Page 1: nrb.etenders.dae.gov.innrb.etenders.dae.gov.in/tnduploads/nrb/pressnotices/PRSN59.pdf · The bidders must study the technical ... (i.e. SS equipment/vessel fabrication work with radiography
Page 2: nrb.etenders.dae.gov.innrb.etenders.dae.gov.in/tnduploads/nrb/pressnotices/PRSN59.pdf · The bidders must study the technical ... (i.e. SS equipment/vessel fabrication work with radiography
Page 3: nrb.etenders.dae.gov.innrb.etenders.dae.gov.in/tnduploads/nrb/pressnotices/PRSN59.pdf · The bidders must study the technical ... (i.e. SS equipment/vessel fabrication work with radiography
Page 4: nrb.etenders.dae.gov.innrb.etenders.dae.gov.in/tnduploads/nrb/pressnotices/PRSN59.pdf · The bidders must study the technical ... (i.e. SS equipment/vessel fabrication work with radiography
Page 5: nrb.etenders.dae.gov.innrb.etenders.dae.gov.in/tnduploads/nrb/pressnotices/PRSN59.pdf · The bidders must study the technical ... (i.e. SS equipment/vessel fabrication work with radiography
Page 6: nrb.etenders.dae.gov.innrb.etenders.dae.gov.in/tnduploads/nrb/pressnotices/PRSN59.pdf · The bidders must study the technical ... (i.e. SS equipment/vessel fabrication work with radiography
Page 7: nrb.etenders.dae.gov.innrb.etenders.dae.gov.in/tnduploads/nrb/pressnotices/PRSN59.pdf · The bidders must study the technical ... (i.e. SS equipment/vessel fabrication work with radiography
Page 8: nrb.etenders.dae.gov.innrb.etenders.dae.gov.in/tnduploads/nrb/pressnotices/PRSN59.pdf · The bidders must study the technical ... (i.e. SS equipment/vessel fabrication work with radiography
Page 9: nrb.etenders.dae.gov.innrb.etenders.dae.gov.in/tnduploads/nrb/pressnotices/PRSN59.pdf · The bidders must study the technical ... (i.e. SS equipment/vessel fabrication work with radiography
Page 10: nrb.etenders.dae.gov.innrb.etenders.dae.gov.in/tnduploads/nrb/pressnotices/PRSN59.pdf · The bidders must study the technical ... (i.e. SS equipment/vessel fabrication work with radiography
Page 11: nrb.etenders.dae.gov.innrb.etenders.dae.gov.in/tnduploads/nrb/pressnotices/PRSN59.pdf · The bidders must study the technical ... (i.e. SS equipment/vessel fabrication work with radiography
Page 12: nrb.etenders.dae.gov.innrb.etenders.dae.gov.in/tnduploads/nrb/pressnotices/PRSN59.pdf · The bidders must study the technical ... (i.e. SS equipment/vessel fabrication work with radiography
Page 13: nrb.etenders.dae.gov.innrb.etenders.dae.gov.in/tnduploads/nrb/pressnotices/PRSN59.pdf · The bidders must study the technical ... (i.e. SS equipment/vessel fabrication work with radiography
Page 14: nrb.etenders.dae.gov.innrb.etenders.dae.gov.in/tnduploads/nrb/pressnotices/PRSN59.pdf · The bidders must study the technical ... (i.e. SS equipment/vessel fabrication work with radiography

1

Minutes of Meeting of Pre-Bid Meeting

Tender No.-NRBPSU/11/ENG/TPT/2055

GENERAL

a) NRB, BARC explained the scope of the work and the salient technical requirements of the tendered work. It was further explained that the equipment tendered are required for critical application and will be handling highly corrosive process streams. As such, it is essential to deploy qualified manpower and implement strict quality assurance procedures during entire duration of fabrication.

b) Point wise clarifications to the queries raised by the bidders were provided and same is enclosed as Appendix –A.

c) BARC pointed out that, the price bid has been invited on weight of finished product in Rs/Kg basis except one catagory. The bidders must study the technical specification & drawings enclosed with tender carefully to understand the extent of actual job requirement.

d) BARC informed that all the commercial terms and conditions must be indicated in the technical bid only (i.e. in Part-I).

e) “APPENDIX – VI:Notes for the bidders” of the tech specs was explained and presented to all the bidders during the meeting which covered general conditions, payment terms, criteria for evaluation of bidders, procedure for financial & technical evaluation etc. It was also clarified to all the bidders that the vendor evaluation will be strictly based on the financial and technical criteria as specified in the technical specification. In this context the similar works (i.e. SS equipment/vessel fabrication work with radiography requirements and the minimum and maximum sizes of vessels are ranging from 10 lit to 6000 liter) completed by the bidder will be considered based on the certification of performance by the clients during last five years ending March, 2016.

f) Bidders requested more clarity w.r.t. details of the equipment and drawings of the equipments for better estimation of the costs. Accordingly, a detailed list of equipment mentioning the category and linkage with sample tender drawings is enclosed in form of Appendix-B of this MOM. Sample drawings for uniquely different tanks/equipments in each category will be uploaded on the tender portal. The newly uploaded drawing list is enclosed in Appendix-C of this MOM.

g) On the request of the firms, the due date for submission of the bids was extended up to three weeks from the date of uploading the minutes of meeting & Appendix of pre-bid meeting.

Page 15: nrb.etenders.dae.gov.innrb.etenders.dae.gov.in/tnduploads/nrb/pressnotices/PRSN59.pdf · The bidders must study the technical ... (i.e. SS equipment/vessel fabrication work with radiography

2

APPENDIX-A

CLARIFICATIONS Sr.

No

Queries/comments from the

Bidders

NRB, BARC’s Response

1 It’s mentioned in the techspecs that

FIM will be collected from WIP

stores, Trombay and FRFCF stores,

Kalpakkam. Please elaborate which

FIM is available at which location.

FIM is available in FRFCF store, Kalpakkam, Tamilnadu and WIP

stores Trombay. Pipes, Plates, HBN are available at FRFCF stores

Kalpakkam. Spray nozzles & steam jets are available at WIP stores

Trombay.

2 What are the modalities regarding

loading of FIM and unloading of

finished equipments at project site?

Vendor will arrange the transport vehicle for collecting FIM from

departmental stores at their own cost. Material Handling equipment

& manpower required at the site (FRFCF) for loading and unloading

will be provided by the department. However, it is mandatory for the

vendor to depute their authorized and qualified staff for collection of

FIM from departmental stores. An insurance policy as per the

“Notes for bidders’ is required to be submitted in advance by the

fabricator. Only upon acceptance of the same by the department,

FIM can be released.

