Minutes of Meeting of Pre-Bid Meeting
Tender No.-NRBPSU/11/ENG/TPT/2055
GENERAL
a) NRB, BARC explained the scope of the work and the salient technical requirements of the tendered work. It was further explained that the equipment tendered are required for critical application and will be handling highly corrosive process streams. As such, it is essential to deploy qualified manpower and implement strict quality assurance procedures during entire duration of fabrication.
b) Point wise clarifications to the queries raised by the bidders were provided and same is enclosed as Appendix –A.
c) BARC pointed out that, the price bid has been invited on weight of finished product in Rs/Kg basis except one catagory. The bidders must study the technical specification & drawings enclosed with tender carefully to understand the extent of actual job requirement.
d) BARC informed that all the commercial terms and conditions must be indicated in the technical bid only (i.e. in Part-I).
e) “APPENDIX – VI:Notes for the bidders” of the tech specs was explained and presented to all the bidders during the meeting which covered general conditions, payment terms, criteria for evaluation of bidders, procedure for financial & technical evaluation etc. It was also clarified to all the bidders that the vendor evaluation will be strictly based on the financial and technical criteria as specified in the technical specification. In this context the similar works (i.e. SS equipment/vessel fabrication work with radiography requirements and the minimum and maximum sizes of vessels are ranging from 10 lit to 6000 liter) completed by the bidder will be considered based on the certification of performance by the clients during last five years ending March, 2016.
f) Bidders requested more clarity w.r.t. details of the equipment and drawings of the equipments for better estimation of the costs. Accordingly, a detailed list of equipment mentioning the category and linkage with sample tender drawings is enclosed in form of Appendix-B of this MOM. Sample drawings for uniquely different tanks/equipments in each category will be uploaded on the tender portal. The newly uploaded drawing list is enclosed in Appendix-C of this MOM.
g) On the request of the firms, the due date for submission of the bids was extended up to three weeks from the date of uploading the minutes of meeting & Appendix of pre-bid meeting.
2
APPENDIX-A
CLARIFICATIONS Sr.
No
Queries/comments from the
Bidders
NRB, BARC’s Response
1 It’s mentioned in the techspecs that
FIM will be collected from WIP
stores, Trombay and FRFCF stores,
Kalpakkam. Please elaborate which
FIM is available at which location.
FIM is available in FRFCF store, Kalpakkam, Tamilnadu and WIP
stores Trombay. Pipes, Plates, HBN are available at FRFCF stores
Kalpakkam. Spray nozzles & steam jets are available at WIP stores
Trombay.
2 What are the modalities regarding
loading of FIM and unloading of
finished equipments at project site?
Vendor will arrange the transport vehicle for collecting FIM from
departmental stores at their own cost. Material Handling equipment
& manpower required at the site (FRFCF) for loading and unloading
will be provided by the department. However, it is mandatory for the
vendor to depute their authorized and qualified staff for collection of
FIM from departmental stores. An insurance policy as per the
“Notes for bidders’ is required to be submitted in advance by the
fabricator. Only upon acceptance of the same by the department,
FIM can be released.
3 Different equipments have different
NDT requirements. Cost estimation
based on weight basis is difficult for
different size and type of
equipments in absence of all
drawings. Can it be quoted on
equipment basis?
No, bidders are informed to quote on as per “Proforma for Price Schedule” page no 23 of the tech specs only for the uniformity and cost comparision of participating firms. Some more drawings as per Appendix-C of different types and sizes of equipments will be uploaded in the tender portal for better understanding and cost estimation.
4 What is Expected Delivery time for
the equipment?
The equipment shall be delivered to project site within 24 months
from the date of placement of Purchase Order (PO).
5 Can it be possible to provide the
drawings of all equipments on a soft
form or uploaded in the tender
portral for better understanding and
No, drawings cannot be provided to the bidders on soft form.
However, some more drawings as per Appendix-C of different
types and sizes of equipments will be uploaded in the tender portal
for better understanding and cost estimation.
3
Sr.
No
Queries/comments from the
Bidders
NRB, BARC’s Response
cost estimation?
Whether it’s possible to show all
the drawings?
Further, interested vendors may visit BARC with prior appointment
to see the drawings before the submission date of the tender.
7 There are a couple of bidders from
Chennai area. Can they see the
drawings in Kalpakkam?
Yes, the arrangement for the same will be made on written request
and prior appointment before due date.
8 Can it be poosible to increase
permissible wastage allowance on
FIM consumed?
No. Indicated wastage allowance of 3% of consumed FIM is
adequate. It is to clarify that this wastage allowance is irretrievable
wastage allowance on weight basis. Any wastage beyond 3% will
be charged at the rate of Rs 350/kg to the fabricator as indicated in
the technical specification.
9 Will plate cutting plan be provided
by you?
No, plate cutting plan won’t be provided by the department. The
fabricator will have to prepare plate cutting plan and get it approved
by the department (BARC).
9 Can bidder collect FIM material
from stores in multiple lots?
Yes, bidder can collect FIM material from stores any number of
times.
10 Can the orders be splitted? If yes,
How it will be splitted.
Yes, Competent authority of the tender reserves the right for
splitting and part order placement.
It will be split category wise. Categories of equipment are mentioned
on ‘Proforma for Price Schedule’, page no 23 of Tender
Specifications document.
11 More clarity is needed on Pall ring
meant for scrubber type equipment.
How much weight of Pall rings is
required per scrubber basis? It is
required for estimating cost.
Details of the dimensions requirement are mentioned in the technical
specification. The weight of pall ring per scrubber is 300 Kg(max).
4
Sr.
No
Queries/comments from the
Bidders
NRB, BARC’s Response
12 Is functional testing of the agitator
system is in scope of fabricator?
Yes.
