OBG PRESENTS:

Alphabet Soup: MBBR Ain't Exactly ENR or IFAS!Lessons Along the Way to Optimization

VA WaterJAM 2017 9/12/17 4:30-5:00PM Bill Meinert & Ned Talbot, OBG

Page 2: OBG PRESENTS: Alphabet Soup: MBBR Ain't Exactly ENR or …MBBR Piloting Piloted September 2011 –March 2012 Warm and Cold, Dry and Wet, IR Adjustments Air distribution and DO control

Project Overview

Page 3: OBG PRESENTS: Alphabet Soup: MBBR Ain't Exactly ENR or …MBBR Piloting Piloted September 2011 –March 2012 Warm and Cold, Dry and Wet, IR Adjustments Air distribution and DO control

Overview

M

Moving

B

Bed

B

Biofilm

R

Reactor

Fixed Biofilm / IR / TN (& some TP) Removal Fixed Biofilm + SS / IR + RAS / TN + EBio-P

I

Integrated

F

Fixed-Film

A

Activated

S

Sludge

Protected biomass on plastic media expands capacity and effluent quality

Nutrients, peak flows, cold temps

3

Page 4: OBG PRESENTS: Alphabet Soup: MBBR Ain't Exactly ENR or …MBBR Piloting Piloted September 2011 –March 2012 Warm and Cold, Dry and Wet, IR Adjustments Air distribution and DO control

MBBR for Martinsburg

Benefits Obstacles

4

Page 5: OBG PRESENTS: Alphabet Soup: MBBR Ain't Exactly ENR or …MBBR Piloting Piloted September 2011 –March 2012 Warm and Cold, Dry and Wet, IR Adjustments Air distribution and DO control

MBBR Piloting

Piloted September 2011 – March 2012

Warm and Cold, Dry and Wet, IR Adjustments

Air distribution and DO control (+/-), No clarification

Initial – Nitrification, startup, warm & cold (vs. Tower)

5

Comparison – DN, Tower Effluent DO & temp, Carbon

Pre- & Post-Anoxic MBBR Sizing

BOD-limited Nutrient Removal (add Carbon)

Page 6: OBG PRESENTS: Alphabet Soup: MBBR Ain't Exactly ENR or …MBBR Piloting Piloted September 2011 –March 2012 Warm and Cold, Dry and Wet, IR Adjustments Air distribution and DO control

WRRF Project: MARTINSBURG, WV

3 MGD (12 MGD influent, 10 MGD peak to bio)

5 mg/L TN effluent limit

0.5 mg/L TP effluent limit

Project Summary

Demo:

Trickling filters

Nitrification tower

Modifications:

New Headworks, Biological, Ballasted Polishing

Improve Clarification, Disinfection, Anaerobic Digestion

New Solids Handling, Operations Building

Page 7: OBG PRESENTS: Alphabet Soup: MBBR Ain't Exactly ENR or …MBBR Piloting Piloted September 2011 –March 2012 Warm and Cold, Dry and Wet, IR Adjustments Air distribution and DO control

Tank configuration

Minimize approach velocity (~30-35 m/hr max)

Fail safes to contain media

Physical and operational

Important Design Details

Variation between vendors

Pre-purchase / selection

7

Page 8: OBG PRESENTS: Alphabet Soup: MBBR Ain't Exactly ENR or …MBBR Piloting Piloted September 2011 –March 2012 Warm and Cold, Dry and Wet, IR Adjustments Air distribution and DO control

Pre-Purchase Selection

Suez (IDI) Kruger Biowater Technology Headworks

Operational deadline – June 2016

Pre-purchased MBBR

Lowest life-cycle, capital costs

Potential change to IFAS in future

8

Page 9: OBG PRESENTS: Alphabet Soup: MBBR Ain't Exactly ENR or …MBBR Piloting Piloted September 2011 –March 2012 Warm and Cold, Dry and Wet, IR Adjustments Air distribution and DO control