3 Different equipments have different

NDT requirements. Cost estimation

based on weight basis is difficult for

different size and type of

equipments in absence of all

drawings. Can it be quoted on

equipment basis?

No, bidders are informed to quote on as per “Proforma for Price Schedule” page no 23 of the tech specs only for the uniformity and cost comparision of participating firms. Some more drawings as per Appendix-C of different types and sizes of equipments will be uploaded in the tender portal for better understanding and cost estimation.

4 What is Expected Delivery time for

the equipment?

The equipment shall be delivered to project site within 24 months

from the date of placement of Purchase Order (PO).

5 Can it be possible to provide the

drawings of all equipments on a soft

form or uploaded in the tender

portral for better understanding and

No, drawings cannot be provided to the bidders on soft form.

However, some more drawings as per Appendix-C of different

types and sizes of equipments will be uploaded in the tender portal

for better understanding and cost estimation.

Page 16: nrb.etenders.dae.gov.innrb.etenders.dae.gov.in/tnduploads/nrb/pressnotices/PRSN59.pdf · The bidders must study the technical ... (i.e. SS equipment/vessel fabrication work with radiography

3

Sr.

No

Queries/comments from the

Bidders

NRB, BARC’s Response

cost estimation?

Whether it’s possible to show all

the drawings?

Further, interested vendors may visit BARC with prior appointment

to see the drawings before the submission date of the tender.

7 There are a couple of bidders from

Chennai area. Can they see the

drawings in Kalpakkam?

Yes, the arrangement for the same will be made on written request

and prior appointment before due date.

8 Can it be poosible to increase

permissible wastage allowance on

FIM consumed?

No. Indicated wastage allowance of 3% of consumed FIM is

adequate. It is to clarify that this wastage allowance is irretrievable

wastage allowance on weight basis. Any wastage beyond 3% will

be charged at the rate of Rs 350/kg to the fabricator as indicated in

the technical specification.

9 Will plate cutting plan be provided

by you?

No, plate cutting plan won’t be provided by the department. The

fabricator will have to prepare plate cutting plan and get it approved

by the department (BARC).

9 Can bidder collect FIM material

from stores in multiple lots?

Yes, bidder can collect FIM material from stores any number of

times.

10 Can the orders be splitted? If yes,

How it will be splitted.

Yes, Competent authority of the tender reserves the right for

splitting and part order placement.

It will be split category wise. Categories of equipment are mentioned

on ‘Proforma for Price Schedule’, page no 23 of Tender

Specifications document.

11 More clarity is needed on Pall ring

meant for scrubber type equipment.

How much weight of Pall rings is

required per scrubber basis? It is

required for estimating cost.

Details of the dimensions requirement are mentioned in the technical

specification. The weight of pall ring per scrubber is 300 Kg(max).

Page 17: nrb.etenders.dae.gov.innrb.etenders.dae.gov.in/tnduploads/nrb/pressnotices/PRSN59.pdf · The bidders must study the technical ... (i.e. SS equipment/vessel fabrication work with radiography

4

Sr.

No

Queries/comments from the

Bidders

NRB, BARC’s Response

12 Is functional testing of the agitator

system is in scope of fabricator?

Yes.

13 Regarding agitators, manufacturers

of agitators have different warranty

terms. What should be done if the

Warranty provided by

manufacturers is less than that

mentioned in tender document?

The warranty should be one year from the date of delivery of the

equipment.

14 In what form/shape HBNs will be

provided by BARC? Is OD

machining required?

HBNs will be provided in long tubular product form. The machining

of the same shall be carried out by the fabricator. In HBN ID is

matched to the corresponding standard Sch 40 pipe. However, OD

of the same is required to be machined at the ends to suit the

corresponding standard pipe size as per the drawing.

15 What kind of packaging for

transportation of equipment is

envisaged?

Smaller equipment (upto 2 MT) will be packed in wooden crates

after wrapping with 2 layers of bubble polythene. If needed, saddles

will also be provided for packing.

Bigger equipment will be packed on wooden saddles after wrapping

with 2 layers of bubble polythene. It may be noted that only SS

metallic wraps will be used for clamping purpose.

16 Whether excise duty exemption

certificate will be provided by the

department?

Yes. However, written request for the certificate should be clearly

indicated in the offer of the firm. Applicability of excise duty should

be clearly indicated in the bid

17 Whether there is exemption for

service tax?

There is no exemption from service tax.

**************************************************

Page 18: nrb.etenders.dae.gov.innrb.etenders.dae.gov.in/tnduploads/nrb/pressnotices/PRSN59.pdf · The bidders must study the technical ... (i.e. SS equipment/vessel fabrication work with radiography

5

APPENDIX – B REVISED LIST OF EQUIPMENT & APPLICABLE DRAWINGS (With Reference drawing in tender portal) 1. HLW System:

Sl. No.

Equipment Tag No weight Size D X H (all in mm)

Applicable Drawing No.

MOC Applicable Design

&Fab.Code

Remarks Reference Drawing in tender portal

A)HL Bay-1 1 Melter Feed Tank H1-1TK041 160 450 X 1800 FRFCF/43211/GA/2500 SS-304L ASME SEC. III