13 Regarding agitators, manufacturers
of agitators have different warranty
terms. What should be done if the
Warranty provided by
manufacturers is less than that
mentioned in tender document?
The warranty should be one year from the date of delivery of the
equipment.
14 In what form/shape HBNs will be
provided by BARC? Is OD
machining required?
HBNs will be provided in long tubular product form. The machining
of the same shall be carried out by the fabricator. In HBN ID is
matched to the corresponding standard Sch 40 pipe. However, OD
of the same is required to be machined at the ends to suit the
corresponding standard pipe size as per the drawing.
15 What kind of packaging for
transportation of equipment is
envisaged?
Smaller equipment (upto 2 MT) will be packed in wooden crates
after wrapping with 2 layers of bubble polythene. If needed, saddles
will also be provided for packing.
Bigger equipment will be packed on wooden saddles after wrapping
with 2 layers of bubble polythene. It may be noted that only SS
metallic wraps will be used for clamping purpose.
16 Whether excise duty exemption
certificate will be provided by the
department?
Yes. However, written request for the certificate should be clearly
indicated in the offer of the firm. Applicability of excise duty should
be clearly indicated in the bid
17 Whether there is exemption for
service tax?
There is no exemption from service tax.
**************************************************
5
APPENDIX – B REVISED LIST OF EQUIPMENT & APPLICABLE DRAWINGS (With Reference drawing in tender portal) 1. HLW System:
Sl. No.
Equipment Tag No weight Size D X H (all in mm)
Applicable Drawing No.
MOC Applicable Design
&Fab.Code
Remarks Reference Drawing in tender portal
A)HL Bay-1 1 Melter Feed Tank H1-1TK041 160 450 X 1800 FRFCF/43211/GA/2500 SS-304L ASME SEC. III
DIV.1,SUB SEC.NCWithout cooling coil
FRFCF/43211/GA/2500
2 Dust Scrubber Tank H1-1SBT041 495 1000 X 1500 FRFCF/43211/GA/2509 SS-304L ASME SEC. III DIV.1,SUB SEC.NC
With cooling coiland jacket
FRFCF/43211/GA/2509
3 Melter Condensate Tank H1-1TK042 250 800 X 830 FRFCF/43211/GA/2501 SS-304L ASME SEC. III DIV.1,SUB SEC.NC
With cooling coil FRFCF/43211/GA/2501
4 MOG Scrubber Tank-1 H1-1SBT051 710 1200 X 1800 FRFCF/43211/GA/2504 SS-304L ASME SEC. III DIV.1,SUB SEC.NC
With cooling coil FRFCF/43211/GA/2504
5 MOG Scrubber Tank-2 H1-1SBT052 710 1200 X 1800 FRFCF/43211/GA/2506 SS-304L ASME SEC. III DIV.1,SUB SEC.NC
With cooling coil FRFCF/43211/GA/2504
6 First Stage Air Lift Pot for Melter Feed Tank H1-1ALP001 36 300 X 369 FRFCF/43211/GA/2502
(Sht 1 of 3) SS-304L ASME SEC. III
DIV.1,SUB SEC.NCWithout cooling coil
FRFCF/43211/GA/2502
7 Second Stage Air Lift Pot for Melter Feed Tank H1-1ALP002 18 200 X 272 FRFCF/43211/GA/2503
(Sht 1 of 2) SS-304L ASME SEC. III
DIV.1,SUB SEC.NCWithout cooling coil
FRFCF/43211/GA/2503
8 Second Stage Air Lift Pot for Melter Feed Tank H1-1ALP003 18 200 X 272 FRFCF/43211/GA/2503
(Sht 1 of 2) SS-304L ASME SEC. III
DIV.1,SUB SEC.NCWithout cooling coil
FRFCF/43211/GA/2503
9 Second Stage Air Lift Pot for Melter Feed Tank H1-1ALP004 18 200 X 272 FRFCF/43211/GA/2503
(Sht 1 of 2) SS-304L ASME SEC. III
DIV.1,SUB SEC.NCWithout cooling coil
FRFCF/43211/GA/2503
10 Second Stage Air Lift Pot for Melter Feed Tank H1-1ALP005 18 200 X 272 FRFCF/43211/GA/2503
(Sht 1 of 2)SS-304L ASME SEC. III
DIV.1,SUB SEC.NCWithout cooling coil
FRFCF/43211/GA/2503
11 First Stage Air Lift Pot for Dust Scrubber Tank H1-1ALP006 36 200X 272 FRFCF/43211/GA/2502
(Sht 3 of 3) SS-304L ASME SEC. III
DIV.1,SUB SEC.NCWithout cooling coil
FRFCF/43211/GA/2502
12 Second Stage Air Lift Pot for Dust Scrubber Tank H1-1ALP007 18 200 X 272 FRFCF/43211/GA/1511 SS-304L ASME SEC. III