Martinsburg WWTP Upgrade

Simplified Process Flow Diagram

9

1. Headworks

2. MBBR

4. Co-Mag

3. Disinfection

5. Solids Handling

6. O&M, Lab

Page 10: OBG PRESENTS: Alphabet Soup: MBBR Ain't Exactly ENR or …MBBR Piloting Piloted September 2011 –March 2012 Warm and Cold, Dry and Wet, IR Adjustments Air distribution and DO control

MBBR Biofilm by Zone

Diurnal VariationSolids Treatment Recycles

Seasonal FlexibilitySummer, Winter

DO ControlSetpoints, Control Valves

IR ControlMatch NO3 to BOD5

Carbon Feed ControlPost-Anoxic (& Pre-Ax?)

Process Performance by Design

10

Mix,BOD5, NO3

-> Anoxic

BOD5?, NH3

Air,BOD5?, NH3

-> Oxic

NH3

AirNH3, NO3

Oxic

NH3?, NO3

AirNH3?, NO3

Oxic

NO3

IR

Mix,NO3, Carbon-> Anoxic

TN < 5

Air

Mix,BOD5, NO3

-> Anoxic

BOD5,NO3 NH3

Mix,BOD5, NO3

-> Anoxic

NH3

AirNH3, NO3

Oxic

NH3, NO3

AirNH3, NO3

Oxic

NO3

IR

Mix,NO3, Carbon-> Anoxic

TN < 5

Air

“Summer” (more Denitrification capacity)

“Winter” (more Nitrification capacity)

Page 11: OBG PRESENTS: Alphabet Soup: MBBR Ain't Exactly ENR or …MBBR Piloting Piloted September 2011 –March 2012 Warm and Cold, Dry and Wet, IR Adjustments Air distribution and DO control

11

New 5 mm screens and gritPHASE 1 (INTERIM)

HeadworksTricking Filter

Nit. TowerTank 2

Page 12: OBG PRESENTS: Alphabet Soup: MBBR Ain't Exactly ENR or …MBBR Piloting Piloted September 2011 –March 2012 Warm and Cold, Dry and Wet, IR Adjustments Air distribution and DO control

Pre-Anoxic

Effluent Channel

Swing

Internal Recycle

Re-Aeration

Nitrification

Post-Anoxic

Tank 1

IR

Tank 2

INTERIM WASTEWATER TREATMENT

Keep 1 trickling filter online

Site / size restrictions

Build MBBR in 2 stages

Can also bypass Tank 1

Maintenance

Or, if media blockage

12

Page 13: OBG PRESENTS: Alphabet Soup: MBBR Ain't Exactly ENR or …MBBR Piloting Piloted September 2011 –March 2012 Warm and Cold, Dry and Wet, IR Adjustments Air distribution and DO control

NEW TANKS

Allowed for “ideal” reactors

Square Zones

3-4 ft freeboard

Overflows between reactors

13

Page 14: OBG PRESENTS: Alphabet Soup: MBBR Ain't Exactly ENR or …MBBR Piloting Piloted September 2011 –March 2012 Warm and Cold, Dry and Wet, IR Adjustments Air distribution and DO control

Martinsburg WWTP Upgrade

Interim Wastewater Treatment

14

Page 15: OBG PRESENTS: Alphabet Soup: MBBR Ain't Exactly ENR or …MBBR Piloting Piloted September 2011 –March 2012 Warm and Cold, Dry and Wet, IR Adjustments Air distribution and DO control

Change from 8hr to 24hr composite Sampling

8-hr overnightcomposite

24-hr overnightComposite

(a 30% jump)

Page 16: OBG PRESENTS: Alphabet Soup: MBBR Ain't Exactly ENR or …MBBR Piloting Piloted September 2011 –March 2012 Warm and Cold, Dry and Wet, IR Adjustments Air distribution and DO control

Headworks

Status: Constructed, Optimized

PHASE 2 (FINAL) HeadworksTank 1 + 2

Solids HandlingOperations

16

Page 17: OBG PRESENTS: Alphabet Soup: MBBR Ain't Exactly ENR or …MBBR Piloting Piloted September 2011 –March 2012 Warm and Cold, Dry and Wet, IR Adjustments Air distribution and DO control

MBBR Biofilm by Zone

AirMix

BOD - Heterotrophs (H)Denitrifiers – Heterotrophs-DNNitrifiers – Autotrophs (A)

The Wrong Mix or Type of Biofilm by Zone?