DIV.1,SUB SEC.NCWithout cooling coil

FRFCF/43211/GA/2500

2 Dust Scrubber Tank H1-1SBT041 495 1000 X 1500 FRFCF/43211/GA/2509 SS-304L ASME SEC. III DIV.1,SUB SEC.NC

With cooling coiland jacket

FRFCF/43211/GA/2509

3 Melter Condensate Tank H1-1TK042 250 800 X 830 FRFCF/43211/GA/2501 SS-304L ASME SEC. III DIV.1,SUB SEC.NC

With cooling coil FRFCF/43211/GA/2501

4 MOG Scrubber Tank-1 H1-1SBT051 710 1200 X 1800 FRFCF/43211/GA/2504 SS-304L ASME SEC. III DIV.1,SUB SEC.NC

With cooling coil FRFCF/43211/GA/2504

5 MOG Scrubber Tank-2 H1-1SBT052 710 1200 X 1800 FRFCF/43211/GA/2506 SS-304L ASME SEC. III DIV.1,SUB SEC.NC

With cooling coil FRFCF/43211/GA/2504

6 First Stage Air Lift Pot for Melter Feed Tank H1-1ALP001 36 300 X 369 FRFCF/43211/GA/2502

(Sht 1 of 3) SS-304L ASME SEC. III

DIV.1,SUB SEC.NCWithout cooling coil

FRFCF/43211/GA/2502

7 Second Stage Air Lift Pot for Melter Feed Tank H1-1ALP002 18 200 X 272 FRFCF/43211/GA/2503

(Sht 1 of 2) SS-304L ASME SEC. III

DIV.1,SUB SEC.NCWithout cooling coil

FRFCF/43211/GA/2503

8 Second Stage Air Lift Pot for Melter Feed Tank H1-1ALP003 18 200 X 272 FRFCF/43211/GA/2503

(Sht 1 of 2) SS-304L ASME SEC. III

DIV.1,SUB SEC.NCWithout cooling coil

FRFCF/43211/GA/2503

9 Second Stage Air Lift Pot for Melter Feed Tank H1-1ALP004 18 200 X 272 FRFCF/43211/GA/2503

(Sht 1 of 2) SS-304L ASME SEC. III

DIV.1,SUB SEC.NCWithout cooling coil

FRFCF/43211/GA/2503

10 Second Stage Air Lift Pot for Melter Feed Tank H1-1ALP005 18 200 X 272 FRFCF/43211/GA/2503

(Sht 1 of 2)SS-304L ASME SEC. III

DIV.1,SUB SEC.NCWithout cooling coil

FRFCF/43211/GA/2503

11 First Stage Air Lift Pot for Dust Scrubber Tank H1-1ALP006 36 200X 272 FRFCF/43211/GA/2502

(Sht 3 of 3) SS-304L ASME SEC. III

DIV.1,SUB SEC.NCWithout cooling coil

FRFCF/43211/GA/2502

12 Second Stage Air Lift Pot for Dust Scrubber Tank H1-1ALP007 18 200 X 272 FRFCF/43211/GA/1511 SS-304L ASME SEC. III

DIV.1,SUB SEC.NCWithout cooling coil

FRFCF/43211/GA/2503

13 Second Stage Air Lift Pot for Dust Scrubber Tank H1-1ALP008 18 200 X 272 FRFCF/43211/GA/2503

(Sht 2 of 2) SS-304L ASME SEC. III

DIV.1,SUB SEC.NCWithout cooling coil

FRFCF/43211/GA/2503

14 Second Stage Air Lift Pot for Dust Scrubber Tank H1-1ALP009 18 200 X 272 FRFCF/43211/GA/2503

(Sht 2 of 2) SS-304L ASME SEC. III

DIV.1,SUB SEC.NCWithout cooling coil

FRFCF/43211/GA/2503

15 First Stage Air Lift Pot for H1-1ALP010 36 300 X 369 FRFCF/43211/GA/2502 SS-304L ASME SEC. III Without cooling FRFCF/43211/GA/2502

Page 19: nrb.etenders.dae.gov.innrb.etenders.dae.gov.in/tnduploads/nrb/pressnotices/PRSN59.pdf · The bidders must study the technical ... (i.e. SS equipment/vessel fabrication work with radiography

6

Melter Feed Tank (Sht 2 of 3) DIV.1,SUB SEC.NC coil

16 First Stage Air Lift Pot for Dust Scrubber Tank H1-1ALP011 36 300 X 369 FRFCF/43211/GA/1508 SS-304L ASME SEC. III

DIV.1,SUB SEC.NCWithout cooling coil

FRFCF/43211/GA/2502

17 First Stage Air Lift Pot for MOG Scrubber Tank-1 H1-1ALP021 36 300 X 369 FRFCF/43211/GA/1513 SS-304L ASME SEC. III

DIV.1,SUB SEC.NCWithout cooling coil

FRFCF/43211/GA/2502

18 Second Stage Air Lift Pot for MOG Scrubber Tank-1 H1-1ALP022 18 200 X 272 FRFCF/43211/GA/2505 SS-304L ASME SEC. III

DIV.1,SUB SEC.NCWithout cooling coil

FRFCF/43211/GA/2503

19 First Stage Air Lift Pot for MOG Scrubber Tank-2 H1-1ALP023 36 300 X 369 FRFCF/43211/GA/1513 SS-304L ASME SEC. III

DIV.1,SUB SEC.NCWithout cooling coil

FRFCF/43211/GA/2502

20 Second Stage Air Lift Pot for MOG Scrubber Tank-2 H1-1ALP024 18 200 X 272 FRFCF/43211/GA/2507 SS-304L ASME SEC. III

DIV.1,SUB SEC.NCWithout cooling coil

FRFCF/43211/GA/2503

21 UG HLW Tank UH1-1TK001 2200 1600 X 3800 FRFCF/43100/GA/2502 Sht 1 and 2

SS-304L ASME SEC. III DIV.1,SUB SEC.NC

With cooling coil FRFCF/43100/GA/2503

22 UG Condensate/Scrub Sol/Misc.tank UH1-1TK002 2200 1600 X 3800 FRFCF/43100/GA/2503

Sht 1 and 2 SS-304L ASME SEC. III

DIV.1,SUB SEC.NCWith cooling coil FRFCF/43100/GA/2503

23 MOG Scrubber 1 H1-1SCR002 225 350 X 3550 FRFCF/43294/GA/2500 Sht 1 of 2

SS-304L ASME SEC. III DIV.1,SUB SEC.NC

Scrubber with pall ring packing

FRFCF/43294/GA/2500

24 MOG Scrubber 2 H1-1SCR003 225 350 X 3550 FRFCF/43294/GA/2500 Sht 2 of 2

SS-304L ASME SEC. III DIV.1,SUB SEC.NC

Scrubber with pall ring packing

FRFCF/43294/GA/2500

25 Dust Scrubber H1-2SCR001 130 271 X 2291 FRFCF/43294/GA/2501 (Sht 1 & 2)

SS-304L ASME SEC. III DIV.1,SUB SEC.NC

Without cooling coil

FRFCF/43294/GA/2501

26 W&DC Tank H1-3SMP027 400 700 X 2350 FRFCF/43216/GA/1500 SS-304L ASME SEC. III DIV.1,SUB SEC.NC

Without cooling coil

FRFCF/43216/GA/1500

HLW Off gas system

27 De-mister H1-1DER001 210 (500X600)X800

FRFCF/43297/GA/2512 SS-304L ASME SEC. III DIV.1,SUB SEC.NC

Without cooling coil

FRFCF/43297/GA/2512

B)HL Bay-2 1 Melter Feed Tank H2-1TK061 160 450 X 1800 FRFCF/43211/GA/2500 SS-304L ASME SEC. III