DIV.1,SUB SEC.NCWithout cooling coil
FRFCF/43211/GA/2503
13 Second Stage Air Lift Pot for Dust Scrubber Tank H1-1ALP008 18 200 X 272 FRFCF/43211/GA/2503
(Sht 2 of 2) SS-304L ASME SEC. III
DIV.1,SUB SEC.NCWithout cooling coil
FRFCF/43211/GA/2503
14 Second Stage Air Lift Pot for Dust Scrubber Tank H1-1ALP009 18 200 X 272 FRFCF/43211/GA/2503
(Sht 2 of 2) SS-304L ASME SEC. III
DIV.1,SUB SEC.NCWithout cooling coil
FRFCF/43211/GA/2503
15 First Stage Air Lift Pot for H1-1ALP010 36 300 X 369 FRFCF/43211/GA/2502 SS-304L ASME SEC. III Without cooling FRFCF/43211/GA/2502
6
Melter Feed Tank (Sht 2 of 3) DIV.1,SUB SEC.NC coil
16 First Stage Air Lift Pot for Dust Scrubber Tank H1-1ALP011 36 300 X 369 FRFCF/43211/GA/1508 SS-304L ASME SEC. III
DIV.1,SUB SEC.NCWithout cooling coil
FRFCF/43211/GA/2502
17 First Stage Air Lift Pot for MOG Scrubber Tank-1 H1-1ALP021 36 300 X 369 FRFCF/43211/GA/1513 SS-304L ASME SEC. III
DIV.1,SUB SEC.NCWithout cooling coil
FRFCF/43211/GA/2502
18 Second Stage Air Lift Pot for MOG Scrubber Tank-1 H1-1ALP022 18 200 X 272 FRFCF/43211/GA/2505 SS-304L ASME SEC. III
DIV.1,SUB SEC.NCWithout cooling coil
FRFCF/43211/GA/2503
19 First Stage Air Lift Pot for MOG Scrubber Tank-2 H1-1ALP023 36 300 X 369 FRFCF/43211/GA/1513 SS-304L ASME SEC. III
DIV.1,SUB SEC.NCWithout cooling coil
FRFCF/43211/GA/2502
20 Second Stage Air Lift Pot for MOG Scrubber Tank-2 H1-1ALP024 18 200 X 272 FRFCF/43211/GA/2507 SS-304L ASME SEC. III
DIV.1,SUB SEC.NCWithout cooling coil
FRFCF/43211/GA/2503
21 UG HLW Tank UH1-1TK001 2200 1600 X 3800 FRFCF/43100/GA/2502 Sht 1 and 2
SS-304L ASME SEC. III DIV.1,SUB SEC.NC
With cooling coil FRFCF/43100/GA/2503
22 UG Condensate/Scrub Sol/Misc.tank UH1-1TK002 2200 1600 X 3800 FRFCF/43100/GA/2503
Sht 1 and 2 SS-304L ASME SEC. III
DIV.1,SUB SEC.NCWith cooling coil FRFCF/43100/GA/2503
23 MOG Scrubber 1 H1-1SCR002 225 350 X 3550 FRFCF/43294/GA/2500 Sht 1 of 2
SS-304L ASME SEC. III DIV.1,SUB SEC.NC
Scrubber with pall ring packing
FRFCF/43294/GA/2500
24 MOG Scrubber 2 H1-1SCR003 225 350 X 3550 FRFCF/43294/GA/2500 Sht 2 of 2
SS-304L ASME SEC. III DIV.1,SUB SEC.NC
Scrubber with pall ring packing
FRFCF/43294/GA/2500
25 Dust Scrubber H1-2SCR001 130 271 X 2291 FRFCF/43294/GA/2501 (Sht 1 & 2)
SS-304L ASME SEC. III DIV.1,SUB SEC.NC
Without cooling coil
FRFCF/43294/GA/2501
26 W&DC Tank H1-3SMP027 400 700 X 2350 FRFCF/43216/GA/1500 SS-304L ASME SEC. III DIV.1,SUB SEC.NC
Without cooling coil
FRFCF/43216/GA/1500
HLW Off gas system
27 De-mister H1-1DER001 210 (500X600)X800
FRFCF/43297/GA/2512 SS-304L ASME SEC. III DIV.1,SUB SEC.NC
Without cooling coil
FRFCF/43297/GA/2512
B)HL Bay-2 1 Melter Feed Tank H2-1TK061 160 450 X 1800 FRFCF/43211/GA/2500 SS-304L ASME SEC. III
DIV.1,SUB SEC.NCWithout cooling coil
FRFCF/43211/GA/2500
2 Dust Scrubber Tank H2-1SBT061 495 1000 X 1500 FRFCF/43211/GA/2509 SS-304L ASME SEC. III DIV.1,SUB SEC.NC
With cooling coiland jacket
FRFCF/43211/GA/2509
3 Condensate Tank H2-1TK062 250 800 X 830 FRFCF/43211/GA/2501 SS-304L ASME SEC. III DIV.1,SUB SEC.NC
With cooling coil FRFCF/43211/GA/2501
4 MOG Scrubber Tank-1 H2-1SBT071 710 1200 X 1800 FRFCF/43211/GA/2504 SS-304L ASME SEC. III DIV.1,SUB SEC.NC
With cooling coil FRFCF/43211/GA/2504
7
5 MOG Scrubber Tank-2 H2-1SBT072 710 1200 X 1800 FRFCF/43211/GA/2506 SS-304L ASME SEC. III DIV.1,SUB SEC.NC
With cooling coil FRFCF/43211/GA/2504
6 First Stage Air Lift Pot for Melter Feed Tank H2-1ALP031 36 300 X 369 FRFCF/43211/GA/2502
(Sht 1 of 3) SS-304L ASME SEC. III
DIV.1,SUB SEC.NCWithout cooling coil
FRFCF/43211/GA/2502
7 Second Stage Air Lift Pot for Melter Feed Tank H2-1ALP032 18 200 X 272 FRFCF/43211/GA/2503
(Sht 1 of 2) SS-304L ASME SEC. III
DIV.1,SUB SEC.NCWithout cooling coil
