NPOESS Status Andrew Heidinger, VIIRS OAT co-chair and Jeff Key NOAA/NESDIS/Office of Research and Applications Madison, Wisconsin July 27, 2006. Baseline NPOESS Products (aka EDRs) pre Nunn-McCurdy. Nunn-McCurdy Impacts on NPOESS. The NPOESS budget went from $ 6.5B to $11.5B - PowerPoint PPT Presentation
Citation preview
NPOESS Status
Andrew Heidinger, VIIRS OAT co-chairand
Jeff Key
NOAA/NESDIS/Office of Research and ApplicationsMadison, Wisconsin
July 27, 2006
Baseline NPOESS Products (aka EDRs) pre Nunn-McCurdy
Nunn-McCurdy Impacts on NPOESS
• The NPOESS budget went from $ 6.5B to $11.5B
• Because NPOESS is run under DOD procurement procedures, this budget overrun caused a review under the Nunn-McCurdy Act.
• Defense Department organized a comprehensive review of the program.
• Defense Department reviewers recommended:
reducing the number of satellites planned from six to four
dropping several climate sensors,
rebidding a contract for a key scientific instrument.
• The entire NPOESS contract has to be renegotiated with NGST and there may be more changes especially in the EDR generation area.
•The Integrated Program Office has also been reorganized.
Decision Drivers in Redefining NPOESS
• Continuity
• Lower Risk
• Growth Potential
• Affordability
5
Justification for Changes: Preserves Weather Forecasting Capability Improvements
• Afternoon orbit contains advanced imager and advanced sounder to enhance weather forecasting
• Reliance upon METOP in mid-morning orbit
– AVHRR vs VIIRS: preserves some imagery capability
– METOP scatterometer and advanced atmospheric sounder enhance operational weather forecasting capability in mid morning orbit
• No microwave imager/sounder on C1
– METOP scatterometer for ocean winds and waves becomes primary instrument until new imager/sounder is available on C2
• Continue reliance on DMSP (SSM/I) for ocean wind speed
Schedule Impacts: pre Nunn-McCurdy
F17
F19
F18
F20
F16
F13
M
N N’
NPP
Metop AMetop B
Metop C
C1
C2
C3
AM
mid-AM
PM
05 06 07 08 09 11 12 13 14 15 16 17 18 19 20 21 22 23 24 2510
AQUA
Metop D
C4
post Nunn-McCurdy CALENDAR YEAR
Post N-M Sensor Manifest
1730 Orbit (C2, C4) 1330 Orbit (C1, C3) 2130 OrbitVIIRS VIIRS Metopwave imager wave imager SARSAT CrIS ATMS SEM OMPS (Nadir) SARSAT A-DCS CERES (C1)
POST N-M Sensor Integration: Non-Manifested Sensors
1730 1330
TSIS SESS
SESS ERBS
ALT APS
OMPS (Limb)
Information on how these sensors can be manifested will be forthcoming.
Sensor Configuration pre Nunn-McCurdy
Sensor Configuration post Nunn-McCurdy for C1
Worst Case for C1
-wave
Post Nunn McCurdy Sensors (from IPO brief to the SUAG on 20 July 2006)
Satellite NPP C1 C2 C3 C4
Launch Sep 2009 2013 2016 2020 2022
Nodal Time 1330 1330 0530 1330 0530
VIIRS X X X X X
Microwave Imager/Sounder X X X
CrIS X X X
ATMS X X X
OMPS Nadir X X X
SEM (MEPED and TED) X X
CERES X
SARSAT X X X X
ADCS X X X X
Non-manifested (Integration only provided for specified orbit)SESS (Aurora, TPS, SEM)
NOTE: (SEM replaces MEPS, HEPS, LEPS)X X
Survivability Sensor X X X X
ERBS X
ALT X X
TSIS X X
OMPS Limb X X
APS X
Manifested
NOAA Impacts and Mitigation Strategy
• CMIS: Ocean wind speed and direction– Mitigation: Rely on MetOp and DMSP
• SEM: Space Environment Monitor (of SESS)– Mitigation: Fly POES operational SEM instrument – Maintain capability on POES
• APS: Aerosol data for air quality forecasts and role of aerosols in climate; – Mitigation: NASA still to fly first APS in this decade
• ALT: Characterization of sea surface heights; – Mitigation: Navy developing mitigation plan for altimetry
• ERBS: provides ability to understand changes in the Earth’s radiation budget – Mitigation: Fly NASA CERES research instrument on C1
• TSIS: ability to understand changes in solar irradiance– Not flown on NOAA satellites
Summary of Major N-M Impacts
• CMIS is gone but a redesigned microwave imager-sounder is planned for C2
• 21:30 NPOESS satellite is gone and DOD/DOC will rely on the European METOP (AVHRR/IASI/AMSU). NO VIIRS IN MID-AM.
• OMPS limb-sounder is gone.• NPP is delayed until 2010• C1 is delayed until 2013• C5 and C6 are gone.• NPOESS will keep space for climate sensors but will not
fund their design (similar to instruments of opportunity on the GOES satellites).
Summary
• NPOESS took a big hit in the N-M review and is a smaller program. Climate instruments may not fly (e.g., CERES, APS).
• VIIRS technical issues are being solved and it should serve the aviation community well.
• CrIS should provide improved AIRS performance in some regions and more spectral coverage.
• Unfortunately, the microwave imager is gone until at least C2 (2016)