DIV.1,SUB SEC.NCWithout cooling coil

FRFCF/43211/GA/2500

2 Dust Scrubber Tank H2-1SBT061 495 1000 X 1500 FRFCF/43211/GA/2509 SS-304L ASME SEC. III DIV.1,SUB SEC.NC

With cooling coiland jacket

FRFCF/43211/GA/2509

3 Condensate Tank H2-1TK062 250 800 X 830 FRFCF/43211/GA/2501 SS-304L ASME SEC. III DIV.1,SUB SEC.NC

With cooling coil FRFCF/43211/GA/2501

4 MOG Scrubber Tank-1 H2-1SBT071 710 1200 X 1800 FRFCF/43211/GA/2504 SS-304L ASME SEC. III DIV.1,SUB SEC.NC

With cooling coil FRFCF/43211/GA/2504

Page 20: nrb.etenders.dae.gov.innrb.etenders.dae.gov.in/tnduploads/nrb/pressnotices/PRSN59.pdf · The bidders must study the technical ... (i.e. SS equipment/vessel fabrication work with radiography

7

5 MOG Scrubber Tank-2 H2-1SBT072 710 1200 X 1800 FRFCF/43211/GA/2506 SS-304L ASME SEC. III DIV.1,SUB SEC.NC

With cooling coil FRFCF/43211/GA/2504

6 First Stage Air Lift Pot for Melter Feed Tank H2-1ALP031 36 300 X 369 FRFCF/43211/GA/2502

(Sht 1 of 3) SS-304L ASME SEC. III

DIV.1,SUB SEC.NCWithout cooling coil

FRFCF/43211/GA/2502

7 Second Stage Air Lift Pot for Melter Feed Tank H2-1ALP032 18 200 X 272 FRFCF/43211/GA/2503

(Sht 1 of 2) SS-304L ASME SEC. III

DIV.1,SUB SEC.NCWithout cooling coil

FRFCF/43211/GA/2503

8 Second Stage Air Lift Pot for Melter Feed Tank H2-1ALP033 18 200 X 272 FRFCF/43211/GA/2503

(Sht 1 of 2) SS-304L ASME SEC. III

DIV.1,SUB SEC.NCWithout cooling coil

FRFCF/43211/GA/2503

9 Second Stage Air Lift Pot for Melter Feed Tank H2-1ALP034 18 200 X 272 FRFCF/43211/GA/2503

(Sht 1 of 2) SS-304L ASME SEC. III

DIV.1,SUB SEC.NCWithout cooling coil

FRFCF/43211/GA/2503

10 Second Stage Air Lift Pot for Melter Feed Tank H2-1ALP035 18 200 X 272 FRFCF/43211/GA/2503

(Sht 1 of 2) SS-304L ASME SEC. III

DIV.1,SUB SEC.NCWithout cooling coil

FRFCF/43211/GA/2503

11 First Stage Air Lift Pot for Dust Scrubber Tank H2-1ALP036 36 300 X 369 FRFCF/43211/GA/2502

(Sht 3 of 3) SS-304L ASME SEC. III

DIV.1,SUB SEC.NCWithout cooling coil

FRFCF/43211/GA/2502

12 Second Stage Air Lift Pot for Dust Scrubber Tank H2-1ALP037 18 200 X 272 FRFCF/43211/GA/1511 SS-304L ASME SEC. III

DIV.1,SUB SEC.NCWithout cooling coil

FRFCF/43211/GA/2503

13 Second Stage Air Lift Pot for Dust Scrubber Tank H2-1ALP038 18 200 X 272 FRFCF/43211/GA/2503

(Sht 2 of 2) SS-304L ASME SEC. III

DIV.1,SUB SEC.NCWithout cooling coil

FRFCF/43211/GA/2503

14 Second Stage Air Lift Pot for Dust Scrubber Tank H2-1ALP039 18 200 X 272 FRFCF/43211/GA/2503

(Sht 2 of 2) SS-304L ASME SEC. III

DIV.1,SUB SEC.NCWithout cooling coil

FRFCF/43211/GA/2503

15 First Stage Air Lift Pot for Melter Feed Tank H2-1ALP040 36 300 X 369 FRFCF/43211/GA/2502

(Sht 2 of 3) SS-304L ASME SEC. III

DIV.1,SUB SEC.NCWithout cooling coil

FRFCF/43211/GA/2502

16 First Stage Air Lift Pot for Dust Scrubber Tank H2-1ALP041 36 300 X 369 FRFCF/43211/GA/1508 SS-304L ASME SEC. III

DIV.1,SUB SEC.NCWithout cooling coil

FRFCF/43211/GA/2502

17 First Stage Air Lift Pot for MOG Scrubber Tank-1 H2-1ALP051 36 300 X 369 FRFCF/43211/GA/1513 SS-304L ASME SEC. III

DIV.1,SUB SEC.NCWithout cooling coil

FRFCF/43211/GA/2502

18 Second Stage Air Lift Pot for MOG Scrubber Tank-1 H2-1ALP052 18 200 X 272 FRFCF/43211/GA/2505 SS-304L ASME SEC. III

DIV.1,SUB SEC.NCWithout cooling coil

FRFCF/43211/GA/2503

19 First Stage Air Lift Pot for MOG Scrubber Tank-2 H2-1ALP053 36 300 X 369 FRFCF/43211/GA/1513 SS-304L ASME SEC. III

DIV.1,SUB SEC.NCWithout cooling coil

FRFCF/43211/GA/2502

20 Second Stage Air Lift Pot for MOG Scrubber Tank-2 H2-1ALP054 18 200 X 272 FRFCF/43211/GA/2507 SS-304L ASME SEC. III

DIV.1,SUB SEC.NCWithout cooling coil

FRFCF/43211/GA/2503

21 UG HLW tank UH2-1TK011 2200 1600 X 3800 FRFCF/43100/GA/2504 Sht 1 and 2

SS-304L ASME SEC. III DIV.1,SUB SEC.NC

With cooling coil FRFCF/43100/GA/2503

22 UG Condensate/Scrub Sol/Misc.tank UH2-1TK012 2200 1600 X 3800 FRFCF/43100/GA/2505 SS-304L ASME SEC. III

DIV.1,SUB SEC.NCWith cooling coil FRFCF/43100/GA/2503

23 MOG Scrubber 1 H2-1SCR012 225 350 X 3550 FRFCF/43294/GA/2500 SS-304L ASME SEC. III With pall ring FRFCF/43294/GA/2500

Page 21: nrb.etenders.dae.gov.innrb.etenders.dae.gov.in/tnduploads/nrb/pressnotices/PRSN59.pdf · The bidders must study the technical ... (i.e. SS equipment/vessel fabrication work with radiography

8

Sht 1 of 2 DIV.1,SUB SEC.NC packing

24 MOG Scrubber 2 H2-1SCR013 225 350 X 3550 FRFCF/43294/GA/2500 Sht 2 of 2

SS-304L ASME SEC. III DIV.1,SUB SEC.NC

With pall ring packing

FRFCF/43294/GA/2500

25 Dust Scrubber H2-2SCR011 130 271 X 2291 FRFCF/43294/GA/2501 SS-304L ASME SEC. III DIV.1,SUB SEC.NC

Without cooling coil

FRFCF/43294/GA/2501

26 Annulus Drain tank UH2-1TK013

95 500 X 750 FRFCF/43100/GA/2501 (Sht 1 & 2)

SS-304L ASME SEC. III DIV.1,SUB SEC.NC

Without cooling coil

FRFCF/43211/GA/2500

27 W&DC Tank H2-3SMP042 400 700 X 2350 FRFCF/43216/GA/1500 SS-304L ASME SEC. III DIV.1,SUB SEC.NC

Without cooling coil

FRFCF/43216/GA/1500

Off gas system

28 De-mister H2-1DER004 210 (500X600)X800

FRFCF/43297/GA/2512 SS-304L ASME SEC. III DIV.1,SUB SEC.NC

Without cooling coil

FRFCF/43297/GA/2512

Sl. No.