FRFCF/43211/GA/2503
8 Second Stage Air Lift Pot for Melter Feed Tank H2-1ALP033 18 200 X 272 FRFCF/43211/GA/2503
(Sht 1 of 2) SS-304L ASME SEC. III
DIV.1,SUB SEC.NCWithout cooling coil
FRFCF/43211/GA/2503
9 Second Stage Air Lift Pot for Melter Feed Tank H2-1ALP034 18 200 X 272 FRFCF/43211/GA/2503
(Sht 1 of 2) SS-304L ASME SEC. III
DIV.1,SUB SEC.NCWithout cooling coil
FRFCF/43211/GA/2503
10 Second Stage Air Lift Pot for Melter Feed Tank H2-1ALP035 18 200 X 272 FRFCF/43211/GA/2503
(Sht 1 of 2) SS-304L ASME SEC. III
DIV.1,SUB SEC.NCWithout cooling coil
FRFCF/43211/GA/2503
11 First Stage Air Lift Pot for Dust Scrubber Tank H2-1ALP036 36 300 X 369 FRFCF/43211/GA/2502
(Sht 3 of 3) SS-304L ASME SEC. III
DIV.1,SUB SEC.NCWithout cooling coil
FRFCF/43211/GA/2502
12 Second Stage Air Lift Pot for Dust Scrubber Tank H2-1ALP037 18 200 X 272 FRFCF/43211/GA/1511 SS-304L ASME SEC. III
DIV.1,SUB SEC.NCWithout cooling coil
FRFCF/43211/GA/2503
13 Second Stage Air Lift Pot for Dust Scrubber Tank H2-1ALP038 18 200 X 272 FRFCF/43211/GA/2503
(Sht 2 of 2) SS-304L ASME SEC. III
DIV.1,SUB SEC.NCWithout cooling coil
FRFCF/43211/GA/2503
14 Second Stage Air Lift Pot for Dust Scrubber Tank H2-1ALP039 18 200 X 272 FRFCF/43211/GA/2503
(Sht 2 of 2) SS-304L ASME SEC. III
DIV.1,SUB SEC.NCWithout cooling coil
FRFCF/43211/GA/2503
15 First Stage Air Lift Pot for Melter Feed Tank H2-1ALP040 36 300 X 369 FRFCF/43211/GA/2502
(Sht 2 of 3) SS-304L ASME SEC. III
DIV.1,SUB SEC.NCWithout cooling coil
FRFCF/43211/GA/2502
16 First Stage Air Lift Pot for Dust Scrubber Tank H2-1ALP041 36 300 X 369 FRFCF/43211/GA/1508 SS-304L ASME SEC. III
DIV.1,SUB SEC.NCWithout cooling coil
FRFCF/43211/GA/2502
17 First Stage Air Lift Pot for MOG Scrubber Tank-1 H2-1ALP051 36 300 X 369 FRFCF/43211/GA/1513 SS-304L ASME SEC. III
DIV.1,SUB SEC.NCWithout cooling coil
FRFCF/43211/GA/2502
18 Second Stage Air Lift Pot for MOG Scrubber Tank-1 H2-1ALP052 18 200 X 272 FRFCF/43211/GA/2505 SS-304L ASME SEC. III
DIV.1,SUB SEC.NCWithout cooling coil
FRFCF/43211/GA/2503
19 First Stage Air Lift Pot for MOG Scrubber Tank-2 H2-1ALP053 36 300 X 369 FRFCF/43211/GA/1513 SS-304L ASME SEC. III
DIV.1,SUB SEC.NCWithout cooling coil
FRFCF/43211/GA/2502
20 Second Stage Air Lift Pot for MOG Scrubber Tank-2 H2-1ALP054 18 200 X 272 FRFCF/43211/GA/2507 SS-304L ASME SEC. III
DIV.1,SUB SEC.NCWithout cooling coil
FRFCF/43211/GA/2503
21 UG HLW tank UH2-1TK011 2200 1600 X 3800 FRFCF/43100/GA/2504 Sht 1 and 2
SS-304L ASME SEC. III DIV.1,SUB SEC.NC
With cooling coil FRFCF/43100/GA/2503
22 UG Condensate/Scrub Sol/Misc.tank UH2-1TK012 2200 1600 X 3800 FRFCF/43100/GA/2505 SS-304L ASME SEC. III
DIV.1,SUB SEC.NCWith cooling coil FRFCF/43100/GA/2503
23 MOG Scrubber 1 H2-1SCR012 225 350 X 3550 FRFCF/43294/GA/2500 SS-304L ASME SEC. III With pall ring FRFCF/43294/GA/2500
8
Sht 1 of 2 DIV.1,SUB SEC.NC packing
24 MOG Scrubber 2 H2-1SCR013 225 350 X 3550 FRFCF/43294/GA/2500 Sht 2 of 2
SS-304L ASME SEC. III DIV.1,SUB SEC.NC
With pall ring packing
FRFCF/43294/GA/2500
25 Dust Scrubber H2-2SCR011 130 271 X 2291 FRFCF/43294/GA/2501 SS-304L ASME SEC. III DIV.1,SUB SEC.NC
Without cooling coil
FRFCF/43294/GA/2501
26 Annulus Drain tank UH2-1TK013
95 500 X 750 FRFCF/43100/GA/2501 (Sht 1 & 2)
SS-304L ASME SEC. III DIV.1,SUB SEC.NC
Without cooling coil
FRFCF/43211/GA/2500
27 W&DC Tank H2-3SMP042 400 700 X 2350 FRFCF/43216/GA/1500 SS-304L ASME SEC. III DIV.1,SUB SEC.NC
Without cooling coil
FRFCF/43216/GA/1500
Off gas system
28 De-mister H2-1DER004 210 (500X600)X800
FRFCF/43297/GA/2512 SS-304L ASME SEC. III DIV.1,SUB SEC.NC
Without cooling coil
FRFCF/43297/GA/2512
Sl. No.
Equipment Tag No weight Size D X H (all in mm)
Applicable Drawing No.
