DESCRIPTION
NRG Contribution to LEADER WP1.1 Status. LEADER Petten, Netherlands Ferry Roelofs [email protected]. Contents. Introduction Roadmaps v3 Guinevere MYRRHA ALFRED PROLFR ELFR LEADER Overview LFR Deployment Conclusions. Introduction Roadmap visualisation. Purpose - PowerPoint PPT Presentation
Citation preview
2Petten • 2 November 2011
Contents
• Introduction• Roadmaps v3
– Guinevere– MYRRHA– ALFRED– PROLFR– ELFR– LEADER Overview– LFR Deployment
• Conclusions
3Petten • 2 November 2011
IntroductionRoadmap visualisation
• Purpose– Provide overview of timing of main developments– In addition
• Identification of critical path
• Identification of costly developments
• Identification of developments with high risk
• Approach– Roadmapper Workbench Excel based tool from Albright
Strategy Group– Limited level of detail to enable keeping an overview
• Outcome– Roadmap visuals which can be used in presentations to
(potential) stakeholders and which are easy to update during and after the project
4Petten • 2 November 2011
IntroductionRoadmaps under Consideration
• It was agreed with WP1 and WP1.1 coordinators to include roadmaps for:
– LFR Zero Power GUINEVERE (LFR/ADS)
– LFR ETPP MYRRHA (LFR/ADS)– LFR E&T ELECTRA (LFR)– LFR ETDR ALFRED (LFR)– LFR Prototype PROLFR (LFR)– LFR FOAK ELFR (LFR)
5Petten • 2 November 2011
IntroductionRoadmap Construction
• Three levels– Level 1
• Main roadmap elements (e.g. reactor, fuels, materials)
– Level 2• Secondary roadmap elements / subdivisions of main roadmap
elements, e.g. fuel qualification, fuel fabrication
– Level 3• Individual developments / subdivisions of secondary roadmap
elements, e.g. fuel irradiation, fuel safety tests
6Petten • 2 November 2011
IntroductionInput Data
• Input data– Begin time– End time / duration– Cost estimate (range)– Risk (low / medium / high)
• Initial guess provided by NRG based on information from SNE-TP, ESNII, EUROTRANS, MYRRHA, EISOFAR Fuel Roadmap, ELSY and LEADER projects
• Data review by LEADER experts to be identified this meeting
• Continuous update during the LEADER project
7Petten • 2 November 2011
IntroductionItems for Discussion
• Confirmation/identification of main and secondary roadmap elements
• Confirmation/identification of individual developments
• Input data content review
8Petten • 2 November 2011
RoadmapsGUINEVERE
LEADER GUINEVERE Table
14 December 2010
2006 2007 2008 2009 2010 2011 2012 2013 2014 2015
Reactor
GUINEVERE Design
GUINEVERE Construction
Primary System
Primary Components
ADS Components
Subcritical Core
Target
Secondary System
Secondary Components
Heat Rejection
Fuels
Fuel Qualification
Fabrication
Materials
Target Material
Other Materials
Coolant
Analyses
Analysis
Licensing
License
Safeguards
Proliferation
Dvlpmt Begins Costs
Feasibility Risk Event
©2008-2010 Albright Strategy Group, LLC
Detail
Civil
Construction Commissioning
Reactor Vessel
Piping
Pump
HEX
Fuel Handling
DHR
Design
Solid Lead Target
Piping
Eng. & Constr.
Irradiation
Safety Tests
Fuel Elements
Lead
VENUS
Water
Economic
Neutronic
Thermal Hydraulic
Structural PRA
'Exp. License' Site Selection
Proliferation Resistance
<50K <250K <1M <10M <50M <100M <500M <1B >1B
High Medium Low
9Petten • 2 November 2011
RoadmapMYRRHA
LEADER MYRRHA Table
2 November 2010
2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
Reactor
MYRRHA Design
MYRRHA Construction
Primary System
Primary Components
ADS Components
Subcritical Core
Target
Beam
Secondary System
Secondary Components
Heat Rejection
Fuels
Fuel Qualification
Fabrication
Materials
Cladding
Vessel
Internals
Control Rods
Coolant
Analyses
Analysis
Licensing
License
SA Tools & Exp.