Equipment Tag No weight Size D X H (all in mm)

Applicable Drawing No.

MOC Applicable Design

&Fab.Code

Remarks Reference Drawing in tender

portal

C) HL Bay-3 1 Melter Feed Tank H3-1TK081 160 450 X 1800 FRFCF/43211/GA/2500 SS-304L ASME SEC. III

DIV.1,SUB SEC.NCWithout cooling coil

FRFCF/43211/GA/2500

2 Dust Scrubber Tank H3-1SBT081 495 1000 X 1500 FRFCF/43211/GA/2509 SS-304L ASME SEC. III DIV.1,SUB SEC.NC

With cooling coiland jacket

FRFCF/43211/GA/2509

3 Condensate Tank H3-1TK082 250 800 X 830 FRFCF/43211/GA/2501 SS-304L ASME SEC. III DIV.1,SUB SEC.NC

With cooling coil FRFCF/43211/GA/2501

4 MOG Scrubber Tank-1 H3-1SBT091 710 1200 X 1800 FRFCF/43211/GA/2504 SS-304L ASME SEC. III DIV.1,SUB SEC.NC

With cooling coil FRFCF/43211/GA/2504

5 MOG Scrubber Tank-2 H3-1SBT092 710 1200 X 1800 FRFCF/43211/GA/2506 SS-304L ASME SEC. III DIV.1,SUB SEC.NC

With cooling coil FRFCF/43211/GA/2504

6 First Stage Air Lift Pot for Melter Feed Tank H3-1ALP061 36 300 X 369 FRFCF/43211/GA/2502

(Sht 1 of 3)SS-304L ASME SEC. III

DIV.1,SUB SEC.NCWithout cooling coil

FRFCF/43211/GA/2502

7 Second Stage Air Lift Pot for Melter Feed Tank H3-1ALP062 18 200 X 272 FRFCF/43211/GA/2503

(Sht 1 of 2) SS-304L ASME SEC. III

DIV.1,SUB SEC.NCWithout cooling coil

FRFCF/43211/GA/2503

8 Second Stage Air Lift Pot for Melter Feed Tank H3-1ALP063 18 200 X 272 FRFCF/43211/GA/2503

(Sht 1 of 2) SS-304L ASME SEC. III

DIV.1,SUB SEC.NCWithout cooling coil

FRFCF/43211/GA/2503

Page 22: nrb.etenders.dae.gov.innrb.etenders.dae.gov.in/tnduploads/nrb/pressnotices/PRSN59.pdf · The bidders must study the technical ... (i.e. SS equipment/vessel fabrication work with radiography