MOC Applicable Design
&Fab.Code
Remarks Reference Drawing in tender
portal
C) HL Bay-3 1 Melter Feed Tank H3-1TK081 160 450 X 1800 FRFCF/43211/GA/2500 SS-304L ASME SEC. III
DIV.1,SUB SEC.NCWithout cooling coil
FRFCF/43211/GA/2500
2 Dust Scrubber Tank H3-1SBT081 495 1000 X 1500 FRFCF/43211/GA/2509 SS-304L ASME SEC. III DIV.1,SUB SEC.NC
With cooling coiland jacket
FRFCF/43211/GA/2509
3 Condensate Tank H3-1TK082 250 800 X 830 FRFCF/43211/GA/2501 SS-304L ASME SEC. III DIV.1,SUB SEC.NC
With cooling coil FRFCF/43211/GA/2501
4 MOG Scrubber Tank-1 H3-1SBT091 710 1200 X 1800 FRFCF/43211/GA/2504 SS-304L ASME SEC. III DIV.1,SUB SEC.NC
With cooling coil FRFCF/43211/GA/2504
5 MOG Scrubber Tank-2 H3-1SBT092 710 1200 X 1800 FRFCF/43211/GA/2506 SS-304L ASME SEC. III DIV.1,SUB SEC.NC
With cooling coil FRFCF/43211/GA/2504
6 First Stage Air Lift Pot for Melter Feed Tank H3-1ALP061 36 300 X 369 FRFCF/43211/GA/2502
(Sht 1 of 3)SS-304L ASME SEC. III
DIV.1,SUB SEC.NCWithout cooling coil
FRFCF/43211/GA/2502
7 Second Stage Air Lift Pot for Melter Feed Tank H3-1ALP062 18 200 X 272 FRFCF/43211/GA/2503
(Sht 1 of 2) SS-304L ASME SEC. III
DIV.1,SUB SEC.NCWithout cooling coil
FRFCF/43211/GA/2503
8 Second Stage Air Lift Pot for Melter Feed Tank H3-1ALP063 18 200 X 272 FRFCF/43211/GA/2503
(Sht 1 of 2) SS-304L ASME SEC. III
DIV.1,SUB SEC.NCWithout cooling coil
FRFCF/43211/GA/2503
9
9 Second Stage Air Lift Pot for Melter Feed Tank H3-1ALP064 18 200 X 272 FRFCF/43211/GA/2503
(Sht 1 of 2) SS-304L ASME SEC. III
DIV.1,SUB SEC.NCWithout cooling coil
FRFCF/43211/GA/2503
10 Second Stage Air Lift Pot for Melter Feed Tank H3-1ALP065 18 200 X 272 FRFCF/43211/GA/2503
(Sht 1 of 2) SS-304L ASME SEC. III
DIV.1,SUB SEC.NCWithout cooling coil
FRFCF/43211/GA/2503
11 First Stage Air Lift Pot for Dust Scrubber Tank H3-1ALP066 36 200 X 272 FRFCF/43211/GA/2502
(Sht 3 of 3) SS-304L ASME SEC. III
DIV.1,SUB SEC.NCWithout cooling coil
FRFCF/43211/GA/2502
12 Second Stage Air Lift Pot for Dust Scrubber Tank H3-1ALP067 18 200 X 272 FRFCF/43211/GA/1511 SS-304L ASME SEC. III
DIV.1,SUB SEC.NCWithout cooling coil
FRFCF/43211/GA/2503
13 Second Stage Air Lift Pot for Dust Scrubber Tank H3-1ALP068 18 200 X 272 FRFCF/43211/GA/2503
(Sht 2 of 2)SS-304L ASME SEC. III
DIV.1,SUB SEC.NCWithout cooling coil
FRFCF/43211/GA/2503
14 Second Stage Air Lift Pot for Dust Scrubber Tank H3-1ALP069 18 200 X 272 FRFCF/43211/GA/2503
(Sht 2 of 2) SS-304L ASME SEC. III
DIV.1,SUB SEC.NCWithout cooling coil
FRFCF/43211/GA/2503
15 First Stage Air Lift Pot for Melter Feed Tank H3-1ALP070 36 300 X 369 FRFCF/43211/GA/2502
(Sht 2 of 3) SS-304L ASME SEC. III
DIV.1,SUB SEC.NCWithout cooling coil
FRFCF/43211/GA/2502
16 First Stage Air Lift Pot for Dust Scrubber Tank H3-1ALP071 36 300 X 369 FRFCF/43211/GA/1508 SS-304L ASME SEC. III
DIV.1,SUB SEC.NCWithout cooling coil
FRFCF/43211/GA/2502
17 First Stage Air Lift Pot for MOG Scrubber Tank-1 H3-1ALP081 36 300 X 369 FRFCF/43211/GA/1513 SS-304L ASME SEC. III
DIV.1,SUB SEC.NCWithout cooling coil
FRFCF/43211/GA/2502
18 Second Stage Air Lift Pot for MOG Scrubber Tank-1 H3-1ALP082 18 200 X 272 FRFCF/43211/GA/2505 SS-304L ASME SEC. III
DIV.1,SUB SEC.NCWithout cooling coil
FRFCF/43211/GA/2503
19 First Stage Air Lift Pot for MOG Scrubber Tank-2 H3-1ALP083 36 300 X 369 FRFCF/43211/GA/1513 SS-304L ASME SEC. III
DIV.1,SUB SEC.NCWithout cooling coil
FRFCF/43211/GA/2502
20 Second Stage Air Lift Pot for MOG Scrubber Tank-2 H3-1ALP084 18 200 X 272 FRFCF/43211/GA/2507 SS-304L ASME SEC. III
DIV.1,SUB SEC.NCWithout cooling coil
FRFCF/43211/GA/2503
21 UG HLW tank UH3-1TK021 2200 1600 X 3800 FRFCF/43100/GA/2506 Sht 1 and 2