Safeguards
Proliferation
Dvlpmt Begins Costs
Feasibility Risk Event
©2008-2010 Albright Strategy Group, LLC
Pre-Conceptual | EUROTRANS, CDT, ESNIIBasic | ESNIIDetail | ESNII
Civil | ESNII
Construction | ESNII, EUROTRANS D1.68| ESNII
Reactor Vessel | EUROTRANS D1.68
Piping
Pumps | EUROTRANS D1.68
HEX | EUROTRANS D1.68
LBE Purification | ELSY D10
Fuel Handling System | EUROTRANS D1.68
Oxygen Control | ELSY D10
ISI&R | EUROTRANS D1.68
DHR | EUROTRANS D1.68
Design | Paper work
Safety Tests | GUINEVERE
Target System | EUROTRANS D1.68
Accelerator | EUROTRANS D1.68
Piping | ELSY D10
Eng. & Constr. | ELSY D10
Irradiation | EISOFAR D10Safety Tests | EISOFAR D10
FR-MOX Fuel | EISOFAR D10
Fuel Elements | EISOFAR D10
15-15 Ti Qualification | Irradiation / CDT D1.4
316L Qualification | Irradiation / CDT D1.4
T91 Qualification | Irradiation / CDT D1.4
B4C Qualification | Irradiation / CDT D1.4
LBE | EUROTRANS D1.68
Economic | Paper work
Neutronic | Core optimization, shielding
Thermal Hydraulic | Operations, DBC, DEC, SA
Structural | Seismic, Vibration
PRA | Input required from other analyses
Constr. License | LEADER D29Site
Preparation PSAR SAR | Input required from analyses
EIA | ~ EIA for Gen III
Safety Analysis | RELAP
Seismic | FEM available
SGTR | Needs upscaled experiments compared to LIFUS with LBE
Thermal Fatigue | High risk because of conductivity and experiments required
DHR | Needs experimental validation
Source Term | Approach to be developed
Proliferation | Paper work
<50K <250 <1M <10M <50M <100 <500 <1B >1B
High Mediu Low
10Petten • 2 November 2011
RoadmapALFRED
LEADER ALFRED Table
2 November 2011
2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029
Reactor
ALFRED Design
ALFRED Construction
Primary System
Primary Components
ECS
Secondary Components
Heat Rejection
Fuels
Fuel Qualification
Fabrication
Materials
Cladding
Vessel
Internals
Control Rods
Coolant
Analyses
Analysis
Licensing
License
SA Tools & Exp.
Safeguards
Proliferation
Dvlpmt Begins Costs
Feasibility Risk Event
©2008-2010 Albright Strategy Group, LLC
Pre-Conceptual | LEADER, ESNIIBasic | ESNIIDetail | ESNII
Civil | ESNII
Construction | ESNII| ESNII
Reactor Vessel | ELSY D10
Piping
Pumps | ELSY D10
Steam Generator | ELSY D10
Lead Purification | ELSY D10
Fuel Handling System | ELSY D10
Oxygen Control | ELSY D10
ISI&R | ELSY D10
DHR | ELSY D10
Piping | ELSY D10
Turbine | ELSY D10
Generator | ELSY D10
Electrical | ELSY D10
Eng. & Constr. | ELSY D10
Irradiation | EISOFAR D10Safety Tests | EISOFAR D10
FR-MOX Fuel | EISOFAR D10
Fuel Elements | EISOFAR D10
T91 Qualification | Irradiation / WP3
15-15 Ti Qualification | Irradiation / WP3
316L Qualification | Irradiation / WP3
T91 Qualification | Irradiation / WP3
B4C Qualification | Irradiation / WP3
Lead | Available
Economic | Paper work
Neutronic | Core optimization, shielding
Thermal Hydraulic | Operations, DBC, DEC, SA
Structural | Seismic, Vibration
PRA | Input required from other analyses
Construction Lic. | LEADER D29Site | LEADER D29
Preparation PSAR SAR | Input required from analyses
EIA | ~ EIA for Gen III
Safety Analysis Code | RELAP
Seismic | FEM available
SGTR | Needs upscaled experiments compared to LIFUS
Thermal Fatigue | High risk because of conductivity and experiments required
DHR | Needs experimental validationSource Term | Approach to be developed
Proliferation Resistance | Paper work
<50K <250 <1M <10M <50M <100 <500 <1B >1B
High Mediu Low
11Petten • 2 November 2011
RoadmapPROLFR
LEADER PROLFR Table
17 May 2011
2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040
Reactor
PROLFR Design
PROLFR Construction
Primary System
Primary Components
ECS
Secondary Components
Heat Rejection
Fuels
Fuel Qualification
Fabrication
Materials
Cladding
Vessel
Internals
Control Rods
Coolant
Analyses
Analysis
Licensing
License
SA Tools & Exp.