9

9 Second Stage Air Lift Pot for Melter Feed Tank H3-1ALP064 18 200 X 272 FRFCF/43211/GA/2503

(Sht 1 of 2) SS-304L ASME SEC. III

DIV.1,SUB SEC.NCWithout cooling coil

FRFCF/43211/GA/2503

10 Second Stage Air Lift Pot for Melter Feed Tank H3-1ALP065 18 200 X 272 FRFCF/43211/GA/2503

(Sht 1 of 2) SS-304L ASME SEC. III

DIV.1,SUB SEC.NCWithout cooling coil

FRFCF/43211/GA/2503

11 First Stage Air Lift Pot for Dust Scrubber Tank H3-1ALP066 36 200 X 272 FRFCF/43211/GA/2502

(Sht 3 of 3) SS-304L ASME SEC. III

DIV.1,SUB SEC.NCWithout cooling coil

FRFCF/43211/GA/2502

12 Second Stage Air Lift Pot for Dust Scrubber Tank H3-1ALP067 18 200 X 272 FRFCF/43211/GA/1511 SS-304L ASME SEC. III

DIV.1,SUB SEC.NCWithout cooling coil

FRFCF/43211/GA/2503

13 Second Stage Air Lift Pot for Dust Scrubber Tank H3-1ALP068 18 200 X 272 FRFCF/43211/GA/2503

(Sht 2 of 2)SS-304L ASME SEC. III

DIV.1,SUB SEC.NCWithout cooling coil

FRFCF/43211/GA/2503

14 Second Stage Air Lift Pot for Dust Scrubber Tank H3-1ALP069 18 200 X 272 FRFCF/43211/GA/2503

(Sht 2 of 2) SS-304L ASME SEC. III

DIV.1,SUB SEC.NCWithout cooling coil

FRFCF/43211/GA/2503

15 First Stage Air Lift Pot for Melter Feed Tank H3-1ALP070 36 300 X 369 FRFCF/43211/GA/2502

(Sht 2 of 3) SS-304L ASME SEC. III

DIV.1,SUB SEC.NCWithout cooling coil

FRFCF/43211/GA/2502

16 First Stage Air Lift Pot for Dust Scrubber Tank H3-1ALP071 36 300 X 369 FRFCF/43211/GA/1508 SS-304L ASME SEC. III

DIV.1,SUB SEC.NCWithout cooling coil

FRFCF/43211/GA/2502

17 First Stage Air Lift Pot for MOG Scrubber Tank-1 H3-1ALP081 36 300 X 369 FRFCF/43211/GA/1513 SS-304L ASME SEC. III

DIV.1,SUB SEC.NCWithout cooling coil

FRFCF/43211/GA/2502

18 Second Stage Air Lift Pot for MOG Scrubber Tank-1 H3-1ALP082 18 200 X 272 FRFCF/43211/GA/2505 SS-304L ASME SEC. III

DIV.1,SUB SEC.NCWithout cooling coil

FRFCF/43211/GA/2503

19 First Stage Air Lift Pot for MOG Scrubber Tank-2 H3-1ALP083 36 300 X 369 FRFCF/43211/GA/1513 SS-304L ASME SEC. III

DIV.1,SUB SEC.NCWithout cooling coil

FRFCF/43211/GA/2502

20 Second Stage Air Lift Pot for MOG Scrubber Tank-2 H3-1ALP084 18 200 X 272 FRFCF/43211/GA/2507 SS-304L ASME SEC. III

DIV.1,SUB SEC.NCWithout cooling coil

FRFCF/43211/GA/2503

21 UG HLW tank UH3-1TK021 2200 1600 X 3800 FRFCF/43100/GA/2506 Sht 1 and 2

SS-304L ASME SEC. III DIV.1,SUB SEC.NC

With cooling coil FRFCF/43100/GA/2503

22 UG Condensate/Scrub Sol/Misc.tank UH3-1TK022 2200 1600 X 3800 FRFCF/43100/GA/2507

Sht 1 and 2 SS-304L ASME SEC. III

DIV.1,SUB SEC.NCWith cooling coil FRFCF/43100/GA/2503

23 MOG Scrubber 1 H3-1SCR022 225 350 X 3550 FRFCF/43294/GA/2500 Sht 1 of 2

SS-304L ASME SEC. III DIV.1,SUB SEC.NC

Scrubber with pall ring packing

FRFCF/43294/GA/2500

24 MOG Scrubber 2 H3-1SCR023 225 350 X 3550 FRFCF/43294/GA/2500 Sht 2 of 2

SS-304L ASME SEC. III DIV.1,SUB SEC.NC

Scrubber with pall ring packing

FRFCF/43294/GA/2500

25 Dust Scrubber H3-2SCR021 130 271 X 2291 FRFCF/43294/GA/2501 SS-304L ASME SEC. III DIV.1,SUB SEC.NC

With cooling coil FRFCF/43294/GA/2501

26 W&DC Tank H3-3SMP057 400 700 X 2350 FRFCF/43216/GA/1500 SS-304L ASME SEC. III DIV.1,SUB SEC.NC

Without cooling coil

FRFCF/43216/GA/1500

Off gas system

Page 23: nrb.etenders.dae.gov.innrb.etenders.dae.gov.in/tnduploads/nrb/pressnotices/PRSN59.pdf · The bidders must study the technical ... (i.e. SS equipment/vessel fabrication work with radiography

10

27 De-mister H3-1DER007 210 (500X600)X800 FRFCF/43297/GA/2512 SS-304L ASME SEC. III DIV.1,SUB SEC.NC

Without cooling coil

FRFCF/43297/GA/2512

2. ILW SYSTEM : Sl. No. Equipment Tag No. Total

Empty weight (Kg)

Size D X H (all in mm)

Applicable Drawing No.

MOC Applicable Design

&Fab.Code

Remarks Reference Drawing in tender portal

A) ILW tank

1 IX feed tank 1 IL1TK101 490 1000 X 1500 FRFCF/43311/GA/2500 SS-304L ASME SEC. III DIV.1,SUBSEC.NC

Without cooling coil

FRFCF/43311/GA/2500

2 IX feed tank 2 IL1TK102 490 1000 X 1500 FRFCF/43311/GA/2501 SS-304L ASME SEC. III DIV.1,SUB

SEC.NC

Without cooling coil

FRFCF/43311/GA/2500

3 Eluate collection tank

IL1TK103 490 1000 X 1500 FRFCF/43311/GA/2502 SS-304L ASME SEC. III DIV.1,SUB

SEC.NC

Without cooling coil

FRFCF/43311/GA/2500

4 Regenerant collection tank

IL1TK104 490 1000 X 1500 FRFCF/43311/GA/2503 SS-304L ASME SEC. III DIV.1,SUB

SEC.NC

Without cooling coil

FRFCF/43311/GA/2500

5 Monitoring tank 1 IL1TK105 490 1000 X 1500 FRFCF/43311/GA/2504 SS-304L ASME SEC. III DIV.1,SUB

SEC.NC

Without cooling coil

FRFCF/43311/GA/2500

6 Monitoring tank 2 IL1TK106 490 1000 X 1500 FRFCF/43311/GA/2505 SS-304L ASME SEC. III DIV.1,SUB

SEC.NC

Without cooling coil

FRFCF/43311/GA/2500

7 Precipitation tank 1 IL1TK121 710 1250 X 2000 FRFCF/43311/GA/2506 SS-304L ASME SEC. III DIV.1,SUB

SEC.NC

Without cooling coil

FRFCF/43311/GA/2507

8 Precipitation tank 2 IL1TK122 710 1250 X 2000 FRFCF/43311/GA/2507 SS-304L ASME SEC. III DIV.1,SUB

SEC.NC

Without cooling coil

FRFCF/43311/GA/2507

9 Precipitation tank 3 IL1TK123 710 1250 X 2000 FRFCF/43311/GA/2508 SS-304L ASME SEC. III DIV.1,SUB

SEC.NC

Without cooling coil

FRFCF/43311/GA/2507

10 Precipitation tank 4 IL1TK124 710 1250 X 2000 FRFCF/43311/GA/2509 SS-304L ASME SEC. III DIV.1,SUB

Without cooling

FRFCF/43311/GA/2507

Page 24: nrb.etenders.dae.gov.innrb.etenders.dae.gov.in/tnduploads/nrb/pressnotices/PRSN59.pdf · The bidders must study the technical ... (i.e. SS equipment/vessel fabrication work with radiography

