22
ODU FORMULA SAE STATUS UPDATE 2 Company Logo

ODU F ORMULA SAE S TATUS U PDATE 2. Submitted Budget on November 2 nd Currently organizing for fabrication phase Addition of an Aero team Management

Embed Size (px)

Citation preview

Page 1: ODU F ORMULA SAE S TATUS U PDATE 2. Submitted Budget on November 2 nd Currently organizing for fabrication phase Addition of an Aero team Management

ODU FORMULA SAE STATUS UPDATE 2

Company Logo

Page 2: ODU F ORMULA SAE S TATUS U PDATE 2. Submitted Budget on November 2 nd Currently organizing for fabrication phase Addition of an Aero team Management

• Submitted Budget on November 2nd

• Currently organizing for fabrication phase• Addition of an Aero team

Management

Page 3: ODU F ORMULA SAE S TATUS U PDATE 2. Submitted Budget on November 2 nd Currently organizing for fabrication phase Addition of an Aero team Management

Gantt Chart

Page 4: ODU F ORMULA SAE S TATUS U PDATE 2. Submitted Budget on November 2 nd Currently organizing for fabrication phase Addition of an Aero team Management

SUSPENSION

Company Logo

Page 5: ODU F ORMULA SAE S TATUS U PDATE 2. Submitted Budget on November 2 nd Currently organizing for fabrication phase Addition of an Aero team Management

• .625 X .035 4130 round steel tube• 3/8” Heim joints• Completely modeled• Jigging in progress• Heims have been ordered

• Wheels and tires have been processed

Control Arms

Page 6: ODU F ORMULA SAE S TATUS U PDATE 2. Submitted Budget on November 2 nd Currently organizing for fabrication phase Addition of an Aero team Management

• Uprights have been modified considerably• Bracket from top to a point outside of the wheel• Control arms had to be modified to accept new upright design

Uprights

Page 7: ODU F ORMULA SAE S TATUS U PDATE 2. Submitted Budget on November 2 nd Currently organizing for fabrication phase Addition of an Aero team Management

Suspension Design

• Designed to accommodatenew uprights and A-Armdesign

Page 8: ODU F ORMULA SAE S TATUS U PDATE 2. Submitted Budget on November 2 nd Currently organizing for fabrication phase Addition of an Aero team Management

Rockers

• Redesigned to save weight

• Optimize motion ratios

Page 9: ODU F ORMULA SAE S TATUS U PDATE 2. Submitted Budget on November 2 nd Currently organizing for fabrication phase Addition of an Aero team Management

CONTROLS TEAM

Company Logo

Page 10: ODU F ORMULA SAE S TATUS U PDATE 2. Submitted Budget on November 2 nd Currently organizing for fabrication phase Addition of an Aero team Management

• Prototyped mechanical aspects of electronic shifting in the shop.• Designed the actuator mount in SolidWorks.• Compiled the order form for the actuator and actuator mount material.

Shifting

Page 11: ODU F ORMULA SAE S TATUS U PDATE 2. Submitted Budget on November 2 nd Currently organizing for fabrication phase Addition of an Aero team Management

• Some issues have caused Pedal Assembly not to be finished• Throttle and clutch pedals will be thinner version of brake pedal• Order forms for steering have been completed and turned in

Pedal Assembly

Page 12: ODU F ORMULA SAE S TATUS U PDATE 2. Submitted Budget on November 2 nd Currently organizing for fabrication phase Addition of an Aero team Management

ENGINE TEAM

Page 13: ODU F ORMULA SAE S TATUS U PDATE 2. Submitted Budget on November 2 nd Currently organizing for fabrication phase Addition of an Aero team Management

INTAKE MANIFOLD

Mark Griffin and Aaron Kun Mu

Company Logo

Page 14: ODU F ORMULA SAE S TATUS U PDATE 2. Submitted Budget on November 2 nd Currently organizing for fabrication phase Addition of an Aero team Management

• Q (Volumetric Flow Rate)• Range Tested: 350 to 3500 • RPM: Idle at 1300 rpm to 10000 rpm

Test Phase in Solidworks

Page 15: ODU F ORMULA SAE S TATUS U PDATE 2. Submitted Budget on November 2 nd Currently organizing for fabrication phase Addition of an Aero team Management

- Currently Underway- Flange to Runner Transition Piece 3D Print - Foundry Fabrication

Production Phase

Page 16: ODU F ORMULA SAE S TATUS U PDATE 2. Submitted Budget on November 2 nd Currently organizing for fabrication phase Addition of an Aero team Management

Production Phase

Page 17: ODU F ORMULA SAE S TATUS U PDATE 2. Submitted Budget on November 2 nd Currently organizing for fabrication phase Addition of an Aero team Management

COOLING AND FUEL SYSTEM

Company Logo

Page 18: ODU F ORMULA SAE S TATUS U PDATE 2. Submitted Budget on November 2 nd Currently organizing for fabrication phase Addition of an Aero team Management

• Finalized design choices for ordering parts for cooling and fuel systems

• Choices are based on needs, quality of products and budget considerations

• Radiator: Speedway Universal Ford / Mopar– 19” x 22” x 2.25”– 2 rows of coolant tubes– Highly efficient due to use of maximum fins

per Inch to increase air cooling surface area

– Cost effective at 129$• Fan: 14” Electric Fan

– 1500cfm• 3” x 9” over flow tank• Coolant hoses and associated

adapters

Cooling

Page 19: ODU F ORMULA SAE S TATUS U PDATE 2. Submitted Budget on November 2 nd Currently organizing for fabrication phase Addition of an Aero team Management

• Completed Solid Works 3D design – design utilizes 2mm (to support welding) and 5052 aluminum to keep weight low.• To be donated by Bauer Compressors

• Finalized design choices and completed cost list for ordering parts• New Pressure gauge (0-100psi , Aeromotive)• Materials to fabricate a fuel filler neck and vent • PTFE SS Fuel hoses – chosen for its compatibility with high Octane fuels

• Durable, chemically and heat resistant• Blank fuel rail for fuel injection• Fuel cell safety foam – a modification in sloshing control from baffles

Fuel Cell

Page 20: ODU F ORMULA SAE S TATUS U PDATE 2. Submitted Budget on November 2 nd Currently organizing for fabrication phase Addition of an Aero team Management

EXHAUST

Company Logo

Page 21: ODU F ORMULA SAE S TATUS U PDATE 2. Submitted Budget on November 2 nd Currently organizing for fabrication phase Addition of an Aero team Management

• Exhaust redesigned to reduce losses and fix interface

• Order forms completed• Awaiting funding to

purchase parts

Exhaust Progress

Page 22: ODU F ORMULA SAE S TATUS U PDATE 2. Submitted Budget on November 2 nd Currently organizing for fabrication phase Addition of an Aero team Management

• Fabrication• Wrap headers• Final Assembly

What’s Left