SS-304L ASME SEC. III DIV.1,SUB SEC.NC
With cooling coil FRFCF/43100/GA/2503
22 UG Condensate/Scrub Sol/Misc.tank UH3-1TK022 2200 1600 X 3800 FRFCF/43100/GA/2507
Sht 1 and 2 SS-304L ASME SEC. III
DIV.1,SUB SEC.NCWith cooling coil FRFCF/43100/GA/2503
23 MOG Scrubber 1 H3-1SCR022 225 350 X 3550 FRFCF/43294/GA/2500 Sht 1 of 2
SS-304L ASME SEC. III DIV.1,SUB SEC.NC
Scrubber with pall ring packing
FRFCF/43294/GA/2500
24 MOG Scrubber 2 H3-1SCR023 225 350 X 3550 FRFCF/43294/GA/2500 Sht 2 of 2
SS-304L ASME SEC. III DIV.1,SUB SEC.NC
Scrubber with pall ring packing
FRFCF/43294/GA/2500
25 Dust Scrubber H3-2SCR021 130 271 X 2291 FRFCF/43294/GA/2501 SS-304L ASME SEC. III DIV.1,SUB SEC.NC
With cooling coil FRFCF/43294/GA/2501
26 W&DC Tank H3-3SMP057 400 700 X 2350 FRFCF/43216/GA/1500 SS-304L ASME SEC. III DIV.1,SUB SEC.NC
Without cooling coil
FRFCF/43216/GA/1500
Off gas system
10
27 De-mister H3-1DER007 210 (500X600)X800 FRFCF/43297/GA/2512 SS-304L ASME SEC. III DIV.1,SUB SEC.NC
Without cooling coil
FRFCF/43297/GA/2512
2. ILW SYSTEM : Sl. No. Equipment Tag No. Total
Empty weight (Kg)
Size D X H (all in mm)
Applicable Drawing No.
MOC Applicable Design
&Fab.Code
Remarks Reference Drawing in tender portal
A) ILW tank
1 IX feed tank 1 IL1TK101 490 1000 X 1500 FRFCF/43311/GA/2500 SS-304L ASME SEC. III DIV.1,SUBSEC.NC
Without cooling coil
FRFCF/43311/GA/2500
2 IX feed tank 2 IL1TK102 490 1000 X 1500 FRFCF/43311/GA/2501 SS-304L ASME SEC. III DIV.1,SUB
SEC.NC
Without cooling coil
FRFCF/43311/GA/2500
3 Eluate collection tank
IL1TK103 490 1000 X 1500 FRFCF/43311/GA/2502 SS-304L ASME SEC. III DIV.1,SUB
SEC.NC
Without cooling coil
FRFCF/43311/GA/2500
4 Regenerant collection tank
IL1TK104 490 1000 X 1500 FRFCF/43311/GA/2503 SS-304L ASME SEC. III DIV.1,SUB
SEC.NC
Without cooling coil
FRFCF/43311/GA/2500
5 Monitoring tank 1 IL1TK105 490 1000 X 1500 FRFCF/43311/GA/2504 SS-304L ASME SEC. III DIV.1,SUB
SEC.NC
Without cooling coil
FRFCF/43311/GA/2500
6 Monitoring tank 2 IL1TK106 490 1000 X 1500 FRFCF/43311/GA/2505 SS-304L ASME SEC. III DIV.1,SUB
SEC.NC
Without cooling coil
FRFCF/43311/GA/2500
7 Precipitation tank 1 IL1TK121 710 1250 X 2000 FRFCF/43311/GA/2506 SS-304L ASME SEC. III DIV.1,SUB
SEC.NC
Without cooling coil
FRFCF/43311/GA/2507
8 Precipitation tank 2 IL1TK122 710 1250 X 2000 FRFCF/43311/GA/2507 SS-304L ASME SEC. III DIV.1,SUB
SEC.NC
Without cooling coil
FRFCF/43311/GA/2507
9 Precipitation tank 3 IL1TK123 710 1250 X 2000 FRFCF/43311/GA/2508 SS-304L ASME SEC. III DIV.1,SUB
SEC.NC
Without cooling coil
FRFCF/43311/GA/2507
10 Precipitation tank 4 IL1TK124 710 1250 X 2000 FRFCF/43311/GA/2509 SS-304L ASME SEC. III DIV.1,SUB
Without cooling
FRFCF/43311/GA/2507
11
SEC.NC coil
11 Sludge tank 1 IL1TK125 250 900 X 1000 FRFCF/43311/GA/2510 SS-304L ASME SEC. III DIV.1,SUB
SEC.NC
Without cooling coil
FRFCF/43311/GA/2500
12 Sludge tank 2 IL1TK126 250 900 X 1000 FRFCF/43311/GA/2511 SS-304L ASME SEC. III DIV.1,SUB
SEC.NC
Without cooling coil
FRFCF/43311/GA/2500
13 Supernatant tank 1 IL1TK127 800 1250 X 2000 FRFCF/43311/GA/2512 SS-304L ASME SEC. III DIV.1,SUB
SEC.NC
Without cooling coil
FRFCF/43311/GA/2507
14 Supernatant tank 2 IL1TK128 800 1250 X 2000 FRFCF/43311/GA/2513 SS-304L ASME SEC. III DIV.1,SUB
SEC.NC
Without cooling coil
FRFCF/43311/GA/2507
15 UG ILW alkaline tank
UILTK031 1910 1650 X 3000 FRFCF/43100/GA/2508 SS-304L ASME SEC. III DIV.1,SUB
SEC.NC
Without cooling coil
FRFCF/43100/GA/2503
16 UG ILW acidic tank
UILTK032 1910 1650 X 3000 FRFCF/43100/GA/2509 SS-304L ASME SEC. III DIV.1,SUB
SEC.NC
Without cooling coil
FRFCF/43100/GA/2503