Safeguards
Proliferation
Dvlpmt Begins Costs
Feasibility Risk Event
©2008-2010 Albright Strategy Group, LLC
Pre-Conceptual Basic Detail
Civil
Construction Com
Reactor Vessel
Piping Pumps
Steam Generator
Lead Purification
Fuel Handling System
Oxygen Control
ISI&R
DHR
Piping
Turbine Generator
Electrical Equipment
Eng. & Constr.
Irradiation (MOX) Irradiation (MA-MOX)
Safety Tests (MOX) Safety Tests (MA-MOX)
FR-MOX Fuel
FR-MA-MOX Fuel Fuel Elements
T91 Qualification
316LN Qualification
SA-516 Gr. 70 Qualification
B4C Qualification
Lead
Economic
Neutronic
Thermal Hydraulic
Structural
PRA
Constr. Lic. Site Selection Preparation
PSAR SAR
EIA
Safety Analysis Code
Seismic
SGTR
Thermal Fatigue
DHR
Source Term
Proliferation Resistance
<50K <250K
<1M <10M <50M <100M
<500M
<1B >1B
High Medi Low
12Petten • 2 November 2011
RoadmapELFR
LEADER ELFR Table
17 May 2011
2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 2041 2042 2043 2044 2045 2046 2047 2048 2049 2050
Reactor
ELFR Design
ELFR Construction
Primary System
Primary Components
ECS
Secondary Components
Heat Rejection
Fuels
Fuel Qualification
Fabrication
Materials
Cladding
Vessel
Internals
Control Rods
Coolant
Analyses
Analysis
Licensing
License
SA Tools & Exp.
Safeguards
Proliferation
Dvlpmt Begins Costs
Feasibility Risk Event
©2008-2010 Albright Strategy Group, LLC
Pre-Conceptual Basic Detail
Civil
Construction Com
Reactor Vessel Piping Pumps
Steam Generator Lead Purification
Fuel Handling System Oxygen Control
ISI&R
DHR
Piping Turbine
Generator
Electrical Equipment
Eng. & Constr.
Irradiation (MA-MOX) Safety Tests (MA-MOX)
FR-MA-MOX Fuel Fuel Elements
T91 Qualification
316LN Qualification
SA-516 Gr. 70 Qualification
B4C Qualification
Lead
Economic Neutronic
Thermal Hydraulic
Structural
PRA
Constr. Lic. Site Selection
Preparation
PSAR SAR
EIA
Safety Analysis Code
Seismic
SGTR
Thermal Fatigue
DHR
Source Term
Proliferation Resistance
<50K <250K
<1M <10M <50M <100M
<500M
<1B >1B
High Medi Low
13Petten • 2 November 2011
RoadmapLFR Deployment
• Adapted according to D29 rev1.1 october 2011• Including a schedule for ELECTRA
LEADER LFR Deployment Table
2-November-2011
2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 2041 2042 2043 2044 2045 2046 2047 2048 2049 2050
GUINEVERE
GUINEVERE Design
GUINEVERE Construction
MYRRHA
MYRRHA Design
MYRRHA Consortium
MYRRHA Construction
ELECTRA
ELECTRA Design
ELECTRA Consortium
ELECTRA Construction
ALFRED
ALFRED Design
ALFRED Consortium
ALFRED Construction
PROLFR
PROLFR Design
PROLFR Consortium
PROLFR Construction
ELFR
ELFR Design
ELFR Consortium
ELFR Construction
Dvlpmt Begins Deployment
Feasibility Risk Event
©2008-2010 Albright Strategy Group, LLC
Detail
Civil
Pre-Conceptual Basic Detail
Civil
Agreement
Construction
Pre-Conceptual Basic Detail
Civil
Agreement
Construction LEADER D29
Pre-Conceptual Basic Detail
Civil
Agreement
Construction
Pre-Conceptual Basic Detail
Civil
Agreement
Construction
Pre-Conceptual Basic Detail
Civil
Agreement
Construction
Basic Detail Const Com
High Mediu Low
14Petten • 2 November 2011
The End
“Thanks for your attention”