Process Performance by Stage

17

“Planned”

H A A

H? H A H, A?

High Load, or Low Air

H? H? A?H A, DN?

Intermittent / Insufficient Air

Phase 1

“Planned”

Sw A AH-DN

H?H, A A H,

A?

High Load, Low Air, or no Auto

H? H? A?H A, DN?

Intermittent / Insufficient Air

Phase 2

H-DN

H-DN

H-DN?

Page 18: OBG PRESENTS: Alphabet Soup: MBBR Ain't Exactly ENR or …MBBR Piloting Piloted September 2011 –March 2012 Warm and Cold, Dry and Wet, IR Adjustments Air distribution and DO control

Construction Staging, Startup, Optimization(Lessons Learned)

Page 19: OBG PRESENTS: Alphabet Soup: MBBR Ain't Exactly ENR or …MBBR Piloting Piloted September 2011 –March 2012 Warm and Cold, Dry and Wet, IR Adjustments Air distribution and DO control

MBBR Equipment Pre-Purchase Challenges

Timing of Equipment Delivery

Storage During Phasing

Vendor Controls Engineer Turnover

Lack of Vendor Startup Support

Contract Coordination

Page 20: OBG PRESENTS: Alphabet Soup: MBBR Ain't Exactly ENR or …MBBR Piloting Piloted September 2011 –March 2012 Warm and Cold, Dry and Wet, IR Adjustments Air distribution and DO control

Phase 1 StartupJune 2015

Initial Startup

• PE Split between TF and MBBR

• All flow to Nitrification Tower

• Coagulant to PC – remove BOD

After 2 weeks of operation

• All PE to MBBR

• Tower offline

• Coagulant Continued

Minimum flow required for filter arms

Slow biological growth on media

Construction 6 months behind

Page 21: OBG PRESENTS: Alphabet Soup: MBBR Ain't Exactly ENR or …MBBR Piloting Piloted September 2011 –March 2012 Warm and Cold, Dry and Wet, IR Adjustments Air distribution and DO control

LESSONS FROM CONSTRUCTION

IR zone flap gates

High mixing velocity

Minimize DO entrainment, Media back into IR zone

Flat screen addition

Still - mixing is good!

Keeps media from blocking

Square tanks, air scour facilitate roll

Warranty lengths

Tank 2 end near performance test

21

Page 22: OBG PRESENTS: Alphabet Soup: MBBR Ain't Exactly ENR or …MBBR Piloting Piloted September 2011 –March 2012 Warm and Cold, Dry and Wet, IR Adjustments Air distribution and DO control

Phase 2 StartupMarch 2016

Variable MBBR Influent Loading

Construction Impacts - Anaerobic Conditions in Primary Clarifiers

Construction Sequencing, Diurnal Variations - High Ammonia in Dewatering Filtrate

Interim, Partial Process Performance

Limited data to drive decisions

SCADA Trending not online

Nutrient Probes not installed

Only grab and composite samples

Too much construction work was pushed to the end!