11

SEC.NC coil

11 Sludge tank 1 IL1TK125 250 900 X 1000 FRFCF/43311/GA/2510 SS-304L ASME SEC. III DIV.1,SUB

SEC.NC

Without cooling coil

FRFCF/43311/GA/2500

12 Sludge tank 2 IL1TK126 250 900 X 1000 FRFCF/43311/GA/2511 SS-304L ASME SEC. III DIV.1,SUB

SEC.NC

Without cooling coil

FRFCF/43311/GA/2500

13 Supernatant tank 1 IL1TK127 800 1250 X 2000 FRFCF/43311/GA/2512 SS-304L ASME SEC. III DIV.1,SUB

SEC.NC

Without cooling coil

FRFCF/43311/GA/2507

14 Supernatant tank 2 IL1TK128 800 1250 X 2000 FRFCF/43311/GA/2513 SS-304L ASME SEC. III DIV.1,SUB

SEC.NC

Without cooling coil

FRFCF/43311/GA/2507

15 UG ILW alkaline tank

UILTK031 1910 1650 X 3000 FRFCF/43100/GA/2508 SS-304L ASME SEC. III DIV.1,SUB

SEC.NC

Without cooling coil

FRFCF/43100/GA/2503

16 UG ILW acidic tank

UILTK032 1910 1650 X 3000 FRFCF/43100/GA/2509 SS-304L ASME SEC. III DIV.1,SUB

SEC.NC

Without cooling coil

FRFCF/43100/GA/2503

17 UG ILW drain tank UILTK038 100 500x750 FRFCF/43100/GA/2513 SS-304L ASME SEC. III DIV.1,SUB

SEC.NC

Without cooling coil

FRFCF/43100/GA/2503

2) ILW IX column & filters

18 IX RF column 1 IL1IX001 60 399 X 1038 FRFCF/43324/GA/2500 SS-304L ASME SEC. III DIV.1,SUB

SEC.NC

Without cooling coil

FRFCF/43324/GA/2500

19 IX RF column 2 IL1IX002 60 399 X 1038 FRFCF/43324/GA/2500 SS-304L ASME SEC. III DIV.1,SUB

SEC.NC

Without cooling coil

FRFCF/43324/GA/2500

20 IX IDA column 3 IL1IX003 60 399 X 1038 FRFCF/43324/GA/2500 SS-304L ASME SEC. III DIV.1,SUB

SEC.NC

Without cooling coil

FRFCF/43324/GA/2500

21 IX IDA column 4 IL1IX004 60 399 X 1038 FRFCF/43324/GA/2500 SS-304L ASME SEC. III DIV.1,SUB

SEC.NC

Without cooling coil

FRFCF/43324/GA/2500

22 Pre-filter IL1FLT031 30 399 X 1038 FRFCF/43326/GA/2500 SS-304L ASME SEC. III DIV.1,SUB

Without cooling

FRFCF/43326/GA/2500

Page 25: nrb.etenders.dae.gov.innrb.etenders.dae.gov.in/tnduploads/nrb/pressnotices/PRSN59.pdf · The bidders must study the technical ... (i.e. SS equipment/vessel fabrication work with radiography

12

SEC.NC coil

23 Resin trap filter IL1RET031 30 160X700 FRFCF/43326/GA/2500 SS-304L ASME SEC. III DIV.1,SUB

SEC.NC

Without cooling coil

FRFCF/43324/GA/2500

Sl. No. Equipment Tag No. Total Empty weight (Kg)

Size D X H (all in mm)

Applicable Drawing No.

MOC Applicable Design

&Fab.Code

Remarks

4) OLW tank

1 UG OLW tank-1 UOLTK033 1910 1650 X 3000 FRFCF/43100/GA/2510 SS-304L ASME SEC. III DIV.1,SUB

SEC.NC

Without cooling coil

FRFCF/43100/GA/2503

2 UG OLW tank-2 UOLTK034 1910 1650 X 3000 FRFCF/43100/GA/2511 SS-304L ASME SEC. III DIV.1,SUB

SEC.NC

Without cooling coil

FRFCF/43100/GA/2503

3 UG OLW misc. Tank

UOLTK035 1910 1650 X 3000 FRFCF/43100/GA/2512 SS-304L ASME SEC. III DIV.1,SUB

SEC.NC

Without cooling coil

FRFCF/43100/GA/2503

4 OLW receiving cum wash tank

OLTK141 850 1500 X 1500 FRFCF/43511/GA/2500 SS-304L ASME SEC. III DIV.1,SUB

SEC.NC

Without cooling coil

FRFCF/43311/GA/2500

5 OLW separation tank

OLTK143 445 1000 X 1200 FRFCF/43511/GA/2501 SS-304L ASME SEC. III DIV.1,SUB

SEC.NC

Without cooling coil

FRFCF/43311/GA/2507

6 OLW aqueous phase tank

OLTK145 250 900 X 1000 FRFCF/43511/GA/2502 SS-304L ASME SEC. III DIV.1,SUB

SEC.NC

Without cooling coil

FRFCF/43311/GA/2500

7 Do-decane collection tank

OLTK146 370 1000 X 1500 FRFCF/43511/GA/2503 SS-304L ASME SEC. III DIV.1,SUB

SEC.NC

Without cooling coil

FRFCF/43311/GA/2500

8 OLW batching tank OLTK144 100 500x800 FRFCF/43511/GA/2510 SS-304L ASME SEC. III DIV.1,SUB

SEC.NC

Without cooling coil

FRFCF/43311/GA/2500

9 Na- DBP tank OLTK149 260 800 X 1400 FRFCF/43511/GA/2504 SS-304L ASME SEC. III DIV.1,SUB

SEC.NC

Without cooling coil

FRFCF/43311/GA/2500

Page 26: nrb.etenders.dae.gov.innrb.etenders.dae.gov.in/tnduploads/nrb/pressnotices/PRSN59.pdf · The bidders must study the technical ... (i.e. SS equipment/vessel fabrication work with radiography

13

10 OLW reactor1 OLRAR001 760 950 X 1200 FRFCF/43511/GA/2515 SS-304L ASME SEC. III DIV.1,SUB

SEC.NC

With cooling coil and agitator and outer jacket

FRFCF/43511/GA/2514

11 OLW reactor-2 OLRAR002 760 950 X 1200 FRFCF/43511/GA/2516 SS-304L ASME SEC. III DIV.1,SUB

SEC.NC

With cooling coil and agitator and outer jacket

FRFCF/43511/GA/2514

12 OLW reactor-3 OLRAR003 760 950 X 1200 FRFCF/43511/GA/2517 SS-304L ASME SEC. III DIV.1,SUB

SEC.NC

With cooling coil and agitator and outer jacket

FRFCF/43511/GA/2514

13 OLW evaporator OLRAR004 760 950 X 1200 FRFCF/43511/GA/2514 SS-304L ASME SEC. III DIV.1,SUB

SEC.NC

With cooling coil and agitator and outer jacket

FRFCF/43511/GA/2514

14 VOG Scrubber Tank

OLSBT141 720 1000x1500 FRFCF/43511/GA/2520 SS-304L ASME SEC. III DIV.1,SUB

SEC.NC

Without cooling coil

FRFCF/43311/GA/2500

15 Carbonate Waste Tank

OLTK142 720 1000x1500 FRFCF/43511/GA/2521 SS-304L ASME SEC. III DIV.1,SUB

SEC.NC

Without cooling coil

FRFCF/43311/GA/2500

16 Middle Phase Tank OLTK148 720 1000x1500 FRFCF/43511/GA/2522 SS-304L ASME SEC. III DIV.1,SUB

SEC.NC

Without cooling coil

FRFCF/43311/GA/2500

17 First stage Airlift OLALP091 36 300 X 369 FRFCF/43511/GA/2523 SS-304L ASME SEC. III Without FRFCF/43211/GA/2502

Page 27: nrb.etenders.dae.gov.innrb.etenders.dae.gov.in/tnduploads/nrb/pressnotices/PRSN59.pdf · The bidders must study the technical ... (i.e. SS equipment/vessel fabrication work with radiography