17 UG ILW drain tank UILTK038 100 500x750 FRFCF/43100/GA/2513 SS-304L ASME SEC. III DIV.1,SUB
SEC.NC
Without cooling coil
FRFCF/43100/GA/2503
2) ILW IX column & filters
18 IX RF column 1 IL1IX001 60 399 X 1038 FRFCF/43324/GA/2500 SS-304L ASME SEC. III DIV.1,SUB
SEC.NC
Without cooling coil
FRFCF/43324/GA/2500
19 IX RF column 2 IL1IX002 60 399 X 1038 FRFCF/43324/GA/2500 SS-304L ASME SEC. III DIV.1,SUB
SEC.NC
Without cooling coil
FRFCF/43324/GA/2500
20 IX IDA column 3 IL1IX003 60 399 X 1038 FRFCF/43324/GA/2500 SS-304L ASME SEC. III DIV.1,SUB
SEC.NC
Without cooling coil
FRFCF/43324/GA/2500
21 IX IDA column 4 IL1IX004 60 399 X 1038 FRFCF/43324/GA/2500 SS-304L ASME SEC. III DIV.1,SUB
SEC.NC
Without cooling coil
FRFCF/43324/GA/2500
22 Pre-filter IL1FLT031 30 399 X 1038 FRFCF/43326/GA/2500 SS-304L ASME SEC. III DIV.1,SUB
Without cooling
FRFCF/43326/GA/2500
12
SEC.NC coil
23 Resin trap filter IL1RET031 30 160X700 FRFCF/43326/GA/2500 SS-304L ASME SEC. III DIV.1,SUB
SEC.NC
Without cooling coil
FRFCF/43324/GA/2500
Sl. No. Equipment Tag No. Total Empty weight (Kg)
Size D X H (all in mm)
Applicable Drawing No.
MOC Applicable Design
&Fab.Code
Remarks
4) OLW tank
1 UG OLW tank-1 UOLTK033 1910 1650 X 3000 FRFCF/43100/GA/2510 SS-304L ASME SEC. III DIV.1,SUB
SEC.NC
Without cooling coil
FRFCF/43100/GA/2503
2 UG OLW tank-2 UOLTK034 1910 1650 X 3000 FRFCF/43100/GA/2511 SS-304L ASME SEC. III DIV.1,SUB
SEC.NC
Without cooling coil
FRFCF/43100/GA/2503
3 UG OLW misc. Tank
UOLTK035 1910 1650 X 3000 FRFCF/43100/GA/2512 SS-304L ASME SEC. III DIV.1,SUB
SEC.NC
Without cooling coil
FRFCF/43100/GA/2503
4 OLW receiving cum wash tank
OLTK141 850 1500 X 1500 FRFCF/43511/GA/2500 SS-304L ASME SEC. III DIV.1,SUB
SEC.NC
Without cooling coil
FRFCF/43311/GA/2500
5 OLW separation tank
OLTK143 445 1000 X 1200 FRFCF/43511/GA/2501 SS-304L ASME SEC. III DIV.1,SUB
SEC.NC
Without cooling coil
FRFCF/43311/GA/2507
6 OLW aqueous phase tank
OLTK145 250 900 X 1000 FRFCF/43511/GA/2502 SS-304L ASME SEC. III DIV.1,SUB
SEC.NC
Without cooling coil
FRFCF/43311/GA/2500
7 Do-decane collection tank
OLTK146 370 1000 X 1500 FRFCF/43511/GA/2503 SS-304L ASME SEC. III DIV.1,SUB
SEC.NC
Without cooling coil
FRFCF/43311/GA/2500
8 OLW batching tank OLTK144 100 500x800 FRFCF/43511/GA/2510 SS-304L ASME SEC. III DIV.1,SUB
SEC.NC
Without cooling coil
FRFCF/43311/GA/2500
9 Na- DBP tank OLTK149 260 800 X 1400 FRFCF/43511/GA/2504 SS-304L ASME SEC. III DIV.1,SUB
SEC.NC
Without cooling coil
FRFCF/43311/GA/2500
13
10 OLW reactor1 OLRAR001 760 950 X 1200 FRFCF/43511/GA/2515 SS-304L ASME SEC. III DIV.1,SUB
SEC.NC
With cooling coil and agitator and outer jacket
FRFCF/43511/GA/2514
11 OLW reactor-2 OLRAR002 760 950 X 1200 FRFCF/43511/GA/2516 SS-304L ASME SEC. III DIV.1,SUB
SEC.NC
With cooling coil and agitator and outer jacket
FRFCF/43511/GA/2514
12 OLW reactor-3 OLRAR003 760 950 X 1200 FRFCF/43511/GA/2517 SS-304L ASME SEC. III DIV.1,SUB
SEC.NC
With cooling coil and agitator and outer jacket
FRFCF/43511/GA/2514
13 OLW evaporator OLRAR004 760 950 X 1200 FRFCF/43511/GA/2514 SS-304L ASME SEC. III DIV.1,SUB
SEC.NC
With cooling coil and agitator and outer jacket
FRFCF/43511/GA/2514
14 VOG Scrubber Tank
OLSBT141 720 1000x1500 FRFCF/43511/GA/2520 SS-304L ASME SEC. III DIV.1,SUB
SEC.NC
Without cooling coil
FRFCF/43311/GA/2500
15 Carbonate Waste Tank
OLTK142 720 1000x1500 FRFCF/43511/GA/2521 SS-304L ASME SEC. III DIV.1,SUB
SEC.NC
Without cooling coil
FRFCF/43311/GA/2500
16 Middle Phase Tank OLTK148 720 1000x1500 FRFCF/43511/GA/2522 SS-304L ASME SEC. III DIV.1,SUB
SEC.NC
Without cooling coil
FRFCF/43311/GA/2500
17 First stage Airlift OLALP091 36 300 X 369 FRFCF/43511/GA/2523 SS-304L ASME SEC. III Without FRFCF/43211/GA/2502