Page 23: OBG PRESENTS: Alphabet Soup: MBBR Ain't Exactly ENR or …MBBR Piloting Piloted September 2011 –March 2012 Warm and Cold, Dry and Wet, IR Adjustments Air distribution and DO control

LESSONS FROM CONSTRUCTION

Aeration System Safety Factor is Key

Adequate blower pressure / temp capacity

Auto DO control of each zone adds pressure to system

Monitor temp/pressure alarms separately for troubleshooting

Manual Blower Control is tricky

Check DO at several times during the day

Under aeration during day worse than over aeration at night

Motorized Valve Setup Critical

Integrate with process control performance testing

Page 24: OBG PRESENTS: Alphabet Soup: MBBR Ain't Exactly ENR or …MBBR Piloting Piloted September 2011 –March 2012 Warm and Cold, Dry and Wet, IR Adjustments Air distribution and DO control

Nitrification Process Performance8/2016-8/2017

Nitrification established,But Lost due extendedaeration system issues Nitrification re-established,

Using Swing Zone, CorrectingMBBR biofilm migration

Nitrifier & Denitrifier Populations and Swing by Season

Pre-Ax Nit-1 Nit-2 Post-AxSwing

Page 25: OBG PRESENTS: Alphabet Soup: MBBR Ain't Exactly ENR or …MBBR Piloting Piloted September 2011 –March 2012 Warm and Cold, Dry and Wet, IR Adjustments Air distribution and DO control

Denitrification Process Performance8/2016-8/2017

Nitrification established in Phase 1,Denitrification in Phase 2

Denitrification established, but not optimized untilSCADA, Auto, and Carbon feed and Aeration System fixed

Coagulant feed and CoMag ballasted floc used to polish effluent TSS and TP.

Page 26: OBG PRESENTS: Alphabet Soup: MBBR Ain't Exactly ENR or …MBBR Piloting Piloted September 2011 –March 2012 Warm and Cold, Dry and Wet, IR Adjustments Air distribution and DO control

Conclusions & Plan Going Forward(Post-Construction)

Page 27: OBG PRESENTS: Alphabet Soup: MBBR Ain't Exactly ENR or …MBBR Piloting Piloted September 2011 –March 2012 Warm and Cold, Dry and Wet, IR Adjustments Air distribution and DO control

Process Differences Reinforced during Construction & Operation

Suspended Growth Process

• Biology can move throughout process train

• 2 mg/L or less DO in liquid phase for aerobic processes

• Suspended biology acts as a buffer

• DO carryover controlled by tapered aeration to match load

Fixed Film Process

• Biology fixed in zones. Adjustments take time.

• 3-4 mg/L DO liquid phase to drive oxygen into film

• Quicker DO changes. DO control more challenging.

• Higher potential for DO carryover to post-anoxic. Additional carbon needed for denitrification.

… and different mixing (RAS, IR) and sludge wasting abilities.

Page 28: OBG PRESENTS: Alphabet Soup: MBBR Ain't Exactly ENR or …MBBR Piloting Piloted September 2011 –March 2012 Warm and Cold, Dry and Wet, IR Adjustments Air distribution and DO control

Optimization & Path Forward

Auto DO and carbon control required for optimization.

Blowers being modified to provide better pressure / temperature capability

Swing zone use and number of trains required in winter to be optimized during next couple months. Transition to start early.

Solids recycles will be analyzed to determine ways to spread out ammonia load – Equalization?

Page 29: OBG PRESENTS: Alphabet Soup: MBBR Ain't Exactly ENR or …MBBR Piloting Piloted September 2011 –March 2012 Warm and Cold, Dry and Wet, IR Adjustments Air distribution and DO control

OBG | THERE’S A WAY

[email protected], 443-474-7332; [email protected], 301-731-1150

Page 30: OBG PRESENTS: Alphabet Soup: MBBR Ain't Exactly ENR or …MBBR Piloting Piloted September 2011 –March 2012 Warm and Cold, Dry and Wet, IR Adjustments Air distribution and DO control

Conclusions – Path Forward

Page 31: OBG PRESENTS: Alphabet Soup: MBBR Ain't Exactly ENR or …MBBR Piloting Piloted September 2011 –March 2012 Warm and Cold, Dry and Wet, IR Adjustments Air distribution and DO control

Lessons Learned: MBBR Internal Recycle Slipstream

Primary Effluent MBBR Bypass

Accidental during loss of power

No Check Valves – Limited space

Added check on FM

Interlocked Pumps on Fail