUCTION COST 370,673$

Construct an addition to the existing maintenance shop to provide two additional vehicle service bays, additional storage space and on‐site laundry facility.

24

Page 26: Montana Law Enforcement Academy Master Plan · 209 stor. 212 dorm room 5 3 1 dorm room 7 dorm room 8 jan. 218 dorm room 9 dorm room 10 dorm room 11 corridor 222 down up dn dn dn dn

PHASE 7 - COTTONWOOD DORMITORY DEMOLITIONMONTANA LAW ENFORCEMENT ACADEMY

COTTONWOOD DORM DEMOLITION

• Constructed in 1960 as a secure, prison-like women's dormitory for theMountain View School for Girls.

• The foundation continues to settle causing cracking in many of thecinder block walls.

• Heating and ventilation are inadequate and the type of constructionmakes it difficult to upgrade.

• The building's architectural style is vastly different than the rest of thecampus

It is anticipated that prior to the demolition of Cottonwood, planning wouldcommence for a replacement dorm which would bring the total dormcapacity to 140. The replacement dorm cost was not estimated for this plansince many factors could affect the cost such as total dorm rooms needed,configuration of the building, amenities and additional space that may beutilized for classrooms, meetings rooms, or a weight room.

25

Page 27: Montana Law Enforcement Academy Master Plan · 209 stor. 212 dorm room 5 3 1 dorm room 7 dorm room 8 jan. 218 dorm room 9 dorm room 10 dorm room 11 corridor 222 down up dn dn dn dn

Phase 7 Estimate of Cost: Cottonwood Dormitory Demolition

Description:

A. Renovation/Remodel Work1. Building Renovation 2250002. Permits, Fees, Testing, Survey, Mobilization 4500

Subtotal Renovation Costs 229,500$ B. Architect Engineer Fees & Expenses

1. New Construction - Building 22,950$ 2. Expenses 1,148$

Subtotal A/E Fees & Expenses 24,098$

C. Equipment & Furnishings1. Furnishings & Equipment

Subtotal Equip. & Furnishings -$

Subtotal Project Cost 253,598$

D. Contingency 15% 38,040$

TOTAL DESIGN AND CONSTRUCTION COST 291,637$

E. Escalation to Mid Point Const - 2.5 years @ 3.0% per year 22,367$ (Bid Jan 2018, Demo complete in Sept 2018)

F. TOTAL DESIGN & CONSTRUCTION COST 314,004$

Demolish Cottonwood dormitory due to structural issues.

26