14
pot-1 DIV.1,SUB SEC.NC
cooling coil
18 First stage Airlift pot-2
OLALP094 36 300 X 369 FRFCF/43511/GA/2523 SS-304L ASME SEC. III DIV.1,SUB
SEC.NC
Without cooling coil
FRFCF/43211/GA/2502
19 First stage Airlift pot-3
OLALP092 36 300 X 369 FRFCF/43511/GA/2523 SS-304L ASME SEC. III DIV.1,SUB
SEC.NC
Without cooling coil
FRFCF/43211/GA/2502
20 First stage Airlift pot-4
OLALP096 36 300 X 369 FRFCF/43511/GA/2523 SS-304L ASME SEC. III DIV.1,SUB
SEC.NC
Without cooling coil
FRFCF/43211/GA/2502
21 Second stage Airlift pot-1
OLALP095 18 200 X 272 FRFCF/43511/GA/2524 SS-304L ASME SEC. III DIV.1,SUB
SEC.NC
Without cooling coil
FRFCF/43211/GA/2503
22 Second stage Airlift pot-2
OLALP093 18 200 X 272 FRFCF/43511/GA/2524 SS-304L ASME SEC. III DIV.1,SUB
SEC.NC
Without cooling coil
FRFCF/43211/GA/2503
23 Second stage Airlift pot-3
OLALP097 18 200 X 272 FRFCF/43511/GA/2524 SS-304L ASME SEC. III DIV.1,SUB
SEC.NC
Without cooling coil
FRFCF/43211/GA/2503
ILW & OLW VOG EQUIPMENTS
24 OLW VOG scrubber
OLSCR031 300 350X3730 FRFCF/43511/GA/2513 SS-304L ASME SEC. III DIV.1,SUB
SEC.NC
With pall ring packing
FRFCF/43311/GA/2500
25 OLW VOG De-mister
OLDER011 210 (500x600)x800 (rectangular)
FRFCF/43597/GA/2512 SS-304L ASME SEC. III DIV.1,SUB
SEC.NC
Without cooling coil
FRFCF/43297/GA/2512
15
6) HULL COMPACTION BLOCK EQUIPMENTS
Sl. No. Equipment Tag No. Total Empty weight (Kg)
Size D X H (all in mm)
Applicable Drawing No.
MOC Applicable Design
&Fab.Code
Remarks
1 Scrubber/Condensate tank
HCSBT011 750 1000 x 1500
FRFCF/43611/GA/2511 SS-304L ASME SEC. III DIV.1,SUB
SEC.NC
Without cooling coil
FRFCF/43311/GA/2500
2 VOG Scrubber HCSCR013 300 350X3730
FRFCF/43611/GA/2513 SS-304L ASME SEC. III DIV.1,SUB
SEC.NC
With pall ring packing
FRFCF/43294/GA/2500
3 First stage Airlift pot HCALP014 36 300 X 369
FRFCF/43611/GA/2514 SS-304L ASME SEC. III DIV.1,SUB
SEC.NC
Without cooling coil
FRFCF/43211/GA/2502
4 Second stage Airlift pot
HCALP015 18 200 X 272
FRFCF/43611/GA/2515 SS-304L ASME SEC. III DIV.1,SUB
SEC.NC
Without cooling coil
FRFCF/43211/GA/2503
5 DC Tank-2 Nos (HCB & ASF)
400 (each)
700 X 2350
FRFCF-43611-GA-2516-R-0
SS-304L ASME SEC. III DIV.1,SUB
SEC.NC
Without cooling coil
FRFCF/43216/GA/1500
HCB VOG EQUIPMENTS 6 HC VOG De-mister HCD
ER011
210 (500x600)x800 (rectangular)
FRFCF/43697/GA/2512 SS-304L ASME SEC. III DIV.1,SUB
SEC.NC
Without cooling coil
FRFCF/43297/GA/2512
7) OTHER RELEVANT DRAWINGS S.No Eqpt. Name Applicable Drawing No. No. of drgs 1 TYP.NOZZLES & WELD
DETAILS FRFCF/43511/NZ/2500/0001 1
16
APPENDIX – C: LIST OF NEW DRAWINGS UPLOADED
Sl no Drawing title Drawing number 1 Tender Drawing for First Stage Air Lift Pot of melter feed
tank FRFCF/43211/GA/2502
2 Tender drawing for second stage air lift pot to melter feed tank from dust scrubber
FRFCF/43211/GA/2503
3 Tender Drawing for DC tank FRFCF/43216/GA/1500
4 Tender Drawing for Demister of HLW FRFCF/43297/GA/2512
5 Tender Drawing for Dust Scrubber tank of HLW system FRFCF/43211/GA/2509
6 Tender Drawing for Dust Scrubber of HLW Bays 1,2&3 FRFCF/43294/GA/2501
7 Tender Drawing for UG ILW Alkaline Tank FRFCF/43100/GA/2508
8 Tender Drawing for Precipitation Tank-2 FRFCF/43311/GA/2507
9 ILW Pre-Filter & Resin trap Column (ILRET031 & ILFLT031)
FRFCF/43326/GA/2500
10 Tender Drawing for MOG Scrubber Tank -1 of HLW System FRFCF/43211/GA/2504
11 Tender Drawing for UG Condensate/Scrub Solution/Misc. Tank of HLW Bay-1
FRFCF/43100/GA/2503
12 ION EXCHANGE COLUMN FRFCF-43324-GA-2500
13 Tender Drawing for IX Feed Tank FRFCF-43311-GA-2500
14 NOZZLE DETAILS FRFCF/43511/NZ/2500/0001