14

pot-1 DIV.1,SUB SEC.NC

cooling coil

18 First stage Airlift pot-2

OLALP094 36 300 X 369 FRFCF/43511/GA/2523 SS-304L ASME SEC. III DIV.1,SUB

SEC.NC

Without cooling coil

FRFCF/43211/GA/2502

19 First stage Airlift pot-3

OLALP092 36 300 X 369 FRFCF/43511/GA/2523 SS-304L ASME SEC. III DIV.1,SUB

SEC.NC

Without cooling coil

FRFCF/43211/GA/2502

20 First stage Airlift pot-4

OLALP096 36 300 X 369 FRFCF/43511/GA/2523 SS-304L ASME SEC. III DIV.1,SUB

SEC.NC

Without cooling coil

FRFCF/43211/GA/2502

21 Second stage Airlift pot-1

OLALP095 18 200 X 272 FRFCF/43511/GA/2524 SS-304L ASME SEC. III DIV.1,SUB

SEC.NC

Without cooling coil

FRFCF/43211/GA/2503

22 Second stage Airlift pot-2

OLALP093 18 200 X 272 FRFCF/43511/GA/2524 SS-304L ASME SEC. III DIV.1,SUB

SEC.NC

Without cooling coil

FRFCF/43211/GA/2503

23 Second stage Airlift pot-3

OLALP097 18 200 X 272 FRFCF/43511/GA/2524 SS-304L ASME SEC. III DIV.1,SUB

SEC.NC

Without cooling coil

FRFCF/43211/GA/2503

ILW & OLW VOG EQUIPMENTS

24 OLW VOG scrubber

OLSCR031 300 350X3730 FRFCF/43511/GA/2513 SS-304L ASME SEC. III DIV.1,SUB

SEC.NC

With pall ring packing

FRFCF/43311/GA/2500

25 OLW VOG De-mister

OLDER011 210 (500x600)x800 (rectangular)

FRFCF/43597/GA/2512 SS-304L ASME SEC. III DIV.1,SUB

SEC.NC

Without cooling coil

FRFCF/43297/GA/2512

Page 28: nrb.etenders.dae.gov.innrb.etenders.dae.gov.in/tnduploads/nrb/pressnotices/PRSN59.pdf · The bidders must study the technical ... (i.e. SS equipment/vessel fabrication work with radiography

15

6) HULL COMPACTION BLOCK EQUIPMENTS

Sl. No. Equipment Tag No. Total Empty weight (Kg)

Size D X H (all in mm)

Applicable Drawing No.

MOC Applicable Design

&Fab.Code

Remarks

1 Scrubber/Condensate tank

HCSBT011 750 1000 x 1500

FRFCF/43611/GA/2511 SS-304L ASME SEC. III DIV.1,SUB

SEC.NC

Without cooling coil

FRFCF/43311/GA/2500

2 VOG Scrubber HCSCR013 300 350X3730

FRFCF/43611/GA/2513 SS-304L ASME SEC. III DIV.1,SUB

SEC.NC

With pall ring packing

FRFCF/43294/GA/2500

3 First stage Airlift pot HCALP014 36 300 X 369

FRFCF/43611/GA/2514 SS-304L ASME SEC. III DIV.1,SUB

SEC.NC

Without cooling coil

FRFCF/43211/GA/2502

4 Second stage Airlift pot

HCALP015 18 200 X 272

FRFCF/43611/GA/2515 SS-304L ASME SEC. III DIV.1,SUB

SEC.NC

Without cooling coil

FRFCF/43211/GA/2503

5 DC Tank-2 Nos (HCB & ASF)

400 (each)

700 X 2350

FRFCF-43611-GA-2516-R-0

SS-304L ASME SEC. III DIV.1,SUB

SEC.NC

Without cooling coil

FRFCF/43216/GA/1500

HCB VOG EQUIPMENTS 6 HC VOG De-mister HCD

ER011

210 (500x600)x800 (rectangular)

FRFCF/43697/GA/2512 SS-304L ASME SEC. III DIV.1,SUB

SEC.NC

Without cooling coil

FRFCF/43297/GA/2512

7) OTHER RELEVANT DRAWINGS S.No Eqpt. Name Applicable Drawing No. No. of drgs 1 TYP.NOZZLES & WELD

DETAILS FRFCF/43511/NZ/2500/0001 1

Page 29: nrb.etenders.dae.gov.innrb.etenders.dae.gov.in/tnduploads/nrb/pressnotices/PRSN59.pdf · The bidders must study the technical ... (i.e. SS equipment/vessel fabrication work with radiography

16

APPENDIX – C: LIST OF NEW DRAWINGS UPLOADED

Sl no Drawing title Drawing number 1 Tender Drawing for First Stage Air Lift Pot of melter feed

tank FRFCF/43211/GA/2502

2 Tender drawing for second stage air lift pot to melter feed tank from dust scrubber

FRFCF/43211/GA/2503

3 Tender Drawing for DC tank FRFCF/43216/GA/1500

4 Tender Drawing for Demister of HLW FRFCF/43297/GA/2512

5 Tender Drawing for Dust Scrubber tank of HLW system FRFCF/43211/GA/2509

6 Tender Drawing for Dust Scrubber of HLW Bays 1,2&3 FRFCF/43294/GA/2501

7 Tender Drawing for UG ILW Alkaline Tank FRFCF/43100/GA/2508

8 Tender Drawing for Precipitation Tank-2 FRFCF/43311/GA/2507

9 ILW Pre-Filter & Resin trap Column (ILRET031 & ILFLT031)

FRFCF/43326/GA/2500

10 Tender Drawing for MOG Scrubber Tank -1 of HLW System FRFCF/43211/GA/2504

11 Tender Drawing for UG Condensate/Scrub Solution/Misc. Tank of HLW Bay-1

FRFCF/43100/GA/2503

12 ION EXCHANGE COLUMN FRFCF-43324-GA-2500

13 Tender Drawing for IX Feed Tank FRFCF-43311-GA-2500

14 NOZZLE DETAILS FRFCF/43511/NZ/2500/0001

Page 30: nrb.etenders.dae.gov.innrb.etenders.dae.gov.in/tnduploads/nrb/pressnotices/PRSN59.pdf · The bidders must study the technical ... (i.e. SS equipment/vessel fabrication work with radiography
Page 31: nrb.etenders.dae.gov.innrb.etenders.dae.gov.in/tnduploads/nrb/pressnotices/PRSN59.pdf · The bidders must study the technical ... (i.e. SS equipment/vessel fabrication work with radiography
Page 32: nrb.etenders.dae.gov.innrb.etenders.dae.gov.in/tnduploads/nrb/pressnotices/PRSN59.pdf · The bidders must study the technical ... (i.e. SS equipment/vessel fabrication work with radiography