Objective FCM05 ESSIP Plan 2015 Octavian CIOARA DPS/PEPR 01.11.2015

Objective FCM05

  • Upload
    kerri

  • View
    26

  • Download
    0

Embed Size (px)

DESCRIPTION

Objective FCM05. ESSIP Plan 2014. Octavian CIOARA DPS/PEPR 19.09.2014. Objective FCM05. Comprehensive Explanation What is new or has changed since LSSIP 2013 Link to European ATM Master Plan Finalisation Criteria and Closed Questions ESSIP Report 2013 - PowerPoint PPT Presentation

Citation preview

Page 1: Objective FCM05

Objective FCM05

ESSIP Plan 2015

Octavian CIOARADPS/PEPR

01.11.2015

Page 2: Objective FCM05

ESSIP Plan 2015 / Objective FCM05 2

Objective FCM05

• Comprehensive Explanation• What is new or has changed since LSSIP 2014• Link to European ATM Master Plan• Finalisation Criteria and Closed Questions• ESSIP Report 2014• Objective Coordinator’s Analysis, recommendations, tips & tricks• Links and contacts

Page 3: Objective FCM05

Comprehensive Explanation

ESSIP Plan 2015 / Objective FCM05 3

Area of applicability: All ECAC

Initial Operational Capability (IOC): 09/2013Full Operational Capability (FOC): 12/2021

The objective will ensure the improvement of B2B exchanges between local ASM tools and NM

Implementation will provide enhanced NOP capabilities (ADR, DDR2, Flight Plan filling...)

Page 4: Objective FCM05

What is new or has changed since LSSIP 2014

ESSIP Plan 2015 / Objective FCM05 4

Scope of the Objective enlarged so as to cover the integration of Airport Operational Plans (new NM10 and APO02 SLoAs).

Compliance date changed so as to address the new scope as defined in the PCP Regulation (12/2021) – but only for the new SLoAS!

Finalisation of SLoAs NM01, 02, 03, 07 and 08

Page 5: Objective FCM05

Link to European ATM Master Plan

ESSIP Plan 2015 / Objective FCM05 5

Objective FCM05 covers the following SESAR OI steps:

OI Step – [AOM-0202]-Enhanced Real-time Civil-Military Coordination of Airspace Utilisation

OI Step - [AOM-0205]-Modular Temporary Airspace Structures and Reserved Areas

OI Step - [DCB-0102]-Interactive Rolling NOP OI Step - [DCB-0103-A]-Collaborative NOP for Step 1 OI Step - [IS-0901-A]-SWIM for Step1

Page 6: Objective FCM05

Most important SLoA(s)

FCM05-ASP01 – Upgrade the automated ASM support system with the capability of AIXM 5.1 B2B data exchange with NM

FCM05-ASP02 – Perform an integration of the automated ASM support systems with the Network

Each SLoA should be fulfilled in accordance with the relevant provisions of the NM B2B Reference Manuals

ESSIP Plan 2015 / Objective FCM05 6

Page 7: Objective FCM05

Finalisation Criteria and Closed Questions

ESSIP Plan 2015 / Objective FCM05 7

Finalisation criteria: Contact your subject matter expert to determine the deployment Status for

each SloA

Closed questions: Closed Questions have been introduced for this Objective Statements on Deployment Status should provide answers

to Closed Questions

Page 8: Objective FCM05

ESSIP Report 2014

ESSIP Plan 2015 / Objective FCM05 8

It is important to note that most of the SLoAs are applicable to the Network Manager (NM) and that all NM-s SLoAs planned for 2014 (5 out of 7) have been implemented according with the plans so can be considered as -Finalised-.

Page 9: Objective FCM05

Objective Coordinator’s Analysis, recommendations, tips & tricks

ESSIP Plan 2015 / Objective FCM05 9

Ensure that your subject matter expert is involvement once you make your statement.

Information provided per SLoA can be easily verified by checking the provisions laid down in the supporting material.

Attention to the applicability to the Military stakeholders as airspace users.

Objective also related to AOM19

Page 10: Objective FCM05

Links and contacts

ESSIP Plan 2015 / Objective FCM05 10

Objective Coordinator: Octavian CIOARA +32 2 729 3282

[email protected]

NMD Objective Expert: Idalina MENDES +32 2 729 9646

[email protected]